View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19), newest first.
File Type Posted
C01 - Award Notice.docx DOCX document
36C25920R0104 P0015.docx DOCX document
Amendment 0012 - 36C25920R0104.docx DOCX document
Amendment 0011 - 36C25920R0104.docx DOCX document
Amendment 0010 - 36C25920R0104.docx DOCX document
Amendment 09 - 10-FA 18-314 Add01.pdf PDF
Amendment 09 - 03-Arch 18-314 Add01.pdf PDF
Amendment 09 - 06-Plumb 18-314 Add01.pdf PDF
Amendment 09 - 05-FP 18-314 Add01.pdf PDF
Amendment 09 - 36C25920R0104.docx DOCX document
Amendment 09 - Submittal ID 00011r01 - Div 28 52 31 rev 1 Submittals.pdf PDF
Amendment 09 - 18-314_Addendum-01.pdf PDF
Amendment 09 - 07-Mech 18-314 Add01.pdf PDF
Amendment 09 - 08-Elec 18-314 Add01.pdf PDF
Amendment 09 - SoilBearingInfo-ExistCondDWG_36-02-S1.pdf PDF
Amendment 09 - Interior Design Comments-221026.docx DOCX document
Amendment 09 - 02-Struct 18-314 Add01.pdf PDF
Amendment 09 - 09-Tech 18-314 Add01.pdf PDF
Amendment 09 - 04-IntD 18-314 Add01.pdf PDF
Amendment 09 - RFIs for MATOC Seed Project 36C25920R0104.docx DOCX document
Amendment 09 - Infrastructure Standard for Telecommunications Spaces_with OIT Design Guide Templates_1 Jul 21.pdf PDF
Amendment 09 - 18-314 Specs 20221104.pdf PDF
Amendment 09 - Sub 00004r01 Response.pdf PDF
Amendment 0008 - 36C25920R0104.docx DOCX document
Amendment 0007 - 36C25920R0104.docx DOCX document
Amendment 0006 - 36C25920R0104.docx DOCX document
Amendment 0005 - 36C25920R0104.docx DOCX document
Amendment 0004 - 36C25920R0104.docx DOCX document
NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
Amendment 0003 - 36C25920R0104.docx DOCX document
Amendment 0002 - 36C25920R0104.docx DOCX document
S04 - Site Visit Sign-In - 10-11-22.pdf PDF
Amendment 0001 - 36C25920R0104.docx DOCX document
Attachment (RFP Letter Seed Project - Updated 1-27-22).docx DOCX document
Attachment (Pricing Schedule).docx DOCX document
Attachment (Seed Project - Combined Specs).pdf PDF
36C25920R0104_1 - 9-30-2022.docx DOCX document
Attachment (Seed Project - Combined Drawings)_Part2.pdf PDF
Attachment (Seed Project - Combined Drawings)_Part1.pdf PDF
Attachment (Seed Project - SLCVA Bldgs 14 1 and 7 Pre-Reno Asb Rpt_signed).pdf PDF
Attachment (Past Performance Questionnaire).docx DOCX document
Attachment (Seed Project - SP01 660-18-243 SOW).docx DOCX document
Attachment (Seed Project - NESHAP).pdf PDF
Wage Determination UT20210085.pdf PDF
Attachment (Calculation Worksheet for Self-Peformed and Subcontracted Worksheet).docx DOCX document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

/3 /2

:4

:5

P

M

G-001

COVER SHEET

1 5LG/CK

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

NOVEMBER 04, 2022

100% CONSTRUCTION DOCUMENTS

660-18-24318-314

1, 7, 14

EXPAND LINEN DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

VA PROJECT #: 660-18-243 APOGEE PROJECT #: 18-314

CK

DRAWING LIST

No. Description Dwg of Dwg

MECHANICAL

M-001 HVAC LEGENDS AND ABBREVIATIONS 1 20

1-M-101 BLDG 1 HVAC PLAN - FIRST FLOOR 2 20

7-MD-100 BLDG 7 HVAC DEMOLITION PLAN - BASEMENT 3 20

7-MD-101 BLDG 7 HVAC DEMOLITION PLAN - FIRST FLOOR 4 20

7-MD-102 BLDG 7 HVAC DEMOLITION PLAN - ROOF 5 20

7-MH-100 BLDG 7 HVAC DUCT PLAN - BASEMENT 6 20

7-MH-101 BLDG 7 HVAC DUCT PLAN - FIRST FLOOR 7 20

7-MP-100 BLDG 7 HVAC PIPING PLAN - BASEMENT 8 20

7-MP-101 BLDG 7 HVAC PIPING PLAN - FIRST FLOOR 9 20

7-M-102 BLDG 7 HVAC PLAN - ROOF 10 20

14-MH-100 BLDG 14 HVAC DUCT PLAN - BASEMENT 11 20

14-MP-100 BLDG 14 HVAC PIPING PLAN - BASEMENT 12 20

M-501 MECHANICAL DETAILS I 13 20

M-502 MECHANICAL DETAILS II 14 20

M-601 MECHANICAL SCHEDULES I 15 20

M-602 MECHANICAL SCHEDULES II 16 20

M-701 MECHANICAL CONTROLS I 17 20

M-702 MECHANICAL CONTROLS II 18 20

M-703 MECHANICAL CONTROLS III 19 20

M-704 MECHANICAL CONTROLS IV 20 20

ELECTRICAL

E-001 ELECTRICAL LEGEND 1 17

1-E-101 BLDG 1 LIGHTING AND POWER PLANS 2 17

7-ELD100 BLDG 7 ELECTRIAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT 3 17

7-ELD101 BLDG 7 ELECTRIAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR 4 17

