Amendment 09 - 01-Gen 18-314 Add01.pdf
PDF 3 MB Posted
- Attached to
- Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19) Federal contract opportunity
- Solicitation number
- 36C25920R0104
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:5
P
M
G-001
COVER SHEET
1 5LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
EXPAND LINEN DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
VA PROJECT #: 660-18-243 APOGEE PROJECT #: 18-314
CK
DRAWING LIST
No. Description Dwg of Dwg
MECHANICAL
M-001 HVAC LEGENDS AND ABBREVIATIONS 1 20
1-M-101 BLDG 1 HVAC PLAN - FIRST FLOOR 2 20
7-MD-100 BLDG 7 HVAC DEMOLITION PLAN - BASEMENT 3 20
7-MD-101 BLDG 7 HVAC DEMOLITION PLAN - FIRST FLOOR 4 20
7-MD-102 BLDG 7 HVAC DEMOLITION PLAN - ROOF 5 20
7-MH-100 BLDG 7 HVAC DUCT PLAN - BASEMENT 6 20
7-MH-101 BLDG 7 HVAC DUCT PLAN - FIRST FLOOR 7 20
7-MP-100 BLDG 7 HVAC PIPING PLAN - BASEMENT 8 20
7-MP-101 BLDG 7 HVAC PIPING PLAN - FIRST FLOOR 9 20
7-M-102 BLDG 7 HVAC PLAN - ROOF 10 20
14-MH-100 BLDG 14 HVAC DUCT PLAN - BASEMENT 11 20
14-MP-100 BLDG 14 HVAC PIPING PLAN - BASEMENT 12 20
M-501 MECHANICAL DETAILS I 13 20
M-502 MECHANICAL DETAILS II 14 20
M-601 MECHANICAL SCHEDULES I 15 20
M-602 MECHANICAL SCHEDULES II 16 20
M-701 MECHANICAL CONTROLS I 17 20
M-702 MECHANICAL CONTROLS II 18 20
M-703 MECHANICAL CONTROLS III 19 20
M-704 MECHANICAL CONTROLS IV 20 20
ELECTRICAL
E-001 ELECTRICAL LEGEND 1 17
1-E-101 BLDG 1 LIGHTING AND POWER PLANS 2 17
7-ELD100 BLDG 7 ELECTRIAL LIGHTING DEMOLITION FLOOR PLAN - BASEMENT 3 17
7-ELD101 BLDG 7 ELECTRIAL LIGHTING DEMOLITION FLOOR PLAN - FIRST FLOOR 4 17
7-EPD100 BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - BASEMENT 5 17
7-EPD101 BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - FIRST FLOOR 6 17
7-EPD102 BLDG 7 ELECTRICAL POWER DEMOLITION FLOOR PLAN - ROOF 7 17
7-EL100 BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - BASEMENT 8 17
7-EL101 BLDG 7 ELECTRICAL LIGHTING FLOOR PLAN - FIRST FLOOR 9 17
7-EP100 BLDG 7 ELECTRICAL POWER PLAN - BASEMENT 10 17
7-EP101 BLDG 7 ELECTRICAL POWER PLAN - FIRST FLOOR 11 17
7-EP102 BLDG 7 ELECTRICAL POWER PLAN - ROOF 12 17
7-E-501 ELECTRICAL DETAILS 13 17
7-E-601 BLDG 7 ELECTRICAL SCHEDULES 14 17
7-E-602 BLDG 7 ELECTRICAL SCHEDULES 15 17
7-E-603 BLDG 7 ELECTRICAL SCHEDULES 16 17
14-E-100 BLDG 14 LIGHTING AND POWER PLANS 17 17
TELECOMMUNICATIONS
T-001 TECHNOLOGY LEGEND 1 11
1-T-101 BLDG 1 TECHNOLOGY FLOOR PLAN 2 11
7-TD100 BLDG 7 TECHNOLOGY DEMOLITION PLAN - BASEMENT 3 11
7-TD101 BLDG 7 TECHNOLOGY DEMOLITION PLAN -FIRST FLOOR 4 11
7-T-100 BLDG 7 TECHNOLOGY FLOOR PLAN - BASEMENT 5 11
7-T-101 BLDG 7 TECHNOLOGY FLOOR PLAN - FIRST FLOOR 6 11
7-T-401 TECHNOLOGY ENLARGED FLOOR PLANS AND SECTIONS 7 11
