Amendment 09 - 07-Mech 18-314 Add01.pdf
PDF 17 MB Posted
- Attached to
- Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19) Federal contract opportunity
- Solicitation number
- 36C25920R0104
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
V
VBG
VBF
AV
AW
AW
ST
OST
GW
GW
S
W
ID
SPD
T
T
SCW
WS
140°
S
W
ST
RS
RL
CWR
CWS
CHR
CHS
HWR
HWS
PD
CD
ACD
D
CD
LPC
LPS
MPC
MPS
HPC
HPS
H
T
H
T
RD
RDB
HPSR
HPWS
RV
CAP
LC
M
AV
26-P 3
XX-1
xx
X100
X100
ETR
GENERAL PLUMBING EQUIPMENT
GENERAL DUCT SYMBOLS
HVAC PIPING SYMBOLS
VALVE SYMBOLS
WASTE
WATER
EXISTING PIPING
FUEL
STORM
MEDICAL GASES
DENTAL
GENERAL PLUMBING SYMBOLS
ANNOTATION
PLUMBING PIPING SYMBOLS
WALL MOUNTED FLUSH VALVE WATER
CLOSET
FLOOR MOUNTED FLUSH VALVE WATER
CLOSET
SHOWER HEADS
JANITORS SINK
DRINKING FOUNTAIN & TYPE
SHOWER
BATHTUB
TANK TYPE WATER CLOSET
COUNTER TOP LAVATORY & TYPE
WALL MOUNTED LAVATORY & TYPE
URINAL SINK & TYPE
JANITORS SINK - CORNER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
IS LOCATED.
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
LA
LV
OA
IA
TWR
TWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGE
ANCHOR
CONNECTION - SIDE
ECCENTRIC REDUCER
CONNECTION - BOTTOM, 45° OR 90°
CONNECTION - TOP, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
STRAINER
FLOAT & THERMOSTATIC TRAP SET W/
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS BELOW GRADE (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (S)
SOIL PIPING - BELOW FLOOR (S)
STORM DRAIN - ABOVE FLOOR (ST)
STORM DRAIN - BELOW FLOOR (ST)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
VENT BELOW GRADE (VBG)
VENT BELOW FLOOR (VBF)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
PRESSURE REDUCING VALVE
REDUCER
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL NUMBER
SHEET NUMBER
TRAP PRIMER LINE - BELOW SLAB (T)
DOUBLE EXTERIOR CLEANOUT (ECO)
CLEANOUTS
DRAINS AND TRAPS
EQUIPMENT
PIPE FITTINGS AND ACCESSORIES
SHEET NUMBER
SECTION NUMBER
MEDICAL GAS OUTLET (TYPE)
DIVISION 23 PIPE FITTINGS AND ACCESSORIES
DRAIN (D)
CONDENSATE DRAIN (CD)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
T
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
S
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
O
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J
J INTENTIALLY LEFT BLANK
I
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
M
M METER, SI UNIT
M/s METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
H
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
D
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
C
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING
TOWER
CWS CONDENSER WATER SUPPLY (FROM COOLING
TOWER)
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
EXISTING TO REMAIN
CO
LIMIT OF DEMOLITION
A
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACDTP AUTOMATIC CONTROL DMPR, TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW FOD
26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
BUILDING NO. WHERE EQUIP. IS LOCATED
10x8AUTOMATIC BALANCING CONTROL VALVE
WYE STRAINER (WITH BALL VALVE
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
QUICK-COUPLE HOSE CONNECTOR
WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER
FLOW METER
EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED
EXISTING DUCTWORK OR EQUIPMENT TO REMAIN
BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH
BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL
RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN
FITTING AND MANUAL VOLUME DAMPER
SUPPLY AIR DUCT UP
RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP
LINEAR SLOT DIFFUSER
ELBOW WITH TURNING VANES
INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)
VOLUME CONTROL DAMPER
NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER
MOTORIZED DAMPER
VOLUME DAMPER
THERMOSTAT
FIRE DAMPER
FIRE SMOKE DAMPER
SMOKE DAMPER
24x24 CEG-1 800 CFM
SIZE, TYPE, CFM OF EXHAUST GRILLE
MANUAL VOLUME DAMPER
SQUARE TO ROUND TRANSITION
RISER DESIGNATION
HUMIDISTAT
EQUIPMENT WITH FLEXIBLE DUCT CONNECTION
10" CSD-1 300 CFM
BACKDRAFT DAMPER
SUPPLY AIR DUCT DOWN
DUCT MOUNTED SMOKE DETECTOR
(SD=SUPPLY/RD=RETURN)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
LOUVER
DUCT WITH SOUND LINING
DAMPERS: (BD, FD, FSD, MD, SD, VD)
TRAP PRIMER WITH DISTRIBUTION UNIT
TRAP PRIMER
P-TRAP
GAS COCK
HEATING HOT WATER RETURN (HHR)
HEATING HOT WATER SUPPLY (HHS)
REFRIGERANT DISCHARGE BYPASS (RDB)
REFRIGERANT SUCTION (RS)
CHILLED WATER RETURN (CHR)
CONDENSER WATER SUPPLY (CWS)
CONDENSER WATER RETURN (CWR)
REFRIGERANT DISCHARGE (HOT GAS) (RD)
HEAT PUMP WATER RETURN (HPWR)
HEAT PUMP WATER SUPPLY (HPWS)
REFRIGERANT LIQUID (RL)
CHILLED WATER SUPPLY (CHS)
HIGH PRESSURE STEAM CONDENSATE (HPC)
HIGH PRESSURE STEAM SUPPLY (HPS)
MEDIUM PRESSURE STEAM CONDENSATE (MPC)
MEDIUM PRESSURE STEAM SUPPLY (MPS)
LOW PRESSURE STEAM CONDENSATE (LPC)
LOW PRESSURE STEAM SUPPLY (LPS)
CONDENSATE PUMP DISCHARGE (PD)
EXPANSION JOINT
F & T TRAP
TRIPLE DUTY VALVE WITH PRESSURE PORTS
BALANCING VALVE WITH PRESSURE PORTS
SOLENOID VALVE
STRAINER WITH BLOWOFF
REFRIGERANT VENT (RV)
EJ
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM RELIEF VALVE
PRESSURE / VACUUM SWITCH
LIMIT OF DEMOLITION
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
BACK DRAFT DAMPER
BDD
SOLAR WATER RETURN
SOLAR WATER SUPPLY
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
MAKE-UP WATER
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
GHS
GHR
SWS
SWR
GCR
GCS
MW
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURNGRR
GRS
VACUUM CONDENSATE RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
FWPS
FWPD
FEEDWATER SAMPLE (DEAERATOR)
BOILER WATER SAMPLE
CONTINUOUS BLOWDOWN
CF
FWS
BWS
CBD
BO
CHEMICAL FEED
BOILER BLOWOFF
TUBE CLEANER WATER SUPPLYTC
OFL OVERFLOW
REFRIGERANT SIGHT GLASS
QUICK-COUPLE HOSE CONNECTOR
TEMPERATURE SENSOR
HUMIDITY SENSOR
DUCT W/DAMPERS
DIFFUSERS,GRILLES, FLEX CONNECTIONS
FITTINGS & TRANSITIONS
SOFTENED WATERSW
BRINE & SOFT WATER
REFRIGERANT
PLANT PIPING
STEAM
EXISTING TO REMAIN
Y
YR YEAR
W
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
U
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
& HOSE CONNECTION)
ABBREVIATIONS
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:2
A
M
M-001
HVAC LEGENDS AND ABBREVIATIONS
1 20CC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRMNOVEMBER 04, 2022
EXHAUST FAN (ETR)
MECHANICAL
EQUIPMENT (ETR)
EXISTING DUCT
DOWN FROM
FLOOR ABOVE
(ETR)
EXISTING
DUCT (ETR)
EA (ETR)
EA UP TO
ROOF (ETR)
EXHAUST FAN (ETR)
EA UP TO
ROOF (ETR)
EA (ETR)
UNIT HEATER
3/4" HWR
3/4" HWS
CONDENSING
UNIT
SOILED LINEN
1C31B
MECH
1C31A
10"ø CD-1
10"ø CD-1
22"x22" EG-1
5 7
9VAV
1-1
12"x10" SA
7"ø SA
3/4" HWR
3/4" HWS 3/4" HWR
3/4" HWS
EXHAUST FAN (ETR)
MECHANICAL
EQUIPMENT (ETR)
EXISTING DUCT
DOWN FROM
FLOOR ABOVE
(ETR)
EXISTING
DUCT (ETR)
EA (ETR)
EA UP TO
ROOF (ETR)
EXHAUST FAN (ETR)
EA UP TO
ROOF (ETR)
EA (ETR)
CONDENSING
UNIT
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:0
A
M
1-M-101
BLDG 1 HVAC PLAN - FIRST FLOOR
2 20CC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/4" = 1'-0"
BLDG 1 HVAC DEMOLITION PLAN - FIRST FLOOR
Scale: 1/4" = 1'-0"
BLDG 1 HVAC PLAN - FIRST FLOOR
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. DEMOLISH UNIT HEATER AND ALL ASSOCIATED
ACCESSORIES AND CONTROLS.
2. DEMOLISH HYDRONIC PIPING AND ASSOCIATED
ACCESSORIES BACK TO DEMARCATION POINT
SHOWN.
3. DEMOLISH EXHAUST DUCT BACK TO
DEMARCATION POINT SHOWN.
4. DISCONNECT REFRIGERANT LINES FROM
CONDENSING UNIT AND RELOCATE EXISTING
CONDENSING UNIT TO ROOF.
5. PROVIDE AND INSTALL BRANCH DUCTWORK AND
ASSOCIATED AIR DEVICES AND CONNECT TO
EXISTING SYSTEM.
6. PROVIDE AND INSTALL HYDRONIC PIPING AND
ASSOCIATED ACCESSORIES AND CONNECT TO
EXISTING SYSTEM.
7. REBALANCE SYSTEM TO PROVIDE INDICATED
AIRFLOW. EXISTING AIRFLOWS OF ROOMS
OUTSIDE OF SCOPE SHALL NOT BE AFFECTED.
8. REROUTE REFRIGERANT LINES FROM
CONDENSING UNIT ON ROOF TO INDOOR UNITS.
9. COORDINATE CONNECTIONS AND
MODIFICATIONS TO EXISTING SYSTEM WITH
CONTRACTING OFFICER’S REPRESENTATIVE
(COR).
0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
TRUE
NOVEMBER 04, 2022
7-AH-1
7-HC2
7-CC2
7-RF-1
4" x2 8"
74"x28"
"x
48"ø
48"ø
60"ø
28"x12"
12"x10"
10"ø
10"x12"
12"x10"
12"x6"
6"x6"
8"ø
20"ø
26"x16"
3/4"
3/4" 1" 1"
4" CHS
4" CHR4" HWS
4" HWR
3/4" 3/4" 1"
1"
EXISTING HYDRONIC PIPING FROM
EXISTING UTILITY TUNNEL SYSTEM
8.3
8.3
9.1
9.1
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
(TYP)
(TYP)
LAUNDRY TANKS
SCREEN SHAKER
HEAT EXCHANGER
SUPERVAC
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:0
A
M
7-MD-100
BLDG 7 HVAC DEMOLITION PLAN -
BASEMENT
3 20CC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 HVAC DEMOLITION PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. DEMOLISH ALL MECHANICAL EQUIPMENT,
DUCTWORK, PIPING, CONTROL DEVICES, AND
ACCESSORIES UNLESS OTHERWISE NOTED.
2. DEMOLISH MECHANICAL PIPING TO
DEMARCATION POINT SHOWN.
HYDRONIC PIPING
TFA
12.9
12.9
'S
'A
'B
'C
'E
'G
(E) 7-ERC2
7-F2
"ø
"ø
"ø
30"ø 26"ø 20"ø
"ø
46"ø44"ø42"ø40"ø38"ø36"ø
"ø
"ø
"ø
"ø
22"ø 20"ø
"x
20"ø 26"ø 30"ø 36"ø 40"ø 42"ø 44"ø 48"ø
16"ø
"ø
"ø
"ø
"ø
48"ø
"ø
"ø
30"ø26"ø20"ø
20"x10"
18"x10"
6"x6"
18"x16"
12"x10"
16"x16"
12"x10"
14"x16"
10"x6" 8"x6" 6"x6"
6"x6"
12"x6"
12"x8"
12"x6"
12"x10"
10"x14"
8.3
8.3
9.1
9.1
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
(TYP)
(TYP)
'T
10"x5" 10"x5"
HYDRONIC PIPING
FFB
3/4" 3/4"
3/4" 3/4"
3/4" 3/4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
3/ 4"
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
7-MD-101
BLDG 7 HVAC DEMOLITION PLAN -
FIRST FLOOR
4 20CC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 HVAC DEMOLITION PLAN - FIRST FLOOR 0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. DEMOLISH ALL MECHANICAL EQUIPMENT,
DUCTWORK, PIPING, CONTROL DEVICES, AND
ACCESSORIES UNLESS OTHERWISE NOTED.
12.9
12.9
'S
'A
'B
'C
'E
'G
9.1
9.1
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
RD (ETR)
RD (ETR)
RD (ETR)
RD (ETR)
VTR (ETR)
VTR (ETR)
RD (ETR)
ROOF HATCH (ETR)
'T
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
7-MD-102
BLDG 7 HVAC DEMOLITION PLAN -
ROOF
5 20RDC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 HVAC DEMOLITION PLAN - ROOF 0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. EXISTING SOLAR PANELS TO REMAIN.
COORDINATE DEMOLITION WORK WITH EXISTING
SOLAR PANELS.
2. EXISTING EXHAUST FANS TO BE REMOVED.
3. EXISTING RELIEF VENT TO BE REMOVED.
4. EXISTING LAUNDRY EQUIPMENT TO BE
REMOVED.
F
D FD
FD
VAV
0-1
8.3
8.3
9.1
9.1
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
FT
UH
UH
12"x12" EA
HU
16"x16" EA TO
FIRST FLOOR
14"x12" SA
16"x14" SA
10"ø CD-1
12"x12" EG-1
12"x12" EG-1
12"x12" EG-1
12" SA TO
FIRST FLOOR
12"x12" TG-1
12"x12" TG-1
12"x12" TG-1
12"x12" TG-1
12"x12" TG-1
12"x12" TG-1
MAINTENANCE
BENCH STOCK
BA06
EQUIP ROOM
BA05
ELEC
BA04
STAIR
BA03
MECH RM
BA02
(TYP 5)
14"x14" EA
12"ø SA
12"x12" EA
ELEV MACH
BA07
ACU
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
7-MH-100
BLDG 7 HVAC DUCT PLAN - BASEMENT
6 20RDC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 HVAC DUCT PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. VAV BOX INLET AND OUTLET DUCTWORK SIZES
SHALL MATCH UNIT INLET AND OUTLET
CONNECTION SIZE UNLESS NOTED OTHERWISE
ON PLAN.
6. VAV ATU HEATING HOT WATER SUPPLY AND
RETURN PIPING BRANCHES SHALL BE 3/4”
UNLESS NOTED OTHERWISE.
'S
'A
'B
'C
'E
'G
VAV
1-2
VAV
1-4
VAV
1-5
VAV
1-7
VAV
1-11
VAV
1-12
VAV
1-9
VAV
1-3
16"ø SA
14"ø SA
8.3
8.3
9.1
9.1
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
8"ø CD-1
22"x22" RG-1
22"x22" RG-1
AC
AC
AC
AC
AC
VAV
1-6
22"x22" RG-1
22"x22" RG-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
8"ø CD-1
8"x8" EG-1
8"x8" EG-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
6"ø CD-1
22"x22" RG-1
8"x8" EG-1
8"x8" EG-1
22"x22" RG-1
22"x22" RG-1
22"x22" RG-1
12"x12" EG-1
8"x8" EG-1
8"x8" EG-1
6"ø CD-1
6"ø CD-1
8"ø CD-1
6"ø CD-1
6"ø CD-1
22"x22" RG-1
22"x22" RG-1
14"ø SA
14"ø SA
ROOF HATCH (ETR)
'T
TELE/DATA
1B08
AUX
1B10
CONFERENCE
1B01A
BREAK ROOM
1B01C
WAREHOUSE
1B01
LOGISTICS ADMIN
1B20
MAINTENANCE
BENCH STOCK
1B02
STAIR
1BA
OFFICE, CSCO
1B07A
SHOWER/LOCKER
1B06A
TOILET, WOMEN
1B06
TOILET, MEN
1B04
SHOWER/LOCKER
1B04A
OFFICE, MGMT
ANALYSIS
1B02F
OIT CLOSET
1B02E
OFFICE
1B02B
HAC
1B03
HAC
1B02A
ELEC
1B05
OFFICE, DCSCO
1B07
CORRIDOR
1B01B
ENTRY
1B00
CHECK OUT
1B02C
6"ø CD-3
