View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Multiple Award Task Order Contract (MATOC) Veterans Integrated Service Network (VlSN 19), newest first.
File Type Posted
C01 - Award Notice.docx DOCX document
36C25920R0104 P0015.docx DOCX document
Amendment 0012 - 36C25920R0104.docx DOCX document
Amendment 0011 - 36C25920R0104.docx DOCX document
Amendment 0010 - 36C25920R0104.docx DOCX document
Amendment 09 - Infrastructure Standard for Telecommunications Spaces_with OIT Design Guide Templates_1 Jul 21.pdf PDF
Amendment 09 - 18-314 Specs 20221104.pdf PDF
Amendment 09 - Sub 00004r01 Response.pdf PDF
Amendment 09 - 10-FA 18-314 Add01.pdf PDF
Amendment 09 - 03-Arch 18-314 Add01.pdf PDF
Amendment 09 - 06-Plumb 18-314 Add01.pdf PDF
Amendment 09 - 05-FP 18-314 Add01.pdf PDF
Amendment 09 - 36C25920R0104.docx DOCX document
Amendment 09 - Submittal ID 00011r01 - Div 28 52 31 rev 1 Submittals.pdf PDF
Amendment 09 - 18-314_Addendum-01.pdf PDF
Amendment 09 - 01-Gen 18-314 Add01.pdf PDF
Amendment 09 - 08-Elec 18-314 Add01.pdf PDF
Amendment 09 - SoilBearingInfo-ExistCondDWG_36-02-S1.pdf PDF
Amendment 09 - Interior Design Comments-221026.docx DOCX document
Amendment 09 - 02-Struct 18-314 Add01.pdf PDF
Amendment 09 - 09-Tech 18-314 Add01.pdf PDF
Amendment 09 - 04-IntD 18-314 Add01.pdf PDF
Amendment 09 - RFIs for MATOC Seed Project 36C25920R0104.docx DOCX document
Amendment 0008 - 36C25920R0104.docx DOCX document
Amendment 0007 - 36C25920R0104.docx DOCX document
Amendment 0006 - 36C25920R0104.docx DOCX document
Amendment 0005 - 36C25920R0104.docx DOCX document
Amendment 0004 - 36C25920R0104.docx DOCX document
NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
Amendment 0003 - 36C25920R0104.docx DOCX document
Amendment 0002 - 36C25920R0104.docx DOCX document
S04 - Site Visit Sign-In - 10-11-22.pdf PDF
Amendment 0001 - 36C25920R0104.docx DOCX document
Attachment (Seed Project - NESHAP).pdf PDF
Wage Determination UT20210085.pdf PDF
Attachment (Calculation Worksheet for Self-Peformed and Subcontracted Worksheet).docx DOCX document
Attachment (RFP Letter Seed Project - Updated 1-27-22).docx DOCX document
Attachment (Pricing Schedule).docx DOCX document
Attachment (Seed Project - Combined Specs).pdf PDF
36C25920R0104_1 - 9-30-2022.docx DOCX document
Attachment (Seed Project - Combined Drawings)_Part2.pdf PDF
Attachment (Seed Project - Combined Drawings)_Part1.pdf PDF
Attachment (Seed Project - SLCVA Bldgs 14 1 and 7 Pre-Reno Asb Rpt_signed).pdf PDF
Attachment (Past Performance Questionnaire).docx DOCX document
Attachment (Seed Project - SP01 660-18-243 SOW).docx DOCX document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MA

MV

CO

EV

VE

AI

FOV

FOR

FOS

FP

LPG

NPW

NO

O

N

G

MPG

G

MPG

CA

V

VBG

VBF

AV

AW

AW

ST

OST

GW

GW

S

W

ID

SPD

T

T

SCW

WS

140°

S

W

ST

RS

RL

CWR

CWS

CHR

CHS

HWR

HWS

PD

CD

ACD

D

CD

LPC

LPS

MPC

MPS

HPC

HPS

H

T

H

T

RD

RDB

HPSR

HPWS

RV

CAP

LC

M

AV

26-P 3

XX-1

xx

X100

X100

ETR

GENERAL PLUMBING EQUIPMENT

GENERAL DUCT SYMBOLS

HVAC PIPING SYMBOLS

VALVE SYMBOLS

WASTE

WATER

EXISTING PIPING

FUEL

STORM

MEDICAL GASES

DENTAL

GENERAL PLUMBING SYMBOLS

ANNOTATION

PLUMBING PIPING SYMBOLS

WALL MOUNTED FLUSH VALVE WATER

CLOSET

FLOOR MOUNTED FLUSH VALVE WATER

CLOSET

SHOWER HEADS

JANITORS SINK

DRINKING FOUNTAIN & TYPE

SHOWER

BATHTUB

TANK TYPE WATER CLOSET

COUNTER TOP LAVATORY & TYPE

WALL MOUNTED LAVATORY & TYPE

URINAL SINK & TYPE

JANITORS SINK - CORNER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

IS LOCATED.

