B05 75H70125R00026 Amendment 03.pdf

PDF 266 KB Posted

Attached to
Pueblo Pintado Health Center Construction
Solicitation number
75H70125R00026
Issued by

About this file

This is Amendment 03 to solicitation 75H70125R00026 for the Pueblo Pintado Health Center Construction project, providing responses to nine submitted questions. The amendment clarifies that the water storage tank capacity will be 200,000 gallons (not 120,000 as stated in Spec 13 41 20), which will be updated in a future amendment. Other key clarifications include: Spec Section 08 71 00 for Door Hardware will be provided in a future amendment; kitchen equipment elevations are not included as they are standard items to be reviewed via cutsheets; the project includes one patient lift spanning from restroom 1G-023 into Exercise Area 1G-008C; and landscape drawings will be updated to remove blacked out areas.

The amendment also provides multiple clarifications regarding wall finishes: all toilet rooms will have Thermofoil on wet walls and Chromacoat paint on other walls; the Crash Cart area will have Thermofoil on the bottom wall; all Utility Rooms will have Thermofoil finish; and various other finish specifications will be updated in forthcoming amendments. The amendment was issued by the Division of Engineering Services Seattle office with an effective date of February 3, 2025.

View the file

Other files

File Type Posted
B05 75H70125R00026 A00015.pdf PDF
B05 75H70125R00026 A00014.pdf PDF
B05 75H70125R00026 A00013.pdf PDF
Attachment 01 - 01 45 00 - Quality Controls.pdf PDF
Attachment J15 Temp Housing.pdf PDF
B05 75H70125R00026 A00012.pdf PDF
Attachment J09 Wage Determination dated 03.07.2025.pdf PDF
MB05 75H70125R00026 Amendment 11.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Specifications.zip ZIP file
B05 75H70125R00026 Amendment 10.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Drawings.zip ZIP file
Attachment J14 FY25 Subcontracting Plan (Large Businesses Only).docx DOCX document
B05 75H70125R00026 Amendment 09.pdf PDF
B05 75H70125R00026 Amendment 08.pdf PDF
B05 Amendment 07 Updated Specifications.zip ZIP file
B05 Amendment 07 Updated Drawings.zip ZIP file
B05 75H70125R00026 Amendment 07.pdf PDF
B05 75H70125R00026 Amendment 06.pdf PDF
Amendment 06 Drawings.zip ZIP file
28 31 12 - FA System.pdf PDF
10 14 00 - Signage.pdf PDF
B05 75H70125R00026 Amendment 05.pdf PDF
B05 75H70125R00026 Amendment 04.pdf PDF
B05 75H70125R00026 Amendment 02.pdf PDF
B05 75H70125R00026 Amendment 01.pdf PDF
Attachment J10 Example Nuvolo Maint Spreadsheet.xlsx XLSX spreadsheet
Attachment J11 Company Technical Experience Construction Form.docx DOCX document
Attachment J12 - Key Personnel Resume Form.docx DOCX document
Attachment J08.2 Geotechnical Addendum.pdf PDF
Attachment J06 Facility User Manual.pdf PDF
Attachment J04 Commissioning Plan.pdf PDF
B01 RFP - 75H70125R00026.pdf PDF
Attachment J05 Weather Conditions Gallup NM.pdf PDF
Attachment J09 Wage Determination.pdf PDF
Attachment J14 Subcontracting Plan (Large Businesses Only).docx DOCX document
Attachment J13 Past Performance Questionnaire.docx DOCX document
Attachment J08.1 Geotechnical Report.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000003

The reason for this amendment is to provide responses to questions submitted.

See Page 2.

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00026

131154

1 2

02/03/2025

01/06/2025

QUESTIONS AND RESPONSES

1. Description/ Question: I had a question as far as the Pueblo Pintado Health Center: what size tanks are planned to be used at the facility?

a. Response: The storage tank will hold 200,000 gallons as the drawings indicate. Spec 13 41 20 will be updated to reflect this amount and will be provided in a forthcoming amendment.

2. Description/Question: Spec Section 13 41 20, 2.01, A.1, indicates that the elevated storage tank is 120,000 gallons. The drawings call out 200,000 gallons. Please confirm the size of the water storage tank.

a. Response: The storage tank will hold 200,000 gallons as the drawings indicate. Spec 13 41 20 will be updated to reflect this amount.

3. Description/Question: Spec section 087100 for Door Hardware is missing from the specifications. Can you please provide this spec section?

a. Response: Spec Section 08 71 00 will be included in a future amendment.

4. Description/Question: Please provide elevations for kitchen equipment. Please provide cut sheets/product data for walk in cooler.

a. Response: Elevations depicting the kitchen equipment are not included in the bid documents as these are standard items and will be reviewed via cutsheets. The walk-in fridges will need to be custom manufactured. Refrigeration design and calculations will be the responsibility of the kitchen installation subcontractor.

5. Description/Question: I'm reaching out in regard to the patient lift in this project, per the design team. Can you please confirm the following: 1) Quantity of 1 patient lift in the project. 2)Room-covering system into the bathroom. "Exercise Area" G, Room 1G-008C, into bath, "Patient training toilet", Room1G-023.

a. Response: The project includes one patient lift spanning from restroom 1G-023 into Exercise Area 1G-008C. Drawings and descriptions of the room covering system can be found on drawing reflected ceiling and equipment plans, equipment schedule and within Appendix A2_2 - Medical EQ Cutsheets.

6. Description/Question: The landscaping plans have blacked out areas, making takeoffs difficult.

Please provide updated landscaping plans free of blacked areas. Thanks,

a. Responses: Landscape drawings will be updated and included in a future amendment.

7. Description/Question: Should all prefabricated wall partitions in toilet rooms have Thermofoil finish. The finish schedule is calling Chromacoat Paint only in some areas, and some areas call out all Thermofoil.

a. Response: All toilet rooms to have Thermofoil on wet wall and Chromacoat paint on all other walls. Drawings to be updated in forthcoming amendment.

8. Description/Question: Should all prefabricated wall partitions in alcoves (ie Stretcher Alcove, Crash Cart Alcove) have Thermofoil finish? The finish schedule is calling Chromacoat Paint, we recommend Thermofoil at bottom of wall

a. Response: The Stretcher Alcove 1E-043F does not have prefabricated wall partitions.

Proceed with Thermofoil on the bottom wall at the Crash Cart. The location of Chromacoat and Thermofoil at the Crash Cart and Team Room will be clarified in forthcoming addendum on the Finish Plan.

9. Description/Question: Should all prefabricated wall partitions in Utility Rooms have Thermofoil finish? The finish schedule is calling Chromacoat Paint, we recommend Thermofoil on walls.

a. Response: All Utility Rooms to have Thermofoil finish. Drawings to be updated in forthcoming amendment.

File details come from the government source that posted it. Updated .