View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19), newest first.
File Type Posted
C01 - Award Notice.docx DOCX document
36C25920R0104 P0015.docx DOCX document
Amendment 0012 - 36C25920R0104.docx DOCX document
Amendment 0011 - 36C25920R0104.docx DOCX document
Amendment 0010 - 36C25920R0104.docx DOCX document
Amendment 09 - Infrastructure Standard for Telecommunications Spaces_with OIT Design Guide Templates_1 Jul 21.pdf PDF
Amendment 09 - 18-314 Specs 20221104.pdf PDF
Amendment 09 - Sub 00004r01 Response.pdf PDF
Amendment 09 - 10-FA 18-314 Add01.pdf PDF
Amendment 09 - 03-Arch 18-314 Add01.pdf PDF
Amendment 09 - 05-FP 18-314 Add01.pdf PDF
Amendment 09 - 36C25920R0104.docx DOCX document
Amendment 09 - Submittal ID 00011r01 - Div 28 52 31 rev 1 Submittals.pdf PDF
Amendment 09 - 18-314_Addendum-01.pdf PDF
Amendment 09 - 01-Gen 18-314 Add01.pdf PDF
Amendment 09 - 09-Tech 18-314 Add01.pdf PDF
Amendment 09 - 04-IntD 18-314 Add01.pdf PDF
Amendment 09 - RFIs for MATOC Seed Project 36C25920R0104.docx DOCX document
Amendment 09 - 07-Mech 18-314 Add01.pdf PDF
Amendment 09 - 08-Elec 18-314 Add01.pdf PDF
Amendment 09 - SoilBearingInfo-ExistCondDWG_36-02-S1.pdf PDF
Amendment 09 - Interior Design Comments-221026.docx DOCX document
Amendment 09 - 02-Struct 18-314 Add01.pdf PDF
Amendment 0008 - 36C25920R0104.docx DOCX document
Amendment 0007 - 36C25920R0104.docx DOCX document
Amendment 0006 - 36C25920R0104.docx DOCX document
Amendment 0005 - 36C25920R0104.docx DOCX document
Amendment 0004 - 36C25920R0104.docx DOCX document
NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
Amendment 0003 - 36C25920R0104.docx DOCX document
S04 - Site Visit Sign-In - 10-11-22.pdf PDF
Amendment 0002 - 36C25920R0104.docx DOCX document
Amendment 0001 - 36C25920R0104.docx DOCX document
Attachment (Seed Project - NESHAP).pdf PDF
Wage Determination UT20210085.pdf PDF
Attachment (Calculation Worksheet for Self-Peformed and Subcontracted Worksheet).docx DOCX document
Attachment (RFP Letter Seed Project - Updated 1-27-22).docx DOCX document
Attachment (Pricing Schedule).docx DOCX document
Attachment (Seed Project - Combined Drawings)_Part1.pdf PDF
Attachment (Seed Project - SLCVA Bldgs 14 1 and 7 Pre-Reno Asb Rpt_signed).pdf PDF
Attachment (Past Performance Questionnaire).docx DOCX document
Attachment (Seed Project - SP01 660-18-243 SOW).docx DOCX document
Attachment (Seed Project - Combined Specs).pdf PDF
36C25920R0104_1 - 9-30-2022.docx DOCX document
Attachment (Seed Project - Combined Drawings)_Part2.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MA

MV

CO

EV

VE

AI

FOV

FOR

FOS

FP

LPG

NPW

NO

O

N

G

MPG

G

MPG

CA

CD

ACD

V

VBG

VBF

AV

AW

AW

ST

OST

GW

GW

S

W

ID

SPD

T

T

SCW

WS

140°

S

W

ST

CAP

AV

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

IS LOCATED.

ORAL EVACUATION

LABORATORY VACUUM

LABORATORY AIR

TEMPERED WATER RETURN

TEMPERED WATER SUPPLY

INDUSTRIAL AIR

LA

LV

OA

IA

TWR

TWS

FILTERED COLD WATERFCW

FUEL OIL DISCHARGEFOD

ANCHOR

CONNECTION - SIDE

ECCENTRIC REDUCER

CONNECTION - BOTTOM, 45° OR 90°

CONNECTION - TOP, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

RISE OR DROP IN PIPE

STRAINER

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

FLOOR DRAIN (FD), SIZE & TYPE

ROOF DRAIN (RD), SIZE & TYPE

FLOOR SINK (FS), SIZE & TYPE

NATURAL GAS BELOW GRADE (G)

SUMP OR SEWAGE PUMP DISCHARGE (SPD)

CONDENSATE DRAIN (CD)

INDIRECT DRAIN (ID)

NATURAL GAS (G)

NITROUS OXIDE (NO)

LIQUIFIED PETROLEUM GAS (LPG)

FIRE PROTECTION (FP)

WATER SERVICE (WS)

COMPRESSED AIR (CA)

NITROGEN (N)

MEDICAL AIR (MA)

OXYGEN (O)

DOMESTIC HOT WATER RECIRC.

SOIL PIPING - ABOVE FLOOR (S)

SOIL PIPING - BELOW FLOOR (S)

STORM DRAIN - ABOVE FLOOR (ST)

STORM DRAIN - BELOW FLOOR (ST)

ACID WASTE - ABOVE FLOOR (AW)

ACID WASTE - BELOW FLOOR (AW)

DOMESTIC COLD WATER

DOMESTIC HOT WATER

140° DOMESTIC HOT WATER (140°)

WASTE PIPING - ABOVE FLOOR (W)

WASTE PIPING - BELOW FLOOR (W)

GREASE WASTE - ABOVE FLOOR (GW)

GREASE WASTE - BELOW FLOOR (GW)

SOFTENED COLD WATER (SCW)

ACID VENT (AV)

VENT PIPING (V)

HOSE BIBB (HB)

NONFREEZE WALL HYDRANT (NW)

WALL CLEANOUT (WCO)

FLOOR CLEANOUT (FCO)

EXTERIOR CLEANOUT (ECO)

THERMOSTATIC MIXING VALVE

BACKFLOW PREVENTER

OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)

NON POTABLE WATER (NPW)

FUEL OIL SUPPLY (FOS)

FUEL OIL RETURN (FOR)

FUEL OIL VENT (FOV)

AUXILIARY CONDENSATE DRAIN (ACD)

VENT BELOW GRADE (VBG)

VENT BELOW FLOOR (VBF)

CARBON DIOXIDE (CO)

MEDICAL VACUUM (MV)

EVACUATION (EV)

MEDICAL VACUUM EXHAUST (VE)

MEDICAL AIR INTAKE (AI)

TRAP PRIMER LINE (T)

WATER METER

MEDIUM PRESSURE NATURAL GAS (MPG)

MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)

ELBOW DOWN WITH SHUT-OFF VALVE (SOV)

TEE DOWN WITH SHUT-OFF VALVE (SOV)

TEE UP WITH SHUT-OFF VALVE (SOV)

RECIRCULATION PUMP

DIRECTION OF FLOW

EXISTING PIPING TO REMAIN

EXISTING PIPING TO BE REMOVED

FLANGE CONNECTION

CLEANOUT

ELBOW DOWN

ELBOW UP

TEE DOWN

ELBOW UP WITH SHUT-OFF VALVE (SOV)

TEE UP

UNION

THERMOMETER

PRESSURE GAUGE

PRESSURE REDUCING VALVE

REDUCER

SHOWER HEADS

JANITORS SINK

DRINKING FOUNTAIN & TYPE

SHOWER

BATHTUB

TANK TYPE WATER CLOSET

COUNTER TOP LAVATORY & TYPE

WALL MOUNTED LAVATORY & TYPE

URINAL SINK & TYPE

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT

PLUMBING PLAN NOTE CALL OUT

ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT

TECHNOLOGY PLAN NOTE CALL OUT

PLUMBING EQUIPMENT DESIGNATION

MECHANICAL EQUIPMENT DESIGNATION TAG

OWNER FURNISHED, CONTRACTOR INSTALLED

EQUIPMENT DESIGNATION

NEW WORK TO EXISTING WORK CONNECTION POINT

DETAIL NUMBER

SHEET NUMBER

LIMIT OF DEMOLITION

TRAP PRIMER LINE - BELOW SLAB (T)

CO

DOUBLE EXTERIOR CLEANOUT (ECO)

CLEANOUTS

DRAINS AND TRAPS

EQUIPMENT

FITTINGS AND ACCESSORIES

SHEET NUMBER

SECTION NUMBER

JANITORS SINK - CORNER

MEDICAL GAS OUTLET (TYPE)

EXISTING TO REMAIN

A

A/E ARCHITECT / ENGINEER

AD AREA DRAIN/ACCESS DOOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASD ADJUSTABLE SPEED DRIVES

ASD AUTOMATIC SPRINKLER DRAIN

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF ECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

B

BFP REDUCED PRESSURE BACKFLOW

PREVENTER

BHP BREAK HORSEPOWER

BSP BLACK STEEL PIPE

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C

C CELSIUS

CA COMPRESSED AIR

CGA COMPRESSED GAS ASSOCIATION

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

CV CONTROL VALVE

D

DCW DOMESTIC COLD WATER

DFU DRAINAGE FIXTURE UNITS

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

E

EL ELEVATION

EMCS ENERGY MONOSERRAT

AND CENTRAL SYSTEM

EPA ENVIROMENTAL PROTECTION AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EWS/SH EYE WASH/DRENCH SHOWER

EX EXISTING

F

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FS FLOW SWITCH

FU FIXTURE UNITS

G

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H

H&CW HOT AND COLD WATER

HB HOSE BIBB

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK (DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

I

ID INSIDE DIAMETER

IE INVERT ELEVATION

ICW INDUSTRIAL COLD WATER

IHW INDUSTRIAL HOT WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

K

KW KILOWATT

KWH KILOWATT-HOUR

L

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH 1000 BTUH

MED MEDICAL

MER MECHANICAL EQUIPMENT

ROOM

MH MANHOLE

MOU MEMORANDUM OF

UNDERSTADING

MSB MOP SERVICE BASIN

MV MEDICAL VACUUM

N

N2 NITROGEN

N20 NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM. NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O

O OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

P

PA PASCAL

PD PRESSURE DROP OR DIFFERENCE

PDI PLUMBING AND DRAINAGE

INSTITUTE

PG PRESSURE GAGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH

GAGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

R

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RP RECIRCULATION PUMP

RO REVERSE OSMOSIS WATER

RWL RAIN WATER LEADER

S

SAN SANITARY SEWER

SMACNA SHEET METAL AND AIR

CONDITIONING CONTRACTORS

NATIONAL ASSOCIATION

SCFM STANDARD CUBIC FOOT/MINUTE

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SMH SANITARY MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT/SF SQUARE FEET

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

T

TCV TEMPERATURE CONTROL VALVE

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

V

V VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAGE

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

WSFU WATER SUPPLY FIXTURE UNITS

Y

YCO YARD CLEANOUT

YH YARD HYDRANT

26-P 3

PIPING SYMBOLS

ANNOTATION

XX-1

xx

X100

X100

GENERAL PLUMBING SYMBOLS

DENTAL

MEDICAL GASES

STORM

FUEL

EXISTING PIPING

WATER

WASTE

VALVE SYMBOLS

GENERAL EQUIPMENT

FLOOR MOUNTED FLUSH VALVE

WATER

CLOSET

WALL MOUNTED FLUSH VALVE

WATER

CLOSET

ETR

ABBREVIATIONS

ETR EXISTING TO REMAIN

TFA TO FLOOR ABOVE

TFB TO FLOOR BELOW

FFA FROM FLOOR ABOVE

FFB FROM FLOOR BELOW

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

P-001

PLUMBING LEGEND AND

ABBREVIATION

1 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

100% CONSTRUCTION DOCUMENTS

660-18-243

JRMNOVEMBER 04, 2022

7 8 8.3 9.1 10 11 11.9 12

'G

W

X

Y

Z

7.4 9.99

4" S

4" S

2" V

4" S

4" S

S

V

S P

D

2" V

S

2" S

S

2" S

S

4" S

S

3" S

4" S

1 1/2" V

S

S3" S

S

4" S

4" S

3" S

1 1/2" V

V

FD (ETR)

FD (ETR)

LIFT STATION (ETR)

AREA OF DEMOLITION

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

7-PLD100

BLDG 7 PLUMBING WASTE DEMOLITION

PLAN - BASEMENT

2 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/8" = 1'-0"

BLDG 7 PLUMBING WASTE DEMOLITION PLAN - BASEMENT

0 4 8 16

N O R

TH

TRUE

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. DEMOLISH EXISTING FIXTURES AND ASSOCIATED

SANITARY WASTE AND VENT PIPING BACK TO

DEMARCATION POINT SHOWN.

2. SEE SHEET 7-PLD101 FOR CONTINUATION.

NOVEMBER 04, 2022

'G

W

X

Y

Z

7.4 9.99

'E

'C

'S

'A

'B

'T

2" VTR

4" VTR

1 1/2" V

1 1/2" V

1 1/2" V

/2

V

FD (ETR)

FD (ETR)

FD (ETR)

6" S6" S

S

6" S

AREA OF DEMOLITION

FD 1 2

(ETR)

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

7-PLD101

BLDG 7 PLUMBING WASTE DEMOLITION

PLAN - FIRST FLOOR

3 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/8" = 1'-0"

BLDG 7 PLUMBING WASTE DEMOLITION PLAN - FIRST FLOOR

0 4 8 16

N O R

TH

TRUE

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. DEMOLISH EXISTING FIXTURES AND ASSOCIATED

SANITARY WASTE AND VENT PIPING BACK TO

DEMARCATION POINT SHOWN.

2. SEE SHEET 7-PLD100 FOR CONTINUATION.

SP-1

EQUIP ROOM

BA05

ELEC

BA04

STAIR

BA03

MECH RM

BA02

MAINTENANCE BENCH STOCK

BA06

FD (ETR)

FD (ETR)

FD (ETR)

7 8 8.3 9.1 10 11 11.9 12

'G

W

X

Y

Z

7.4 9.99

ELEV MACH

BA07

4" S

4" S

2" V

4" S

4" S

S

V

S P

D

2" V

S

2" S

S

2" S

S

4" S

S

3" S

4" S

1 1/2" V

S

S3" S

S

4" S

4" S

3" S

1 1/2" V

V

LIFT

STATION

(ETR)

2" SPD

AREA OF WORK

ACU

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

7-PL-100

BLDG 7 PLUMBING WASTE PLAN -

BASEMENT

4 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/8" = 1'-0"

BLDG 7 PLUMBING WASTE PLAN - BASEMENT

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

1. SEE SHEET 7-PL-101 FOR CONTINUATION.

2. ROUTE CONDENSATE LINE FROM MINI SPLIT

(ACU-1) TO FLOOR DRAIN. PROVIDE AIR GAP

CONNECTION.

3. EXTEND PUMPED ELEVATOR DRAIN ABOVE

FLOOR, TURN AND DISCHARGE INTO FLOOR

DRAIN. PROVIDE A FUNNEL ON THE FLOOR

DRAIN.

0 4 8 16

N O R

TH

TRUE

S

2" VTR

P-524

OIT CLOSET

1B02E

OFFICE

1B02B

CORRIDOR

1B00A

ELEC

1B05

OFFICE, DCSCO

1B07

OFFICE, CSCO

1B07A

CORRIDOR

1B00A

STAIR

1BA

SHOWER/LOCKER

1B06A

TOILET, WOMEN

1B06

TOILET, MEN

1B04

SHOWER/LOCKER

1B04A

HAC

1B03

HAC

1B02A

OFFICE, MGMT ANALYSIS

1B02FLOGISTICS ADMIN

1B20

CORRIDOR

1B01B

ENTRY

1B00

CONFERENCE

1B01A

BREAK ROOM

1B01C

WAREHOUSE

1B01

MAINTENANCE BENCH STOCK

1B02

S

6" S (ETR)6" S (ETR)

7 8 8.3 9.1 10 11 11.9 12

'G

W

X

Y

Z

7.4 9.99

'E

'C

'S

'A

'B

'T

S

E T

R

1 1/2" V

1 1/2" V

1 1/2" V

/2

V

FD (ETR)

FD (ETR)

FD (ETR)

4" VTR

2" VTR

AREA OF WORK

ACU

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

7-PL-101

BLDG 7 PLUMBING WASTE PLAN -

FIRST FLOOR

5 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/8" = 1'-0"

BLDG 7 PLUMBING WASTE PLAN - FIRST FLOOR

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

1. PROVIDE AND INSTALL SANITARY WASTE PIPING

AND CONNECT TO EXISTING PIPING BELOW AT

DEMARCATION POINT SHOWN.

2. SEE SHEET 7-PL-100 FOR CONTINUATION.

3. ROUTE CONDENSATE LINE FROM MINI-SPLIT

(ACU-1) TO FLOOR DRAIN. PROVIDE AIR GAP

CONNECTION.

0 4 8 16

N O R

TH

TRUE

ELEC

BA04

MECH RM

BA02

STAIR

BA03

EQUIP ROOM

BA05

MAINTENANCE BENCH STOCK

BA06

/2

C W

E

T R

1 1/2" CW (ETR)

1" HW (ETR)

1 1/2" CW (ETR)

FD (ETR)

FD (ETR)

FD (ETR)

7 8 8.3 9.1 10 11 11.9 12

'G

W

X

Y

Z

7.4 9.99

2 3/4" CW

ELEV MACH

BA07

AREA OF WORK

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

7-PP-100

BLDG 7 PLUMBING SUPPLY PLAN -

BASEMENT

6 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 PLUMBING SUPPLY PLAN - BASEMENT

NKEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

1. PROVIDE AND INSTALL DOMESTIC WATER

PIPING AND CONNECT TO EXISTING PIPING AT

DEMARCATION POINT SHOWN.

2. PROVIDE AND INSTALL DOMESTIC WATER

PIPING CONNECTION TO RESISTIVE ELEMENT

HUMIDIFIER. SEE MECHANICAL FOR RELATED

INFORMATION.

3. PROVIDE AND INSTALL BACKFLOW PREVENTER

(BFP-1) ON BRANCH PIPING TO RESISTIVE

ELEMENT HUMIDIFIER. SEE DETAIL 5/M-501 FOR

RELATED INFORMATION.

0 4 8 16

N O R

TH

P-524

LOGISTICS ADMIN

1B20

CORRIDOR

1B01B

CONFERENCE

1B01A

BREAK ROOM

1B01C

ENTRY

1B00

CORRIDOR

1B00A

TOILET, MEN

1B04

SHOWER/LOCKER

1B04A

TOILET, WOMEN

1B06

SHOWER/LOCKER

1B06A

STAIR

1BA

CORRIDOR

1B00A

OFFICE, CSCO

1B07A

OFFICE, DCSCO

1B07

ELEC

1B05

HAC

1B02A

HAC

1B03

OFFICE

1B02B

OIT CLOSET

1B02E

OFFICE, MGMT ANALYSIS

1B02F

WAREHOUSE

1B01

MAINTENANCE BENCH STOCK

1B02

FD (ETR)

FD (ETR)

FD (ETR)

1" HW (ETR)

1 1/2" CW (ETR)

/4

H

W /4

C

W /4

H

W /4

C

W

3/4" CW

3/4" HW

7 8 8.3 9.1 10 11 11.9 12

'G

W

X

Y

Z

7.4 9.99

3/4" CW (ETR)

3/4" CW (ETR)

3/4" HW (ETR)

1 1/4" CW (ETR)

3/4" HW (ETR) 3/4" CW (ETR)

3/4" HW (ETR)

TELE/DATA

1B08

AUX

1B10

'E

'C

'S

'A

'B

'T

CHECK OUT

1B02C

WHA-A

WHA-A

3/4" CW TO

P-815 ON ROOF

/4

C

W

AREA OF WORK

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

7-PP-101

BLDG 7 PLUMBING SUPPLY PLAN -

FIRST FLOOR

7 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

NKEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/8" = 1'-0"

BLDG 7 PLUMBING SUPPLY PLAN - FIRST FLOOR

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

1. PROVIDE AND INSTALL DOMESTIC WATER

PIPING AND CONNECT TO EXISTING PIPING AT

DEMARCATION POINT SHOWN.

0 4 8 16

N O R

TH

RD (ETR)

'G

W

X

Y

Z

7.4 9.99

RD (ETR)

RD (ETR)

VTR

RD (ETR)

RD (ETR)

VTR (ETR)

VTR (ETR)

AHU

'E

'C

'S

'A

'B

'T

12.9 13 14

EF

EF

P-815

CU

CU

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

7-P-102

BLDG 7 PLUMBING PLAN - ROOF

8 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 PLUMBING PLAN - ROOF 0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

1. EXISTING SOLAR PANELS TO REMAIN. COORDINATE

NEW WORK WITH EXISTING SOLAR PANELS.

2. PROVIDE AND INSTALL SANITARY VENT THROUGH

ROOF. VTR MUST BE A MINIMUM OF 10 FEET AWAY

FROM ALL FRESH AIR INTAKES.

3. SEE MECHANICAL FOR NEW AHU LOCATION.

COORDINATE VENT TERMINATIONS AND ROOF

DRAINS TO ACCOMMODATE TO AHU.

4. SEE MECHANICAL FOR EQUIPMENT LOCATIONS

AND SCHEDULES.

/4

M

V

/2

O

/2

M

A

1/2" MA

1/2" O

3/4" MV

1/2" MA

1/2" O

3/4" MV

/2

M

A

/2

O

/4

M

V

/2

H

W

/2

C

W

/4

M

V /2

O

/2

M

A

3/4" MV

1/2" O

1/2" MA

/2

C

W

1/2" CW

4" CW

2 1/2" HW

3/4" HWR

/4

H

W

/4

H

W R

/4

C

W

2"

3/4"

C W

/4

H

W R

H W

/4

H

W R

H W

C W

1" CW 1/2" CW

1/2" HW1" HW

C W

/4

H

W R

H W

4" CW

2" HW

1/2" HWR

1 1/4" CW

1 1/4" HW

3/4" HWR

3" S

S

S

2" V

2" V

3" S

S

3" S

S

S

S

AREA OF DEMOLITION

CLEAN LINEN

BC09

OFFICE

BC04

/4

M

V

/2

O

/2

M

A

1/2" MA

1/2" O

3/4" MV

1/2" MA

1/2" O

3/4" MV

/2

M

A

/2

O

/4

M

V

/2

H

W

/2

C

W

/4

M

V /2

O

/2

M

A

3/4" MV

1/2" O

1/2" MA

/2

C

W

1/2" CW

4" CW

2 1/2" HW

3/4" HWR

/4

H

W

/4

H

W R

/4

C

W

C W

/4

H

W R

H W

/4

H

W R

H W

C W

1" CW 1/2" CW

1/2" HW1" HW

C W

/4

H

W R

H W

4" CW

2" HW

1/2" HWR

1 1/4" CW

1 1/4" HW

3/4" HWR

3" S

S

S

2" V

2" V

3" S

S

3" S

S

S

S

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:2

P

M

14-P-100

BLDG 14 PLUMBING PLAN - BASEMENT

9 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/4" = 1'-0"

BLDG 14 PLUMBING DEMOLITION PLAN - BASEMENT

Scale: 1/4" = 1'-0"

BLDG 14 PLUMBING PLAN - BASEMENT

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL

INFORMATION REGARDING SCHEDULE AND

PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE PLUMBING WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. DEMOLISH EXISTING FIXTURES AND

ASSOCIATED SANITARY WASTE PIPING BACK TO

FLOOR. PROVIDE AND INSTALL PLUG AT OR

BELOW EXISTING FLOOR TO ALLOW FOR FLOOR

FINISHES.

2. DEMOLISH EXISTING FIXTURES AND

ASSOCIATED SANITARY VENT PIPING BACK TO

MAIN AND PROVIDE AND INSTALL PLUG.

3. DEMOLISH EXISTING FIXTURES AND

ASSOCIATED DOMESTIC WATER PIPING BACK

TO MAIN AND PROVIDE AND INSTALL PLUG.

4. DEMOLISH EXISTING MEDICAL GAS ALARM

PANEL AND ASSOCIATED MEDICAL GAS

ACCESSORIES.

5. PLAN SHOWN FOR REFERENCE ONLY. NO NEW

PLUMBING WORK REQUIRED.

0 4 8 16

N O R

TH

TRUE

0 4 8 16

N O R

TH

HOT PIPECOLD PIPE

REFER TO SPECIFICATIONS FOR INSULATION TYPES,

INSULATION THICKNESSES, HANGER TYPES, HANGER ROD

CONNECTIONS TO SRUCTURE AND HANGER SPACING.

CUT INSULATION TO FIT

AROUND HANGER. SEAL

EXPOSED INSULATION

ENDS WITH JOINT

SEALANT.

PROVIDE A SECTION OF HIGH

DENSITY INSULATION OR

STYROFOAM BILLETS AT EACH

HANGER OF COLD INSULATED

PIPE.

THREADED STEEL ROD

WITH NUT AND WASHER

BOTH SIDES (TYP.).

CLEVIS HANGER, SHOWN FOR

CLARITY. SIZE HANGER FOR

COLD PIPE OUTSIDE DIAMETER

PLUS INSULATION THICKNESS.

DO NOT PENETRATE INSULATION

WITHE HANGER.

CLEVIS HANGER, SHOWN

FOR CLARITY. SIZE

HANGER FOR HOT PIPE

OUTSIDE DIAMETER.

SECURE PIPE HANGER

TO STRUCTURE (TYP.)

PROVIDE SHORT INSULATION

SHIELD FOR LAPPING

INSULATION JACKET OVER HIGH

DENSITY INSULATION OR

STYROFOAM BILLETS. MAINTAIN

VAPOR BARRIER.

NOTE:

POINT-OF-USE THERMOSTATIC MIXING VALVES MUST

CONFORM TO ASSE 1070

TYPICAL FAUCET

(OR OTHER LEVER

CONTROLLED FIXTURE)

THERMOSTATIC

MIXING VALVE

TEMPERED WATER

SUPPLY OUTLET

COLD WATER

SUPPLY OUTLET

COLD WATER

SUPPLY INLET

HOT WATER

SUPPLY INLET

FINISHED

FLOOR

CHROME

WALL COVER

AND SCREW

STANDARD 1/8 BEND

PLUGGED TEE

WITH CLEANOUT

STANDARD 1/8 BEND

CAST IRON PIPE

RISER

CLEANOUT PLUG

TOP OF COVER

SHALL BE FLUSH

WITH TOP OF

FLOOR

NOTE:

1. LOCATE VTR MINIMUM 3'-0" FROM PROPERTY LINE, 10'-0" HORIZONTAL, OR 3'-0" VERTICAL

ABOVE ANY BUILDING OPENING OR FRESH AIR INTAKE, 25'-0" FROM ANY OPENING OR FRESH

AIR INTAKE IN MEDICAL FACILITIES AND 1'-0" FROM ANY VERTICAL SURFACE.

2. REFER TO LOCAL CODES FOR OTHER VENT TERMINATION REQUIREMENTS.

3. LOCATE VTR MINIMUM 18" FROM ADJACENT WALL, PARAPET, EXPANSION JOINT, ROOF

DRAIN, EQUIPMENT CURB, OR OTHER ROOF FEATURE

4. OFFSET IN CEILING SPACE WHERE REQUIRED TO MEET THESE CONDITIONS.

5. INSULATE LAST 6'-0" OF VENT PIPE INSIDE BUILDING PER SPECIFICATIONS.

COORDINATE

INSTALLATION OF

FLASHING AND

COUNTERFLASHING

ROOF INSULATION

PROVIDE FIRE STOP

SEAL BETWEEN PIPE

AND SLEEVE OR

DECK.

MINIMUM 12"

BELOW ROOF

ROOF DECK

CORE DRILL ROOF OR

PROVIDE SLEEVE IF

REQUIRED BY TYPE

OF ROOF DECK.

MINIMUM 12" ABOVE ROOF.

EXTEND TO HEIGHT OF PARAPET WHEN

WITHIN 10' OF PARAPET, OR ABOVE

MAXIMUM LOCAL SNOW DEPTH,

ANCHOR PIPE TO

STRUCTURE.

PROVIDE PIPE INCREASER ON

SMALLER VENT WHERE

CODE REQUIRED MINIMUM VTR IS 3"

WHICHEVER IS HIGHER.

OVER 20'

UP TO 20'

155 - 330

NOTE:

PROVIDE ACCESS WHERE DEVICES ARE CONCEALED

WITHIN PARTITIONS OR ABOVE CEILINGS. SEE

SPECIFICATIONS 22 11 00 - 2.10

NEAREST DOMESTIC

WATER SUPPLY RISER

WATER HAMMER

ARRESTER

DOMESTIC WATER

SUPPLY PIPING TO

FIXTURES

NEAREST DOMESTIC

WATER SUPPLY RISER

WATER HAMMER

ARRESTER

DOMESTIC WATER

SUPPLY PIPING TO

FIXTURES

F

114 - 154E

61 - 113D

33 - 60C

12 - 32B

1 - 11A

FIXTURE UNIT RATINGMARK

WATER HAMMER ARRESTER SCHEDULE

PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITONS. REFER TO

SPECIFICATIONS FOR MORE INFORMATION. PIPE AND CONDUIT OF ALL TRADES MAY BE COMBINED ON

THE SAME SUPPORT CHANNEL. COORDINATE SUPPORT CHANNEL LENGTH WITH PIPING AND CONDUIT

TO BE SUPPORTED. SUPPORT CHANNEL SPACING SHALL BE DETERMINED BY SMALLEST PIPE TO BE

SUPPORTED. CHANNEL SUPPORT MAY BE USED AS A WALL BRACKET, ATTACH TO WALL WITH ANCHOR

BOLTS PER SPECIFICATIONS. FOR HORIZONTAL INSULATED PIPING, ATTACH CLAMPS AS INDICATED

ABOVE, FOR VERTICAL INSULATED PIPING, ATTACH CLAMPS TO THE PIPE AND SEAL INSULATION AT BOTH

CLAMP ENDS.

SUPPORT WASHERS AND

LOCKNUTS (TYP.).

UNINSULATED STEEL OR

PLASTIC PIPE.

PROVIDE PLASTIC GALVANIC

ISOLATOR FOR COPPER PIPE

(TYP.)

UNINSULATED COPPER PIPE.

COLD INSULATED PIPE.

PIPE INSULATION (TYP.)

HOT INSULATED PIPE.

PROVIDE 1-5/8"x1-5/8" 14 GA.

CHANNEL SUPPORT.

CUT INSULATION TO FIT AROUND

TRAPEZE HANGER. SEAL BOTH

ENDS OF EXPOSED INSULATION

WITH JOINT SEALANT.

PROVIDE METAL 360° INSULATION SHIELD

AND HIGH DENSITY INSULATION OR

PRE-ENGINEERED THERMAL

HANGER-SHIELD INSERT OF CALCIUM

SILICATE INSULATION. FOR PIPES 4" AND

SMALLER, PRE-ENGINEERED THERMAL

HANGER-SHIELD INSERT OF FLEXIBLE

UNICELLULAR INSULATION MAY BE

PROVIDED.

SIZE AND QUANTITY OF HANGER

RODS PER MANUFACTURER'S

RECOMMENDATIONS.

PROVIDE TWO-PIECE PIPE

CLAMP (TYP.).

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:3

P

M

P-501

PLUMBING DETAILS I

10 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

NOT TO SCALE

PIPE HANGER DETAIL

NOT TO SCALE

POINT-OF-USE 4-PORT THERMOSTATIC MIXING VALVE

DETAIL

NOT TO SCALE

TYPICAL INTERIOR WALL CLEANOUT

NOT TO SCALE

TYPICAL INTERIOR FLOOR CLEANOUT

NOT TO SCALE

VENT THROUGH ROOF DETAIL

NOT TO SCALE

WATER HAMMER ARRESTOR DETAIL

NOT TO SCALE

TRAPEZE PIPE HANGER

TO SAN SEWER

ELEVATOR SUMP

FLOOR

TO BLDG BAS

POWER

SUMP HIGH LEVEL

ON

OFF

HOISTWAY

ELEVATOR

SUBMERSIBLE PUMP

SHUT OFF VALVE

CHECK VALVE

GRATE

MULTI-POINT FLOAT SENSOR

FLOOR

MAXIMUM CONDUIT LENGTH

6 FEET PER ELECTRICAL

CODE. COORDINATE CONDUIT

ROUTING WITH ELECTRICAL.

NEMA 4X JUNCTION BOX WITH

DISCONNECT. COORDINATE

EXACT HEIGHT WITH DIVISION

26 ELECTRICAL CONTRACTOR

SUMP BASIN (24" x 24" x 24") PER

SPECIFICATION SECTION 221429.

ELEVATOR ESC PUMP

CONTROL PANEL w/

SUMP HIGH LEVEL

ALARMS

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTIO

N

NOT FOR

CONSTRUCTIO

N

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/3 /2

:1

:3

P

M

P-502

PLUMBING DETAILS II

11 12RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

NOT TO SCALE

ELEVATOR SUMP PUMP DETAIL

File details come from the government source that posted it. Updated .