These are record drawings for the Phase 2 Chiller Infrastructure project on the Fresno Campus of the Department of Veterans Affairs, prepared by the Office of Construction and Facilities Management. The drawing set includes plumbing, mechanical, and utility infrastructure plans spanning multiple phases of construction.

The project encompasses plumbing work including medical gas piping (oxygen, nitrogen, nitrous oxide, medical air, and vacuum systems), domestic hot and cold water lines, fire protection systems, and emergency oxygen supply connections. Mechanical work includes chilled water supply and return piping (ranging from 3" to 14" in diameter), steam and condensate lines, and the installation of new centrifugal magnetic bearing chillers (600-ton and 300-ton units) in Building 22A. Work is divided into three phases with phased valve schedules, isolation points, and future connection provisions documented throughout. Key details include pipe supports, anchors, guides, insulation requirements, pressure relief systems, air vents, and commissioning requirements. The drawings specify coordination requirements with the Contracting Officer Representative, contractor-managed service interruptions with minimum 30-day advance notice, utility stacking configurations for review, and testing and cleaning protocols prior to system commissioning. The project team includes Triple C – The A-E Group, Bridgers & Paxton Consulting Engineers, Inc., and United Structural Design, LLC, with the site located at 2615 E Clinton Avenue, Fresno, California 93703.

View the file

Other files

File Type Posted
Wage Determinaton CA202600148 07.14.26.pdf PDF
36C26126R0028 0007.docx DOCX document
36C26126R0028 0006.docx DOCX document
90209 - 570-20-308 - VA CA Fresno CHW - ASI-01 Drawings- 20260724.pdf PDF
RFI LOG UPDATE AMENDMENT 005.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno CHW - ASI 01 - 20260724.pdf PDF
36C26126R0028 0005.docx DOCX document
36C26126R0028 0004.docx DOCX document
36C26126R0028 -0003.docx DOCX document
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.pdf PDF
Construction Clause 52.212-4.docx DOCX document
Attachment C - Key Personnel Evaluation 36C26126R0028.docx DOCX document
36C26126R0028-0002.docx DOCX document
RFI LOG UPDATE AMENDMENT 003.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504r1.pdf PDF
VA Specific Clause Payments Fixed Price Construction.docx DOCX document
36C26126R0028 0003.docx DOCX document
VA Specific Clause Payments under Fixed Price Construction.docx DOCX document
Construction 52.212-4.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part2.pdf PDF
RFI LOG UPDATE AMENDMENT 002.xlsx XLSX spreadsheet
36C26126R0028 0002.docx DOCX document
36C26126R0028 Site Visit Log In Sheet.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Summary - 20260701.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Narrative - 20260701.pdf PDF
Question RFI No. 4 - Asbestos Abatement Scope and Allowance.docx DOCX document
RFI LOG.xlsx XLSX spreadsheet
Question RFI No. 7 - Buy American Domestic Materials.docx DOCX document
Question RFI No. 12 - Temporary Pumps Piping.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Drawings - 20260701.pdf PDF
36C26126R0028 0001.docx DOCX document
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING DEV 2023.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bid Set Basis Of Design - 20260504.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
36C26126R0028_1.docx DOCX document
ID Me Information.docx DOCX document
Attachment E - Past Performance Questionnaire.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part3.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.doc DOC document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part2.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504.pdf PDF
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part1.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
Site Visit Location Details.pdf PDF
852.219-75 Fillable.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN DOWN

WC WATER CLOSET

FLUSH VALVEFV

YH YARD HYDRANT

TD TRENCH DRAIN

FOV

FOR

FOS

FUEL OIL VENT

FUEL OIL RETURN

FUEL OIL SUPPLY

ES

EEW

EMERGENCY SHOWER

EMERGENCY EYEWASH

CWV COMBINATION WASTE AND VENT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ACID NEUTRALIZING TANK

ACID RESISTANT VENT THROUGH ROOF

BALANCING COCK

BOTTOM OF PIPE

BRITISH THERMAL UNIT

BTU PER HOUR

CLOTHES WASHER BOX

CUBIC FEET PER HOUR

CLEANOUT

CLEANOUT TO GRADE

CIRCULATION PUMP

DOUBLE CLEANOUT

DRINKING FOUNTAIN

ELEVATION

ELECTRIC WATER HEATER

ELECTRIC WATER COOLER

DEGREES FAHRENHEIT

FLOOR CLEANOUT

FINISHED FLOOR ELEVATION

FEET

GUTTER DRAIN

GREASE INTERCEPTOR

GALLONS PER HOUR

GALLONS PER MINUTE

GAS WATER HEATER

HORSEPOWER

HEAD

INCHES

INVERT

KILOWATT

1,000 BTUH

MIXING VALVE

NOT APPLICABLE

NOT IN CONTRACT

NUMBER

NORMALLY CLOSED

NORMALLY OPEN

OUTSIDE SCREW AND YOKE

PHASE

POUNDS PER SQUARE INCH GAUGE

STATIC PRESSURE

TYPICAL

YARD BOX

WALL CLEANOUT

AFF

AFG

ANT

AVTR

B.C.

BOP

BTU

BTUH

CWB

CFH

CO

COTG

CP

DCO

DF

EL

EWH

EWC

°F

FCO

FFE

FT

GD

GI

GPH

GPM

GWH

HP

HD

IN

INV

kW

MBh

MV

NA

NIC

No. # N.C.

N.O.

OS&Y

Ph

PSIG

SP

TYP

YB

WCO

DOUBLE CLEANOUT TO GRADEDCOTG

ESEW

EMERGENCY SHOWER EYE WASH

POWERS OF HARDNESS

PH

HOSE BIBBHB

DS DOWNSPOUT

DSN DOWNSPOUT NOZZLE

PLUMBING SYMBOL LEGEND

NOTE: NOT ALL ABBREVIATIONS OR

SYMBOLS APPLY TO THIS PROJECT

ABBREVIATIONS

A

PENETRATION

TEST PLUG (PRESS/TEMP)

(WH) (HB)

DCOTG

FCO/COTG

FS/FD/AD

VTR

TWO WAY OR DOUBLE CLEANOUT TO GRADE

FLOOR CLEANOUT/CLEANOUT TO GRADE

FLOOR SINK , FLOOR DRAIN , AREA DRAIN

WATER HAMMER ARREST0R

FITTING (PETE'S PLUG)

POINT OF CONNECTION TO EXISTING

AQUASTAT

PRESSURE GAUGE AND GAUGE COCK

THERMOMETER

STRAINER WITH BLOWDOWN VALVE & HOSE BIBB

NEW PIPE CONNECTION TO EXISTING PIPING

EXISTING PIPE TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

FLEXIBLE CONNECTION

UNIVERSAL TEMPERATURE-PRESSURE

ORIFICE UNION

FLANGED UNION

UNION

RISE IN PIPE

DROP IN PIPE

CAPPED OUTLET

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

ECCENTRIC REDUCER

REDUCER OR INCREASER

PIPE GUIDE

DIRECTION OF FLOW

MAV MANUAL AIR VENT (MAV)

AAV AUTOMATIC AIR VENT (AAV)

SLOPE OF PIPE

VENT THROUGH ROOF

AG AIR GAP FITTING

WALL HYDRANT, HOSE BIBB

KEYED NOTE

OR

SCHEMATIC SYMBOLS

ABBREVIATIONSYMBOL DESCRIPTION

XX

OXYGEN

FIRE PROTECTION WATER

FIRE PROTECTION SPRINKLER (N) FS

(N) FW

(N) O

(E) FS

(E) FW

(E) O

EXISTINGNEWDESCRIPTION

SITE UTILITY SYMBOLS

CARBON DIOXIDECO2

H

HE

AC

AR

CDA

LOX

LN

DV

DA

WAGD

IA

MV

O

NO

N

MA

DENTAL VACUUM

WASTE ANESTHESIA GAS DISPOSAL

INSTRUMENT AIR

DENTAL AIR

EXISTING PIPING

LIQUID NITROGEN

LIQUID OXYGEN

HYDROGEN

HELIUM

ACETYLENE

ARGON

COMPRESSED DRY AIR

ALARM PANEL (IN WALL)

