Attachment J11 Company Technical Experience Construction Form.docx

DOCX document 21 KB Posted

Attached to
Pueblo Pintado Health Center Construction
Solicitation number
75H70125R00026
Issued by

About this file

This is a Company Technical Experience Form (Attachment J11) that contractors must complete to demonstrate their construction experience for the Pueblo Pintado Health Center Construction project (Solicitation #75H701-25-R-00026). The form requires contractors to provide details about similar construction projects completed within the last 6 years, including project type, location, scope, facility type, building size, role (prime/subcontractor), contract value, subcontracted work, construction dates, performance evaluations, and reference contact information.

The form is related to a larger solicitation for constructing a new 125,884 square foot healthcare facility in Pueblo Pintado, New Mexico for the Indian Health Service. This experience form serves as a template for contractors to document their relevant past performance and capabilities in healthcare or similar institutional construction projects. The form itself does not contain specific requirements or scope details, but rather is a standardized format for capturing contractor qualifications.

View the file

Other files

File Type Posted
B05 75H70125R00026 A00015.pdf PDF
B05 75H70125R00026 A00014.pdf PDF
B05 75H70125R00026 A00013.pdf PDF
Attachment 01 - 01 45 00 - Quality Controls.pdf PDF
Attachment J15 Temp Housing.pdf PDF
B05 75H70125R00026 A00012.pdf PDF
Attachment J09 Wage Determination dated 03.07.2025.pdf PDF
MB05 75H70125R00026 Amendment 11.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Specifications.zip ZIP file
B05 75H70125R00026 Amendment 10.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Drawings.zip ZIP file
Attachment J14 FY25 Subcontracting Plan (Large Businesses Only).docx DOCX document
B05 75H70125R00026 Amendment 09.pdf PDF
B05 75H70125R00026 Amendment 08.pdf PDF
B05 Amendment 07 Updated Specifications.zip ZIP file
B05 Amendment 07 Updated Drawings.zip ZIP file
B05 75H70125R00026 Amendment 07.pdf PDF
B05 75H70125R00026 Amendment 06.pdf PDF
Amendment 06 Drawings.zip ZIP file
28 31 12 - FA System.pdf PDF
10 14 00 - Signage.pdf PDF
B05 75H70125R00026 Amendment 05.pdf PDF
B05 75H70125R00026 Amendment 04.pdf PDF
B05 75H70125R00026 Amendment 03.pdf PDF
B05 75H70125R00026 Amendment 02.pdf PDF
B05 75H70125R00026 Amendment 01.pdf PDF
Attachment J10 Example Nuvolo Maint Spreadsheet.xlsx XLSX spreadsheet
Attachment J12 - Key Personnel Resume Form.docx DOCX document
Attachment J08.2 Geotechnical Addendum.pdf PDF
Attachment J06 Facility User Manual.pdf PDF
Attachment J04 Commissioning Plan.pdf PDF
B01 RFP - 75H70125R00026.pdf PDF
Attachment J05 Weather Conditions Gallup NM.pdf PDF
Attachment J09 Wage Determination.pdf PDF
Attachment J14 Subcontracting Plan (Large Businesses Only).docx DOCX document
Attachment J13 Past Performance Questionnaire.docx DOCX document
Attachment J08.1 Geotechnical Report.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16-161-SOL-00001

NCYRTC

Attachment J11 - Company Technical Experience – Construction Form Solicitation Number: 75H701-25-R-00026

COMPANY TECHNICAL EXPERIENCE – CONSTRUCTION FORM

Provide the following information to show examples of projects your company constructed within the last six (6) years indicating experience with projects of similar type and scope. Use one form per project.

Type of Project Represented Your Firm’s Name Name of Project Location of Project Owner General Scope of Construction Project Type of Facility (i.e. office building, hospital, etc.)

Size of building, including number of gross square feet and number of stories Your Role (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed Dollar Value of the Contract Extent and Type of Work Subcontracted Out Dates Construction: Began___________________ Completed______________ % Completed _______ Your Performance Evaluation by Owner, if known

Were You Terminated or Assessed Liquidated Damages?

(If either is “Yes”, attach an Explanation) Owner’s Point of Contact for Reference (Name and Company) Current Telephone Number of Reference POC

SOURCE SELECTION SENSITIVE For Official Use Only Volume I – Factor 1 – Specialized Experience

FOR OFFICIAL USE ONLY, SOURCE SELECTION INFORMATION (FAR 3.104)

Response to Solicitation 75H701-24-R-00011

File details come from the government source that posted it. Updated .