B05 75H70125R00026 Amendment 10.pdf

PDF 340 KB Posted

Attached to
Pueblo Pintado Health Center Construction
Solicitation number
75H70125R00026
Issued by

About this file

This document is an Amendment (Amendment 10) to Solicitation 75H70125R00026 for the Pueblo Pintado Health Center Construction project. The amendment includes multiple updates and clarifications, principally addressing:

Changes to architectural and electrical drawings, specification updates in multiple sections (including communications, security, and food service specifications), and responses to 22 contractor questions covering topics such as gate details, electrical equipment specifications, nurse call system requirements, and food service equipment. Key modifications include adding new drawing sheets, revising existing drawings, updating section titles and numbering, inserting new specification sections for communications and security systems, and providing detailed responses to technical and procedural inquiries from potential contractors. The amendment also references updates to the Subcontracting Plan and incorporates changes related to recent Executive Orders affecting federal procurement regulations.

View the file

Other files

File Type Posted
B05 75H70125R00026 A00015.pdf PDF
B05 75H70125R00026 A00014.pdf PDF
B05 75H70125R00026 A00013.pdf PDF
Attachment 01 - 01 45 00 - Quality Controls.pdf PDF
Attachment J15 Temp Housing.pdf PDF
B05 75H70125R00026 A00012.pdf PDF
Attachment J09 Wage Determination dated 03.07.2025.pdf PDF
MB05 75H70125R00026 Amendment 11.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Specifications.zip ZIP file
B05 75H70125R00026 Amendment 10 Updated Drawings.zip ZIP file
Attachment J14 FY25 Subcontracting Plan (Large Businesses Only).docx DOCX document
B05 75H70125R00026 Amendment 09.pdf PDF
B05 75H70125R00026 Amendment 08.pdf PDF
B05 Amendment 07 Updated Specifications.zip ZIP file
B05 Amendment 07 Updated Drawings.zip ZIP file
B05 75H70125R00026 Amendment 07.pdf PDF
B05 75H70125R00026 Amendment 06.pdf PDF
Amendment 06 Drawings.zip ZIP file
28 31 12 - FA System.pdf PDF
10 14 00 - Signage.pdf PDF
B05 75H70125R00026 Amendment 05.pdf PDF
B05 75H70125R00026 Amendment 04.pdf PDF
B05 75H70125R00026 Amendment 03.pdf PDF
B05 75H70125R00026 Amendment 02.pdf PDF
B05 75H70125R00026 Amendment 01.pdf PDF
Attachment J10 Example Nuvolo Maint Spreadsheet.xlsx XLSX spreadsheet
Attachment J11 Company Technical Experience Construction Form.docx DOCX document
Attachment J12 - Key Personnel Resume Form.docx DOCX document
Attachment J08.2 Geotechnical Addendum.pdf PDF
Attachment J06 Facility User Manual.pdf PDF
Attachment J04 Commissioning Plan.pdf PDF
B01 RFP - 75H70125R00026.pdf PDF
Attachment J05 Weather Conditions Gallup NM.pdf PDF
Attachment J09 Wage Determination.pdf PDF
Attachment J14 Subcontracting Plan (Large Businesses Only).docx DOCX document
Attachment J13 Past Performance Questionnaire.docx DOCX document
Attachment J08.1 Geotechnical Report.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000010

The reason for this amendment is to provide responses to questions submitted and to update the Subcontracting Plan.

See Summary of Changes

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00026

131154

1 5

03/14/2025

01/06/2025

S

SUMMARY OF CHANGES

A. As a result of HHS FAR Class Deviation 2025‐01 (re Executive Order (EO) 14173 and EO 14168 (CAAC Letter 2025‐01 Amendment 1)) and HHS FAR Class Deviation 2025‐02, (re Section 2 of Executive Order (EO) 14148, which revoked EO14057, and Section 2 of EO 14208 (CAAC Letter 2025‐02 Supplement 1)), and Amendment 1 to HHS FAR Class Deviation 2025‐02 (re Executive Order (EO) 14148, “Initial Rescissions of Harmful Executive Orders and Actions,” which revoked EO 14057 and Section 2 of EO 14208, “Ending Procurement and Forced Use of Paper Straws." The following FAR Provisions and Clauses have been updated as indicated:

Insert by reference to Section I: 52.222‐9, Apprentices and Trainees (JUL 2005) (DEVIATION FEB 2025)

The clause above can be viewed utilizing the following link until they are incorporated into the FAR:

https://www.acquisition.gov/caac‐letters

B. Replace Attachment J14 Subcontracting Plan with the attached J14 FY25 Subcontracting Plan. The updated Subcontracting Plan updates the HHS Subcontracting Goals to the FY25 goals.