7-T-501 TECHNOLOGY DETAILS 8 11
7-T-601 TECHNOLOGY RISER DIAGRAMS 9 11
7-T-602 TECHNOLOGY SCHEDULES 10 11
14-T-100 BLDG 14 TECHNOLOGY FLOOR PLAN 11 11
FIRE ALARM
FA-001 FIRE ALARM LEGEND 1 7
1-FA101 BLDG 1 FIRE ALARM FLOOR PLAN 2 7
7-FAD100 BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - BASEMENT 3 7
7-FAD101 BLDG 7 FIRE ALARM DEMOLITION FLOOR PLAN - FIRST FLOOR 4 7
7-FA100 BLDG 7 FIRE ALARM FLOOR PLAN - BASEMENT 5 7
7-FA101 BLDG 7 FIRE ALARM FLOOR PLAN - FIRST FLOOR 6 7
14-FA100 BLDG 14 FIRE ALARM FLOOR PLAN 7 7
DRAWING LIST
No. Description Dwg of Dwg
GENERAL
G-001 COVER SHEET 1 5
G-100 GENERAL INFORMATION 2 5
GL101 BLDG 1 & BLDG 14 LIFE SAFETY PLANS - PHASE 1 3 5
GL102 BLDG 7 BASEMENT LIFE SAFETY PLAN - PHASE 2 4 5
GL103 BLDG 7 FIRST FLOOR LIFE SAFETY PLAN - PHASE 2 5 5
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES 1 6
S-101 BLDG 7 - FOUNDATION PLAN 2 6
S-102 BLDG 7 - FIRST FLOOR FRAMING PLAN 3 6
S-103 BLDG 7 - ROOF FRAMING PLAN 4 6
S-301 STRUCTURAL DETAILS 5 6
S-302 STRUCTURAL DETAILS 6 6
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 14
AD101 BLDG 1 & BLDG 14 DEMOLITION PLANS - PHASE 1 2 14
AD102 BLDG 7 BASEMENT DEMOLITION PLAN - PHASE 2 3 14
AD103 BLDG 7 FIRST FLOOR DEMOLITION PLAN - PHASE 2 4 14
A-101 BLDG 1 & BLDG 14 FLOOR PLANS - PHASE 1 5 14
A-102 BLDG 7 BASEMENT FLOOR PLAN - PHASE 2 6 14
A-103 BLDG 7 FIRST FLOOR PLAN - PHASE 2 7 14
A-104 BLDG 7 ROOF PLAN - PHASE 2 8 14
AC101 BLDG 1 & BLDG 14 REFLECTED CEILING PLANS - PHASE 1 9 14
AC103 BLDG 7 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 2 10 14
A-301 SECTIONS 11 14
A-401 CASEWORK ELEVATIONS AND DETAILS 12 14
A-501 DETAILS 13 14
A-601 DOOR SCHEDULE AND ELEVATIONS 14 14
INTERIORS
IF001 INTERIOR FINISH SCHEDULE AND DETAILS 1 1
FIRE PROTECTION
F-001 FIRE PROTECTION LEGEND 1 7
1-FX-101 BLDG 1 FIRE PROTECTION PLAN - FIRST FLOOR 2 7
7-FXD100 BLDG 7 FIRE PROTECTION DEMOLITION PLAN - BASEMENT 3 7
7-FXD101 BLDG 7 FIRE PROTECTION DEMOLITION PLAN - FIRST FLOOR 4 7
7-FX-100 BLDG 7 FIRE PROTECTION PLAN - BASEMENT 5 7
7-FX-101 BLDG 7 FIRE PROTECTION PLAN - FIRST FLOOR 6 7
14-FX-100 BLDG 14 FIRE PROTECTION PLAN - BASEMENT 7 7
PLUMBING
P-001 PLUMBING LEGEND AND ABBREVIATION 1 12
7-PLD100 BLDG 7 PLUMBING WASTE DEMOLITION PLAN - BASEMENT 2 12
7-PLD101 BLDG 7 PLUMBING WASTE DEMOLITION PLAN - FIRST FLOOR 3 12
7-PL-100 BLDG 7 PLUMBING WASTE PLAN - BASEMENT 4 12
7-PL-101 BLDG 7 PLUMBING WASTE PLAN - FIRST FLOOR 5 12
7-PP-100 BLDG 7 PLUMBING SUPPLY PLAN - BASEMENT 6 12
7-PP-101 BLDG 7 PLUMBING SUPPLY PLAN - FIRST FLOOR 7 12
7-P-102 BLDG 7 PLUMBING PLAN - ROOF 8 12
14-P-100 BLDG 14 PLUMBING PLAN - BASEMENT 9 12
P-501 PLUMBING DETAILS I 10 12
P-502 PLUMBING DETAILS II 11 12
P-601 PLUMBING SCHEDULES 12 12
