Attachment G - Supplemental Price Breakdown.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Z2DA--570-20-308 - Replace and Expand Chilled Water Infrastructure in Building 1 | Construction Services Procurement
Solicitation number
36C26126R0028
Issued by

About this file

This is a supplemental price breakdown attachment for a federal construction services solicitation (36C26126R0028) for the Department of Veterans Affairs to replace and expand chilled water infrastructure in Building 1 at the Palo Alto Health Care System in Palo Alto, California. The pricing schedule template is formatted with line items organized by construction trade categories including General Requirements, Foundations, Site Improvements, and overhead/profit/bonds categories, with separate columns for Material, Labor, and Total costs. The template shows placeholder values of $1.00 across various line items to demonstrate the structure, with a subtotal of $8.00 in materials, $6.00 in labor, and $14.00 total before final adjustments.

The file serves as a pricing template for contractors to complete with actual cost proposals. Key cost components include General Requirements ($5.00 total in the template), Site Improvements ($2.00 total), Overhead ($2.00), Profit ($2.00), and Bonds and Insurance ($2.00), resulting in a total contract price of $14.00 in the example. The template indicates the file may be edited as needed by offerors to reflect their actual proposed costs for materials and labor across all construction work categories, allowing the government to evaluate pricing proposals on a standardized, itemized basis.

View the file

Other files

File Type Posted
Wage Determinaton CA202600148 07.14.26.pdf PDF
36C26126R0028 0007.docx DOCX document
36C26126R0028 0006.docx DOCX document
90209 - 570-20-308 - VA CA Fresno CHW - ASI-01 Drawings- 20260724.pdf PDF
RFI LOG UPDATE AMENDMENT 005.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno CHW - ASI 01 - 20260724.pdf PDF
36C26126R0028 0005.docx DOCX document
36C26126R0028 0004.docx DOCX document
36C26126R0028 -0003.docx DOCX document
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.pdf PDF
Construction Clause 52.212-4.docx DOCX document
Attachment C - Key Personnel Evaluation 36C26126R0028.docx DOCX document
36C26126R0028-0002.docx DOCX document
RFI LOG UPDATE AMENDMENT 003.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504r1.pdf PDF
VA Specific Clause Payments Fixed Price Construction.docx DOCX document
36C26126R0028 0003.docx DOCX document
VA Specific Clause Payments under Fixed Price Construction.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part1.pdf PDF
Construction 52.212-4.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part2.pdf PDF
RFI LOG UPDATE AMENDMENT 002.xlsx XLSX spreadsheet
36C26126R0028 0002.docx DOCX document
36C26126R0028 Site Visit Log In Sheet.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Summary - 20260701.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Narrative - 20260701.pdf PDF
Question RFI No. 4 - Asbestos Abatement Scope and Allowance.docx DOCX document
RFI LOG.xlsx XLSX spreadsheet
Question RFI No. 7 - Buy American Domestic Materials.docx DOCX document
Question RFI No. 12 - Temporary Pumps Piping.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Drawings - 20260701.pdf PDF
36C26126R0028 0001.docx DOCX document
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING DEV 2023.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bid Set Basis Of Design - 20260504.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
36C26126R0028_1.docx DOCX document
ID Me Information.docx DOCX document
Attachment E - Past Performance Questionnaire.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part3.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.doc DOC document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part2.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504.pdf PDF
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part1.pdf PDF
Site Visit Location Details.pdf PDF
852.219-75 Fillable.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT G - PRICING SCHEDULE
36C26126R0028 Replace and Expand Chilled Water Infrastruture
DESCRIPTIONMATERIALLABORTOTAL
General Requirements
Project Manager$ 1.00$$ 1.00
Superintendent/Safety$ 1.00$$ 1.00
Quality Control Manager$ 1.00$$ 1.00
Temporary Facilities & Controls$$$ - 0
Laborer$$ 1.00$ 1.00
Mobilization$$ 1.00$ 1.00
$$$ - 0
General Requirements Total$ 3.00$ 2.00$ 5.00
Foundations
$$$ - 0
$ 1.00
$$$ 1.00
Foundations Total$ 1.00$ - 0$ 1.00
Superstructure
$$$ - 0
$$$ - 0
Superstructure Total$ - 0$ - 0$ - 0
Exterior Enclosures
$$$ - 0
$$$ - 0
Exterior Enclosures Total$ - 0$ - 0$ - 0
Roofing
$$$ - 0
$$$ - 0
Roofing Total$ - 0$ - 0$ - 0
Interior Construction
$$$ - 0
$$$ - 0
Interior Construction Total$ - 0$ - 0$ - 0
Stairs
$$$ - 0
$$$ - 0
Stairs Total$ - 0$ - 0$ - 0
Interior Finishes
$$$ - 0
$$$ - 0
Interior Finishes Total$ - 0$ - 0$ - 0
Plumbing
$$$ - 0
$$$ - 0
Plumbing Total$ - 0$ - 0$ - 0
Heating, Ventillation & Air Conditioning
$$$ - 0
$$$ - 0
Heating, Ventillation & Air Conditioning Total$ - 0$ - 0$ - 0
Fire Protection
$$$ - 0
$$$ - 0
Fire Protection Total$ - 0$ - 0$ - 0
Electrical
$$$ - 0
$$$ - 0
Electrical Total$ - 0$ - 0$ - 0
Communications
$$$ - 0
$$$ - 0
Communications Total$ - 0$ - 0$ - 0
Equipment
$$$ - 0
$$$ - 0
Equipment Total$ - 0$ - 0$ - 0
Furnishings
$$$ - 0
$$$ - 0
Furnishings Total$ - 0$ - 0$ - 0
Selective Building Demolition
$$$ - 0
$$$ - 0
Selective Building Demolition Total$ - 0$ - 0$ - 0
Site preparation
$$$ - 0
$$$ - 0
Site Preparation Total$ - 0$ - 0$ - 0
Site Improvements
$ 1.00$ 1.00$ 2.00
$$$ - 0
Site Improvements Total$ 1.00$ 1.00$ 2.00
Sub Total$ 5.00$ 3.00$ 8.00
Overhead$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Profit$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Bonds and Insurance$ 1.00$ 1.00$ 2.00
TOTAL$ 8.00$ 6.00$ 14.00
May be edited as needed