VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part2.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26126R0028
About this file
This document set comprises record drawings for Phase 2 Chiller Infrastructure on the Fresno Campus of the Department of Veterans Affairs, dated October 10, 2024, under Project Number 570-16-302. The drawings were prepared by Triple C – The A-E Group, Bridgers & Paxton Consulting Engineers, Inc., and United Structural Design, LLC.
The mechanical scope includes installation of two new water-cooled chillers (CH-3 and CH-4, York YMC2 models with 300 and 600-ton nominal capacities respectively) in Building 22A, along with associated chilled water, condenser water, and steam/condensate piping systems serving Buildings 24, 31, and 32 during Phase 1. The system incorporates motorized butterfly isolation valves, differential pressure transmitters connected to a Building Management System, variable frequency drives for pump speed control, and control logic for N+1 redundancy staging. Chilled water supply temperature setpoint is 45°F with return temperature of 54°F; condenser water operates at 75°F return with basin temperature maintained at 85°F. The electrical infrastructure includes 480V/3-phase power distribution, four new 40-horsepower variable frequency drives for condenser water pumps, lighting and receptacle additions throughout the pathway and canopy areas, new 15kV underground cable installation in concrete-encased ductbanks with associated manholes, and grounding connections per NEC standards. All work requires coordination with existing building services, night and weekend operation to minimize operational impacts, and compliance with commissioning requirements including startup verification and capacity testing.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
B32.11.5 B32.12.5 B32.13.7 B32.14.9 B32.15.9
B32.X.7
B32.Z.3
B32.A.5
B32.B.5
B32.C.3
UNLOADING
PUBLIC
OFFICE
LOUNGE
TOILET
Room
DRUG ROOM
Room
MAIL & COPY
MAILROOM
WAREHOUSE
DPT
DPT
24-P-AH2
24-P-AH3
24-P-AH1
24-R-AH1
1 1/2" CHR
1 1/2" CHR
2" CHR
2" CHR
1 1/4" HWR
1 1/4" HWS
3" CHR
3" CHR
4" CHR
4" CHR
MECHANICAL
PENTHOUSE
P4-1
B24.DB24.CB24.C.1B24.B.1B24.B
B24.2
B24.3
B24.4
DPT
31-P-AH1 31-P-AH2
2 1/2" CHR
2 1/2" CHS
3" CHR
3" CHS
3" CHS
3" CHR
1" HPR
B31.10B31.9B31.8B31.7B31.6B31.4B31.3B31.2B31.1
B31.E
B31.F
2 1/2" HPS
(N) 1-VCHR-04
(N) 1-VCHS-04
PENTHOUSE
MECHANICAL
PLAN
(N) 1-VCHR-06
(N) 1-VCHS-06
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:1
A M
M-104
MECHANICAL PARTIAL PLANS OF BUILDINGS
24, 31 AND 32 - PHASE 1
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
KEYNOTES
1. PROVIDE NEW DIFFERENTIAL PRESSURE TRANSMITTER IN EXISTING
CHILLED WATER PIPING. CONNECT TO METASYS/BMS. SEE DETAIL D6/M501.
2. CONNECT (N) 3" CHS AND CHR TO (E) 3" CHS AND CHR.
3. CONNECT (N) 2-1/2" HPS AND (N) 1" PC TO (E) 2-1/2" HPS AND (E) 1" HPR.
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
0' 4' 8' 16'Scale: 1/8" = 1'-0"
1 MECHANICAL FIRST FLOOR PIPING PLAN - BUILDING 32 - PHASE 1
Scale: 1/8" = 1'-0"
2 MECHANICAL PENTHOUSE PLAN - BUILDING 24 - PHASE 1
Scale: 1/8" = 1'-0"
3 MECHANICAL PENTHOUSE PLAN - BUILDING 31 - PHASE 1
0' 4' 8' 16'
0' 4' 8' 16'
1 PHOTO OF EXISTING CHS/R AND HPS/R
INSIDE BUILDING 31 PENTHOUSE
(E) 2-1/2" HPS AND (E) 1" HPR
TO BE REMOVED
BLIND FLANGED
NO REVISIONS DATE
month/day/ year
C W
S
C W
R
FLOW
SWITCH
C H
S
C H
R
FS
EVAPORATOR
SEE CHILLER
ANCHOR DETAIL
F1/M-501
NOTES:
F6 NTS
EXISTING CONCRETE
HOUSEKEEPING PAD
CHILLER PIPING DETAIL
1. 2-PASS CONDENSER AND EVAPORATOR SHOWN. ACTUAL CHILLER
PASSES MAY VARY, FITTING REQUIREMENTS ARE THE SAME.
PRESSURE RELIEF DEVICE
CONDENSER
FLANGE
THERMOMETER
TYPICAL
FLEXIBLE
PIPE (TYP.)
PRESSURE GAUGE
TYPICAL
TURN DOWN VENT
THROUGH ROOF.
TERMINATE 18" ABOVE ROOF
9 12
(4)DIA 1-1/4"
(3) SIDES
1/4"
1-5/8
1-1/8
ANCHORAGE REQUIREMENTS:
(4) 10 HILTI HIT HY 150 MAX.
WITH HG-1 4-1/2" EMBEDMENT;
11-1/4" EDGE DISTANCE 3000
PSI NORMAL WEIGHT
CONCRETE INSTALLED PER ICC
ESR 1967
12x12 SUPER
WSWH PAD WITH
PL 12x12x3/8
YORK YMC2-S2110ABS
WEIGHT 25,105 LBS.
CHILLER ANCHORAGE DETAIL
F1
NTS
HOUSEKEEPING PAD
CONCRETE FLOOR
(N) 14" CHS
(N) 14" CHR
(F) 3" PC SLOPED 1/8"/ 5'-0"
IN DIRECTION OF FLOW.
(F) 8" HPS PITCH DOWN
1/4"/5'-0" IN THE
DIRECTION OF FLOW
(F) 6" FIRE
PROTECTION
(F) 4" FIRE SPRINKLER
(F) 1-1/4" HPS PITCH
DOWN 1/4"/5'-0" IN THE
DIRECTION OF FLOW
F3 NTS
PIPE SUPPORTS INSIDE WALKWAY ENCLOSURE
(N) 2" OXYGEN.
ELECTRICAL AND COMMUNICATIONS
INCLUDING FIRE ALARM AND SECURITY:
(2) 4" OD INTERDUCTS
(3) 2" OD INTERDUCTS
(N) LED TAPE LUMINAIRE (N) LED TAPE LUMINAIRE
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:1
A M
M-501
MECHANICAL DETAILS
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
10" CHR
10" CHS
14" CHR
14" CHS
PHASE 3 PHASE 2 PHASE 1
(N) 3-VCHS-01
(N) 3-VCHR-01
(N
-V
C H
S -0
(N
-V
C H
R -0
(N
-V
C H
S -0
(N
-V
C H
R -0
(N
-V
C H
S -0
(N
-V
C H
R -0
(N
-V
C H
S -0
(N
-V
C H
R -0
(N) 2-VCHS-01
(N) 2-VCHR-01
(N
-V
C H
S -0
(N
-V
C H
R -0
(N
-V
C H
S -0
(N
-V
C H
R -0
(N) 1-VCHS-01
(N) 1-VCHR-01
(N
-V
C H
S -0
(N
-V
C H
R -0
(N) 3-VCHS-07
(N) 3-VCHR-07
TO AND FROM
B1 SUBBASEMENT
PIPING IN
TUNNEL
EXISTING VALVS
LOCATED ABOVE
CENTRAL PLANT ROOF
C H
S /R
W
IT
H B
L
IN
D F
L A
N G
E F
O R
F U
T U
R E
C O
N N
E C
T
IO
N T
O A
U D
IT
O
R
IU
M
C H
S /R
W
IT
H B
L
IN
D F
L A
N G
E F
O R
F U
T U
R E
C O
N N
E C
T
IO
N T
O B
A N
D W
A R
E H
O U
S E
C H
S
C H
S /R
W
IT
H B
L
IN
D F
L A
N G
E F
O R
F U
T U
R E
C O
N N
E C
T
IO
N T
O W
E S
T A
D D
IT
IO
N
C H
S /R
W
IT
H B
L
IN
D F
L A
N G
E F
O R
F U
T U
R E
C O
N N
E C
T
IO
N T
O B
C H
S /R
W
IT
H B
L
IN
D F
L A
N G
E F
O R
F U
T U
R E
C O
N N
E C
T
IO
N T
O B
C H
S /R
W
IT
H B
L
IN
D F
L A
N G
E F
O R
F U
T U
R E
C L C
E X
P A
N S
IO
N
A N
D
C A
N T
E E
N
C H
R
10" CHS
C H
S
C H
S /R
S E
R V
IN
G
B
10" CHR
C H
R
TYPICAL 1" BYPASS VALVE (NO) TO
MAINTAIN CONTINUOUS
CIRCULATION IN BRANCHES WITH
BLIND FLANGES
FLEX. CONNECTOR
SEE PLANS AND
SPECIFICATIONS FOR
TYPE (TYPICAL)
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:1
A M
M-602
MECHANICAL SITE CHW FLOW DIAGRAM
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
SCALE: NONE1
SITE CHILLED WATER FLOW DIAGRAM
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:2
A M
M-701
MECHANICAL SCHEDULES
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
WATER COOLED CHILLER SCHEDULE
SYMBOL
NO. MANUFACTURER MODEL NO.