C. Update the Solicitation Drawings and Specifications as noted below and see attached updated drawings and specifications for Amendment 10:

Architectural Drawings:

1.01 G‐001.1 ADDED drawings S‐529 and S‐901 to sheet index. Sheets were added in Addendum #005.

1.02 AS‐113: REVISED notes to indicate gate and fence information. F1/AS‐113

1.03 AS‐119: ADDED elevation details for pivot gate and sliding gate.

1.04 A‐312: REVISED to omit steel angle A6/A‐312

1.05 A‐862: REVISED to omit steel angle B5/A‐862

Electrical Drawings:

1.01 E‐111A Added unswitched circuitry for lighting power between rooms 0A‐001 and 0A‐002

1.02 E‐121B

a. Revised chiller electrical connections as required for updated chiller specifications.

1.03 E‐703

a. MSB‐1 – Revised text in schedule to ensure all is shown

b. MSB‐2 – Revised text in schedule to ensure all is shown

c. DPM ‐ Revised chiller electrical connections as required for updated chiller specifications

General/Architectural Specifications:

1.01 00 01 10 REVISED 11 40 00 section title REVISED 31 22 00 section title ADDED 32 12 16 section to TOC. Section previously added in Addendum #003.

REVISED section number 01 32 16 to 01 32 16.00 REVISED section number 01 33 29.06 to 01 33 29.00.06

REVISED section number 01 57 20.10 to 01 57.20.00.10 REVISED section number 10 26 23 to 10 26 23.11

1.02 01 32 01.10 REVISED header to correct section number.

1.03 01 32 16.00 REVISED footer to correct section number.

1.04 01 33 29.06 REVISED file name to 01 33 29.00.06

1.05 01 57 20.10 REVISED file name to 01 57.20.00.10

1.06 09 84 33 REVISED file name to Sound Absorbing Wrapped Wall Panels

Communications Specifications:

1.07 27 41 33 ADDED entire section

1.08 27 53 19 ADDED entire section

Security Specifications:

1.09 28 00 10 ADDED entire section

1.10 28 15 00 ADDED entire section

Food Service Specifications:

1.11 11 40 00: ADDED entire specification section.

D. Provide the following Questions and Responses:

1. Description/Question: Per A6/A‐312, there is an angle attaching to the HSS curtainwall headers, this same detail found in structurals is 10/S‐528 and it does not show an attaching angle. As of now we are not including this item based on structural drawing priority. Is this assumption correct?

Response: Steel angle in A6/A‐312 may be omitted. Detail updated.

2. Description/Question: Per F7/A‐420, the picket rails at the perimeter of the stair openings on the first floor calls for aluminum rails but a conflicting detail F1/A‐423 cut on C1/A‐420 shows picket rails calling for standard size steel picket rails similar to the other stair rails on F3/A‐422. Please confirm if this rail is aluminum or ferrous.

Response: Railing at lobby stair is to be aluminum.

3. Description/Question: Per B5/A‐862, there is a smaller angle attaching to the bottom flange of a WF beam, this same detail found in structurals is 2/S‐527 and it does not show an attaching angle. As of now we are not including this item based on structural drawing priority. Is this assumption correct?Response:

Steel angle in B5/A‐862 may be omitted. Detail is updated on revised Drawings.

4. Description/Question: Sheet E121A Keyed notes 1&2 refer to AQ‐400 and AQ‐401. Please provide the referenced AQ drawings.

Response: AQ‐400 and AQ‐401 added in Amendment 04.

5. Description/Question: Item# G1‐ Delfield Model# T‐1418 is discontinued and there is no replacement at this time. Please advise an alternative.

Response: The model number has changed from T‐1418 to TT‐1418

6. Description/Question: Are specifications available for Section 11 40 00 Food Service Equipment? Please clarify.

Response: 11 40 00 ‐ Food Service Equipment will be included in this amendment.

7. Description/Question: I am having a hard time finding the specs on the tank sizes in which you would like to be located at the facility. If you could help point me in the right direction I would greatly appreciate it, or if you could let me know the sizes and if you guys plan on purchasing new ones or already have tanks there. I would greatly appreciate the feedback.

Response: The propane tank information is called out in the plumbing schedules, the P‐700 series drawings.

8. Description/Question: Spec. 13 34 00; 1.06; C. indicates the manufacturer must be a licensed producer of Easi‐Set Buildings or equal. Will PCI Certified suffice.

Response: PCI Certification will suffice as long as 13 34 00; 1.06; B. is met for minimum 5 years of experience manufacturing and setting precast concrete.

9. Description/Question: Spec. 13 34 00; 2.01; F. indicates the insulation needs to have an R‐value of R‐15.

When scaling the wall thickness in the drawings, they are 8” thick. Will 12” thick walls work to provide a wall panel with an R‐value of R‐15.

Response: 12" walls are acceptable to provide required R value.

10. Description/Question: Spec. 13 34 00; 2.03; B. indicates a washed brown riverstone applied‐aggregate finish on all exterior wall surfaces. Can we provide wall panels with an integral color and a sandblast finish.

Other options are available also.

Response: Integral color and sandblast finish is acceptable.

11. Description/Question: Will 11.4000 Food Service Equipment Specifications be issued?

Response: 11 40 00 ‐ Food Service Equipment is included with this Amendment.

12. Description/Question: Will Food Service Equipment Elevation Drawings be issued?

Response: Food service equipment elevation drawings will not be issued.

13. Description/Question: Will Food Service Equipment Manufacturer Drawings be issued for the Walk‐In?

Response: Drawings for the walk‐ins are to be provided by the walk‐in manufacturer awarded the project as part of the submittal process.

14. Description/Question: Sheet FS‐100, Equipment Schedule, Item # A4, calls out Equipment Manufacturer as "HOBART US FOODSERVICE". Does this the broadliner US Foodservice is providing and installing the dishwasher?

Response: No, the Hobart company is sometimes referred to as "Hobart US Foodservice." The winning food service contractor (FSC) is responsible for providing and installing the dishwasher.

15. Description/Question: Please confirm / Correct for the Walk‐In Remote Refrigeration System, the outdoor ambient temperature rating is 110 degrees Fahrenheit.

Response: The walk‐in manufacturer awarded the project will determine the required sizes of the refrigeration systems based on its own load calculations and its proprietary refrigeration equipment. The manufacturer will determine/confirm the appropriate outdoor ambient temperature to be used in those load calculations.

16. Description/Question: Would it be possible to get an additional detailed drawing for the Vertical Pivot and the Sliding gate?

Response: Additional gate elevations included in this Amendment. Please refer to specification 32 31 13 for additional requirements.

17. Description/Question: Are the gates for the water tower Rolling or Cantilever?

Response: Provide a sliding chain link fence at the water tower. Note will be added to AS‐113 in this Amendment.

18. Description/Question: Request written specifications for the Food Service Equipment and an alternate model for Item# 61. Delfield Model# T‐1418 unit that has been discontinued.

Response: 11 40 00 ‐ Food Service Equipment will be included in this Amendment. Our local Kansas City metro‐area rep for Delfield says those tray dispensers are still being produced, but under a slightly different model name. Instead of T‐1418, they are now TT‐1418. Please verify and if the Delfied model is not available under the new number, a Lakeside 986 is acceptable.

19. Description/Question: CS107‐provide details for monument walls.

Response: Reference sheet A112C and A112C.1 for dimensions and detail callouts.

20. Description/Question: Electrical spec calls for aluminum bussing on the switchboards, copper bussing on panelboards and transformers callout for aluminum windings. Please clarify if aluminum is acceptable across all electrical gear or if copper is expected only in the panelboards.

Response: Aluminum is acceptable across all electrical gear.

21. Description/Question: 27 05 33 3.1 A. indicates that Nurse Call is to be “Complete Conduit”; however, 27 52 23 – 52 allows for conduit to be transitioned to cable tray. Please advise if conduit to cable tray is allowed for Nurse Call wiring.

Response: Conduit transitioned to cable tray is allowed for Nurse Call wiring.

22. Description/Question: As Nurse Call is a dedicated system that does not require CAT 6a cabling, please advise if CAT 6 cabling will be allowed.

Response: Cabling for system independent of building LAN system shall be provided to system manufacturer requirements.