ORAL EVACUATION

LABORATORY VACUUM

LABORATORY AIR

TEMPERED WATER RETURN

TEMPERED WATER SUPPLY

INDUSTRIAL AIR

LA

LV

OA

IA

TWR

TWS

FILTERED COLD WATERFCW

FUEL OIL DISCHARGE

ANCHOR

CONNECTION - SIDE

ECCENTRIC REDUCER

CONNECTION - BOTTOM, 45° OR 90°

CONNECTION - TOP, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

RISE OR DROP IN PIPE

STRAINER

FLOAT & THERMOSTATIC TRAP SET W/

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

FLOOR DRAIN (FD), SIZE & TYPE

ROOF DRAIN (RD), SIZE & TYPE

FLOOR SINK (FS), SIZE & TYPE

NATURAL GAS BELOW GRADE (G)

SUMP OR SEWAGE PUMP DISCHARGE (SPD)

CONDENSATE DRAIN (CD)

INDIRECT DRAIN (ID)

NATURAL GAS (G)

NITROUS OXIDE (NO)

LIQUIFIED PETROLEUM GAS (LPG)

FIRE PROTECTION (FP)

WATER SERVICE (WS)

COMPRESSED AIR (CA)

NITROGEN (N)

MEDICAL AIR (MA)

OXYGEN (O)

DOMESTIC HOT WATER RECIRC.

SOIL PIPING - ABOVE FLOOR (S)

SOIL PIPING - BELOW FLOOR (S)

STORM DRAIN - ABOVE FLOOR (ST)

STORM DRAIN - BELOW FLOOR (ST)

ACID WASTE - ABOVE FLOOR (AW)

ACID WASTE - BELOW FLOOR (AW)

DOMESTIC COLD WATER

DOMESTIC HOT WATER

140° DOMESTIC HOT WATER (140°)

WASTE PIPING - ABOVE FLOOR (W)

WASTE PIPING - BELOW FLOOR (W)

GREASE WASTE - ABOVE FLOOR (GW)

GREASE WASTE - BELOW FLOOR (GW)

SOFTENED COLD WATER (SCW)

ACID VENT (AV)

VENT PIPING (V)

HOSE BIBB (HB)

NONFREEZE WALL HYDRANT (NW)

WALL CLEANOUT (WCO)

FLOOR CLEANOUT (FCO)

EXTERIOR CLEANOUT (ECO)

THERMOSTATIC MIXING VALVE

BACKFLOW PREVENTER

OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)

NON POTABLE WATER (NPW)

FUEL OIL SUPPLY (FOS)

FUEL OIL RETURN (FOR)

FUEL OIL VENT (FOV)

AUXILIARY CONDENSATE DRAIN (ACD)

VENT BELOW GRADE (VBG)

VENT BELOW FLOOR (VBF)

CARBON DIOXIDE (CO)

MEDICAL VACUUM (MV)

EVACUATION (EV)

MEDICAL VACUUM EXHAUST (VE)

MEDICAL AIR INTAKE (AI)

TRAP PRIMER LINE (T)

WATER METER

MEDIUM PRESSURE NATURAL GAS (MPG)

MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)

ELBOW DOWN WITH SHUT-OFF VALVE

TEE DOWN WITH SHUT-OFF VALVE (SOV)

TEE UP WITH SHUT-OFF VALVE (SOV)

RECIRCULATION PUMP

DIRECTION OF FLOW

EXISTING PIPING TO REMAIN

EXISTING PIPING TO BE REMOVED

FLANGE CONNECTION

CLEANOUT

ELBOW DOWN

ELBOW UP

TEE DOWN

ELBOW UP WITH SHUT-OFF VALVE (SOV)

TEE UP

UNION

THERMOMETER

PRESSURE GAUGE

PRESSURE REDUCING VALVE

REDUCER

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT

PLUMBING PLAN NOTE CALL OUT

ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT

TECHNOLOGY PLAN NOTE CALL OUT

PLUMBING EQUIPMENT DESIGNATION

MECHANICAL EQUIPMENT DESIGNATION TAG

OWNER FURNISHED, CONTRACTOR INSTALLED

EQUIPMENT DESIGNATION

NEW WORK TO EXISTING WORK CONNECTION POINT

DETAIL NUMBER

SHEET NUMBER

TRAP PRIMER LINE - BELOW SLAB (T)

DOUBLE EXTERIOR CLEANOUT (ECO)

CLEANOUTS

DRAINS AND TRAPS

EQUIPMENT

PIPE FITTINGS AND ACCESSORIES

SHEET NUMBER

SECTION NUMBER

MEDICAL GAS OUTLET (TYPE)

DIVISION 23 PIPE FITTINGS AND ACCESSORIES

DRAIN (D)

CONDENSATE DRAIN (CD)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

T

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

S

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

R

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

P

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

O

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

N

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

L

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

J

J INTENTIALLY LEFT BLANK

I

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

M

M METER, SI UNIT

M/s METERS PER SECOND (OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

H

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

G

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

F

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

E

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

D

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

C

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING

TOWER

CWS CONDENSER WATER SUPPLY (FROM COOLING

TOWER)

B

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

EXISTING TO REMAIN

CO

LIMIT OF DEMOLITION

A

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACDTP AUTOMATIC CONTROL DMPR, TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW FOD