NOMINAL
CAPACITY
(TONS) LOCATION COMPRESSOR TYPE
REFRIGERANT
TYPE
REFRIGERANT
CHARGE (LBS)
EVAPORATOR
DESIGN FLOW
(GPM)
MIN FLOW
GPM EWT (DEG. F)
LWT (DEG.
F)
PRESSURE
DROP (FT. HD.)
FOULING
FACTOR
NO. OF
PASSES
(E) CH-3 YORK YMC2 600 BLDG 22A MAGNETIC BEARING R-134A 1400 1440 700 54 44 21.8 0.00010 2
(N) CH-4 YORK YMC2 300 BLDG 22A MAGNETIC BEARING R-134A 630 720 520 54 44 8.74 0.00010 2
WATER COOLED CHILLER SCHEDULE.
SYMBOL NO.
CONDENSER ELECTRICAL
NPLV
PHYSICAL DATA
FLOW
(GPM)
EWT
(DEG.F)
LWT
(DEG. F)
PRESSURE
DROP (FT. HD.)
FOULING
FACTOR
NO. OF
PASSES VOLT PHASE HZ FLA MCA MOP
LENGTH
(IN.)
WIDTH
(IN.)
HEIGHT
(IN.)
OPERATING
WEIGHT
(LBS.)
(E) CH-3 1800 83 95 12.1 0.00025 2 460 3 60 460 577 1000 0.3047 193.25 79 101.3 22,105
(N) CH-4 1800 85 89.65 9.71 0.00025 1 460 3 60 213 267 450 0.3508 163 70 84 14,800
ALL SELECTIONS ARE BASED ON 308 FT. ABOVE SEA LEVEL.
EXISTING SCHEDULE FOR REFERENCE ONLY.
EXISTING SCHEDULE FOR REFERENCE ONLY.
EXISTING SCHEDULE FOR REFERENCE ONLY.
CHILLED WATER VALVE SCHEDULE
SYMBOL TYPE SIZE LOCATION SYSTEM COUNT
Phase 1
(N) 3-VCHS-08 O 1
(N) 3-VCHS-09 O 1
(N) 1-VCHR-01 BUTTERFLY 14" COLUMN D-32 CHR 1
(N) 1-VCHS-01 BUTTERFLY 14" COLUMN D-32 CHS 1
(N) 1-VCHS-02 BUTTERFLY 6" COLUMN D-6 CHS 1
(N) 1-VCHR-02 BUTTERFLY 6" COLUMN D-6 CHR 1
(F) 1-VCHS-03 BUTTERFLY 8" COLUMN N-2.5 CHR 1
(F) 1-VCHR-03 BUTTERFLY 8" COLUMN N-2.5 CHS 1
(N) 1-VCHS-04 BUTTERFLY 3" B31 PENTHOUSE CHS 1
(N) 1-VCHR-04 BUTTERFLY 3" B31 PENTHOUSE CHR 1
(N) 1-VCHR-05 BALL 1" COLUMN D-6 CHR 1
(N) 1-VCHS-06 BUTTERFLY 3" B31 PENTHOUSE CHS 1
(N) 1-VCHR-06 BUTTERFLY 3" B31 PENTHOUSE CHR 1
Phase 2
(N) 3-VCHR-13 CHS 1
(N) 3-VCHR-14 CHR 1
(N) 2-VCHR-01 BUTTERFLY 14" COLUMN Y-48 CHR 1
(N) 2-VCHS-01 BUTTERFLY 14" COLUMN Y-48 CHS 1
(N) 2-VCHS-02 BUTTERFLY 4" COLUMN Y-46 1
(N) 2-VCHR-02 BUTTERFLY 4" COLUMN Y-46 CHR 1
(N) 2-VCHR-03 BUTTERFLY 3" BUILDING 24 CHR 1
(N) 2-VCHS-03 BUTTERFLY 3" BUILDING 24 CHS 1
(N) 2-VCHS-04 BALL 1" COLUMN Y-46 1
Phase 3
(N) 3-VCHR-11 CHR 1
(N) 3-VCHR-12 CHR 1
(N) 3-VCHS-01 BUTTERFLY 14" COLUMN CC-63 CHS 1
(N) 3-VCHR-01 BUTTERFLY 14" COLUMN CC-63 CHR 1
(N) 3-VCHS-02 BUTTERFLY 10" COLUMN DD-63 CHR 1
(N) 3-VCHR-02 BUTTERFLY 10" COLUMN DD-63 CHR 1
(N) 3-VCHS-03 BUTTERFLY 3" AUDITORIUM CHS 1
(N) 3-VCHR-03 BUTTERFLY 3" AUDITORIUM CHR 1
(N) 3-VCHR-04 BUTTERFLY 14" COLUMN BB-60 CHR 1
(N) 3-VCHS-04 BUTTERFLY 14" COLUMN BB-60 CHS 1
(N) 3-VCHS-05 BUTTERFLY 3" COLUMN BB-59 1
(N) 3-VCHR-05 BUTTERFLY 3" COLUMN BB-59 CHR 1
(N) 3-VCHS-06 BALL 1" COLUMN CC-62 CHS 1
(N) 3-VCHS-07 BUTTERFLY 10" COLUMN DD-63 CHS 1
(N) 3-VCHR-07 BUTTERFLY 10" COLUMN DD-63 CHR 1
Grand total: 37
STEAM AND CONDENSATE VALVE SCHEDULE
SYMBOL TYPE SIZE LOCATION SYSTEM COUNT
Phase 1
(F) 1-VHPS-01 GATE 3" COLUMN E-6 HPS 1
(F) 1-VHPR-01 GATE 8" COLUMN E-6 PC 1
(F) 1-VHPR-02 GATE 4" COLUMN N-4 PC 1
(F) 1-VHPS-02 GATE 2" COLUMN N-4 HPS 1
(F) 1-VHPS-03 GATE 4" COLUMN E-6 HPS 1
(F) 1-VHPR-03 GATE 2" COLUMN E-6 PC 1
(N) 1-VHPR-05 GATE 1" B22 EQUIPMENT RM HPR 1
(N) 1-VHPS-05 GATE 2-1/2" B22 EQUIPMENT RM HPS 1
Grand total: 8
* CH-3, OWNER FURNISHED CHILLER INSTALLED BY OTHERS
* CH-3, OWNER FURNISHED CHILLER INSTALLED BY OTHERS
VARIABLE FREQUENCY DRIVE SCHEDULE
SYMBOL
MANUFAC
TURER LOCATION
MIN. VFD
HP
CAPACITY
ELECTRICAL
COMMENTSVOLT
PHAS
E HZ
(N) VFD-CWP-1 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH
INTEGRAL DISCONNECT
(N) VFD-CWP-2 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH
INTEGRAL DISCONNECT
(N) VFD-CWP-3 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH
INTEGRAL DISCONNECT
(N) VFD-CWP-4 ABB, Inc. CHILLER PLANT B22A 40 460 3 60 PROVIDE COMBINATION DRIVE WITH
INTEGRAL DISCONNECT
CHILLER NOTE:
DISASSEMBLY FOR RIGGING: DEPENDING ON THE MANUFACTURER SELECTED IT MAY BE NECESSARY TO DISASSEMBLE THE CHILLER IN ORDER TO RIG IT INTO PLACE. IF DISASSEMBLY IS NECESSARY:
A. AT THE TIME THAT CHILLER IS ORDERED NOTIFY THE MANUFACTURER THAT THE CHILLER MUST BE DISASSEMBLED FOR RIGGING.
B. MANUFACTURER SHALL SUBMIT DETAILED, WRITTEN INSTRUCTIONS FOR DISASSEMBLY, RE-ASSEMBLY, TIGHTNESS TESTING, CHARGING, STARTUP AND FUNCTIONAL TESTING TO VERIFY PROPER
SYSTEM OPERATION. THESE ACTIVITIES MAY BE PERFORMED BY MANUFACTURER, MANUFACTURER’S REPRESENTATIVE, CONTRACTOR OR BY A THIRD PARTY, BUT MUST BE UNDER THE
SUPERVISION OF MANUFACTURER’S REPRESENTATIVE.
C. ONCE CHILLER IS INSTALLED AND PLACED IN SERVICE MANUFACTURER’S REPRESENTATIVE SHALL SUBMIT A STARTUP REPORT STATING THAT:
1. THE CHILLER IS PROPERLY INSTALLED, TESTED AND PLACED IN SERVICE PER THE MANUFACTURER’S RECOMMENDATIONS.
2. THE MANUFACTURER’S WARRANTY IS IN FULL EFFECT.
D. THE OWNER RESERVES THE RIGHT TO TEST THE CHILLER TO VERIFY THAT ITS CAPACITY AND ENERGY AS INSTALLED MATCH THE SPECIFIED CONDITIONS OF SERVICE.