(TYP 6)
10"x10" SA 12"x10" SA8"x8" SA
12"x10" SA10"x10" SA8"x8" SA 12"ø SA
12"ø SA
18"x18" SA
14"x14" SA
14"x14" SA
12"ø SA12"ø SA
16"x14" SA
16"x14" SA
12"x6" CD-6
12"ø CD-5
CAV
1-3
VAV
1-10
CORRIDOR
1B00A
CAV
1-2
16"ø SA
10"ø SA
8"ø SA
10"x10" SA
8"ø SA
12"ø SA
10"x10" SA 6"x10" SA
10"x10" SA
14"ø SA
10"ø SA
10"x10" SA
14"x14" RA
8"ø RA
12"ø RA
10"ø RA 10"ø RA
12"ø RA
8"x8" SA
6"ø CD-3
(TYP 4)
8"ø CD-1
8"ø CD-1
12"x6" CD-6
12"x6" CD-6215
12"x6" CD-6 3
12"ø CD-5
10"ø CD-5
10"ø CD-5
10"ø CD-5
10"ø CD-5
12"ø CD-5
12"ø CD-5
12"ø CD-5
12"ø CD-5
12"ø CD-5
12"ø CD-5
14"x14" SA
14"x14" SA
16"ø SA
8"ø CD-1
22"x22" RG-1
22"x22" RG-1
18"x16" RA
18"x16" RA
"x
R A
"x
R A
"x
S A
"x
S A
"x
S A
"x
S A
31"x42" RA
12"ø SA
6"x6" RA
10"x10" EA
8"x8" EA
8"x8" SA
"x
R A
8"x8" RA
16"x16" EA
8"ø CD-1
12"ø SA
12"x12" EA
TO EF-1
ON ROOF
12"x12" SA
12"x12" EA
TO EF-2
ON ROOF
8"x8" SA
8"ø SA
10"x10" SA
6"ø RA
VAV
1-1
8"x8" SA
"x
S
A
6"x6" RA
6"x6" RA
6"x6" RA
VAV
1-8
10"ø SA
CAV
1-1
24"x24" RG-2
22"x22" RG-2
16"x16"
EA FFB16
"x
E
A
10"ø SA TFB
10"ø RA
ACU
6"ø CD-1
22"x22" RG-1
6"ø CD-3
OFFICE, MGMT
ANALYSIS
1B02G
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
7-MH-101
BLDG 7 HVAC DUCT PLAN - FIRST
FLOOR
7 20RDC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 HVAC DUCT PLAN - FIRST FLOOR 0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. 31”x33” SA FROM AHU ON ROOF. SEE SHEET 7-
M-102 FOR RELATED INFORMATION.
2. 31”x42” RA TO AHU ON ROOF. SEE SHEET 7-M-102
FOR RELATED INFORMATION.
3. MOUNT DIFFUSERS AT 45° BELOW VERTICAL.
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. VAV BOX INLET AND OUTLET DUCTWORK SIZES
SHALL MATCH UNIT INLET AND OUTLET
CONNECTION SIZE UNLESS NOTED OTHERWISE
ON PLAN.
6. VAV ATU HEATING HOT WATER SUPPLY AND
RETURN PIPING BRANCHES SHALL BE 3/4”
VAV
0-1
4" HWR
4" HWS
4" CHR
4" CHS
EXISTING HYDRONIC PIPING FROM
EXISTING UTILITY TUNNEL SYSTEM
TO REMAIN.
2" CHR
2" HWR
3/4" HWR
3/4" HWS
2" CHS
2" HWS
8.3
8.3
9.1
9.1
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
UH
UH
FT
3/4" HWS
3/4" HWR
HU
MECH RM
BA02
MAINTENANCE
BENCH STOCK
BA06
EQUIP ROOM
BA05
ELEC
BA04
STAIR
BA03
TFT-1
T UH-1
T
UH-2
T VAV-0-1
2" HWR 2" HWS2" CHR2" CHS
ELEV MACH
BA07
2" LPS
2"
L P
S
2" LPS TFA
ACU
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
7-MP-100
BLDG 7 HVAC PIPING PLAN -
BASEMENT
8 20CC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/8" = 1'-0"
BLDG 7 HVAC PIPING PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. 2” HWS, 2” HWR, 2” CHS, 2” CHR TO FLOOR
ABOVE.
2. ROUTE CONDENSATE FROM HUMIDIFIER TO
FLOOR DRAIN. SEE SHEET 7-PL-100 FOR RELATED
INFORMATION.
3. ROUTE REFRIGERANT LINES FROM MINI SPLIT
(ACU-1) TO CONDENSING UNIT (CU-1) ON ROOF.
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. VAV BOX INLET AND OUTLET DUCTWORK SIZES
SHALL MATCH UNIT INLET AND OUTLET
CONNECTION SIZE UNLESS NOTED OTHERWISE
ON PLAN.
6. VAV ATU HEATING HOT WATER SUPPLY AND
RETURN PIPING BRANCHES SHALL BE 3/4”
'S
'A
'B
'C
'E
'G
VAV
1-2
VAV
1-4
VAV
1-5
VAV
1-7
VAV
1-11
VAV
1-12
VAV
1-9
1" HWS
1" HWR
2" HWS
2" HWR
1" HWS
1" HWR
1" H
W R
1" H
W S
1" H
W S
1" H
W R
8.3
8.3
9.1
9.1
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
AC
AC
AC
AC
AC
VAV
1-3
VAV
1-6
3/ 4"
H W
S 3/
4" H
W R
3/4" HWS
3/4" HWR
1" HWS
1" HWR
2" H
W S
2" H
W R
3/ 4"
H W
S 3/
4" H
W R
3/ 4"
H W
R 3/
4" H
W S
T VAV 1-6 T
VAV 1-7
T VAV 1-11
T VAV 1-4
T VAV 1-5
T VAV 1-3
T VAV 1-2
3/ 4"
H W
R 3/
4" H
W S
'T
TELE/DATA
1B08
AUX
1B10
CONFERENCE
1B01A BREAK ROOM
1B01C
WAREHOUSE
1B01
LOGISTICS ADMIN
1B20
MAINTENANCE
BENCH STOCK
1B02
STAIR
1BA
OFFICE, CSCO
1B07A
SHOWER/LOCKER
1B06A
TOILET, WOMEN
1B06
TOILET, MEN
1B04
SHOWER/LOCKER
1B04A
OFFICE, MGMT
ANALYSIS
1B02F
OIT CLOSET
1B02E
OFFICE
1B02B
HAC
1B03
HAC
1B02A
ELEC
1B05
OFFICE, DCSCO
1B07
CORRIDOR
1B01B
ENTRY
1B00
CHECK OUT
1B02C
T VAV 1-1
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWR
3/4" HWS
CAV
1-2
VAV
1-10
CAV
1-3
TVAV 1-9
TVAV 1-8
T VAV 1-10
T VAV 1-12
T
CAV 1-1
T CAV 1-2
VAV
1-1
VAV
1-8
2" CHR
2" CHS
2" C
H S
2" C
H R
2" CHS
2" HWR
2" HWS
CAV
1-1
2" LPS
2" LPS FFB
T CAV 1-3
ACU
1" H
W S
1" H
W R
2" CHR
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
7-MP-101
BLDG 7 HVAC PIPING PLAN - FIRST
FLOOR
9 20CC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
0 4 8 16
N O R
TH
TRUE
Scale: 1/8" = 1'-0"
BLDG 7 HVAC PIPING PLAN - FIRST FLOOR
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. 2” HWS, 2” HWR, 2” CHS, 2” CHR FROM BASEMENT.
2. 2” HWS, 2” HWR, 2” CHS, 2” CHR, 2" LPS TO AHU
ON ROOF.
3. PROVIDE AND INSTALL DRIP PAN BENEATH
HYDRONIC PIPING IN 1B05 – ELEC. DISCHARGE
DRIP PAN IN MOP SINK LOCATED IN 1B03 – HAC.
4. ROUTE REFRIGERANT LINES FROM MINI SPLIT
(ACU-2) TO CONDENSING UNIT (CU-2) ON ROOF.
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. VAV BOX INLET AND OUTLET DUCTWORK SIZES
SHALL MATCH UNIT INLET AND OUTLET
CONNECTION SIZE UNLESS NOTED OTHERWISE
ON PLAN.
6. VAV ATU HEATING HOT WATER SUPPLY AND
RETURN PIPING BRANCHES SHALL BE 3/4”
12.9
12.9
'S
'A
'B
'C
'E
'G
8.3
8.3
11.9
11.9
W
X
Y
Z
7.4
7.4
9.9
9.9
AHU
RD (ETR)
RD (ETR)
2 3 4
RD (ETR)
VTR (ETR)
VTR (ETR)
VTR
ROOF HATCH (ETR)
'T
EF
EF
RD (ETR)
31"x33" SA
31"x42" RA
CU
CU
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:0
A
M
7-M-102
BLDG 7 HVAC PLAN - ROOF
10 20RDC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
0 4 8 16
N O R
TH
TRUE
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/8" = 1'-0"
BLDG 7 HVAC PLAN - ROOF
1. EXISTING SOLAR PANELS TO REMAIN.
COORDINATE NEW WORK WITH EXISTING SOLAR
PANELS.
2. PROVIDE AND INSTALL AIR HANDLING UNIT AND
ASSOCIATED DUCTWORK, PIPING, CONTROL
DEVICES, AND ACCESSORIES AS SHOWN.
3. AIR HANDLING UNIT SHALL BE MOUNTED ON A
CUSTOM STEEL SUPPORT FRAME WITH A
MINIMUM STAND-OFF OF 12 INCHES FROM THE
ROOF. REFER TO STRUCTURAL DRAWING S-302
FOR SUPPORT FRAME DETAIL.
4. PROVIDE AND INSTALL HEAT TRACE ON ALL
PIPING ABOVE ROOF LEVEL. HEAT TRACE SHALL
EXTEND MIN. 6” BELOW THE ROOF SLAB.
5. PROVIDE AND INSTALL 1” CONDENSATE LINE
FROM THE AIR HANDLING UNIT TO NEAREST
ROOF DRAIN. PROVIDE WITH PIPE SUPPORTS.
SEE PLUMBING SHEETS FOR RELATED
INFORMATION.
6. 31”x33” SA TO FIRST FLOOR.
7. 31”x42” RA FROM FIRST FLOOR.
8. 12”x12” EA FROM FIRST FLOOR.
9. 2” HWS, 2” HWR, 2” CHS, 2” CHR TO FIRST FLOOR.
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
1 ADD 01 11/04/2022
F D
F D
F D
F D
F D
OFFICE
BC04
CLEAN LINEN
BC09
5 14 "x
8" R
A
VAV
0-2
10"x4" RA
"x
8" S
A
8"ø CD-1
8"ø CD-1
12"x12" RG-1
8"ø CD-1
12"x12" RG-1
8"x8" RG-1
6"ø CD-1
8"ø CD-1
VAV
0-1
7" ø
S A
5" ø
S A
14"x8" RA
5" ø
S A
8"x8" SA
6" ø
S A
14"x10" SA
14"x10" SA
7"ø SA
8" ø
S A
14"x3" EA
"x
8" E
A
14"x3" EA
8"x4" SA
8" x4
S
A
"x
6" R
A
"x 8"
R A
12"x12" (ETR)
5"ø (ETR)
6 7 688
UNIT HEATER
VAV
5" ø
S A
7" ø
S A
5" ø
S A
"x
6" R
A
14"x3" EA
"x
8" E
A
14"x3" EA
8" x4
S
A
5"ø (ETR)
12"x12" (ETR)
242 3
UNIT HEATER
VAV
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
14-MH-100
BLDG 14 HVAC DUCT PLAN -
BASEMENT
11 20CC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/4" = 1'-0"
BLDG 14 HVAC DUCT PLAN - BASEMENT
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
Scale: 1/4" = 1'-0"
BLDG 14 HVAC DUCT DEMOLITION PLAN - BASEMENT
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
1. REMOVE ALL EXISTING BRANCH DUCTWORK AND
ASSOCIATED AIR DEVICES.
2. DEMOLISH SUPPLY AIR DUCTWORK BACK TO
DEMARCATION POINT SHOWN.
3. DEMOLISH RETURN AIR DUCTWORK BACK TO
DEMARCATION POINT SHOWN.
4. DEMOLISH EXHAUST AIR BACK TO MAIN IN
CORRIDOR AND PROVIDE AND INSTALL CAP.
5. PROVIDE AND INSTALL BRANCH DUCTWORK AND
ASSOCIATED AIR DEVICES.
6. PROVIDE AND INSTALL SUPPLY AIR DUCTWORK
FROM MAIN AS SHOWN.
7. PROVIDE AND INSTALL RETURN AIR DUCTWORK
FROM MAIN AS SHOWN.
8. REBALANCE SYSTEM TO PROVIDE INDICATED
AIRFLOW. EXISTING AIRFLOWS OF ROOMS
OUTSIDE OF SCOPE SHALL NOT BE AFFECTED.
0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
TRUE
4" MPS
2" MPC
4" MPS
2" LPC
1 1/4" MPC
4" MPS
2" GRR
2" GRS
2 1/2" HWS
2 1/2" HWR
3" CHR
3" CHS
5" G
R S
4" G
R S
8" H
W S
8" H
W R
8" C
H S
8" C
H R
4" M
P S
2" L
P C
2" M
P C
4" M
P S
2" L
P C
1/
4" M
P C
4" M
P S
2" L
P C
1/
4" M
P C
2" L
P C
4" M
P S
1/
4" M
P C
2" MPC2" MPC
6" CHR
6" CHS
6" HWR
6" HWS
4" GRS
3" GRR
3" GRS
UNIT HEATER
VAV
4" MPS
2" MPC
4" MPS
2" LPC
1 1/4" MPC
4" MPS
2" GRR
2" GRS
2 1/2" HWS
2 1/2" HWR
3" CHR
3" CHS
5" G
R S
4" G
R S
8" H
W S
8" H
W R
8" C
H S
8" C
H R
4" M
P S
2" L
P C
2" M
P C
4" M
P S
2" L
P C
1/
4" M
P C
4" M
P S
2" L
P C
1/
4" M
P C
2" L
P C
4" M
P S
1/
4" M
P C
2" MPC2" MPC
6" CHR
6" CHS
6" HWR
6" HWS
4" GRS
3" GRR
3" GRS
1" H
W R
1" H
W S
1" H
W R
1" H
W S
VAV
0-1
VAV
0-2
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com
Mechanical/Electrical/Plumbing:
Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net
Structural:
1, 7, 14
18-314
/4 /2
:2
:1
A
M
14-MP-100
BLDG 14 HVAC PIPING PLAN -
BASEMENT
12 20RLC
EXPAND LINEN
DISTRIBUTION CENTER
SALT LAKE CITY VAMC
SALT LAKE CITY, UT 84148
11/04/2022
100% CONSTRUCTION DOCUMENTS
660-18-243
JRM
Scale: 1/4" = 1'-0"
BLDG 14 HVAC PIPING DEMOLITION PLAN BASEMENT
Scale: 1/4" = 1'-0"
BLDG 14 HVAC PIPING PLAN - BASEMENT 0 4 8 16
N O R
TH
TRUE
0 4 8 16
N O R
TH
TRUE
1. THE AREA OF WORK SHOWN IS ASSOCIATED
WITH AN OPERATING FACILITY THAT MUST
REMAIN IN SERVICE 24/7.
2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION
REGARDING SCHEDULE AND PHASING
REQUIREMENTS. SCHEDULE WORK TO MINIMIZE
DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE
CONTRACTING OFFICER’S REPRESENTATIVE
(COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER
TRADES AND CONTRACTORS. VERIFY ALL
EXISTING CONDITIONS BEFORE THE START OF
WORK.
5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.
CONTRACTOR RESPONSIBLE FOR FIELD
VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
6. VAV BOX INLET AND OUTLET DUCTWORK SIZES
SHALL MATCH UNIT INLET AND OUTLET
CONNECTION SIZE UNLESS NOTED OTHERWISE
ON PLAN.
7. VAV ATU HEATING HOT WATER SUPPLY AND
RETURN PIPING BRANCHES SHALL BE 3/4”
UNLESS NOTED OTHERWISE.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
V A
N A
C C E
S
SI
B
L E
V A
N A
C C E
S
SI
B
L E
1. REMOVE HYDRONIC PIPING BACK TO
DEMARCATION POINT SHOWN.
2. PROVIDE AND INSTALL NEW HYDRONIC PIPING AT
LOCATION SHOWN.
File details come from the government source that posted it. Updated .