90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part2.pdf

PDF 20 MB Posted

Attached to
Z2DA--570-20-308 - Replace and Expand Chilled Water Infrastructure in Building 1 | Construction Services Procurement
Solicitation number
36C26126R0028
Issued by

About this file

These are architectural and engineering drawings for a federal construction project at Fresno VA Hospital. The project, titled "Replace and Expand Chilled Water Infrastructure, Building 1 and OPC," involves comprehensive renovation and expansion of the facility's chilled water systems across multiple floors and buildings.

The drawings include structural plans for the sixth and seventh floors, showing mechanical shaft openings, beam reinforcements, and concrete wall construction details. Demolition plans span from sub-basement through seventh floor, detailing removal of acoustical ceilings, gypsum board, floor decks, concrete slabs, and casework across both Unit A and Unit B areas. Infection control risk assessment (ICRA) precautions are classified as Class II, III, and IV depending on floor location, with specific requirements for critical barriers, negative air pressure maintenance, HEPA filtration, and dust containment during construction. Floor plans show room layouts and modifications across all levels, reflected ceiling plans indicate new suspended acoustic tile and finished gypsum board ceilings with lighting and HVAC fixture locations, and interior elevations provide detailed construction at key locations. General notes specify UL-rated wall construction, blocking provisions for owner equipment, moisture-resistant board for plumbing areas, fireproofing requirements, and lead lining installation where applicable. The project is issued as a Bid Set dated 05/04/2026, with Simpson Gumpertz & Heger serving as the A/E consultant and DavEnergy Solutions as the designer of record. Fire protection scope drawings indicate areas requiring removal of existing upright sprinklers and installation of new pendent sprinklers per NFPA 13 standards.

View the file

Other files

File Type Posted
Wage Determinaton CA202600148 07.14.26.pdf PDF
36C26126R0028 0007.docx DOCX document
36C26126R0028 0006.docx DOCX document
90209 - 570-20-308 - VA CA Fresno CHW - ASI-01 Drawings- 20260724.pdf PDF
RFI LOG UPDATE AMENDMENT 005.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno CHW - ASI 01 - 20260724.pdf PDF
36C26126R0028 0005.docx DOCX document
36C26126R0028 0004.docx DOCX document
36C26126R0028 -0003.docx DOCX document
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.pdf PDF
Construction Clause 52.212-4.docx DOCX document
Attachment C - Key Personnel Evaluation 36C26126R0028.docx DOCX document
36C26126R0028-0002.docx DOCX document
RFI LOG UPDATE AMENDMENT 003.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504r1.pdf PDF
VA Specific Clause Payments Fixed Price Construction.docx DOCX document
36C26126R0028 0003.docx DOCX document
VA Specific Clause Payments under Fixed Price Construction.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part1.pdf PDF
Construction 52.212-4.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part2.pdf PDF
RFI LOG UPDATE AMENDMENT 002.xlsx XLSX spreadsheet
36C26126R0028 0002.docx DOCX document
36C26126R0028 Site Visit Log In Sheet.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Summary - 20260701.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Narrative - 20260701.pdf PDF
Question RFI No. 4 - Asbestos Abatement Scope and Allowance.docx DOCX document
RFI LOG.xlsx XLSX spreadsheet
Question RFI No. 7 - Buy American Domestic Materials.docx DOCX document
Question RFI No. 12 - Temporary Pumps Piping.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Drawings - 20260701.pdf PDF
36C26126R0028 0001.docx DOCX document
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING DEV 2023.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bid Set Basis Of Design - 20260504.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
36C26126R0028_1.docx DOCX document
ID Me Information.docx DOCX document
Attachment E - Past Performance Questionnaire.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part3.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.doc DOC document
Attachment B - EMR Sheet.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504.pdf PDF
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part1.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
Site Visit Location Details.pdf PDF
852.219-75 Fillable.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9

D

E

F

G

A

B

C

21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"±

21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"±

MECHANICAL SHAFT OPENING IN

(E) CONCRETE SLAB, SEE

COORDINATE FINAL SIZE AND

LOCATION WITH MEP DRAWINGS.

/8 S-030

(E

W F

(E

W F

(E) 21WF62

W12x40

W12x40

W x

(E

W F

REMOVE CONCRETE ENCASEMENT

FROM (E) BEAM AND PROVIDE STD

SHEAR CONNECTION, TYP.

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A/E:

321 4 5 6 7 8 9 10

SIMPSON GUMPERTZ & HEGER

757 S ALAMEDA ST, SUITE 440

LOS ANGELES, CA 90021

213-271-2000

NOT F

OR

CONSTRUCTIO

NDAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

/1

/2

:4

:4

P M

C U s e rs

\t tc h a n g

\D o c u m e n ts \R e v it \2

\2

C

H

IL

S

E

R to ri tc h a n g

.r v t

BID SET 570-20-308

S-108A

SGHSGH

FRESNO VA HOSPITAL

2615 E CLINTON AVE, FRESNO, CA 93703

REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC

05/04/2026

SIXTH FLOOR STRUCTURAL PLAN

- AREA A

Approver

1/8" = 1'-0"

SIXTH FLOOR STRUCTURAL PLAN - AREA A

A

B

BID SET 05/04/2026

NO

T F O

R C O

NSTRUCTIO

N

7 8 9 10

D

E

F

G

1817161514131211

A

B

C

21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 20'-11 1/4"±

21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 21'-0"± 20'-11 1/4"±

(E

W F

8" REINFORCED

CONCRETE

ENCLOSURE WALL

PROVIDE DOWELS BETWEEN

(E) AND (N) CONCRETE WALL

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

DESIGNER OF RECORD STAMPCONSULTANT

Revisions: Date:

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A/E:

321 4 5 6 7 8 9 10

SIMPSON GUMPERTZ & HEGER

757 S ALAMEDA ST, SUITE 440

LOS ANGELES, CA 90021

213-271-2000

NOT F

OR

CONSTRUCTIO

NDAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

619-770-8552

/1

/2

:4

:4

P M

C U s e rs

\t tc h a n g

\D o c u m e n ts \R e v it \2

\2

C

H

IL

S

E

R to ri tc h a n g

.r v t

BID SET 570-20-308

S-109B

SGHSGH

FRESNO VA HOSPITAL

2615 E CLINTON AVE, FRESNO, CA 93703

REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC

05/04/2026

SEVENTH FLOOR STRUCTURAL

PLAN - AREA B

Approver

1/8" = 1'-0"

SEVENTH FLOOR STRUCTURAL PLAN - AREA B

A

B

BID SET 05/04/2026

NO

T F O

R C O

NSTRUCTIO

N

EXISTING CEILING

SEAL PERIMETER;

RED PLASTIC TAPE

EXISTING FINISHED

FLOOR

CLOSE OPEN DUCTS WITH 6

MIL POLYETHLENE BARRIER.

SEAL EDGES WITH

CONTINUOUS DUCT TAPE

CLOSE INTERSTITIAL SPACE WITH

6 MIL POLYETHLENE BARRIER.

SEAL ALL JOINTS, PENETRATIONS

AND ENTIRE PERIMETER OF

BARRIER WITH CONTINUOUS RED

PLASTIC TAPE; TYP.

CONTINUOUS FIRE

RETARDANT TREATED

WOOD NAILER

BASE PAINTERS TAPE

PROVIDE (2) ZIPPERS @ 36"

APART TO MAKE OPENING

BASE PAINTERS TAPE AND

SEAL PERIMETER w/ RED

PLASTIC TAPE; TYP

PROVIDE BASE PAINTERS TAPE AT

ALL END CONDITIONS WITH RED

PLASTIC TAPE TO PROVIDE A

CONTIUNOUS SEALED SPACE

CONTINUOUS 6 MIL

POLYETHLENE SHEET BARRIER

C-H STUDS

CEILING LINE

FLOOR LINE

UNDERSIDE OF DECK

STEEL STUD CHANNEL

RUNNER FASTENED TO

FLOOR/DECK

REFERENCE FINISH SCHEDULE

FOR BASE MATERIAL

STEEL STUD TRACK PROFILE

RUNNER FASTENED TO FLOOR

/2

PLAN

TYPE STUD SIZE

PARTITION

WIDTH

FIRE RATING

NOTES

FIRE-RESISTANT RATED JOINT SEALANT

4" 5-1/4" 2 HOURSA4

UL DESIGN

TEST #U437

LINER PANELS

(2) LAYERS OF 5/8" TYPE 'X' GYP.

FIRE-RESISTANT RATED JOINT SEALANT

PIPE LOCATION THIS SIDE;

REFER TO MECHANICAL

C-H STUDS

(2) LAYERS OF 5/8" TYPE 'X' GYP.

DEMOLITION GENERAL NOTES

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLANS.

THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

2. CONTRACTOR TO COMPLETE WASTE MANIFEST FORM AND PROVIDE COMPLIANCE, COORDINATE AND PROVIDE

TO THE COR.

3. CONTRACTOR TO SUBMIT A DETAILED ICRA PLAN FOR REVIEW AND APPROVAL BY THE COR AND AE PRIOR TO

CONSTRUCTION START.

4. ANY WORK WHICH WILL CAUSE NOISE AND VIBRATIONS AND IMPACT TO ADJACENT AREAS INCLUDING FLOORS

ABOVE AND BELOW MUST BE COORDINATED WITH THE COR PRIOR TO COMMENCING AND A TIME FOR THE WORK

TO BE PERFORMED MUST BE AGREED UPON WITH THE COR. WORK AND TIME SHALL BE AT NO COST PREMIUM TO

THE GOVERNMENT.

5. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT REFLECT WHAT IS NOTED IN THE

CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE ARCHITECT.

6. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION DOCUMENTS. REFER TO ALL

DISCIPLINES FOR COMPLETE DEMOLITION WORK. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND

COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.

7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS TO BE DETERMINED BY

COR WITH CONTRACTORS INPUT.

8. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT ALLOW MATERIALS AND

DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE

OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OR REMOVED ITEMS IS PERMITTED.

9. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE PUBLIC AND/OR

WORKERS ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT OR ADJACENT TO THE

PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS

PERTAINING TO SAFETY AND THE PREVENTION OF ACCIDENTS.

10. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE TO REMAIN.

11. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO COORDINATE WITH

COR.

12. DO NOT CUT AND/OR PATCH EXISTING STRUCTURAL ELEMENTS IN ANY MANNER THAN THOSE DIRECTED IN THESE

DOCUMENTS.

13. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION, REWORK AS REQUIRED, PREPARE FOR NEW

CONSTRUCTION AS REQUIRED. BLOCK PATCHING SHALL BE TOOTHED-IN TO MATCH EXISTING COURSING PATTERN.

14. WHERE WALLS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH THE WALLS ARE TO BE REMOVED OR REROUTED.

REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL DEMOLITION NOT SHOWN ON THIS

SHEET.

15. WHERE CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH THE EXISTING CEILINGS ARE TO BE REMOVED, REROUTED AND RESINSTALLED. REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL

DEMOLITION NOT SHOWN ON THIS SHEET.

16. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS WITH A ONE-HOUR FIRE RATED

TEMPORARY CONSTRUCTION BARRIER ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TEMPORARILY SEAL OFF ALL

RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION AREA. PROVIDE RECIRCULATING HEPA FILTER IN

CONSTRUCTION AREA. ALL DEMOLISHED MATERIAL IS TO BE REMOVED FROM SITE IN A COVERED CONTAINER.

NEGATIVE AIR PRESSURE TO BE MAINTAINED AND MONITORED WITHIN CONSTRUCTION ZONE DURING ENTIRE

CONSTRUCTION DURATION. ROOM PRESSURE MONITOR TO BE INSTALLED ON TEMPORARY CONSTRUCTION

BARRIER AND VALUES RECORDED. EXISTING EXHAUST FANS TO BE RUN AS NEEDED TO MAINTAIN THE NEGATIVE

PRESSURE WITHIN THE CONSTRUCTION ZONE.

17. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR SHALL CONTACT COR FOR

ABATEMENT.

18. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING DEMOLITION, BY

METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

19. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.

20. INTERIOR WALLS TO BE REMOVED, SHALL BE REMOVED THE ENTIRE HEIGHT OF THE WALL UNLESS REQUIRED

OTHERWISE BY NEW OPENINGS IN EXISTING WALLS TO REMAIN.

21. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED FIREPROOFING MATERIAL (PLANS SHOW COLUMNS

ONLY BUT THERE COULD BE OTHER LOCATIONS SUCH AS BEAMS/GIRDERS/DECKING THAT COULD NEED PATCHING)

IN AREAS LEFT UNPROTECTED DUE TO REMOVAL OF EXISTING ELEMENTS OR AREAS DAMAGED DURING NEW WORK

AND DEMOLITION. MATCH EXISTING FIREPROOFING MATERIAL TYPE AND THICKNESS TO MAINTAIN REQUIRED

LEVEL OR PROTECTION.

PHASING GENERAL NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS.

2. NO PHASING OVERLAP OR WORK OUT OF SEQUENCE SHALL BE ALLOWED.

3. THE CONTRACTOR IS TO DEVELOP THEIR OWN DETAIL PHASING PLAN AND PRESENT TO THE VA COR FOR FINAL APPROVAL PRIOR TO

PROJECT CONSTRUCTION START. REFER TO 01 00 00 FOR FURTHER REQUIREMENTS.

CURRENT 4/2 2026: PHASING SEQUENCE:

A. EXTERIOR SITE CIVIL

B. SUB-BASEMENT (REPLACE PUMPS, SET UP INFRASTRUCTURE FOR RISERS/INSTALLED, CONNECT TO EXISTING, AIR HANDLER CONNECTIONS)

C. INSTALL INTERIOR RISERS UP TO 7TH FLOOR AND EXTERIOR CHASE (SIXTH AND SEVENTH FLOORS)

D. INTERIOR 7TH FLOOR (NEW CHILLED WATER AND NEW CONDENSATE PIPING, DEMO CHILLED WATER BACK TO RISER CONNECT NEW

CONDENSATE TO UNITS AND EXISTING RISER)

E. INTERIOR 6TH FLOOR (NEW CHILLED WATER AND NEW CONDENSATE, , DEMO CHILLED WATER BACK TO RISER CONNECT NEW

CONDENSATE TO UNITS AND EXISTING RISER)

F. INTERIOR 5TH FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT

NEW CONDENSATE TO UNITS AND EXISTING RISER)

G. INTERIOR 4TH FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT

NEW CONDENSATE TO UNITS AND EXISTING RISER)

H. INTERIOR 3RD FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT

NEW CONDENSATE TO UNITS AND EXISTING RISER)

I. INTERIOR 2ND FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT

NEW CONDENSATE TO UNITS AND EXISTING RISER)

J. INTERIOR 1ST FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER CONNECT NEW

CONDENSATE TO UNITS AND EXISTING RISER)

K. INTERIOR BASEMENT FLOOR, TWO PHASES (NEW CHILLED WATER AND NEW CONDENSATE, DEMO CHILLED WATER BACK TO RISER

CONNECT NEW CONDENSATE TO UNITS AND EXISTING RISER)

L. DEMO CHILLED WATER RISERS AND DEMO EXISTING CONDENSATE AND INSTALL NEW CONDENSATE AND CONEECT TO NEW CONDSATE

PIPING. TO BE PHASED FOR ONLY ONE RISER AT ANY GIVEN TIME.

M. DISCONNECT SUB-BASEMENT CONNECTIONS TO EXISTING CHILLED WATER AND REPLACE WITH NEW CONDENSATE.

INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS IV

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

1. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING

NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE

CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK

ABOVE.

2. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES

MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST

RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO

GROUND AND CEILING AND SECURE FROM MOVEMENT OR

DAMAGE. APPLY TAPE THAT WILL NOT LEAVE A RESIDUE TO

SEAL GAPS BETWEEN BARRIERS, CEILING OR FLOOR.

3. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS,

INCLUDING FLOORS AND CEILING, USING APPROVED

MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR

BARRIER TYPE).

4. CONTAINMENT UNITS OR ENVIRONMENTAL CONTAINMENT

UNITS (ECUS) APPROVED FOR CLASS IV PRECAUTIONS IN

SMALL AREAS TOTALLY CONTAINED BY THE UNIT AND THAT

HAS HEPA-FILTERED EXHAUST AIR.

5. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST

ENTERING THE HVAC SYSTEM.

6. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID

POSITIVE PRESSURIZATION OF THE SPACE.

7. NEGATIVE AIRFLOW PATTERN MUST BE MAINTAINED FROM THE

ENTRY POINT TO THE ANTEROOM AND INTO THE

CONSTRUCTION AREA. THE AIRFLOW MUST CASCADE FROM

OUTSIDE TO INSIDE THE CONSTRUCTION AREA. THE ENTIRE

CONSTRUCTION AREA MUST REMAIN NEGATIVELY

PRESSURIZED.

8. MAINTAIN NEGATIVE PRESSURIZATION OF THE ENTIRE

WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED

OUTDOORS. EXHAUST DISCHARGED DIRECTLY TO THE

OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES,

AIR INTAKES AND WINDOWS DOES NOT REQUIRE HEPA-

FILTERED AIR.

9. IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE

HEPA FILTERED. PRIOR TO START OF WORK, HEPA FILTRATION

MUST BE VERIFIED BY PARTICULATE MEASUREMENT AS NO LESS

THAN 99.97% EFFICIENCY AND MUST NOT ALTER OR CHANGE

AIRFLOW/PRESSURE RELATIONSHIPS IN OTHER AREAS.

10. EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS,

OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM

EXHAUST) IS NOT ACCEPTABLE.

11. INSTALL DEVICE (DIGITAL MONITORING) ON EXTERIOR OF

WORK CONTAINMENT TO CONTINUALLY MONITOR NEGATIVE

PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR

APPARATUS ARE NOT ACCEPTABLE.

12. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.

13. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH

A HARD LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS

FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST

BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS

BEFORE LEAVING THE CONTAINED WORK AREA.

14. WORKER CLOTHING MUST BE CLEAN AND FREE OF VISIBLE

DUST BEFORE LEAVING THE WORK AREA. HEPA VACUUMING

OF CLOTHING OR USE OF COVER SUITES IS ACCEPTABLE.

15. WORKERS MUST WEAR SHOE COVERS PRIOR TO ENTRY INTO

THE WORK AREA. SHOE COVERS MUST BE CHANGED PRIOR TO

EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-

WORK AREA). DAMAGED SHOE COVERS MUST BE

IMMEDIATELY CHANGED.

16. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF

CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY

MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY

SOILED.

17. IN THE EVENT THAT THERE IS A DEVIATION IN PLACE TO

DISCHARGE THE EXHAUST AIR INTO OCCUPIED SPACE (AND

NOT OUTSIDE), THEN CONSIDER PARTICULATE SAMPLING TO

HELP IDENTIFY CONTAMINANTS THAT MAY ENTER PATIENT

CARE AREAS.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION

PREVENTIONIST OR DESIGNEE AND ENGINEERING

REPRESENTATIVE FOR DISCONTINUATION OR DOWNGRADING OF

ICRA PRECAUTIONS.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL

SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING

MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST

ACCUMULATION ON UPPER SURFACES AS WELL AS AIR

DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL

WORK INVOLVING DRYWALL REMOVAL, CREATION OF

DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK.

THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA

CLEANING HAS BEEN PERFORMED.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES

MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST

RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

3. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

4. IF DUST WILL BE GENERATED DURING SCREW REMOVAL,

USE HAND-HELD HEPA VACUUM.

5. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL

PROCESS.

6. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE

REMOVING OUTER HARD BARRIER.

7. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD

BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE

CONTAMINATES FROM THE WORK AREA.

2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT

ALL TIMES AND IN PLACE FOR A PERIOD AFTER

COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE

CONTAMINANTS FROM THE WORK AREA AND BEFORE

REMOVAL OF CRITICAL BARRIERS.

3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES

OF WATER GAUGE WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY

MONITORED WITH A DIGITAL DISPLAY, RECORDING AND

ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON

INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION,

AND MONITORED.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE

ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND

OPERATIONAL.

3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND

AIR EXCHANGE DESIGN SPECIFICATIONS.

INFECTION CONTROL GENERAL NOTES

1. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS

OUTLINED BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL

INFORMATION.

2. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

3. PROJECT SHALL BE COMPLETED IN 3 PHASES.

4. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS

AND FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE

OF ABOVE CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

5. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC)

BARRIER WALL CONSTRUCTION AND INFECTION CONTROL (IC)

MEASURES WITH COR AND PATIENT SAFETY/ INFECTION CONTROL

REPRESENTATIVE. TEMPORARY IC BARRIER WALL CONSTRUCTION

LOCATIONS IN DRAWINGS ARE APPROXIMATE. CONTRACTOR SHALL

PROVIDE DRAWING TO COR AND PATIENT SAFETY/ INFECTION

CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS

APPROVED.

6. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY

COR AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN.

PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE

CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED

ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.

7. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF

5:00 PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK

WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED

AND STORED IN A SAFE MANNER UNTIL CEILING TILES CAN BE

REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR.

8. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE

MAINTAINED DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION

FOR HOURS OF OPERATION.

9. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE

BETWEEN THE HOURS OF 8:00 AM AND 5:00 PM. EVERY EFFORT SHALL

BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.

10. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"

STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY

DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS

NECESSARY

11. PROVIDE THE VA OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

12. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP

VAC, MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON

AGGRESSIVE LIQUIDS UP TO 30 GALLONS.

13. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE

COVERED WITH 4 MIL. POLY SHEET.

14. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA

APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR

SUCH PURPOSED WITH A LID.

15. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE

PROPERLY STORED IN DESIGNATED AREAS AND IN APPROVED

CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE

FACILITY.

16. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

INFECTION CONTROL PLAN NOTES

1. PROVIDE 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION PER NFPA 241. REFER TO DETAIL THIS SHEET.

2. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL CONSTRUCTION ONLY WHEN AND WHERE ALLOWED PER CLASS. REFER

TO DETAIL THIS SHEET FOR ADDITIONAL INFORMATION.

INFECTION CONTROL RISK ASSESSMENT NOTES -

CLASS III

DURING CONSTRUCTION PROJECT

UPON COMPLETION OF PROJECT

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST DISPERSION INTO THE OCCUPIED AREAS.

2. MEANS FOR CONTROLLING MINIMAL DUST DISPERSION MAY INCLUDE HAND-HELD HEPA

VACUUM DEVICES, POLYETHYLENE PLASTIC CONTAINMENT, OR ISOLATION OF WORK AREA BY

CLOSING ROOM DOOR.

3. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST FROM ENTERING THE HVAC SYSTEM.

4. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID POSITIVE PRESSURIZATION OF THE

SPACE,

5. IF WORK AREA IS CONTAINED, THEN IT MUST BE NEGATIVELY PRESSURIZED AT ALL TIMES.

6. SEAL ALL DOORS WITH TAPE THAT WILL NOT LEAVE RESIDUE.

7. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO

TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE

DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED

WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON

FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.

10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR

HEPA VACUUMING SURFACES.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST OR DESIGNEE AND ENGINEERING

REPRESENTATIVE FOR DISCONTINUATION OR DOWNGRADING OF ICRA PRECAUTIONS.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND

FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS WELL

AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE

REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT

PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:

3. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

4. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.

5. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

6. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.

7. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINATES FROM THE WORK AREA.

2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER

COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND

BEFORE REMOVAL OF CRITICAL BARRIERS.

3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION, AND MONITORED.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK

IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

6 MIL POLY

EQUIPMENT OR

FURNISHING

6 MIL POLY

WALL OPENING

CRITICAL BARRIER

WALL PROTRUSION

SEAL WITH DUCT TAPE

ALL SIDES.

CEILING

6 MIL POLY CRITICAL

BARRIER CEILING

PENETRATION

NOTE: ALL CORNERS TO

FORM 90 DEGREE ANGLE

WITH NO RADIUS

SEAL WITH DUCT TAPE.

ALL SIDES

WINDOWDOOR

BEYOND

SEAL ALL CRACKS WITH

DUCT 6 MIL POLY

CRITICAL BARRIER

OVER WINDOWS.

SEAL ALL CRACKS WITH

DUCT 6 MIL POLY CRITICAL

BARRIER OVER WINDOWS.

FLOOR

EXISTING DECK

SEAL PERIMETER: RED

PLASTIC TAPE EXISTING FINISHED

FLOOR

EXISTING FINISHED FLOOR

OCCUPIED SIDE

OF BARRIER

''WORK'' SIDE

OF BARRIER

CONTINUOUS 6 MIL POLYETHLENE

SHEE BARRIER

PROVIDE BASE PAINTERS TAPE AT ALL END

CONDITIONS WTIH RED PLASTIC TAPE TO

PROVIDE A CONTINOUS SEALED SPACE

SEAL PERIMETER: RED PLASTIC TAPE

BASIS OF DESIGN: STARC

FIREBLOCK WALL TEMPORARY

WALL PARTITION AND DOOR

SYSTEM. DOOR TO BE KEYED TO

VA FRESNO STANDARD

CONSTRUCTION KEY SYSTEM

INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS II

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE

WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,

PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK

AREA OR IMPLEMENT CONTROL CUBE METHOD (CART

WITH PLASTIC COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.

4. NEGATIVE PRESSURE MONITORING DEVICES SHOULD BE

VISIBLE FROM OUTSIDE THE WORKSITE AND READINGS

SHOULD BE DOCUMENTED AS LEAST DAILY.

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

6. MAINTAIN CLEAN STICKY MAT AT ENTRANCE AND EXIT OF

WORK AREA.

7. COVER CONSTRUCTION WASTE BEFORE TRANSPORT IN

COVERED CONTAINERS

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED

PROJECT IS INSPECTED BY THE SAFETY DEPARTMENT AND INFECTION

PREVENTION & CONTROL AND THOROUGHLY CLEANED BY THE

ENVIRONMENTAL MANAGEMENT SERVICE.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4. WET MOP AREA WITH CLEANER/DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS

PERFORMED.

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:5

P M

SCALE: As indicated

AD001

DEMOLITION, PHASING, ICRA

GENERAL NOTES & DETAILS

SCALE: 1 1/2" = 1'-0"

NON-FIRE RATED TEMPORARY WALL SEPARATION PARTITION

SCALE: 1 1/2" = 1'-0"

WALL TYPE A4 SHAFTWALL

SCALE: 3/8" = 1'-0"

CRITICAL BARRIER PREP INSALLATION

SCALE: 1 1/2" = 1'-0"

ONE HOUR RATED TEMPORARY WALL PARTITION

Revisions: Date:

BID SET 05/04/2026

ICRA GENERAL NOTES

1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

A D B

B2A03

MECH EQUIP. ROOM

1B09

AIR INTAKE

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:5

P M

SCALE: As indicated

AD101A

SUB-BASEMENT DEMO PLAN -

AREA A

NORTH

SCALE: 1/8" = 1'-0"

SUB-BASEMENT DEMOLITION

FLOOR PLAN - UNIT A

DEMOLITION KEY NOTES

NO. DESCRIPTION

12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.

NOTE: THIS AREA TO BE CLASS III ICRA

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

A D A

A D A

B2A08A

BATTERY CHARGING

ROOM

B2A08

EMS STORAGE

B2A07

EMS SUPERVISOR'S

B2A03

MECH EQUIP. ROOM

B2A08

EMS STORAGE

B2A04

POLICE VAULT

B2A03

MECH EQUIP. ROOM

1B09

AIR INTAKE

SB-5

ELECTRIC SHOP

B2A01A

HVAC/ELECTRICAL

OFFICE

B2A01

ENGINEERING SHOP

B2A03

MECH EQUIP. ROOM

B2A01B

STORAGE

B2A11

CORRIDOR

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:5

P M

SCALE: As indicated

AD101B

SUB-BASEMENT DEMO PLAN -

AREA B

DEMOLITION KEY NOTES

NO. DESCRIPTION

12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.

14 SAWCUT, REMOVE & DISPOSE OF EXISTING CONCRETE HOUSEKEEPING PADS AS REQUIRED BY

MECHANICAL. PREP FLOOR FOR NEW FINISHES. COORDINATE WORK WITH ALL OTHER TRADES.

NORTH

SCALE: 1/8" = 1'-0"

SUB-BASEMENT DEMOLITION

FLOOR PLAN - UNIT B

NOTE: THIS AREA TO BE CLASS III ICRA

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

A D B

2 3

1 1

EXPOSED

STRUCTURE

ABOVE

B1B10

EMS OFFICE

B1B11

CUSTOMER SUPPORT

B1B11A

IRM OFFICE

B1B08

MECHANICAL

B1B09

CHASE

B1B06A

ELECTRICAL UPS

B1B12

B1B16

LAUNDRY SUITE

B1B16D

OFFICE

B1B16C

STORAGE

B1B-5

CORRIDOR

B1B35

Room

B1B16G2

SOILED LAUNDRY

B1B15

CLOTHING ROOM

LOST & FOUND

B1B14

IRM CUSTOMER

SUPPORT

B1B14A

SERVER ROOM

B1B-3

CORRIDOR

B1A01

SUITE

B1B-4

CORRIDOR

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:0

P M

SCALE: As indicated

AD102A

BASEMENT DEMO PLAN - AREA A

DEMOLITION KEY NOTES

NO. DESCRIPTION

1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:

ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]

2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS

NECESSARY.

3 REMOVE EXISTING ADHERED ACOUSTICAL CEILING ATTACHED TO SUSPENDED GYPSUM OR CEMENT PLASTER SUSPENDED CEILING AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLED WATER SYSTEM. PATCH AND REPAIR ADJACENT SURFACES TO REMAIN AS

NECESSARY.

12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR DEMOLITION

PLAN - UNIT A

NOTE: THIS AREA TO BE CLASS IV ICRA

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

A D A

A D A

EXPOSED STRUCTURE ABOVE

EXPOSED

STRUCTURE

ABOVE

EXPOSED

STRUCTURE

ABOVE

EXPOSED

STRUCTURE

ABOVE

EXPOSED

STRUCTURE

ABOVE

2 1

EXPOSED

STRUCTURE

ABOVE

B1A13

TELECOMMUNICATION

OFFICE

B1A12

TELEPHONE

OPERATORS

REFRIG.

REFRIG.

MEAL

PRE-PREP

COLD BOX 7

B1A-4

CORRIDOR

BOX 5

COLD

CHEFS

COLD BOX 1

B1A10

EAT PREP.