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
LA LEVEL ALARM
AT ANALYTICAL TRANSMITTER
AY ANALYTICAL SIGNAL CONVERTER
ACV ANALYTICAL CONTROL VALVE
AIT ANALYTICAL INDICATING CONTROLLER
EY VOLTAGE SIGNAL CONVERTER
IY CURRENT SIGNAL CONVERTER
HS HAND SWITCH
FIT FLOW INDICATING TRANSMITTER
FET FLOW ELEMENT\TRANSMITTER
ESL VOLTAGE SWITCH LOW (24 VAC OR LESS)
II CURRENT INDICATOR
IT CURRENT TRANSMITTER
IS CURRENT SWITCH
IA CURRENT ALARM
FA FLOW ALARM
HSI HAND SWITCH INDICATOR
HK MANUAL VARIABLE CONTROL
FY FLOW SIGNAL CONVERTER
FT FLOW TRANSMITTER
FS FLOW SWITCH
FI FLOW INDICATOR
FE FLOW ELEMENT
FCV FLOW CONTROL VALVE
ET VOLTAGE TRANSMITTER
ES VOLTAGE SWITCH (CONTROL RELAY)
EA VOLTAGE ALARM
EI VOLTAGE INDICATOR
PY PRESSURE SIGNAL CONVERTER
PDT PRESSURE DIFFERENTIAL TRANSMITTER
PS PRESSURE SWITCH
PA PRESSURE ALARM
PT PRESSURE TRANSMITTER
PIT PRESSURE INDICATING TRANSMITTER
PIS PRESSURE INDICATING SWITCH
PI PRESSURE INDICATOR
PDS PRESSURE DIFFERENTIAL SWITCH
PDI PRESSURE DIFFERENTIAL INDICATOR
PCV PRESSURE CONTROL VALVE
MV MANUAL HAND VALVE
LT LEVEL TRANSMITTER
LS LEVEL SWITCH
LE LEVEL ELEMENT
LY LEVEL SIGNAL CONVERTER
LIT LEVEL INDICATING TRANSMITTER
LIC LEVEL INDICATING CONTROLLER
LCV LEVEL CONTROL VALVE
LC LEVEL CONTROLLER (STAND ALONE)
VA VIBRATION ALARM
VS VIBRATION SWITCH
XV SOLENOID VALVE
YS SMOKE DETECTOR
VA VIBRATION ALARM
VS VIBRATION SWITCH
YCD SMOKE DAMPER
TT TEMPERATURE TRANSMITTER
TS TEMPERATURE SWITCH
TIC TEMPERATURE INDICATING CONTROLLER
TIT TEMPERATURE INDICATING TRANSMITTER
TI TEMPERATURE INDICATOR
TET TEMPERATURE ELEMENT TRANSMITTER
TE TEMPERATURE ELEMENT
TCV TEMPERATURE CONTROL VALVE
TC TEMPERATURE CONTROLLER
TA TEMPERATURE ALARM
SCM SPEED CONTROL MANUAL
TSL FREEZE STAT
SC SPEED CONTROL
INSTRUMENTATION SOCIETY OF AMERICA TABLE
INSTRUMENTATION TYPE ABBREVIATION LIST
AIC ANALYTICAL INDICATING CONTROLLER
AET ANALYTICAL ELEMENT TRANSMITTER
A
AC ANALYTICAL CONTROLLER
AI ANALYTICAL INDICATOR
AE ANALYTICAL ELEMENT
AA ANALYTICAL ALARM
CODE DESCRIPTION CODE DESCRIPTION
KC TIME CLOCK
JY POWER SIGNAL CONVERTER
JIT POWER INDICATING TRANSMITTER
TOTALIZE INTEGRATE,
CODE DESCRIPTION
NORMALLY CLOSED OVERLOAD CONTACTS
ABBREVIATIONS
IA INSTRUMENTATION AIR
DDC DIRECT DIGITAL CONTROL
C COMMON VALVE PORT
F.O FAIL OPEN
F.C FAIL CLOSED
SR SPRING RANGE
TR THROTTLING RANGE
PH PREHEAT
HR HEAT RECOVERY
CPA CONTROL POINT ADJUSTMENT
SPDT SINGLE POLE DOUBLE THROW
DPDT DOUBLE THROW DOUBLE POLE
DA DIRECT ACTING
RA REVERSE ACTING
EP COIL IN MOTOR STARTER
TRANSFORMER
R
C
OL
HOA
CONTACT NORMALLY OPEN
PILOT LIGHT (COLOR INDICATION)
COIL IN MOTOR STARTER
CONTACT NORMALLY CLOSED
SWITCH
FUSE
HAND-OFF-AUTO SWITCH
I UNDEFINED INTERLOCK LOGIC
GENERAL INSTRUMENT OR FUNCTION SYMBOLS
FIELD
MOUNTED MOUNTED
PANEL AUXILIARY
LOCATION
ACCESSIBLE INACCESSIBLE
LOCATION
AUXILIARY
DISCRETE INSTRUMENTS
SHARED DISPLAY, SHARED CONTROL
PROGRAMMABLE LOGIC CONTROL
OR DIRECT DIGITAL CONTROL
COMPUTER FUNCTION
DUAL (MULTI)
FUNCTION INSTRUMENT
INDICATING LIGHTS, ALARMS OR HORNS
CONTROL VALVE BODY/ DAMPER SYMBOLS
GENERAL SYMBOL
ANGLE
BUTTERFLY
ROTARY VALVE
THREE - WAY
FOUR - WAY
GLOBE
PARALLEL BLADE
OPPOSED BLADE
TEMPERATURE
DUCT MOUNTED AVERAGING
WELL MOUNTED
ELEMENT/SENSOR ELEMENT/SENSOR
ELEMENT/SENSOR ELEMENT/SENSOR
SURFACE MOUNTED
PRESSURE
DIRECT MOUNTED
ELEMENT/SENSOR
DIFFERENTIAL PRESSURE
ELEMENT/SENSOR
LEVEL
FLOAT TYPE PADDLE TYPE
LEVEL TRANSMITTER
TANK MOUNTED
SONIC OR
RADIOACTIVE
FLOW
ORIFICE PLATE
TURBINE OR
PROPELLER
TYPE
SENSOR
VORTEX
TYPE
TARGET
SENSOR TRANSMITTER
MAGNETIC
TYPE
M
TRANSIT TIME
SONIC FLOWMETER
"DOPPLER" OR
FLOW ARROW
XXX INDICATES
AIR TYPE
INSTRUMENT NAMING CONVENTION
XXX - FUNCTION ID
NNN - DEVICE NUMBER
ZZZ - USER CHOICE
CURRENT
CURRENT SENSOR/TRANSMITTER
LINE LEGEND
INTERNAL SYSTEM LINK
ELECTRICAL SIGNAL
PNEUMATIC SIGNAL
YI EQUIPMENT STATUS
YA EQUIPMENT ALARM
ZI POSITION INDICATOR
ZS POSITION SWITCH
ZC POSITION CONTROL
AAA - UNIT ASSOCIATION OR
PROCESS CODE
PROCESS CODES
TW COOLING TOWER OR CONDENSER WATER
CHW CHILLED WATER
SCHW SECONDARY CHILLED WATER
HW HOT WATER
SHW SECONDARY HOT WATER
STM STEAM
AAA-NNN
XXX
ZZZ
NT HUMIDITY TRANSMITTER
FMS SYSTEM OPERATING CONSTRAINTS
THE FMS CONTROL SYSTEM SHALL OPERATE WITHIN THE FOLLOWING SYSTEM CONSTRAINTS FOR CONTROL:
SUPPLY AIR DRYBULB TEMPERATURE
MIXED AIR DRYBULB TEMPERATURE
WATER TEMPERATURE
DUCT STATIC PRESSURE
SUPPLY/ RETURN AIR VOLUME
OUTSIDE AIR/ RELIEF AIR VOLUME
BUILDING PRESSURE
ROOM TEMPERATURE
ROOM AIR VOLUME
HUMIDITY LEVEL
WATER TEMPERATURE
WATER DIFFERENTIAL PRESSURE
+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
FTFT
FE
FEFEFE
L
L
L
TE
L
PD
TETE
TE
+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 1.0 PSI OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 0.5°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 0.1" W.C. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 0.01" W.C. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 1.0°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 2.5% R.H. OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
+/- 1.0°F OF SETPOINT WITH HUNTING OF < 5% OF THE CONTROL SIGNAL
FIRST LETTER SUCCEEDING LETTERS (3)
MEASURING OR VARIABLE
INITIATING
MODIFIER READOUT OR PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER
ANALYSIS ALARM
B BURNER FLAME USER CHOICE USER CHOICE USER CHOICE
C CONDUCTIVITY CONTROL (13)
D DENSITY DIFFERENTIAL
E VOLTAGE SENSOR PRIMARY ELEMENT
F FLOW RATE RATIO FRACTION
G GAUGE GLASS, VIEWING DEVICE
H HAND HIGH
I CURRENT INDICATE
J POWER SCAN
K TIME TIME RATE OF CHANGE CONTROL STATION
L LEVEL LIGHT LOW
M MOTION MOMENTARY MIDDLE INTERMEDIATE
N HUMIDITY USER DEFINED USER DEFINED USER DEFINED
O USER CHOICE ORIFICE RESTRICTION
P PRESSURE, VACUUM POINT (TEST) CONNECTION
Q QUANTITY
R RADIATION RECORD
S SPEED, FREQUENCY SAFETY SWITCH
T TEMPERATURE TRANSMIT
U
MULTI-
VARIABLE MULTI-FUNCTION MULTI-FUNCTION MULTI-FUNCTION
V VIBRATION, MECHANICAL ANALYSIS VALVE, DAMPER LOUVER
W WEIGHT, FORCE WELL
X UNCLASSIFIED X-AXIS UNCLASSIFIED
Y EVENT, STATE OR PRESENCE Y-AXIS RELAY, COMPUTE CONVERT
Z POSITION DIMENSION Z-AXIS
DRIVER, ACTUATOR UNCLASSIFIED
FINAL CONTROL ELEMENT
IS
PT
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:2
A M
M-801
MECHANICAL INSTRUMENTATION LEGEND
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
A. ALL CONTROLS EQUIPMENT SHOWN ON DRAWING SHALL BE
FURNISHED AND INSTALLED BY CONTROLS CONTRACTOR.
