Text version
S SS
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
WALL TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
PP PUSH PLATE DOOR ACTUATOR
GENERAL NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR
RECESSED OR SEMI-RECESSED PRODUCTS) AND COORDINATE CHANGES TO OTHER MATERIALS OR
PRODUCTS THAT ARE NECESSARY BECAUSE OF PRODUCT SUBSTITUTIONS.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF DISCREPANCY
DISCOVERED.
6. NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
7. VERIFY ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO
PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS.
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
DEMOLITION NOTES
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND
DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED
REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS INDICATED AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION UNLESS
INDICATED OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF
ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE
ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL
DEMOLITION REQUIRED FOR THE COMPLETION OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF
ELECTRICAL SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED
PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND
COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A
PART OF THE SCOPE OF THE PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO
PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES
INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED
DIFFERENTLY FROM THAT INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE
COR.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:2
P
M
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
DocuSign Envelope ID: 72A06BBB-767F-4E9D-B4F0-0D458E7809F7
11/3/2022
UP
DN
DN
DN
CORRIDOR
BC00
MECHANICAL
BC03
STORAGE
BC05
TELE/DATA
BC07
ELECTRICAL
BC08
ELEVATOR
BCE1STAIR
BCA
MECHANICAL
BB02
CORRIDOR
BB00
MECHANICAL
BB14
MECHANICAL
BB15
MECHANICAL
BB05
LOBBY
BB06
CORRIDOR
BC00B
CORRIDOR
BC00C
TOILET
BC10
LOADING
DOCK
BC00D
ELECTRICAL
BC08B
ELECTRICAL
BC08A
CORRIDOR
BC00E
LOBBY
BC00F
ELEVATOR
BBE1
ELEVATOR
BBE2
FUTURE
ELEVATOR
BBE3
FUTURE
ELEVATOR
BBE4
AREA OF WORK
04 05
STORAGE
1C27
THERAPY
1C29
OFFICE
1C29A
HAC
1C25
TOILET
1C21A
THERAPY
1C16
KITCHEN
1C16A
ELEC
1C14
TELE/DATA
STAIR
1CA
STORAGE
1C33A
CLEAN
UTILITY
1C33SOILED
UTILITY
1C31
SOILED
LINEN
1C31B
MECH
1C31A
STORAGE,
TRASH
1C31C
STORAGE,
BIO-HAZ
1C31D
VESTIBULE
1C00C
CORRIDOR
1C00B
OFFICE
1C21
CORRIDOR
1C00A
AREA OF WORK
1C31B
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:4
P
M
AD101
BLDG 1 & BLDG 14 DEMOLITION PLANS
- PHASE 1
2 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
01 REMOVE PORTION OF WALL.
02 REMOVE EXISTING DOOR AND FRAME.
03 REMOVE LINEN/ TRASH CHUTE AND ACCESS
DOORS AT ALL LEVELS. INFILL OPENING WTH 2-HR
FIRE-RATED CONSTRUCT TO MATCH ADJACENT
SHAFT WALLS.
04 AT FLOOR LEVEL ABOVE THIS SPACE, CONSTRUCT
2-HR HORIZONTAL SHAFT WALL TO TERMINATE
EXISTING CHUTE SHAFT.
05 REMOVE TILE FROM FLOOR AND WALLS AND
PREPARE FOR NEW FINISHES.
06 REMOVE EXISTING DOOR. FRAME TO REMAIN.
07 REMOVE EXISTING WALL PROTECTION.
08 REMOVE EXISTING CEILING GRID AND ACOUSTICAL
TILE.
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
BASEMENT DEMOLITION PLAN - BLDG 14
Scale: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - BLDG 1
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
MAINTENANCE
BENCH
STOCK
BA06
STAIR
BA03
STAIR
BA01
MECH RM
BA02
ELEC
BA04
EQUIP
ROOM
BA05
Z
7.4 9.99
01 02
AREA OF WORK
15'-5 1/4" 1'-10 3/8"
/8
/8
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:4
P
M
AD102
BLDG 7 BASEMENT DEMOLITION PLAN -
PHASE 2
3 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
BASEMENT DEMOLITION PLAN - BLDG 7
01 PREPARE CONCRETE SLAB FOR NEW FLOOR
FINISHES.
02 CUT SLAB AND EXCAVATE FOR ELEVATOR PIT.
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
HAC
1B03
TOILET,
MEN
1B04
ELEC
1B05
TOILET,
WOMEN
1B06
OFFICE,
DCSCO
1B07
CORRIDOR
1B00A
STAIR
1BA
SHOWER/LOCKER
1B06A
SHOWER/LOCKER
1B04A
HAC
1B02A
OFFICE
1B02B
ENTRY
1B00
TELE/DATA
1B08
CORRIDOR
1C00
RECEIVING/WAREHOUSE
1C01
OFFICE,
WILL CALL
1C02
STORAGE
(EQUIP)
1C03
OFFICE
1C04
VAULT
1C05
BREAKROOM
1C06
TOILET/SHOWER
1C07
HAC
1C08TELE/DATA
1C10
ELEC
1C12
MECHANICAL
1C01A
WILL CALL
1C02A
WAREHOUSE
1C09
WAREHOUSE
1C09A
WAREHOUSE
1C09B
LOCKERS
1C09C
WAREHOUSE
1C09D
WAREHOUSE
1C09E
AREA OF WORK
Z
7.4 9.99
'T
08 08 08
/2
/4
11'-5 1/2" 3'-10 1/4"
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:4
P
M
AD103
BLDG 7 FIRST FLOOR DEMOLITION
PLAN - PHASE 2
4 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - BLDG 7
01 LAUNDRY EQUIPMENT REMOVED BY VA, TYP.
02 REMOVE PORTION OF WALL INDICATED BY DASHED
LINES.
03 REMOVE CURB AND PREPARE FOR NEW
FLOORINIG.
04 PREPARE FOR NEW FLOOR FINISHES, TYP.
05 REMOVE DOOR AND FRAME.
06 REMOVE WALL FOR NEW DOOR AND FRAME.
07 CUT SLAB FOR NEW ELEVATOR AND EXCAVATE
SOIL AS REQUIRED FOR ELEVATOR PIT AND SUMP.
COORDINATE W/ ELEVATOR MFR REQUIREMENTS
AND NEW WORK.
08 REMOVE EXISTING CEILING GRID AND ACOUSTICAL
TILE.
09 REMOVE METAL GRATES AND PREPARE TRENCH
FOR INFILL.
10 REMOVE STEEL PLATE AND PREPARE WATER PITS
FOR CONCRETE INFILL.
11 COORDINATE USE OF LOADING DOCK AND DOORS
FOR CONSTRUCTION ACCESS WITH VA COR.
12 CUT SLAB AND EXCAVATE FOR NEW SANITARY
LINE.
13 EXISTING RECESSED SCALE TO REMAIN.
14 EXISTING DOCK LEVELER TO REMAIN.
A. CONSTRUCTION TRAILER, LAYDOWN, AND CRANE
MUST BE RESTRICTED TO NORTHEAST SIDE OF
BUILDING.
B. CONTRACTOR SHALL PROVIDE TEMPORARY
CONSTRUCTION FENCE AROUND CONSTRUCTION
AREA.
C. CONTRACTOR SHALL NOT BLOCK VEHICULAR
ACCESS TO ADJACENT BUILDING TO THE
NORTHEAST THAT SHARES AN ACCESS DRIVE.
D. ALL SITE LOGISTICS SHALL BE COORDINATED WITH
AND APPROVED BY THE COR BEFORE PROCEEDING.
E. WHERE NEW FLOOR FINISHES ARE SCHEDULED,
DEMOLISH EXISTING FLOOR FINISH AND PREPARE
SUBSTRATE TO RECEIVE NEW FLOORING. THIS
INCLUDES DEMOLITION OF EXISTING TILE IF
PRESENT.
F. WHERE NEW WALL FINISHES ARE SCHEDULED,
PREPARE EXISTING SURFACE FOR NEW FINISHES.
THIS INCLUDES DEMOLITION OF EXISTING TILE IF
PRESENT.
G. WHERE EXISTING GYP BD CEILINGS RECEIVE NEW
PAINT, PREPARE EXISTING SURFACE FOR NEW
FINISHES.
1 ADD 01 11/04/2022
UP
DN
DN
DN
CORRIDOR
BC00
MECHANICAL
BC03
STORAGE
BC05
TELE/DATA
BC07
ELECTRICAL
BC08
CLEAN
LINEN
BC09
ELEVATOR
BCE1STAIR
BCA
MECHANICAL
BB02
CORRIDOR
BB00
MECHANICAL
BB14
MECHANICAL
BB15
MECHANICAL
BB05
LOBBY
BB06
CORRIDOR
BC00B
CORRIDOR
BC00C
TOILET
BC10
LOADING
DOCK
BC00D
ELECTRICAL
BC08B
ELECTRICAL
BC08A
CORRIDOR
BC00E
LOBBY
BC00F
ELEVATOR
BBE1
ELEVATOR
BBE2
FUTURE
ELEVATOR
BBE3
FUTURE
ELEVATOR
BBE4
BC09
AREA OF WORK
U L R
U L R
F
F
F
F
F
F
F
F
F
F
F
F
F
ULR01 ULR01 ULR01 ULR01 ULR01
ULR01
U L R
U L R
U L R
U L R
U L R
U L R
U L R
U L R
U L R
U L R
U L R
1 OFFICE
BC04
F
B C
9'-0"
ALIGN
CLR
6'-0"
F3.0
G3.0
G3.0
F3.0
PP
PP
G3.0
3'-9"
STORAGE
1C27
THERAPY
1C29
OFFICE
1C29A
HAC
1C25
TOILET
1C21A
THERAPY
1C16
KITCHEN
1C16A
ELEC
1C14
TELE/DATA
STAIR
1CA
STORAGE
1C33A
CLEAN
UTILITY
1C33SOILED
UTILITY
1C31
SOILED
LINEN
1C31B
MECH
1C31A
STORAGE,
TRASH
1C31C
STORAGE,
BIO-HAZ
1C31D
VESTIBULE
1C00C
CORRIDOR
1C00B
OFFICE
1C21
CORRIDOR
1C00A
AREA OF WORK
F
F
F
F
F
F
F
F
F
F
F
F
F
F
PP
PP 1C31B
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:3
P
M
A-101
BLDG 1 & BLDG 14 FLOOR PLANS -
PHASE 1
5 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
0 4 8 16
NORTH
PLAN
01 1-HR ICRA BARRIER.
02 USE EXISTING OVERHEAD COILING DOOR
FOR CONSTRUCTION ACCESS.
05 USE EXISTING EXTERIOR DOOR FOR
CONSTRUCTION ACCESS.
06 PROVIDE WALL PROTECTION, BUMPER
GUARD AND HANDRAIL. MATCH MOUNTING
HEIGHTS OF EXISTING GUARDS AND RAILS IN
ADJACENT AREAS OF CORRIDOR.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
Scale: 1/8" = 1'-0"
BASEMENT FLOOR PLAN - BLDG 14
Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN - BLDG 1 0 4 8 16
NORTH
PLAN
EQUIPMENT SCHEDULE (BASIS OF DESIGN)
JSN Description Manufacturer Model Furnish/Install
A1030 LOCKER, 3-TIER REFER TO
SPECIFICATIONS
REFER TO SPECIFICATIONS CC
A5075 DISPENSER, SOAP, WALL-MOUNT N/A N/A VC
A5080 DISPENSER, PAPER TOWEL, WALL-MOUNT N/A N/A VC
A5212 BRACKET, TELEVISION, WALL-MOUNT N/A N/A VV
F0510 CART, SOILED LINEN N/A N/A VV
F0515 CART, CLEAN LINEN EXCHANGE N/A N/A VV
F3050A WHITEBOARD, LARGE N/A N/A VV
K4665 MICROWAVE N/A N/A VV
R7000 REFRIGERATOR, DOMESTIC N/A N/A VV
ULR01 RACK, CLEAN LINEN, 24"X72"X72" N/A N/A VV
1 ADD 01 11/04/2022
MAINTENANCE
BENCH
STOCK
BA06
STAIR
BA03
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
STAIR
BA01
MECH RM
BA02
ELEC
BA04
EQUIP
ROOM
BA05
Z
7.4 9.99
A-301
A-301
M8.1
M8.1
M8.1
A-501
VERIFY W/ MFR
10'-2" 4'-6"
V E
R
IF
Y W
M
F R
/2
M8.1
B A
ELEV MACH
BA07 01
7'-8"
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:3
P
M
A-102
BLDG 7 BASEMENT FLOOR PLAN -
PHASE 2
6 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
0 4 8 16
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
Scale: 1/8" = 1'-0"
BASEMENT FLOOR PLAN - BLDG 7
01 NEW FLOOR SLAB INFILL. REFER TO
STRUCTURAL.
02 PIT LADDER.
03 SUMP PIT, 24"L X 24"W X 24"D, VERIFY
LOCATION W/ ELEVATOR MANUFACTURER.
A. COORDINATE ELEVATOR SHAFT AND PIT SIZES WITH
SELECTED ELEVATOR EQUIPMENT.
MAINTENANCE
BENCH
STOCK
1B02
HAC
1B03
TOILET,
MEN
1B04
ELEC
1B05
TOILET,
WOMEN
1B06
OFFICE,
DCSCO
1B07
CORRIDOR
1B00A
STAIR
1BA
SHOWER/LOCKER
1B06A
SHOWER/LOCKER
1B04A
HAC
1B02A
1B02B
OFFICE
WAREHOUSE
1B01
CONFERENCE
1B01A
ENTRY
1B00
TELE/DATA
1B08
CORRIDOR
1C00
RECEIVING/WAREHOUSE
1C01
OFFICE,
WILL CALL
1C02
STORAGE
(EQUIP)
1C03
OFFICE
1C04
VAULT
1C05
BREAKROOM
1C06
TOILET/SHOWER
1C07
HAC
1C08TELE/DATA
1C10
ELEC
1C12
MECHANICAL
1C01A
WILL CALL
1C02A
WAREHOUSE
1C09
WAREHOUSE
1C09A
WAREHOUSE
1C09B
LOCKERS
1C09C
WAREHOUSE
1C09D
WAREHOUSE
1C09E
AREA OF WORK
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
CHECK
OUT
1B02C
Z
OFFICE,
CSCO
1B07A
1B02E
OIT CLOSET
1B02F
OFFICE, MGMT
ANALYSIS
BREAK
ROOM
1B01C
LOGISTICS
ADMIN
1B20
1B02F
1B02E
1B02B
1B07A
B
B
E
B
C
CORRIDOR
1B01B
7.4 9.99
'T
/8
A L
IG
N
2'-5 5/8"
1'-10 3/4" TYP.
/2
T Y
P
22'-0 7/8"
6" FROM CORNER
A-301
A-301
1B01B
A-501
2'-4"
M8.1
G3.0
G3.0
G3.0
G3.0
G3.0
G3.0
F3050A
A5212
A-401
R7000
A5080
A5075 K4665
A1030
S4.1
A-501
VERIFY W/ MFR
10'-2" 4'-6"
V E
R
IF
Y W
M
F R
/2
M8.1
M8.103
1'-0"
5'-0"
ALIGN
1B02G
1B02G
OFFICE, MGMT
ANALYSIS
G3.0
VIF
D=48"
VIF
D=48"
VIF
D=60"
2'-0" VIF
V
IF
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:3
P
M
A-103
BLDG 7 FIRST FLOOR PLAN - PHASE 2
7 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
0 4 8 16
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN - BLDG 7
01 INFILL TRENCH WITH CONCRETE.
02 MASONRY CONTROL JOINT
03 NEW FLOOR SLAB INFILL. REFER TO
STRUCTURAL.
04 INFILL WATER PITS WITH CONCRETE.
05 SHOWER WALLS SHALL RECEIVE TILE FINISH
PER DETAIL 7/IF001
06 INFILL SLAB OPENING WITH CONC SLAB
OVER NEW GRANULAR BASE AND VAPOR
BARRIER, FLUSH WITH EXISTING SLAB.
DOWEL INTO EXISTING SLAB.
07 EXISTING SCALE TO REMAIN. COORDINATE
FLOOR FINISH FLUSH TO EDGE OF SCALE
FRAME.
08 EXISTING DOCK LEVELER TO REMAIN.
COORDINATE FLOOR FINISH FLUSH TO EDGE
OF FRAME.
EQUIPMENT SCHEDULE (BASIS OF DESIGN)
JSN Description Manufacturer Model Furnish/Install
A1030 LOCKER, 3-TIER REFER TO
SPECIFICATIONS
REFER TO SPECIFICATIONS CC
A5075 DISPENSER, SOAP, WALL-MOUNT N/A N/A VC
A5080 DISPENSER, PAPER TOWEL, WALL-MOUNT N/A N/A VC
A5212 BRACKET, TELEVISION, WALL-MOUNT N/A N/A VV
F0510 CART, SOILED LINEN N/A N/A VV
F0515 CART, CLEAN LINEN EXCHANGE N/A N/A VV
F3050A WHITEBOARD, LARGE N/A N/A VV
K4665 MICROWAVE N/A N/A VV
R7000 REFRIGERATOR, DOMESTIC N/A N/A VV
ULR01 RACK, CLEAN LINEN, 24"X72"X72" N/A N/A VV
A. COORDINATE ELEVATOR SHAFT AND PIT SIZES WITH
SELECTED ELEVATOR EQUIPMENT.
1 ADD 01 11/04/2022
CRICKET/TAPERED INSULATION
INDICATES ROOF SLOPE
SLOPE: 1/4"
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
Z
7.4 9.99
'T
S L O
P E
SLOPE
S L O
P E
SLOPE
SLOPE
SLOPE
S L O
P E
S L O
P E
A-401
A-301 _____ 3
A-301
A-301 _____4
A-301
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:3
P
M
A-104
BLDG 7 ROOF PLAN - PHASE 2
8 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
0 4 8 16
NORTH
PLAN
ROOF LEGEND
01 NEW MECHANICAL EQUIPMENT, COORDINATE
W/ EXISTING ROOFING.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
Scale: 1/8" = 1'-0"
ROOF PLAN - BLDG 7
A. COORDINATE WITH MECHANICAL DRAWINGS FOR
NEW MECHANICAL UNIT SIZE AND INSTALLATION.
B. MECHANICAL UNIT CURB IS ON RAISED SUPPORTS,
ALLOWING WATER TO FLOW BELOW THE
MECHANICAL UNIT.
C. CUT EXISTING ROOF AS REQUIRED FOR NEW CURB
SUPPORTS. SUPPORTS SHALL ALIGN WITH
EXISTING STRUCTURAL JOISTS, AS SHOWN ON
STRUCTURAL DRAWINGS.
D. PATCH ROOFING AND ROOF INSULATION AROUND
NEW CURB SUPPORTS TO WATERTIGHT CONDITION.
SUPPORTS SHALL HAVE PREFORMED BOOTS
SIMILAR TO 12/A-501.
E. PROVIDE TEMPORARY WEATHER PROTECTION AS
REQUIRED DURING INSTALLATION OF MECHANICAL
CURB SUPPORTS.
1 ADD 01 11/04/2022
AREA OF WORK
CLEAN
LINEN
BC09
AREA OF WORK
SOILED
LINEN
1C31B
REFLECTED CEILING PLAN
LEGEND
DENOTES GWB
SOFFIT/CEILING
CEILING HEIGHT
DESIGNATION
(WHEN HEIGHT
VARIES FROM
TYPICAL)
LIGHT FIXTURE
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
SUPPLY DIFFUSER
RETURN GRILL
PENDANT
MOUNTED LIGHT
DOWN LIGHT
FIXTURE
A.F.F.10' 6"
PERIMETER
RECESSED WALL
SLOT LIGHT FIXTURE
FIRE ALARM
STROBE
FAA
FIRE ALARM
ANNUCIATOR
F
FIRE ALARM PULL
STATION
FIRE ALARM
STROBE LIGHT
S
H
HEAT DETECTOR
SMOKE DETECTOR
SPRINKLER HEAD
LIGHT FIXTURE
A. ACCESS PANELS ARE NOT PERMITTED IN
SOFFITS, CHECK ALL VALVES, FIRE DAMPERS,
REHEAT BOXES, ETC. FOR ACCESS POINTS.
ARRANGE FIRE AND SMOKE DAMPER ACCESS
FROM NON-CORRIDOR SIDE.
B. LIGHTS, DIFFUSERS, EXIT SIGNAGE,
SPRINKLER HEADS, AND SMOKE DETECTORS
MUST BE CENTERED IN CEILING PANELS IN
WHICH THEY OCCUR.
C. PAINT CUT EDGES OF ACT TO MATCH CEILING
TILE WHERE EXPOSED TO VIEW.
D. MEASURE EACH CEILING AREA AND
ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF
EACH ROOM.
E. REVIEW CEILING LAYOUT AS SHOWN AND
NOTIFY VA COR OF ANY CONFLICTS BEFORE
PROCEEDING WITH CONSTRUCTION
F. ALL CEILINGS AT 8'-0'' A.F.F, UNLESS NOTED
OTHERWISE.
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:4
P
M
AC101
BLDG 1 & BLDG 14 REFLECTED CEILING
PLANS - PHASE 1
9 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
Scale: 1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING PLAN - BLDG. 14
Scale: 1/8" = 1'-0"
SECOND FLOOR REFLECTED CEILING PLAN - BLDG. 1 0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
Z
7.4 9.99
'T
AREA OF WORK
A-301
A-301
A-301 _____3
A-301
9' - 0"
9' - 0"
7' - 8"
A. ACCESS PANELS ARE NOT PERMITTED IN
SOFFITS, CHECK ALL VALVES, FIRE DAMPERS,
REHEAT BOXES, ETC. FOR ACCESS POINTS.
ARRANGE FIRE AND SMOKE DAMPER ACCESS
FROM NON-CORRIDOR SIDE.
B. LIGHTS, DIFFUSERS, EXIT SIGNAGE,
SPRINKLER HEADS, AND SMOKE DETECTORS
MUST BE CENTERED IN CEILING PANELS IN
WHICH THEY OCCUR.
C. PAINT CUT EDGES OF ACT TO MATCH CEILING
TILE WHERE EXPOSED TO VIEW.
D. MEASURE EACH CEILING AREA AND
ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF
EACH ROOM.
E. REVIEW CEILING LAYOUT AS SHOWN AND
NOTIFY VA COR OF ANY CONFLICTS BEFORE
PROCEEDING WITH CONSTRUCTION
F. ALL CEILINGS AT 8'-0'' A.F.F, UNLESS NOTED
OTHERWISE.
REFLECTED CEILING PLAN
LEGEND
DENOTES GWB
SOFFIT/CEILING
CEILING HEIGHT
DESIGNATION
(WHEN HEIGHT
VARIES FROM
TYPICAL)
LIGHT FIXTURE
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
SUPPLY DIFFUSER
RETURN GRILL
PENDANT
MOUNTED LIGHT
DOWN LIGHT
FIXTURE
A.F.F.10' 6"
PERIMETER
RECESSED WALL
SLOT LIGHT FIXTURE
FIRE ALARM
STROBE
FAA
FIRE ALARM
ANNUCIATOR
F
FIRE ALARM PULL
STATION
FIRE ALARM
STROBE LIGHT
S
H
HEAT DETECTOR
SMOKE DETECTOR
SPRINKLER HEAD
LIGHT FIXTURE
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:4
P
M
AC103
BLDG 7 FIRST FLOOR REFLECTED
CEILING PLAN - PHASE 2
10 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
Scale: 1/8" = 1'-0"
1ST FLOOR REFLECTED CEILING PLAN - BLDG 7 0 4 8 16
NORTH
PLAN
01 NO CEILING.
BLDG 7 - 1ST FLOOR
-10' - 0"
BLDG 7 - BASEMENT
-22' - 0"
BLDG 7 - HIGH ROOF
10' - 8"
X 2
A-301
_____ FIRESTOPPING AS REQUIRED
TO MAINTAIN RATING
ELEVATOR DOOR FRAME
8" CMU, PAINTED
11 1/2"
ELEVATOR SILL
CONC. FILL
CUT CMU AS REQUIRED TO
CONTINUE SLAB
1/2" FIBER REINFORCED JOINT
FILLER
EXISTING FOUNDATION WALL
1/2" FIBER - REINFORCED
JOINT FILLER
CONC SLAB ON GRADE,
REF TO STRUCTURAL
A-501
A-501
A-501
Sim
PAINTED STEEL PIT LADDER, MIN. 1/4"X2"
VERTICAL BARS AND 1" DIA RUNGS
DAMPPROOFING
STEEL ANGLE, REFER TO
STRUCTURAL
COORDINATE SUMP PUMP
W/ PLUMBING DWGS.
M8.1
M8.1
CONC PIT WALL AND SLAB,
REFER TO STRUCTURAL
CONCRETE SLAB INFILL ON METAL
DECK, REF TO STRUCTURAL
1'-6"
T Y
P
BACKFILL PER STRUCTURAL NOTES
1-HOUR HORIZONTAL SHAFTWALL
SYSTEM TO BE INSTALLED TO
SEPARATE ELEVATOR SHAFT FROM
EXISTING ROOF DRAIN LEADER
EXISTING ROOF SYSTEM
OVER METAL DECK
CUT CMU TO REDUCE GAP TO
BETWEEN CMU AND ROOF DECK TO
2" OR LESS
EXISTING STEEL BEAM
BLDG 7 - 1ST FLOOR
-10' - 0"
BLDG 7 - BASEMENT
-22' - 0"
BLDG 7 - HIGH ROOF
10' - 8"
11.9
A-301
8" CMU, PAINTED
EXISTING FOUNDATION WALL
1/2" FIBER - REINFORCED JOINT
FILLER
EXISTING SLAB
CONCRETE SLAB INFILL
ON METAL DECK, REF TO
STRUCTURAL
DAMPPROOFING
STEEL CHANNEL. REF TO
STRUCTURAL
STEEL ANGLE CLOSURE AND
BRACING, REF TO STRUCTURAL
M8.1 M8.1
CONC PIT WALL AND SLAB,
REFER TO STRUCTURAL
FIRESTOPPING AS REQUIRED
TO MAINTAIN RATING
CONC SLAB ON GRADE,
REF TO STRUCTURAL
BACKFILL PER STRUCTURAL NOTES
1-HOUR HORIZONTAL SHAFTWALL
SYSTEM TO BE INSTALLED TO
SEPARATE ELEVATOR SHAFT FROM
EXISTING ROOF DRAIN LEADER
EXISTING ROOF SYSTEM
OVER METAL DECK
CUT CMU TO REDUCE GAP TO
BETWEEN CMU AND ROOF DECK TO
2" OR LESS
9.19
REMOVE EXISTING WINDOW
EXISTING WALL TO REMAIN
EXISTING FLASHING TO REMAIN
THE PURPOSE OF REMOVING THE EXISTING
WINDOW IS TO ACCOMMODATE NEW
DUCTWORK FROM A NEW AHU. COORDINATE
WHICH WINDOW TO REMOVE WITH
MECHANICAL WORK.
EXISTING ROOF TO REMAIN
9.19
EXISTING WALL TO REMAIN
EXISTING FLASHING TO REMAIN
CONTRACTOR TO COORDINATE THE
INSTALLATION OF THE DUCTWORK AND
BLANK-OFF PANELS TO ENSURE WEATHER-
TIGHT CONSTRUCTION.
EXISTING ROOF TO REMAIN
NEW STAINLESS STEEL
FLASHING THROUGH WALL
CONT SEALANT BETWEEN
FLASHING AND DUCT, ALL SIDES
FIRE-RETARDANT PRESSURE
TREATED WOOD BLOCKING, ALL SIDES
FIRE-RETARDANT PRESSURE TREATED
WOOD BLOCKING, ALL SIDES
NEW STAINLESS STEEL
FLASHING THROUGH WALL
CONT SEALANT BETWEEN
FLASHING AND DUCT, ALL SIDES
DUCT, REF MECH DWGS
ROCK WOOL INSULATION, FIT TIGHT AND
SEAL EDGES TO MASONRY AND DUCT
ROCK WOOL INSULATION, FIT TIGHT AND
SEAL EDGES TO MASONRY AND DUCT
RUBBERIZED ASPHALT FLASHING
WRAPPED AROUND BLOCKING AND
SEALED TO MASONRY
CONT SEALANT
FIRE-RETARDANT PRESSURE
TREATED WOOD BLOCKING, ALL SIDES
NEW STAINLESS STEEL
FLASHING THROUGH WALL
CONT SEALANT BETWEEN
FLASHING AND DUCT, ALL SIDES
DUCT, REF MECH DWGS
ROCK WOOL INSULATION, FIT TIGHT AND
SEAL EDGES TO MASONRY AND DUCT
CONT SEALANT BETWEEN
FLASHING AND MASONRY
CONT SEALANT BETWEEN
FLASHING AND DUCT, ALL SIDES
CONT SEALANT BETWEEN
FLASHING AND MASONRY
ROCK WOOL INSULATION, FIT TIGHT AND
SEAL EDGES TO MASONRY AND DUCT
CONT SEALANT BETWEEN
FLASHING AND DUCT, ALL SIDES
RUBBERIZED ASPHALT FLASHING
WRAPPED AROUND BLOCKING AND
SEALED TO MASONRY
RUBBERIZED ASPHALT FLASHING
WRAPPED AROUND BLOCKING AND
SEALED TO MASONRY
J-RUNNER, EA SIDE
1" GYP LINER PANEL
C-H STUD
(2) LAYERS 5/8" GYP BD
EXISTING FLOOR STRUCTURE
EXISTING FLOOR STRUCTURE
OPTION 1: INFILL BETWEEN SLAB
J-RUNNER, EA SIDE
1" GYP LINER PANEL
C-H STUD
(2) LAYERS 5/8" GYP BD
EXISTING FLOOR STRUCTURE
EXISTING FLOOR STRUCTURE
OPTION 2: SET BELOW SLAB
FIRESTOPPING SEALANT
PROVIDE A COMPLETE
SYSTEM PER MFR'S
INSTRUCTIONS
PROVIDE A COMPLETE
SYSTEM PER MFR'S
INSTRUCTIONS
FIRESTOPPING SEALANT
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:3
P
M
A-301
SECTIONS
11 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
Scale: 3/8" = 1'-0"
SECTION AT ELEVATOR - NORTH-SOUTH - BLDG 7
Scale: 3/8" = 1'-0"
SECTION AT ELEVATOR - EAST-WEST - BLDG 7
Scale: 3/4" = 1'-0"
DEMOLITION SECTION AT WINDOW FOR HVAC
Scale: 3/4" = 1'-0"
SECTION AT WINDOW FOR HVAC
0 1 2
0 1 2
0 21 4 0 21 4Scale: 3/4" = 1'-0"
PLAN DETAIL AT HVAC PENETRATION
0 1 2
Scale: 1 1/2" = 1'-0"
TYPICAL HORIZONTAL SHAFTWALL INFILL DETAIL
1 ADD 01 11/04/2022
DOOR
FACE OF SHIM TO BE
PAINTED BLACK
WALL
SLOPED FILLER PANEL
SEE ELEVATIONS
FOR LOCATIONS
NOTE: SEE MILLWORK
GENERAL NOTES FOR
CABINET CONSTRUCTION
/2
6"
FINISH TO MATCH
CABINET DOOR
DOOR
4" WIRE PULL
FINISH FASCIA PANEL
BLOCKING AS REQ'D.
FINISH EXPOSED SURFACES
1"
/4
BACK PANEL
1' - 0" 1"
1' - 1"
BASE AS SCHEDULE
NOTE: SEE MILLWORK
GENERAL NOTES FOR
CABINET CONSTRUCTION
WOOD BLOCKING
INTERIOR FINISH-
MELAMINE U.N.O.
3"
4"
SOLID SURFACE
SEALANT
SUBSTRATE
BACKSPLASH -
ENDSPLASH WHERE
MILLWORK ABUTS
WALL
CONTINUOUS
SEALANT TO MATCH SOLID
SURFACE COLOR
NOTE: SEE MILLWORK
GENERAL NOTES FOR
CABINET CONSTRUCTION
VARIES - SEE PLAN
BULLNOSE EDGE
1"
/2
BACKER SHEET (TYP)
FOR UNEXPOSED SURFACES
MOUNT OUTLET IN MILLWORK;
COORDINATE WITH ELECTRICAL
MICROWAVE. VERIFY SIZE AND
MANF. INSTALLATION PRIOR TO
FABRICATION OF MILLWORK TO
CONFIRM SHELF DEPTH REQUIRED
BY MICROWAVE.
3"
/8
/8
V A
R
IE
S
S E
E E
L E
V A
T
IO
N
BACKSPLASH-ENDSPLASH
WHERE MILLWORK ABUTS
WALL
CONTINUOUS CAULK
4" WIRE PULL CENTERED
HORIZONTALLY ON DRAWER
SCHEDULED BASE
PROVIDE MILLWORK WITH MATCHING FINISH ON
INTERIOR AND EXTERIOR SURFACES
2' - 0"
WOOD BLOCKING
SCHEDULED BASE
2" WIDE FILLET OVER EACH
LONGITUDINAL BRACE AND ALL
SIDE/END PANELS
BACKSPLASH-
ENDSPLASH
WHERE MILLWORK
ABUTS WALL
NOTE: SEE MILLWORK
GENERAL NOTES FOR
CABINET CONSTRUCTION
V A
IR
E
S S
E E
E L
E V
A T
IO
N
U.N.O.
2' - 0"
CONTINUOUS CAULK
/2
MAX.
9" LC DRAIN
REFER TO PLUMBING
DRAWINGS FOR SINK AND
FAUCET WORK
REMOVABLE RADIUS PANEL
ON "Z" CLIPS OR HINGED,
TO BE FACED IN PLASTIC
LAMINATE
6"
M
IN
LINE OF STRAIGHT
PANEL BEYOND
8" MIN
11" MIN
BLOCKING AS REQUIRED
ADJUSTABLE SHELVES,
SEE ELEVATIONS FOR QUANTITY
DOORS FACED IN PLASTIC LAMINATE
TO MATCH BASE CABINET BELOW, U.N.O.
RECESSED STANDARDS
BACK PANEL TO BE FACED IN MELAMINE
ANGLED FILLER PANEL (WHERE INDICATED)
V A
R
IE
S
S E
E E
L E
V A
T
IO
N
WIRE PULL
1'-3"
BLDG 7 - 1ST FLOOR
-10' - 0"
A1030
A5080
A5075
K4665
R7000
4 EQ
6'-3" 9'-10 3/4"
2'-9" 3'-6"
A-401
A-401 _____ 7
A-401
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:3
P
M
A-401
CASEWORK ELEVATIONS AND DETAILS
12 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
Scale: 3" = 1'-0"
WALL CABINET - SLOPED FILLER PANEL DETAIL
Scale: 3" = 1'-0"
WALL CABINET - WIRE PULL DETAIL
Scale: 3" = 1'-0"
BASE CABINET - TOE KICK DETAIL
Scale: 6" = 1'-0"
BASE CABINET BULLNOSE DETAIL
Scale: 1" = 1'-0"
BASE CABINET - DRAWER AND MICROWAVE SHELF
Scale: 1" = 1'-0"
BASE CABINET - SINK W/ECLOSED- APRON -ADA
Scale: 1" = 1'-0"
WALL CABINET - DOORS W/ SLOPED TOP
Scale: 1/4" = 1'-0"
BREAKROOM
0 2 4 8 0 2"1" 3"
0 4"2" 8"
0 4"2" 8"
0 4"2" 8"0 1 2
0 1 2
0 1 2
+/- 10" COORD. W/ MFR.
2"
CON'T SEALANT ALL
AROUND
ELEVATOR DOOR
JAMB. COORD. FINAL
SHAPE W/ MFR.
1 1/2"
CONCRETE WALL
COORDINATE R.O.
SIZE WITH VENDOR
AND COR. INFILL
MUST MEET 2-HR
RATING
CONCRETE
WALL
2"
R
/2
COORDINATE
R.O. SIZE WITH
VENDOR AND
COR. INFILL
MUST MEET 2-
HR RATING
BLDG 7 - 1ST FLOOR
-10' - 0"
W
EXISTING DRAINAGE TRENCH.
F R
O M
T
O
D E
P T
H T
A P
E R
S
FILL TRENCH W/
CONCRETE
EXISTING SLAB
DOOR AND FRAME -
SEE DOOR SCHEDULE
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
(2) 2x METAL STUDS TO
FORM HEADER
SEE DOOR
SCHEDULE
TYPES
SEE PARTITION
DOOR AND
FRAME - SEE
DOOR
SCHEDULE
SEALANT BOTH
SIDES OF DOOR -
CONTINUOUS
(2) 2x METAL
STUDS TO
FORM JAMB
T Y
P E
S
S E
E P
A R
T
IT
IO
N
REINFORCEMENT -
SEE STRUCTURAL
8" CMU LINTEL - SEE
STRUCTURAL
DOOR & FRAME -
SEE SCHEDULE
CAULK BOTH
SIDES (TYP)
GROUT FRAME
SOLID
SEE DOOR
SCHEDULE
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
8" CMU, FULLY
GROUTED
DOOR & FRAME - SEE
DOOR SCHEDULE
REINFORCEMENT - SEE
STRUCTURAL
GROUT FRAME
SOLID
BULLNOSE
CORNERS - TYPICAL
EXTRUDED
ALUMINUM SILL WITH
LEVELING
BRACKETS. FINAL
HT.
5" BY 5" STEEL
ANGLE BOLTED TO
SLAB EDGE. COORD
FINAL SIZE WITH
MFR.
VERIFY FLOOR
THICKNESS PRIOR
TO INSTALLATION
OF SILL.
FIRE SEALANT
FLOOR SLAB
CEILING
FIRE RATED
GYP WALL BD (5/8")
STEEL CH STUDS (2 1/2")
SHAFTWALL LINER
PANEL (1")
UNDERSIDE OF
STRUCTURE
*FIRESTOP ALL
PENETRATIONS
TYPE S2.1, (1-HR)
SCALE: 1-1/2"=1'-0"
STC-42
UL-U415 1 HOUR & 2 HOUR
/8
S2.2 (2-HR) SIMILAR W/ TWO (2)
LAYERS OF FIRE RATED GYP
WALL BD (5/8")
S4.1 (1-HR) SIMILAR W/ STEEL
CH STUDS (4")
S4.2 (2-HR) SIMILAR W/ TWO (2)
LAYERS OF FIRE RATED GYP
WALL BD (5/8") AND STEEL CH
STUDS (4")
SHAFTWALL LINER
PANEL (1")
FIRE-RATED SEALANT
SYSTEM
BASE AS SCHEDULED
CEILING
STEEL STUDS (3 5/8")
UNDERSIDE OF STRUCTURE
GYP WALL BD (5/8")
SEALANT
FLOOR SLAB
SEALANT
*SEAL ALL
PENETRATIONS WITH
SEALANT
TYPE G3.0
SCALE: 1-1/2"=1'-0"STC-49 SA870717
/8
G2.0 SIMILAR
WITH 2 1/2" STUDS
G4.0 SIMILAR
WITH 4" STUDS
G1.0 SIMILAR
WITH 1 5/8" STUDS
G6.0 SIMILAR
WITH 6" STUDS
SOUND ATTENUATION
INSULATION
BASE AS SCHEDULED
SEALANT
FLOOR SLAB
GYP WALL BD (5/8")
STEEL STUDS (3 5/8")
CEILING
UNDERSIDE OF STRUCTURE
F2.0 SIMILAR
WITH 2 1/2" STUDS
SEALANT
TYPE F3.0
SCALE: 1-1/2"=1'-0"
/8
F4.0 SIMILAR
WITH 4" STUDS
F1.0 SIMILAR
WITH 1 5/8" STUDS
BASE AS SCHEDULED
F0.0 SIMILAR
WITH 7/8" HAT CHANNELS
STEEL STUDS
GYP WALL BD
SEALANT
WALL CONTROL JOINT
SCALE: 3"=1'-0"
VERTICAL CONTROL JOINT
AT 30' O.C. MAX. UNLESS
NOTED OTHERWISE
INSTALL CONTROL JOINTS AT
GYPSUM BOARD WALLS AND
SOFFITS
3/ 8"
FLOOR SLAB
FIRE SEALANT
STEEL STUDS (3 5/8")
@ 16" ON CENTER
FIRE RATED GYP WALL
BD (5/8")
CEILING
UNDERSIDE OF STRUCTURE
*FIRESTOP ALL
PENETRATIONS
TYPE G3.1, (1-HR)
SCALE: 1-1/2"=1'-0"
STC-49 SA870717
UL-U419 1 HOUR
/8
G4.1 SIMILAR
WITH 4" STUDS
G6.1 SIMILAR
WITH 6" STUDS
GLASS FIBER OR MINERAL
WOOL INSULATION
FIRE-RATED SEALANT SYSTEM
BASE AS SCHEDULED
*FIRESTOP ALL
PENETRATIONS
WALL PRIORITY PLAN & LEGEND
SCALE: 1-1/2"=1'-0"
2- H
R R
A
TE
D W
A
LL
NON-RATED
WALL
RATED WALL
N O
N -R
A
TE
D
W A
LL
1-HR RATED
WALL
2-HR RATED
WALL
1-HR RATED
WALL
ONE (1)
LAYER OF
GYP. BD. AT
1-HR RATED
WALL
HOLLOW METAL FRAME
JAMB STUDS AS
REQUIRED
HIGHER PRIORITY WALL
METAL STUDS AS
PRESCRIBED
TWO-HOUR FIRE & SMOKE BARRIER
TWO-HOUR FIRE BARRIER
TWO-HOUR SHAFT WALL
ONE-HOUR FIRE & SMOKE BARRIER
ONE-HOUR FIRE BARRIER
SMOKE PARTITION
NON-RATED WALL
PRIORITY 1 (HIGHEST)
PRIORITY 2
PRIORITY 2
PRIORITY 3
PRIORITY 4
PRIORITY 5
PRIORITY 6 (LOWEST)
WALL PRIORITY LEGEND
2" M
A X
2" MAX.
3/8" NOM. MORTAR
THICKNESS. STAGGER
VERTICAL JOINTS
FLOOR SLAB
8" CONCRETE MASONRY
UNIT: D-2 (2 HR)
UNDERSIDE OF FLOOR OR
ROOF ASSEMBLY PER U.L.
DESIGN NUMBER
SEALANT SYSTEM COMPLIANT
WITH UL# HW-D-0030
TYPE M8.1
SCALE: 1-1/2"=1'-0"
M8.0 SIMILAR
WITH NON-RATED CMU AND
NON-RATED SEALANT AT
TOP.
M A
X
1"
UL U905
SEALANT SYSTEM
COMPLIANT WITH UL# WW-
D-0022
M A
T E
R
IA
L M
A Y
V A
R Y
S
E E
F
LO
O R
P
LA
N
*FIRESTOP ALL
PENETRATIONS
CEILING
STEEL STUDS (3 5/8")
UNDERSIDE OF STRUCTURE
GYP WALL BD (5/8")
FLOOR SLAB
SEALANT
*SEAL ALL
PENETRATIONS WITH
SEALANT
TYPE G3.0H
SCALE: 1-1/2"=1'-0"
/8
ANGLE BRACING TO
STRUCTURE @ 4' O.C.
G2.0H SIMILAR
WITH 2 1/2" STUDS
G4.0H SIMILAR
WITH 4" STUDS
SOUND ATTENUATION
INSULATION
G1.0H SIMILAR
WITH 1 5/8" STUDS
STC-49 SA870717
G6.0H SIMILAR
WITH 6" STUDS
BASE AS SCHEDULED
BLDG 7 - 1ST FLOOR
-10' - 0"
W
EXISTING WATER PIT
CONC SLAB, REF TO
STRUCTURAL
EXISTING SLAB
6'-8" VIF
FILL PIT W/ SOIL, REF TO
STRUCTURAL
6"
C E
IL
IN
G P
LA
N
V A
R
IE
S
S E
E R
E F
LE
C
T E
D
METAL STUDS @ 16" O.C.
BRACED TO STRUCTURE
ABOVE
5/8" GYP BD
CEILING AS SCHEDULED
CONTINUOUS CORNER
BEAD
SHEET METAL ENCLOSURE
WITH REMOVABLE TOP -
CROSSBREAK OR SLOPE
FOR DRAINAGE
INSULATE VOID
TO PREVENT
CONDENSATION
SHEET METAL OR
FLEX-TUBE COLLAR
SLOPE PIPES DOWN AND
AWAY FROM HOOD
REMOVABLE SHEET METAL
COUNTERFLASHING
ROOF DECK
THERMOSET ROOF MEMBRANE
ROOF SYSTEM VARIES
GASKETED FASTENERS
MINIMUM TWO FASTENERS
PER SIDE
SHEET METAL
FLASHING RECEIVER
WOOD NAILERS AND CURB
MIN. 4'' CLEARANCE
FROM PIPE TO TOP OF CURB -
MIN. 2'' BETWEEN PIPES
PITCH POCKETS ARE NOT ACCEPTABLE.
REINFORCED MEMBRANE
ATTACHMENT STRIP WITH
SEAM PLATES AND
FASTENERS
FLASHING MEMBRANE 8"
MIN. HEIGHT
ENCLOSURE FOR MULTIPLE PIPING/CONDUIT
PIPES/CONDUITS SHALL HAVE A
MINIMUM OF 12 INCHES OF
CLEARANCE ON ALL SIDES FROM
WALLS, CURBS, AND OTHER
PROJECTIONS FOR PROPER
FOR MULTIPLE PIPE/CONDUIT
PENETRATIONS WHERE 12"
CLEARANCE IS UNAVAILABLE, SEE ROOF DECK
ROOF SYSTEM VARIES
ROOF MEMBRANE
BASE MEMBRANE
ATTACHMENT
SEALANT
PREFABRICATED
MEMBRANE FLASHING 8''
MIN. HEIGHT
SEALANT BETWEEN
PIPE/CONDUIT AND
PREFABRICATED
MEMBRANE FLASHING
PIPE/CONDUIT
DRAWBAND
SEALANT
FLASHING FOR INDIVIDUAL PIPING/CONDUIT
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:4
P
M
A-501
DETAILS
13 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
Scale: 3" = 1'-0"
ELEVATOR DOOR HEAD - CMU CONCRETE
Scale: 3" = 1'-0"
ELEVATOR DOOR JAMB - CMU CONCRETE
Scale: 3/4" = 1'-0"
TRENCH INFILL DETAIL
Scale: 1 1/2" = 1'-0"
HEAD DETAIL @ METAL STUD
Scale: 1 1/2" = 1'-0"
JAMB DETAIL @ METAL STUD
Scale: 1 1/2" = 1'-0"
HEAD DETAIL @ CMU
Scale: 1 1/2" = 1'-0"
JAMB DETAIL @ CMU
Scale: 3" = 1'-0"
ELEVATOR - Elevator Sill
Scale: 3/4" = 1'-0"
WATER PIT INFILL DETAIL
Scale: 1 1/2" = 1'-0"
CEILING - BULKHEAD DETAIL
Scale: 6" = 1'-0"
ROOF - Penetration Detail
Scale: 6" = 1'-0"
ROOF - Pipe Flashing
DETAIL REMOVED
1 ADD 01 11/04/2022
NOTES:
1. PROVIDE FIRE-RATED GLASS AT FIRE RATED CONDITIONS
2. ALL EXTERIOR GLASS SHALL BE INSULATED
3. ALL GLASS MUST BE TEMPERED
N GF
S E
E S
C H
E D
U L E
SCHEDULE
SEE
SCHEDULE
SEE
S E
E S
C H
E D
U L E
S E
E S
C H
E D
U L E
SCHEDULE
SEE
4" 8"
1'-8" 8"
1 2
2" 2"
SCHEDULE
SEE 2"
SCHEDULE
SEE 2"
S E
E S
C H
E D
U L E
S E
E S
C H
E D
U L E
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:4
P
M
A-601
DOOR SCHEDULE AND ELEVATIONS
14 14LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
DOOR SCHEDULE
DOOR DOOR FRAME HEAD
DETAIL
NO.
JAMB
DETAIL NO.
THRESH
DETAIL NO. LBL
HDWR
SET REMARKSNO. WIDTH HEIGHT THICK MAT'L FINISH ELEV MAT'L FINISH ELEV
BLDG 7 - BASEMENT
BA07 3' - 8" 7' - 0" 1 3/4" HMTL PAINT F HMTL PAINT 2 6/A-501 7/A-501 N/A 60 MIN HW-07
BLDG 7 - 1ST FLOOR
1B01C 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 2 6/A-501 7/A-501 N/A N/A HW-08
1B01E 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 2 6/A-501 7/A-501 N/A N/A HW-08
1B02B 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 2 6/A-501 7/A-501 N/A N/A HW-02
1B02E 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 2 6/A-501 7/A-501 N/A N/A HW-02
1B02F 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 1 4/A-501 5/A-501 N/A N/A HW-01
1B02G 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 1 4/A-501 5/A-501 N/A N/A HW-01
1B07A 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 2 6/A-501 7/A-501 N/A N/A HW-02
1B20 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 1 4/A-501 5/A-501 N/A N/A HW-04 CARD ACCESS CONTROL
BLDG 14 - BASEMENT
BC04 3' - 0" 7' - 0" 1 3/4" WD REF
SPEC
G HMTL PAINT 1 4/A-501 5/A-501 N/A N/A HW-03
BC09 6' - 0" 7' - 0" 1 3/4" WD REF
SPEC
F HMTL PAINT 1 4/A-501 5/A-501 N/A N/A HW-06 CARD ACCESS CONTROL
Scale: 1/4" = 1'-0"
DOOR ELEVATIONS
Scale: 1/4" = 1'-0"
FRAME ELEVATIONS
MODIFICATIONS TO EXISTING DOORS
DOOR DOOR FRAME HEAD
DETAIL NO.
JAMB
DETAIL NO.
THRESH
DETAIL NO. LBL
HDWR
SET REMARKSNO. WIDTH HEIGHT THICK MAT'L FINISH ELEV MAT'L FINISH ELEV
BLDG 7 - 1ST FLOOR
1B01B 6' - 0" 7' - 0" 1 3/4" HMTL PAINT F HMTL PAINT N/A N/A N/A N/A 45 MIN HW-10 CARD ACCESS CONTROL
BLDG 1 - FIRST FLOOR
1C31B 4' - 0" 7' - 0" 1 3/4" HMTL PAINT F HMTL PAINT N/A N/A N/A N/A 45 MIN HW-09
| Sheets |
| A-001 - ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES |
| AD101 - BLDG 1 & BLDG 14 DEMOLITION PLANS - PHASE 1 |
| AD102 - BLDG 7 BASEMENT DEMOLITION PLAN - PHASE 2 |
| AD103 - BLDG 7 FIRST FLOOR DEMOLITION PLAN - PHASE 2 |
| A-101 - BLDG 1 & BLDG 14 FLOOR PLANS - PHASE 1 |
| A-102 - BLDG 7 BASEMENT FLOOR PLAN - PHASE 2 |
| A-103 - BLDG 7 FIRST FLOOR PLAN - PHASE 2 |
| A-104 - BLDG 7 ROOF PLAN - PHASE 2 |
| AC101 - BLDG 1 & BLDG 14 REFLECTED CEILING PLANS - PHASE 1 |
| AC103 - BLDG 7 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 2 |
| A-301 - SECTIONS |
| A-401 - CASEWORK ELEVATIONS AND DETAILS |
| A-501 - DETAILS |
| A-601 - DOOR SCHEDULE AND ELEVATIONS |
| G-001 - COVER SHEET |
| G-100 - GENERAL INFORMATION |
| GL101 - BLDG 1 & BLDG 14 LIFE SAFETY PLANS - PHASE 1 |
| GL102 - BLDG 7 BASEMENT LIFE SAFETY PLAN - PHASE 2 |
| GL103 - BLDG 7 FIRST FLOOR LIFE SAFETY PLAN - PHASE 2 |
| IF001 - INTERIOR FINISH SCHEDULE AND DETAILS |
| 2022-11-03T12:40:47-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |