90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part2.pdf
PDF 20 MB Posted
- Solicitation number
- 36C26126R0028
About this file
These are architectural and engineering drawings for a federal construction project at Fresno VA Hospital. The project, titled "Replace and Expand Chilled Water Infrastructure, Building 1 and OPC," involves comprehensive renovation and expansion of the facility's chilled water systems across multiple floors and buildings.
The drawings include structural plans for the sixth and seventh floors, showing mechanical shaft openings, beam reinforcements, and concrete wall construction details. Demolition plans span from sub-basement through seventh floor, detailing removal of acoustical ceilings, gypsum board, floor decks, concrete slabs, and casework across both Unit A and Unit B areas. Infection control risk assessment (ICRA) precautions are classified as Class II, III, and IV depending on floor location, with specific requirements for critical barriers, negative air pressure maintenance, HEPA filtration, and dust containment during construction. Floor plans show room layouts and modifications across all levels, reflected ceiling plans indicate new suspended acoustic tile and finished gypsum board ceilings with lighting and HVAC fixture locations, and interior elevations provide detailed construction at key locations. General notes specify UL-rated wall construction, blocking provisions for owner equipment, moisture-resistant board for plumbing areas, fireproofing requirements, and lead lining installation where applicable. The project is issued as a Bid Set dated 05/04/2026, with Simpson Gumpertz & Heger serving as the A/E consultant and DavEnergy Solutions as the designer of record. Fire protection scope drawings indicate areas requiring removal of existing upright sprinklers and installation of new pendent sprinklers per NFPA 13 standards.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9
D
E
F
G
A
B
C
21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"±
21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"±
MECHANICAL SHAFT OPENING IN
(E) CONCRETE SLAB, SEE
COORDINATE FINAL SIZE AND
LOCATION WITH MEP DRAWINGS.
/8 S-030
(E
W F
(E
W F
(E) 21WF62
W12x40
W12x40
W x
(E
W F
REMOVE CONCRETE ENCASEMENT
FROM (E) BEAM AND PROVIDE STD
SHEAR CONNECTION, TYP.
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A/E:
321 4 5 6 7 8 9 10
SIMPSON GUMPERTZ & HEGER
757 S ALAMEDA ST, SUITE 440
LOS ANGELES, CA 90021
213-271-2000
NOT F
OR
CONSTRUCTIO
NDAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
/1
/2
:4
:4
P M
C U s e rs
\t tc h a n g
\D o c u m e n ts \R e v it \2
\2
C
H
IL
S
E
R to ri tc h a n g
.r v t
BID SET 570-20-308
S-108A
SGHSGH
FRESNO VA HOSPITAL
2615 E CLINTON AVE, FRESNO, CA 93703
REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC
05/04/2026
SIXTH FLOOR STRUCTURAL PLAN
- AREA A
Approver
1/8" = 1'-0"
SIXTH FLOOR STRUCTURAL PLAN - AREA A
A
B
BID SET 05/04/2026
NO
T F O
R C O
NSTRUCTIO
N
7 8 9 10
D
E
F
G
1817161514131211
A
B
C
21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 20'-11 1/4"±
21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 20'-11 1/4"±
(E
W F
8" REINFORCED
CONCRETE
ENCLOSURE WALL
PROVIDE DOWELS BETWEEN
(E) AND (N) CONCRETE WALL
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
DESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A/E:
321 4 5 6 7 8 9 10
SIMPSON GUMPERTZ & HEGER
757 S ALAMEDA ST, SUITE 440
LOS ANGELES, CA 90021
213-271-2000
NOT F
OR
CONSTRUCTIO
NDAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
/1
/2
:4
:4
P M
C U s e rs
\t tc h a n g
\D o c u m e n ts \R e v it \2
\2
C
H
IL
S
E
R to ri tc h a n g
.r v t
BID SET 570-20-308
S-109B
SGHSGH
FRESNO VA HOSPITAL
2615 E CLINTON AVE, FRESNO, CA 93703
REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC
05/04/2026
SEVENTH FLOOR STRUCTURAL
PLAN - AREA B
Approver
1/8" = 1'-0"
SEVENTH FLOOR STRUCTURAL PLAN - AREA B
A
B
BID SET 05/04/2026
NO
T F O
R C O
NSTRUCTIO
N
EXISTING CEILING
SEAL PERIMETER;
RED PLASTIC TAPE
EXISTING FINISHED
FLOOR
CLOSE OPEN DUCTS WITH 6
MIL POLYETHLENE BARRIER.
SEAL EDGES WITH
CONTINUOUS DUCT TAPE
CLOSE INTERSTITIAL SPACE WITH
6 MIL POLYETHLENE BARRIER.
SEAL ALL JOINTS, PENETRATIONS
AND ENTIRE PERIMETER OF
BARRIER WITH CONTINUOUS RED
PLASTIC TAPE; TYP.
CONTINUOUS FIRE
RETARDANT TREATED
WOOD NAILER
BASE PAINTERS TAPE
PROVIDE (2) ZIPPERS @ 36"
APART TO MAKE OPENING
BASE PAINTERS TAPE AND
SEAL PERIMETER w/ RED
PLASTIC TAPE; TYP
PROVIDE BASE PAINTERS TAPE AT
ALL END CONDITIONS WITH RED
PLASTIC TAPE TO PROVIDE A
CONTIUNOUS SEALED SPACE
CONTINUOUS 6 MIL
POLYETHLENE SHEET BARRIER
C-H STUDS
CEILING LINE
FLOOR LINE
UNDERSIDE OF DECK
STEEL STUD CHANNEL
RUNNER FASTENED TO
FLOOR/DECK
REFERENCE FINISH SCHEDULE
FOR BASE MATERIAL
STEEL STUD TRACK PROFILE
RUNNER FASTENED TO FLOOR
/2
PLAN
TYPE STUD SIZE
PARTITION
WIDTH
FIRE RATING
NOTES
FIRE-RESISTANT RATED JOINT SEALANT
4" 5-1/4" 2 HOURSA4
UL DESIGN
TEST #U437
LINER PANELS
(2) LAYERS OF 5/8" TYPE 'X' GYP.
FIRE-RESISTANT RATED JOINT SEALANT
PIPE LOCATION THIS SIDE;
REFER TO MECHANICAL
C-H STUDS
(2) LAYERS OF 5/8" TYPE 'X' GYP.
DEMOLITION GENERAL NOTES
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLANS.
THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.
2. CONTRACTOR TO COMPLETE WASTE MANIFEST FORM AND PROVIDE COMPLIANCE, COORDINATE AND PROVIDE
TO THE COR.
3. CONTRACTOR TO SUBMIT A DETAILED ICRA PLAN FOR REVIEW AND APPROVAL BY THE COR AND AE PRIOR TO
CONSTRUCTION START.
4. ANY WORK WHICH WILL CAUSE NOISE AND VIBRATIONS AND IMPACT TO ADJACENT AREAS INCLUDING FLOORS
ABOVE AND BELOW MUST BE COORDINATED WITH THE COR PRIOR TO COMMENCING AND A TIME FOR THE WORK
TO BE PERFORMED MUST BE AGREED UPON WITH THE COR. WORK AND TIME SHALL BE AT NO COST PREMIUM TO
THE GOVERNMENT.
5. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT REFLECT WHAT IS NOTED IN THE
CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE ARCHITECT.
6. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION DOCUMENTS. REFER TO ALL
DISCIPLINES FOR COMPLETE DEMOLITION WORK. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND
COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.
7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS TO BE DETERMINED BY
COR WITH CONTRACTORS INPUT.
8. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT ALLOW MATERIALS AND
DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE
OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OR REMOVED ITEMS IS PERMITTED.
9. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE PUBLIC AND/OR
WORKERS ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT OR ADJACENT TO THE
PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS
PERTAINING TO SAFETY AND THE PREVENTION OF ACCIDENTS.
10. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE TO REMAIN.
11. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO COORDINATE WITH
COR.
12. DO NOT CUT AND/OR PATCH EXISTING STRUCTURAL ELEMENTS IN ANY MANNER THAN THOSE DIRECTED IN THESE
DOCUMENTS.
13. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION, REWORK AS REQUIRED, PREPARE FOR NEW
CONSTRUCTION AS REQUIRED. BLOCK PATCHING SHALL BE TOOTHED-IN TO MATCH EXISTING COURSING PATTERN.
14. WHERE WALLS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH THE WALLS ARE TO BE REMOVED OR REROUTED.
REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL DEMOLITION NOT SHOWN ON THIS
SHEET.
15. WHERE CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH THE EXISTING CEILINGS ARE TO BE REMOVED, REROUTED AND RESINSTALLED. REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL
DEMOLITION NOT SHOWN ON THIS SHEET.
16. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS WITH A ONE-HOUR FIRE RATED
TEMPORARY CONSTRUCTION BARRIER ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TEMPORARILY SEAL OFF ALL
RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION AREA. PROVIDE RECIRCULATING HEPA FILTER IN
CONSTRUCTION AREA. ALL DEMOLISHED MATERIAL IS TO BE REMOVED FROM SITE IN A COVERED CONTAINER.
NEGATIVE AIR PRESSURE TO BE MAINTAINED AND MONITORED WITHIN CONSTRUCTION ZONE DURING ENTIRE
CONSTRUCTION DURATION. ROOM PRESSURE MONITOR TO BE INSTALLED ON TEMPORARY CONSTRUCTION
BARRIER AND VALUES RECORDED. EXISTING EXHAUST FANS TO BE RUN AS NEEDED TO MAINTAIN THE NEGATIVE
PRESSURE WITHIN THE CONSTRUCTION ZONE.
17. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR SHALL CONTACT COR FOR
ABATEMENT.
18. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING DEMOLITION, BY
METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.
19. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.
20. INTERIOR WALLS TO BE REMOVED, SHALL BE REMOVED THE ENTIRE HEIGHT OF THE WALL UNLESS REQUIRED
OTHERWISE BY NEW OPENINGS IN EXISTING WALLS TO REMAIN.
21. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED FIREPROOFING MATERIAL (PLANS SHOW COLUMNS
ONLY BUT THERE COULD BE OTHER LOCATIONS SUCH AS BEAMS/GIRDERS/DECKING THAT COULD NEED PATCHING)
IN AREAS LEFT UNPROTECTED DUE TO REMOVAL OF EXISTING ELEMENTS OR AREAS DAMAGED DURING NEW WORK
AND DEMOLITION. MATCH EXISTING FIREPROOFING MATERIAL TYPE AND THICKNESS TO MAINTAIN REQUIRED
LEVEL OR PROTECTION.
PHASING GENERAL NOTES
1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS.
2. NO PHASING OVERLAP OR WORK OUT OF SEQUENCE SHALL BE ALLOWED.
3. THE CONTRACTOR IS TO DEVELOP THEIR OWN DETAIL PHASING PLAN AND PRESENT TO THE VA COR FOR FINAL APPROVAL PRIOR TO
PROJECT CONSTRUCTION START. REFER TO 01 00 00 FOR FURTHER REQUIREMENTS.
CURRENT 4/2 2026: PHASING SEQUENCE:
A. EXTERIOR SITE CIVIL
B. SUB-BASEMENT (REPLACE PUMPS, SET UP INFRASTRUCTURE FOR RISERS/INSTALLED, CONNECT TO EXISTING, AIR HANDLER CONNECTIONS)
C. INSTALL INTERIOR RISERS UP TO 7TH FLOOR AND EXTERIOR CHASE (SIXTH AND SEVENTH FLOORS)
D. INTERIOR 7TH FLOOR (NEW CHILLED WATER AND NEW CONDENSATE PIPING, DEMO CHILLED WATER BACK TO RISER CONNECT NEW
CONDENSATE TO UNITS AND EXISTING RISER)
E. INTERIOR 6TH FLOOR (NEW CHILLED WATER AND NEW CONDENSATE, , DEMO CHILLED WATER BACK TO RISER CONNECT NEW
CONDENSATE TO UNITS AND EXISTING RISER)
F. INTERIOR 5TH FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT
NEW CONDENSATE TO UNITS AND EXISTING RISER)
G. INTERIOR 4TH FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT
NEW CONDENSATE TO UNITS AND EXISTING RISER)
H. INTERIOR 3RD FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT
NEW CONDENSATE TO UNITS AND EXISTING RISER)
I. INTERIOR 2ND FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT
NEW CONDENSATE TO UNITS AND EXISTING RISER)
J. INTERIOR 1ST FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT NEW
CONDENSATE TO UNITS AND EXISTING RISER)
K. INTERIOR BASEMENT FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER
CONNECT NEW CONDENSATE TO UNITS AND EXISTING RISER)
L. DEMO CHILLED WATER RISERS AND DEMO EXISTING CONDENSATE AND INSTALL NEW CONDENSATE AND CONEECT TO NEW CONDSATE
PIPING. TO BE PHASED FOR ONLY ONE RISER AT ANY GIVEN TIME.
M. DISCONNECT SUB-BASEMENT CONNECTIONS TO EXISTING CHILLED WATER AND REPLACE WITH NEW CONDENSATE.
INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS IV
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING
NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE
CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
2. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES
MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST
RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO
GROUND AND CEILING AND SECURE FROM MOVEMENT OR
DAMAGE. APPLY TAPE THAT WILL NOT LEAVE A RESIDUE TO
SEAL GAPS BETWEEN BARRIERS, CEILING OR FLOOR.
3. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS,
INCLUDING FLOORS AND CEILING, USING APPROVED
MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR
BARRIER TYPE).
4. CONTAINMENT UNITS OR ENVIRONMENTAL CONTAINMENT
UNITS (ECUS) APPROVED FOR CLASS IV PRECAUTIONS IN
SMALL AREAS TOTALLY CONTAINED BY THE UNIT AND THAT
HAS HEPA-FILTERED EXHAUST AIR.
5. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST
ENTERING THE HVAC SYSTEM.
6. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID
POSITIVE PRESSURIZATION OF THE SPACE.
7. NEGATIVE AIRFLOW PATTERN MUST BE MAINTAINED FROM THE
ENTRY POINT TO THE ANTEROOM AND INTO THE
CONSTRUCTION AREA. THE AIRFLOW MUST CASCADE FROM
OUTSIDE TO INSIDE THE CONSTRUCTION AREA. THE ENTIRE
CONSTRUCTION AREA MUST REMAIN NEGATIVELY
PRESSURIZED.
8. MAINTAIN NEGATIVE PRESSURIZATION OF THE ENTIRE
WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED
OUTDOORS. EXHAUST DISCHARGED DIRECTLY TO THE
OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES,
AIR INTAKES AND WINDOWS DOES NOT REQUIRE HEPA-
FILTERED AIR.
9. IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE
HEPA FILTERED. PRIOR TO START OF WORK, HEPA FILTRATION
MUST BE VERIFIED BY PARTICULATE MEASUREMENT AS NO LESS
THAN 99.97% EFFICIENCY AND MUST NOT ALTER OR CHANGE
AIRFLOW/PRESSURE RELATIONSHIPS IN OTHER AREAS.
10. EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS,
OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM
EXHAUST) IS NOT ACCEPTABLE.
11. INSTALL DEVICE (DIGITAL MONITORING) ON EXTERIOR OF
WORK CONTAINMENT TO CONTINUALLY MONITOR NEGATIVE
PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR
APPARATUS ARE NOT ACCEPTABLE.
12. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.
13. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH
A HARD LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS
FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST
BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS
BEFORE LEAVING THE CONTAINED WORK AREA.
14. WORKER CLOTHING MUST BE CLEAN AND FREE OF VISIBLE
DUST BEFORE LEAVING THE WORK AREA. HEPA VACUUMING
OF CLOTHING OR USE OF COVER SUITES IS ACCEPTABLE.
15. WORKERS MUST WEAR SHOE COVERS PRIOR TO ENTRY INTO
THE WORK AREA. SHOE COVERS MUST BE CHANGED PRIOR TO
EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-
WORK AREA). DAMAGED SHOE COVERS MUST BE
IMMEDIATELY CHANGED.
16. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF
CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY
MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED.
17. IN THE EVENT THAT THERE IS A DEVIATION IN PLACE TO
DISCHARGE THE EXHAUST AIR INTO OCCUPIED SPACE (AND
NOT OUTSIDE), THEN CONSIDER PARTICULATE SAMPLING TO
HELP IDENTIFY CONTAMINANTS THAT MAY ENTER PATIENT
CARE AREAS.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION
PREVENTIONIST OR DESIGNEE AND ENGINEERING
REPRESENTATIVE FOR DISCONTINUATION OR DOWNGRADING OF
ICRA PRECAUTIONS.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL
SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING
MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST
ACCUMULATION ON UPPER SURFACES AS WELL AS AIR
DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL
WORK INVOLVING DRYWALL REMOVAL, CREATION OF
DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK.
THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA
CLEANING HAS BEEN PERFORMED.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES
MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST
RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
3. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
4. IF DUST WILL BE GENERATED DURING SCREW REMOVAL,
USE HAND-HELD HEPA VACUUM.
5. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL
PROCESS.
6. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE
REMOVING OUTER HARD BARRIER.
7. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD
BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE
CONTAMINATES FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT
ALL TIMES AND IN PLACE FOR A PERIOD AFTER
COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE
CONTAMINANTS FROM THE WORK AREA AND BEFORE
REMOVAL OF CRITICAL BARRIERS.
3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES
OF WATER GAUGE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY
MONITORED WITH A DIGITAL DISPLAY, RECORDING AND
ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION,
AND MONITORED.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE
ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND
OPERATIONAL.
3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND
AIR EXCHANGE DESIGN SPECIFICATIONS.
INFECTION CONTROL GENERAL NOTES
1. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS
OUTLINED BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL
INFORMATION.
2. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
3. PROJECT SHALL BE COMPLETED IN 3 PHASES.
4. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS
AND FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE
OF ABOVE CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR
PLATE OF THE PROJECT BOUNDARY.
5. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC)
BARRIER WALL CONSTRUCTION AND INFECTION CONTROL (IC)
MEASURES WITH COR AND PATIENT SAFETY/ INFECTION CONTROL
REPRESENTATIVE. TEMPORARY IC BARRIER WALL CONSTRUCTION
LOCATIONS IN DRAWINGS ARE APPROXIMATE. CONTRACTOR SHALL
PROVIDE DRAWING TO COR AND PATIENT SAFETY/ INFECTION
CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS
APPROVED.
6. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY
COR AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN.
PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE
CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED
ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
7. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF
5:00 PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK
WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED
AND STORED IN A SAFE MANNER UNTIL CEILING TILES CAN BE
REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR.
8. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE
MAINTAINED DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION
FOR HOURS OF OPERATION.
9. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE
BETWEEN THE HOURS OF 8:00 AM AND 5:00 PM. EVERY EFFORT SHALL
BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
10. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY
DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS
NECESSARY
11. PROVIDE THE VA OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
12. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP
VAC, MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON
AGGRESSIVE LIQUIDS UP TO 30 GALLONS.
13. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE
COVERED WITH 4 MIL. POLY SHEET.
14. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA
APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR
SUCH PURPOSED WITH A LID.
15. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE
PROPERLY STORED IN DESIGNATED AREAS AND IN APPROVED
CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE
FACILITY.
16. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL PLAN NOTES
1. PROVIDE 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION PER NFPA 241. REFER TO DETAIL THIS SHEET.
2. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL CONSTRUCTION ONLY WHEN AND WHERE ALLOWED PER CLASS. REFER
TO DETAIL THIS SHEET FOR ADDITIONAL INFORMATION.
INFECTION CONTROL RISK ASSESSMENT NOTES -
CLASS III
DURING CONSTRUCTION PROJECT
UPON COMPLETION OF PROJECT
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST DISPERSION INTO THE OCCUPIED AREAS.
2. MEANS FOR CONTROLLING MINIMAL DUST DISPERSION MAY INCLUDE HAND-HELD HEPA
VACUUM DEVICES, POLYETHYLENE PLASTIC CONTAINMENT, OR ISOLATION OF WORK AREA BY
CLOSING ROOM DOOR.
3. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST FROM ENTERING THE HVAC SYSTEM.
4. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID POSITIVE PRESSURIZATION OF THE
SPACE,
5. IF WORK AREA IS CONTAINED, THEN IT MUST BE NEGATIVELY PRESSURIZED AT ALL TIMES.
6. SEAL ALL DOORS WITH TAPE THAT WILL NOT LEAVE RESIDUE.
7. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO
TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE
DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED
WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON
FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR
HEPA VACUUMING SURFACES.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST OR DESIGNEE AND ENGINEERING
REPRESENTATIVE FOR DISCONTINUATION OR DOWNGRADING OF ICRA PRECAUTIONS.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND
FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS WELL
AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE
REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT
PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:
3. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
4. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.
5. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
6. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.
7. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINATES FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER
COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND
BEFORE REMOVAL OF CRITICAL BARRIERS.
3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION, AND MONITORED.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK
IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
6 MIL POLY
EQUIPMENT OR
FURNISHING
6 MIL POLY
WALL OPENING
CRITICAL BARRIER
WALL PROTRUSION
SEAL WITH DUCT TAPE
ALL SIDES.
CEILING
6 MIL POLY CRITICAL
BARRIER CEILING
PENETRATION
NOTE: ALL CORNERS TO
FORM 90 DEGREE ANGLE
WITH NO RADIUS
SEAL WITH DUCT TAPE.
ALL SIDES
WINDOWDOOR
BEYOND
SEAL ALL CRACKS WITH
DUCT 6 MIL POLY
CRITICAL BARRIER
OVER WINDOWS.
SEAL ALL CRACKS WITH
DUCT 6 MIL POLY CRITICAL
BARRIER OVER WINDOWS.
FLOOR
EXISTING DECK
SEAL PERIMETER: RED
PLASTIC TAPE EXISTING FINISHED
FLOOR
EXISTING FINISHED FLOOR
OCCUPIED SIDE
OF BARRIER
''WORK'' SIDE
OF BARRIER
CONTINUOUS 6 MIL POLYETHLENE
SHEE BARRIER
PROVIDE BASE PAINTERS TAPE AT ALL END
CONDITIONS WTIH RED PLASTIC TAPE TO
PROVIDE A CONTINOUS SEALED SPACE
SEAL PERIMETER: RED PLASTIC TAPE
BASIS OF DESIGN: STARC
FIREBLOCK WALL TEMPORARY
WALL PARTITION AND DOOR
SYSTEM. DOOR TO BE KEYED TO
VA FRESNO STANDARD
CONSTRUCTION KEY SYSTEM
INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS II
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE
VISIBLE FROM OUTSIDE THE WORKSITE AND READINGS
SHOULD BE DOCUMENTED AS LEAST DAILY.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
6. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF
WORK AREA.
7. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN
COVERED CONTAINERS
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED BY THE SAFETY DEPARTMENT AND INFECTION
PREVENTION & CONTROL AND THOROUGHLY CLEANED BY THE
ENVIRONMENTAL MANAGEMENT SERVICE.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4. WET MOP AREA WITH CLEANER/DISINFECTANT.
5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS
PERFORMED.
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:5
P M
SCALE: As indicated
AD001
DEMOLITION, PHASING, ICRA
GENERAL NOTES & DETAILS
SCALE: 1 1/2" = 1'-0"
NON-FIRE RATED TEMPORARY WALL SEPARATION PARTITION
SCALE: 1 1/2" = 1'-0"
WALL TYPE A4 SHAFTWALL
SCALE: 3/8" = 1'-0"
CRITICAL BARRIER PREP INSALLATION
SCALE: 1 1/2" = 1'-0"
ONE HOUR RATED TEMPORARY WALL PARTITION
Revisions: Date:
BID SET 05/04/2026
ICRA GENERAL NOTES
1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
A D B
B2A03
MECH EQUIP. ROOM
1B09
AIR INTAKE
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:5
P M
SCALE: As indicated
AD101A
SUB-BASEMENT DEMO PLAN -
AREA A
NORTH
SCALE: 1/8" = 1'-0"
SUB-BASEMENT DEMOLITION
FLOOR PLAN - UNIT A
DEMOLITION KEY NOTES
NO. DESCRIPTION
12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.
NOTE: THIS AREA TO BE CLASS III ICRA
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
A D A
A D A
B2A08A
BATTERY CHARGING
ROOM
B2A08
EMS STORAGE
B2A07
EMS SUPERVISOR'S
B2A03
MECH EQUIP. ROOM
B2A08
EMS STORAGE
B2A04
POLICE VAULT
B2A03
MECH EQUIP. ROOM
1B09
AIR INTAKE
SB-5
ELECTRIC SHOP
B2A01A
HVAC/ELECTRICAL
OFFICE
B2A01
ENGINEERING SHOP
B2A03
MECH EQUIP. ROOM
B2A01B
STORAGE
B2A11
CORRIDOR
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:5
P M
SCALE: As indicated
AD101B
SUB-BASEMENT DEMO PLAN -
AREA B
DEMOLITION KEY NOTES
NO. DESCRIPTION
12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.
14 SAWCUT, REMOVE & DISPOSE OF EXISTING CONCRETE HOUSEKEEPING PADS AS REQUIRED BY
MECHANICAL. PREP FLOOR FOR NEW FINISHES. COORDINATE WORK WITH ALL OTHER TRADES.
NORTH
SCALE: 1/8" = 1'-0"
SUB-BASEMENT DEMOLITION
FLOOR PLAN - UNIT B
NOTE: THIS AREA TO BE CLASS III ICRA
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
A D B
2 3
1 1
EXPOSED
STRUCTURE
ABOVE
B1B10
EMS OFFICE
B1B11
CUSTOMER SUPPORT
B1B11A
IRM OFFICE
B1B08
MECHANICAL
B1B09
CHASE
B1B06A
ELECTRICAL UPS
B1B12
B1B16
LAUNDRY SUITE
B1B16D
OFFICE
B1B16C
STORAGE
B1B-5
CORRIDOR
B1B35
Room
B1B16G2
SOILED LAUNDRY
B1B15
CLOTHING ROOM
LOST & FOUND
B1B14
IRM CUSTOMER
SUPPORT
B1B14A
SERVER ROOM
B1B-3
CORRIDOR
B1A01
SUITE
B1B-4
CORRIDOR
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:0
P M
SCALE: As indicated
AD102A
BASEMENT DEMO PLAN - AREA A
DEMOLITION KEY NOTES
NO. DESCRIPTION
1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:
ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]
2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY.
3 REMOVE EXISTING ADHERED ACOUSTICAL CEILING ATTACHED TO SUSPENDED GYPSUM OR CEMENT PLASTER SUSPENDED CEILING AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLED WATER SYSTEM. PATCH AND REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY.
12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.
NORTH
SCALE: 1/8" = 1'-0"
BASEMENT FLOOR DEMOLITION
PLAN - UNIT A
NOTE: THIS AREA TO BE CLASS IV ICRA
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
A D A
A D A
EXPOSED STRUCTURE ABOVE
EXPOSED
STRUCTURE
ABOVE
EXPOSED
STRUCTURE
ABOVE
EXPOSED
STRUCTURE
ABOVE
EXPOSED
STRUCTURE
ABOVE
2 1
EXPOSED
STRUCTURE
ABOVE
B1A13
TELECOMMUNICATION
OFFICE
B1A12
TELEPHONE
OPERATORS
REFRIG.
REFRIG.
MEAL
PRE-PREP
COLD BOX 7
B1A-4
CORRIDOR
BOX 5
COLD
CHEFS
COLD BOX 1
B1A10
EAT PREP.
B1A08
NUTRITION & FOOD
KITCHEN
PREPARATION
AREA
KITHCEN
DISHWASH
AREA
KITCHEN
B1A04
CHEMICAL
STORAGE
NO.3
DUMBWAITER
STORES
DRY
B1A01A
OFFICE
B1A01.1
OFFICE
1A85
HEALTH
INFORMATION
MANAGEMENT
B1A01
SUITE
B1A01.4
VESTIBULE
B1A-1
CORRIDOR
B1A02
LAUNDRY CHUTE
P-1
PASSENGER
ELEVATOR
P-2
PASSENGER
ELEVATOR
P-3
ELEVATOR LOBBY
B1A-2
CORRIDOR
B1A-3
CORRIDOR
B1B-2
CORRIDOR
B1B10
EMS OFFICE
B1B11
CUSTOMER SUPPORT
B1B11A
IRM OFFICE
B1B07
BIOMEDICAL
ENGINEERING
B1B08
MECHANICAL
NO.4
DUMBWAITER
B1B02
CANTEEN STORAGE
B1A03
MECHANICAL
B1B09
CHASE
B1B06A
ELECTRICAL UPS
B1B06
ELECTRICAL VAULT
B1B05
MECHANICAL
CLOSET
B1B-8
Room
B1B-7
Room
B1B-6
Room
B1B-1
CORRIDOR
B1B12
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:0
P M
SCALE: As indicated
AD102B
BASEMENT DEMO PLAN - AREA B
DEMOLITION KEY NOTES
NO. DESCRIPTION
1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:
ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]
2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY.
12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.
NORTH
SCALE: 1/8" = 1'-0"
BASEMENT FLOOR DEMOLITION
PLAN - UNIT B
NOTE: THIS AREA TO BE CLASS IV ICRA
F
1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
A D B
1B11
PHARMACY
CHECK-IN AREA
1B-4
CORRIDOR
1A03
ELIGIBILITY
1A04
ELIGIBILITY
Room
3B10K.2
STORAGE
1B-5
CORRIDOR
1B15
VCS RETAIL STORE
1B16
VCS STOCK RM
1B20
CAFETERIA
1B20D
CAFETERIA FOOD
COURT
1B20E
CAFETERIA DINING
1B20B
STORAGE
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:0
P M
SCALE: As indicated
AD103A
FIRST FLOOR DEMO PLAN - AREA
A
DEMOLITION KEY NOTES
NO. DESCRIPTION
1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:
ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]
12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION
PLAN - UNIT A
NOTE: THIS AREA TO BE CLASS IV ICRA
1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
A D A
A D A
1 1
1 1
2 2
1B06
INPATIENT
PHARMACY SUITE
1B06A
PHARMACY SUPPLY
& PROCUREMENT
1B03
STAIR NO. 2
1B06I
INPATIENT
PHARMACY
1B08
PHARMACY REFILL
CONSULTATION
1B-3
CORRIDOR
1B02
PHARMACY SVC
1B-2
CORRIDOR
1A01
ELEVATOR LOBBY
1B11
PHARMACY
CHECK-IN AREA
1B-4
CORRIDOR
1A08
HEALTHY VET
1A16A
BAS
1A-2
CORRIDOR
1A01A
CHECK IN
1A02
ELIGIBILITY
2A13D
Room
1A03
ELIGIBILITY
1A04
ELIGIBILITY
1A09A
DAV
1A09
SVC OFFICES
1A06
TOILET
1A11
TOILET
1A12
STORAGE
1A09D
AMVETS
1A15
EMPLOYEE HEALTH
E116A
PRIMARY CARE
1A15B
TOILET
1A15A.1
TOILET
1A-3
CORRIDOR
1A18
WAITING ROOM
1A18J
TOILET
1A18A
POLICE ADMIN.
OFFICE
1A18F
PATIENT ADVOCATE
1A18B
POLICE OFFICE
Room
3B10K.2
STORAGE
1A07
HOUSEKEEPING
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:2
:4
P M
SCALE: As indicated
AD103B
FIRST FLOOR DEMO PLAN - AREA
B
DEMOLITION KEY NOTES
NO. DESCRIPTION
1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:
ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]
2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY.
3 REMOVE EXISTING ADHERED ACOUSTICAL CEILING ATTACHED TO SUSPENDED GYPSUM OR CEMENT PLASTER SUSPENDED CEILING AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLED WATER SYSTEM. PATCH AND REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY.
12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
- UNIT B
NOTE: THIS AREA TO BE CLASS IV ICRA
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
1 1 1
1 1
A D B
2B13
ANATOMIC
PATHOLOGY
2B24B
MICROBIOLOGY
LAB
2B24E
AUTOCLAVE
2B24C
TOILET
2B24
CLINICAL
LABORATORY
2B23
SPECIMEN
COLLECTION
2B18
PATHOLOGY/LAB
MEDICINE
2B-2
CORRIDOR
2B19A
CONFERENCE
2B21
ANCILLARY TESTING
COORD.
2B-2
CORRIDOR
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:1
P M
SCALE: As indicated
AD104A
SECOND FLOOR DEMO PLAN -
AREA A
DEMOLITION KEY NOTES
NO. DESCRIPTION
1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:
ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]
2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF
CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS
NECESSARY.
4 REMOVE A PORTION OF EXISTING CASEWORK AND COUNTERTOP AS REQUIRED FOR NEW
CONSTRUCTION. TURN OVER TO OWNER UNLESS DIRECTED OTHERWISE. PATCH AND REPAIR EXPOSED
SURFACES TO REMAIN AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.
12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.
NORTH
SCALE: 1/8" = 1'-0"
SECOND FLOOR DEMOLITION
PLAN - UNIT A
NOTE: THIS AREA TO BE CLASS IV ICRA
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION
WORK.
3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,
EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR
CLASS III.
4. ALL EXTERIOR WORK TO BE CLASS II ICRA.
5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED
COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY
PARTITION IS CALLED OUT.
6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION
OPERATIONS.
7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR APPROVAL.
DEMO/ICRA LEGEND
TEMPORARY WALL (REFER TO WALL TYPES)
AREA OF SAWCUT FLOOR SLAB DEMOLITION
(REFER TO STRUCTURAL)
AREA NOT IN PROJECT SCOPE
NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.
1 1 1 1
1 1 1
A D A
A D A
1 1
1 1
2B10A
RADIOLOGY ROOM
2B10C
TOILET
2B10
CONTROL RM
2B-1
CORRIDOR
2B11
STORAGE/DUMBWAITER
2B12
CHANGING RM
2B03
STORAGE/DUMBWAITER
2B-1
CORRIDOR
2B13A
STORAGE
2B13
ANATOMIC
PATHOLOGY
2B29
IMAGING X-RAY
WAITING ROOM
2A11
IMAGING ADPAC
2B29
IMAGING X-RAY
WAITING ROOM
2A07A
ELEC.
2A07B
MRI CONTROL
ROOM/WORK AREA
2A06
TOILET
2A08
TOILET
2A09A
CLEAN SUPPLY
2A09
ULTRASOUND SUITE
2A09B
ULTRASOUND 2
2A13
SPECIAL
PROOCEDURES
PRE/POST
OPERATIVE
3A-6
GURNEY STORAGE
2A13B
SPECIAL
PROCEDURES O.R.
2A16B
CHIEF IMAGING
2A-1
CORRIDOR
2A16A
ADMN. ASSIST.
2A16
IMAGING SUITE
2A20
VSO OFFICE
2A23
ULTRASOUND ROOM
2A16E
OFFICE2A16D
OFFICE
2A25A
ULTRASOUND ROOM
2A25
ULTRASOUND
OFFICE
2A27J
IMAGINE OFFICE
2A27A
COPY RM
2A27
CORRIDOR
2A27H
IMAGING ADMIN
2A27K
TOILET
A
B architecture +engineering
SEVEN
GENERATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
570-20-308REPLACE AND EXPAND CHILLED
WATER INFRASTRUCTURE,
BUILDING 1 AND OPC N/A
TCMH05/04/2026
FRESNO VA HOSPITAL
2615 E. CLINTON AVE, FRESNO, CA 93703
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVE., SUITE B
KALAMAZOO, MI 49007
269-927-0144
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE 1
SAN DIEGO, CA 22108
612-770-8552
A/E:
A u to d e s k D o c s /2
V A
F re s n o C h ill e d
W a te r
In fr a s tr u c tu re /2
V
A F re s n o
C h ill e d
W a te r
In fr a s tr u c tu re
A R
C H
-R
.r v t
/4
/2
:1
:1
P M
SCALE: As indicated
AD104B
SECOND FLOOR DEMO PLAN -
AREA B
DEMOLITION KEY NOTES
NO. DESCRIPTION
1 REMOVE…