This is Amendment 04 to solicitation 75H70125R00026, which provides responses to vendor questions and updates to specifications and drawings for the Pueblo Pintado Health Center Construction project. The amendment includes clarifications about prefab glass walls and door types in room IE-022, guidance on Thermofoil finish locations behind and beside sinks, and clarification on the placement of DT7 magnetic fabric boards in procedure rooms. Multiple drawing sets were updated, including General Vol1 and Vol2, Landscape, Civil, Structural, Architectural Site, and Architectural drawings, with changes to wall types, frame types, finishes, and specifications. Notable technical updates include revision of water tank capacity from 120,000 to 200,000 gallons, addition of Earth Moving and Asphalt Paving specifications, complete revision of Concrete Paving specification, and inclusion of missing door hardware specifications.

The amendment contains various architectural interior revisions, including wall finish changes in multiple rooms (from DT5 to DT3, DT4 to DT3, etc.), ceiling color revisions, and updates to wall finishes in procedure rooms. The project is administered by the Division of Engineering Services Seattle office, with an effective date of 02/07/2025. The amendment indicates contractors are not required to sign and return the document to the issuing office.

View the file

Other files

File Type Posted
B05 75H70125R00026 A00015.pdf PDF
B05 75H70125R00026 A00014.pdf PDF
B05 75H70125R00026 A00013.pdf PDF
Attachment 01 - 01 45 00 - Quality Controls.pdf PDF
Attachment J15 Temp Housing.pdf PDF
B05 75H70125R00026 A00012.pdf PDF
Attachment J09 Wage Determination dated 03.07.2025.pdf PDF
MB05 75H70125R00026 Amendment 11.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Specifications.zip ZIP file
B05 75H70125R00026 Amendment 10.pdf PDF
B05 75H70125R00026 Amendment 10 Updated Drawings.zip ZIP file
Attachment J14 FY25 Subcontracting Plan (Large Businesses Only).docx DOCX document
B05 75H70125R00026 Amendment 09.pdf PDF
B05 75H70125R00026 Amendment 08.pdf PDF
B05 Amendment 07 Updated Specifications.zip ZIP file
B05 Amendment 07 Updated Drawings.zip ZIP file
B05 75H70125R00026 Amendment 07.pdf PDF
B05 75H70125R00026 Amendment 06.pdf PDF
Amendment 06 Drawings.zip ZIP file
28 31 12 - FA System.pdf PDF
10 14 00 - Signage.pdf PDF
B05 75H70125R00026 Amendment 05.pdf PDF
B05 75H70125R00026 Amendment 03.pdf PDF
B05 75H70125R00026 Amendment 02.pdf PDF
B05 75H70125R00026 Amendment 01.pdf PDF
Attachment J10 Example Nuvolo Maint Spreadsheet.xlsx XLSX spreadsheet
Attachment J11 Company Technical Experience Construction Form.docx DOCX document
Attachment J12 - Key Personnel Resume Form.docx DOCX document
Attachment J08.2 Geotechnical Addendum.pdf PDF
Attachment J06 Facility User Manual.pdf PDF
Attachment J04 Commissioning Plan.pdf PDF
B01 RFP - 75H70125R00026.pdf PDF
Attachment J05 Weather Conditions Gallup NM.pdf PDF
Attachment J09 Wage Determination.pdf PDF
Attachment J14 Subcontracting Plan (Large Businesses Only).docx DOCX document
Attachment J13 Past Performance Questionnaire.docx DOCX document
Attachment J08.1 Geotechnical Report.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A000004

The reason for this amendment is to provide responses to questions submitted and to provide revised specifications and drawings based upon the responses from Amendment 03.

See Page 2.

Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104

See block 6

75H70125R00026

131154

1 4

02/07/2025

01/06/2025

SUMMARY OF CHANGES

Provided are a list of responses to vendor questions

1. Description/ Question: IE‐022, ae the North & East walls Prefab, if yes‐ all glass, or what is the wall type? The door is on the door schedule, is the door DIRTT?

Response: Correct, the door is DIRTT. North and East walls of IE‐022 to be prefab glass. Glass frame type for North wall to be clarified in forthcoming addendum. Reference PFIWP door schedule for East wall frame type.

2. Description/Question: By any sink, should there be Thermofoil finish on the wall behind the sink and on the wall to the side of the sink? Currently, per the finish schedule Thermofoil is only behind the sink. Due to location of paper towel holder etc, we suggest Thermofoil at the side of sink cabinet as well.

Response: Forthcoming addendum will clarify locations where Thermofoil should be located behind and to the side of sink.

3. Description/Question: Should there be a DT7 (Magnetic fabric board with Xorel) in procedure rooms? For majority of procedure type rooms it is listed on the finish schedule but not on the equipment schedule. ExamplesE‐009, E‐010, E‐017, E‐

018, IC‐057

Response: Forthcoming addendum will clarify locations of DT7 for the rooms in question.

4. Description/Question: DIRTT can replace the hanging mirror with a mirror tile that would be a part of the DIRTT wall, Would you prefer the DIRTT provided mirror as a tile?

Response: IHS is not accepting substitutions request until the project is awarded.

5. Description/Question: Request civil details/drawings for road to water tower and road to lagoon.

Response: Refer to Appendix A10(2B) – Civil for drawings and details.

The following drawings and specifications are hereby updated. See attached compressed and uncompressed drawings (NOTE: Drawings in the compressed file are compressed versions of the same drawings in the uncompressed file).

General Vol1:

1.01 G‐000.1:

a. UPDATED Revision date

b. UPDATED vicinity map

1.02 G‐131 – 133:

a. FIXED missing sustainability linked documents

General Vol2:

1.01 G‐000.2:

a. UPDATED revision date

b. UPDATED vicinity map

Landscape:

1.01 LI‐102 , LI‐103 , LI‐105 , LP‐101 , LP‐102 , LP‐103 , LP‐104:

a. FIXED Graphical issues of black boxes appearing on sheets

Civil (Compressed):

1.01 CS110 , CU206

a. FIXED Graphical issues of black boxes appearing on sheets

Structural (Compressed):

1.01 S‐112G , S‐133:

a. FIXED graphical issue with seal appearing incorrectly

Architectural Site (Compressed):

1.01 AS‐111

a. FIXED Graphical issue of fuzzy grain appearing across sheet

Architectural:

1.01 A‐001:

a. UPDATED wall type J6 to include J6.1 with lead lining

1.02 A‐111A:

a. REMOVED PFIWP frame type tag at 0A‐039, 0A‐046, AND 0A‐ 090A. Reference frame type on PFIWP door schedule.

1.03 A‐112E:

a. ADDED tag for PFIWP frame type at room 1E‐022.

1.04 A‐112E.1:

a. UPDATED J6 wall types to J6.1 at rad procedure room

1.05 A‐112E.2:

a. CLARIFIED location of DT3 / DT5 on North wall in room 1E‐043.

1.06 A‐112F.1:

a. UPDATED wall types to be lead lined in rad procedure room

1.07 A‐112G.2:

a. REMOVED PFIWP wall tag for room 1G‐007. Reference PFIWP door schedule for frame type.

1.08 A‐601:

a. REVISED PF 0A‐039 and PF 0A‐00A frame type.

1.09 A‐604:

a. REVISED PF 1G‐007 frame type.

Architectural Interiors:

1.01 AI‐602:

a. REVISED 0A‐045 West wall finish from DT5 to DT3.

b. REVISED 0A‐048 wall finishes from DT5 to DT3.

c. REVISED 0A‐049 wall finishes from DT4 to DT3.

d. REVISED 0A‐100 wall finishes from DT5 / DT6 to DT3 / DT4.

e. REVISED 0A‐110 wall finishes from DT5 to DT3.

f. REVISED 0A‐116 South wall finish from DT5 to DT3 / DT5. DT3 to be added by the sink.

1.02 AI ‐ 604:

a. ADDED DT4 finish to West wall in room 1C‐012.

b. REVISED ceiling color to EP1 for room 1C‐021.

c. REVISED 1C‐025 wall finishes.

1.03 AI‐605:

a. REVISED 1D‐005 wall finishes.

b. REVISED 1D‐006 wall finishes.

c. REVISED 1D‐015 wall finishes.

d. REVISED 1D‐026 wall finishes.

1.04 AI‐606:

a. REVISED 1E‐043E West wall finishes.

b. ADDED ‘Key Notes’ number 7.

c. REVISED 1E‐043 North wall finishes.

d. REVISED wall finishes on East wall in room 1E‐017 and 1E‐018.

1.05 AI ‐ 607:

a. REVISED 1F‐019 wall finishes.

b. REVISED South wall finishes to be ‘REF. INT. ELEV in room

1F‐037.

Architectural Equipment:

1.01 AQ‐103.2:

a. ADDED DT7 in room 1C‐057.

1.02 AQ‐105.1:

a. ADDED DT7 in rooms 1E‐009 AND 1E‐010.

Civil Specifications:

1.01 09 97 00

a. ADDED section: 2.01.B.4

b. ADDED section: 2.02.B.2.c

c. REMOVED text: * Tnemec Series N140F Pota‐Pox Plus (Fast

Cute) may be substituted for Series N140 Pota Pox Plus when surface temperatures are below 50 F.” from sections 2.02 and

1.02 13 41 20

a. REVISED water tank capacity from 120,000 to 200,00 gallons in section 1.01.B and 2.01.A.1

b. REMOVED text “The seismic conditions for this tank installation shall be for Seismic Zone 1” an added “The tank shall be approximately 35 to 45 feed in diameter” to section 2.01.B

c. UPDATED section 2.01.M

1.03 31 22 00

a. ADDED spec Earth Moving

1.04 32 12 16

a. ADDED spec Asphalt Paving

1.05 32 13 13

a. COMPLETE revision of Concrete Paving specification

Architectural Specifications:

1.06 08 71 00

a. INCLUDED missing door hardware specification.