7-EPD100 BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT 5 17

7-EPD101 BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR 6 17

7-EPD102 BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF 7 17

7-EL100 BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT 8 17

7-EL101 BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR 9 17

7-EP100 BLDG 7 ELECTRICAL POWER PLAN - BASEMENT 10 17

7-EP101 BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR 11 17

7-EP102 BLDG 7 ELECTRICAL POWER PLAN - ROOF 12 17

7-E-501 ELECTRICAL DETAILS 13 17

7-E-601 BLDG 7 ELECTRICAL SCHEDULES 14 17

7-E-602 BLDG 7 ELECTRICAL SCHEDULES 15 17

7-E-603 BLDG 7 ELECTRICAL SCHEDULES 16 17

14-E-100 BLDG 14 LIGHTING AND POWER PLANS 17 17

TELECOMMUNICATIONS

T-001 TECHNOLOGY LEGEND 1 11

1-T-101 BLDG 1 TECHNOLOGY FLOOR PLAN 2 11

7-TD100 BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASEMENT 3 11

7-TD101 BLDG 7 TECHNOLOGY DEMOLITION PLAN -FIRST FLOOR 4 11

7-T-100 BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT 5 11

7-T-101 BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR 6 11

7-T-401 TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS 7 11

7-T-501 TECHNOLOGY DETAILS 8 11

7-T-601 TECHNOLOGY RISER DIAGRAMS 9 11

7-T-602 TECHNOLOGY SCHEDULES 10 11

14-T-100 BLDG 14 TECHNOLOGY FLOOR PLAN 11 11

FIRE ALARM

FA-001 FIRE ALARM LEGEND 1 7

1-FA101 BLDG 1 FIRE ALARM FLOOR PLAN 2 7

7-FAD100 BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT 3 7

7-FAD101 BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR 4 7

7-FA100 BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT 5 7

7-FA101 BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR 6 7

14-FA100 BLDG 14 FIRE ALARM FLOOR PLAN 7 7

DRAWING LIST

No. Description Dwg of Dwg

GENERAL

G-001 COVER SHEET 1 5

G-100 GENERAL INFORMATION 2 5

GL101 BLDG 1 & BLDG 14 LIFE SAFETY PLANS - PHASE 1 3 5

GL102 BLDG 7 BASEMENT LIFE SAFETY PLAN - PHASE 2 4 5

GL103 BLDG 7 FIRST FLOOR LIFE SAFETY PLAN - PHASE 2 5 5

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES 1 6

S-101 BLDG 7 - FOUNDATION PLAN 2 6

S-102 BLDG 7 - FIRST FLOOR FRAMING PLAN 3 6

S-103 BLDG 7 - ROOF FRAMING PLAN 4 6

S-301 STRUCTURAL DETAILS 5 6

S-302 STRUCTURAL DETAILS 6 6

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 14

AD101 BLDG 1 & BLDG 14 DEMOLITION PLANS - PHASE 1 2 14

AD102 BLDG 7 BASEMENT DEMOLITION PLAN - PHASE 2 3 14

AD103 BLDG 7 FIRST FLOOR DEMOLITION PLAN - PHASE 2 4 14

A-101 BLDG 1 & BLDG 14 FLOOR PLANS - PHASE 1 5 14

A-102 BLDG 7 BASEMENT FLOOR PLAN - PHASE 2 6 14

A-103 BLDG 7 FIRST FLOOR PLAN - PHASE 2 7 14

A-104 BLDG 7 ROOF PLAN - PHASE 2 8 14

AC101 BLDG 1 & BLDG 14 REFLECTED CEILING PLANS - PHASE 1 9 14

AC103 BLDG 7 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 2 10 14

A-301 SECTIONS 11 14

A-401 CASEWORK ELEVATIONS AND DETAILS 12 14

A-501 DETAILS 13 14

A-601 DOOR SCHEDULE AND ELEVATIONS 14 14

INTERIORS

IF001 INTERIOR FINISH SCHEDULE AND DETAILS 1 1

FIRE PROTECTION

F-001 FIRE PROTECTION LEGEND 1 7

1-FX-101 BLDG 1 FIRE PROTECTION PLAN - FIRST FLOOR 2 7

7-FXD100 BLDG 7 FIRE PROTECTION DEMOLITION PLAN - BASEMENT 3 7

7-FXD101 BLDG 7 FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR 4 7

7-FX-100 BLDG 7 FIRE PROTECTION PLAN - BASEMENT 5 7

7-FX-101 BLDG 7 FIRE PROTECTION PLAN - FIRST FLOOR 6 7

14-FX-100 BLDG 14 FIRE PROTECTION PLAN - BASEMENT 7 7

PLUMBING

P-001 PLUMBING LEGEND AND ABBREVIATION 1 12

7-PLD100 BLDG 7 PLUMBING WASTE DEMOLITION PLAN - BASEMENT 2 12

7-PLD101 BLDG 7 PLUMBING WASTE DEMOLITION PLAN - FIRST FLOOR 3 12

7-PL-100 BLDG 7 PLUMBING WASTE PLAN - BASEMENT 4 12

7-PL-101 BLDG 7 PLUMBING WASTE PLAN - FIRST FLOOR 5 12

7-PP-100 BLDG 7 PLUMBING SUPPLY PLAN - BASEMENT 6 12

7-PP-101 BLDG 7 PLUMBING SUPPLY PLAN - FIRST FLOOR 7 12

7-P-102 BLDG 7 PLUMBING PLAN - ROOF 8 12

14-P-100 BLDG 14 PLUMBING PLAN - BASEMENT 9 12

P-501 PLUMBING DETAILS I 10 12

P-502 PLUMBING DETAILS II 11 12

P-601 PLUMBING SCHEDULES 12 12

DocuSign Envelope ID: 72A06BBB-767F-4E9D-B4F0-0D458E7809F7

11/3/2022

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTH

PLAN

NORTH

TRUE

0 4 8 16

THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE CONTRACTOR

OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED SUBMITTAL OF

DESIGN WORK TO THE CITY OF ANYWHERE FOR PLAN REVIEW AND PERMITTING:

1. FIRE SPRINKLER SYSTEMS

2. FIRE ALARM SYSTEMS

REFERENCE SECTION 010000 OF THE PROJECT MANUAL FOR THE SCHEDULE OF BID

ALTERNATES TO BE INCLUDED WITH THE BID PACKAGE

1-1/2"

DIAMETER

GRAB BAR

TOILET

TISSUE

DISPENSER

SANITARY

NAPKIN

DISPOSAL

TOILET

FIXTURE

TOILET

FIXTURE

TOILET

TISSUE

DISPENSER

1-1/2"

DIAMETER

GRAB BAR

EXPOSED

PLUMBING AT

BARRIER

FREE

LAVATORIES

SHALL BE

INSULATED.

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

NOTE: SINKS IN COUNTERS TO BE

MOUNTED WITH RIM NO MORE

THAN 2'-10" HIGH AND WITH AT

LEAST 2'-3" KNEE CLEARANCE.

CLEAR

ACCESSIBLE TOILET TYPICAL ACCESSIBLE

CLEARANCE AT LAVATORY

TYPICAL ACCESSIBLE

LAVATORY AND MIRROR

1'-3" 1'-3"

M

IN

M A

X

M

A X

M

A X6

A

.F .F

1'-6"

5'-0" CLEAR

3'-0" 6"

3'-0"

" 3

1'-0" 3'-6"

2'-4"

5'-0" CLEAR

MIN

8"

MAX

6"

M

IN9

M

IN

M

IN

M A

X

17" MIN

TYPICAL URINAL

MOUNTING

CLEAR

15"

CLEAR

15"

"3

M

A X

TYPICAL TOILET NON-ACCESSIBLE

TOILET

TISSUE

DISPENSER

2'-9"

TOILET

FIXTURE

1'-6"

O F

R

IM

T

O P

W H

E R

E H

.C

A C

C E

S S

R E

Q 'D

OF DOOR WIDTH WHEN

ON WALL BEYOND

DOOR

CLOCK

NURSE

CALL

DOME

LIGHT

CLOCK OUTLET

TOWEL BAR

ACCESSIBLE

ROBE/COAT HOOK

ROBE/COAT

HOOK

TELEVISION

OUTLET

WALL MOUNTED TVCOAT RACK / COAT HOOK CLOCK & NURSE CALL DEVICESTOILET ACCESSORIES

6"

T

Y P

M A

X

F O

R S

T A

N D

IN

G

O

.C

TELEVISION

OUTLET

F O

R S

E A

T E

D

O

.C

WALL MOUNTED TACKBOARD

AND MARKERBOARD

WALL MOUNTED LECTURE UNIT

BOARD

PAPER TOWEL

DISPENSER

2'-0" AT SIDEWALLS

AT COUNTER SINKS

1'-6" AT SIDEWALLS

AT LAVATORY

4'-0" MAX TO

HIGHEST OPERABLE

POINT - IF FIRE

EXTINGUISHER

OVER 40 LBS

3'-6" MAX HT.

FIRE EXTINGUISHER

CABINET

ELECTRICAL CABINET

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

MOP BASIN

MOP SHELF

TYPICAL JANITORS CLOSET

FIRE ALARM

CHIME WITH

VISUAL

ALARM LIGHT

FIRE ALARM

PULL STATION

FIRE ALARM

ANNUNCIATOR

FIRE ALARM

INTERCOM

STATION

INTERCOM

MASTER

STATION

INTERCOM

WALL

OUTLET

INTERCOM STATION

WALL PROTECTION

BUMPERGUARD

HANDRAIL

OR DOOR FRAME

3" TO CORNERGUARD

CORNERGUARD

DRINKING FOUNTAIN

WHEELCHAIR ACCESSIBLE

(CANTILEVERED STYLE)

17" - 19"

8" MIN

9" MIN

6" MAX

M

IN

T O

P O

F S

P O

U T

' M

A X

MISC. WALL DEVICES

/8

/4

T O

B O

T T

O M

O F

R

E F

L E

C T

IV

E

S

U R

F A

C E

O F

M

IR

R

O R

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR

THIS PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION

CONTROL ACTIVITIES.

2. PROVIDE AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE

A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES-

CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION

AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE. TIGHT SEALS

SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.

ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER.

3. DO NOT REMOVE BARRIERS UNTIL AUTHORIZED BY VA COR AND INFECTION

CONTROL. WHEN AUTHORIZED, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO

MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST

PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. A DWYER

GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR

PRESSURE.

4. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES

(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO

PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

5. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE

DEFINED BY COR. EGRESS PATHS SHALL BE FREE OF DEBRIS. ONLY AUTHORIZED

PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE

SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND

MATERIALS.

6. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-

CLEAN CART SHALL BE USED BETWEEN THE BUILDING ENTRY AND THE CONSTRUCTION

STAGING/PREP AREA.

7. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED

COVERS, DESIGNATED TRAFFIC ROUTES SHALL BE MADE TO MINIMIZE USE OF

ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF

ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.

8. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTEDOUT OF

THE CONSTRUCTION AREA.THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH

PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.

9. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION

FROM ANY ADJACENT EXCAVATION DEBRIS.

VENTILATION AND ENVIRONMENTAL CONTROLS

10. AIR SYSTEM FLOW: THE COR WILL ADVISE THE CONTRACTOR WHETHER THE

SYSTEM USES OUTSIDE OR RE-CIRCULATED AIR. FILTERS SHALL BE ADDED OR

RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST

FLOW FROM CLEAN TO DIRTY AREAS.

11. NEGATIVE AIR PRESSURE: THE AIR PRESSURE WITHIN THE CONSTRUCTION

AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR

PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR

THROUGH AN INDUSTRIAL GRADE PORTABLE HEPA FILTER CAPABLE OF FILTRATION

RATES OF 300 TO 800 CFM, OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF

APPROVED BY THE VAMC. A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE

EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

12. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT

CEILINGS SHALL BE VERIFIED DAILY.

13. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR

CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED FROM THE

CONSTRUCTION AREA WITHOUT FILTRATION. PROVIDE AIR PRESSURE TESTING

THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

14. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE

OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF

PROTECTIVE APPAREL IS NOT WORN (E.G. COVERALLS, FOOTGEAR, AND HEADGEAR),

A HEPA FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING

BEFORE LEAVING THE CONSTRUCTION BARRIER.

15. ALL EQUIPMENT, TOOLS, CARTS, AND MATERIALS TRANSPORTED THROUGH

OCCUPIED AREAS SHALL BE MADE FREE OF DUST AND MOISTURE BY VACUUMING

AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE.

16. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC

ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION ZONE, VA EMS STAFF

HAS DONE A TERMINAL CLEANING, AND VA INFECTION CONTROL HAS INSPECTED AND

APPROVED THE CLEANING.

17. AIR BALANCING AND AHU STARTUP ARE NOT PERMISSABLE PRIOR TO REVIEW

AND APPROVAL OF EXTENSIVE "CONSTRUCTION CLEAN" BY THE CONTRACTOR.

GENERAL:

A. PERFORM WORK REQUIRED BY VA INFECTION CONTROL PERSONNEL

REGARDING ICRA FORM. REFER TO VA'S ICRA FORM FOR REQUIREMENTS. ALL

ICRA WORK ITEMS MUST BE COMPLETED PRIOR TO BEGINNING ANY NEW

CONSTRUCITON WORK OR DEMOLITION.

B. VA REQUIRES THAT ALL APPLICABLE PERMITS BE COMPLETED AND APPROVED

PRIOR TO BEGINNING ANY WORK ON STATION. PERMITS INCLUDE: ICRA, ILSM,

ABOVE CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM

SYSTEM, MEDICAL GASES, AND CONFINED SPACE.

THE PROJECT SHALL CONSIST OF TWO PHASES. THE

FIRST PHASE MUST BE COMPLETED AND READY FOR

VA OCCUPANCY AND OPERATIONS PRIOR TO

BEGINNING THE NEXT PHASE. ALL PHASES MUST BE

REVIEWED AND COORDINATED WITH THE VA COR

PRIOR TO BEGINNING WORK.

THE PHASES ARE AS FOLLOWS:

PHASE 1 - ALL WORK SHOWN IN BUILDING 1

AND BUILDING 14. THESE AREAS WILL ALLOW

THE VA TO VACATE BUILDING 7.

PHASE 2 - ALL WORK SHOWN IN BUILDING 7.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

/3 /2

:4

:5

P

M

G-100

GENERAL INFORMATION

2 5LG/CK

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

NOVEMBER 04, 2022

100% CONSTRUCTION DOCUMENTS

660-18-24318-314

1, 7, 14

CK

GENERAL SYMBOL LEGEND

DEFERRED SUBMITTALS BID ALTERNATES

STANDARD MOUNTING HEIGHTS

ICRA NOTES

PHASING NOTES

UP

DN

DN

DN

STORAGE

1C27

THERAPY

1C29

OFFICE

1C29A

HAC

1C25

TOILET

1C21A

THERAPY

1C16

KITCHEN

1C16A

ELEC

1C14

TELE/DATA

STAIR

1CA

STORAGE

1C33A

CLEAN

UTILITY

1C33SOILED

UTILITY

1C31

SOILED

LINEN

1C31B

MECH

1C31A

STORAGE,

TRASH

1C31C

STORAGE,

BIO-HAZ

1C31D

VESTIBULE

1C00C

CORRIDOR

1C00B

OFFICE

1C21

CORRIDOR

1C00A

AREA OF WORK

CAPACITYCLR

EXIT

PASSAGEWAY

34" 170

T R

A V

E L D

IS

T

A N

C E

FE

FE

FE

CORRIDOR

BC00

MECHANICAL

BC03

STORAGE

BC05

TELE/DATA

BC07

ELECTRICAL

BC08

CLEAN

LINEN

BC09

ELEVATOR

BCE1STAIR

BCA

MECHANICAL

BB02

CORRIDOR

BB00

MECHANICAL

BB14

MECHANICAL

BB15

MECHANICAL

BB05

LOBBY

BB06

CORRIDOR

BC00B

CORRIDOR

BC00C

TOILET

BC10

ELECTRICAL

BC08B

ELECTRICAL

BC08A

CORRIDOR

BC00E

LOBBY

BC00F

ELEVATOR

BBE1

ELEVATOR

BBE2

FUTURE

ELEVATOR

BBE3

FUTURE

ELEVATOR

BBE4

BC09

AREA OF WORK

OFFICE

BC04

B C

ALIGN

CAPACITYCLR

EXIT

68" 340

TRAVEL DISTANCE: 109'-6"

CAPACITYCLR

EXIT

34" 170

T R

A V

E L D

IS

T

A N

C E

FE

FE

FE

FE

FE

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

/3 /2

:4

:5

P

M

GL101

BLDG 1 & BLDG 14 LIFE SAFETY PLANS

- PHASE 1

3 5LG/CK

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

NOVEMBER 04, 2022

100% CONSTRUCTION DOCUMENTS

660-18-24318-314

1, 7, 14

CK

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

BLDG 7

BLDG 14

BLDG 1

TRUE

NORTH

CODE INFORMATION

LIFE SAFETY LEGEND

Scale: 1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - BLDG 1

Scale: 1/8" = 1'-0"

BASEMENT LIFE SAFETY PLAN - BLDG 14

PROPOSED USE:

OWNED BY: PRIVATE

FEDERAL GOVERNMENT

CITY/COUNTY

STATE

CODE ENFORCEMENT JURISDICTION: VA

APPLICABLE CODES:

GENERAL CODE INFORMATION:

NEW CONSTRUCTION

RENOVATION (EXISTING BUILDING)

CONSTRUCTION TYPE:

MIXED CONSTRUCTION

SPRINKLERED

MEZZANINE

MIXED OCCUPANCY

PRIMARY OCCUPANCY:

SECONDARY OCCUPANCY:

PROJECT NAME:

PROJECT ADDRESS:

OWNER OR AGENT:

IB

STORAGE

N/A

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL MECHANICAL CODE

2015 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRIC CODE

(ADA) ACCESSIBILITY CODE

2018 NFPA 101 LIFE SAFETY CODE

EXPAND LINEN DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

Owner

CAPACITYCLR

EXIT

0" 0

EGRESS

CAPACITY

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

2 HOUR FIRE SEPARATION

EGRESS PATH

EGRESS IDENTIFICATION

0 4 8 16

NORTH

PLAN

0 4 8 16

NORTH

PLAN

FIRE EXTINGUISHER LOCATIONFE

1 HOUR FIRE SEPARATION

1 ADD 01 11/04/2022

7 8 8.3 9.1 10 11 11.9 12

'G

W

X

Y

Z

7.4 9.99

MAINTENANCE

BENCH

STOCK

BA06

STAIR

BA03

STAIR

BA01

MECH RM

BA02

ELEC

BA04

EQUIP

ROOM

BA05

CAPACITYCLR

EXIT

PASSAGEWAY

34" 170

TR

A V E L D

IS

T A N

C E : 56'-6"

CAPACITYCLR

EXIT

PASSAGEWAY

34" 170

A-501

M8.1

M8.1 M8.1

M8.1

ELEV MACH

BA07

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

/3 /2

:4

:5

P

M

GL102

BLDG 7 BASEMENT LIFE SAFETY PLAN -

PHASE 2

4 5LG/CK

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

NOVEMBER 04, 2022

100% CONSTRUCTION DOCUMENTS

660-18-24318-314

1, 7, 14

CK

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

BLDG 7

BLDG 14

BLDG 1

TRUE

NORTH

Scale: 1/8" = 1'-0"

BASEMENT LIFE SAFETY PLAN - BLDG 7

LIFE SAFETY LEGEND

CAPACITYCLR

EXIT

0" 0

EGRESS

CAPACITY

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

2 HOUR FIRE SEPARATION

EGRESS PATH

EGRESS IDENTIFICATION

PROPOSED USE:

OWNED BY: PRIVATE

FEDERAL GOVERNMENT

CITY/COUNTY

STATE

CODE ENFORCEMENT JURISDICTION: VA

APPLICABLE CODES:

GENERAL CODE INFORMATION:

NEW CONSTRUCTION

RENOVATION (EXISTING BUILDING)

CONSTRUCTION TYPE:

MIXED CONSTRUCTION

SPRINKLERED

MEZZANINE

MIXED OCCUPANCY

PRIMARY OCCUPANCY:

SECONDARY OCCUPANCY:

PROJECT NAME:

PROJECT ADDRESS:

OWNER OR AGENT:

IB

STORAGE

N/A

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL MECHANICAL CODE

2015 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRIC CODE

(ADA) ACCESSIBILITY CODE

2018 NFPA 101 LIFE SAFETY CODE

EXPAND LINEN DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

Owner

CODE INFORMATION

0 4 8 16

NORTH

PLAN

1 HOUR FIRE SEPARATION

1 ADD 01 11/04/2022

7 8 8.3 9.1 10 11 11.9 12 12.9 13 14

'S

'A

'B

'C

'E

'G

W

X

Y

Z

7.4 9.99

'T

MAINTENANCE

BENCH

STOCK

1B02

HAC

1B03

TOILET,

MEN

1B04

ELEC

1B05

TOILET,

WOMEN

1B06

OFFICE,

DCSCO

1B07

CORRIDOR

1B00A

STAIR

1BA

SHOWER/LOCKER

1B06A

SHOWER/LOCKER

1B04A

HAC

1B02A

1B02B

OFFICE

WAREHOUSE

1B01

CONFERENCE

1B01A

ENTRY

1B00

TELE/DATA

1B08

CORRIDOR

1C00

RECEIVING/WAREHOUSE

1C01

OFFICE,

WILL CALL

1C02

STORAGE

(EQUIP)

1C03

OFFICE

1C04

VAULT

1C05

BREAKROOM

1C06

TOILET/SHOWER

1C07

HAC

1C08TELE/DATA

1C10

ELEC

1C12

MECHANICAL

1C01A

WILL CALL

1C02A

WAREHOUSE

1C09

WAREHOUSE

1C09A

WAREHOUSE

1C09B

LOCKERS

1C09C

WAREHOUSE

1C09D

WAREHOUSE

1C09E

AREA OF WORK

CHECK

OUT

1B02C

OFFICE,

CSCO

1B07A

1B02E

OIT CLOSET

OFFICE,

MGMT

ANALYSIS

1B02F

BREAK

ROOM

1B01C

LOGISTICS

ADMIN

1B20

CORRIDOR

1B01B

CAPACITYCLR

EXIT

PASSAGEWAY

34" 170

TRAVEL DISTANCE: 85'-1"

CAPACITYCLR

EXIT

PASSAGEWAY

34" 170

T R

A V

E L D

IS

T

A N

C E

CAPACITYCLR

EXIT

PASSAGEWAY

34" 170

T R

A V

E L D

IS

T

A N

C E

CAPACITYCLR

EXIT

PASSAGEWAY

34" 170

T R

A V

E L D

IS

T A

N C

E : 1

'-8

FE

FE

FE

FE

FEC

OFFICE,

MGMT

ANALYSIS

1B02G

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

/3 /2

:4

:5

P

M

GL103

BLDG 7 FIRST FLOOR LIFE SAFETY

PLAN - PHASE 2

5 5LG/CK

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

NOVEMBER 04, 2022

100% CONSTRUCTION DOCUMENTS

660-18-24318-314

1, 7, 14

CK

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

BLDG 7

BLDG 14

BLDG 1

TRUE

NORTH

PROPOSED USE:

OWNED BY: PRIVATE

FEDERAL GOVERNMENT

CITY/COUNTY

STATE

CODE ENFORCEMENT JURISDICTION: VA

APPLICABLE CODES:

GENERAL CODE INFORMATION:

NEW CONSTRUCTION

RENOVATION (EXISTING BUILDING)

CONSTRUCTION TYPE:

MIXED CONSTRUCTION

SPRINKLERED

MEZZANINE

MIXED OCCUPANCY

PRIMARY OCCUPANCY:

SECONDARY OCCUPANCY:

PROJECT NAME:

PROJECT ADDRESS:

OWNER OR AGENT:

IB

STORAGE

N/A

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL MECHANICAL CODE

2015 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRIC CODE

(ADA) ACCESSIBILITY CODE

2018 NFPA 101 LIFE SAFETY CODE

EXPAND LINEN DISTRIBUTION CENTER

SALT LAKE CITY VA MEDICAL CENTER

SALT LAKE CITY, UT 84148

Owner

CODE INFORMATION

LIFE SAFETY LEGEND

CAPACITYCLR

EXIT

0" 0

EGRESS

CAPACITY

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

2 HOUR FIRE SEPARATION

EGRESS PATH

EGRESS IDENTIFICATION

Scale: 1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - BLDG 7 0 4 8 16

NORTH

PLAN

1 HOUR FIRE SEPARATION

1 ADD 01 11/04/2022

2022-11-03T12:40:41-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .