Amendment 09 - 06-Plumb 18-314 Add01.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19) Federal contract opportunity
- Solicitation number
- 36C25920R0104
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
CD
ACD
V
VBG
VBF
AV
AW
AW
ST
OST
GW
GW
S
W
ID
SPD
T
T
SCW
WS
140°
S
W
ST
CAP
AV
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
IS LOCATED.
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
LA
LV
OA
IA
TWR
TWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGEFOD
ANCHOR
CONNECTION - SIDE
ECCENTRIC REDUCER
CONNECTION - BOTTOM, 45° OR 90°
CONNECTION - TOP, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
STRAINER
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS BELOW GRADE (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (S)
SOIL PIPING - BELOW FLOOR (S)
STORM DRAIN - ABOVE FLOOR (ST)
STORM DRAIN - BELOW FLOOR (ST)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
VENT BELOW GRADE (VBG)
VENT BELOW FLOOR (VBF)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE (SOV)
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
PRESSURE REDUCING VALVE
REDUCER
SHOWER HEADS
JANITORS SINK
DRINKING FOUNTAIN & TYPE
SHOWER
BATHTUB
TANK TYPE WATER CLOSET
COUNTER TOP LAVATORY & TYPE
WALL MOUNTED LAVATORY & TYPE
URINAL SINK & TYPE
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL NUMBER
SHEET NUMBER
LIMIT OF DEMOLITION
TRAP PRIMER LINE - BELOW SLAB (T)
CO
DOUBLE EXTERIOR CLEANOUT (ECO)
CLEANOUTS
DRAINS AND TRAPS
EQUIPMENT
FITTINGS AND ACCESSORIES
SHEET NUMBER
SECTION NUMBER
JANITORS SINK - CORNER
MEDICAL GAS OUTLET (TYPE)
EXISTING TO REMAIN
A
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF ECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
B
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
D
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
E
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
G
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
I
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
K
KW KILOWATT
KWH KILOWATT-HOUR
L
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT
ROOM
MH MANHOLE
MOU MEMORANDUM OF
UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O
O OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
P
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE
INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH
GAGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
R
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
S
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
T
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
Y
YCO YARD CLEANOUT
YH YARD HYDRANT
26-P 3
PIPING SYMBOLS
ANNOTATION
XX-1
xx
X100
X100
GENERAL PLUMBING SYMBOLS
DENTAL
MEDICAL GASES
STORM
FUEL
EXISTING PIPING
WATER
WASTE
VALVE SYMBOLS
GENERAL EQUIPMENT
FLOOR MOUNTED FLUSH VALVE
WATER
CLOSET
WALL MOUNTED FLUSH VALVE
WATER
CLOSET
ETR
ABBREVIATIONS
ETR EXISTING TO REMAIN
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
P-001
PLUMBING LEGEND AND
ABBREVIATION
1 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
100% CONSTRUCTION DOCUMENTS
660-18-243
JRMNOVEMBER 04, 2022
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
4" S
4" S
2" V
4" S
4" S
S
V
S P
D
2" V
S
2" S
S
2" S
S
4" S
S
3" S
4" S
1 1/2" V
S
S3" S
S
4" S
4" S
3" S
1 1/2" V
V
FD (ETR)
FD (ETR)
LIFT STATION (ETR)
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
7-PLD100
BLDG 7 PLUMBING WASTE DEMOLITION
PLAN - BASEMENT
2 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 PLUMBING WASTE DEMOLITION PLAN - BASEMENT
0 4 8 16
N O R
TH
TRUE
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. DEMOLISH EXISTING FIXTURES AND ASSOCIATED
SANITARY WASTE AND VENT PIPING BACK TO
DEMARCATION POINT SHOWN.
2. SEE SHEET 7-PLD101 FOR CONTINUATION.
NOVEMBER 04, 2022
'G
W
X
Y
Z
7.4 9.99
'E
'C
'S
'A
'B
'T
2" VTR
4" VTR
1 1/2" V
1 1/2" V
1 1/2" V
/2
V
FD (ETR)
FD (ETR)
FD (ETR)
6" S6" S
S
6" S
AREA OF DEMOLITION
FD 1 2
(ETR)
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
7-PLD101
BLDG 7 PLUMBING WASTE DEMOLITION
PLAN - FIRST FLOOR
3 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 PLUMBING WASTE DEMOLITION PLAN - FIRST FLOOR
0 4 8 16
N O R
TH
TRUE
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. DEMOLISH EXISTING FIXTURES AND ASSOCIATED
SANITARY WASTE AND VENT PIPING BACK TO
DEMARCATION POINT SHOWN.
2. SEE SHEET 7-PLD100 FOR CONTINUATION.
SP-1
EQUIP ROOM
BA05
ELEC
BA04
STAIR
BA03
MECH RM
BA02
MAINTENANCE BENCH STOCK
BA06
FD (ETR)
FD (ETR)
FD (ETR)
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
ELEV MACH
BA07
4" S
4" S
2" V
4" S
4" S
S
V
S P
D
2" V
S
2" S
S
2" S
S
4" S
S
3" S
4" S
1 1/2" V
S
S3" S
S
4" S
4" S
3" S
1 1/2" V
V
LIFT
STATION
(ETR)
2" SPD
AREA OF WORK
ACU
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
7-PL-100
BLDG 7 PLUMBING WASTE PLAN -
BASEMENT
4 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 PLUMBING WASTE PLAN - BASEMENT
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
1. SEE SHEET 7-PL-101 FOR CONTINUATION.
2. ROUTE CONDENSATE LINE FROM MINI SPLIT
(ACU-1) TO FLOOR DRAIN. PROVIDE AIR GAP
CONNECTION.
3. EXTEND PUMPED ELEVATOR DRAIN ABOVE
FLOOR, TURN AND DISCHARGE INTO FLOOR
DRAIN. PROVIDE A FUNNEL ON THE FLOOR
DRAIN.
0 4 8 16
N O R
TH
TRUE
S
2" VTR
P-524
OIT CLOSET
1B02E
OFFICE
1B02B
CORRIDOR
1B00A
ELEC
1B05
OFFICE, DCSCO
1B07
OFFICE, CSCO
1B07A
CORRIDOR
1B00A
STAIR
1BA
SHOWER/LOCKER
1B06A
TOILET, WOMEN
1B06
TOILET, MEN
1B04
SHOWER/LOCKER
1B04A
HAC
1B03
HAC
1B02A
OFFICE, MGMT ANALYSIS
1B02FLOGISTICS ADMIN
1B20
CORRIDOR
1B01B
ENTRY
1B00
CONFERENCE
1B01A
BREAK ROOM
1B01C
WAREHOUSE
1B01
MAINTENANCE BENCH STOCK
1B02
S
6" S (ETR)6" S (ETR)
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
'E
'C
'S
'A
'B
'T
S
E T
R
1 1/2" V
1 1/2" V
1 1/2" V
/2
V
FD (ETR)
FD (ETR)
FD (ETR)
4" VTR
2" VTR
AREA OF WORK
ACU
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
7-PL-101
BLDG 7 PLUMBING WASTE PLAN -
FIRST FLOOR
5 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 PLUMBING WASTE PLAN - FIRST FLOOR
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
1. PROVIDE AND INSTALL SANITARY WASTE PIPING
AND CONNECT TO EXISTING PIPING BELOW AT
DEMARCATION POINT SHOWN.
2. SEE SHEET 7-PL-100 FOR CONTINUATION.
3. ROUTE CONDENSATE LINE FROM MINI-SPLIT
(ACU-1) TO FLOOR DRAIN. PROVIDE AIR GAP
CONNECTION.
0 4 8 16
N O R
TH
TRUE
ELEC
BA04
MECH RM
BA02
STAIR
BA03
EQUIP ROOM
BA05
MAINTENANCE BENCH STOCK
BA06
/2
C W
E
T R
1 1/2" CW (ETR)
1" HW (ETR)
1 1/2" CW (ETR)
FD (ETR)
FD (ETR)
FD (ETR)
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
2 3/4" CW
ELEV MACH
BA07
AREA OF WORK
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
7-PP-100
BLDG 7 PLUMBING SUPPLY PLAN -
BASEMENT
6 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 PLUMBING SUPPLY PLAN - BASEMENT
NKEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
1. PROVIDE AND INSTALL DOMESTIC WATER
PIPING AND CONNECT TO EXISTING PIPING AT
DEMARCATION POINT SHOWN.
2. PROVIDE AND INSTALL DOMESTIC WATER
PIPING CONNECTION TO RESISTIVE ELEMENT
HUMIDIFIER. SEE MECHANICAL FOR RELATED
INFORMATION.
3. PROVIDE AND INSTALL BACKFLOW PREVENTER
(BFP-1) ON BRANCH PIPING TO RESISTIVE
ELEMENT HUMIDIFIER. SEE DETAIL 5/M-501 FOR
RELATED INFORMATION.
0 4 8 16
N O R
TH
P-524
LOGISTICS ADMIN
1B20
CORRIDOR
1B01B
CONFERENCE
1B01A
BREAK ROOM
1B01C
ENTRY
1B00
CORRIDOR
1B00A
TOILET, MEN
1B04
SHOWER/LOCKER
1B04A
TOILET, WOMEN
1B06
SHOWER/LOCKER
1B06A
STAIR
1BA
CORRIDOR
1B00A
OFFICE, CSCO
1B07A
OFFICE, DCSCO
1B07
ELEC
1B05
HAC
1B02A
HAC
1B03
OFFICE
1B02B
OIT CLOSET
1B02E
OFFICE, MGMT ANALYSIS
1B02F
WAREHOUSE
1B01
MAINTENANCE BENCH STOCK
1B02
FD (ETR)
FD (ETR)
FD (ETR)
1" HW (ETR)
1 1/2" CW (ETR)
/4
H
W /4
C
W /4
H
W /4
C
W
3/4" CW
3/4" HW
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
3/4" CW (ETR)
3/4" CW (ETR)
3/4" HW (ETR)
1 1/4" CW (ETR)
3/4" HW (ETR) 3/4" CW (ETR)
3/4" HW (ETR)
TELE/DATA
1B08
AUX
1B10
'E
'C
'S
'A
'B
'T
CHECK OUT
1B02C
WHA-A
WHA-A
3/4" CW TO
P-815 ON ROOF
/4
C
W
AREA OF WORK
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
7-PP-101
BLDG 7 PLUMBING SUPPLY PLAN -
FIRST FLOOR
7 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
NKEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 PLUMBING SUPPLY PLAN - FIRST FLOOR
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
1. PROVIDE AND INSTALL DOMESTIC WATER
PIPING AND CONNECT TO EXISTING PIPING AT
DEMARCATION POINT SHOWN.
0 4 8 16
N O R
TH
RD (ETR)
'G
W
X
Y
Z
7.4 9.99
RD (ETR)
RD (ETR)
VTR
RD (ETR)
RD (ETR)
VTR (ETR)
VTR (ETR)
AHU
'E
'C
'S
'A
'B
'T
12.9 13 14
EF
EF
P-815
CU
CU
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
7-P-102
BLDG 7 PLUMBING PLAN - ROOF
8 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 PLUMBING PLAN - ROOF 0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
1. EXISTING SOLAR PANELS TO REMAIN. COORDINATE
NEW WORK WITH EXISTING SOLAR PANELS.
2. PROVIDE AND INSTALL SANITARY VENT THROUGH
ROOF. VTR MUST BE A MINIMUM OF 10 FEET AWAY
FROM ALL FRESH AIR INTAKES.
3. SEE MECHANICAL FOR NEW AHU LOCATION.
COORDINATE VENT TERMINATIONS AND ROOF
DRAINS TO ACCOMMODATE TO AHU.
4. SEE MECHANICAL FOR EQUIPMENT LOCATIONS
AND SCHEDULES.
/4
M
V
/2
O
/2
M
A
1/2" MA
1/2" O
3/4" MV
1/2" MA
1/2" O
3/4" MV
/2
M
A
/2
O
/4
M
V
/2
H
W
/2
C
W
/4
M
V /2
O
/2
M
A
3/4" MV
1/2" O
1/2" MA
/2
C
W
1/2" CW
4" CW
2 1/2" HW
3/4" HWR
/4
H
W
/4
H
W R
/4
C
W
2"
3/4"
C W
/4
H
W R
H W
/4
H
W R
H W
C W
1" CW 1/2" CW
1/2" HW1" HW
C W
/4
H
W R
H W
4" CW
2" HW
1/2" HWR
1 1/4" CW
1 1/4" HW
3/4" HWR
3" S
S
S
2" V
2" V
3" S
S
3" S
S
S
S
AREA OF DEMOLITION
CLEAN LINEN
BC09
OFFICE
BC04
/4
M
V
/2
O
/2
M
A
1/2" MA
1/2" O
3/4" MV
1/2" MA
1/2" O
3/4" MV
/2
M
A
/2
O
/4
M
V
/2
H
W
/2
C
W
/4
M
V /2
O
/2
M
A
3/4" MV
1/2" O
1/2" MA
/2
C
W
1/2" CW
4" CW
2 1/2" HW
3/4" HWR
/4
H
W
/4
H
W R
/4
C
W
C W
/4
H
W R
H W
/4
H
W R
H W
C W
1" CW 1/2" CW
1/2" HW1" HW
C W
/4
H
W R
H W
4" CW
2" HW
1/2" HWR
1 1/4" CW
1 1/4" HW
3/4" HWR
3" S
S
S
2" V
2" V
3" S
S
3" S
S
S
S
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:2
P
M
14-P-100
BLDG 14 PLUMBING PLAN - BASEMENT
9 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/4" = 1'-0"
BLDG 14 PLUMBING DEMOLITION PLAN - BASEMENT
Scale: 1/4" = 1'-0"
BLDG 14 PLUMBING PLAN - BASEMENT
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE PLUMBING WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. DEMOLISH EXISTING FIXTURES AND
ASSOCIATED SANITARY WASTE PIPING BACK TO
FLOOR. PROVIDE AND INSTALL PLUG AT OR
BELOW EXISTING FLOOR TO ALLOW FOR FLOOR
FINISHES.
2. DEMOLISH EXISTING FIXTURES AND
ASSOCIATED SANITARY VENT PIPING BACK TO
MAIN AND PROVIDE AND INSTALL PLUG.
3. DEMOLISH EXISTING FIXTURES AND
ASSOCIATED DOMESTIC WATER PIPING BACK
TO MAIN AND PROVIDE AND INSTALL PLUG.
4. DEMOLISH EXISTING MEDICAL GAS ALARM
PANEL AND ASSOCIATED MEDICAL GAS
ACCESSORIES.
5. PLAN SHOWN FOR REFERENCE ONLY. NO NEW
PLUMBING WORK REQUIRED.
0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
HOT PIPECOLD PIPE
REFER TO SPECIFICATIONS FOR INSULATION TYPES,
INSULATION THICKNESSES, HANGER TYPES, HANGER ROD
CONNECTIONS TO SRUCTURE AND HANGER SPACING.
CUT INSULATION TO FIT
AROUND HANGER. SEAL
EXPOSED INSULATION
ENDS WITH JOINT
SEALANT.
PROVIDE A SECTION OF HIGH
DENSITY INSULATION OR
STYROFOAM BILLETS AT EACH
HANGER OF COLD INSULATED
PIPE.
THREADED STEEL ROD
WITH NUT AND WASHER
BOTH SIDES (TYP.).
CLEVIS HANGER, SHOWN FOR
CLARITY. SIZE HANGER FOR
COLD PIPE OUTSIDE DIAMETER
PLUS INSULATION THICKNESS.
DO NOT PENETRATE INSULATION
WITHE HANGER.
CLEVIS HANGER, SHOWN
FOR CLARITY. SIZE
HANGER FOR HOT PIPE
OUTSIDE DIAMETER.
SECURE PIPE HANGER
TO STRUCTURE (TYP.)
PROVIDE SHORT INSULATION
SHIELD FOR LAPPING
INSULATION JACKET OVER HIGH
DENSITY INSULATION OR
STYROFOAM BILLETS. MAINTAIN
VAPOR BARRIER.
NOTE:
POINT-OF-USE THERMOSTATIC MIXING VALVES MUST
CONFORM TO ASSE 1070
TYPICAL FAUCET
(OR OTHER LEVER
CONTROLLED FIXTURE)
THERMOSTATIC
MIXING VALVE
TEMPERED WATER
SUPPLY OUTLET
COLD WATER
SUPPLY OUTLET
COLD WATER
SUPPLY INLET
HOT WATER
SUPPLY INLET
FINISHED
FLOOR
CHROME
WALL COVER
AND SCREW
STANDARD 1/8 BEND
PLUGGED TEE
WITH CLEANOUT
STANDARD 1/8 BEND
CAST IRON PIPE
RISER
CLEANOUT PLUG
TOP OF COVER
SHALL BE FLUSH
WITH TOP OF
FLOOR
NOTE:
1. LOCATE VTR MINIMUM 3'-0" FROM PROPERTY LINE, 10'-0" HORIZONTAL, OR 3'-0" VERTICAL
ABOVE ANY BUILDING OPENING OR FRESH AIR INTAKE, 25'-0" FROM ANY OPENING OR FRESH
AIR INTAKE IN MEDICAL FACILITIES AND 1'-0" FROM ANY VERTICAL SURFACE.
2. REFER TO LOCAL CODES FOR OTHER VENT TERMINATION REQUIREMENTS.
3. LOCATE VTR MINIMUM 18" FROM ADJACENT WALL, PARAPET, EXPANSION JOINT, ROOF
DRAIN, EQUIPMENT CURB, OR OTHER ROOF FEATURE
4. OFFSET IN CEILING SPACE WHERE REQUIRED TO MEET THESE CONDITIONS.
5. INSULATE LAST 6'-0" OF VENT PIPE INSIDE BUILDING PER SPECIFICATIONS.
COORDINATE
INSTALLATION OF
FLASHING AND
COUNTERFLASHING
ROOF INSULATION
PROVIDE FIRE STOP
SEAL BETWEEN PIPE
AND SLEEVE OR
DECK.
MINIMUM 12"
BELOW ROOF
ROOF DECK
CORE DRILL ROOF OR
PROVIDE SLEEVE IF
REQUIRED BY TYPE
OF ROOF DECK.
MINIMUM 12" ABOVE ROOF.
EXTEND TO HEIGHT OF PARAPET WHEN
WITHIN 10' OF PARAPET, OR ABOVE
MAXIMUM LOCAL SNOW DEPTH,
ANCHOR PIPE TO
STRUCTURE.
PROVIDE PIPE INCREASER ON
SMALLER VENT WHERE
CODE REQUIRED MINIMUM VTR IS 3"
WHICHEVER IS HIGHER.
OVER 20'
UP TO 20'
155 - 330
NOTE:
PROVIDE ACCESS WHERE DEVICES ARE CONCEALED
WITHIN PARTITIONS OR ABOVE CEILINGS. SEE
SPECIFICATIONS 22 11 00 - 2.10
NEAREST DOMESTIC
WATER SUPPLY RISER
WATER HAMMER
ARRESTER
DOMESTIC WATER
SUPPLY PIPING TO
FIXTURES
NEAREST DOMESTIC
WATER SUPPLY RISER
WATER HAMMER
ARRESTER
DOMESTIC WATER
SUPPLY PIPING TO
FIXTURES
F
114 - 154E
61 - 113D
33 - 60C
12 - 32B
1 - 11A
FIXTURE UNIT RATINGMARK
WATER HAMMER ARRESTER SCHEDULE
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITONS. REFER TO
SPECIFICATIONS FOR MORE INFORMATION. PIPE AND CONDUIT OF ALL TRADES MAY BE COMBINED ON
THE SAME SUPPORT CHANNEL. COORDINATE SUPPORT CHANNEL LENGTH WITH PIPING AND CONDUIT
TO BE SUPPORTED. SUPPORT CHANNEL SPACING SHALL BE DETERMINED BY SMALLEST PIPE TO BE
SUPPORTED. CHANNEL SUPPORT MAY BE USED AS A WALL BRACKET, ATTACH TO WALL WITH ANCHOR
BOLTS PER SPECIFICATIONS. FOR HORIZONTAL INSULATED PIPING, ATTACH CLAMPS AS INDICATED
ABOVE, FOR VERTICAL INSULATED PIPING, ATTACH CLAMPS TO THE PIPE AND SEAL INSULATION AT BOTH
CLAMP ENDS.
SUPPORT WASHERS AND
LOCKNUTS (TYP.).
UNINSULATED STEEL OR
PLASTIC PIPE.
PROVIDE PLASTIC GALVANIC
ISOLATOR FOR COPPER PIPE
(TYP.)
UNINSULATED COPPER PIPE.
COLD INSULATED PIPE.
PIPE INSULATION (TYP.)
HOT INSULATED PIPE.
PROVIDE 1-5/8"x1-5/8" 14 GA.
CHANNEL SUPPORT.
CUT INSULATION TO FIT AROUND
TRAPEZE HANGER. SEAL BOTH
ENDS OF EXPOSED INSULATION
WITH JOINT SEALANT.
PROVIDE METAL 360° INSULATION SHIELD
AND HIGH DENSITY INSULATION OR
PRE-ENGINEERED THERMAL
HANGER-SHIELD INSERT OF CALCIUM
SILICATE INSULATION. FOR PIPES 4" AND
SMALLER, PRE-ENGINEERED THERMAL
HANGER-SHIELD INSERT OF FLEXIBLE
UNICELLULAR INSULATION MAY BE
PROVIDED.
SIZE AND QUANTITY OF HANGER
RODS PER MANUFACTURER'S
RECOMMENDATIONS.
PROVIDE TWO-PIECE PIPE
CLAMP (TYP.).
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:3
P
M
P-501
PLUMBING DETAILS I
10 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
NOT TO SCALE
PIPE HANGER DETAIL
NOT TO SCALE
POINT-OF-USE 4-PORT THERMOSTATIC MIXING VALVE
DETAIL
NOT TO SCALE
TYPICAL INTERIOR WALL CLEANOUT
NOT TO SCALE
TYPICAL INTERIOR FLOOR CLEANOUT
NOT TO SCALE
VENT THROUGH ROOF DETAIL
NOT TO SCALE
WATER HAMMER ARRESTOR DETAIL
NOT TO SCALE
TRAPEZE PIPE HANGER
TO SAN SEWER
ELEVATOR SUMP
FLOOR
TO BLDG BAS
POWER
SUMP HIGH LEVEL
ON
OFF
HOISTWAY
ELEVATOR
SUBMERSIBLE PUMP
SHUT OFF VALVE
CHECK VALVE
GRATE
MULTI-POINT FLOAT SENSOR
FLOOR
MAXIMUM CONDUIT LENGTH
6 FEET PER ELECTRICAL
CODE. COORDINATE CONDUIT
ROUTING WITH ELECTRICAL.
NEMA 4X JUNCTION BOX WITH
DISCONNECT. COORDINATE
EXACT HEIGHT WITH DIVISION
26 ELECTRICAL CONTRACTOR
SUMP BASIN (24" x 24" x 24") PER
SPECIFICATION SECTION 221429.
ELEVATOR ESC PUMP
CONTROL PANEL w/
SUMP HIGH LEVEL
ALARMS
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/3 /2
:1
:3
P
M
P-502
PLUMBING DETAILS II
11 12RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
NOT TO SCALE
ELEVATOR SUMP PUMP DETAIL
File details come from the government source that posted it. Updated .