Attachment J-6 Modified_Pre-Award_Survey_SF1408_Checklist_.doc Final.pdf

PDF 925 KB Posted

Attached to
Pre-Solicitation Draft Request for Proposal Project Management Oversight (PMO) IDIQ Contract
Solicitation number
FTA_2024_PMO_0003
Issued by

About this file

This document is a checklist for a pre-award survey of a prospective contractor's accounting system. The checklist asks questions to determine if the accounting system is adequate for determining costs applicable to a potential cost-reimbursement contract. It covers topics such as segregation of direct and indirect costs, identification of costs by contract and cost objectives, accumulation of costs under general ledger control, and compliance with generally accepted accounting principles. The contractor must provide narrative responses explaining how its accounting system supports the answers to each item. Additional questions address whether the system is ready for a DCAA audit, if the contractor has read the requirements in the SF1408 form and DCAA website, and the identity of the cognizant DCAA office. The contractor's authorized representative must sign and date the completed checklist.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Number 69319519R000001

Attachment J-6 Modified Pre-Award Survey of Prospective

Contractor Accounting System Checklist

Attachment J-6 Modified Pre-Award Survey of Prospective

Contractor Accounting System Checklist

DRAFT

Attachment J-6 Modified Pre-award Survey of

Prospective Contractor Accounting System Checklist

FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract.

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary.

3. Answer the questions on page 3.

Contractor Name:

Point of Contact:

(Name/Ph #/email)

CAGE Code:

DUNS Code:

Yes No N/A Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs. 2

b. Identification and accumulation of direct costs by contract. 3

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control. 5

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs. 11

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments. 13

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

6. Has your organization’s Accounting System ever been audited by

DCAA?

7. If the answer is yes to question 6. Above, when was the audit performed? Within the past 1 year to the closing date of this solicitation, within the past 3 years prior to the closing date of this solicitation, or greater than 3 years prior to the closing date of this solicitation.

8. If the answer is “YES” to question 6 above, did DCAA determine the

Accounting System acceptable for award of prospective contracts?

9. Has your organization’s Accounting System been audited by an outside Certified Public Accounting or other Cognizant Federal

Agency other than DCAA?

10. Is your organization’s Accounting System in accord with Generally

Accepted Accounting Principles (GAAP)?

Instruction: Use this section to explain how the current accounting system supports your response to each item. If Yes, provide an explanation that validates your answer in the box below, if NO, provide an explanation in the box below, if a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note Narrative

PLEASE ANSWER ALL QUESTIONS BELOW:

IS YOUR ORGANIZATION’S ACCOUNTING SYSTEM READY FOR A DCAA AUDIT?

(YES/NO)

HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO)

HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's

WEBSITE (http://www.dcaa.mil/)? (YES/NO)

PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR COMPANY -

(Found on DCAA's website (http://www.dcaa.mil/)

PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT REGARDING YOUR

ACCOUNTING SYSTEM (Name/phone #/ email)

If an Outside CPA/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report.

[Insert name and title of individual responsible for design of the accounting system]

Name: Signature:

Title: Date:

Contractor:

http://www.dcaa.mil/) http://www.dcaa.mil/) http://www.dcaa.mil/) http://www.dcaa.mil/)