B1A08

NUTRITION & FOOD

KITCHEN

PREPARATION

AREA

KITHCEN

DISHWASH

AREA

KITCHEN

B1A04

CHEMICAL

STORAGE

NO.3

DUMBWAITER

STORES

DRY

B1A01A

OFFICE

B1A01.1

OFFICE

1A85

HEALTH

INFORMATION

MANAGEMENT

B1A01

SUITE

B1A01.4

VESTIBULE

B1A-1

CORRIDOR

B1A02

LAUNDRY CHUTE

P-1

PASSENGER

ELEVATOR

P-2

PASSENGER

ELEVATOR

P-3

ELEVATOR LOBBY

B1A-2

CORRIDOR

B1A-3

CORRIDOR

B1B-2

CORRIDOR

B1B10

EMS OFFICE

B1B11

CUSTOMER SUPPORT

B1B11A

IRM OFFICE

B1B07

BIOMEDICAL

ENGINEERING

B1B08

MECHANICAL

NO.4

DUMBWAITER

B1B02

CANTEEN STORAGE

B1A03

MECHANICAL

B1B09

CHASE

B1B06A

ELECTRICAL UPS

B1B06

ELECTRICAL VAULT

B1B05

MECHANICAL

CLOSET

B1B-8

Room

B1B-7

Room

B1B-6

Room

B1B-1

CORRIDOR

B1B12

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:0

P M

SCALE: As indicated

AD102B

BASEMENT DEMO PLAN - AREA B

DEMOLITION KEY NOTES

NO. DESCRIPTION

1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:

ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]

2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS

NECESSARY.

12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR DEMOLITION

PLAN - UNIT B

NOTE: THIS AREA TO BE CLASS IV ICRA

F

1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

A D B

1B11

PHARMACY

CHECK-IN AREA

1B-4

CORRIDOR

1A03

ELIGIBILITY

1A04

ELIGIBILITY

Room

3B10K.2

STORAGE

1B-5

CORRIDOR

1B15

VCS RETAIL STORE

1B16

VCS STOCK RM

1B20

CAFETERIA

1B20D

CAFETERIA FOOD

COURT

1B20E

CAFETERIA DINING

1B20B

STORAGE

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:0

P M

SCALE: As indicated

AD103A

FIRST FLOOR DEMO PLAN - AREA

A

DEMOLITION KEY NOTES

NO. DESCRIPTION

1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:

ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]

12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR DEMOLITION

PLAN - UNIT A

NOTE: THIS AREA TO BE CLASS IV ICRA

1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

A D A

A D A

1 1

1 1

2 2

1B06

INPATIENT

PHARMACY SUITE

1B06A

PHARMACY SUPPLY

& PROCUREMENT

1B03

STAIR NO. 2

1B06I

INPATIENT

PHARMACY

1B08

PHARMACY REFILL

CONSULTATION

1B-3

CORRIDOR

1B02

PHARMACY SVC

1B-2

CORRIDOR

1A01

ELEVATOR LOBBY

1B11

PHARMACY

CHECK-IN AREA

1B-4

CORRIDOR

1A08

HEALTHY VET

1A16A

BAS

1A-2

CORRIDOR

1A01A

CHECK IN

1A02

ELIGIBILITY

2A13D

Room

1A03

ELIGIBILITY

1A04

ELIGIBILITY

1A09A

DAV

1A09

SVC OFFICES

1A06

TOILET

1A11

TOILET

1A12

STORAGE

1A09D

AMVETS

1A15

EMPLOYEE HEALTH

E116A

PRIMARY CARE

1A15B

TOILET

1A15A.1

TOILET

1A-3

CORRIDOR

1A18

WAITING ROOM

1A18J

TOILET

1A18A

POLICE ADMIN.

OFFICE

1A18F

PATIENT ADVOCATE

1A18B

POLICE OFFICE

Room

3B10K.2

STORAGE

1A07

HOUSEKEEPING

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:2

:4

P M

SCALE: As indicated

AD103B

FIRST FLOOR DEMO PLAN - AREA

B

DEMOLITION KEY NOTES

NO. DESCRIPTION

1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:

ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]

2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS

NECESSARY.

3 REMOVE EXISTING ADHERED ACOUSTICAL CEILING ATTACHED TO SUSPENDED GYPSUM OR CEMENT PLASTER SUSPENDED CEILING AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLED WATER SYSTEM. PATCH AND REPAIR ADJACENT SURFACES TO REMAIN AS

NECESSARY.

12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

- UNIT B

NOTE: THIS AREA TO BE CLASS IV ICRA

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

1 1 1

1 1

A D B

2B13

ANATOMIC

PATHOLOGY

2B24B

MICROBIOLOGY

LAB

2B24E

AUTOCLAVE

2B24C

TOILET

2B24

CLINICAL

LABORATORY

2B23

SPECIMEN

COLLECTION

2B18

PATHOLOGY/LAB

MEDICINE

2B-2

CORRIDOR

2B19A

CONFERENCE

2B21

ANCILLARY TESTING

COORD.

2B-2

CORRIDOR

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:1

P M

SCALE: As indicated

AD104A

SECOND FLOOR DEMO PLAN -

AREA A

DEMOLITION KEY NOTES

NO. DESCRIPTION

1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID SYSTEM INCLUDING ASSOCIATED HANGERS, METAL TEE GRID, AND EDGE ANGLES AS REQUIRED FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLED WATER SYSTEM. EXISTING CEILING MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS, ETC. TO BE TEMPORARILY SUPPORTED FOR REINSTALLATION IN NEW CEILING FINISH; REFER TO REFLECTED CEILING PLANS FOR EXISTING AND REINSTALLED LOCATIONS. [NOTE:

ITEMS SHALL NOT BE TEMPORARILY OR PERMANENTLY SUSPENDED FROM FIRE SUPPRESSION LINES]

2 REMOVE EXISTING GYPSUM BOARD OR PLASTER CEILING OVER METAL LATH ATTACHED TO SUSPENDED COLD ROLLED CHANNELS AS REQUIRED AND TO THE EXTENT FOR DEMOLITION AND INSTALLATION OF

CONDENSATE/CHILLLED WATER SYSTEM. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS

NECESSARY.

4 REMOVE A PORTION OF EXISTING CASEWORK AND COUNTERTOP AS REQUIRED FOR NEW

CONSTRUCTION. TURN OVER TO OWNER UNLESS DIRECTED OTHERWISE. PATCH AND REPAIR EXPOSED

SURFACES TO REMAIN AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.

12 SAW-CUT AND REMOVE FLOOR DECK AND SLAB. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

SUPPORT MODIFICATIONS REQUIRED AND EXACT SAW-CUT DIMENSIONS AND PLACEMENT.

NORTH

SCALE: 1/8" = 1'-0"

SECOND FLOOR DEMOLITION

PLAN - UNIT A

NOTE: THIS AREA TO BE CLASS IV ICRA

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION

WORK.

3. WHERE CLASS IV ICRA IS CALLED OUT ON THE DEMO PLANS,

EXISTING MECHANICAL ROOMS CAN BE PLANNED FOR

CLASS III.

4. ALL EXTERIOR WORK TO BE CLASS II ICRA.

5. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED

COMPLETELY WITH SHEET PLASTIC WHEN NO TEMPORARY

PARTITION IS CALLED OUT.

6. MAINTAIN PRESSURE MONITORS DRUING CONSTRUCTION

OPERATIONS.

7. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING AFTER HOURS (5:30 PM PST - 6:00 AM PST)

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR APPROVAL.

DEMO/ICRA LEGEND

TEMPORARY WALL (REFER TO WALL TYPES)

AREA OF SAWCUT FLOOR SLAB DEMOLITION

(REFER TO STRUCTURAL)

AREA NOT IN PROJECT SCOPE

NOTE: SEE SHEET AD001 FOR DEMOLITION GENERAL NOTES.

1 1 1 1

1 1 1

A D A

A D A

1 1

1 1

2B10A

RADIOLOGY ROOM

2B10C

TOILET

2B10

CONTROL RM

2B-1

CORRIDOR

2B11

STORAGE/DUMBWAITER

2B12

CHANGING RM

2B03

STORAGE/DUMBWAITER

2B-1

CORRIDOR

2B13A

STORAGE

2B13

ANATOMIC

PATHOLOGY

2B29

IMAGING X-RAY

WAITING ROOM

2A11

IMAGING ADPAC

2B29

IMAGING X-RAY

WAITING ROOM

2A07A

ELEC.

2A07B

MRI CONTROL

ROOM/WORK AREA

2A06

TOILET

2A08

TOILET

2A09A

CLEAN SUPPLY

2A09

ULTRASOUND SUITE

2A09B

ULTRASOUND 2

2A13

SPECIAL

PROOCEDURES

PRE/POST

OPERATIVE

3A-6

GURNEY STORAGE

2A13B

SPECIAL

PROCEDURES O.R.

2A16B

CHIEF IMAGING

2A-1

CORRIDOR

2A16A

ADMN. ASSIST.

2A16

IMAGING SUITE

2A20

VSO OFFICE

2A23

ULTRASOUND ROOM

2A16E

OFFICE2A16D

OFFICE

2A25A

ULTRASOUND ROOM

2A25

ULTRASOUND

OFFICE

2A27J

IMAGINE OFFICE

2A27A

COPY RM

2A27

CORRIDOR

2A27H

IMAGING ADMIN

2A27K

TOILET

A

B architecture +engineering

SEVEN

GENERATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID SET

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

570-20-308REPLACE AND EXPAND CHILLED

WATER INFRASTRUCTURE,

BUILDING 1 AND OPC N/A

TCMH05/04/2026

FRESNO VA HOSPITAL

2615 E. CLINTON AVE, FRESNO, CA 93703

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVE., SUITE B

KALAMAZOO, MI 49007

269-927-0144

DAVENERGY SOLUTIONS

2207 GARNET AVE, SUITE 1

SAN DIEGO, CA 22108

612-770-8552

A/E:

A u to d e s k D o c s /2

V A

F re s n o C h ill e d

W a te r

In fr a s tr u c tu re /2

V

A F re s n o

C h ill e d

W a te r

In fr a s tr u c tu re

A R

C H

-R

.r v t

/4

/2

:1

:1

P M

SCALE: As indicated

AD104B

SECOND FLOOR DEMO PLAN -

AREA B

DEMOLITION KEY NOTES

NO. DESCRIPTION

1 REMOVE…