DocuSign Envelope ID: 72A06BBB-767F-4E9D-B4F0-0D458E7809F7
11/3/2022
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE CONTRACTOR
OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED SUBMITTAL OF
DESIGN WORK TO THE CITY OF ANYWHERE FOR PLAN REVIEW AND PERMITTING:
1. FIRE SPRINKLER SYSTEMS
2. FIRE ALARM SYSTEMS
REFERENCE SECTION 010000 OF THE PROJECT MANUAL FOR THE SCHEDULE OF BID
ALTERNATES TO BE INCLUDED WITH THE BID PACKAGE
1-1/2"
DIAMETER
GRAB BAR
TOILET
TISSUE
DISPENSER
SANITARY
NAPKIN
DISPOSAL
TOILET
FIXTURE
TOILET
FIXTURE
TOILET
TISSUE
DISPENSER
1-1/2"
DIAMETER
GRAB BAR
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
ACCESSIBLE TOILET TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
1'-6"
5'-0" CLEAR
3'-0" 6"
3'-0"
" 3
1'-0" 3'-6"
2'-4"
5'-0" CLEAR
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
TYPICAL URINAL
MOUNTING
CLEAR
15"
CLEAR
15"
"3
M
A X
TYPICAL TOILET NON-ACCESSIBLE
TOILET
TISSUE
DISPENSER
2'-9"
TOILET
FIXTURE
1'-6"
O F
R
IM
T
O P
W H
E R
E H
.C
A C
C E
S S
R E
Q 'D
OF DOOR WIDTH WHEN
ON WALL BEYOND
DOOR
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
TOWEL BAR
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
TELEVISION
OUTLET
WALL MOUNTED TVCOAT RACK / COAT HOOK CLOCK & NURSE CALL DEVICESTOILET ACCESSORIES
6"
T
Y P
M A
X
F O
R S
T A
N D
IN
G
O
.C
TELEVISION
OUTLET
F O
R S
E A
T E
D
O
.C
WALL MOUNTED TACKBOARD
AND MARKERBOARD
WALL MOUNTED LECTURE UNIT
BOARD
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MOP BASIN
MOP SHELF
TYPICAL JANITORS CLOSET
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
INTERCOM
STATION
INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
WALL PROTECTION
BUMPERGUARD
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNERGUARD
DRINKING FOUNTAIN
WHEELCHAIR ACCESSIBLE
(CANTILEVERED STYLE)
17" - 19"
8" MIN
9" MIN
6" MAX
M
IN
T O
P O
F S
P O
U T
' M
A X
MISC. WALL DEVICES
/8
/4
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
E
S
U R
F A
C E
O F
M
IR
R
O R
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR
THIS PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION
CONTROL ACTIVITIES.
2. PROVIDE AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE
A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES-
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION
AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE. TIGHT SEALS
SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER.
3. DO NOT REMOVE BARRIERS UNTIL AUTHORIZED BY VA COR AND INFECTION
CONTROL. WHEN AUTHORIZED, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO
MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. A DWYER
GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR
PRESSURE.
4. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES
(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO
PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
5. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE
DEFINED BY COR. EGRESS PATHS SHALL BE FREE OF DEBRIS. ONLY AUTHORIZED
PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE
SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
6. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-
CLEAN CART SHALL BE USED BETWEEN THE BUILDING ENTRY AND THE CONSTRUCTION
STAGING/PREP AREA.
7. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS, DESIGNATED TRAFFIC ROUTES SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF
ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.
8. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTEDOUT OF
THE CONSTRUCTION AREA.THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH
PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
9. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION
FROM ANY ADJACENT EXCAVATION DEBRIS.
VENTILATION AND ENVIRONMENTAL CONTROLS
10. AIR SYSTEM FLOW: THE COR WILL ADVISE THE CONTRACTOR WHETHER THE
SYSTEM USES OUTSIDE OR RE-CIRCULATED AIR. FILTERS SHALL BE ADDED OR
RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST
FLOW FROM CLEAN TO DIRTY AREAS.
11. NEGATIVE AIR PRESSURE: THE AIR PRESSURE WITHIN THE CONSTRUCTION
AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR
PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR
THROUGH AN INDUSTRIAL GRADE PORTABLE HEPA FILTER CAPABLE OF FILTRATION
RATES OF 300 TO 800 CFM, OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY THE VAMC. A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE
EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
12. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT
CEILINGS SHALL BE VERIFIED DAILY.
13. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR
CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED FROM THE
CONSTRUCTION AREA WITHOUT FILTRATION. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
14. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE
OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF
PROTECTIVE APPAREL IS NOT WORN (E.G. COVERALLS, FOOTGEAR, AND HEADGEAR),
A HEPA FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE CONSTRUCTION BARRIER.
15. ALL EQUIPMENT, TOOLS, CARTS, AND MATERIALS TRANSPORTED THROUGH
OCCUPIED AREAS SHALL BE MADE FREE OF DUST AND MOISTURE BY VACUUMING
AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE.
16. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC
ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION ZONE, VA EMS STAFF
HAS DONE A TERMINAL CLEANING, AND VA INFECTION CONTROL HAS INSPECTED AND
APPROVED THE CLEANING.
17. AIR BALANCING AND AHU STARTUP ARE NOT PERMISSABLE PRIOR TO REVIEW
AND APPROVAL OF EXTENSIVE "CONSTRUCTION CLEAN" BY THE CONTRACTOR.
GENERAL:
A. PERFORM WORK REQUIRED BY VA INFECTION CONTROL PERSONNEL
REGARDING ICRA FORM. REFER TO VA'S ICRA FORM FOR REQUIREMENTS. ALL
ICRA WORK ITEMS MUST BE COMPLETED PRIOR TO BEGINNING ANY NEW
CONSTRUCITON WORK OR DEMOLITION.
B. VA REQUIRES THAT ALL APPLICABLE PERMITS BE COMPLETED AND APPROVED
PRIOR TO BEGINNING ANY WORK ON STATION. PERMITS INCLUDE: ICRA, ILSM,
ABOVE CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM
SYSTEM, MEDICAL GASES, AND CONFINED SPACE.
THE PROJECT SHALL CONSIST OF TWO PHASES. THE
FIRST PHASE MUST BE COMPLETED AND READY FOR
VA OCCUPANCY AND OPERATIONS PRIOR TO
BEGINNING THE NEXT PHASE. ALL PHASES MUST BE
REVIEWED AND COORDINATED WITH THE VA COR
PRIOR TO BEGINNING WORK.
THE PHASES ARE AS FOLLOWS:
PHASE 1 - ALL WORK SHOWN IN BUILDING 1
AND BUILDING 14. THESE AREAS WILL ALLOW
THE VA TO VACATE BUILDING 7.
