B05 75H70125R00026 Amendment 07.pdf

PDF 307 KB Posted

Attached to
Pueblo Pintado Health Center Construction
Solicitation number
75H70125R00026
Issued by

About this file

This is Amendment 07 to solicitation 75H70125R00026 for the Pueblo Pintado Health Center Construction project, which extends the proposal due date to March 21, 2025 and provides responses to contractor questions about specifications and drawings.

The amendment includes various technical clarifications and updates, including the addition of fire alarm specifications, access control specifications, and uninterruptible power supply specifications. Key updates address structural drawings with added column and beam sizes, architectural interior revisions, and electrical drawing corrections. The amendment also provides important project location details - the new health center will be built on a 108-acre tribal trust land site in Pueblo Pintado, approximately 89.80 km W/SW of Cuba, NM. Notable clarifications confirm there are no liquidated damages for this project, contractor is not responsible for utility work/transformer costs at this time, and while temporary worker housing via trailers may be permitted, this must be coordinated with the Navajo Nation. The amendment also updates several FAR provisions related to biobased products and sustainability requirements while deleting greenhouse gas emissions disclosure requirements.

View the file

Other files

File Type Posted
B05 75H70125R00026 A00015.pdf PDF
B05 75H70125R00026 A00014.pdf PDF
B05 75H70125R00026 A00013.pdf PDF
Attachment 01 - 01 45 00 - Quality Controls.pdf PDF
Attachment J15 Temp Housing.pdf PDF
B05 75H70125R00026 A00012.pdf PDF
Attachment J09 Wage Determination dated 03.07.2025.pdf PDF
MB05 75H70125R00026 Amendment 11.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Specifications.zip ZIP file
B05 75H70125R00026 Amendment 10.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Drawings.zip ZIP file
Attachment J14 FY25 Subcontracting Plan (Large Businesses Only).docx DOCX document
B05 75H70125R00026 Amendment 09.pdf PDF
B05 75H70125R00026 Amendment 08.pdf PDF
B05 Amendment 07 Updated Specifications.zip ZIP file
B05 Amendment 07 Updated Drawings.zip ZIP file
B05 75H70125R00026 Amendment 06.pdf PDF
Amendment 06 Drawings.zip ZIP file
28 31 12 - FA System.pdf PDF
10 14 00 - Signage.pdf PDF
B05 75H70125R00026 Amendment 05.pdf PDF
B05 75H70125R00026 Amendment 04.pdf PDF
B05 75H70125R00026 Amendment 03.pdf PDF
B05 75H70125R00026 Amendment 02.pdf PDF
B05 75H70125R00026 Amendment 01.pdf PDF
Attachment J10 Example Nuvolo Maint Spreadsheet.xlsx XLSX spreadsheet
Attachment J11 Company Technical Experience Construction Form.docx DOCX document
Attachment J12 - Key Personnel Resume Form.docx DOCX document
Attachment J08.2 Geotechnical Addendum.pdf PDF
Attachment J06 Facility User Manual.pdf PDF
Attachment J04 Commissioning Plan.pdf PDF
B01 RFP - 75H70125R00026.pdf PDF
Attachment J05 Weather Conditions Gallup NM.pdf PDF
Attachment J09 Wage Determination.pdf PDF
Attachment J14 Subcontracting Plan (Large Businesses Only).docx DOCX document
Attachment J13 Past Performance Questionnaire.docx DOCX document
Attachment J08.1 Geotechnical Report.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000007

The reason for this amendment is to provide responses to questions submitted, update specifications and drawings, update/ delete clauses and to extend the proposal due date.

See Summary of Changes

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00026

131154

1 4

02/28/2025

01/06/2025

SUMMARY OF CHANGES

A. Provide a list of questions and answers:

Question: Contractor requests fire alarm spec (28 31 12).

Response: Specification 28 31 12 ‐ FA System added as a part of Amendment 06

Question: Is there a 28‐15‐000 spec for Access Control? Do not see in the bid documents.

Response: Specification 28 15 00 ‐ Access Control is included with this amendment.

Question: Nurse Call / Paging integration: Are you open to alternate products? In respect to Nurse Call integration specs, Biamp Vocia is most applicable.

Response: Alternate products can be provided as long as system specifications requirements and operation are met. Alternate products will not be reviewed until after the contract has been awarded.

Question: Nurse Call: Rauland 5 is spec’d as manufacturer, but elsewhere in the section a defunct Dukane system is mentioned. If two‐way communication in necessary, Rauland is the correct product.

Response: Nurse Call specification should be specified around Rauland 5, reference to Dukane system shall not be part of specification.

Question: Please provide specifications for UPS‐R shown on E601.

Response: Specification 26 33 53 ‐ Uninterruptible Power Supply is attached to this amendment.

Question: As of now, we have a weight allowance added for the end connections for the T‐shaped double beam at detail8/S‐526, will there be a detail for this in the future? This same allowance/question is applied to the HSS at the top of this same detail.

Response: Please see attached updated drawings.

Question: There is a group of beams connecting to a cluster of 5 columns on S‐112E gridline R1‐L4 that are not sized, can you provide a beam size?

Response: These members are tagged in the attached updated drawings.

Question: Can you confirm the column size located on S‐111B close to gridline 14‐Z (column for canopy)?

Response: This column is tagged in the attached updated drawings.

Question: Is contractor to include costs for utility work by others? Transformer cost? If yes, is there a POC for NTUA to coordinate? Please clarify.

Response: Contractor is not to include this cost in the proposal. The utility work still being determined at this time and may or may not be included later as a modification to the award.

Question: Is contractor responsible for any of the proposed lease boundaries shown? Please clarify.

Response: No, there isn’t any scope associated with the lease boundary at this time. However, if you are referring to the perimeter fence, the contractor is responsible for this.

Question: What type of living quarters will be permissible near the job site? Given it's remote location, we are exploring options for housing staff for the project duration and need to estimate costs.

Response: On past projects the Navajo Nation has allowed trailers for workers for temporary living quarters. This needs to be established with the tribe prior to assuming this will be allowed at this project location. The contractor will be responsible for developing the site and getting utilities to their trailers.

Question: Can you provide any additional insight as to where this project is at?

Response: The new health center will be located on an 108 acre site on tribal trust land in Pueblo Pintado.

Site is within the Pueblo Pintado (Nahodeeshigiizh Ch’inilini) Chapter area, located approximately 89.80 km W/SW of Cuba, 65.82 km NE of Crownpoint, and 231.32 km NW of Albuquerque, NM within the Crownpoint Service Unit (CSU), part of the Navajo Area Indian Health Service (NAIHS). It is also located approximately 27.36 km SE of the Chaco Culture National Historic Park.

Question: There are no liquidated damages listed for the project. Please clarify if there are liquidated damages and what they are.

Response: There are no liquidated damages for this project.

B. The following specifications and drawings have been modified/added as noted below (See attached updated Drawings and Specifications):

Structural Drawings:

1.01 S‐11B: ADDED column size.

1.02 S‐112F: ADDED beam sizes.

1.03 S‐134: ADDED member sizes.

1.04 S‐155: ADDED bracing symbol.

1.05 S‐204: REVISED bracing elevation 1/S‐204.

1.06 S‐207: REVISED bracing elevation 2/S‐207.

1.07 S‐529: ADDED entire sheet.

1.08 S‐901: ADDED entire sheet.

Architectural Interiors Drawings:

1.09 AI‐601: REVISED specification division number and product description for EF1, EF2, EFB1, and EFB2.

Electrical Drawings:

1.01 E‐001: CORRECTED spelling of Lightning in keynote 19.

Mechanical Specifications:

1.02 23 09 23: ADDED specification section 23 09 23 – Direct Digital Control System for HVAC

Electrical Specifications:

1.01 26 33 53: Section ADDED in its entirety.

Low Voltage Specifications:

1.01 28 00 10 ADDED specification section 28 00 10 – Electronic Safety and Security Submittals

1.02 28 15 00 ADDED specification section 28 15 00 – Integrated Access Control Hardware Devices

Civil Specifications:

1.01 31 10 00 ADDED specification section 31 10 00 – Site Clearing

C. In accordance with HHS FAR Class Deviation 2025‐02, (re Section 2 of Executive Order (EO) 14148, which revoked EO14057, and Section 2 of EO 14208 (CAAC Letter 2025‐02 Supplement 1)), and Amendment 1 to HHS FAR Class Deviation 2025‐02 (re Executive Order (EO) 14148, “Initial Rescissions of Harmful Executive Orders and Actions,” which revoked EO 14057 and Section 2 of EO 14208, “Ending Procurement and Forced Use of Paper Straws." (CAAC Letter 2025‐02 Supplement 1)) the following FAR Provisions and Clauses have been updated or deleted as indicated:

Updated 52.223‐1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025) 52.223‐2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024)

(DEVIATION FEB 2025)

52.223‐10 Waste Reduction Program (MAY 2024) (DEVIATION FEB 2025) 52.223‐23, Sustainable Products and Services (MAY 2024 (DEVIATION FEB 2025))

Deleted 52.223‐22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation

(DEC 2016)

The clauses above can be viewed utilizing the following link until they are incorporated into the FAR:

https://www.acquisition.gov/caac‐letters.

D. Extend the due date for proposals to 21 March 2025. The cut‐off date for all RFI’s is revised to 11 March 2025.

E. No other Changes.

File details come from the government source that posted it. Updated .