MEDICAL VALVE BOX

MEDICAL GAS DROP

MEDICAL VACUUM

OXYGEN

NITROUS OXIDE

NITROGEN

MEDICAL AIR

O OXYGEN

CDA

CO2

AR

AC

HE

H

LN

LOX

MA

N

NO

O

MV

IA

WAGD

DA

DV

O

SYMBOL ABBREVIATION DESCRIPTION

DESCRIPTIONABBREVIATIONSYMBOL

PROCESS GASES

MEDICAL GAS SYMBOLS

S

VACUUM BREAKER

ATMOSPHERIC VACUUM BREAKER

PRESSURE STYLE

FLOW SWITCH

SOLENOID VALVE

FUEL GAS PRESSURE REGULATOR

DIAPHRAGM (PROCESS SYSTEMS)

OS&Y VALVE

GATE VALVE

GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

CHECK VALVE

PLUG VALVE

WATER PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

TEMPERATURE AND PRESSURE RELIEF VALVE

2-WAY CONTROL VALVE

3-WAY MODULATING CONTROL VALVE

VALVE IN VERTICAL

REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)

DRAIN VALVE

BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE

OR OR

OR

OR

DESCRIPTIONSYMBOL

VALVE SYMBOLS

P##

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

ELEVATION LETTER

LETTER REFER TO EQUIPMENT TYPE

NUMBER REFERS TO SPECIFIC EQUIPMENT

SYMBOL INDICATES FIXTURE/EQUIPMENT

IDENTIFIED IN EQUIPMENT SCHEDULE

SECTION SYMBOL

DETAIL SYMBOL

SECTION, ELEVATION, AND DETAIL TITLES

FIXTURE & EQUIPMENT SYMBOL

P-100

A

P-500

P-200

A

P-500

P-300

A

SCALE

ELEVATION

SCALE

DETAIL

SCALE

SECTION

IRR

INDIRECT WASTEIW

TW

TWR

SAN

V

DHWR

DCW

DHW

LA

IA

INW

IHWR

IHW

ICW

PD

SCW

IRR

NGH

NGM

G

LPG

ORD

RD

DIR

DIS

NPW

MU

ROR

ROS

CD

CA

AW

AV

PUMPED DISCHARGE LINE

IRRIGATION

SOFT COLD WATER

TEMPERED WATER (TEMP °F)

TEMPERED WATER RETURN (TEMP °F)

NATURAL GAS-HIGH PRESSURE

NATURAL GAS-MEDIUM PRESSURE

LAB COMPRESSED AIR

INSTRUMENT COMPRESSED AIR

INDUSTRIAL WASTE

REVERSE OSMOSIS RETURN

INDUSTRIAL HOT WATER RETURN

INDUSTRIAL HOT WATER

INDUSTRIAL COLD WATER

NATURAL GAS-LOW PRESSURE

LIQUIFIED PETROLEUM GAS

OVERFLOW ROOF DRAIN

STORM/ROOF DRAIN

SANITARY SEWER

DEIONIZED WATER RETURN

DEIONIZED WATER SUPPLY

VENT

NON-POTABLE WATER

MAKE-UP WATER

REVERSE OSMOSIS SUPPLY

140° DOMESTIC HOT WATER

140° DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER

DOMESTIC COLD WATER

CONDENSATE DRAIN

COMPRESSED AIR

ACID WASTE

ACID VENT

SHW SOFT HOT WATER

SAN

AV

AW

CA

CD

ROS

ROR

NPW

V

DIS

DIR

RD

ORD

LPG

G

NGM

NGH

SCW

PD

INW

IA

IW

LA

SHW

GW GREASE WASTEGW

GV GREASE VENT

ABBREVIATIONSYMBOL DESCRIPTION

PIPING SYMBOLS

ICW

IHW

IHWR

TWR (_ _ _)

TW (_ _ _)

GV

DCW

DHW

DHWR

DHW 140ºF

DHWR 140ºF

MU

DHW 140ºF

DHWR 140ºF

OXYGENO

FUTURE PIPE

(F) FS

(F) FW

(F) O

FUTURE

FUTURE(F)

EXISTING(E)

NEW (N)

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:1

A M

P-001

PLUMBING LEGEND

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

NO REVISIONS DATE

month/day/ year

DN

UP

DN

UP

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

SD

SD

SD

SD

SOLAR PANELS

SOLAR PANELS

H

H H H H H

HH

HH

H H H H H H

H

H

HHHHH

H

H

H

H

H

G

AREA OF WORK

AREA OF WORK

A R

E A

O F

W O

R K

A R

E A

O F

W O

R K

AREA OF WORK

AREA OF WORK

A R

E A

O F

W O

R K

AREA OF WORK

AREA OF WORK

PHASE 1

B25

B31

(CLC)

B2

B22

B22A

B36 B3

B8 B7

LOT C

LOT A

B1

B19

LOT D

B34

B17

B24 B24

BREEZE

WAY

LOT E

B32

P H

A S

E

S E

E S

H E

E T

P S

.1

P H

A S

E

S E

E S

H E

E T

P S

.2

P H

A S

E

S E

E S

H E

E T

P S

.2

P H

A S

E

S E

E S

H E

E T

P S

.3

AREA OF WORK

AREA OF WORK

AREA OF WORK

LOT C

SEE

PLAN

1/P-101

SEE

PLAN

2/P-101

SEE ENLARGED

PLAN 3/P-101

SEE ENLARGED

PLAN 1/P-102

B27

LOT B

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:3

A M

PS101

PLUMBING SITE PLAN

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

GENERAL SHEET NOTES

A CONTRACTOR TO ENSURE ALL SERVICE

INTERRUPTIONS ARE COORDINATED WITH THE

COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER

MEETING IS TO OCCUR 2 DAYS PRIOR TO

INTERRUPTION.

B A DETAILED SCHEDULE, INCLUDING PROJECTED

SERVICE INTERRUPTION DATES WITH DURATIONS,

AND DETAILED PHASING PLAN IS TO BE PROVIDED TO

THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO

THE START OF WORK.

C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT

UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS

DESIGNED.

D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,

AND TEST PORTS WITH ACCESS PANELS. CENTER

SERVICE POINT IN ACCESS PANEL TO MAXIMIZE

ACCESS.

E ALL PIPING TO BE PAINTED AND LABELED PER VA

UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.

MEDICAL GAS PIPES ARE NOT REQUIRED TO BE

PAINTED. SEE SCOPE OF WORK AND SPEC SECTION

09 91 00 - 34.

F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING

CONFIGURATION FOR COR REVIEW PRIOR TO THE

START OF WORK.

G ALL INSULATION AND JACKETING TO BE PROVIDED AS

REQUIRED BY THE SPECIFICATIONS AND VA UTILITY

STANDARDS.

H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1

MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY

SPECIFICATION 01 00 00.

I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO

COMMISSIONING.

J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL

INFORMATION.

0' 20' 40' 80'Scale: 1" = 40'-0"

1 PLUMBING SITE PLAN - OVERALL

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

P2P3 B31

B3

B32 P1

ADD- ALT.

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

PLUMBING PROJECT SCOPE

THE OVERHEAD PEDESTRIAN CANOPIES SHALL INCLUDE:

A. CONCEALED RACEWAY CARRYING MEDICAL OXYGEN FROM BUILDING NO. 22 TO BUILDING NO.

31 PENTHOUSE AND FROM FIRST FLOOR ALARM PANEL TO BUILDING 1.

B. REMOVAL OF EXISTING PIPE UTILITY STANDS ASSOCIATED WITH MEDICAL OXYGEN SERVICES WHICH WERE CONSTRUCTED FOR PROJECT NO. 570-13-300, “NEW BUILDING NO. 22A AND CHILLER

INFRASTRUCTURE”.

C. EMERGENCY LOW PRESSURE OXYGEN INLET. SEE SHEET P-102 FOR SCOPE OF WORK.

A

B

C

D

E

F

W

X

B22.4

7.9

P H

A S

E

ADD ALTERNATE

SEE SHEET PS101.5

B22

B22A

P H

A S

E

S E

E S

H E

E T

P S

.2

A R

E A

O F

W O

R K

B31

CLC

AREA OF WORK

OFFICE

CHILLER PLANT

BLDG 22A

CHILLERS, BLDG

EQUIPMENT

ROOM

2 BED ROOM

1A30

HSKPA

1A28

TOILET

1A37A CORRIDOR

2 BED ROOM

1A33

2 BED ROOM

1A32

2 BED ROOM

1A37

2 BED ROOM

1A36

DIABETIC

RESERCH

1A27

DIABETIC CLINIC

1A26

(F) 1-VFS-02

(F) 1-VFW-02

(F) 1-VFS-01

(F) 1-VFW-01

AREA OF WORK

(N) 1-VO-01

SEE ENLARGED PLAN

3/P-101

SEE ENLARGED PLAN

1/P-102

ELECTRICAL

ROOM

CHILLER ROOM

A

B

C

D

E

B31.2 B31.3 B31.4B31.5B31.6B31.7B31.8 B31.9B31.10 B31.11 B31.12

W

X

B22.4

7.9

B22

B22A

B31

CLC

AREA OF WORK

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:4

A M

PS101.1

PLUMBING SITE PLAN - PHASE 1

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

GENERAL SHEET NOTES

KEYNOTES

1 (N) 2" OXYGEN ROUTED INSIDE WALKWAY ENCLOSURE.

2 VALVE AND CAP (N) 2" OXYGEN PIPE FOR FUTURE

CONNECTION.

3 FUTURE 6" FIRE PROTECTION WATER LINE TO BUILDING

01 AND FUTURE 4" FIRE SPRINKLER TO BUILDING 24.

4 ADD ALTERNATE (N) 6" FIRE PROTECTION AND (N) 4" FIRE

SPRINKLER TO SERVE THE FUTURE CLC ADDITION AND

CANTEEN.

5 FUTURE 6" FIRE PROTECTION AND FUTURE 4" FIRE

SPRINKLER TO BE CONNECTED TO EXISTING MAINS.

0' 4' 8' 16'

Scale: 1/8" = 1'-0"

1 PLUMBING SITE PLAN - PHASE 1

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

B31

B3

B32 P1

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

PLUMBING VALVE SCHEDULE PHASE 1

SYMBOL VAVLE TYPE VAVLE SIZE

LOCATION IN

PROJECT SYSTEM COUNT

Phase 1

(F) 1-VFW-01 BUTTERFLY 6" COLUMN E-7 FW 1

(F) 1-VFS-02 BUTTERFLY 4" COLUMN E-6 FS 1

(F) 1-VFS-01 BUTTERFLY 4" COLUMN E-7 FS 1

(F) 1-VFW-02 BUTTERFLY 6" COLUMN E-6 FW 1

Grand total: 4

F O

R C

O N

T

IN

U A

T

IO

N O

F O

X E

G E

N P

IP

IN

G S

E E

S H

E E

T P

-1

OXYGEN VALVE SCHEDULE - PAHSE 1

SYMBOL VAVLE TYPE VAVLE SIZE

LOCATION IN

PROJECT SYSTEM COUNT

Phase 1

(N) 1-VO-01 BUTTERFLY 2" COLUMN D-32 O 1

Grand total: 1

Scale: 1/16" = 1'-0"

2 PLUMBING PARTIAL SITE PLAN - PHASE 2 DEMO 0' 8' 16' 32'

EXISTING OXYGEN PIPE TO

EXISTING EMERGENCY OXYGEN

CONNECTION TO BE REMOVED

EXISTING OXYGEN PIPE DROP

TO TUNNEL TO BE REMOVE.

CAP PIPE A TUNNEL

PENETRATION

EXISTING OXYGEN PIPE ON PIPE

BRIDGE TO BE REMOVED

EXISTING OXYGEN

PIPE TO BE REMOVED

POINT OF

DISCONNEC

T

A CONTRACTOR TO ENSURE ALL SERVICE

INTERRUPTIONS ARE COORDINATED WITH THE

COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER

MEETING IS TO OCCUR 2 DAYS PRIOR TO

INTERRUPTION.

B A DETAILED SCHEDULE, INCLUDING PROJECTED

SERVICE INTERRUPTION DATES WITH DURATIONS,

AND DETAILED PHASING PLAN IS TO BE PROVIDED TO

THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO

THE START OF WORK.

C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT

UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS

DESIGNED.

D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,

AND TEST PORTS WITH ACCESS PANELS. CENTER

SERVICE POINT IN ACCESS PANEL TO MAXIMIZE

ACCESS.

E ALL PIPING TO BE PAINTED AND LABELED PER VA

UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.

MEDICAL GAS PIPES ARE NOT REQUIRED TO BE

PAINTED. SEE SCOPE OF WORK AND SPEC SECTION

09 91 00 - 34.

F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING

CONFIGURATION FOR COR REVIEW PRIOR TO THE

START OF WORK.

G ALL INSULATION AND JACKETING TO BE PROVIDED AS

REQUIRED BY THE SPECIFICATIONS AND VA UTILITY

STANDARDS.

H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1

MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY

SPECIFICATION 01 00 00.

I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO

COMMISSIONING.

J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL

INFORMATION.

D

E

W

X

4344454647

Z

W.0

40.9

FF

HH

X.0

42.8

Y

B22.4

7.9

42.1

58.1

57.5

49.9

GG.1

FF.1

Z.0

Y.0

P H

A S

E

S E

E S

H E

E T

P S

.1

P H

A S

E

P H

A S

E

ADD ALTERNATE

SEE SHEET PS101.5

B36

B3

B24

AREA OF WORK

AREA OF WORK

AREA OF WORK

AREA OF WORK

P H

A S

E

S E

E S

H E

E T

P S

.3

P H

A S

E

S E

E S

H E

E T

P S

.3

(N) 2-VO-02

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:4

A M

PS101.2

PLUMBING SITE PLAN - PHASE 2

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

GENERAL SHEET NOTES

KEYNOTES

0' 4' 8' 16'

Scale: 1/8" = 1'-0"

1 PLUMBING SITE PLAN - PHASE 2

1 (N) 2" OXYGEN ROUTED INSIDE WALKWAY ENCLOSURE.

2 VALVE AND CAP (N) 2" OXYGEN PIPE FOR FUTURE

CONNECTION.

3 CONNECT (N) 2" OXYGEN TO (E) 2" OXYGEN PIPE.

4 (F) 6" FIRE PROTECTION WATER LINE TO BUILDING 01 AND

(F)4" FIRE SPRINKLER TO BUILDING 24.

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

P2 B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

OXYGEN VALVE SCHEDULE - PHASE 2

SYMBOL VAVLE TYPE VAVLE SIZE

LOCATION IN

PROJECT SYSTEM COUNT

Phase 2

(N) 2-VO-02 BUTTERFLY 2" COLUMN Y-48 O 1

Grand total: 1

A CONTRACTOR TO ENSURE ALL SERVICE

INTERRUPTIONS ARE COORDINATED WITH THE

COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER

MEETING IS TO OCCUR 2 DAYS PRIOR TO

INTERRUPTION.

B A DETAILED SCHEDULE, INCLUDING PROJECTED

SERVICE INTERRUPTION DATES WITH DURATIONS,

AND DETAILED PHASING PLAN IS TO BE PROVIDED TO

THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO

THE START OF WORK.

C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT

UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS

DESIGNED.

D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,

AND TEST PORTS WITH ACCESS PANELS. CENTER

SERVICE POINT IN ACCESS PANEL TO MAXIMIZE

ACCESS.

E ALL PIPING TO BE PAINTED AND LABELED PER VA

UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.

MEDICAL GAS PIPES ARE NOT REQUIRED TO BE

PAINTED. SEE SCOPE OF WORK AND SPEC SECTION

09 91 00 - 34.

F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING

CONFIGURATION FOR COR REVIEW PRIOR TO THE

START OF WORK.

G ALL INSULATION AND JACKETING TO BE PROVIDED AS

REQUIRED BY THE SPECIFICATIONS AND VA UTILITY

STANDARDS.

H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1

MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY

SPECIFICATION 01 00 00.

I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO

COMMISSIONING.

J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL

INFORMATION.

2" O

Z

AABB

FF

HH

CC

GG

Y

58.9

58.1

57.5

57.2

49.9

GG.1

FF.1

HH.1

DD

58.5

Z.0

Y.0

M A

C H

IN

E

P H

A S

E

M A

C H

IN

E

P H

A S

E

B24

BREEZEWAY

S E

E S

H E

E T

P S

.2

B24

B01

A R

E A

O F

W O

R K

A R

E A

O F

W O

R K

AREA OF WORK

B24

AUDITORIUM

AREA OF WORK

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:4

A M

PS101.3

PLUMBING SITE PLAN - PHASE 3

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

GENERAL SHEET NOTES

KEYNOTES

0' 4' 8' 16'

Scale: 1/8" = 1'-0"

1 PLUMBING SITE PLAN - PHASE 3

1 (N) 2" OXYGEN ROUTED INSIDE WALKWAY ENCLOSURE.

2 CONNECT (N) 2" OXYGEN TO (E) 2" OXYGEN PIPE

LOCATED IN SUB-BASEMENT

3 CONNECT (N) 2" OXYGEN TO (E) 2" OXYGEN PIPE.

4 (F) 6" FIRE PROTECTION WATER LINE TO BUILDING 01.

5 (N) 2" OXYGEN ROUTED OVER EXISTING CANOPY.

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

P3 B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

A CONTRACTOR TO ENSURE ALL SERVICE

INTERRUPTIONS ARE COORDINATED WITH THE

COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER

MEETING IS TO OCCUR 2 DAYS PRIOR TO

INTERRUPTION.

B A DETAILED SCHEDULE, INCLUDING PROJECTED

SERVICE INTERRUPTION DATES WITH DURATIONS,

AND DETAILED PHASING PLAN IS TO BE PROVIDED TO

THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO

THE START OF WORK.

C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT

UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS

DESIGNED.

D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,

AND TEST PORTS WITH ACCESS PANELS. CENTER

SERVICE POINT IN ACCESS PANEL TO MAXIMIZE

ACCESS.

E ALL PIPING TO BE PAINTED AND LABELED PER VA

UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.

MEDICAL GAS PIPES ARE NOT REQUIRED TO BE

PAINTED. SEE SCOPE OF WORK AND SPEC SECTION

09 91 00 - 34.

F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING

CONFIGURATION FOR COR REVIEW PRIOR TO THE

START OF WORK.

G ALL INSULATION AND JACKETING TO BE PROVIDED AS

REQUIRED BY THE SPECIFICATIONS AND VA UTILITY

STANDARDS.

H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1

MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY

SPECIFICATION 01 00 00.

I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO

COMMISSIONING.

J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL

INFORMATION.

HH

E

F

G

B25.B B25.A.5 B25.A.1B25.AB25.AA

B31.K

B31.L

H

J

L

M

N

P

S

T

89101112

2425262728

Q

R

W

31U

V

35 33

K

3.9

7.9

VV UU

WW

XX

B-25

MENTAL HEALTH

FREEDOM BLDG

ADD ALTERNATE

B25

B24

AREA OF WORK

A D

D A

L T

E R

N A

T E

PHASE 2

SEE SHEET MS101.2

P H

A S

E

S

E S

H E

E T

M S

.3

(F)1-VFW-03

(F) 1-VFS-03AREA OF WORK

AREA OF WORK

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:5

A M

PS101.5

PLUMBING SITE PLAN - PHASE 1 ADD

ALTERNATE

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

GENERAL SHEET NOTES

KEYNOTES

1 FUTURE 6" FIRE PROTECTION AND 4" FIRE SPRINKLER TO

SERVE THE FUTURE CLC ADDITION AND CANTEEN .

2 FUTURE ISOLATION VALVE FOR CONNECTION TO FUTURE

CLC EXPANSION AND CANTEEN.

0' 5' 10' 20'

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

B31

B3

B32

ADD- ALT.

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

Scale: 1" = 10'-0"

1 PLUMBING SITE PLAN - PHASE 1

PLUMBING VALVE SCHEDULE ADD ALTERNATE

SYMBOL VAVLE TYPE VAVLE SIZE

LOCATION IN

PROJECT SYSTEM COUNT

Phase 1

(F)1-VFW-03 BUTTERFLY 6" COLUMN N-4 FW 1

(F) 1-VFS-03 BUTTERFLY 4" COLUMN N-4 FS 1

Grand total: 2

ADD ALTERNATE

ADD ALTERNATE

ADD ALTERNATE

A CONTRACTOR TO ENSURE ALL SERVICE

INTERRUPTIONS ARE COORDINATED WITH THE

COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER

MEETING IS TO OCCUR 2 DAYS PRIOR TO

INTERRUPTION.

B A DETAILED SCHEDULE, INCLUDING PROJECTED

SERVICE INTERRUPTION DATES WITH DURATIONS,

AND DETAILED PHASING PLAN IS TO BE PROVIDED TO

THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO

THE START OF WORK.

C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT

UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS

DESIGNED.

D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,

AND TEST PORTS WITH ACCESS PANELS. CENTER

SERVICE POINT IN ACCESS PANEL TO MAXIMIZE

ACCESS.

E ALL PIPING TO BE PAINTED AND LABELED PER VA

UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.

MEDICAL GAS PIPES ARE NOT REQUIRED TO BE

PAINTED. SEE SCOPE OF WORK AND SPEC SECTION

09 91 00 - 34.

F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING

CONFIGURATION FOR COR REVIEW PRIOR TO THE

START OF WORK.

G ALL INSULATION AND JACKETING TO BE PROVIDED AS

REQUIRED BY THE SPECIFICATIONS AND VA UTILITY

STANDARDS.

H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1

MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY

SPECIFICATION 01 00 00.

I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO

COMMISSIONING.

J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL

INFORMATION.

UPUP

LAUNDRY

B1B16

OFFICE

B1B16D

STORAGE

B1B16C

CORRIDOR

B1B-5

STORAGE

B1B16B

LOCKER ROOM

B1B16A

CLOTHING ROOM

LOST & FOUND

B1B15

SOILED LAUNDRY

B1B16G2

LAUNDRY

B1B16DRYERS

MACHINE RM

B1B16F

LAUNDRY

B1B16

OFFICE

B1B16G

COMM

B1B16G1

IRM SERVICE

B1B17A

CHIEF IRM

OFFICE

B1B17

C O

R R

ID

O

R

B

B -4

Room

B2A07

Room

B2A06

Room

B2A05

MECHANICAL

B2A05A

EMS LOCKER

B2A02

HVAC/

ELECTRICAL

OFFICES

B2A01A

SERVICE

ELEVATOR

S-3

SERVICE

ELEVATOR PIT

S-6

MECHANICAL

EQUIPMENT

ROOM

B2A03

BATTERY

CHARGING ROOM

B2A08A

Room

B2A08

Room

B2A08

Room

B2A04

VAULT

B2A04B

NARCOTIC VAULT

B2A04A

B22.A

B22.3

B22.2

B22.1

B22.B B22.C

CHILLERS, BLDG

EQUIPMENT

ROOM

118 CHILLER PLANT

BLDG 22A

BOILER ROOM,

BLDG 2

BOILER BLDG

BOILER BLDG

A

567 4

B22.A

B22.3

B22.2

B22.1

B22.B B22.C o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:1

A M

P-101

PLUMBING PARTIAL PLANS - BUILDINGS 1

AND 22

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

Scale: 1/8" = 1'-0"

1 PLUMBING PARTIAL BASEMENT PLAN - BUILDING 1

Scale: 1/8" = 1'-0"

2 PLUMBING PARTIAL SUB-BASEMENT PLAN - BUILDING 1

GENERAL SHEET NOTES

KEYNOTES

1 EXISTING MEDICAL GAS MASTER ALARM PANEL TO BE RELABELED IN

ACCORDANCE WITH NFPA99 ALARM LABELING REQUIREMENTS. SEE SHEET

P-501.1

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

Scale: 1/8" = 1'-0"

3 PLUMBING PARTIAL FIRST FLOOR PLAN - BUILDING 22 AND 22A

A CONTRACTOR TO ENSURE ALL SERVICE

INTERRUPTIONS ARE COORDINATED WITH THE COR 30

DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO

OCCUR 2 DAYS PRIOR TO INTERRUPTION.

B A DETAILED SCHEDULE, INCLUDING PROJECTED

SERVICE INTERRUPTION DATES WITH DURATIONS, AND

DETAILED PHASING PLAN IS TO BE PROVIDED TO THE

COR PRIOR TO THE START OF WORK. THIS SUBMITTAL

MUST BE ACCEPTED BY THE COR PRIOR TO THE START

OF WORK.

C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT

UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS

DESIGNED.

D SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL

INFORMATION.

B31.1 B31.2 B31.3 B31.7 B31.10 B31.11 B31.12

B31.A

B31.B

B31.C

B31.D

B31.E

B31.F

B31.G

B31.H

B31.I

B31.K

B31.L

B31.J

B31.4 B31.6B31.5 B31.8 B31.9 B31.13 B31.14

RECREATION

ROOM

1A09

CORRIDOR

1A-1

CORRIDOR

1A-2

CORRIDOR

TOILET

1A37A

LOBBY

C1-1

HOME BASED

PRIMARY CARE

1A13

CLEAN SUPPLY

1A15

HSKPA

1A28

2 BED ROOM

1A30

NURSES STATION

C1-3

TOILET

1A30A

OXYGEN

1A29

HSKPG

1A14

ACN-GEC PMG

ASST

1A04

Room

SOILED UTILITY

1C21

HEAD NURSE

MDS CO-ORDR

1A05

ACOS-GERIATRIC

EXTENDED CARE

1A06

OCCUPATIONAL

ACTIVITIES

1A08STORAGE

1A08A

GERIATRIC /

PRIMARY PMG

ASST

1A07

REHAB MEDICINE

1A13A

TOILET

1A16

COMM

1A17

HOME BASED

CARE

1A18

EXAM ROOM

1A19C

EXAM ROOM

1A19D

GERIATRIC

PRIMARY CARE

CLINIC

1A19

MENS RR

1A12

WOMENS RR

1A11

PATIENT CHECK

IN

1A19B

TELEMED

1A31

2" O

(N)

(N)

2" O

2" (N)

(N)2" EOSC

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:1

A M

P-102

PLUMBING FIRST FLOOR PLAN - BUILDING 31

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

SCALE: 1/8" = 1'-0"1

PLUMBING FIRST FLOOR PLAN - BUILDING 31

GENERAL SHEET NOTES

KEYNOTES

1 PROVIDE NEW EMERGENCY OXYGEN SUPPLY CONNECTION IN ACCESSIBLE

AREA BY EMERGENCY SUPPLY VEHICLES AT ALL TIMES IN ALL WEATHER

CONDITIONS PER NFPA99 REQUIREMENTS. SEE VALVE ARRANGEMENT

DETAIL B1/P502.

2 ROUTE (N) 2" OXYGEN SUPPLY PIPING FROM EXISTING EMERGENCY OXYGEN

CONNECTION TO NEW EMERGENCY OXYGEN SUPPLY CONNECTION. SEE

VALVE ARRANGEMENT DETAIL B1/P502.

3 PROVIDE 2" ISOLATION VALVE AND CHECK VALVE AT BUILDING ENTRY.

0' 4' 8' 16'

M A

T C

H L

IN

E S

E E

S H

E E

T P

S -1

.1

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

KEY PLAN

B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

F O

R C

O N

T

IN

U A

T

IO

N O

F O

X E

G

N

P

IP

IN

G

S E

E S

H E

E T

P S

.1

A CONTRACTOR TO ENSURE ALL SERVICE

INTERRUPTIONS ARE COORDINATED WITH THE

COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER

MEETING IS TO OCCUR 2 DAYS PRIOR TO

INTERRUPTION.

B A DETAILED SCHEDULE, INCLUDING PROJECTED

SERVICE INTERRUPTION DATES WITH DURATIONS,

AND DETAILED PHASING PLAN IS TO BE PROVIDED TO

THE COR PRIOR TO THE START OF WORK. THIS

SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO

THE START OF WORK.

C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT

UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS

DESIGNED.

D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,

AND TEST PORTS WITH ACCESS PANELS. CENTER

SERVICE POINT IN ACCESS PANEL TO MAXIMIZE

ACCESS.

E ALL PIPING TO BE PAINTED AND LABELED PER VA

UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING

SPECIFICATION 09900.

F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING

CONFIGURATION FOR COR REVIEW PRIOR TO THE

START OF WORK.

G ALL INSULATION AND JACKETING TO BE PROVIDED AS

REQUIRED BY THE SPECIFICATIONS AND VA UTILITY

STANDARDS.

H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1

MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY

SPECIFICATION 01 00 00.

I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO

COMMISSIONING.

J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL

INFORMATION.

POWER

MAINTENANCE

PUSH

TO

TEST

ALARM

SILENCE

MEDICAL GAS

ALARM SYSTEM

MICROPROCESSOR

EXISTING #22 AWG TWISTED SHIELDED

PAIR HIGH QUALITY ALARM CABLING

(BELDEN #8451 OR APPROVED

EQUIVALENT)

EXISTING MASTER ALARM PANEL (BOILER ROOM)

EXISTING MASTER ALARM PANEL (SUB-BASEMENT)

EXISTING MASTER ALARM PANEL (BLDG 1 - BASEMENT EMERGENCY DEPARTMENT)

EMER RES CYL IN USE

EMER RES CYL LOW

44 02 ROOM PS

RESR GAS PRES LOW

SEC TANK LOW

SEC TANK IN USE

PRIM LIQ LEVEL LOW

OXY LINE PRES LOW

OXY LINE PRES HIGH

#6 RES MAN

POWER

LAG COMP IN USE

COMP HI TEMP SHDN

CARBN MONOX HIGH

DEW POINT HIGH

LINE PRES HIGH

LINE PRES LOW

LINE PRES LOW

LINE PRES HIGH

GECU OXYGEN

LAG PUMP IN USE

LINE PRESS. LOW

LAG PUMP IN USE

VACUUM LOW

LINE PRESSURE LOW

CLC MED VACUUM

RESERVE CYL IN USE

LINE PRESS. HIGH

LINE PRESS. LOW

LINE PRESS. LOW

LINE PRESS. HIGH

RESERVE CYL IN USE

NITROUS OXIDE

MAINTENANCE

POWER

MAINTENANCE

POWER

MAINTENANCE

POWER

POWER

MAINTENANCE

PUSH

TO

TEST

ALARM

SILENCE

MEDICAL GAS

ALARM SYSTEM

MICROPROCESSOR

OXYGEN EMERGENCY

RESERVE IN USE

OXYGEN PRIMARY

LIQUID LEVEL LOW

MEDICAL SUPPLY

STATUS

POWER

OXYGEN LINE

PRESSURE LOW

BLDG 31

MEDICAL VACUUM LOW

PUMP IN USE

MEDICAL VACUUM LOW

MAINTENANCE

POWER

MAINTENANCE

POWER

MAINTENANCE

POWER

OXYGEN MEDICAL AIR VACUUM NITROGEN

RESERVE GAS

PRESSURE LOW

OXYGEN EMERGENCY

RESERVE LOW

OXYGEN EMERGENCY

RESERVE CYL. IN USE

OXYGEN EMERGENCY

RESERVE CYC. LOW

BLDG 1

OXYGEN LINE

PRESSURE LOW

OXYGEN LINE

PRESSURE HIGH

OXYGEN LINE

PRESSURE HIGH

MEDICAL AIR LINE

PRESSURE HIGH

MEDICAL AIR

LINE PRESSURE LOW

CARBON MONOXIDE

LEVEL HIGH

MEDICAL AIR

HIGH DEW POINT

MEDICAL AIR LAG

COMPRESSOR IN USE

MEDICAL AIR COMPRESSOR

HIGH TEMP. SHUTDOWN

NITROGEN LINE

PRESSURE HIGH

NITROGEN RESERVE

CYLINDERS IN USE

NITROGEN LINE

PRESSURE LOW

NITROUS OXIDE LINE

PRESSURE HIGH

NITROUS OXIDE RESERVE

CYLINDERS IN USE

NITROUS OXIDE LINE

PRESSURE LOW

MAINTENANCE

POWER

MAINTENANCE

POWER

POWER

MAINTENANCE

PUSH

TO

TEST

ALARM

SILENCE

MEDICAL GAS

ALARM SYSTEM

MICROPROCESSOR

OXYGEN EMERGENCY

RESERVE IN USE

OXYGEN PRIMARY

LIQUID LEVEL LOW

OXYGEN MEDICAL AIR

POWER

VACUUM

OXYGEN LINE

PRESSURE LOW

BLDG 31 LAG PUMP IN USE

VACUUM LAG

PUMP IN USE

VACUUM LOW

LOW VAC

CLC MED VACUUM

02 LOW

NITROGEN

CLC MED OXYGEN

MAINTENANCE

POWER

MAINTENANCE

POWER

MAINTENANCE

POWER

RESERVE GAS

PRESSURE LOW

OXYGEN EMERGENCY

RESERVE LOW

OXYGEN EMERGENCY

RESERVE CYL. IN USE

OXYGEN EMERGENCY

RESERVE CYC. LOW

BLDG 1

OXYGEN LINE

PRESSURE LOW

OXYGEN LINE

PRESSURE HIGH

OXYGEN LINE

PRESSURE HIGH

MEDICAL AIR LINE

PRESSURE HIGH

MEDICAL AIR

LINE PRESSURE LOW

CARBON MONOXIDE

LEVEL HIGH

MEDICAL AIR

HIGH DEW POINT

MEDICAL AIR LAG

COMPRESSOR IN USE

MEDICAL AIR COMPRESSOR

HIGH TEMP SHUTDOWN

NITROGEN LINE

PRESSURE HIGH

NITROGEN RESERVE

CYLINDERS IN USE

NITROGEN LINE

PRESSURE LOW

NITROUS OXIDE

RESERVE LOW

NITROUS OXIDE LINE

PRESSURE HIGH

NITROUS OXIDE RESERVE

CYLINDERS IN USE

NITROUS OXIDE LINE

PRESSURE LOW

MEDICAL SUPPLY STATUS

MAINTENANCE

POWER

MAINTENANCE

POWER

MEDICAL SUPPLY

STATUS

MEDICAL SUPPLY

STATUS

MEDICAL SUPPLY

STATUS

MEDICAL SUPPLY

STATUS

MEDICAL SUPPLY

STATUS

EXISTING #22 AWG TWISTED SHIELDED

PAIR HIGH QUALITY ALARM CABLING

(BELDEN #8451 OR APPROVED

EQUIVALENT)

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:2

A M

P-501

PLUMBING DETAILS

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

POWER

MAINTENANCE

PUSH

TO

TEST

ALARM

SILENCE

MEDICAL GAS

ALARM SYSTEM

MICROPROCESSOR

RELABELING OF EXISTING MASTER ALARM PANEL (BOILER ROOM)

RELABELING OF EXISTING MASTER ALARM PANEL (SUB-BASEMENT)

RELABELING OF EXISTING MASTER ALARM PANEL (BLDG 1 - BASEMENT EMERGENCY

DEPARTMENT)

EMERGENCY RESERVE SUPPLY

LESS THAN ONE DAY (LOW

CONTENTS)

EMERERGENCY RESERVE

PRESSURE LOW (NOT FUNCTIONAL)

BLDG 1. 44 02 ROOM PS

RESERVE PRESSURE LOW

(NOT FUNCTIONAL)

RESERVE SUPPLY LESS THAN

ONE DAY (LOW CONTENTS)

RESERVE IN USE

PRIMARY LIQUID LEVEL LOW

BLDG 1, MAIN LINE PRESSURE LOW

BLDG 1, MAIN LINE PRESSURE HIGH

BLDG1, #6 RES MAN

POWER

CHANGEOVER TO

SECONDARY SUPPLY

COMPRESSOR HIGH

TEMPERATUR SHUTDOWN

CARBON MONOXIDE LEVEL

HIGH

DEW POINT HIGH

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE LOW

BLDG 31

LAG PUMP IN USE

MAIN LINE PRESSURE LOW

LAG PUMP IN USE

MEDICAL VACUUM LOW

MAIN LINE PRESSURE LOW

BLDG 31

MAINTENANCE

POWER

MAINTENANCE

POWER

MAINTENANCE

POWER

POWER

MAINTENANCE

PUSH

TO

TEST

ALARM

SILENCE

MEDICAL GAS

ALARM SYSTEM

MICROPROCESSOR

PRIMARY LIQUID LEVEL LOW

POWER

BLDG 31

MEDICAL VACUUM LOW

MAINTENANCE

POWER

MAINTENANCE

POWER

MAINTENANCE

POWER

OXYGEN MEDICAL AIR MEDICAL VACUUM NITROGEN

BLDG 1, MAIN LINE PRESSURE

LOW

BLDG1, MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE LOW

CARBON MONOXIDE LEVEL

HIGH

DEW POINT HIGH

MAINTENANCE

POWER

MAINTENANCE

POWER

POWER

MAINTENANCE

PUSH

TO

TEST

ALARM

SILENCE

MEDICAL GAS

ALARM SYSTEM

MICROPROCESSOR

OXYGEN MEDICAL AIR

POWER

VACUUM

BLDG 31

BLDG 31

NITROGEN CLC MED OXYGEN

MAINTENANCE

POWER

MAINTENANCE

POWER

MAINTENANCE

POWER

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE LOW

NITROUS OXIDE

MAINTENANCE

POWER

MAINTENANCE

POWER

MAIN LINE PRESSURE LOW

MAIN LINE PRESSURE HIGH

CHANGEOVER TO

SECONDARY SUPPLY

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE LOW

CHANGEOVER TO

SECONDARY SUPPLY

NITROUS OXIDE

MAIN LINE PRESSURE LOW

MAIN LINE PRESSURE HIGH

MAINTENANCE

POWER

MAINTENANCE

POWER

OXYGEN MEDICAL AIR MEDICAL VACUUM NITROGEN NITROUS OXIDE

RESERVE IN USE

MAIN LINE PRESSURE LOW

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE LOW

CHANGEOVER TO

SECONDARY SUPPLY

MAIN LINE PRESSURE LOW

MAIN LINE PRESSURE HIGH

LAG PUMP IN USE

MEDICAL VACUUM LOW

MEDICAL VACUUM LOW

LAG PUMP IN USE

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE LOW

MAIN LINE PRESSURE HIGH

MAIN LINE PRESSURE LOW

CARBON MONOXIDE LEVEL

HIGH

DEW POINT HIGH

COMPRESSOR HIGH

TEMPERATUR SHUTDOWN

MAIN LINE PRESSURE LOW

MAIN LINE PRESSURE HIGH

CHANGEOVER TO

SECONDARY SUPPLY

CHANGEOVER TO

SECONDARY SUPPLY

EXISTING #22 AWG TWISTED SHIELDED

PAIR HIGH QUALITY ALARM CABLING

(BELDEN #8451 OR APPROVED

EQUIVALENT)

EXISTING #22 AWG TWISTED SHIELDED

PAIR HIGH QUALITY ALARM CABLING

(BELDEN #8451 OR APPROVED

EQUIVALENT)

BLDG 1, 44 02 ROOM PS

BLDG1, #6 RES MAN

EMERGENCY RESERVE SUPPLY

LESS THAN ONE DAY (LOW

CONTENTS)

EMERERGENCY RESERVE

PRESSURE LOW (NOT FUNCTIONAL)

RESERVE PRESSURE LOW

(NOT FUNCTIONAL)

RESERVE SUPPLY LESS THAN

ONE DAY (LOW CONTENTS)

CHANGEOVER TO

SECONDARY SUPPLY

COMPRESSOR HIGH

TEMPERATUR SHUTDOWN

LAG PUMP IN USE

MAIN LINE PRESSURE LOW

LAG PUMP IN USE

MAIN LINE PRESSURE LOW

BLDG 31

CHANGEOVER TO

SECONDARY SUPPLY

PRIMARY LIQUID LEVEL LOW

BLDG 1, MAIN LINE PRESSURE

LOW

BLDG1, MAIN LINE PRESSURE HIGH

RESERVE IN USE

BLDG 1, 44 02 ROOM PS

BLDG1, #6 RES MAN

EMERGENCY RESERVE SUPPLY

LESS THAN ONE DAY (LOW

CONTENTS)

EMERERGENCY RESERVE

PRESSURE LOW (NOT FUNCTIONAL)

RESERVE PRESSURE LOW

(NOT FUNCTIONAL)

RESERVE SUPPLY LESS THAN

ONE DAY (LOW CONTENTS)

CHANGEOVER TO

SECONDARY SUPPLY

MAIN LINE PRESSURE LOW

RESERVE PRESSURE LOW

(NOT FUNCTIONAL)

MAIN LINE PRESSURE LOW

CLC MED OXYGEN

RESERVE PRESSURE LOW

(NOT FUNCTIONAL)

MAIN LINE PRESSURE LOW

CLC MED OXYGEN

RESERVE PRESSURE LOW

(NOT FUNCTIONAL)

MAIN LINE PRESSURE LOW

SCALE = NONE

EMERGENCY OXYGEN SUPPLY CONNECTION (PHASE

1)

B1

(E) BALL VALVE

EMERGENCY

OXYGEN

CONNECTION POINT

TO BE REMOVED.

PATCH WALL PER

ARCHITECTURAL

SPECIFICATIONS

2" SHUTTOFF

BALL VALVE

RELIEF

VALVE AND

VENT

CHECK

VALVE

EMERGENCY

OXYGEN

CONNECTION

POINT

(N) 2" OXYGEN PIPE TO

CONNECTION POINT

2" OXYGEN PIPE

EXISTING EMERGENCY

CONNECTION POINT

(E) CHECK VALVE

VALVE ARRANGEMENT AT NEW LOCATION IN RECREATION

ROOM 1A09

VALVE ARRANGEMENT AT EXISTING LOCATION IN CORRIDOR 2

OUTSID

E

INSIDE

OUTSID

E

INSIDE

VENT TO OUTSIDE

VIA SIDEWALL OR

ROOF

(E) 1-1/2" MAIN

OXYGEN SUPPLY

TO BE REMOVED

DURING PHASE 2

(N) LOCKABLE, RECESSED,

WEATHER TIGHT OXYGEN

INLET BOX

(E) 1-1/2" TO CLC BLDG 31

(E) 3/4" TO CLC EXPANSION

CAP

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management

Department of Veterans Affairs

7 8 9

TRIPLE C - THE A-E GROUP

4401 ATLANTIC AVE. SUITE 200

LONG BEACH, CA 90807

CONTACT: DAVID POTTER

PHONE: 307 460-2054

BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

1839 S. ALMA SCHOOL ROAD, SUITE 300

MESA, AZ 85210

CONTACT: JOHN MONTANO

PHONE: 602 336-5415

UNITED STRUCTURAL DESIGN, LLC

720 W. COMMERCE AVE OR P.O. BOX 33245

GILBERT, AZ 85233 PHOENIX, AZ 85067

CONTACT: DAVID GRAPSAS

PHONE: 480 382-9768

A ut od es k D oc s:

//5

-1 6-

V A

F re sn o

C hi lle r

P la nt P

/V

A F re sn o C hi lle r P la nt

M P

E _A

D D

_S E

R V

IC

E

.r vt

/1

5/

0:

:2

A M

P-502

PLUMBING DETAILS

R. REIF R. SCHAMP10/10/2024

570-16-302PHASE 2 CHILLER

INFRASTRUCTURE ON FRESNO

CAMPUS

RECORD DRAWINGS

2615 E CLINTON AVE, FRESNO, CA 93703

V

HWR

HWS

DOWN

CHR

CHS

GENERAL NOTES:MECHANICAL SYMBOL LEGENDABBREVIATIONS

VALVE ASSEMBLY

XX - ## NUMBERS REFER TO SPECIFIC EQUIPMENT

SYMBOL INDICATES NEW EQUIPMENT

EQUIPMENT SYMBOLS

IDENTIFIED IN EQUIPMENT SCHEDULE

CFM

SYMBOL INDICATES GRILLE OR

DIFFUSER IDENTIFIED IN EQUIPMENT

SCHEDULE

SIDEWALL GRILLE DIMENSION WHERE

SHOWN ON PLANS

LETTERS REFER TO THE EQUIPMENT TYPE

ACCESS DOOR

AIR CONDITIONING UNIT

ABOVE FINISHED FLOOR

ACOUSTIC LINING

ACU

AD

AFF

AL

BOP

BOD

BOTTOM OF PIPE

BOTTOM OF DUCT

CUBIC FEET PER MINUTE

CLEANOUT

CFM

CO

MOTOR CONTROL CENTERMCC

NOT APPLICABLE

NOT IN CONTRACT

NUMBER (QUANTITY)

NA

NIC

NO.

OUTSIDE AIR

OPPOSED BLADE DAMPER

OA

OBD

PSIG

PRV PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH GAGE

QUADRANT

QUANTITYQTY

QUAD

RETURN AIRR.A.

SMOKE CONTROL DAMPERSCD

EXHAUSTEXH

FLAT TOP

FEET PER MINUTE

FT

FPM

DEGREES FAHRENHEIT

FAN COIL UNIT

FLOOR DRAIN

FLEXIBLE

FCU

FD

FLEX

°F

TOPT TOP OF PIPE TRAPEZE

VENT THRU ROOFVTR

VEL

VAV VARIABLE AIR VOLUME

VELOCITY

GALLONS PER HOUR

GALLONS PER MINUTE

GPH

GPM

HAND DAMPER (VOLUME DAMPER)

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HD

HEPA

INCHESIN

MAKE-UP WATER

CONDENSATE DRAIN

CHILLED WATER RETURN

CHILLED WATER SUPPLY

HEATING WATER RETURN

HEATING WATER SUPPLY

PIPING SYMBOLS

DIRECTION OF FLOW

DIRECTION OF PIPE PITCH (DOWN) WATER FLOW MEASURING DEVICE

PLUG VALVE

VALVE SYMBOLS

GATE VALVE

GLOBE VALVE

CHECK VALVE

PRESSURE REDUCING VALVE

THREE-WAY MODULATING CONTROL VALVE

TWO-WAY CONTROL VALVE

SAFETY VALVE OR PRESSURE RELIEF

MANUAL AIR VENT

SOLENOID VALVE

3/4" GATE VALVE WITH ADAPTER TO 3/4"

HOSE THREAD

BUTTERFLY VALVE

BALL VALVE

VALVE IN RISE

WCO

WH

WALL CLEANOUT

WALL HYDRANT

V

VAC

VOLTS

VOLTS, ALTERNATING CURRENT

TP TOTAL PRESSURE (INCHES OF WATER)

SP STATIC PRESSURE (INCHES OF WATER)

Rh

RPM

RELATIVE HUMIDITY

REVOLUTIONS PER MINUTE

KWH

KW KILOWATT

KILOWATT HOUR

HB HOSE BIBB

FS FLOOR SINK

FCO FLOOR CLEANOUT

ENT ENTERING

DX DIRECT EXPANSION

BTU

BTUH

BRITISH THERMAL UNIT

BTU PER HOUR

BHP BRAKE HORSEPOWER

VENT

SECTION SYMBOLS

SDVV SINGLE DUCT VARIABLE VOLUME

ST SOUND TRAP

TYP. TYPICAL

CONT. CONTINUATION

D DRAIN

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

FT. FEET

F.G. FILTER GAUGE

FB FLAT BOTTOM

MA MAIN AIR (CONTROLS)

NOTE: NOT ALL ABBREVIATIONS AND

SYMBOLS APPLY TO THIS PROJECT.

CD

ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED

CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.

PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING

AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS

REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES

OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE

PROVIDE HOSE CONNECTION ON VALVE.

REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE

RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. ALL PIPE AND DUCTWORK

PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED

AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL.

CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND FIRE

PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT

ACCESS AND SERVICEABILITY.

CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES,

AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND PLUMBING

EQUIPMENT, AND PIPING, ETC. CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR AND ALL BUILDING TRADES TO AVOID CONFLICTS AND TO MAINTAIN

EQUIPMENT ACCESS AND SERVICEABILITY.

CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY

MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO

ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT IN A

MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE BUILDING

STRUCTURAL SYSTEM.

WHERE SIZES ARE INDICATED FOR EXISTING PIPES, THESE SIZES ARE

APPROXIMATE. VERIFY IN FIELD

SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR

MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.

1.

2.

3.

6.

7.

8.

XX - #

##x#

SINGLE LINE PIPE SYMBOLS

DOUBLE LINE PIPE SYMBOLS

BALL VALVE

CHECK VALVE

BUTTERFLY VALVE

ELBOW - DOWN

ELBOW - UP

PIPE RISE - DROP

ELBOW - DOWN TO TEE

TEE - DOWN

TEE - UP

ELBOW - UP TO TEE

END CAP

FLEX CONNECTION

PIPE REDUCER - CONCENTRIC

PIPE REDUCER - ECCENTRIC

PIPE STRAINER

UNION - SCREWED

AIR VENT - AUTOMATIC

AIR VENT - MANUAL

GAUGE - DIFFERENTIAL

GAUGE - PRESSURE

GAUGE - PRESSURE

GAUGE - PRESSURE WITH COCK

GAUGE - TEMPERATURE

PIPE - CAPPED WITH SHUT-OFF VALVE

PIPE ANCHOR

PIPE EXPANSION JOINT

P

PS

A

F

PS

TS

PIPE GUIDE

SENSOR - FLOW

SWITCH - FLOW

SWITCH - PRESSURE

SWITCH - TEMPERATURE

TEMPERATURE - PRESSURE TEST FITTING

THERMOMETER

THERMOMETER WELL

SECTION NUMBER

DRAWING NUMBER WHERE

DETAILED

DETAIL LOCATION

DRAWING NUMBER WHERE

DETAILED

X#

X###

X#/X###

DETAIL LOCATION X#

SECTION LOCATION X#

SECTION

DETAIL

SCALE

SCALE

FITTING SYMBOLS

RS REFRIGERATION SUCTION

RL REFRIGERATION LIQUID

VALVE - BALL LEVER

VALVE - GATE MANUAL

VALVE - BUTTERFLY MOTORIZED

VALVE - GLOBE MANUAL

VALVE - GLOBE LEVER

VALVE - PLUG LEVER

VALVE - PLUG MANUAL

VALVE - PRESSURE REGULATING

VALVE - CHECK

VALVE - PRESSURE RELIEF

TWS TOWER WATER SUPPLY

TWR TOWER WATER RETURN

TWB TOWER WATER BYPASS

HPS STEAM - HIGH PRESSURE SUPPLY

HPR STEAM - HIGH PRESSURE RETURN

LPR STEAM - LOW PRESSURE RETURN

CND STEAM - CONDENSATE RETURN

PC STEAM - PUMPED CONDENSATE

R REFRIGERATION

MU

EXISTING PIPE TO REMAIN

EXISTING PIPE TO BE REMOVED

DRAIND

SOLENOID VALVE

PLUG VALVE

GATE VALVE

DIAPHRAGM VALVE

GLOBE VALVE

CIRCUIT SETTER

STEAM TRAP INVERTED BUCKET

2-WAY CONTROL VALVE

3-WAY CONTROL VALVE

RELIEF VALVE

PRESSURE REDUCING VALVE

ELBOW - DOWN

ELBOW - UP

PIPE RISE - DROP

ELBOW - DOWN TO TEE

TEE - DOWN

END CAP

PIPE REDUCER - CONCENTRIC

PIPE REDUCER - ECCENTRIC

UNION - SCREWED

SINGLE LINE PIPE SYMBOLS

DOUBLE LINE PIPE SYMBOLS

PIPE STRAINER

THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING

SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE

PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,

ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING

BUILDING MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.

THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING

SERVICES FOR REMOVALS WITH THE COR AUTHORIZED REPRESENTATIVE AND

SHALL CONFORM TO THEIR REQUIREMENTS.

DISRUPTION OF NORMAL HOSPITAL ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE

MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT

THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE MEDICAL CENTER WHICH

ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE

OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED

OUTSIDE OF THE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE

MEDICAL CENTER. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION

(MAINTAIN WORK ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST

SCREENS, ETC. FOR ALL WORK AREAS AFFECTED BY DEMOLITION FOR NEW

INSTALLATION TO MINIMIZE DUST AND FUMES. SOME ASPECTS OF THE WORK WILL

BE REQUIRED TO BE PERFORMED DURING OFF NORMAL HOURS, INCLUDING NIGHTS

AND WEEKENDS.

THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN

ADVANCE TO THE ARCHITECT AND THE COR'S AUTHORIZED REPRESENTATIVE FOR

APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN

OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL

COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH

ACCEPTABLE ROUTING AND ACCESS WITHIN THE MEDICAL CENTER FOR MATERIALS

REQUIRED FOR THE NEW INSTALLATION.

ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON

FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT

DATA.

ALL DATA OBTAINED VIA TESTING AND MEASURING OF THE EXISTING AIR HANDLING

UNIT, AND THE ASSOCIATED RETURN/RELIEF FAN, SUPPLY AIR DUCTS, EXHAUST, AND

RETURN AIR DUCTS PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW WORK

SCOPE OF WORK SHALL BE UTILIZED TO ESTABLISH NEW HVAC SYSTEM

PERFORMANCE AND BALANCE DATA FOR THE RENOVATION. DATA SHALL BE

FORWARDED TO THE PROJECT ENGINEER FOR REVIEW AND COMMENT PRIOR TO

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL

TRADES INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND

ARCHITECTURAL. ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE

ARCHITECT PRIOR TO START OF WORK.

A

B

C

D

E

F

G

GENERAL DEMO NOTES:

ACCESS DOORAD

AIR HANDLING UNITAHU

COMPRESSED AIR

CONDENSATE DRAIN

CA

CD

DETAIL REFERENCE

SECTION AND DETAIL TITLES

MPS STEAM - MEDIUM PRESSURE SUPPLY

MPR STEAM - MEDIUM PRESSURE RETURN

LPS STEAM - LOW PRESSURE SUPPLY

SCAN OR PHOTO NUMBER

LIDAR SCAN OR PHOTO

FUTURE PIPE

EXISTING(E)

(N) NEW

(F) FUTURE

RR REFRIGERATION RELIEF

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Project Number

Checked by

Drawing Title

Approved : Project Director

1 2 3 4 5 6

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .