B05 75H70125R00026 Amendment 05.pdf

PDF 275 KB Posted

Attached to
Pueblo Pintado Health Center Construction
Solicitation number
75H70125R00026
Issued by

About this file

This is Amendment 05 to solicitation 75H70125R00026 for the Pueblo Pintado Health Center Construction project, issued by the Division of Engineering Services Seattle office with an effective date of February 18, 2025. The amendment provides responses to eight contractor questions primarily focused on signage and door hardware specifications.

Key clarifications include: door hardware sets D10A and DP11 require closers per manufacturer specifications; Navajo language is only required on interior signage in specific areas rather than all room signs; exterior building signage details are provided in Appendix A10; dimensional letters for the facility name will be non-illuminated aluminum with 3" return rather than cast aluminum; and the marquee board will include an LED display to be updated to a rectangular shape. The amendment does not extend the original response deadline of January 6, 2025, and contractors are not required to sign and return this amendment.

View the file

Other files

File Type Posted
B05 75H70125R00026 A00015.pdf PDF
B05 75H70125R00026 A00014.pdf PDF
B05 75H70125R00026 A00013.pdf PDF
Attachment 01 - 01 45 00 - Quality Controls.pdf PDF
Attachment J15 Temp Housing.pdf PDF
B05 75H70125R00026 A00012.pdf PDF
Attachment J09 Wage Determination dated 03.07.2025.pdf PDF
MB05 75H70125R00026 Amendment 11.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Specifications.zip ZIP file
B05 75H70125R00026 Amendment 10.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Drawings.zip ZIP file
Attachment J14 FY25 Subcontracting Plan (Large Businesses Only).docx DOCX document
B05 75H70125R00026 Amendment 09.pdf PDF
B05 75H70125R00026 Amendment 08.pdf PDF
B05 Amendment 07 Updated Specifications.zip ZIP file
B05 Amendment 07 Updated Drawings.zip ZIP file
B05 75H70125R00026 Amendment 07.pdf PDF
B05 75H70125R00026 Amendment 06.pdf PDF
Amendment 06 Drawings.zip ZIP file
28 31 12 - FA System.pdf PDF
10 14 00 - Signage.pdf PDF
B05 75H70125R00026 Amendment 04.pdf PDF
B05 75H70125R00026 Amendment 03.pdf PDF
B05 75H70125R00026 Amendment 02.pdf PDF
B05 75H70125R00026 Amendment 01.pdf PDF
Attachment J10 Example Nuvolo Maint Spreadsheet.xlsx XLSX spreadsheet
Attachment J11 Company Technical Experience Construction Form.docx DOCX document
Attachment J12 - Key Personnel Resume Form.docx DOCX document
Attachment J08.2 Geotechnical Addendum.pdf PDF
Attachment J06 Facility User Manual.pdf PDF
Attachment J04 Commissioning Plan.pdf PDF
B01 RFP - 75H70125R00026.pdf PDF
Attachment J05 Weather Conditions Gallup NM.pdf PDF
Attachment J09 Wage Determination.pdf PDF
Attachment J14 Subcontracting Plan (Large Businesses Only).docx DOCX document
Attachment J13 Past Performance Questionnaire.docx DOCX document
Attachment J08.1 Geotechnical Report.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000005

The reason for this amendment is to provide responses to questions submitted.

See Page 2.

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00026

131154

1 2

02/18/2025

01/06/2025

SUMMARY OF CHANGES

1. Description/Question: Door hardware with door seals (DP10, DP10A, DP11)‐ do these doors need closers? If yes, LCN4040?

a. Response: Door Hardware sets D10A and DP11 require a closer per manufacturer's specifications. The doors specified are in the PFIWP (pre‐fabricated interior wall partition) scope and include a lot of their own specific hardware.

2. Description/Question: n Section 10 14 00 Signage, Part 2.02 Signage Applications. C. General Signage Requirements, 3. Character Height: 1” (English & Navajo language on each sign). Sheet AW‐ 501 & AW‐502 Signage Details, does not indicate Navajo language on signs. Please confirm if the Navajo language on the signs is a requirement, or do we follow Sheets AW‐501 & AW‐502.

a. Response: Section 10 14 00 Signage, Section 2.02 Signage Applications, C General Signage Requirements to be updated in forthcoming Amendment. Navajo language to only be used in specific areas on the Interior as indicated on the Interior Elevations. Navajo language to not be integrated into room signage. Please follow sheets AW‐501 and AW‐502.

3. Description/Question: In Section 10 14 00 Signage, Part 2.02 Signage Applications. F. Exterior Bldg Identification Signs: None of plans. Please confirm if they are part of the scope and please provide drawings.

a. Response: Exterior Building Signage detailed and indicated within Appendix A10(4) ‐ Architectural Site and Appendix A10(7) Signage.

4. Description/Question: In Section 10 14 00 Signage, Part 2.02 Signage Applications. G. Other Dimensional Letter Signs. 1. Exterior: Allow for 50 Letters 6” Tall. Please confirm if this item should be included in the bid.

a. Response: Spec 10 14 00, section 2.02.G.1 will be updated to say "Exterior: Size as indicated on drawings." The quantity of letters are indicated on the drawings. Signage is included in this bid package.

5. Description/Question: In Section 10 14 00 Signage, Part 2.04 Dimensional Letters. A. Metal Letters,

1. Aluminum casting. Please confirm if all dimensional letters seen of plans are to be cast aluminum letters.

a. Response: All Interior dimensional letters are to be aluminum cast. The mounting technique for dimensional letters to be updated in the specification for forthcoming Amendment.

6. Description/Question: Sheet A‐205, Detail F1, “PUEBLO PINTADO HEALTH CENTER” letters, Signage specs call for letters to be cast aluminum. These letters are too big to be cast aluminum. If they can even be cast aluminum at that size, they would most likely be in multiple pieces and be extremely heavy and require strong backing inside wall. Non‐illuminated fabricated aluminum letters with a 3” return are highly recommended. Please confirm fabrication type.

a. Response: Please proceed with non‐illuminated aluminum letters with a 3" return.

Reference drawings for signage letter heights. Signage specification to be updated in forthcoming Amendment.

7. Description/Question: Sheet AS‐116 Architectural Site‐Entry Monument Signs Elevations, Detail F1.

Detail does not indicate fabrication method of sign. No profile/section view is provided. Please provide further details on fabrication methods.

a. Response: The reference is F1/AS‐115. Non‐illuminated aluminum letters will be pin mounted to the monument signage.

8. Description/Question: Sheet AS‐116 Architectural Site‐Entry Monument Signs Elevations, Details F7 and Sheet AS‐115, Detail B1. Please confirm if Marquee Board will have an LED electronic display. If so, please confirm details of the LED board (Pixel pitch, brand, communication, etc.) Most LED displays cannot be customized to your size, they have their standard cabinet sizes. If Marquee Board is not an LED display, please confirm/provide fabrication method.

a. Response: The references are F7/AS‐115 and B1/AS‐115. The marquee board has an LED display. Drawings will be updated to a rectangular shape.

File details come from the government source that posted it. Updated .