Attachment (Pricing Schedule).docx
DOCX document 14 KB Posted
- Attached to
- Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19) Federal contract opportunity
- Solicitation number
- 36C25920R0104
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
The government's payment for the items listed in the pricing schedule shall constitute full compensation to the contractor for selective demolition, general construction, and alterations including necessary removal of existing structures and construction and certain other items). Work includes all labor, material, equipment and supervision to perform the required demolition and construction work on this project including Architectural Modifications, Fire Protection Systems, Electrical Systems, and Telecommunication Systems as described in the Specifications and indicated in the construction documents for VA Project 660-18-243: Expand Linen Distribution Center project at the SLC VAMC. The contractor shall include prices for all items listed in the pricing schedule and include all costs associated for work in the specifications, whether or not specifically listed in the pricing schedule. Work will be accomplished at the SLC VAMC at 500 Foothill Dr., SLC, UT 84148.
| CLIN |
| Description |
| Qty |
| Unit of issue |
Firm Fixed Price Lump Sum Total amount
| 0001 |
| Construction services |
Provide all work as described by attached plans, specifications, and Wage Determinations for Veterans Administration project 660-18-243: Expand Linen Distribution Center project at the SLC VAMC as described in the attached scope of work. Price includes all costs for construction. Cost shall include but not be limited to direct and indirect costs including profit, overhead, general and administration, insurance, labor, bonds, taxes, necessary for 100% completion of the project as indicated in the attached SOW. The construction performance period is 240 calendar days from receipt of notice to proceed.
| 1 |
| Job |
| $ |
Grand Total
CLIN – contract line item Qty- quantity
File details come from the government source that posted it. Updated .