B. THE CONTROLS CONTRACTOR SHALL HAVE FULL ACCESS TO
MANUFACTURER'S CONTROL PANEL TO SET UP ACTUATORS
POSITIONS, ADJUST FREQUENCY, RESET WATER TEMPERATURE
SETPOINTS, ETC. OR PROVIDE ALL CONNECTION POINTS AS
SHOWN ON CONTROL DRAWINGS.
C. REFER TO MECHANICAL PLANS AND DETAILS FOR EXACT VALVE
CONFIGURATIONS AND PIPING.
D. GENERAL CONTRACTOR SHALL EMPLOY A CONTROLS ENGINEER
TO ENSURE COMPLIANCE WITH COMMISSIONING AGENT
REQUIREMENTS IS EFFICIENT AND COMPLETE
C H
S C
H S
S E
T P
O
IN
T
C H
W A
D J
(AO)S
T
A T
U S
(DI)(DO)S
T
A R
T /S
T O
P
(DI)A
L A
R M
C H
IL
L E
R A
M P
S
(AI)(AO)V
A
L V
E S
IG
N
A L
T E
M P
C
H S
/C H
R -2
(AI)
CONTROL
POWER
H E
A D
P R
E S
S
(AI)
CHW-02
TC
CHW-04
YI
CHW-07
HS
CHW-02
YA
CHW-02
IT
CHW-04
FCV
CHW-06
TI
TT
CHW-06
FCV
CHW-04
N.O.
PDS
CHW-05
CHW-02
PI
C
H R
CONTROL
PANELCONDENSER
CONDENSER
CONTROL
PANEL
(N)CH-4
(N)CH-3
CONTROL
PANEL
EVAPORATOR
CONTROL
PANEL
EVAPORATOR
(N)CH-4
(N)CH-3
PDS
CW-02
PDS
CW-01
N.O.
FCV
CW-06
TT
CW-06
CW-07
FCV
CW-07
TI
CW-06
FCV
TT
CW-05
FCV
CW-05
N.O.
CW-07
TI
TT
CW-08
CW-04
TI
FCV
CHW-03
TT
CHW-05
CHW-05
TI
CHW-03
FCV
PDS
CHW-04
CHW-01
IT
CHW-01
YA
CHW-08
HS
CHW-05
YI
CHW-01
TC
CHW-01
PI
PDT
CHW-01
CHW-01
PDI
PDT
CHW-02
PDT
CHW-03
PDT
CHW-04
PDT
CHW-05
CHW-02
PDI
CHW-03
PDI
CHW-04
PDI
CHW-05
PDI
CONDENSER WATER CONTROL DIAGRAMCHILLED WATER CONTROL DIAGRAM
POWER
CONTROL
(AO)V
A
L V
E S
IG
N
A L
(DO)T
E
M P
C W
S /C
H R
-2
V A
L V
E S
IG
N
A L
(AO)
CONTROL
POWER
T E
M P
C W
S /C
H R
-1
(DO)(AI)T
E
M P
C
W S
F R
O M
C H
IL
L E
R S
N.O.
POWER
CONTROL
(AI)T
E
M P
C
H S
/C H
R -1
V A
L V
E S
IG
N
A L
(AO) (AI)C
H
IL
L E
R A
M P
S
A L A
R M
(DI)S
T
A R
T /S
T O
P
(DO) (DI)S
T
A T
U S
(AO)S
E
T P
O
IN
T
C H
W A
D J
(AI)H
E
A D
P R
E S
S
DIFFERENTIAL PRESSURE
SENSOR/TRANSMITTER LOCATED IN
OPC. SEE SHEET M-103 FOR
LOCATION.
(AI)D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
DIFFERENTIAL PRESSURE
SENSOR/TRANSMITTER LOCATED IN
B1. SEE SHEET M-103 FOR
LOCATION.
DIFFERENTIAL PRESSURE
SENSOR/TRANSMITTER LOCATED
IN B32. SEE SHEET M-104 FOR
LOCATION.
DIFFERENTIAL PRESSURE
SENSOR/TRANSMITTER
LOCATED IN B24. SEE SHEET
M-104 FOR LOCATION.
DIFFERENTIAL PRESSURE
SENSOR/TRANSMITTER
LOCATED IN B31. SEE SHEET
M-104 FOR LOCATION.
(AI)D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
(AI)D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
(AI)D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
(AI)D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
C W
R
CWR
CWS
C W
S
CHS
CHR
CHS
CHR
CHS
CHR
CHS
CHR
CHS
CHR
PDT
CWP-01
CWP-01
PDI
(AI)D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
ECC NETWORK
ECC
NETWORK
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:2
A M
M-802
MECHANICAL CONTROLS
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
CHILLED WATER PLANT IS DESIGNED FOR N+1 REDUNDANCY. THE NEW CHILLERS CH-3 AND CH-4 SHALL OPERATE AS THE PRIMARY CHILLERS. THE OPERATOR SHALL SELECT THE LEAD/LAG ORDER CHILLERS IN THE SEQUENCE. (E) CH-1 AND (E) CH-2 IN BUILDING 22, ASSOCIATED PRIMARY, SECONDARY, AND CONDENSER WATER PUMPS, AND COOLING
TOWER PUMPS ALL REMAIN. THEY PROVIDE PEAK DEMAND AND BACKUP CAPACITY.
FAILURE OF A SINGLE COMPONENT WILL ONLY DISABLE THAT COMPONENT, NOT RELATED COMPONENTS.
THE PLANT IS CONTROLLED THROUGH THE ENGINEERING CONTROL CENTER (ECC).
MAJOR COMPONENTS
CHILLER WITH MOTORIZED BUTTERFLY VALVES TO SHUT OFF CHILLED WATER AND CONDENSER WATER TO CHILLER
WHEN NOT IN OPERATION ((E) CH-1, (E) CH-2, CH-3, AND CH-4).
PRIMARY CHILLED WATER PUMPS TO CIRCULATE CHILLED WATER THROUGH CHILLERS ((E)CHP-1, (E)CHP-2, (E)CHP-3, AND (E)CHP-4).
SECONDARY CHILLED WATER PUMPS TO CIRCULATE CHILLED WATER THROUGHOUT CAMPUS
((E)CHWP-1, (E)CHWP-2, AND (E)CHWP-3).
COOLING TOWERS TO REJECT CHILLER HEAT TO THE ENVIRONMENT, WITH MOTORIZED BUTTERFLY
VALVES TO SHUT OFF CONDENSER WATER FLOW TO TOWER WHEN NOT IN OPERATION.
CONDENSER WATER PUMPS TO CIRCULATE CONDENSER WATER FROM THE CHILLER TO THE COOLING
TOWER ((E)CWP-1, (E)CWP-2, (E)CWP-3, AND (E)CWP-4).
CHILLER STAGING SEQUENCE
ON SIGNAL FROM THE ECC, THE FIRST SECONDARY CHILLED WATER PUMP IS ENABLED. VARIABLE FREQUENCY DRIVE BRINGS PUMP UP TO SPEED THROUGH INTERNAL RAMP-UP RATE (180 SECONDS, ADJUSTABLE). PUMP IS SET TO MAINTAIN A DIFFERENTIAL SETPOINT BETWEEN SUPPLY AND RETURN HEADERS (REFER TO CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE SETPOINT SEQUENCE). IF FIRST PUMP IS UNABLE TO MAINTAIN PRESSURE DIFFERENTIAL, A SECOND PUMP IS STARTED AND RAMPED UP TO SAME SPEED AS OPERATING PUMP. ONCE EQUAL SPEED IS ACHIEVED, BOTH PUMPS SLOW DOWN TOGETHER TO MAINTAIN PRESSURE. WHEN PUMPS SLOW TO 60% SPEED, LEAD PUMP CYCLES OFF AND LAG PUMP BECOMES LEAD PUMP. ON NEXT PUMP CYCLE, SPARE PUMP BECOMES LAG PUMP.
ON FAILURE OF A PUMP AS REPORTED BY VFD, PUMP IS LOCKED OUT AND TAKEN OUT OF THE ROTATION. ALARM IS
REPORTED BY ECC.
FLOW METER ON CHILLED WATER MAIN HEADER PROVIDES DATA TO THE ECC TO DETERMINE THE TOTAL CHILLED WATER BEING SUPPLIED TO THE CAMPUS. PROVIDE TEMPERATURE SENSORS ON MAIN SUPPLY AND MAIN RETURN HEADERS. ECC CALCULATES THE TONNAGE BEING USED BY THE CAMPUS AND DETERMINES WHEN TO ADD OR
REMOVE CHILLERS.
ON RISE IN CHILLED WATER SUPPLY HEADER ABOVE 45°F (ADJUSTABLE), ECC COMMANDS MOTORIZED BUTTERFLY VALVES ON FIRST CHILLER (CH-3 OR CH-4) CHILLED WATER CIRCUIT AND CONDENSER WATER CIRCUIT TO OPEN. THE VALVE TIMING SHALL BE ADJUSTABLE THROUGH THE ECC SO THAT THE VALVES OPEN SLOW ENOUGH TO PREVENT TRIPS ON LOW FLOW FOR THE OPERATING CHILLERS. AFTER PROOF OF FLOW IS RECEIVED, ECC COMMANDS ON FIRST PRIMARY CHILLED WATER PUMP AND FIRST CONDENSER WATER PUMP. FIRST COOLING TOWER ISOLATION BUTTERFLY VALVE IS OPENED. COOLING TOWER BYPASS VALVE OPERATES AS REQUIRED TO PROVIDE CONDENSER WATER RETURN TEMPERATURE OF 75°F (ADJUSTABLE) TO CHILLER. AFTER 30 SECONDS (ADJUSTABLE) CHILLER IS ENABLED. IF CHILLER SENSES PROPER CHILLED WATER AND CONDENSER WATER FLOW, CHILLER OPERATES THROUGH ITS INTERNALLY SUPERVISED SEQUENCE TO CONTROL DISCHARGE WATER TEMPERATURE TO 45 °F. VFD INTERNAL TO CHILLER ADJUSTS CHILLER SPEED TO ADJUSTS CHILLER SPEED TO ADJUST CHILLER CAPACITY.
COOLING TOWER BYPASS VALVE CLOSES WHEN RETURN WATER REACHES 75°F (ADJUSTABLE). COOLING TOWER INTERNAL CONTROLS AND VFD ADJUST FAN SPEED TO MAINTAIN BASIN TEMPERATURE OF 85°F (ADJUSTABLE). IF COOLING TOWER IS OFF AND BASIN TEMPERATURE DROPS BELOW 35°F (ADJUSTABLE), ELECTRIC IMMERSION HEATER
IS ENERGIZED.
CH-3 AND CH-4 SEQUENCE OF OPERATION
ECC MONITORS CHILLER OUTPUT AND IF TONNAGE OF THE CHILLER IS AT 80% FOR 20 MINUTES AND
DOES NOT SATISFY CAMPUS LOAD, SECOND CHILLED WATER PRIMARY PUMP IS STARTED AND
AFTER PROOF OF OPERATION BY CURRENT SENSOR, SECOND CHILLER (CH-3 OR CH-4) CHILLED WATER ISOLATION BUTTERFLY VALVES ARE OPENED. SECOND CONDENSER WATER PUMP IS STARTED, AND AFTER PROOF OF OPERATION BY CURRENT SENSOR, SECOND CHILLER CONDENSER WATER ISOLATION BUTTERFLY VALVES ARE OPENED. SECOND COOLING TOWER ISOLATION BUTTERFLY VALVE IS ALSO OPENED. AFTER PROOF OF VALVES OPENING, CHILLER IS ENABLED. IF CHILLER SENSES PROPER CHILLED WATER AND CONDENSER WATER FLOW, CHILLER OPERATES THROUGH ITS INTERNALLY SUPERVISED SEQUENCE TO CONTROL DISCHARGE WATER TEMPERATURE TO 45°F. ON FAILURE OF ANY COMPONENT TO OPERATE PROPERLY ON START UP, THE COMPONENT SHALL BE DISABLED AND NEXT AVAILABLE COMPONENT (PUMP, CHILLER, OR TOWER) IS BROUGHT INTO SERVICE TO ALLOW START SEQUENCE TO PROCEED. FAILED COMPONENTS ARE LOCKED-OUT AND ECC GENERATES ALARM. ON INCREASE IN LOAD BEYOND CHILLER 3 AND CHILLER 4 CAPACITY AT 80%, THIRD CHILLER GROUP (CH-1
OR CH-2) IS BROUGHT ON PER SEQUENCE.
ON DROP IN LOAD BELOW 40% OF THE 3 CHILLERS, THE THIRD CHILLER (CH-1 OR CH-2) IS COMMANDED OFF. AFTER SHUTDOWN SEQUENCE BY CHILLER IS COMPLETE, THE ASSOCIATED CHILLED WATER AND CONDENSER WATER MOTORIZED VALVES CLOSE, TOWER MOTORIZED VALVE SHUTS, AND ASSOCIATED CHILLED WATER AND CONDENSER WATER PUMPS SHUT OFF AFTER PROOF OF VALVE CLOSURE. FAILURE OF ANY COMPONENT TO PROPERLY CLOSE OR SHUT OFF ALARMS AT ECC. ON DROP IN LOAD BELOW 30% OF THE TWO CHILLER CAPACITY, SECOND CHILLER (CH-3 OR CH-4) IS COMMANDED OFF PER THE SEQUENCE ABOVE.
ROTATE ALL COMPONENTS TO BE BROUGHT ONLINE AS LOADS INCREASE.
REFRIGERANT ALARM:
REFRIGERANT ALARM SYSTEM MONITORS CHILLER ROOM. ON DETECTION OF REFRIGERANT IN THE ROOM, ECC IS NOTIFIED. ON RISE IN CONCENTRATION ABOVE 25,000 PPM, ALARM AT BUILDING IS TRIGGERED, EMERGENCY PURGE FAN IS STARTED, AND MOTORIZED OUTDOOR AIR LOUVERS ARE OPENED. CHILLERS ARE COMMANDED OFF THROUGH THE ECC, AND AFTER CHILLERS ARE SHUT DOWN THROUGH THEIR INTERNAL SEQUENCE, ALL CONDENSER AND CHILLED WATER PUMPS SHUT DOWN, AND MOTORIZED VALVES CLOSE.
CONDENSER WATER PUMP SPEED CONTROL
THE ECC SHALL MODULATE THE SPEED OF THE OPERATING PUMPS TOGETHER TO MAINTAIN THE CONDENSER WATER HEADER DIFFERENTIAL PRESSURE AT SETPOINT ANYTIME ANY OF THE PUMPS ARE OPERATING. THE DIFFERENTIAL PRESSURE SETPOINT SHALL BE ESTABLISHED BY THE TEST AND BALANCE CONTRACTOR TO MEET THE REQUIRED CONDENSER WATER FLOWRATE FOR
EACH CHILLER.
PRIMARY CHILLED WATER PUMP
WHEN CH-4 IS STARTED THE ONLY PUMP THAT SHALL BE OPERATED WITH IT IS CHP-4. WHEN RUNNING WITH CH-4, PRIMARY
CHILLED WATER PUMP CHP-4, THE ECC SHALL COMMAND THE CHP-4 TO RUN.
CHILLED WATER SYSTEM DIFFERENTIAL PRESSURE SETPOINT
THE ECC SHALL RESET THE SYSTEM DIFFERENTIAL PRESSURE SETPOINT FOR EACH OF THE FIVE DIFFERENTAIL PRESSURE SENSORS USING A TRIM AND RESPOND LOGIC WITHIN THE RANGE OF 5 PSIG TO 20 PSIG ONCE THE MAXIMUM CHILLED WATER TEMPERATURE SETPOINT IS REACHED. ONCE THE TEMPERATURE SETPOINT IS REACHED, THE DIFFERENTIAL PRESSURE SETPOINT FOR EACH OF THE FIVE ZONES SHALL BE RESET BASED ON THE VALVE POSITIONS IN EACH ZONE. EACH DIFFERENTAIL PRESSURE SETPOINT SHALL BE TRIMMED BY 0.1 PSIG EVERY TWO MINUTES UNTIL A VALVE IN EACH DIFFERENTIAL PRESSURE ZONE IS 50% OPEN. WHEN A VALVE IN THE ZONE RISES TO 80% OPEN, THE DIFFERENTIAL PRESSURE SETPOINT SHALL BE INCREASED BY 0.1 PSIG EVERY TWO MINUTES. ALL SETPOINTS SHALL BE ADJUSTABLE THROUGH THE OPERATOR WORKSTATION FOR EACH DIFFERENTIAL PRESSURE SENSOR. THE PUMPS SHALL BE CONTROLLED TO THE DIFFERENTIAL PRESSURE SENSOR
WHICH IS FURTHEST BELOW SETPOINT.
IN ADDITION TO THE HARDWIRED POINTS SHWON, THE CHILLERS
SHALL BE CONNECTED TO THE ECC THROUGH A
BACNET NETWORK CONNECTION. THE FOLLOWING POINTS
SHALL BE MONITORED OR CONTROLLED BY THE FMS:
A. LEAVING CHILLED WATER TEMPERATURE
B. ENTERING CHILLED WATER TEMPERATURE
C. LEAVING CONDENSER WATER TEMPERATURE
D. ENTERING CHILLED WATER TEMPERATURE
E. PERCENT RLA
F. EVAPORATOR REFRIGERANT PRESSURE
G. CONDENSER REFRIGERANT PRESSURE
H. COMPRESSOR DISCHARGE REFRIGERANT TEMPERATURE
I. EVAPORATOR REFRIGERANT TEMPERATURE
J. CONDENSER REFRIGERANT TEMPERATURE
K. OIL TEMPERATURE
L. OIL PRESSURE DIFFERENTIAL
M. CHILLED WATER FLOW RATE
N. CONDENSER FLOW RATE
O. COMPRESSOR POWER
P. PERCENT LOAD
Q. DEMAND LIMIT SETPOINT
R. CHILLER ENABLE/DISABLE
S. CHILLER STATUS
T. MANUAL RESET ALARMS
U. AUTO RESET ALARMS
V. COMMUNICATIONS STATE
KEYNOTE
VARIABLE FREQUENCY DRIVE CONTROL DIAGRAM
VFDFMS1
(DO)S
T
A R
T /S
T O
P
CWP3-01
HS
(DI)S
T
A T
U S
CWP3-01
YI
(AO)S
P
E E
D S
IG
N
A L
CWP3-01
SC
VFDFMS1
(E) CWP-3
(E) CWP-4
(DO)S
T
A R
T /S
T O
P
CWP4-01
HS
(DI)S
T
A T
U S
CWP4-01
YI
(AO)S
P
E E
D S
IG
N
A L
CWP4-01
SC
GENERAL SHEET NOTES
SHEET KEYNOTES
A. ALL CONTROLS EQUIPMENT SHOWN ON DRAWING SHALL BE FURNISHED AND
INSTALLED BY CONTROLS CONTRACTOR.
THE CONTROLS CONTRACTOR SHALL HAVE FULL ACCESS TO MANUFACTURER'S
CONTROL PANEL TO SET UP ACTUATORS POSITIONS, ADJUST FREQUENCY, RESET
WATER TEMPERATURE SETPOINTS, ETC. OR PROVIDE ALL CONNECTION POINTS AS
SHOWN ON CONTROL DRAWINGS.
REFER TO MECHANICAL PLANS AND DETAILS FOR EXACT VALVE CONFIGURATIONS
AND PIPING.
B.
C.
1. VFD'S SHALL BE CONNECTED TO THE FMS NETWORK THROUGH A DIRECT NETWORK
CONNECTION AS WELL AS THROUGH THE HARDWIRED POINTS INDICATED. IT IS THE
RESPONSIBILITY OF THE FMS CONTRACTOR TO COORDINATE AND ADAPT THE FMS
NETWORK TO THE COMMUNICATIONS PROTOCOLS AVAILABLE FROM THE VFD
MANUFACTURER. THE FOLLOWING POINTS SHALL BE INTEGRATED INTO THE FMS:
A. SPEED FEEDBACK
B. FREQUENCY OUTPUT
C. INPUT VOLTAGE/PHASE
D. CURRENT
E. TORQUE
F. POWER
G. UNDER VOLTAGE
H. OVER VOLTAGE
I. OUTPUT VOLTAGE
J. KWH COUNTER
K. DRIVE TEMPERATURE
L. FREQUENCY SETPOINTS (MIN & MAX)
M. MOTOR FLA
N. ROTATION DIRECTION
O. ALARMS
P. STATUSES
VFDFMS1
VFDFMS1
(E) CWP-1
(E) CWP-2
(DO)S
T
A R
T /S
T O
P
CWP1-01
HS
(DI)S
T
A T
U S
CWP1-01
YI
(AO)S
P
E E
D S
IG
N
A L
CWP1-01
SC
(DO)S
T
A R
T /S
T O
P
CWP2-01
HS
(DI)S
T
A T
U S
CWP2-01
YI
(AO)S
P
E E
D S
IG
N
A L
CWP2-01
SC
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:2
A M
M-803
MECHANICAL CONTROLS
Checker Author10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
R
EX
A
X a
WALL
CEILING
WALL
CEILING
OS
OS
208Y/120V T1A 75kVA K-4
E4E3
A
DRAWING NUMBER WHERE TAKEN
DRAWING NUMBER WHERE DETAILED
SECTION/ELEVATION LETTER OR DETAIL
NUMBER
A
E4
E4
+44"
DRAWING NUMBER WHERE DETAILED
SECTION/ELEVATION LETTER OR DETAIL
NUMBER
VAV-9
(NOT ALL SYMBOLS APPLY TO THIS PROJECT)
NORTH ARROW OR MATCH ARCHITECT'S
SCALE BAR OR MATCH ARCHITECT'S
SURFACE
WALL
CEILING
ONE-LINE DIAGRAM
SPD
3000/5
CIRCUIT BREAKER; TRIP SETTING/FRAME SIZE OR NO. OF
POLES.
SETTINGS AND PROTECTION AS NOTED ON PLANS
DRAWOUT CIRCUIT BREAKER
MEDIUM VOLTAGE DRAWOUT
CIRCUIT BREAKER
POTENTIAL TRANSFORMER.
DISCONNECT SWITCH. "300A"
DENOTES AMPERAGE
RATING
FUSE. "300A" DENOTES
AMPERAGE
RATING
GROUND CONNECTION
TRANSFER SWITCH. SEE PLANS
FOR TYPE OF SWITCH
SURGE ARRESTOR
SURGE PROTECTIVE DEVICE
KILOWATT METER
ELECTRONIC METER
KIRK KEY INTERLOCK No.1
RELAY No.1
AMMETER SWITCH
AMMETER
VOLTMETER SWITCH
VOLTMETER
DELTA CONNECTED
WYE CONNECTED
LIGHTING
RECESSED MOUNTED LUMINAIRE. SMALL CASE
"a" DENOTES SWITCHING, NUMBER "3" DENOTES
BRANCH CIRCUITING. SYMBOL "A" DENOTES
LUMINAIRE TYPE
WALL MOUNTED LUMINAIRES
STRIP LUMINAIRE
LINEAR DIRECT/INDIRECT LUMINAIRE. CABLE
OR STEM MOUNTED
DOWN LIGHT LUMINAIRE; CEILING MOUNTED
EXIT LUMINAIRE. SHADED SIDE INDICATES
FACE SIDE. PROVIDE DIRECTIONAL ARROW(S)
AS INDICATED ON PLANS
EMERGENCY BATTERY PACK LUMINAIRE
(BUG-EYE/FROG-EYE)
DOUBLE HEAD, POLE MOUNTED LUMINAIRE
TRACK MOUNTED LUMINAIRES
SURFACE
AS
DETAILED
CEILING
EXTERIOR
WALL
DEMOLITION
DASHED SYMBOL INDICATES EXISTING
DEVICE OR EQUIPMENT TO BE REMOVED
SOLID SYMBOL, LIGHTER IN COLOR
INDICATES EXISTING DEVICE OR EQUIPMENT
TO REMAIN
EXISTING CONDUIT TO BE REUSED
REMOVE EXISTING RACEWAY IN ALL
ACCESSIBLE AREAS. CAPPED AND
ABANDONED IF IN UNACCESSIBLE AREA
SYMBOL DEFINITION
REFERENCE TAGS
KEYED NOTE REFERENCE
MECHANICAL EQUIPMENT REFERENCE
DENOTES MOUNTING HEIGHT AFF
KITCHEN EQUIPMENT REFERENCE
MEDICAL EQUIPMENT REFERENCE
GENERAL DRAWING SYMBOLS
TRIP SETTING
FRAME SIZE
VARIES
R E
F E
R T
O L
IG
H
T
IN
G S
C H
E D
U L E
EMERGENCY, CRITICALEC
EMERGENCY, LIFE SAFETYEL
EMERGENCY, EQUIPMENTEQ
TELEVISIONTV
EXISTING(E)
GROUND FAULT PROTECTIONGFP
SWITCHSW
FEEDERFDR
UNDERGROUND ELECTRICUGE
MANHOLEMH
MIXED MEDIAMM
UNDERGROUNDU/G
POWER MONITORING AND CONTROL SYSTEMPMCS
AUTOMATIC TRANSFER SWITCH CONTROLATSC
TEMPORARYTEMP
SECURITYSEC
DEFINITIONABBREV.
ABBREVIATIONS
A
ADA
AFF
AFG
AWG
ANSI
AIC
C
CCTV
CLF
CO
GFI
GND
HOA
G OR GFCI
FACP
AMPS, AMPERE, AMPERAGE
ABOVE FINISHED GRADE
ABOVE FINISHED FLOOR
AMERICANS WITH DISABILITIES ACT
AVAILABLE INTERRUPTING CURRENT
AMERICAN NATIONAL STANDARDS INSTITUTE
GROUND FAULT CIRCUIT INTERRUPTER
HAND-OFF-AUTOMATIC.
GROUND.
GROUND FAULT INTERRUPTER
CURRENT LIMITING FUSE
AMERICAN WIRE GAUGE
CLOSED CIRCUIT TELEVISION
FIRE ALARM CONTROL PANEL
CONDUIT ONLY
CONDUIT
HP
IEEE
KV
KVA
KW
KWH
MVA
MCC
NEC
NEMA
NIC
NFPA
NM
P
PA
PC
NC
POLE
KILOVOLT AMPS
NATIONAL FIRE PROTECTION ASSOCIATION
PHOTOCELL
PUBLIC ADDRESS
NEW MEXICO
NOT IN CONTRACT
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS
MOTOR CONTROL CENTER
MEGAVOLT AMPS
NORMALLY CLOSED
KILOWATT HOUR.
KILOWATT
HORSEPOWER
KILOVOLT
TVSS
UPS
UON
V
VFD
XFER
XFMR (TRANSF)
VARIABLE FREQUENCY DRIVE
UNINTERRUPTABLE POWER SUPPLY
TRANSIENT VOLTAGE SURGE SUPPRESSER
TRANSFORMER
TRANSFER
UNLESS OTHERWISE NOTED
VOLTS, VOLTAGE
TTB TELEPHONE TERMINAL BOARD
INSTITUTE OF ELECTRICAL AND ELECTRONICS
CEILING MOUNTED OCCUPANCY SENSOR;
TYPE AS INDICATED ON PLANS
DISTRIBUTION POLE FOR OVERHEAD ELECTRICAL
OR COMMUNICATIONS AS INDICATED ON PLAN.
OVERHEAD UTILITY AND OR SYSTEM DISTRIBUTION.X
X
3PH = THREE PHASE
X X
UT UTILITY OR FACILITY TRANSFORMER
S
CC
PAD MOUNTED SWITCH
CONNECTION CABINET (UTILITY
METER MOUNT)
MH
MANHOLE - POWER OR
COMMUNICATION
AS INDICATED ON PLANS
HH
HAND HOLE - POWER OR
COMMUNICATION
AS INDICATED ON PLANS
1PH = SINGLE PHASE
S = ELECTRICAL SECONDARY
P = ELECTRICAL PRIMARY
T = TELECOMMUNICATION
TV = TELEVISION
E = EMERGENCY POWER
ATSC = AUTOMATIC TRANSFER SWITCH CONTROL
PM PRIMARY SITE METER ENCLOSURE
EG ENGINE GENERATOR
TP TELECOMMUNICATION PEDESTAL
TVP TELEVISION PEDESTAL
METER ENCLOSURE. EITHER ON BUILDING OR ON
UTILITY
EQUIPMENT
ME
CT CT ENCLOSURE. EITHER ON BUILDING OR ON UTILITY EQUIPMENT
GENERATOR
a =
2 = 3 = 4 = P = M = K =
WP =
T =
D =
AC ABOVE COUNTER
AL ALUMINUM
ATS AUTOMATIC TRANSFER SWITCH
CKT CIRCUIT
CU COPPER
DL DAY-LIGHTING
DIA DIAMETER
FA FIRE ALARM
KCMIL THOUSAND CIRCULAR MILS
MAX MAXIMUM
MIN MINIMUM
NEUT NEUTRAL
PH PHASE
RSC RIGID STEEL CONDUIT
UC UNDER COUNTER
WP WEATHERPROOF
WALL MOUNTED OCCUPANCY SENSOR; TYPE
AS INDICATED ON PLANS
HATCHING INDICATES EMERGENCY LIGHTING.
HATCH WILL BE MODIFIED FOR EACH
LUMINAIRE TYPE. EMERGENCY LUMINAIRE
DESIGNATED WITH "E" IN TYPE DESIGNATION.
VARIES
SURFACE MOUNTED LUMINAIRE.
LUMINAIRE TYPE AS INDICATED ON PLANS
REFER TO
DEMOLITION
PLANS FOR
ADDITIONAL
INFORMATIO
N
(F
) FUTURE
LSIG LONG TIME, SHORT TIME, INSTANTANEOUS,
(N) NEW
W WALL MOUNTED
NL NORMAL
MTS MANUAL TRANSFER SWITCH
UL UNDERWRITERS' LABORATORIES
EMERGENCYE
IG ISOLATED GROUND
KVAR KILOVOLT AMPS REACTIVE
NO NORMALLY OPEN
SURGE PROTECTIVE DEVICESPD
REFER TO LUMINAIRE SCHEDULE FOR ALL LUMINAIRE TYPES WHETHER WALL
MOUNTED OR CEILING MOUNTED.
GROUND FAULT PROTECTION
SHUNT TRIP OPERATOR
TYP. TYPICAL
TRIP SETTING
FRAME SIZE
300A
300A
N/A NOT APPLICABLE
O/H OVERHEAD
GEN GENERATOR
ENGINE GENERATOREG
SYMBOL DESCRIPTION
MOUNTING
HT.LOC.
SINGLE HEAD, POLE MOUNTED LUMINAIRE
DOUBLE FACE EXIT LUMINAIRE. SHADED SIDE
INDICATES FACE SIDE. PROVIDE DIRECTIONAL
ARROW(S) AS INDICATED ON PLANS
SYMBOL DESCRIPTION
SYMBOL DESCRIPTION NOTES
ASSOCIATION
AND GROUND FAULT PROTECTION
ENGINEERS
UTILITIES
DESCRIPTIONSYMBOL
NORTH
ELECTRICAL SYMBOL LEGEND
E3 E4
TRANSFORMER. TRANSFORMER NAME, TRANSFORMER kVA RATING, PRIMARY VOLTAGE AND WIRING CONFIGURATION, SECONDARY
VOLTAGE, K RATING (IF APPLICABLE)
G
ST
0 10' 20' 40' 80'
1" = 40'-0"
DEVICE INDICATOR LETTER. "X" EQUALS
DESIGNATION BELOW
(TYPICAL FOR MOST SWITCH TYPES):
SMALL CASE LETTER DENOTES
SWITCHING CONTROL
DOUBLE POLE TOGGLE SWITCH
THREE-WAY TOGGLE SWITCH
FOUR-WAY TOGGLE SWITCH
PILOT LIGHT TOGGLE SWITCH
MOMENTARY CONTACT SWITCH
KEY OPERATED SWITCH
WEATHERPROOF TOGGLE SWITCH
MANUAL MOTOR STARTER SWITCH WITH
THERMAL OVERLOAD PROTECTION
DIMMER SWITCH
KW
M
K1
R1
AS
A
VS
V
VFD CONNECTION
MOTOR CONNECTION
UPS
VF
D
J
T
30/3R
0/1
1/30/3R
F
30/1
30/3R
DEVICES
CODE SIZE JUNCTION BOX
WALL MOUNTED CODE SIZE J-BOX
CODE SIZE PULLBOX (OR AS SIZED ON PLAN)
ENCLOSED CIRCUIT BREAKER.
AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE
UON
NON-FUSED DISCONNECT SWITCH.
AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE
UON
FUSED DISCONNECT SWITCH.
AMPERAGE/NEMA ENCLOSURE RATING, 3 POLE
UON
MOTOR STARTER. STARTER SIZE INDICATED
BY NUMBER/NEMA ENCLOSURE RATING,
SINGLE SPEED UON
COMBINATION FUSIBLE DISCONNECT SWITCH
AND MOTOR STARTER. NEMA STARTER
SIZE/AMPERAGE/NEMA ENCLOSURE RATING, 3
POLE UON
MOTOR. NUMBER INDICATES HORSEPOWER
RATING FOR 1HP AND LARGER
THERMOSTAT
PHOTOCELL
LIGHTNING PROTECTION AIR TERMINAL
PUSHBUTTON (EMERGENCY POWER OFF - EPO)
SYMBOL DESCRIPTION MOUNTING
+44"
UON
N/A
VARIES
HT.LOC.
WALL
ROOF
VARIES
N/A
VARIES
MULTI-OULET ASSEMBLY (SURFACE MOUNTED
RACEWAY) VARIES
SEE
PLANS
VARIES
SEE
PLANS
MOTOR. "F" INDICATES FRACTIONAL
HORSEPOWER
VARIES
SEE
PLANS
VARIES
SEE
PLANS
VARIES
DEVICE INDICATOR LETTER. "X" EQUALS DESIGNATION BELOW
(TYPICAL FOR MOST RECEPTACLE TYPES):
BLANK FOR NORMAL POWER
G = GFCI RATED
IG = ISOLATED GROUND
T = TAMPERPROOF
WG = WEATHERPROOF AND GFCI
WP = WEATHERPROOF (IN-USE COVER)
CL = CLOCK
TV = TELEVISION
+18", UON
FLUSH
IN FLOOR DUPLEX RECEPTACLE.
CONFIGURATION AS INDICATED ON PLANS
IN FLOOR DOUBLE DUPLEX (QUADPLEX)
RECEPTACLE. CONFIGURATION AS INDICATED ON
PLANS
CEILING MOUNTED DUPLEX RECEPTACLE
CEILING MOUNTED DOUBLE DUPLEX
(QUADPLEX) RECEPTACLE
SIMPLEX RECEPTACLE
DUPLEX RECEPTACLE
DOUBLE DUPLEX (QUADPLEX) RECEPTACLE
EMERGENCY DOUBLE DUPLEX (QUADPLEX)
RECEPTACLE
SPECIAL PURPOSE RECEPTACLE. NEMA
CONFIGURATION AND AMPERAGE AS NOTED ON
PLANS
COMBINATION POWER/COMMUNICATION POLE.
CONFIGURATION AS NOTED ON PLANS
FLOOR
CEILING
WALL,
UON
IN FLOOR EMERGENCY DUPLEX RECEPTACLE.
CONFIGURATION AS INDICATED ON PLANS
CEILING MOUNTED EMERGENCY DUPLEX
RECEPTACLE
EMERGENCY DUPLEX RECEPTACLE
COMBINATION POWER/COMMUNICATION IN
CEILING OUTLET. CONFIGURATION AS
INDICATED ON PLANS
COMBINATION DUPLEX RECEPTACLE AND
COMMUNICATIONS FLOORBOX. DEVICE
CONFIGURATION AS INDICATED ON PLANS.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
J
P
IN FLOOR EMERGENCY DOUBLE DUPLEX
(QUADPLEX) RECEPTACLE. CONFIGURATION AS
INDICATED ON PLANS
X
A, B, C, = SEQUENCE OF PANELS OF THIS TYPE
1, 2, 3, . . = SUBFED PANEL
1, 2, 3, . . = FLOOR LEVEL
H L
T
BLANK FOR NORMAL POWER
EL
EC
EQ
= EMERGENCY-LIFE SAFETY-BRANCH
= EMERGENCY-CRITICAL-BRANCH
= EMERGENCY-EQUIPMENT-BRANCH
GROUND BAR
MAIN SWITCHBOARD. DASHED LINES INDICATE CLEARANCES.
VARIABLE FREQUENCY DRIVE
SYMBOL
EQUIPMENT
DESCRIPTION
EQUIPMENT NAMING CONVENTION
= HIGH VOLTAGE PANELBOARD (480Y/277V)
= LOW VOLTAGE PANELBOARD (208Y/120V)
= TRANSFORMER
= DISTRIBUTION BOARDDB
= MAIN SWITCH BOARDMSB
MCC= MOTOR CONTROL CENTER
= UNINTERRUPTABLE POWER SUPPLYUPS
= POWER DISTRIBUTION UNIT
ATS = AUTOMATIC TRANSFER SWITCH
PDU
= ISOLATED PANELBOARDI
B = BUSWAY
MSB
FLUSH MOUNTED PANELBOARD. DASHED LINES INDICATE
CLEARANCES.
SURFACE MOUNTED PANELBOARD. DASHED LINES INDICATE
CLEARANCES.
H1A
L1A
MCC
MOTOR CONTROL CENTER. DASHED LINES INDICATE CLEARANCES.
T1A
UNINTERRUPTABLE POWER SUPPLY. DASHED LINES INDICATE
CLEARANCES.
AUTOMATIC TRANSFER SWITCH. DASHED LINES INDICATE CLEARANCES.
DRY TYPE TRANSFORMER (15kVA OR ABOVE), WITH EQUIPMENT TAG
(TAG INSIDE OR OUTSIDE, DEPENDING ON SIZE). IN MOST CASES,
ACTUAL SIZE SHOWN ON PLANS (ELECTRICAL ROOMS).
E = EMERGENCY
DISTRIBUTION BOARD. DASHED LINES INDICATE CLEARANCES.
DB
UPS-A
ATS-1
EXAMPLES:
A. SES1 (SERVICE ENTRANCE SECTION #1)
B. 1H1A (SERVED FROM SES#1, 480/277 NORMAL, LEVEL 1, FIRST BOARD)
C. 1EQH1A (SERVED FROM MAIN EMER SWBD #1, 480/277 EQUIP POWER,
LEVEL 1, FIRST BOARD)
SES
G
= GROUND
= HOT/PHASE
= NEUTRAL
= SWITCH LEG
CONDUCTOR IDENTIFICATION SYMBOLS. REFER TO
PLANS FOR COMBINATION USE. CONDUCTOR
IDENTIFICATION MOSTLY USED IN HOMERUN
LOCATION, BUT CAN ALSO BE USED IN BRANCH
CIRCUITING WHERE APPLIED. GROUND
CONDUCTORS WILL BE INSTALLED IN ALL RACEWAYS
WHETHER SHOWN OR NOT.
LA-1
HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT
NUMBER ADJACENT TO HOMERUN INDICATES PANEL
SOURCE AND INDIVIDUAL SINGLE POLE CIRCUIT
BREAKER(S). CONDUCTOR IDENTIFICATION SYMBOL
INDICATES NUMBER OF CONDUCTORS IN HOMERUN.
MINIMUM #12 CONDUCTORS AND 3/4" RACEWAY PATH
WILL BE PROVIDED IN HOMERUN UON. ALL
HOMERUNS WILL INCLUDE GROUND CONDUCTOR.
LA-7
HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT
NUMBER ADJACENT TO HOMERUN INDICATES PANEL
SOURCE AND INDIVIDUAL TWO OR THREE POLE
CIRCUIT BREAKERS. CONDUCTOR IDENTIFICATION
SYMBOL INDICATES NUMBER OF CONDUCTORS IN
HOMERUN. MINIMUM #12 CONDUCTORS AND 3/4"
RACEWAY PATH WILL BE PROVIDED IN HOMERUN UON.
NEUTRAL MAY BE USED WHERE INDICATED ON PLAN.
ALL HOMERUNS WILL INCLUDE GROUND CONDUCTOR.
LA-13
CONCEALED RACEWAY BETWEEN DEVICES AND OR
EQUIPMENT IN WALLS OR IN CEILING SPACE
UNDERGROUND RACEWAY BETWEEN DEVICES
AND OR EQUIPMENT
EXPOSED RACEWAY BETWEEN DEVICES AND
OR EQUIPMENT ON WALLS OR CEILINGS
CONDUIT TURNS
DOWN UP
B BUSWAY
GROUNDING CONDUCTORG
CABLE TRAY - POWER AND TELECOMMUNICATIONS
T TELECOMMUNICATIONS RACEWAY
D DATA RACEWAY
FA FIRE ALARM RACEWAY
CONDUIT STUBBED AND CAPPED
VOICE/DATA COMBINATION RACEWAYV/D
BRANCH CIRCUIT GENERAL INFORMATION:
BRANCH CIRCUITS FROM OVERCURRENT PROTECTION (20A) TO FURTHEST DEVICE SHALL
NOT EXCEED 75 FEET FOR #12AWG COPPER AND 150 FEET FOR #10AWG COPPER MEASURED
ALONG CONDUCTORS ROUTING PATH. BRANCH CIRCUITS EXCEEDING 150 FEET WILL BE
SIZED SO THAT VOLTAGE DROP DOES NOT EXCEED 5%. 2% FOR FEEDERS AND 3% FOR
BRANCH CIRCUITS. REF: CEC 210.19(A).
LA-1,3
LA-5,7,9
HOMERUN FROM EQUIPMENT LOCATION. THE CIRCUIT
NUMBER ADJACENT TO HOMERUN INDICATES PANEL
SOURCE AND INDIVIDUAL SINGLE POLE CIRCUIT
BREAKER(S). SYMBOL REPRESENTS A MULTI-BRANCH
CIRCUIT. NUMBER OF CONDUCTORS IN HOMERUN
WILL INCLUDE A SEPERATE NEUTRAL FOR EACH
CIRCUIT PHASE CONDUCTOR. MINIMUM #12
CONDUCTORS AND 3/4" RACEWAY PATH WILL BE
PROVIDED IN HOMERUN UON. ALL HOMERUNS WILL
INCLUDE GROUND CONDUCTOR.
RACEWAY & CONDUCTORS
CURRENT TRANFORMER, NUMBER
"3000/5" DENOTES RATIO.
WG WEATHERPROOF AND GFCI
R REMOVED/REMOVAL
RC ROOM CONTROLLER
FAA FIRE ALARM ANNUNCIATOR
FMS FACILITY MANAGEMENT SYSTEM
GROUND FAULT EQUIPMENT PROTECTIONGFEP
CB CIRCUIT BREAKER
D DIMMING
DC DIRECT CURRENT
UPS
NUMBER OR MAIN EMERG SWBD NUMBER
= SERVICE ENTRANCE SECTION
(SB=SUB-BASEMENT, B=BASEMENT, M=MEZZANINE,
P=PENTHOUSE)
CEILING MOUNTED EMERGENCY DOUBLE
DUPLEX (QUADPLEX) RECEPTACLEX
PC
UNDERGROUND UTILITY AND OR SYSTEM DISTRIBUTION.
X
X
N = NEW
EX = EXISTING
DL DAY-LIGHTING SENSOR; TYPE AS INDICATED
ON PLANS
RC ROOM CONTROLLER; TYPE AS INDICATED
ON PLANS
480V
CL CLOCK
CB
FATC FIRE ALARM TERMINAL CABINET
UPDATED: 03/03/2014
A/V AUDIO/VISUAL
DRY TYPE TRANSFORMER (LESS THAN 15kVA), WITH NO EQUIPMENT TAG.
SIZE, TYPE AND LOCATION NOTED ON PLANS.
A/C ALTERNATING CURRENT
DESCRIPTIONSYMBOL
T
VF
D
FC FOOTCANDLES
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
E le c.
rv t
/1
5/
0:
:1
A M
E-001
ELECTRICAL LEGEND
J.
MONTANO
R. RIBA10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E Clinton Ave, Fresno, CA 93703
CONTRACTOR IS TO PROVIDE NEW CONTROLS, LIGHTS AND OUTLETS AS IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS. ALL LIGHTING TO BE 5-7 FC ALONG WALKWAY. COORDINATE
ALL SHUTDOWNS WITH THE COR 30 DAYS IN ADVANCE AND AGAIN 2 DAYS IN ADVANCE TO
ENSURE ALL SAFETY PRECAUTIONS ARE IN PLACE AND OPERATIONAL IMPACTS ARE MINIMIZED.
NIGHT AND WEEKEND WORK WILL BE REQUIRED FOR THIS CONTRACT.
ELECTRICAL SCOPE OF WORK:
GENERAL
CONTRACTOR SHALL INFORM HIMSELF OF ANY ELECTRICAL INFORMATION THAT
MIGHT BE SHOWN IN OTHER DISCIPLINES OF THIS PROJECT AND NOT SHOWN IN
ELECTRICAL DIVISION. COORDINATE ALL WORK DISCREPANCIES WITH
ARCHITECT PRIOR TO BID. SHOULD COORDINATION NOT OCCUR, IT IS
UNDERSTOOD THAT THE CONTRACTOR FOUND NO DISCREPANCIES AND SHALL
PROVIDE AND INSTALL ELECTRICAL RACEWAY, CONDUCTORS, DEVICES, AND
EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER.
THE CONTRACTOR SHALL REFER TO DIVISION 26 SPECIFICATIONS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS. THE SPECIFICATIONS ARE A
PART OF THE CONSTRUCTION DOCUMENT SET AND MAY CONTAIN INFORMATION
NOT SHOWN ON THE DRAWING SET.
THESE DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING SERVICES
GATHERED BY SITE INSPECTION AND PREVIOUS CONSTRUCTION DRAWINGS.
THE EXACT LOCATION, ARRANGEMENT, AND SIZES OF EXISTING DEVICES MAY
BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS. ALL BIDDERS ARE
REQUIRED TO INVESTIGATE…