Amendment 09 - 05-FP 18-314 Add01.pdf
PDF 605 KB Posted
- Attached to
- Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19) Federal contract opportunity
- Solicitation number
- 36C25920R0104
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
CD
ACD
V
VBG
VBF
AV
AW
AW
ST
OST
GW
GW
S
W
ID
SPD
T
SCW
WS
140°
S
W
ST
CAP
"A"
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BIL BASIC INSULATION LEVEL
BLDG BUILDING
BPIP BOILER PLANT
INSTRUMENTATION PANEL
BRKR BREAKER
BYP BY PASS
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
A/C AIR CONDITIONING
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED
CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR
AVAILABLE FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB OR A AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
1P SINGLE POLE
1PH SINGLE-PHASE
3P THREE POLE
3PH THREE-PHASE
3W THREE WIRE
4W FOUR WIRE
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR
PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PT POTENTIAL TRANSFORMER
PTRV POWER TYPE ROOF VENTILATION
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
SCC SHORT CIRCUIT CAPACITY
SES SERVICE ENTRANCE SECTION
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
IESNA ILLUMINATION ENGINEERING SOCIETY
OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
W WATT
WH WATER HEATER
WP WEATHERPROOF
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LTCP LOCAL TEMPERATURE CONTROL PANEL
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
XFER TRANSFER
XFMR TRANSFORMER
XP EXPLOSION PROOF
JB JUNCTION BOX
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAH KILOVOLT AMPERE PER HOUR
KVAR KILOVOLT AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
N NEUTRAL
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REC RECESSED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
TC TIME CLOCK
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
ABBREVIATIONS
A
B
C
C CONDUIT
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CLF CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMCP EMERGENCY MONITORING
CONTROL PANEL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
D
E
F
G
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FABL FIRE ALARM BELL
FABX FIRE ALARM BOX
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FI FILM ILLUMINATOR
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE METALLIC CONDUIT
FLUOR FLUORESCENT
FP FIRE PROTECTION
FT FEET OR FOOT
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
H
I
J
K
L
M
N
O
P
ANNOTATION
R
S
T
U
V
W
W
CU
M100
M100
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL REFERENCE
SECTION CUT DESIGNATION
PIPING SYMBOLS
FIRE SPRINKLERS
FIRE PIPING
PENDENT SPRINKLER
UPRIGHT SPRINKLER
CONCEALED SPRINKLER
DRY PENDENT SPRINKLER
DRY SIDEWALL SPRINKLER
SIDEWALL SPRINKLER
WITH PDI SIZES, (A, B, C, D, & E)
WATER HAMMER ARRESTER (WHA)
FIRE DEPARTMENT CONNECTION
FIRE PUMP TEST HEADER
INSPECTOR'S TEST CONNECTION / AUXILIARY
DRAIN
SPRINKLER RISER
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
NITROUS OXIDE OUTLET
NITROGEN OUTLET
MEDICAL VACUUM INLET
OXYGEN OUTLET
MEDICAL AIR OUTLET
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS ON ROOF (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (S)
SOIL PIPING - BELOW FLOOR (S)
STORM DRAIN - ABOVE FLOOR (ST)
STORM DRAIN - BELOW FLOOR (ST)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
GAS PRESSURE REGULATOR
OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
VENT BELOW GRADE (VBG)
VENT BELOW FLOOR (VBF)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE (SOV)
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
BALL VALVE
SHUTOFF VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
REDUCER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:4
:2
A
M
F-001
FIRE PROTECTION LEGEND
1 7RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRMNOVEMBER 04, 2022
SOILED LINEN
1C31B
MECH
1C31A
AREA OF DEMOLITION
2 3 4
SOILED LINEN
1C31B
MECH
1C31A
AREA OF WORK
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:4
:2
A
M
1-FX-101
BLDG 1 FIRE PROTECTION PLAN -
FIRST FLOOR
2 7RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/4" = 1'-0"
BLDG 1 FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR
Scale: 1/4" = 1'-0"
BLDG 1 FIRE PROTECTION PLAN - FIRST FLOOR
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE FIRE SPRINKLER WORK WITH
OTHER TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. REMOVE EXISTING FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE WITH ALL OTHER TRADES. VERIFY
ALL EXISTING CONDITIONS PRIOR TO
DEMOLITION.
2. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
RECONNECT TO EXISTING AS REQUIRED.
3. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE EXACT LOCATION WITH RELATED
TRADES.
4. DIVISION 21 CONTRACTOR TO REPOSITION
SPRINKLER HEADS AS REQUIRED.
0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
TRUE
NOVEMBER 04, 2022
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
MECH RM
BA02
STAIR
BA03
EQUIP ROOM
BA05
ELEC
BA04
MAINTENANCE BENCH STOCK
BA06
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:4
:2
A
M
7-FXD100
BLDG 7 FIRE PROTECTION DEMOLITION
PLAN - BASEMENT
3 7RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE FIRE SPRINKLER WORK WITH
OTHER TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. REMOVE EXISTING FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE WITH ALL OTHER TRADES. VERIFY
ALL EXISTING CONDITIONS PRIOR TO
DEMOLITION.
Scale: 1/8" = 1'-0"
BLDG 7 FIRE PROTECTION DEMOLITION PLAN - BASEMENT 0 4 8 16
N O R
TH
W
X
Y
Z
7.4 9.99
'E
'C
'S
'A
'B
'T
2 1/2" FP FFB
1 1/2" FP FFB
OFFICE, CSCO
1B07A
OFFICE, DCSCO
1B07
ELEC
1B05
OFFICE
1B02B
OIT CLOSET
1B02E
OFFICE, MGMT ANALYSIS
1B02F
HAC
1B03
HAC
1B02A
STAIR
1BA
SHOWER/LOCKER
1B06A
TOILET, WOMEN
1B06
TOILET, MEN
1B04
SHOWER/LOCKER
1B04A
MAINTENANCE BENCH STOCK
1B02
WAREHOUSE
1B01
CORRIDOR
1B01B
ENTRY
1B00
CONFERENCE
1B01A
BREAK ROOM
1B01C
TELE/DATA
1B08
AUX
1B10
AREA OF DEMOLITION
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:4
:2
A
M
7-FXD101
BLDG 7 FIRE PROTECTION DEMOLITION
PLAN - FIRST FLOOR
4 7RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 FIRE PROTECTION DEMO PLAN - FIRST FLOOR
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE FIRE SPRINKLER WORK WITH
OTHER TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. REMOVE EXISTING FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE WITH ALL OTHER TRADES. VERIFY
ALL EXISTING CONDITIONS PRIOR TO
DEMOLITION.
0 4 8 16
N O R
TH
W
X
Y
Z
7.4 9.99
1 2 3
MECH RM
BA02
STAIR
BA03
EQUIP ROOM
BA05
ELEC
BA04
MAINTENANCE BENCH STOCK
BA06
ELEV MACH
BA07
AREA OF WORK
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:4
:2
A
M
7-FX-100
BLDG 7 FIRE PROTECTION PLAN -
BASEMENT
5 7RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE FIRE SPRINKLER WORK WITH
OTHER TRADES AND CONTRACTORS. VERIFY
ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
Scale: 1/8" = 1'-0"
BLDG 7 FIRE PROTECTION PLAN - BASEMENT
1. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
RECONNECT TO EXISTING AS REQUIRED.
2. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE EXACT LOCATION WITH RELATED
TRADES.
3. DIVISION 21 CONTRACTOR TO REPOSITION
SPRINKLER HEADS AS REQUIRED.
0 4 8 16
N O R
TH
W
X
Y
Z
7.4 9.99
'E
'C
'S
'A
'B
'T
2 1/2" FP FFB
1 1/2" FP FFB
1 2 3
1 2 3
1 2 3
OFFICE, CSCO
1B07A
STAIR
1BA
OFFICE, DCSCO
1B07
ELEC
1B05
HAC
1B03
HAC
1B02A
OFFICE
1B02B
OIT CLOSET
1B02E
SHOWER/LOCKER
1B04A
TOILET, MEN
1B04
TOILET, WOMEN
1B06
SHOWER/LOCKER
1B06A
CORRIDOR
1B00A
CHECK OUT
1B02C
MAINTENANCE BENCH STOCK
1B02
OFFICE, MGMT ANALYSIS
1B02F
LOGISTICS ADMIN
1B20
WAREHOUSE
1B01
BREAK ROOM
1B01C
CONFERENCE
1B01A
CORRIDOR
1B01B
ENTRY
1B00
TELE/DATA
1B08
AUX
1B10
AREA OF WORK
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:4
:2
A
M
7-FX-101
BLDG 7 FIRE PROTECTION PLAN -
FIRST FLOOR
6 7RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 FIRE PROTECTION PLAN - FIRST FLOOR
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE FIRE SPRINKLER WORK WITH
OTHER TRADES AND CONTRACTORS. VERIFY
ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
1. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
RECONNECT TO EXISTING AS REQUIRED.
2. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE EXACT LOCATION WITH RELATED
TRADES.
3. DIVISION 21 CONTRACTOR TO REPOSITION
SPRINKLER HEADS AS REQUIRED.
4. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL SPRINKLER HEAD AT THE TOP OF THE
ELEVATOR SHAFT AS REQUIRED BY CODE.
0 4 8 16
N O R
TH
AREA OF DEMOLITION
2 3 4
CLEAN LINEN
BC09
OFFICE
BC04
AREA OF WORK
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:4
:2
A
M
14-FX-100
BLDG 14 FIRE PROTECTION PLAN -
BASEMENT
7 7RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/4" = 1'-0"
BLDG 14 FIRE PROTECTION DEMOLITION PLAN - BASEMENT
Scale: 1/4" = 1'-0"
BLDG 14 FIRE PROTECTION PLAN - BASEMENT
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL
INFORMATION REGARDING SCHEDULE AND
PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE FIRE SPRINKLER WORK WITH
OTHER TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. REMOVE EXISTING FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE WITH ALL OTHER TRADES. VERIFY
ALL EXISTING CONDITIONS PRIOR TO
DEMOLITION.
2. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
RECONNECT TO EXISTING AS REQUIRED.
3. DIVISION 21 CONTRACTOR TO PROVIDE AND
INSTALL FIRE SPRINKLER PIPING AND
ASSOCIATED ACCESSORIES AS REQUIRED.
COORDINATE EXACT LOCATION WITH RELATED
TRADES.
4. DIVISION 21 CONTRACTOR TO REPOSITION
SPRINKLER HEADS AS REQUIRED.
0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
| Sheets |
| F-001 - FIRE PROTECTION LEGEND |
| 1-FX-101 - BLDG 1 FIRE PROTECTION PLAN - FIRST FLOOR |
| 7-FXD100 - BLDG 7 FIRE PROTECTION DEMOLITION PLAN - BASEMENT |
| 7-FXD101 - BLDG 7 FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR |
| 7-FX-100 - BLDG 7 FIRE PROTECTION PLAN - BASEMENT |
| 7-FX-101 - BLDG 7 FIRE PROTECTION PLAN - FIRST FLOOR |
| 14-FX-100 - BLDG 14 FIRE PROTECTION PLAN - BASEMENT |
File details come from the government source that posted it. Updated .