26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

BUILDING NO. WHERE EQUIP. IS LOCATED

10x8AUTOMATIC BALANCING CONTROL VALVE

WYE STRAINER (WITH BALL VALVE

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

QUICK-COUPLE HOSE CONNECTOR

WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER

FLOW METER

EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED

EXISTING DUCTWORK OR EQUIPMENT TO REMAIN

BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH

BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL

RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN

FITTING AND MANUAL VOLUME DAMPER

SUPPLY AIR DUCT UP

RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP

LINEAR SLOT DIFFUSER

ELBOW WITH TURNING VANES

INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)

VOLUME CONTROL DAMPER

NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER

MOTORIZED DAMPER

VOLUME DAMPER

THERMOSTAT

FIRE DAMPER

FIRE SMOKE DAMPER

SMOKE DAMPER

24x24 CEG-1 800 CFM

SIZE, TYPE, CFM OF EXHAUST GRILLE

MANUAL VOLUME DAMPER

SQUARE TO ROUND TRANSITION

RISER DESIGNATION

HUMIDISTAT

EQUIPMENT WITH FLEXIBLE DUCT CONNECTION

10" CSD-1 300 CFM

BACKDRAFT DAMPER

SUPPLY AIR DUCT DOWN

DUCT MOUNTED SMOKE DETECTOR

(SD=SUPPLY/RD=RETURN)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

LOUVER

DUCT WITH SOUND LINING

DAMPERS: (BD, FD, FSD, MD, SD, VD)

TRAP PRIMER WITH DISTRIBUTION UNIT

TRAP PRIMER

P-TRAP

GAS COCK

HEATING HOT WATER RETURN (HHR)

HEATING HOT WATER SUPPLY (HHS)

REFRIGERANT DISCHARGE BYPASS (RDB)

REFRIGERANT SUCTION (RS)

CHILLED WATER RETURN (CHR)

CONDENSER WATER SUPPLY (CWS)

CONDENSER WATER RETURN (CWR)

REFRIGERANT DISCHARGE (HOT GAS) (RD)

HEAT PUMP WATER RETURN (HPWR)

HEAT PUMP WATER SUPPLY (HPWS)

REFRIGERANT LIQUID (RL)

CHILLED WATER SUPPLY (CHS)

HIGH PRESSURE STEAM CONDENSATE (HPC)

HIGH PRESSURE STEAM SUPPLY (HPS)

MEDIUM PRESSURE STEAM CONDENSATE (MPC)

MEDIUM PRESSURE STEAM SUPPLY (MPS)

LOW PRESSURE STEAM CONDENSATE (LPC)

LOW PRESSURE STEAM SUPPLY (LPS)

CONDENSATE PUMP DISCHARGE (PD)

EXPANSION JOINT

F & T TRAP

TRIPLE DUTY VALVE WITH PRESSURE PORTS

BALANCING VALVE WITH PRESSURE PORTS

SOLENOID VALVE

STRAINER WITH BLOWOFF

REFRIGERANT VENT (RV)

EJ

PRESSURE AND TEMPERATURE TEST PLUG

VACUUM RELIEF VALVE

PRESSURE / VACUUM SWITCH

LIMIT OF DEMOLITION

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

BACK DRAFT DAMPER

BDD

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

MAKE-UP WATER

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

GHS

GHR

SWS

SWR

GCR

GCS

MW

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

VACUUM CONDENSATE RETURN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

FWPS

FWPD

FEEDWATER SAMPLE (DEAERATOR)

BOILER WATER SAMPLE

CONTINUOUS BLOWDOWN

CF

FWS

BWS

CBD

BO

CHEMICAL FEED

BOILER BLOWOFF

TUBE CLEANER WATER SUPPLYTC

OFL OVERFLOW

REFRIGERANT SIGHT GLASS

QUICK-COUPLE HOSE CONNECTOR

TEMPERATURE SENSOR

HUMIDITY SENSOR

DUCT W/DAMPERS

DIFFUSERS,GRILLES, FLEX CONNECTIONS

FITTINGS & TRANSITIONS

SOFTENED WATERSW

BRINE & SOFT WATER

REFRIGERANT

PLANT PIPING

STEAM

EXISTING TO REMAIN

Y

YR YEAR

W

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

V

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

U

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

& HOSE CONNECTION)

ABBREVIATIONS

TFA TO FLOOR ABOVE

TFB TO FLOOR BELOW

FFA FROM FLOOR ABOVE

FFB FROM FLOOR BELOW

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:2

A

M

M-001

HVAC LEGENDS AND ABBREVIATIONS

1 20CC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRMNOVEMBER 04, 2022

EXHAUST FAN (ETR)

MECHANICAL

EQUIPMENT (ETR)

EXISTING DUCT

DOWN FROM

FLOOR ABOVE

(ETR)

EXISTING

DUCT (ETR)

EA (ETR)

EA UP TO

ROOF (ETR)

EXHAUST FAN (ETR)

EA UP TO

ROOF (ETR)

EA (ETR)

UNIT HEATER

3/4" HWR

3/4" HWS

CONDENSING

UNIT

SOILED LINEN

1C31B

MECH

1C31A

10"ø CD-1

10"ø CD-1

22"x22" EG-1

5 7

9VAV

1-1

12"x10" SA

7"ø SA

3/4" HWR

3/4" HWS 3/4" HWR

3/4" HWS

EXHAUST FAN (ETR)

MECHANICAL

EQUIPMENT (ETR)

EXISTING DUCT

DOWN FROM

FLOOR ABOVE

(ETR)

EXISTING

DUCT (ETR)

EA (ETR)

EA UP TO

ROOF (ETR)

EXHAUST FAN (ETR)

EA UP TO

ROOF (ETR)

EA (ETR)

CONDENSING

UNIT

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:0

A

M

1-M-101

BLDG 1 HVAC PLAN - FIRST FLOOR

2 20CC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/4" = 1'-0"

BLDG 1 HVAC DEMOLITION PLAN - FIRST FLOOR

Scale: 1/4" = 1'-0"

BLDG 1 HVAC PLAN - FIRST FLOOR

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. DEMOLISH UNIT HEATER AND ALL ASSOCIATED

ACCESSORIES AND CONTROLS.

2. DEMOLISH HYDRONIC PIPING AND ASSOCIATED

ACCESSORIES BACK TO DEMARCATION POINT

SHOWN.

3. DEMOLISH EXHAUST DUCT BACK TO

DEMARCATION POINT SHOWN.

4. DISCONNECT REFRIGERANT LINES FROM

CONDENSING UNIT AND RELOCATE EXISTING

CONDENSING UNIT TO ROOF.

5. PROVIDE AND INSTALL BRANCH DUCTWORK AND

ASSOCIATED AIR DEVICES AND CONNECT TO

EXISTING SYSTEM.

6. PROVIDE AND INSTALL HYDRONIC PIPING AND

ASSOCIATED ACCESSORIES AND CONNECT TO

EXISTING SYSTEM.

7. REBALANCE SYSTEM TO PROVIDE INDICATED

AIRFLOW. EXISTING AIRFLOWS OF ROOMS

OUTSIDE OF SCOPE SHALL NOT BE AFFECTED.

8. REROUTE REFRIGERANT LINES FROM

CONDENSING UNIT ON ROOF TO INDOOR UNITS.

9. COORDINATE CONNECTIONS AND

MODIFICATIONS TO EXISTING SYSTEM WITH

CONTRACTING OFFICER’S REPRESENTATIVE

(COR).

0 4 8 16

N O R

TH

TRUE

0 4 8 16

N O R

TH

TRUE

NOVEMBER 04, 2022

7-AH-1

7-HC2

7-CC2

7-RF-1

4" x2 8"

74"x28"

"x

48"ø

48"ø

60"ø

28"x12"

12"x10"

10"ø

10"x12"

12"x10"

12"x6"

6"x6"

8"ø

20"ø

26"x16"

3/4"

3/4" 1" 1"

4" CHS

4" CHR4" HWS

4" HWR

3/4" 3/4" 1"

1"

EXISTING HYDRONIC PIPING FROM

EXISTING UTILITY TUNNEL SYSTEM

8.3

8.3

9.1

9.1

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

(TYP)

(TYP)

LAUNDRY TANKS

SCREEN SHAKER

HEAT EXCHANGER

SUPERVAC

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:0

A

M

7-MD-100

BLDG 7 HVAC DEMOLITION PLAN -

BASEMENT

3 20CC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 HVAC DEMOLITION PLAN - BASEMENT 0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. DEMOLISH ALL MECHANICAL EQUIPMENT,

DUCTWORK, PIPING, CONTROL DEVICES, AND

ACCESSORIES UNLESS OTHERWISE NOTED.

2. DEMOLISH MECHANICAL PIPING TO

DEMARCATION POINT SHOWN.

HYDRONIC PIPING

TFA

12.9

12.9

'S

'A

'B

'C

'E

'G

(E) 7-ERC2

7-F2

"ø

"ø

"ø

30"ø 26"ø 20"ø

"ø

46"ø44"ø42"ø40"ø38"ø36"ø

"ø

"ø

"ø

"ø

22"ø 20"ø

"x

20"ø 26"ø 30"ø 36"ø 40"ø 42"ø 44"ø 48"ø

16"ø

"ø

"ø

"ø

"ø

48"ø

"ø

"ø

30"ø26"ø20"ø

20"x10"

18"x10"

6"x6"

18"x16"

12"x10"

16"x16"

12"x10"

14"x16"

10"x6" 8"x6" 6"x6"

6"x6"

12"x6"

12"x8"

12"x6"

12"x10"

10"x14"

8.3

8.3

9.1

9.1

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

(TYP)

(TYP)

'T

10"x5" 10"x5"

HYDRONIC PIPING

FFB

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

3/ 4"

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

7-MD-101

BLDG 7 HVAC DEMOLITION PLAN -

FIRST FLOOR

4 20CC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 HVAC DEMOLITION PLAN - FIRST FLOOR 0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. DEMOLISH ALL MECHANICAL EQUIPMENT,

DUCTWORK, PIPING, CONTROL DEVICES, AND

ACCESSORIES UNLESS OTHERWISE NOTED.

12.9

12.9

'S

'A

'B

'C

'E

'G

9.1

9.1

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

RD (ETR)

RD (ETR)

RD (ETR)

RD (ETR)

VTR (ETR)

VTR (ETR)

RD (ETR)

ROOF HATCH (ETR)

'T

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

7-MD-102

BLDG 7 HVAC DEMOLITION PLAN -

ROOF

5 20RDC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 HVAC DEMOLITION PLAN - ROOF 0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. EXISTING SOLAR PANELS TO REMAIN.

COORDINATE DEMOLITION WORK WITH EXISTING

SOLAR PANELS.

2. EXISTING EXHAUST FANS TO BE REMOVED.

3. EXISTING RELIEF VENT TO BE REMOVED.

4. EXISTING LAUNDRY EQUIPMENT TO BE

REMOVED.

F

D FD

FD

VAV

0-1

8.3

8.3

9.1

9.1

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

FT

UH

UH

12"x12" EA

HU

16"x16" EA TO

FIRST FLOOR

14"x12" SA

16"x14" SA

10"ø CD-1

12"x12" EG-1

12"x12" EG-1

12"x12" EG-1

12" SA TO

FIRST FLOOR

12"x12" TG-1

12"x12" TG-1

12"x12" TG-1

12"x12" TG-1

12"x12" TG-1

12"x12" TG-1

MAINTENANCE

BENCH STOCK

BA06

EQUIP ROOM

BA05

ELEC

BA04

STAIR

BA03

MECH RM

BA02

(TYP 5)

14"x14" EA

12"ø SA

12"x12" EA

ELEV MACH

BA07

ACU

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

7-MH-100

BLDG 7 HVAC DUCT PLAN - BASEMENT

6 20RDC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 HVAC DUCT PLAN - BASEMENT 0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. VAV BOX INLET AND OUTLET DUCTWORK SIZES

SHALL MATCH UNIT INLET AND OUTLET

CONNECTION SIZE UNLESS NOTED OTHERWISE

ON PLAN.

6. VAV ATU HEATING HOT WATER SUPPLY AND

RETURN PIPING BRANCHES SHALL BE 3/4”

UNLESS NOTED OTHERWISE.

'S

'A

'B

'C

'E

'G

VAV

1-2

VAV

1-4

VAV

1-5

VAV

1-7

VAV

1-11

VAV

1-12

VAV

1-9

VAV

1-3

16"ø SA

14"ø SA

8.3

8.3

9.1

9.1

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

8"ø CD-1

22"x22" RG-1

22"x22" RG-1

AC

AC

AC

AC

AC

VAV

1-6

22"x22" RG-1

22"x22" RG-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

8"ø CD-1

8"x8" EG-1

8"x8" EG-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

6"ø CD-1

22"x22" RG-1

8"x8" EG-1

8"x8" EG-1

22"x22" RG-1

22"x22" RG-1

22"x22" RG-1

12"x12" EG-1

8"x8" EG-1

8"x8" EG-1

6"ø CD-1

6"ø CD-1

8"ø CD-1

6"ø CD-1

6"ø CD-1

22"x22" RG-1

22"x22" RG-1

14"ø SA

14"ø SA

ROOF HATCH (ETR)

'T

TELE/DATA

1B08

AUX

1B10

CONFERENCE

1B01A

BREAK ROOM

1B01C

WAREHOUSE

1B01

LOGISTICS ADMIN

1B20

MAINTENANCE

BENCH STOCK

1B02

STAIR

1BA

OFFICE, CSCO

1B07A

SHOWER/LOCKER

1B06A

TOILET, WOMEN

1B06

TOILET, MEN

1B04

SHOWER/LOCKER

1B04A

OFFICE, MGMT

ANALYSIS

1B02F

OIT CLOSET

1B02E

OFFICE

1B02B

HAC

1B03

HAC

1B02A

ELEC

1B05

OFFICE, DCSCO

1B07

CORRIDOR

1B01B

ENTRY

1B00

CHECK OUT

1B02C

6"ø CD-3

(TYP 6)

10"x10" SA 12"x10" SA8"x8" SA

12"x10" SA10"x10" SA8"x8" SA 12"ø SA

12"ø SA

18"x18" SA

14"x14" SA

14"x14" SA

12"ø SA12"ø SA

16"x14" SA

16"x14" SA

12"x6" CD-6

12"ø CD-5

CAV

1-3

VAV

1-10

CORRIDOR

1B00A

CAV

1-2

16"ø SA

10"ø SA

8"ø SA

10"x10" SA

8"ø SA

12"ø SA

10"x10" SA 6"x10" SA

10"x10" SA

14"ø SA

10"ø SA

10"x10" SA

14"x14" RA

8"ø RA

12"ø RA

10"ø RA 10"ø RA

12"ø RA

8"x8" SA

6"ø CD-3

(TYP 4)

8"ø CD-1

8"ø CD-1

12"x6" CD-6

12"x6" CD-6215

12"x6" CD-6 3

12"ø CD-5

10"ø CD-5

10"ø CD-5

10"ø CD-5

10"ø CD-5

12"ø CD-5

12"ø CD-5

12"ø CD-5

12"ø CD-5

12"ø CD-5

12"ø CD-5

14"x14" SA

14"x14" SA

16"ø SA

8"ø CD-1

22"x22" RG-1

22"x22" RG-1

18"x16" RA

18"x16" RA

"x

R A

"x

R A

"x

S A

"x

S A

"x

S A

"x

S A

31"x42" RA

12"ø SA

6"x6" RA

10"x10" EA

8"x8" EA

8"x8" SA

"x

R A

8"x8" RA

16"x16" EA

8"ø CD-1

12"ø SA

12"x12" EA

TO EF-1

ON ROOF

12"x12" SA

12"x12" EA

TO EF-2

ON ROOF

8"x8" SA

8"ø SA

10"x10" SA

6"ø RA

VAV

1-1

8"x8" SA

"x

S

A

6"x6" RA

6"x6" RA

6"x6" RA

VAV

1-8

10"ø SA

CAV

1-1

24"x24" RG-2

22"x22" RG-2

16"x16"

EA FFB16

"x

E

A

10"ø SA TFB

10"ø RA

ACU

6"ø CD-1

22"x22" RG-1

6"ø CD-3

OFFICE, MGMT

ANALYSIS

1B02G

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

7-MH-101

BLDG 7 HVAC DUCT PLAN - FIRST

FLOOR

7 20RDC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 HVAC DUCT PLAN - FIRST FLOOR 0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. 31”x33” SA FROM AHU ON ROOF. SEE SHEET 7-

M-102 FOR RELATED INFORMATION.

2. 31”x42” RA TO AHU ON ROOF. SEE SHEET 7-M-102

FOR RELATED INFORMATION.

3. MOUNT DIFFUSERS AT 45° BELOW VERTICAL.

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. VAV BOX INLET AND OUTLET DUCTWORK SIZES

SHALL MATCH UNIT INLET AND OUTLET

CONNECTION SIZE UNLESS NOTED OTHERWISE

ON PLAN.

6. VAV ATU HEATING HOT WATER SUPPLY AND

RETURN PIPING BRANCHES SHALL BE 3/4”

VAV

0-1

4" HWR

4" HWS

4" CHR

4" CHS

EXISTING HYDRONIC PIPING FROM

EXISTING UTILITY TUNNEL SYSTEM

TO REMAIN.

2" CHR

2" HWR

3/4" HWR

3/4" HWS

2" CHS

2" HWS

8.3

8.3

9.1

9.1

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

UH

UH

FT

3/4" HWS

3/4" HWR

HU

MECH RM

BA02

MAINTENANCE

BENCH STOCK

BA06

EQUIP ROOM

BA05

ELEC

BA04

STAIR

BA03

TFT-1

T UH-1

T

UH-2

T VAV-0-1

2" HWR 2" HWS2" CHR2" CHS

ELEV MACH

BA07

2" LPS

2"

L P

S

2" LPS TFA

ACU

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

7-MP-100

BLDG 7 HVAC PIPING PLAN -

BASEMENT

8 20CC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/8" = 1'-0"

BLDG 7 HVAC PIPING PLAN - BASEMENT 0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. 2” HWS, 2” HWR, 2” CHS, 2” CHR TO FLOOR

ABOVE.

2. ROUTE CONDENSATE FROM HUMIDIFIER TO

FLOOR DRAIN. SEE SHEET 7-PL-100 FOR RELATED

INFORMATION.

3. ROUTE REFRIGERANT LINES FROM MINI SPLIT

(ACU-1) TO CONDENSING UNIT (CU-1) ON ROOF.

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. VAV BOX INLET AND OUTLET DUCTWORK SIZES

SHALL MATCH UNIT INLET AND OUTLET

CONNECTION SIZE UNLESS NOTED OTHERWISE

ON PLAN.

6. VAV ATU HEATING HOT WATER SUPPLY AND

RETURN PIPING BRANCHES SHALL BE 3/4”

'S

'A

'B

'C

'E

'G

VAV

1-2

VAV

1-4

VAV

1-5

VAV

1-7

VAV

1-11

VAV

1-12

VAV

1-9

1" HWS

1" HWR

2" HWS

2" HWR

1" HWS

1" HWR

1" H

W R

1" H

W S

1" H

W S

1" H

W R

8.3

8.3

9.1

9.1

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

AC

AC

AC

AC

AC

VAV

1-3

VAV

1-6

3/ 4"

H W

S 3/

4" H

W R

3/4" HWS

3/4" HWR

1" HWS

1" HWR

2" H

W S

2" H

W R

3/ 4"

H W

S 3/

4" H

W R

3/ 4"

H W

R 3/

4" H

W S

T VAV 1-6 T

VAV 1-7

T VAV 1-11

T VAV 1-4

T VAV 1-5

T VAV 1-3

T VAV 1-2

3/ 4"

H W

R 3/

4" H

W S

'T

TELE/DATA

1B08

AUX

1B10

CONFERENCE

1B01A BREAK ROOM

1B01C

WAREHOUSE

1B01

LOGISTICS ADMIN

1B20

MAINTENANCE

BENCH STOCK

1B02

STAIR

1BA

OFFICE, CSCO

1B07A

SHOWER/LOCKER

1B06A

TOILET, WOMEN

1B06

TOILET, MEN

1B04

SHOWER/LOCKER

1B04A

OFFICE, MGMT

ANALYSIS

1B02F

OIT CLOSET

1B02E

OFFICE

1B02B

HAC

1B03

HAC

1B02A

ELEC

1B05

OFFICE, DCSCO

1B07

CORRIDOR

1B01B

ENTRY

1B00

CHECK OUT

1B02C

T VAV 1-1

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

CAV

1-2

VAV

1-10

CAV

1-3

TVAV 1-9

TVAV 1-8

T VAV 1-10

T VAV 1-12

T

CAV 1-1

T CAV 1-2

VAV

1-1

VAV

1-8

2" CHR

2" CHS

2" C

H S

2" C

H R

2" CHS

2" HWR

2" HWS

CAV

1-1

2" LPS

2" LPS FFB

T CAV 1-3

ACU

1" H

W S

1" H

W R

2" CHR

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

7-MP-101

BLDG 7 HVAC PIPING PLAN - FIRST

FLOOR

9 20CC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

0 4 8 16

N O R

TH

TRUE

Scale: 1/8" = 1'-0"

BLDG 7 HVAC PIPING PLAN - FIRST FLOOR

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. 2” HWS, 2” HWR, 2” CHS, 2” CHR FROM BASEMENT.

2. 2” HWS, 2” HWR, 2” CHS, 2” CHR, 2" LPS TO AHU

ON ROOF.

3. PROVIDE AND INSTALL DRIP PAN BENEATH

HYDRONIC PIPING IN 1B05 – ELEC. DISCHARGE

DRIP PAN IN MOP SINK LOCATED IN 1B03 – HAC.

4. ROUTE REFRIGERANT LINES FROM MINI SPLIT

(ACU-2) TO CONDENSING UNIT (CU-2) ON ROOF.

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. VAV BOX INLET AND OUTLET DUCTWORK SIZES

SHALL MATCH UNIT INLET AND OUTLET

CONNECTION SIZE UNLESS NOTED OTHERWISE

ON PLAN.

6. VAV ATU HEATING HOT WATER SUPPLY AND

RETURN PIPING BRANCHES SHALL BE 3/4”

12.9

12.9

'S

'A

'B

'C

'E

'G

8.3

8.3

11.9

11.9

W

X

Y

Z

7.4

7.4

9.9

9.9

AHU

RD (ETR)

RD (ETR)

2 3 4

RD (ETR)

VTR (ETR)

VTR (ETR)

VTR

ROOF HATCH (ETR)

'T

EF

EF

RD (ETR)

31"x33" SA

31"x42" RA

CU

CU

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:0

A

M

7-M-102

BLDG 7 HVAC PLAN - ROOF

10 20RDC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

0 4 8 16

N O R

TH

TRUE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/8" = 1'-0"

BLDG 7 HVAC PLAN - ROOF

1. EXISTING SOLAR PANELS TO REMAIN.

COORDINATE NEW WORK WITH EXISTING SOLAR

PANELS.

2. PROVIDE AND INSTALL AIR HANDLING UNIT AND

ASSOCIATED DUCTWORK, PIPING, CONTROL

DEVICES, AND ACCESSORIES AS SHOWN.

3. AIR HANDLING UNIT SHALL BE MOUNTED ON A

CUSTOM STEEL SUPPORT FRAME WITH A

MINIMUM STAND-OFF OF 12 INCHES FROM THE

ROOF. REFER TO STRUCTURAL DRAWING S-302

FOR SUPPORT FRAME DETAIL.

4. PROVIDE AND INSTALL HEAT TRACE ON ALL

PIPING ABOVE ROOF LEVEL. HEAT TRACE SHALL

EXTEND MIN. 6” BELOW THE ROOF SLAB.

5. PROVIDE AND INSTALL 1” CONDENSATE LINE

FROM THE AIR HANDLING UNIT TO NEAREST

ROOF DRAIN. PROVIDE WITH PIPE SUPPORTS.

SEE PLUMBING SHEETS FOR RELATED

INFORMATION.

6. 31”x33” SA TO FIRST FLOOR.

7. 31”x42” RA FROM FIRST FLOOR.

8. 12”x12” EA FROM FIRST FLOOR.

9. 2” HWS, 2” HWR, 2” CHS, 2” CHR TO FIRST FLOOR.

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

1 ADD 01 11/04/2022

F D

F D

F D

F D

F D

OFFICE

BC04

CLEAN LINEN

BC09

5 14 "x

8" R

A

VAV

0-2

10"x4" RA

"x

8" S

A

8"ø CD-1

8"ø CD-1

12"x12" RG-1

8"ø CD-1

12"x12" RG-1

8"x8" RG-1

6"ø CD-1

8"ø CD-1

VAV

0-1

7" ø

S A

5" ø

S A

14"x8" RA

5" ø

S A

8"x8" SA

6" ø

S A

14"x10" SA

14"x10" SA

7"ø SA

8" ø

S A

14"x3" EA

"x

8" E

A

14"x3" EA

8"x4" SA

8" x4

S

A

"x

6" R

A

"x 8"

R A

12"x12" (ETR)

5"ø (ETR)

6 7 688

UNIT HEATER

VAV

5" ø

S A

7" ø

S A

5" ø

S A

"x

6" R

A

14"x3" EA

"x

8" E

A

14"x3" EA

8" x4

S

A

5"ø (ETR)

12"x12" (ETR)

242 3

UNIT HEATER

VAV

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

14-MH-100

BLDG 14 HVAC DUCT PLAN -

BASEMENT

11 20CC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/4" = 1'-0"

BLDG 14 HVAC DUCT PLAN - BASEMENT

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

Scale: 1/4" = 1'-0"

BLDG 14 HVAC DUCT DEMOLITION PLAN - BASEMENT

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

1. REMOVE ALL EXISTING BRANCH DUCTWORK AND

ASSOCIATED AIR DEVICES.

2. DEMOLISH SUPPLY AIR DUCTWORK BACK TO

DEMARCATION POINT SHOWN.

3. DEMOLISH RETURN AIR DUCTWORK BACK TO

DEMARCATION POINT SHOWN.

4. DEMOLISH EXHAUST AIR BACK TO MAIN IN

CORRIDOR AND PROVIDE AND INSTALL CAP.

5. PROVIDE AND INSTALL BRANCH DUCTWORK AND

ASSOCIATED AIR DEVICES.

6. PROVIDE AND INSTALL SUPPLY AIR DUCTWORK

FROM MAIN AS SHOWN.

7. PROVIDE AND INSTALL RETURN AIR DUCTWORK

FROM MAIN AS SHOWN.

8. REBALANCE SYSTEM TO PROVIDE INDICATED

AIRFLOW. EXISTING AIRFLOWS OF ROOMS

OUTSIDE OF SCOPE SHALL NOT BE AFFECTED.

0 4 8 16

N O R

TH

TRUE

0 4 8 16

N O R

TH

TRUE

4" MPS

2" MPC

4" MPS

2" LPC

1 1/4" MPC

4" MPS

2" GRR

2" GRS

2 1/2" HWS

2 1/2" HWR

3" CHR

3" CHS

5" G

R S

4" G

R S

8" H

W S

8" H

W R

8" C

H S

8" C

H R

4" M

P S

2" L

P C

2" M

P C

4" M

P S

2" L

P C

1/

4" M

P C

4" M

P S

2" L

P C

1/

4" M

P C

2" L

P C

4" M

P S

1/

4" M

P C

2" MPC2" MPC

6" CHR

6" CHS

6" HWR

6" HWS

4" GRS

3" GRR

3" GRS

UNIT HEATER

VAV

4" MPS

2" MPC

4" MPS

2" LPC

1 1/4" MPC

4" MPS

2" GRR

2" GRS

2 1/2" HWS

2 1/2" HWR

3" CHR

3" CHS

5" G

R S

4" G

R S

8" H

W S

8" H

W R

8" C

H S

8" C

H R

4" M

P S

2" L

P C

2" M

P C

4" M

P S

2" L

P C

1/

4" M

P C

4" M

P S

2" L

P C

1/

4" M

P C

2" L

P C

4" M

P S

1/

4" M

P C

2" MPC2" MPC

6" CHR

6" CHS

6" HWR

6" HWS

4" GRS

3" GRR

3" GRS

1" H

W R

1" H

W S

1" H

W R

1" H

W S

VAV

0-1

VAV

0-2

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

Spur Design 312 SW 25th Street Oklahoma City, OK 73109 405.842.6100 www.spur-design.com

Mechanical/Electrical/Plumbing:

Foresite Group, LLC 3740 Davinci Court, Suite 100 Peachtree Corners, GA 30092 770.368.1399 www.fg-inc.net

Structural:

1, 7, 14

18-314

/4 /2

:2

:1

A

M

14-MP-100

BLDG 14 HVAC PIPING PLAN -

BASEMENT

12 20RLC

EXPAND LINEN

DISTRIBUTION CENTER

SALT LAKE CITY VAMC

SALT LAKE CITY, UT 84148

11/04/2022

100% CONSTRUCTION DOCUMENTS

660-18-243

JRM

Scale: 1/4" = 1'-0"

BLDG 14 HVAC PIPING DEMOLITION PLAN BASEMENT

Scale: 1/4" = 1'-0"

BLDG 14 HVAC PIPING PLAN - BASEMENT 0 4 8 16

N O R

TH

TRUE

0 4 8 16

N O R

TH

TRUE

1. THE AREA OF WORK SHOWN IS ASSOCIATED

WITH AN OPERATING FACILITY THAT MUST

REMAIN IN SERVICE 24/7.

2. SEE SHEET G-100 FOR ADDITIONAL INFORMATION

REGARDING SCHEDULE AND PHASING

REQUIREMENTS. SCHEDULE WORK TO MINIMIZE

DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE

CONTRACTING OFFICER’S REPRESENTATIVE

(COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER

TRADES AND CONTRACTORS. VERIFY ALL

EXISTING CONDITIONS BEFORE THE START OF

WORK.

5. THE DEMOLITION DRAWINGS ARE SCHEMATIC.

CONTRACTOR RESPONSIBLE FOR FIELD

VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

6. VAV BOX INLET AND OUTLET DUCTWORK SIZES

SHALL MATCH UNIT INLET AND OUTLET

CONNECTION SIZE UNLESS NOTED OTHERWISE

ON PLAN.

7. VAV ATU HEATING HOT WATER SUPPLY AND

RETURN PIPING BRANCHES SHALL BE 3/4”

UNLESS NOTED OTHERWISE.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

V A

N A

C C E

S

SI

B

L E

V A

N A

C C E

S

SI

B

L E

1. REMOVE HYDRONIC PIPING BACK TO

DEMARCATION POINT SHOWN.

2. PROVIDE AND INSTALL NEW HYDRONIC PIPING AT

LOCATION SHOWN.

File details come from the government source that posted it. Updated .