Text version
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BIL BASIC INSULATION LEVEL
BLDG BUILDING
BPIP BOILER PLANT
INSTRUMENTATION PANEL
BRKR BREAKER
BYP BY PASS
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
A/C AIR CONDITIONING
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED
CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR
AVAILABLE FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB OR A AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
1P SINGLE POLE
1PH SINGLE-PHASE
3P THREE POLE
3PH THREE-PHASE
3W THREE WIRE
4W FOUR WIRE
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR
PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PT POTENTIAL TRANSFORMER
PTRV POWER TYPE ROOF VENTILATION
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
SCC SHORT CIRCUIT CAPACITY
SES SERVICE ENTRANCE SECTION
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPD SURGE PROTECTIVE DEVICE
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
IESNA ILLUMINATION ENGINEERING SOCIETY
OF NORTH AMERICA
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
W WATT
WH WATER HEATER
WP WEATHERPROOF
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LTCP LOCAL TEMPERATURE CONTROL PANEL
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
XFER TRANSFER
XFMR TRANSFORMER
XP EXPLOSION PROOF
JB JUNCTION BOX
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAH KILOVOLT AMPERE PER HOUR
KVAR KILOVOLT AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
N NEUTRAL
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REC RECESSED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
TC TIME CLOCK
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
ABBREVIATIONS
A
B
C
C CONDUIT
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CLF CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMCP EMER. MONITORING CONTROL PANEL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
ETD EXISTING TO BE DEMOLISHED
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
D
E
F
G
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FABL FIRE ALARM BELL
FABX FIRE ALARM BOX
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FI FILM ILLUMINATOR
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE METALLIC CONDUIT
FLUOR FLUORESCENT
FP FIRE PROTECTION
FT FEET OR FOOT
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
H
I
J
K
L
M
N
O
P
STANDARD MOUNTING HEIGHTSANNOTATION
R
S
T
U
V
W
X
CU
M100
M100
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL REFERENCE
SECTION CUT DESIGNATION
ELECTRICAL:
AUDIBLE APPLIANCES (CENTERLINE) 84"
ALARMS 48"
ANNUNCIATOR PANELS 48"
CLOCK OUTLETS (CENTERLINE) 84"
CONTROLS (TOP) 48"
EXIT SIGNS (WALL-MOUNTED, BOTTOM) 80"
FIRE ALARM ANNUNCIATOR PANEL (DISPLAY) 60"
FIRE ALARM BELL (EXTERIOR) 120"
FIRE ALARM CONTROL PANEL/UNIT (DISPLAY) 60"
INTERCOM (AFEA ONLY) 36"
INTERCOMS (TOP) 48"
PANELS & PANELBOARDS (TOP) 72"
PULL STATIONS (HANDLE) 48"
PHOTOCELLS 144"
RECEPTACLES (BOTTOM) 18"
RECEPTACLES (EXTERIOR) 24"
RECEPTACLES (GARAGES) 26"
RECEPTACLES IN EQUIPMENT ROOMS (TOP) 48"
REMOTE INDICATING LIGHT (EQUIPMENT ROOMS) 48"
REMOTE INDICATING LIGHT (FINISHED AREAS) CEILING
SAFETY SWITCHES & STARTERS 48"
SWITCHES (TOP) 48"
TELEPHONE/DATA/TV OUTLETS (BOTTOM) 18"
VISIBLE APPLIANCES (CENTERLINE) 84"
(AFF, AFG UNLESS NOTED OTHERWISE)
FAAP
FAAP
FACP
FACP
AMP
AMP
RPS
F cd cd cd cd
F
F
RT
RL
PS
FS
VT
DH
K
RD
FIRE ALARM SYMBOLS
FIRE ALARM CONTROL PANEL, SURFACE MOUNTED
FIRE ALARM CONTROL PANEL, RECESS MOUNTED
FIRE ALARM ANNUNCIATOR PANEL, SURFACE MOUNTED
FIRE ALARM ANNUNCIATOR PANEL, RECESS MOUNTED
AMPLIFIER PANEL, SURFACE MOUNTED
AMPLIFIER PANEL, RECESS MOUNTED
REMOTE POWER SUPPLY, SURFACE MOUNTED
REMOTE TEST STATION WITH INDICATING LIGHT
REMOTE INDICATING LIGHT
PRESSURE SWITCH, LOW/HIGH
WATERFLOW ALARM SWITCH
CONTROL VALVE TAMPER SWITCH
MAGNETIC DOOR HOLD OPEN DEVICE
KNOX BOX
MANUAL PULL STATION
FIREFIGHTER'S PHONE JACK
BELL
AUDIBLE NOTIFICATION DEVICE, WALL MOUNTED
AUDIBLE NOTIFICATION DEVICE, CEILING MOUNTED
AUDIBLE/VISUAL NOTIFICATION DEVICE, WALL MOUNTED
AUDIBLE/VISUAL NOTIFICATION DEVICE, CEILING MOUNTED
VISUAL NOTIFICATION DEVICE, WALL MOUNTED
VISUAL NOTIFICATION DEVICE, CEILING MOUNTED
BEAM DETECTOR
HEAT DETECTOR, E = ELEVATOR RECALL
SMOKE DETECTOR, E = ELEVATOR RECALL
SMOKE DETECTOR, SINGLE STATION
SMOKE DETECTOR, DUCT MOUNTED, SD = SUPPLY
ABORT SWITCH
cd = CANDELA RATING cd = CANDELA RATING cd = CANDELA RATING cd = CANDELA RATING
RD = RETURN
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
FA-001
FIRE ALARM LEGEND
1 7ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
A. PROVIDE FIRE ALARM SYSTEM DESIGN,
INSTALLATION, AND MATERIALS IN ACCORDANCE
WITH NFPA 70, NFPA 72, AND NFPA 101. SYSTEM
SHALL ALSO COMPLY WITH ALL APPLICABLE
BUILDING CODES, FIRE CODES, AS WELL AS, THE
REQUIREMENTS OF THE VA. VERIFY ALL
REQUIREMENTS PRIOR TO BID.
B. INFORMATION SHOWN ON CONTRACT
DOCUMENTS IS GENERAL INFORMATION AND FOR
BID PURPOSES ONLY. PERFORM REQURIED
CALCULATIONS AND COORDINATE WITH OTHER
TRADES. REFER TO THE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
C. PROVIDE ALL EQUIPMENT AND LABOR REQUIRED
FOR A COMPLETE AND OPERATIONAL FIRE ALARM
SYSTEM.
D. COORDINATE THE FIRE ALARM CONTROL PANEL
AND REMOTE ANNUNCIATOR PANEL WITH THE
FIRE DEPARTMENT AND VA PRIOR TO
INSTALLATION. DO NOT INSTALL SMOKE
DETECTORS IN A DIRECT AIR FLOW, NOR CLOSER
THAN 3 FEET FROM AN AIR SUPPLY DIFFUSER OR
RETURN AIR OPENING.
E. COORDINATE NOTIFICATION DEVICE PLACEMENT
WITH FURNISHINGS, CABINETS, AND EQUIPMENT
SO THAT DEVICES ARE NOT COVERED OR
OBSTRUCED FROM VIEW.
F. REFER TO MECHANICAL PLANS FOR QUANITY AND
LOCATIONS OF SMOKE DAMPERS AND PROVIDE
POWER AND FIRE ALARM CONNECTION TO EACH.
G. REFER TO FIRE SPRINKLER SHOP DRAWINGS FOR
FLOW AND TAMPER SWITCH LOCATIONS AND
PROVIDE FIRE ALARM CONNECTIONS TO EACH.
H. FORWARD COMPLETED FIRE ALARM CERTIFIATE
OF COMPLETION TO THE OWNER.
I. PROVIDE FIRE ALARM WIRING IN CONDUIT,
FACTORY PAINTED RED.
J. BEFORE STARTING WORK, TEST EXISTING FIRE
ALARM SYSTEM IN AREA OF WORK AND
ADJACENT AREAS.
K. NOTIFY COR REGARDING DEFICIENCIES AND NON
OPERATING COMPONENTS. VA WILL MAKE
REPAIRS.
L. WHEN WORK IS COMPLETE, TEST FIRE ALARM
SYSTEM IN AREA OF WORK AND ADJACENT
AREAS.
M. MAKE REPAIRS TO RESOLVE INCORRECT SYSTEM
OPERATIONS AT NO ADDITIONAL COST.
N. THE FIRE ALARM SYSTEM VENDOR/CONTRACTOR
SHALL TERMINATE, TEST, AND PROGRAM ALL
NEW FIRE ALARM DEVICES.
O. EXISTING FIRE ALARM CONTROL PANEL AND
ANNUNCIATORS TO REMAIN. PROVIDE
ADDITIONAL EXTENDER PANELS TO EXISTING
SYSTEM AS REQUIRED TO MEET SYSTEM
CAPACITY REQUIREMENTS.
P. ALL NEW FIRE ALARM DEVICES SHOWN ARE TO
CONNECT TO THE EXISTING FIRE ALARM SYSTEM.
Q. GRAYED OUT AREAS ARE NOT IN SCOPE OF
WORK.
GENERAL FIRE ALARM NOTES:
11/04/202011/04/2020NOVEMBER 4, 20202022
SOILED LINEN
1C31B
MECH
1C31A
30 cd
SOILED LINEN
1C31B
MECH
1C31A
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:2
A
M
1-FA101
BLDG 1 FIRE ALARM FLOOR PLAN
2 7ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/4" = 1'-0"1
BLDG 1 FIRE ALARM FLOOR PLAN - FIRST FLOOR
1/4" = 1'-0"2
BLDG 1 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR 0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
TRUE
1 REMOVE ALL FIRE ALARM DEVICES, CONTROL
WIRING, AND IT'S CONDUIT BACK TO THE
NEAREST JUNCTION BOX AND SAVE CIRCUITS
FOR REUSE IN NEW CONSTRUCTION.
BLDG 1
11/04/202011/04/2020NOVEMBER 4, 202011/04/2020NOVEMBER 4, 20202022
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
ELEC
BA04
EQUIP ROOM
BA05
MAINTENANCE BENCH STOCK
BA06
MECH RM
BA02
STAIR
BA01
STAIR
BA03
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:4
A
M
7-FAD100
BLDG 7 FIRE ALARM DEMOLITION
FLOOR PLAN - BASEMENT
3 7ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
1 REMOVE ALL FIRE ALARM DEVICES, CONTROL
WIRING, AND IT'S CONDUIT BACK TO THE
NEAREST JUNCTION BOX AND SAVE CIRCUITS
FOR REUSE IN NEW CONSTRUCTION.
BLDG 7
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
Z
7.4 9.99
'T
MAINTENANCE BENCH STOCK
1B02
HAC
1B03
TOILET, MEN
1B04
ELEC
1B05
TOILET, WOMEN
1B06
CORRIDOR
1B00A
STAIR
1BA
SHOWER/LOCKER
1B06A
SHOWER/LOCKER
1B04A
HAC
1B02A
OFFICE
1B02B
WAREHOUSE
1B01
ENTRY
1B00
TELE/DATA
1B08
AUX
1B10
CORRIDOR
1C00
RECEIVING/WAREHOUSE
1C01
OFFICE, WILL CALL
1C02
STORAGE (EQUIP)
1C03
OFFICE
1C04
VAULT
1C05
BREAKROOM
1C06
TOILET/SHOWER
1C07
HAC
1C08
TELE/DATA
1C10
ELEC
1C12
MECHANICAL
1C01A
WILL CALL
1C02A
WAREHOUSE
1C09
WAREHOUSE
1C09A
WAREHOUSE
1C09B
LOCKERS
1C09C
WAREHOUSE
1C09D
WAREHOUSE
1C09E
LOGISTICS ADMIN
1B20
CHECK OUT
1B02C
OFFICE, CSCO
1B07A
OIT CLOSET
1B02E
OFFICE, MGMT ANALYSIS
1B02F
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
7-FAD101
BLDG 7 FIRE ALARM DEMOLITION
FLOOR PLAN - FIRST FLOOR
4 7ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
BEN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR 0 4 8 16
N O R
TH
TRUE
1 REMOVE ALL FIRE ALARM DEVICES, CONTROL
WIRING, AND IT'S CONDUIT BACK TO THE
NEAREST JUNCTION BOX AND SAVE CIRCUITS
FOR REUSE IN NEW CONSTRUCTION.
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
ELEC
BA04
EQUIP ROOM
BA05
MAINTENANCE BENCH STOCK
BA06
MECH RM
BA02
STAIR
BA01
STAIR
BA03
ELEV MACH
BA07
15 cd
15 cd
30 cd
15 cd
30 cd
30 cd
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:4
A
M
7-FA100
BLDG 7 FIRE ALARM FLOOR PLAN -
BASEMENT
5 7ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
Z
7.4 9.99
'T
MAINTENANCE BENCH STOCK
1B02
HAC
1B03
TOILET, MEN
1B04
ELEC
1B05
TOILET, WOMEN
1B06
OFFICE, DCSCO
1B07
CORRIDOR
1B00A
STAIR
1BA
SHOWER/LOCKER
1B06A
SHOWER/LOCKER
1B04A
HAC
1B02A
OFFICE
1B02B
WAREHOUSE
1B01
CONFERENCE
1B01A
CORRIDOR
1B01B
ENTRY
1B00
TELE/DATA
1B08
AUX
1B10
CORRIDOR
1C00
RECEIVING/WAREHOUSE
1C01
OFFICE, WILL CALL
1C02
STORAGE (EQUIP)
1C03
OFFICE
1C04
VAULT
1C05
BREAKROOM
1C06
TOILET/SHOWER
1C07
HAC
1C08
TELE/DATA
1C10
ELEC
1C12
MECHANICAL
1C01A
WILL CALL
1C02A
WAREHOUSE
1C09
WAREHOUSE
1C09A
WAREHOUSE
1C09B
LOCKERS
1C09C
WAREHOUSE
1C09D
WAREHOUSE
1C09E
LOGISTICS ADMIN
1B20
CHECK OUT
1B02C
OFFICE, CSCO
1B07A
OIT CLOSET
1B02E
OFFICE, MGMT ANALYSIS
1B02F
BREAK ROOM
1B01C
15 cd
15 cd
15 cd
15 cd
15 cd
15 cd
15 cd
30 cd
30 cd
30 cd
30 cd
30 cd
30 cd
15 cd
30 cd 30 cd 30 cd
30 cd30 cd30 cd
30 cd 30 cd 30 cd
30 cd30 cd30 cd
30 cd
30 cd
30 cd
30 cd 30 cd 30 cd
15 cd
15 cd
15 cd
15 cd
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:4
A
M
7-FA101
BLDG 7 FIRE ALARM FLOOR PLAN -
FIRST FLOOR
6 7ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/8" = 1'-0"1
BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR 0 4 8 16
N O R
TH
TRUE
AREA OF DEMOLITION
CLEAN LINEN
BC09
OFFICE
BC04
CLEAN LINEN
BC09
CLEAN LINEN
BC09
CLEAN LINEN
BC09
30 cd
15 cd 15 cd
30 cd
15 cd
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/2 /2
:5
:5
A
M
14-FA100
BLDG 14 FIRE ALARM FLOOR PLAN
7 7ABM
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
02/07/2020
100% CONSTRUCTION DOCUMENTS
660-18-243
DIW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1/4" = 1'-0"1
BLDG 14 FIRE ALARM DEMO FLOOR PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
1/4" = 1'-0"2
BLDG 14 FIRE ALARM FLOOR PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
1 REMOVE ALL FIRE ALARM DEVICES, CONTROL
WIRING, AND IT'S CONDUIT BACK TO THE
NEAREST JUNCTION BOX AND SAVE CIRCUITS
FOR REUSE IN NEW CONSTRUCTION.
BLDG 14
| 01_FA-001 - FIRE ALARM LEGEND |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 02_1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 03_7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 04_7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 05_7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 06_7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |
| 07_14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| Sheets |
| 1-E-101 - BLDG 1 LIGHTING AND POWER PLANS |
| 1-FA101 - BLDG 1 FIRE ALARM FLOOR PLAN |
| 1-T-101 - BLDG 1 TECHNOLOGY FLOOR PLAN |
| 7-E-501 - ELECTRICAL DETAILS |
| 7-E-601 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-602 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-E-603 - BLDG 7 ELECTRICAL SCHEDULES |
| 7-EL100 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT |
| 7-EL101 - BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR |
| 7-ELD100 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT |
| 7-ELD101 - BLDG 7 ELECTRICAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EP100 - BLDG 7 ELECTRICAL POWER PLAN - BASEMENT |
| 7-EP101 - BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR |
| 7-EP102 - BLDG 7 ELECTRICAL POWER PLAN - ROOF |
| 7-EPD100 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT |
| 7-EPD101 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-EPD102 - BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF |
| 7-FA100 - BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT |
| 7-FA101 - BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR |
| 7-FAD100 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT |
| 7-FAD101 - BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR |
| 7-T-100 - BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT |
| 7-T-101 - BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR |
| 7-T-401 - TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS |
| 7-T-501 - TECHNOLOGY DETAILS |
| 7-T-601 - TECHNOLOGY RISER DIAGRAMS |
| 7-T-602 - TECHNOLOGY SCHEDULES |
| 7-TD100 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASMENT |
| 7-TD101 - BLDG 7 TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR |
| 14-E-100 - BLDG 14 LIGHTING AND POWER PLANS |
| 14-FA100 - BLDG 14 FIRE ALARM FLOOR PLAN |
| 14-T-100 - BLDG 14 TECHNOLOGY FLOOR PLAN |
| E-001 - ELECTRICAL LEGEND |
| FA-001 - FIRE ALARM LEGEND |
| T-001 - TECHNOLOGY LEGEND |