PHASE 2 - ALL WORK SHOWN IN BUILDING 7.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:5
P
M
G-100
GENERAL INFORMATION
2 5LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
GENERAL SYMBOL LEGEND
DEFERRED SUBMITTALS BID ALTERNATES
STANDARD MOUNTING HEIGHTS
ICRA NOTES
PHASING NOTES
UP
DN
DN
DN
STORAGE
1C27
THERAPY
1C29
OFFICE
1C29A
HAC
1C25
TOILET
1C21A
THERAPY
1C16
KITCHEN
1C16A
ELEC
1C14
TELE/DATA
STAIR
1CA
STORAGE
1C33A
CLEAN
UTILITY
1C33SOILED
UTILITY
1C31
SOILED
LINEN
1C31B
MECH
1C31A
STORAGE,
TRASH
1C31C
STORAGE,
BIO-HAZ
1C31D
VESTIBULE
1C00C
CORRIDOR
1C00B
OFFICE
1C21
CORRIDOR
1C00A
AREA OF WORK
CAPACITYCLR
EXIT
PASSAGEWAY
34" 170
T R
A V
E L D
IS
T
A N
C E
FE
FE
FE
CORRIDOR
BC00
MECHANICAL
BC03
STORAGE
BC05
TELE/DATA
BC07
ELECTRICAL
BC08
CLEAN
LINEN
BC09
ELEVATOR
BCE1STAIR
BCA
MECHANICAL
BB02
CORRIDOR
BB00
MECHANICAL
BB14
MECHANICAL
BB15
MECHANICAL
BB05
LOBBY
BB06
CORRIDOR
BC00B
CORRIDOR
BC00C
TOILET
BC10
ELECTRICAL
BC08B
ELECTRICAL
BC08A
CORRIDOR
BC00E
LOBBY
BC00F
ELEVATOR
BBE1
ELEVATOR
BBE2
FUTURE
ELEVATOR
BBE3
FUTURE
ELEVATOR
BBE4
BC09
AREA OF WORK
OFFICE
BC04
B C
ALIGN
CAPACITYCLR
EXIT
68" 340
TRAVEL DISTANCE: 109'-6"
CAPACITYCLR
EXIT
34" 170
T R
A V
E L D
IS
T
A N
C E
FE
FE
FE
FE
FE
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:5
P
M
GL101
BLDG 1 & BLDG 14 LIFE SAFETY PLANS
- PHASE 1
3 5LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
CODE INFORMATION
LIFE SAFETY LEGEND
Scale: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN - BLDG 1
Scale: 1/8" = 1'-0"
BASEMENT LIFE SAFETY PLAN - BLDG 14
PROPOSED USE:
OWNED BY: PRIVATE
FEDERAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: VA
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
IB
STORAGE
N/A
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2017 NATIONAL ELECTRIC CODE
(ADA) ACCESSIBILITY CODE
2018 NFPA 101 LIFE SAFETY CODE
EXPAND LINEN DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
Owner
CAPACITYCLR
EXIT
0" 0
EGRESS
CAPACITY
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
2 HOUR FIRE SEPARATION
EGRESS PATH
EGRESS IDENTIFICATION
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
FIRE EXTINGUISHER LOCATIONFE
1 HOUR FIRE SEPARATION
1 ADD 01 11/04/2022
7 8 8.3 9.1 10 11 11.9 12
'G
W
X
Y
Z
7.4 9.99
MAINTENANCE
BENCH
STOCK
BA06
STAIR
BA03
STAIR
BA01
MECH RM
BA02
ELEC
BA04
EQUIP
ROOM
BA05
CAPACITYCLR
EXIT
PASSAGEWAY
34" 170
TR
A V E L D
IS
T A N
C E : 56'-6"
CAPACITYCLR
EXIT
PASSAGEWAY
34" 170
A-501
M8.1
M8.1 M8.1
M8.1
ELEV MACH
BA07
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:5
P
M
GL102
BLDG 7 BASEMENT LIFE SAFETY PLAN -
PHASE 2
4 5LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
Scale: 1/8" = 1'-0"
BASEMENT LIFE SAFETY PLAN - BLDG 7
LIFE SAFETY LEGEND
CAPACITYCLR
EXIT
0" 0
EGRESS
CAPACITY
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
2 HOUR FIRE SEPARATION
EGRESS PATH
EGRESS IDENTIFICATION
PROPOSED USE:
OWNED BY: PRIVATE
FEDERAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: VA
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
IB
STORAGE
N/A
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2017 NATIONAL ELECTRIC CODE
(ADA) ACCESSIBILITY CODE
2018 NFPA 101 LIFE SAFETY CODE
EXPAND LINEN DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
Owner
CODE INFORMATION
0 4 8 16
NORTH
PLAN
1 HOUR FIRE SEPARATION
1 ADD 01 11/04/2022
7 8 8.3 9.1 10 11 11.9 12 12.9 13 14
'S
'A
'B
'C
'E
'G
W
X
Y
Z
7.4 9.99
'T
MAINTENANCE
BENCH
STOCK
1B02
HAC
1B03
TOILET,
MEN
1B04
ELEC
1B05
TOILET,
WOMEN
1B06
OFFICE,
DCSCO
1B07
CORRIDOR
1B00A
STAIR
1BA
SHOWER/LOCKER
1B06A
SHOWER/LOCKER
1B04A
HAC
1B02A
1B02B
OFFICE
WAREHOUSE
1B01
CONFERENCE
1B01A
ENTRY
1B00
TELE/DATA
1B08
CORRIDOR
1C00
RECEIVING/WAREHOUSE
1C01
OFFICE,
WILL CALL
1C02
STORAGE
(EQUIP)
1C03
OFFICE
1C04
VAULT
1C05
BREAKROOM
1C06
TOILET/SHOWER
1C07
HAC
1C08TELE/DATA
1C10
ELEC
1C12
MECHANICAL
1C01A
WILL CALL
1C02A
WAREHOUSE
1C09
WAREHOUSE
1C09A
WAREHOUSE
1C09B
LOCKERS
1C09C
WAREHOUSE
1C09D
WAREHOUSE
1C09E
AREA OF WORK
CHECK
OUT
1B02C
OFFICE,
CSCO
1B07A
1B02E
OIT CLOSET
OFFICE,
MGMT
ANALYSIS
1B02F
BREAK
ROOM
1B01C
LOGISTICS
ADMIN
1B20
CORRIDOR
1B01B
CAPACITYCLR
EXIT
PASSAGEWAY
34" 170
TRAVEL DISTANCE: 85'-1"
CAPACITYCLR
EXIT
PASSAGEWAY
34" 170
T R
A V
E L D
IS
T
A N
C E
CAPACITYCLR
EXIT
PASSAGEWAY
34" 170
T R
A V
E L D
IS
T
A N
C E
CAPACITYCLR
EXIT
PASSAGEWAY
34" 170
T R
A V
E L D
IS
T A
N C
E : 1
'-8
FE
FE
FE
FE
FEC
OFFICE,
MGMT
ANALYSIS
1B02G
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
/3 /2
:4
:5
P
M
GL103
BLDG 7 FIRST FLOOR LIFE SAFETY
PLAN - PHASE 2
5 5LG/CK
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
NOVEMBER 04, 2022
100% CONSTRUCTION DOCUMENTS
660-18-24318-314
1, 7, 14
CK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
BLDG 7
BLDG 14
BLDG 1
TRUE
NORTH
PROPOSED USE:
OWNED BY: PRIVATE
FEDERAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: VA
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
IB
STORAGE
N/A
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2017 NATIONAL ELECTRIC CODE
(ADA) ACCESSIBILITY CODE
2018 NFPA 101 LIFE SAFETY CODE
EXPAND LINEN DISTRIBUTION CENTER
SALT LAKE CITY VA MEDICAL CENTER
SALT LAKE CITY, UT 84148
Owner
CODE INFORMATION
LIFE SAFETY LEGEND
CAPACITYCLR
EXIT
0" 0
EGRESS
CAPACITY
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
2 HOUR FIRE SEPARATION
EGRESS PATH
EGRESS IDENTIFICATION
Scale: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN - BLDG 7 0 4 8 16
NORTH
PLAN
1 HOUR FIRE SEPARATION
1 ADD 01 11/04/2022
| 2022-11-03T12:40:41-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .