VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part2.pdf

PDF 8 MB Posted

Attached to
Z2DA--570-20-308 - Replace and Expand Chilled Water Infrastructure in Building 1 | Construction Services Procurement
Solicitation number
36C26126R0028
Issued by

About this file

This document set comprises record drawings for Phase 2 Chiller Infrastructure on the Fresno Campus of the Department of Veterans Affairs, dated October 10, 2024, under Project Number 570-16-302. The drawings were prepared by Triple C – The A-E Group, Bridgers & Paxton Consulting Engineers, Inc., and United Structural Design, LLC.

The mechanical scope includes installation of two new water-cooled chillers (CH-3 and CH-4, York YMC2 models with 300 and 600-ton nominal capacities respectively) in Building 22A, along with associated chilled water, condenser water, and steam/condensate piping systems serving Buildings 24, 31, and 32 during Phase 1. The system incorporates motorized butterfly isolation valves, differential pressure transmitters connected to a Building Management System, variable frequency drives for pump speed control, and control logic for N+1 redundancy staging. Chilled water supply temperature setpoint is 45°F with return temperature of 54°F; condenser water operates at 75°F return with basin temperature maintained at 85°F. The electrical infrastructure includes 480V/3-phase power distribution, four new 40-horsepower variable frequency drives for condenser water pumps, lighting and receptacle additions throughout the pathway and canopy areas, new 15kV underground cable installation in concrete-encased ductbanks with associated manholes, and grounding connections per NEC standards. All work requires coordination with existing building services, night and weekend operation to minimize operational impacts, and compliance with commissioning requirements including startup verification and capacity testing.

View the file

Other files

File Type Posted
Wage Determinaton CA202600148 07.14.26.pdf PDF
36C26126R0028 0007.docx DOCX document
36C26126R0028 0006.docx DOCX document
90209 - 570-20-308 - VA CA Fresno CHW - ASI-01 Drawings- 20260724.pdf PDF
RFI LOG UPDATE AMENDMENT 005.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno CHW - ASI 01 - 20260724.pdf PDF
36C26126R0028 0005.docx DOCX document
36C26126R0028 0004.docx DOCX document
36C26126R0028 -0003.docx DOCX document
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.pdf PDF
Construction Clause 52.212-4.docx DOCX document
Attachment C - Key Personnel Evaluation 36C26126R0028.docx DOCX document
36C26126R0028-0002.docx DOCX document
RFI LOG UPDATE AMENDMENT 003.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504r1.pdf PDF
VA Specific Clause Payments Fixed Price Construction.docx DOCX document
36C26126R0028 0003.docx DOCX document
VA Specific Clause Payments under Fixed Price Construction.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part1.pdf PDF
Construction 52.212-4.docx DOCX document
RFI LOG UPDATE AMENDMENT 002.xlsx XLSX spreadsheet
36C26126R0028 0002.docx DOCX document
36C26126R0028 Site Visit Log In Sheet.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Summary - 20260701.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Narrative - 20260701.pdf PDF
Question RFI No. 4 - Asbestos Abatement Scope and Allowance.docx DOCX document
RFI LOG.xlsx XLSX spreadsheet
Question RFI No. 7 - Buy American Domestic Materials.docx DOCX document
Question RFI No. 12 - Temporary Pumps Piping.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Drawings - 20260701.pdf PDF
36C26126R0028 0001.docx DOCX document
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING DEV 2023.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bid Set Basis Of Design - 20260504.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
36C26126R0028_1.docx DOCX document
ID Me Information.docx DOCX document
Attachment E - Past Performance Questionnaire.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part3.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.doc DOC document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part2.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504.pdf PDF
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part1.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
Site Visit Location Details.pdf PDF
852.219-75 Fillable.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

B32.11.5 B32.12.5 B32.13.7 B32.14.9 B32.15.9

B32.X.7

B32.Z.3

B32.A.5

B32.B.5

B32.C.3

UNLOADING

PUBLIC

OFFICE

LOUNGE

TOILET

Room

DRUG ROOM

Room

MAIL & COPY

MAILROOM

WAREHOUSE

DPT

DPT

24-P-AH2

24-P-AH3

24-P-AH1

24-R-AH1

1 1/2" CHR

1 1/2" CHR

2" CHR

2" CHR

1 1/4" HWR

1 1/4" HWS

3" CHR

3" CHR

4" CHR

4" CHR

MECHANICAL

PENTHOUSE

P4-1

B24.DB24.CB24.C.1B24.B.1B24.B

B24.2

B24.3

B24.4

DPT

31-P-AH1 31-P-AH2

2 1/2" CHR

2 1/2" CHS

3" CHR

3" CHS

3" CHS

3" CHR

1" HPR

B31.10B31.9B31.8B31.7B31.6B31.4B31.3B31.2B31.1

B31.E

B31.F

2 1/2" HPS

(N) 1-VCHR-04

(N) 1-VCHS-04

PENTHOUSE

MECHANICAL

PLAN

(N) 1-VCHR-06

(N) 1-VCHS-06

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:1

A M

M-104

MECHANICAL PARTIAL PLANS OF BUILDINGS

24, 31 AND 32 - PHASE 1

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

KEYNOTES

1. PROVIDE NEW DIFFERENTIAL PRESSURE TRANSMITTER IN EXISTING

CHILLED WATER PIPING. CONNECT TO METASYS/BMS. SEE DETAIL D6/M501.

2. CONNECT (N) 3" CHS AND CHR TO (E) 3" CHS AND CHR.

3. CONNECT (N) 2-1/2" HPS AND (N) 1" PC TO (E) 2-1/2" HPS AND (E) 1" HPR.

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

0' 4' 8' 16'Scale: 1/8" = 1'-0"

1 MECHANICAL FIRST FLOOR PIPING PLAN - BUILDING 32 - PHASE 1

Scale: 1/8" = 1'-0"

2 MECHANICAL PENTHOUSE PLAN - BUILDING 24 - PHASE 1

Scale: 1/8" = 1'-0"

3 MECHANICAL PENTHOUSE PLAN - BUILDING 31 - PHASE 1

0' 4' 8' 16'

0' 4' 8' 16'

1 PHOTO OF EXISTING CHS/R AND HPS/R

INSIDE BUILDING 31 PENTHOUSE

(E) 2-1/2" HPS AND (E) 1" HPR

TO BE REMOVED

BLIND FLANGED

NO REVISIONS DATE

month/day/ year

C W

S

C W

R

FLOW

SWITCH

C H

S

C H

R

FS

EVAPORATOR

SEE CHILLER

ANCHOR DETAIL

F1/M-501

NOTES:

F6 NTS

EXISTING CONCRETE

HOUSEKEEPING PAD

CHILLER PIPING DETAIL

1. 2-PASS CONDENSER AND EVAPORATOR SHOWN. ACTUAL CHILLER

PASSES MAY VARY, FITTING REQUIREMENTS ARE THE SAME.

PRESSURE RELIEF DEVICE

CONDENSER

FLANGE

THERMOMETER

TYPICAL

FLEXIBLE

PIPE (TYP.)

PRESSURE GAUGE

TYPICAL

TURN DOWN VENT

THROUGH ROOF.

TERMINATE 18" ABOVE ROOF

9 12

(4)DIA 1-1/4"

(3) SIDES

1/4"

1-5/8

1-1/8

ANCHORAGE REQUIREMENTS:

(4) 10 HILTI HIT HY 150 MAX.

WITH HG-1 4-1/2" EMBEDMENT;

11-1/4" EDGE DISTANCE 3000

PSI NORMAL WEIGHT

CONCRETE INSTALLED PER ICC

ESR 1967

12x12 SUPER

WSWH PAD WITH

PL 12x12x3/8

YORK YMC2-S2110ABS

WEIGHT 25,105 LBS.

CHILLER ANCHORAGE DETAIL

F1

NTS

HOUSEKEEPING PAD

CONCRETE FLOOR

(N) 14" CHS

(N) 14" CHR

(F) 3" PC SLOPED 1/8"/ 5'-0"

IN DIRECTION OF FLOW.

(F) 8" HPS PITCH DOWN

1/4"/5'-0" IN THE

DIRECTION OF FLOW

(F) 6" FIRE

PROTECTION

(F) 4" FIRE SPRINKLER

(F) 1-1/4" HPS PITCH

DOWN 1/4"/5'-0" IN THE

DIRECTION OF FLOW

F3 NTS

PIPE SUPPORTS INSIDE WALKWAY ENCLOSURE

(N) 2" OXYGEN.

ELECTRICAL AND COMMUNICATIONS

INCLUDING FIRE ALARM AND SECURITY:

(2) 4" OD INTERDUCTS

(3) 2" OD INTERDUCTS

(N) LED TAPE LUMINAIRE (N) LED TAPE LUMINAIRE

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:1

A M

M-501

MECHANICAL DETAILS

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

10" CHR

10" CHS

14" CHR

14" CHS

PHASE 3 PHASE 2 PHASE 1

(N) 3-VCHS-01

(N) 3-VCHR-01

(N

-V

C H

S -0

(N

-V

C H

R -0

(N

-V

C H

S -0

(N

-V

C H

R -0

(N

-V

C H

S -0

(N

-V

C H

R -0

(N

-V

C H

S -0

(N

-V

C H

R -0

(N) 2-VCHS-01

(N) 2-VCHR-01

(N

-V

C H

S -0

(N

-V

C H

R -0

(N

-V

C H

S -0

(N

-V

C H

R -0

(N) 1-VCHS-01

(N) 1-VCHR-01

(N

-V

C H

S -0

(N

-V

C H

R -0

(N) 3-VCHS-07

(N) 3-VCHR-07

TO AND FROM

B1 SUBBASEMENT

PIPING IN

TUNNEL

EXISTING VALVS

LOCATED ABOVE

CENTRAL PLANT ROOF

C H

S /R

W

IT

H B

L

IN

D F

L A

N G

E F

O R

F U

T U

R E

C O

N N

E C

T

IO

N T

O A

U D

IT

O

R

IU

M

C H

S /R

W

IT

H B

L

IN

D F

L A

N G

E F

O R

F U

T U

R E

C O

N N

E C

T

IO

N T

O B

A N

D W

A R

E H

O U

S E

C H

S

C H

S /R

W

IT

H B

L

IN

D F

L A

N G

E F

O R

F U

T U

R E

C O

N N

E C

T

IO

N T

O W

E S

T A

D D

IT

IO

N

C H

S /R

W

IT

H B

L

IN

D F

L A

N G

E F

O R

F U

T U

R E

C O

N N

E C

T

IO

N T

O B

C H

S /R

W

IT

H B

L

IN

D F

L A

N G

E F

O R

F U

T U

R E

C O

N N

E C

T

IO

N T

O B

C H

S /R

W

IT

H B

L

IN

D F

L A

N G

E F

O R

F U

T U

R E

C L C

E X

P A

N S

IO

N

A N

D

C A

N T

E E

N

C H

R

10" CHS

C H

S

C H

S /R

S E

R V

IN

G

B

10" CHR

C H

R

TYPICAL 1" BYPASS VALVE (NO) TO

MAINTAIN CONTINUOUS

CIRCULATION IN BRANCHES WITH

BLIND FLANGES

FLEX. CONNECTOR

SEE PLANS AND

SPECIFICATIONS FOR

TYPE (TYPICAL)

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:1

A M

M-602

MECHANICAL SITE CHW FLOW DIAGRAM

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

SCALE: NONE1

SITE CHILLED WATER FLOW DIAGRAM

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:2

A M

M-701

MECHANICAL SCHEDULES

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

WATER COOLED CHILLER SCHEDULE

SYMBOL

NO. MANUFACTURER MODEL NO.

NOMINAL

CAPACITY

(TONS) LOCATION COMPRESSOR TYPE

REFRIGERANT

TYPE

REFRIGERANT

CHARGE (LBS)

EVAPORATOR

DESIGN FLOW

(GPM)

MIN FLOW

GPM EWT (DEG. F)

LWT (DEG.

F)

PRESSURE

DROP (FT. HD.)

FOULING

FACTOR

NO. OF

PASSES

(E) CH-3 YORK YMC2 600 BLDG 22A MAGNETIC BEARING R-134A 1400 1440 700 54 44 21.8 0.00010 2

(N) CH-4 YORK YMC2 300 BLDG 22A MAGNETIC BEARING R-134A 630 720 520 54 44 8.74 0.00010 2

WATER COOLED CHILLER SCHEDULE.

SYMBOL NO.

CONDENSER ELECTRICAL

NPLV

PHYSICAL DATA

FLOW

(GPM)

EWT

(DEG.F)

LWT

(DEG. F)

PRESSURE

DROP (FT. HD.)

FOULING

FACTOR

NO. OF

PASSES VOLT PHASE HZ FLA MCA MOP

LENGTH

(IN.)

WIDTH

(IN.)

HEIGHT

(IN.)

OPERATING

WEIGHT

(LBS.)

(E) CH-3 1800 83 95 12.1 0.00025 2 460 3 60 460 577 1000 0.3047 193.25 79 101.3 22,105

(N) CH-4 1800 85 89.65 9.71 0.00025 1 460 3 60 213 267 450 0.3508 163 70 84 14,800

ALL SELECTIONS ARE BASED ON 308 FT. ABOVE SEA LEVEL.

EXISTING SCHEDULE FOR REFERENCE ONLY.

EXISTING SCHEDULE FOR REFERENCE ONLY.

EXISTING SCHEDULE FOR REFERENCE ONLY.

CHILLED WATER VALVE SCHEDULE

SYMBOL TYPE SIZE LOCATION SYSTEM COUNT

Phase 1

(N) 3-VCHS-08 O 1

(N) 3-VCHS-09 O 1

(N) 1-VCHR-01 BUTTERFLY 14" COLUMN D-32 CHR 1

(N) 1-VCHS-01 BUTTERFLY 14" COLUMN D-32 CHS 1

(N) 1-VCHS-02 BUTTERFLY 6" COLUMN D-6 CHS 1

(N) 1-VCHR-02 BUTTERFLY 6" COLUMN D-6 CHR 1

(F) 1-VCHS-03 BUTTERFLY 8" COLUMN N-2.5 CHR 1

(F) 1-VCHR-03 BUTTERFLY 8" COLUMN N-2.5 CHS 1

(N) 1-VCHS-04 BUTTERFLY 3" B31 PENTHOUSE CHS 1

(N) 1-VCHR-04 BUTTERFLY 3" B31 PENTHOUSE CHR 1

(N) 1-VCHR-05 BALL 1" COLUMN D-6 CHR 1

(N) 1-VCHS-06 BUTTERFLY 3" B31 PENTHOUSE CHS 1

(N) 1-VCHR-06 BUTTERFLY 3" B31 PENTHOUSE CHR 1

Phase 2

(N) 3-VCHR-13 CHS 1

(N) 3-VCHR-14 CHR 1

(N) 2-VCHR-01 BUTTERFLY 14" COLUMN Y-48 CHR 1

(N) 2-VCHS-01 BUTTERFLY 14" COLUMN Y-48 CHS 1

(N) 2-VCHS-02 BUTTERFLY 4" COLUMN Y-46 1

(N) 2-VCHR-02 BUTTERFLY 4" COLUMN Y-46 CHR 1

(N) 2-VCHR-03 BUTTERFLY 3" BUILDING 24 CHR 1

(N) 2-VCHS-03 BUTTERFLY 3" BUILDING 24 CHS 1

(N) 2-VCHS-04 BALL 1" COLUMN Y-46 1

Phase 3

(N) 3-VCHR-11 CHR 1

(N) 3-VCHR-12 CHR 1

(N) 3-VCHS-01 BUTTERFLY 14" COLUMN CC-63 CHS 1

(N) 3-VCHR-01 BUTTERFLY 14" COLUMN CC-63 CHR 1

(N) 3-VCHS-02 BUTTERFLY 10" COLUMN DD-63 CHR 1

(N) 3-VCHR-02 BUTTERFLY 10" COLUMN DD-63 CHR 1

(N) 3-VCHS-03 BUTTERFLY 3" AUDITORIUM CHS 1

(N) 3-VCHR-03 BUTTERFLY 3" AUDITORIUM CHR 1

(N) 3-VCHR-04 BUTTERFLY 14" COLUMN BB-60 CHR 1

(N) 3-VCHS-04 BUTTERFLY 14" COLUMN BB-60 CHS 1

(N) 3-VCHS-05 BUTTERFLY 3" COLUMN BB-59 1

(N) 3-VCHR-05 BUTTERFLY 3" COLUMN BB-59 CHR 1

(N) 3-VCHS-06 BALL 1" COLUMN CC-62 CHS 1

(N) 3-VCHS-07 BUTTERFLY 10" COLUMN DD-63 CHS 1

(N) 3-VCHR-07 BUTTERFLY 10" COLUMN DD-63 CHR 1

Grand total: 37

STEAM AND CONDENSATE VALVE SCHEDULE

SYMBOL TYPE SIZE LOCATION SYSTEM COUNT

Phase 1

(F) 1-VHPS-01 GATE 3" COLUMN E-6 HPS 1

(F) 1-VHPR-01 GATE 8" COLUMN E-6 PC 1

(F) 1-VHPR-02 GATE 4" COLUMN N-4 PC 1

(F) 1-VHPS-02 GATE 2" COLUMN N-4 HPS 1

(F) 1-VHPS-03 GATE 4" COLUMN E-6 HPS 1

(F) 1-VHPR-03 GATE 2" COLUMN E-6 PC 1

(N) 1-VHPR-05 GATE 1" B22 EQUIPMENT RM HPR 1

(N) 1-VHPS-05 GATE 2-1/2" B22 EQUIPMENT RM HPS 1

Grand total: 8

* CH-3, OWNER FURNISHED CHILLER INSTALLED BY OTHERS

* CH-3, OWNER FURNISHED CHILLER INSTALLED BY OTHERS

VARIABLE FREQUENCY DRIVE SCHEDULE

SYMBOL

MANUFAC

TURER LOCATION

MIN. VFD

HP

CAPACITY

ELECTRICAL

COMMENTSVOLT

PHAS

E HZ

(N) VFD-CWP-1 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH

INTEGRAL DISCONNECT

(N) VFD-CWP-2 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH

INTEGRAL DISCONNECT

(N) VFD-CWP-3 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH

INTEGRAL DISCONNECT

(N) VFD-CWP-4 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH

INTEGRAL DISCONNECT

CHILLER NOTE:

DISASSEMBLY FOR RIGGING: DEPENDING ON THE MANUFACTURER SELECTED IT MAY BE NECESSARY TO DISASSEMBLE THE CHILLER IN ORDER TO RIG IT INTO PLACE. IF DISASSEMBLY IS NECESSARY:

A. AT THE TIME THAT CHILLER IS ORDERED NOTIFY THE MANUFACTURER THAT THE CHILLER MUST BE DISASSEMBLED FOR RIGGING.

B. MANUFACTURER SHALL SUBMIT DETAILED, WRITTEN INSTRUCTIONS FOR DISASSEMBLY, RE-ASSEMBLY, TIGHTNESS TESTING, CHARGING, STARTUP AND FUNCTIONAL TESTING TO VERIFY PROPER

SYSTEM OPERATION. THESE ACTIVITIES MAY BE PERFORMED BY MANUFACTURER, MANUFACTURER’S REPRESENTATIVE, CONTRACTOR OR BY A THIRD PARTY, BUT MUST BE UNDER THE

SUPERVISION OF MANUFACTURER’S REPRESENTATIVE.

C. ONCE CHILLER IS INSTALLED AND PLACED IN SERVICE MANUFACTURER’S REPRESENTATIVE SHALL SUBMIT A STARTUP REPORT STATING THAT:

1. THE CHILLER IS PROPERLY INSTALLED, TESTED AND PLACED IN SERVICE PER THE MANUFACTURER’S RECOMMENDATIONS.

2. THE MANUFACTURER’S WARRANTY IS IN FULL EFFECT.

D. THE OWNER RESERVES THE RIGHT TO TEST THE CHILLER TO VERIFY THAT ITS CAPACITY AND ENERGY AS INSTALLED MATCH THE SPECIFIED CONDITIONS OF SERVICE.

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

LA LEVEL ALARM

AT ANALYTICAL TRANSMITTER

AY ANALYTICAL SIGNAL CONVERTER

ACV ANALYTICAL CONTROL VALVE

AIT ANALYTICAL INDICATING CONTROLLER

EY VOLTAGE SIGNAL CONVERTER

IY CURRENT SIGNAL CONVERTER

HS HAND SWITCH

FIT FLOW INDICATING TRANSMITTER

FET FLOW ELEMENT\TRANSMITTER

ESL VOLTAGE SWITCH LOW (24 VAC OR LESS)

II CURRENT INDICATOR

IT CURRENT TRANSMITTER

IS CURRENT SWITCH

IA CURRENT ALARM

FA FLOW ALARM

HSI HAND SWITCH INDICATOR

HK MANUAL VARIABLE CONTROL

FY FLOW SIGNAL CONVERTER

FT FLOW TRANSMITTER

FS FLOW SWITCH

FI FLOW INDICATOR

FE FLOW ELEMENT

FCV FLOW CONTROL VALVE

ET VOLTAGE TRANSMITTER

ES VOLTAGE SWITCH (CONTROL RELAY)

EA VOLTAGE ALARM

EI VOLTAGE INDICATOR

PY PRESSURE SIGNAL CONVERTER

PDT PRESSURE DIFFERENTIAL TRANSMITTER

PS PRESSURE SWITCH

PA PRESSURE ALARM

PT PRESSURE TRANSMITTER

PIT PRESSURE INDICATING TRANSMITTER

PIS PRESSURE INDICATING SWITCH

PI PRESSURE INDICATOR

PDS PRESSURE DIFFERENTIAL SWITCH

PDI PRESSURE DIFFERENTIAL INDICATOR

PCV PRESSURE CONTROL VALVE

MV MANUAL HAND VALVE

LT LEVEL TRANSMITTER

LS LEVEL SWITCH

LE LEVEL ELEMENT

LY LEVEL SIGNAL CONVERTER

LIT LEVEL INDICATING TRANSMITTER

LIC LEVEL INDICATING CONTROLLER

LCV LEVEL CONTROL VALVE

LC LEVEL CONTROLLER (STAND ALONE)

VA VIBRATION ALARM

VS VIBRATION SWITCH

XV SOLENOID VALVE

YS SMOKE DETECTOR

VA VIBRATION ALARM

VS VIBRATION SWITCH

YCD SMOKE DAMPER

TT TEMPERATURE TRANSMITTER

TS TEMPERATURE SWITCH

TIC TEMPERATURE INDICATING CONTROLLER

TIT TEMPERATURE INDICATING TRANSMITTER

TI TEMPERATURE INDICATOR

TET TEMPERATURE ELEMENT TRANSMITTER

TE TEMPERATURE ELEMENT

TCV TEMPERATURE CONTROL VALVE

TC TEMPERATURE CONTROLLER

TA TEMPERATURE ALARM

SCM SPEED CONTROL MANUAL

TSL FREEZE STAT

SC SPEED CONTROL

INSTRUMENTATION SOCIETY OF AMERICA TABLE

INSTRUMENTATION TYPE ABBREVIATION LIST

AIC ANALYTICAL INDICATING CONTROLLER

AET ANALYTICAL ELEMENT TRANSMITTER

A

AC ANALYTICAL CONTROLLER

AI ANALYTICAL INDICATOR

AE ANALYTICAL ELEMENT

AA ANALYTICAL ALARM

CODE DESCRIPTION CODE DESCRIPTION

KC TIME CLOCK

JY POWER SIGNAL CONVERTER

JIT POWER INDICATING TRANSMITTER

TOTALIZE INTEGRATE,

CODE DESCRIPTION

NORMALLY CLOSED OVERLOAD CONTACTS

ABBREVIATIONS

IA INSTRUMENTATION AIR

DDC DIRECT DIGITAL CONTROL

C COMMON VALVE PORT

F.O FAIL OPEN

F.C FAIL CLOSED

SR SPRING RANGE

TR THROTTLING RANGE

PH PREHEAT

HR HEAT RECOVERY

CPA CONTROL POINT ADJUSTMENT

SPDT SINGLE POLE DOUBLE THROW

DPDT DOUBLE THROW DOUBLE POLE

DA DIRECT ACTING

RA REVERSE ACTING

EP COIL IN MOTOR STARTER

TRANSFORMER

R

C

OL

HOA

CONTACT NORMALLY OPEN

PILOT LIGHT (COLOR INDICATION)

COIL IN MOTOR STARTER

CONTACT NORMALLY CLOSED

SWITCH

FUSE

HAND-OFF-AUTO SWITCH

I UNDEFINED INTERLOCK LOGIC

GENERAL INSTRUMENT OR FUNCTION SYMBOLS

FIELD

MOUNTED MOUNTED

PANEL AUXILIARY

LOCATION

ACCESSIBLE INACCESSIBLE

LOCATION

AUXILIARY

DISCRETE INSTRUMENTS

SHARED DISPLAY, SHARED CONTROL

PROGRAMMABLE LOGIC CONTROL

OR DIRECT DIGITAL CONTROL

COMPUTER FUNCTION

DUAL (MULTI)

FUNCTION INSTRUMENT

INDICATING LIGHTS, ALARMS OR HORNS

CONTROL VALVE BODY/ DAMPER SYMBOLS

GENERAL SYMBOL

ANGLE

BUTTERFLY

ROTARY VALVE

THREE - WAY

FOUR - WAY

GLOBE

PARALLEL BLADE

OPPOSED BLADE

TEMPERATURE

DUCT MOUNTED AVERAGING

WELL MOUNTED

ELEMENT/SENSOR ELEMENT/SENSOR

ELEMENT/SENSOR ELEMENT/SENSOR

SURFACE MOUNTED

PRESSURE

DIRECT MOUNTED

ELEMENT/SENSOR

DIFFERENTIAL PRESSURE

ELEMENT/SENSOR

LEVEL

FLOAT TYPE PADDLE TYPE

LEVEL TRANSMITTER

TANK MOUNTED

SONIC OR

RADIOACTIVE

FLOW

ORIFICE PLATE

TURBINE OR

PROPELLER

TYPE

SENSOR

VORTEX

TYPE

TARGET

SENSOR TRANSMITTER

MAGNETIC

TYPE

M

TRANSIT TIME

SONIC FLOWMETER

"DOPPLER" OR

FLOW ARROW

XXX INDICATES

AIR TYPE

INSTRUMENT NAMING CONVENTION

XXX - FUNCTION ID

NNN - DEVICE NUMBER

ZZZ - USER CHOICE

CURRENT

CURRENT SENSOR/TRANSMITTER

LINE LEGEND

INTERNAL SYSTEM LINK

ELECTRICAL SIGNAL

PNEUMATIC SIGNAL

YI EQUIPMENT STATUS

YA EQUIPMENT ALARM

ZI POSITION INDICATOR

ZS POSITION SWITCH

ZC POSITION CONTROL

AAA - UNIT ASSOCIATION OR

PROCESS CODE

PROCESS CODES

TW COOLING TOWER OR CONDENSER WATER

CHW CHILLED WATER

SCHW SECONDARY CHILLED WATER

HW HOT WATER

SHW SECONDARY HOT WATER

STM STEAM

AAA-NNN

XXX

ZZZ

NT HUMIDITY TRANSMITTER

FMS SYSTEM OPERATING CONSTRAINTS

THE FMS CONTROL SYSTEM SHALL OPERATE WITHIN THE FOLLOWING SYSTEM CONSTRAINTS FOR CONTROL:

SUPPLY AIR DRYBULB TEMPERATURE

MIXED AIR DRYBULB TEMPERATURE

WATER TEMPERATURE

DUCT STATIC PRESSURE

SUPPLY/ RETURN AIR VOLUME

OUTSIDE AIR/ RELIEF AIR VOLUME

BUILDING PRESSURE

ROOM TEMPERATURE

ROOM AIR VOLUME

HUMIDITY LEVEL

WATER TEMPERATURE

WATER DIFFERENTIAL PRESSURE

+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

FTFT

FE

FEFEFE

L

L

L

TE

L

PD

TETE

TE

+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 1.0 PSI OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 0.1" W.C. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 0.01" W.C. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 1.0°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 2.5% R.H. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

+/- 1.0°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL

FIRST LETTER SUCCEEDING LETTERS (3)

MEASURING OR VARIABLE

INITIATING

MODIFIER READOUT OR PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER

ANALYSIS ALARM

B BURNER FLAME USER CHOICE USER CHOICE USER CHOICE

C CONDUCTIVITY CONTROL (13)

D DENSITY DIFFERENTIAL

E VOLTAGE SENSOR PRIMARY ELEMENT

F FLOW RATE RATIO FRACTION

G GAUGE GLASS, VIEWING DEVICE

H HAND HIGH

I CURRENT INDICATE

J POWER SCAN

K TIME TIME RATE OF CHANGE CONTROL STATION

L LEVEL LIGHT LOW

M MOTION MOMENTARY MIDDLE INTERMEDIATE

N HUMIDITY USER DEFINED USER DEFINED USER DEFINED

O USER CHOICE ORIFICE RESTRICTION

P PRESSURE, VACUUM POINT (TEST) CONNECTION

Q QUANTITY

R RADIATION RECORD

S SPEED, FREQUENCY SAFETY SWITCH

T TEMPERATURE TRANSMIT

U

MULTI-

VARIABLE MULTI-FUNCTION MULTI-FUNCTION MULTI-FUNCTION

V VIBRATION, MECHANICAL ANALYSIS VALVE, DAMPER LOUVER

W WEIGHT, FORCE WELL

X UNCLASSIFIED X-AXIS UNCLASSIFIED

Y EVENT, STATE OR PRESENCE Y-AXIS RELAY, COMPUTE CONVERT

Z POSITION DIMENSION Z-AXIS

DRIVER, ACTUATOR UNCLASSIFIED

FINAL CONTROL ELEMENT

IS

PT

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:2

A M

M-801

MECHANICAL INSTRUMENTATION LEGEND

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

GENERAL SHEET NOTES

A. ALL CONTROLS EQUIPMENT SHOWN ON DRAWING SHALL BE

FURNISHED AND INSTALLED BY CONTROLS CONTRACTOR.

B. THE CONTROLS CONTRACTOR SHALL HAVE FULL ACCESS TO

MANUFACTURER'S CONTROL PANEL TO SET UP ACTUATORS

POSITIONS, ADJUST FREQUENCY, RESET WATER TEMPERATURE

SETPOINTS, ETC. OR PROVIDE ALL CONNECTION POINTS AS

SHOWN ON CONTROL DRAWINGS.

C. REFER TO MECHANICAL PLANS AND DETAILS FOR EXACT VALVE

CONFIGURATIONS AND PIPING.

D. GENERAL CONTRACTOR SHALL EMPLOY A CONTROLS ENGINEER

TO ENSURE COMPLIANCE WITH COMMISSIONING AGENT

REQUIREMENTS IS EFFICIENT AND COMPLETE

C H

S C

H S

S E

T P

O

IN

T

C H

W A

D J

(AO)S

T

A T

U S

(DI)(DO)S

T

A R

T /S

T O

P

(DI)A

L A

R M

C H

IL

L E

R A

M P

S

(AI)(AO)V

A

L V

E S

IG

N

A L

T E

M P

C

H S

/C H

R -2

(AI)

CONTROL

POWER

H E

A D

P R

E S

S

(AI)

CHW-02

TC

CHW-04

YI

CHW-07

HS

CHW-02

YA

CHW-02

IT

CHW-04

FCV

CHW-06

TI

TT

CHW-06

FCV

CHW-04

N.O.

PDS

CHW-05

CHW-02

PI

C

H R

CONTROL

PANELCONDENSER

CONDENSER

CONTROL

PANEL

(N)CH-4

(N)CH-3

CONTROL

PANEL

EVAPORATOR

CONTROL

PANEL

EVAPORATOR

(N)CH-4

(N)CH-3

PDS

CW-02

PDS

CW-01

N.O.

FCV

CW-06

TT

CW-06

CW-07

FCV

CW-07

TI

CW-06

FCV

TT

CW-05

FCV

CW-05

N.O.

CW-07

TI

TT

CW-08

CW-04

TI

FCV

CHW-03

TT

CHW-05

CHW-05

TI

CHW-03

FCV

PDS

CHW-04

CHW-01

IT

CHW-01

YA

CHW-08

HS

CHW-05

YI

CHW-01

TC

CHW-01

PI

PDT

CHW-01

CHW-01

PDI

PDT

CHW-02

PDT

CHW-03

PDT

CHW-04

PDT

CHW-05

CHW-02

PDI

CHW-03

PDI

CHW-04

PDI

CHW-05

PDI

CONDENSER WATER CONTROL DIAGRAMCHILLED WATER CONTROL DIAGRAM

POWER

CONTROL

(AO)V

A

L V

E S

IG

N

A L

(DO)T

E

M P

C W

S /C

H R

-2

V A

L V

E S

IG

N

A L

(AO)

CONTROL

POWER

T E

M P

C W

S /C

H R

-1

(DO)(AI)T

E

M P

C

W S

F R

O M

C H

IL

L E

R S

N.O.

POWER

CONTROL

(AI)T

E

M P

C

H S

/C H

R -1

V A

L V

E S

IG

N

A L

(AO) (AI)C

H

IL

L E

R A

M P

S

A L A

R M

(DI)S

T

A R

T /S

T O

P

(DO) (DI)S

T

A T

U S

(AO)S

E

T P

O

IN

T

C H

W A

D J

(AI)H

E

A D

P R

E S

S

DIFFERENTIAL PRESSURE

SENSOR/TRANSMITTER LOCATED IN

OPC. SEE SHEET M-103 FOR

LOCATION.

(AI)D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

DIFFERENTIAL PRESSURE

SENSOR/TRANSMITTER LOCATED IN

B1. SEE SHEET M-103 FOR

LOCATION.

DIFFERENTIAL PRESSURE

SENSOR/TRANSMITTER LOCATED

IN B32. SEE SHEET M-104 FOR

LOCATION.

DIFFERENTIAL PRESSURE

SENSOR/TRANSMITTER

LOCATED IN B24. SEE SHEET

M-104 FOR LOCATION.

DIFFERENTIAL PRESSURE

SENSOR/TRANSMITTER

LOCATED IN B31. SEE SHEET

M-104 FOR LOCATION.

(AI)D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

(AI)D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

(AI)D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

(AI)D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

C W

R

CWR

CWS

C W

S

CHS

CHR

CHS

CHR

CHS

CHR

CHS

CHR

CHS

CHR

PDT

CWP-01

CWP-01

PDI

(AI)D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

ECC NETWORK

ECC

NETWORK

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:2

A M

M-802

MECHANICAL CONTROLS

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

CHILLED WATER PLANT IS DESIGNED FOR N+1 REDUNDANCY. THE NEW CHILLERS CH-3 AND CH-4 SHALL OPERATE AS THE PRIMARY CHILLERS. THE OPERATOR SHALL SELECT THE LEAD/LAG ORDER CHILLERS IN THE SEQUENCE. (E) CH-1 AND (E) CH-2 IN BUILDING 22, ASSOCIATED PRIMARY, SECONDARY, AND CONDENSER WATER PUMPS, AND COOLING

TOWER PUMPS ALL REMAIN. THEY PROVIDE PEAK DEMAND AND BACKUP CAPACITY.

FAILURE OF A SINGLE COMPONENT WILL ONLY DISABLE THAT COMPONENT, NOT RELATED COMPONENTS.

THE PLANT IS CONTROLLED THROUGH THE ENGINEERING CONTROL CENTER (ECC).

MAJOR COMPONENTS

CHILLER WITH MOTORIZED BUTTERFLY VALVES TO SHUT OFF CHILLED WATER AND CONDENSER WATER TO CHILLER

WHEN NOT IN OPERATION ((E) CH-1, (E) CH-2, CH-3, AND CH-4).

PRIMARY CHILLED WATER PUMPS TO CIRCULATE CHILLED WATER THROUGH CHILLERS ((E)CHP-1, (E)CHP-2, (E)CHP-3, AND (E)CHP-4).

SECONDARY CHILLED WATER PUMPS TO CIRCULATE CHILLED WATER THROUGHOUT CAMPUS

((E)CHWP-1, (E)CHWP-2, AND (E)CHWP-3).

COOLING TOWERS TO REJECT CHILLER HEAT TO THE ENVIRONMENT, WITH MOTORIZED BUTTERFLY

VALVES TO SHUT OFF CONDENSER WATER FLOW TO TOWER WHEN NOT IN OPERATION.

CONDENSER WATER PUMPS TO CIRCULATE CONDENSER WATER FROM THE CHILLER TO THE COOLING

TOWER ((E)CWP-1, (E)CWP-2, (E)CWP-3, AND (E)CWP-4).

CHILLER STAGING SEQUENCE

ON SIGNAL FROM THE ECC, THE FIRST SECONDARY CHILLED WATER PUMP IS ENABLED. VARIABLE FREQUENCY DRIVE BRINGS PUMP UP TO SPEED THROUGH INTERNAL RAMP-UP RATE (180 SECONDS, ADJUSTABLE). PUMP IS SET TO MAINTAIN A DIFFERENTIAL SETPOINT BETWEEN SUPPLY AND RETURN HEADERS (REFER TO CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE SETPOINT SEQUENCE). IF FIRST PUMP IS UNABLE TO MAINTAIN PRESSURE DIFFERENTIAL, A SECOND PUMP IS STARTED AND RAMPED UP TO SAME SPEED AS OPERATING PUMP. ONCE EQUAL SPEED IS ACHIEVED, BOTH PUMPS SLOW DOWN TOGETHER TO MAINTAIN PRESSURE. WHEN PUMPS SLOW TO 60% SPEED, LEAD PUMP CYCLES OFF AND LAG PUMP BECOMES LEAD PUMP. ON NEXT PUMP CYCLE, SPARE PUMP BECOMES LAG PUMP.

ON FAILURE OF A PUMP AS REPORTED BY VFD, PUMP IS LOCKED OUT AND TAKEN OUT OF THE ROTATION. ALARM IS

REPORTED BY ECC.

FLOW METER ON CHILLED WATER MAIN HEADER PROVIDES DATA TO THE ECC TO DETERMINE THE TOTAL CHILLED WATER BEING SUPPLIED TO THE CAMPUS. PROVIDE TEMPERATURE SENSORS ON MAIN SUPPLY AND MAIN RETURN HEADERS. ECC CALCULATES THE TONNAGE BEING USED BY THE CAMPUS AND DETERMINES WHEN TO ADD OR

REMOVE CHILLERS.

ON RISE IN CHILLED WATER SUPPLY HEADER ABOVE 45°F (ADJUSTABLE), ECC COMMANDS MOTORIZED BUTTERFLY VALVES ON FIRST CHILLER (CH-3 OR CH-4) CHILLED WATER CIRCUIT AND CONDENSER WATER CIRCUIT TO OPEN. THE VALVE TIMING SHALL BE ADJUSTABLE THROUGH THE ECC SO THAT THE VALVES OPEN SLOW ENOUGH TO PREVENT TRIPS ON LOW FLOW FOR THE OPERATING CHILLERS. AFTER PROOF OF FLOW IS RECEIVED, ECC COMMANDS ON FIRST PRIMARY CHILLED WATER PUMP AND FIRST CONDENSER WATER PUMP. FIRST COOLING TOWER ISOLATION BUTTERFLY VALVE IS OPENED. COOLING TOWER BYPASS VALVE OPERATES AS REQUIRED TO PROVIDE CONDENSER WATER RETURN TEMPERATURE OF 75°F (ADJUSTABLE) TO CHILLER. AFTER 30 SECONDS (ADJUSTABLE) CHILLER IS ENABLED. IF CHILLER SENSES PROPER CHILLED WATER AND CONDENSER WATER FLOW, CHILLER OPERATES THROUGH ITS INTERNALLY SUPERVISED SEQUENCE TO CONTROL DISCHARGE WATER TEMPERATURE TO 45 °F. VFD INTERNAL TO CHILLER ADJUSTS CHILLER SPEED TO ADJUSTS CHILLER SPEED TO ADJUST CHILLER CAPACITY.

COOLING TOWER BYPASS VALVE CLOSES WHEN RETURN WATER REACHES 75°F (ADJUSTABLE). COOLING TOWER INTERNAL CONTROLS AND VFD ADJUST FAN SPEED TO MAINTAIN BASIN TEMPERATURE OF 85°F (ADJUSTABLE). IF COOLING TOWER IS OFF AND BASIN TEMPERATURE DROPS BELOW 35°F (ADJUSTABLE), ELECTRIC IMMERSION HEATER

IS ENERGIZED.

CH-3 AND CH-4 SEQUENCE OF OPERATION

ECC MONITORS CHILLER OUTPUT AND IF TONNAGE OF THE CHILLER IS AT 80% FOR 20 MINUTES AND

DOES NOT SATISFY CAMPUS LOAD, SECOND CHILLED WATER PRIMARY PUMP IS STARTED AND

AFTER PROOF OF OPERATION BY CURRENT SENSOR, SECOND CHILLER (CH-3 OR CH-4) CHILLED WATER ISOLATION BUTTERFLY VALVES ARE OPENED. SECOND CONDENSER WATER PUMP IS STARTED, AND AFTER PROOF OF OPERATION BY CURRENT SENSOR, SECOND CHILLER CONDENSER WATER ISOLATION BUTTERFLY VALVES ARE OPENED. SECOND COOLING TOWER ISOLATION BUTTERFLY VALVE IS ALSO OPENED. AFTER PROOF OF VALVES OPENING, CHILLER IS ENABLED. IF CHILLER SENSES PROPER CHILLED WATER AND CONDENSER WATER FLOW, CHILLER OPERATES THROUGH ITS INTERNALLY SUPERVISED SEQUENCE TO CONTROL DISCHARGE WATER TEMPERATURE TO 45°F. ON FAILURE OF ANY COMPONENT TO OPERATE PROPERLY ON START UP, THE COMPONENT SHALL BE DISABLED AND NEXT AVAILABLE COMPONENT (PUMP, CHILLER, OR TOWER) IS BROUGHT INTO SERVICE TO ALLOW START SEQUENCE TO PROCEED. FAILED COMPONENTS ARE LOCKED-OUT AND ECC GENERATES ALARM. ON INCREASE IN LOAD BEYOND CHILLER 3 AND CHILLER 4 CAPACITY AT 80%, THIRD CHILLER GROUP (CH-1

OR CH-2) IS BROUGHT ON PER SEQUENCE.

ON DROP IN LOAD BELOW 40% OF THE 3 CHILLERS, THE THIRD CHILLER (CH-1 OR CH-2) IS COMMANDED OFF. AFTER SHUTDOWN SEQUENCE BY CHILLER IS COMPLETE, THE ASSOCIATED CHILLED WATER AND CONDENSER WATER MOTORIZED VALVES CLOSE, TOWER MOTORIZED VALVE SHUTS, AND ASSOCIATED CHILLED WATER AND CONDENSER WATER PUMPS SHUT OFF AFTER PROOF OF VALVE CLOSURE. FAILURE OF ANY COMPONENT TO PROPERLY CLOSE OR SHUT OFF ALARMS AT ECC. ON DROP IN LOAD BELOW 30% OF THE TWO CHILLER CAPACITY, SECOND CHILLER (CH-3 OR CH-4) IS COMMANDED OFF PER THE SEQUENCE ABOVE.

ROTATE ALL COMPONENTS TO BE BROUGHT ONLINE AS LOADS INCREASE.

REFRIGERANT ALARM:

REFRIGERANT ALARM SYSTEM MONITORS CHILLER ROOM. ON DETECTION OF REFRIGERANT IN THE ROOM, ECC IS NOTIFIED. ON RISE IN CONCENTRATION ABOVE 25,000 PPM, ALARM AT BUILDING IS TRIGGERED, EMERGENCY PURGE FAN IS STARTED, AND MOTORIZED OUTDOOR AIR LOUVERS ARE OPENED. CHILLERS ARE COMMANDED OFF THROUGH THE ECC, AND AFTER CHILLERS ARE SHUT DOWN THROUGH THEIR INTERNAL SEQUENCE, ALL CONDENSER AND CHILLED WATER PUMPS SHUT DOWN, AND MOTORIZED VALVES CLOSE.

CONDENSER WATER PUMP SPEED CONTROL

THE ECC SHALL MODULATE THE SPEED OF THE OPERATING PUMPS TOGETHER TO MAINTAIN THE CONDENSER WATER HEADER DIFFERENTIAL PRESSURE AT SETPOINT ANYTIME ANY OF THE PUMPS ARE OPERATING. THE DIFFERENTIAL PRESSURE SETPOINT SHALL BE ESTABLISHED BY THE TEST AND BALANCE CONTRACTOR TO MEET THE REQUIRED CONDENSER WATER FLOWRATE FOR

EACH CHILLER.

PRIMARY CHILLED WATER PUMP

WHEN CH-4 IS STARTED THE ONLY PUMP THAT SHALL BE OPERATED WITH IT IS CHP-4. WHEN RUNNING WITH CH-4, PRIMARY

CHILLED WATER PUMP CHP-4, THE ECC SHALL COMMAND THE CHP-4 TO RUN.

CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE SETPOINT

THE ECC SHALL RESET THE SYSTEM DIFFERENTIAL PRESSURE SETPOINT FOR EACH OF THE FIVE DIFFERENTAIL PRESSURE SENSORS USING A TRIM AND RESPOND LOGIC WITHIN THE RANGE OF 5 PSIG TO 20 PSIG ONCE THE MAXIMUM CHILLED WATER TEMPERATURE SETPOINT IS REACHED. ONCE THE TEMPERATURE SETPOINT IS REACHED, THE DIFFERENTIAL PRESSURE SETPOINT FOR EACH OF THE FIVE ZONES SHALL BE RESET BASED ON THE VALVE POSITIONS IN EACH ZONE. EACH DIFFERENTAIL PRESSURE SETPOINT SHALL BE TRIMMED BY 0.1 PSIG EVERY TWO MINUTES UNTIL A VALVE IN EACH DIFFERENTIAL PRESSURE ZONE IS 50% OPEN. WHEN A VALVE IN THE ZONE RISES TO 80% OPEN, THE DIFFERENTIAL PRESSURE SETPOINT SHALL BE INCREASED BY 0.1 PSIG EVERY TWO MINUTES. ALL SETPOINTS SHALL BE ADJUSTABLE THROUGH THE OPERATOR WORKSTATION FOR EACH DIFFERENTIAL PRESSURE SENSOR. THE PUMPS SHALL BE CONTROLLED TO THE DIFFERENTIAL PRESSURE SENSOR

WHICH IS FURTHEST BELOW SETPOINT.

IN ADDITION TO THE HARDWIRED POINTS SHWON, THE CHILLERS

SHALL BE CONNECTED TO THE ECC THROUGH A

BACNET NETWORK CONNECTION. THE FOLLOWING POINTS

SHALL BE MONITORED OR CONTROLLED BY THE FMS:

A. LEAVING CHILLED WATER TEMPERATURE

B. ENTERING CHILLED WATER TEMPERATURE

C. LEAVING CONDENSER WATER TEMPERATURE

D. ENTERING CHILLED WATER TEMPERATURE

E. PERCENT RLA

F. EVAPORATOR REFRIGERANT PRESSURE

G. CONDENSER REFRIGERANT PRESSURE

H. COMPRESSOR DISCHARGE REFRIGERANT TEMPERATURE

I. EVAPORATOR REFRIGERANT TEMPERATURE

J. CONDENSER REFRIGERANT TEMPERATURE

K. OIL TEMPERATURE

L. OIL PRESSURE DIFFERENTIAL

M. CHILLED WATER FLOW RATE

N. CONDENSER FLOW RATE

O. COMPRESSOR POWER

P. PERCENT LOAD

Q. DEMAND LIMIT SETPOINT

R. CHILLER ENABLE/DISABLE

S. CHILLER STATUS

T. MANUAL RESET ALARMS

U. AUTO RESET ALARMS

V. COMMUNICATIONS STATE

KEYNOTE

VARIABLE FREQUENCY DRIVE CONTROL DIAGRAM

VFDFMS1

(DO)S

T

A R

T /S

T O

P

CWP3-01

HS

(DI)S

T

A T

U S

CWP3-01

YI

(AO)S

P

E E

D S

IG

N

A L

CWP3-01

SC

VFDFMS1

(E) CWP-3

(E) CWP-4

(DO)S

T

A R

T /S

T O

P

CWP4-01

HS

(DI)S

T

A T

U S

CWP4-01

YI

(AO)S

P

E E

D S

IG

N

A L

CWP4-01

SC

GENERAL SHEET NOTES

SHEET KEYNOTES

A. ALL CONTROLS EQUIPMENT SHOWN ON DRAWING SHALL BE FURNISHED AND

INSTALLED BY CONTROLS CONTRACTOR.

THE CONTROLS CONTRACTOR SHALL HAVE FULL ACCESS TO MANUFACTURER'S

CONTROL PANEL TO SET UP ACTUATORS POSITIONS, ADJUST FREQUENCY, RESET

WATER TEMPERATURE SETPOINTS, ETC. OR PROVIDE ALL CONNECTION POINTS AS

SHOWN ON CONTROL DRAWINGS.

REFER TO MECHANICAL PLANS AND DETAILS FOR EXACT VALVE CONFIGURATIONS

AND PIPING.

B.

C.

1. VFD'S SHALL BE CONNECTED TO THE FMS NETWORK THROUGH A DIRECT NETWORK

CONNECTION AS WELL AS THROUGH THE HARDWIRED POINTS INDICATED. IT IS THE

RESPONSIBILITY OF THE FMS CONTRACTOR TO COORDINATE AND ADAPT THE FMS

NETWORK TO THE COMMUNICATIONS PROTOCOLS AVAILABLE FROM THE VFD

MANUFACTURER. THE FOLLOWING POINTS SHALL BE INTEGRATED INTO THE FMS:

A. SPEED FEEDBACK

B. FREQUENCY OUTPUT

C. INPUT VOLTAGE/PHASE

D. CURRENT

E. TORQUE

F. POWER

G. UNDER VOLTAGE

H. OVER VOLTAGE

I. OUTPUT VOLTAGE

J. KWH COUNTER

K. DRIVE TEMPERATURE

L. FREQUENCY SETPOINTS (MIN & MAX)

M. MOTOR FLA

N. ROTATION DIRECTION

O. ALARMS

P. STATUSES

VFDFMS1

VFDFMS1

(E) CWP-1

(E) CWP-2

(DO)S

T

A R

T /S

T O

P

CWP1-01

HS

(DI)S

T

A T

U S

CWP1-01

YI

(AO)S

P

E E

D S

IG

N

A L

CWP1-01

SC

(DO)S

T

A R

T /S

T O

P

CWP2-01

HS

(DI)S

T

A T

U S

CWP2-01

YI

(AO)S

P

E E

D S

IG

N

A L

CWP2-01

SC

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:2

A M

M-803

MECHANICAL CONTROLS

Checker Author10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

R

EX

A

X a

WALL

CEILING

WALL

CEILING

OS

OS

208Y/120V T1A 75kVA K-4

E4E3

A

DRAWING NUMBER WHERE TAKEN

DRAWING NUMBER WHERE DETAILED

SECTION/ELEVATION LETTER OR DETAIL

NUMBER

A

E4

E4

+44"

DRAWING NUMBER WHERE DETAILED

SECTION/ELEVATION LETTER OR DETAIL

NUMBER

VAV-9

(NOT ALL SYMBOLS APPLY TO THIS PROJECT)

NORTH ARROW OR MATCH ARCHITECT'S

SCALE BAR OR MATCH ARCHITECT'S

SURFACE

WALL

CEILING

ONE-LINE DIAGRAM

SPD

3000/5

CIRCUIT BREAKER; TRIP SETTING/FRAME SIZE OR NO. OF

POLES.

SETTINGS AND PROTECTION AS NOTED ON PLANS

DRAWOUT CIRCUIT BREAKER

MEDIUM VOLTAGE DRAWOUT

CIRCUIT BREAKER

POTENTIAL TRANSFORMER.

DISCONNECT SWITCH. "300A"

DENOTES AMPERAGE

RATING

FUSE. "300A" DENOTES

AMPERAGE

RATING

GROUND CONNECTION

TRANSFER SWITCH. SEE PLANS

FOR TYPE OF SWITCH

SURGE ARRESTOR

SURGE PROTECTIVE DEVICE

KILOWATT METER

ELECTRONIC METER

KIRK KEY INTERLOCK No.1

RELAY No.1

AMMETER SWITCH

AMMETER

VOLTMETER SWITCH

VOLTMETER

DELTA CONNECTED

WYE CONNECTED

LIGHTING

RECESSED MOUNTED LUMINAIRE. SMALL CASE

"a" DENOTES SWITCHING, NUMBER "3" DENOTES

BRANCH CIRCUITING. SYMBOL "A" DENOTES

LUMINAIRE TYPE

WALL MOUNTED LUMINAIRES

STRIP LUMINAIRE

LINEAR DIRECT/INDIRECT LUMINAIRE. CABLE

OR STEM MOUNTED

DOWN LIGHT LUMINAIRE; CEILING MOUNTED

EXIT LUMINAIRE. SHADED SIDE INDICATES

FACE SIDE. PROVIDE DIRECTIONAL ARROW(S)

AS INDICATED ON PLANS

EMERGENCY BATTERY PACK LUMINAIRE

(BUG-EYE/FROG-EYE)

DOUBLE HEAD, POLE MOUNTED LUMINAIRE

TRACK MOUNTED LUMINAIRES

SURFACE

AS

DETAILED

CEILING

EXTERIOR

WALL

DEMOLITION

DASHED SYMBOL INDICATES EXISTING

DEVICE OR EQUIPMENT TO BE REMOVED

SOLID SYMBOL, LIGHTER IN COLOR

INDICATES EXISTING DEVICE OR EQUIPMENT

TO REMAIN

EXISTING CONDUIT TO BE REUSED

REMOVE EXISTING RACEWAY IN ALL

ACCESSIBLE AREAS. CAPPED AND

ABANDONED IF IN UNACCESSIBLE AREA

SYMBOL DEFINITION

REFERENCE TAGS

KEYED NOTE REFERENCE

MECHANICAL EQUIPMENT REFERENCE

DENOTES MOUNTING HEIGHT AFF

KITCHEN EQUIPMENT REFERENCE

MEDICAL EQUIPMENT REFERENCE

GENERAL DRAWING SYMBOLS

TRIP SETTING

FRAME SIZE

VARIES

R E

F E

R T

O L

IG

H

T

IN

G S

C H

E D

U L E

EMERGENCY, CRITICALEC

EMERGENCY, LIFE SAFETYEL

EMERGENCY, EQUIPMENTEQ

TELEVISIONTV

EXISTING(E)

GROUND FAULT PROTECTIONGFP

SWITCHSW

FEEDERFDR

UNDERGROUND ELECTRICUGE

MANHOLEMH

MIXED MEDIAMM

UNDERGROUNDU/G

POWER MONITORING AND CONTROL SYSTEMPMCS

AUTOMATIC TRANSFER SWITCH CONTROLATSC

TEMPORARYTEMP

SECURITYSEC

DEFINITIONABBREV.

ABBREVIATIONS

A

ADA

AFF

AFG

AWG

ANSI

AIC

C

CCTV

CLF

CO

GFI

GND

HOA

G OR GFCI

FACP

AMPS, AMPERE, AMPERAGE

ABOVE FINISHED GRADE

ABOVE FINISHED FLOOR

AMERICANS WITH DISABILITIES ACT

AVAILABLE INTERRUPTING CURRENT

AMERICAN NATIONAL STANDARDS INSTITUTE

GROUND FAULT CIRCUIT INTERRUPTER

HAND-OFF-AUTOMATIC.

GROUND.

GROUND FAULT INTERRUPTER

CURRENT LIMITING FUSE

AMERICAN WIRE GAUGE

CLOSED CIRCUIT TELEVISION

FIRE ALARM CONTROL PANEL

CONDUIT ONLY

CONDUIT

HP

IEEE

KV

KVA

KW

KWH

MVA

MCC

NEC

NEMA

NIC

NFPA

NM

P

PA

PC

NC

POLE

KILOVOLT AMPS

NATIONAL FIRE PROTECTION ASSOCIATION

PHOTOCELL

PUBLIC ADDRESS

NEW MEXICO

NOT IN CONTRACT

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL MANUFACTURERS

MOTOR CONTROL CENTER

MEGAVOLT AMPS

NORMALLY CLOSED

KILOWATT HOUR.

KILOWATT

HORSEPOWER

KILOVOLT

TVSS

UPS

UON

V

VFD

XFER

XFMR (TRANSF)

VARIABLE FREQUENCY DRIVE

UNINTERRUPTABLE POWER SUPPLY

TRANSIENT VOLTAGE SURGE SUPPRESSER

TRANSFORMER

TRANSFER

UNLESS OTHERWISE NOTED

VOLTS, VOLTAGE

TTB TELEPHONE TERMINAL BOARD

INSTITUTE OF ELECTRICAL AND ELECTRONICS

CEILING MOUNTED OCCUPANCY SENSOR;

TYPE AS INDICATED ON PLANS

DISTRIBUTION POLE FOR OVERHEAD ELECTRICAL

OR COMMUNICATIONS AS INDICATED ON PLAN.

OVERHEAD UTILITY AND OR SYSTEM DISTRIBUTION.X

X

3PH = THREE PHASE

X X

UT UTILITY OR FACILITY TRANSFORMER

S

CC

PAD MOUNTED SWITCH

CONNECTION CABINET (UTILITY

METER MOUNT)

MH

MANHOLE - POWER OR

COMMUNICATION

AS INDICATED ON PLANS

HH

HAND HOLE - POWER OR

COMMUNICATION

AS INDICATED ON PLANS

1PH = SINGLE PHASE

S = ELECTRICAL SECONDARY

P = ELECTRICAL PRIMARY

T = TELECOMMUNICATION

TV = TELEVISION

E = EMERGENCY POWER

ATSC = AUTOMATIC TRANSFER SWITCH CONTROL

PM PRIMARY SITE METER ENCLOSURE

EG ENGINE GENERATOR

TP TELECOMMUNICATION PEDESTAL

TVP TELEVISION PEDESTAL

METER ENCLOSURE. EITHER ON BUILDING OR ON

UTILITY

EQUIPMENT

ME

CT CT ENCLOSURE. EITHER ON BUILDING OR ON UTILITY EQUIPMENT

GENERATOR

a =

2 = 3 = 4 = P = M = K =

WP =

T =

D =

AC ABOVE COUNTER

AL ALUMINUM

ATS AUTOMATIC TRANSFER SWITCH

CKT CIRCUIT

CU COPPER

DL DAY-LIGHTING

DIA DIAMETER

FA FIRE ALARM

KCMIL THOUSAND CIRCULAR MILS

MAX MAXIMUM

MIN MINIMUM

NEUT NEUTRAL

PH PHASE

RSC RIGID STEEL CONDUIT

UC UNDER COUNTER

WP WEATHERPROOF

WALL MOUNTED OCCUPANCY SENSOR; TYPE

AS INDICATED ON PLANS

HATCHING INDICATES EMERGENCY LIGHTING.

HATCH WILL BE MODIFIED FOR EACH

LUMINAIRE TYPE. EMERGENCY LUMINAIRE

DESIGNATED WITH "E" IN TYPE DESIGNATION.

VARIES

SURFACE MOUNTED LUMINAIRE.

LUMINAIRE TYPE AS INDICATED ON PLANS

REFER TO

DEMOLITION

PLANS FOR

ADDITIONAL

INFORMATIO

N

(F

) FUTURE

LSIG LONG TIME, SHORT TIME, INSTANTANEOUS,

(N) NEW

W WALL MOUNTED

NL NORMAL

MTS MANUAL TRANSFER SWITCH

UL UNDERWRITERS' LABORATORIES

EMERGENCYE

IG ISOLATED GROUND

KVAR KILOVOLT AMPS REACTIVE

NO NORMALLY OPEN

SURGE PROTECTIVE DEVICESPD

REFER TO LUMINAIRE SCHEDULE FOR ALL LUMINAIRE TYPES WHETHER WALL

MOUNTED OR CEILING MOUNTED.

GROUND FAULT PROTECTION

SHUNT TRIP OPERATOR

TYP. TYPICAL

TRIP SETTING

FRAME SIZE

300A

300A

N/A NOT APPLICABLE

O/H OVERHEAD

GEN GENERATOR

ENGINE GENERATOREG

SYMBOL DESCRIPTION

MOUNTING

HT.LOC.

SINGLE HEAD, POLE MOUNTED LUMINAIRE

DOUBLE FACE EXIT LUMINAIRE. SHADED SIDE

INDICATES FACE SIDE. PROVIDE DIRECTIONAL

ARROW(S) AS INDICATED ON PLANS

SYMBOL DESCRIPTION

SYMBOL DESCRIPTION NOTES

ASSOCIATION

AND GROUND FAULT PROTECTION

ENGINEERS

UTILITIES

DESCRIPTIONSYMBOL

NORTH

ELECTRICAL SYMBOL LEGEND

E3 E4

TRANSFORMER. TRANSFORMER NAME, TRANSFORMER kVA RATING, PRIMARY VOLTAGE AND WIRING CONFIGURATION, SECONDARY

VOLTAGE, K RATING (IF APPLICABLE)

G

ST

0 10' 20' 40' 80'

1" = 40'-0"

DEVICE INDICATOR LETTER. "X" EQUALS

DESIGNATION BELOW

(TYPICAL FOR MOST SWITCH TYPES):

SMALL CASE LETTER DENOTES

SWITCHING CONTROL

DOUBLE POLE TOGGLE SWITCH

THREE-WAY TOGGLE SWITCH

FOUR-WAY TOGGLE SWITCH

PILOT LIGHT TOGGLE SWITCH

MOMENTARY CONTACT SWITCH

KEY OPERATED SWITCH

WEATHERPROOF TOGGLE SWITCH

MANUAL MOTOR STARTER SWITCH WITH

THERMAL OVERLOAD PROTECTION

DIMMER SWITCH

KW

M

K1

R1

AS

A

VS

V

VFD CONNECTION

MOTOR CONNECTION

UPS

VF

D

J

T

30/3R

0/1

1/30/3R

F

30/1

30/3R

DEVICES

CODE SIZE JUNCTION BOX

WALL MOUNTED CODE SIZE J-BOX

CODE SIZE PULLBOX (OR AS SIZED ON PLAN)

ENCLOSED CIRCUIT BREAKER.

AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE

UON

NON-FUSED DISCONNECT SWITCH.

AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE

UON

FUSED DISCONNECT SWITCH.

AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE

UON

MOTOR STARTER. STARTER SIZE INDICATED

BY NUMBER/NEMA ENCLOSURE RATING,

SINGLE SPEED UON

COMBINATION FUSIBLE DISCONNECT SWITCH

AND MOTOR STARTER. NEMA STARTER

SIZE/AMPERAGE/NEMA ENCLOSURE RATING, 3

POLE UON

MOTOR. NUMBER INDICATES HORSEPOWER

RATING FOR 1HP AND LARGER

THERMOSTAT

PHOTOCELL

LIGHTNING PROTECTION AIR TERMINAL

PUSHBUTTON (EMERGENCY POWER OFF - EPO)

SYMBOL DESCRIPTION MOUNTING

+44"

UON

N/A

VARIES

HT.LOC.

WALL

ROOF

VARIES

N/A

VARIES

MULTI-OULET ASSEMBLY (SURFACE MOUNTED

RACEWAY) VARIES

SEE

PLANS

VARIES

SEE

PLANS

MOTOR. "F" INDICATES FRACTIONAL

HORSEPOWER

VARIES

SEE

PLANS

VARIES

SEE

PLANS

VARIES

DEVICE INDICATOR LETTER. "X" EQUALS DESIGNATION BELOW

(TYPICAL FOR MOST RECEPTACLE TYPES):

BLANK FOR NORMAL POWER

G = GFCI RATED

IG = ISOLATED GROUND

T = TAMPERPROOF

WG = WEATHERPROOF AND GFCI

WP = WEATHERPROOF (IN-USE COVER)

CL = CLOCK

TV = TELEVISION

+18", UON

FLUSH

IN FLOOR DUPLEX RECEPTACLE.

CONFIGURATION AS INDICATED ON PLANS

IN FLOOR DOUBLE DUPLEX (QUADPLEX)

RECEPTACLE. CONFIGURATION AS INDICATED ON

PLANS

CEILING MOUNTED DUPLEX RECEPTACLE

CEILING MOUNTED DOUBLE DUPLEX

(QUADPLEX) RECEPTACLE

SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE

DOUBLE DUPLEX (QUADPLEX) RECEPTACLE

EMERGENCY DOUBLE DUPLEX (QUADPLEX)

RECEPTACLE

SPECIAL PURPOSE RECEPTACLE. NEMA

CONFIGURATION AND AMPERAGE AS NOTED ON

PLANS

COMBINATION POWER/COMMUNICATION POLE.

CONFIGURATION AS NOTED ON PLANS

FLOOR

CEILING

WALL,

UON

IN FLOOR EMERGENCY DUPLEX RECEPTACLE.

CONFIGURATION AS INDICATED ON PLANS

CEILING MOUNTED EMERGENCY DUPLEX

RECEPTACLE

EMERGENCY DUPLEX RECEPTACLE

COMBINATION POWER/COMMUNICATION IN

CEILING OUTLET. CONFIGURATION AS

INDICATED ON PLANS

COMBINATION DUPLEX RECEPTACLE AND

COMMUNICATIONS FLOORBOX. DEVICE

CONFIGURATION AS INDICATED ON PLANS.

X

X

X

X

X

X

X

X

X

X

X

X

X

X

J

P

IN FLOOR EMERGENCY DOUBLE DUPLEX

(QUADPLEX) RECEPTACLE. CONFIGURATION AS

INDICATED ON PLANS

X

A, B, C, = SEQUENCE OF PANELS OF THIS TYPE

1, 2, 3, . . = SUBFED PANEL

1, 2, 3, . . = FLOOR LEVEL

H L

T

BLANK FOR NORMAL POWER

EL

EC

EQ

= EMERGENCY-LIFE SAFETY-BRANCH

= EMERGENCY-CRITICAL-BRANCH

= EMERGENCY-EQUIPMENT-BRANCH

GROUND BAR

MAIN SWITCHBOARD. DASHED LINES INDICATE CLEARANCES.

VARIABLE FREQUENCY DRIVE

SYMBOL

EQUIPMENT

DESCRIPTION

EQUIPMENT NAMING CONVENTION

= HIGH VOLTAGE PANELBOARD (480Y/277V)

= LOW VOLTAGE PANELBOARD (208Y/120V)

= TRANSFORMER

= DISTRIBUTION BOARDDB

= MAIN SWITCH BOARDMSB

MCC= MOTOR CONTROL CENTER

= UNINTERRUPTABLE POWER SUPPLYUPS

= POWER DISTRIBUTION UNIT

ATS = AUTOMATIC TRANSFER SWITCH

PDU

= ISOLATED PANELBOARDI

B = BUSWAY

MSB

FLUSH MOUNTED PANELBOARD. DASHED LINES INDICATE

CLEARANCES.

SURFACE MOUNTED PANELBOARD. DASHED LINES INDICATE

CLEARANCES.

H1A

L1A

MCC

MOTOR CONTROL CENTER. DASHED LINES INDICATE CLEARANCES.

T1A

UNINTERRUPTABLE POWER SUPPLY. DASHED LINES INDICATE

CLEARANCES.

AUTOMATIC TRANSFER SWITCH. DASHED LINES INDICATE CLEARANCES.

DRY TYPE TRANSFORMER (15kVA OR ABOVE), WITH EQUIPMENT TAG

(TAG INSIDE OR OUTSIDE, DEPENDING ON SIZE). IN MOST CASES,

ACTUAL SIZE SHOWN ON PLANS (ELECTRICAL ROOMS).

E = EMERGENCY

DISTRIBUTION BOARD. DASHED LINES INDICATE CLEARANCES.

DB

UPS-A

ATS-1

EXAMPLES:

A. SES1 (SERVICE ENTRANCE SECTION #1)

B. 1H1A (SERVED FROM SES#1, 480/277 NORMAL, LEVEL 1, FIRST BOARD)

C. 1EQH1A (SERVED FROM MAIN EMER SWBD #1, 480/277 EQUIP POWER,

LEVEL 1, FIRST BOARD)

SES

G

= GROUND

= HOT/PHASE

= NEUTRAL

= SWITCH LEG

CONDUCTOR IDENTIFICATION SYMBOLS. REFER TO

PLANS FOR COMBINATION USE. CONDUCTOR

IDENTIFICATION MOSTLY USED IN HOMERUN

LOCATION, BUT CAN ALSO BE USED IN BRANCH

CIRCUITING WHERE APPLIED. GROUND

CONDUCTORS WILL BE INSTALLED IN ALL RACEWAYS

WHETHER SHOWN OR NOT.

LA-1

HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT

NUMBER ADJACENT TO HOMERUN INDICATES PANEL

SOURCE AND INDIVIDUAL SINGLE POLE CIRCUIT

BREAKER(S). CONDUCTOR IDENTIFICATION SYMBOL

INDICATES NUMBER OF CONDUCTORS IN HOMERUN.

MINIMUM #12 CONDUCTORS AND 3/4" RACEWAY PATH

WILL BE PROVIDED IN HOMERUN UON. ALL

HOMERUNS WILL INCLUDE GROUND CONDUCTOR.

LA-7

HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT

NUMBER ADJACENT TO HOMERUN INDICATES PANEL

SOURCE AND INDIVIDUAL TWO OR THREE POLE

CIRCUIT BREAKERS. CONDUCTOR IDENTIFICATION

SYMBOL INDICATES NUMBER OF CONDUCTORS IN

HOMERUN. MINIMUM #12 CONDUCTORS AND 3/4"

RACEWAY PATH WILL BE PROVIDED IN HOMERUN UON.

NEUTRAL MAY BE USED WHERE INDICATED ON PLAN.

ALL HOMERUNS WILL INCLUDE GROUND CONDUCTOR.

LA-13

CONCEALED RACEWAY BETWEEN DEVICES AND OR

EQUIPMENT IN WALLS OR IN CEILING SPACE

UNDERGROUND RACEWAY BETWEEN DEVICES

AND OR EQUIPMENT

EXPOSED RACEWAY BETWEEN DEVICES AND

OR EQUIPMENT ON WALLS OR CEILINGS

CONDUIT TURNS

DOWN UP

B BUSWAY

GROUNDING CONDUCTORG

CABLE TRAY - POWER AND TELECOMMUNICATIONS

T TELECOMMUNICATIONS RACEWAY

D DATA RACEWAY

FA FIRE ALARM RACEWAY

CONDUIT STUBBED AND CAPPED

VOICE/DATA COMBINATION RACEWAYV/D

BRANCH CIRCUIT GENERAL INFORMATION:

BRANCH CIRCUITS FROM OVERCURRENT PROTECTION (20A) TO FURTHEST DEVICE SHALL

NOT EXCEED 75 FEET FOR #12AWG COPPER AND 150 FEET FOR #10AWG COPPER MEASURED

ALONG CONDUCTORS ROUTING PATH. BRANCH CIRCUITS EXCEEDING 150 FEET WILL BE

SIZED SO THAT VOLTAGE DROP DOES NOT EXCEED 5%. 2% FOR FEEDERS AND 3% FOR

BRANCH CIRCUITS. REF: CEC 210.19(A).

LA-1,3

LA-5,7,9

HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT

NUMBER ADJACENT TO HOMERUN INDICATES PANEL

SOURCE AND INDIVIDUAL SINGLE POLE CIRCUIT

BREAKER(S). SYMBOL REPRESENTS A MULTI-BRANCH

CIRCUIT. NUMBER OF CONDUCTORS IN HOMERUN

WILL INCLUDE A SEPERATE NEUTRAL FOR EACH

CIRCUIT PHASE CONDUCTOR. MINIMUM #12

CONDUCTORS AND 3/4" RACEWAY PATH WILL BE

PROVIDED IN HOMERUN UON. ALL HOMERUNS WILL

INCLUDE GROUND CONDUCTOR.

RACEWAY & CONDUCTORS

CURRENT TRANFORMER, NUMBER

"3000/5" DENOTES RATIO.

WG WEATHERPROOF AND GFCI

R REMOVED/REMOVAL

RC ROOM CONTROLLER

FAA FIRE ALARM ANNUNCIATOR

FMS FACILITY MANAGEMENT SYSTEM

GROUND FAULT EQUIPMENT PROTECTIONGFEP

CB CIRCUIT BREAKER

D DIMMING

DC DIRECT CURRENT

UPS

NUMBER OR MAIN EMERG SWBD NUMBER

= SERVICE ENTRANCE SECTION

(SB=SUB-BASEMENT, B=BASEMENT, M=MEZZANINE,

P=PENTHOUSE)

CEILING MOUNTED EMERGENCY DOUBLE

DUPLEX (QUADPLEX) RECEPTACLEX

PC

UNDERGROUND UTILITY AND OR SYSTEM DISTRIBUTION.

X

X

N = NEW

EX = EXISTING

DL DAY-LIGHTING SENSOR; TYPE AS INDICATED

ON PLANS

RC ROOM CONTROLLER; TYPE AS INDICATED

ON PLANS

480V

CL CLOCK

CB

FATC FIRE ALARM TERMINAL CABINET

UPDATED: 03/03/2014

A/V AUDIO/VISUAL

DRY TYPE TRANSFORMER (LESS THAN 15kVA), WITH NO EQUIPMENT TAG.

SIZE, TYPE AND LOCATION NOTED ON PLANS.

A/C ALTERNATING CURRENT

DESCRIPTIONSYMBOL

T

VF

D

FC FOOTCANDLES

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

E le c.

rv t

/1

5/

0:

:1

A M

E-001

ELECTRICAL LEGEND

J.

MONTANO

R. RIBA10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E Clinton Ave, Fresno, CA 93703

CONTRACTOR IS TO PROVIDE NEW CONTROLS, LIGHTS AND OUTLETS AS IDENTIFIED IN THE

DRAWINGS AND SPECIFICATIONS. ALL LIGHTING TO BE 5-7 FC ALONG WALKWAY. COORDINATE

ALL SHUTDOWNS WITH THE COR 30 DAYS IN ADVANCE AND AGAIN 2 DAYS IN ADVANCE TO

ENSURE ALL SAFETY PRECAUTIONS ARE IN PLACE AND OPERATIONAL IMPACTS ARE MINIMIZED.

NIGHT AND WEEKEND WORK WILL BE REQUIRED FOR THIS CONTRACT.

ELECTRICAL SCOPE OF WORK:

GENERAL

CONTRACTOR SHALL INFORM HIMSELF OF ANY ELECTRICAL INFORMATION THAT

MIGHT BE SHOWN IN OTHER DISCIPLINES OF THIS PROJECT AND NOT SHOWN IN

ELECTRICAL DIVISION. COORDINATE ALL WORK DISCREPANCIES WITH

ARCHITECT PRIOR TO BID. SHOULD COORDINATION NOT OCCUR, IT IS

UNDERSTOOD THAT THE CONTRACTOR FOUND NO DISCREPANCIES AND SHALL

PROVIDE AND INSTALL ELECTRICAL RACEWAY, CONDUCTORS, DEVICES, AND

EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER.

THE CONTRACTOR SHALL REFER TO DIVISION 26 SPECIFICATIONS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS. THE SPECIFICATIONS ARE A

PART OF THE CONSTRUCTION DOCUMENT SET AND MAY CONTAIN INFORMATION

NOT SHOWN ON THE DRAWING SET.

THESE DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING SERVICES

GATHERED BY SITE INSPECTION AND PREVIOUS CONSTRUCTION DRAWINGS.

THE EXACT LOCATION, ARRANGEMENT, AND SIZES OF EXISTING DEVICES MAY

BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS. ALL BIDDERS ARE

REQUIRED TO INVESTIGATE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .