These are record drawings for the Phase 2 Chiller Infrastructure project on the Fresno Campus of the Department of Veterans Affairs, prepared by the Office of Construction and Facilities Management. The drawing set includes plumbing, mechanical, and utility infrastructure plans spanning multiple phases of construction.
The project encompasses plumbing work including medical gas piping (oxygen, nitrogen, nitrous oxide, medical air, and vacuum systems), domestic hot and cold water lines, fire protection systems, and emergency oxygen supply connections. Mechanical work includes chilled water supply and return piping (ranging from 3" to 14" in diameter), steam and condensate lines, and the installation of new centrifugal magnetic bearing chillers (600-ton and 300-ton units) in Building 22A. Work is divided into three phases with phased valve schedules, isolation points, and future connection provisions documented throughout. Key details include pipe supports, anchors, guides, insulation requirements, pressure relief systems, air vents, and commissioning requirements. The drawings specify coordination requirements with the Contracting Officer Representative, contractor-managed service interruptions with minimum 30-day advance notice, utility stacking configurations for review, and testing and cleaning protocols prior to system commissioning. The project team includes Triple C – The A-E Group, Bridgers & Paxton Consulting Engineers, Inc., and United Structural Design, LLC, with the site located at 2615 E Clinton Avenue, Fresno, California 93703.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN DOWN
WC WATER CLOSET
FLUSH VALVEFV
YH YARD HYDRANT
TD TRENCH DRAIN
FOV
FOR
FOS
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
ES
EEW
EMERGENCY SHOWER
EMERGENCY EYEWASH
CWV COMBINATION WASTE AND VENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ACID NEUTRALIZING TANK
ACID RESISTANT VENT THROUGH ROOF
BALANCING COCK
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BTU PER HOUR
CLOTHES WASHER BOX
CUBIC FEET PER HOUR
CLEANOUT
CLEANOUT TO GRADE
CIRCULATION PUMP
DOUBLE CLEANOUT
DRINKING FOUNTAIN
ELEVATION
ELECTRIC WATER HEATER
ELECTRIC WATER COOLER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FEET
GUTTER DRAIN
GREASE INTERCEPTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GAS WATER HEATER
HORSEPOWER
HEAD
INCHES
INVERT
KILOWATT
1,000 BTUH
MIXING VALVE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
WALL CLEANOUT
AFF
AFG
ANT
AVTR
B.C.
BOP
BTU
BTUH
CWB
CFH
CO
COTG
CP
DCO
DF
EL
EWH
EWC
°F
FCO
FFE
FT
GD
GI
GPH
GPM
GWH
HP
HD
IN
INV
kW
MBh
MV
NA
NIC
No. # N.C.
N.O.
OS&Y
Ph
PSIG
SP
TYP
YB
WCO
DOUBLE CLEANOUT TO GRADEDCOTG
ESEW
EMERGENCY SHOWER EYE WASH
POWERS OF HARDNESS
PH
HOSE BIBBHB
DS DOWNSPOUT
DSN DOWNSPOUT NOZZLE
PLUMBING SYMBOL LEGEND
NOTE: NOT ALL ABBREVIATIONS OR
SYMBOLS APPLY TO THIS PROJECT
ABBREVIATIONS
A
PENETRATION
TEST PLUG (PRESS/TEMP)
(WH) (HB)
DCOTG
FCO/COTG
FS/FD/AD
VTR
TWO WAY OR DOUBLE CLEANOUT TO GRADE
FLOOR CLEANOUT/CLEANOUT TO GRADE
FLOOR SINK , FLOOR DRAIN , AREA DRAIN
WATER HAMMER ARREST0R
FITTING (PETE'S PLUG)
POINT OF CONNECTION TO EXISTING
AQUASTAT
PRESSURE GAUGE AND GAUGE COCK
THERMOMETER
STRAINER WITH BLOWDOWN VALVE & HOSE BIBB
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
FLEXIBLE CONNECTION
UNIVERSAL TEMPERATURE-PRESSURE
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
PIPE GUIDE
DIRECTION OF FLOW
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
SLOPE OF PIPE
VENT THROUGH ROOF
AG AIR GAP FITTING
WALL HYDRANT, HOSE BIBB
KEYED NOTE
OR
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
OXYGEN
FIRE PROTECTION WATER
FIRE PROTECTION SPRINKLER (N) FS
(N) FW
(N) O
(E) FS
(E) FW
(E) O
EXISTINGNEWDESCRIPTION
SITE UTILITY SYMBOLS
CARBON DIOXIDECO2
H
HE
AC
AR
CDA
LOX
LN
DV
DA
WAGD
IA
MV
O
NO
N
MA
DENTAL VACUUM
WASTE ANESTHESIA GAS DISPOSAL
INSTRUMENT AIR
DENTAL AIR
EXISTING PIPING
LIQUID NITROGEN
LIQUID OXYGEN
HYDROGEN
HELIUM
ACETYLENE
ARGON
COMPRESSED DRY AIR
ALARM PANEL (IN WALL)
MEDICAL VALVE BOX
MEDICAL GAS DROP
MEDICAL VACUUM
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
O OXYGEN
CDA
CO2
AR
AC
HE
H
LN
LOX
MA
N
NO
O
MV
IA
WAGD
DA
DV
O
SYMBOL ABBREVIATION DESCRIPTION
DESCRIPTIONABBREVIATIONSYMBOL
PROCESS GASES
MEDICAL GAS SYMBOLS
S
VACUUM BREAKER
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE
FLOW SWITCH
SOLENOID VALVE
FUEL GAS PRESSURE REGULATOR
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
PLUG VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE
OR OR
OR
OR
DESCRIPTIONSYMBOL
VALVE SYMBOLS
P##
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
LETTER REFER TO EQUIPMENT TYPE
NUMBER REFERS TO SPECIFIC EQUIPMENT
SYMBOL INDICATES FIXTURE/EQUIPMENT
IDENTIFIED IN EQUIPMENT SCHEDULE
SECTION SYMBOL
DETAIL SYMBOL
SECTION, ELEVATION, AND DETAIL TITLES
FIXTURE & EQUIPMENT SYMBOL
P-100
A
P-500
P-200
A
P-500
P-300
A
SCALE
ELEVATION
SCALE
DETAIL
SCALE
SECTION
IRR
INDIRECT WASTEIW
TW
TWR
SAN
V
DHWR
DCW
DHW
LA
IA
INW
IHWR
IHW
ICW
PD
SCW
IRR
NGH
NGM
G
LPG
ORD
RD
DIR
DIS
NPW
MU
ROR
ROS
CD
CA
AW
AV
PUMPED DISCHARGE LINE
IRRIGATION
SOFT COLD WATER
TEMPERED WATER (TEMP °F)
TEMPERED WATER RETURN (TEMP °F)
NATURAL GAS-HIGH PRESSURE
NATURAL GAS-MEDIUM PRESSURE
LAB COMPRESSED AIR
INSTRUMENT COMPRESSED AIR
INDUSTRIAL WASTE
REVERSE OSMOSIS RETURN
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL HOT WATER
INDUSTRIAL COLD WATER
NATURAL GAS-LOW PRESSURE
LIQUIFIED PETROLEUM GAS
OVERFLOW ROOF DRAIN
STORM/ROOF DRAIN
SANITARY SEWER
DEIONIZED WATER RETURN
DEIONIZED WATER SUPPLY
VENT
NON-POTABLE WATER
MAKE-UP WATER
REVERSE OSMOSIS SUPPLY
140° DOMESTIC HOT WATER
140° DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN
COMPRESSED AIR
ACID WASTE
ACID VENT
SHW SOFT HOT WATER
SAN
AV
AW
CA
CD
ROS
ROR
NPW
V
DIS
DIR
RD
ORD
LPG
G
NGM
NGH
SCW
PD
INW
IA
IW
LA
SHW
GW GREASE WASTEGW
GV GREASE VENT
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
ICW
IHW
IHWR
TWR (_ _ _)
TW (_ _ _)
GV
DCW
DHW
DHWR
DHW 140ºF
DHWR 140ºF
MU
DHW 140ºF
DHWR 140ºF
OXYGENO
FUTURE PIPE
(F) FS
(F) FW
(F) O
FUTURE
FUTURE(F)
EXISTING(E)
NEW (N)
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:1
A M
P-001
PLUMBING LEGEND
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
NO REVISIONS DATE
month/day/ year
DN
UP
DN
UP
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
SD
SD
SD
SD
SOLAR PANELS
SOLAR PANELS
H
H H H H H
HH
HH
H H H H H H
H
H
HHHHH
H
H
H
H
H
G
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
A R
E A
O F
W O
R K
AREA OF WORK
AREA OF WORK
PHASE 1
B25
B31
(CLC)
B2
B22
B22A
B36 B3
B8 B7
LOT C
LOT A
B1
B19
LOT D
B34
B17
B24 B24
BREEZE
WAY
LOT E
B32
P H
A S
E
S E
E S
H E
E T
P S
.1
P H
A S
E
S E
E S
H E
E T
P S
.2
P H
A S
E
S E
E S
H E
E T
P S
.2
P H
A S
E
S E
E S
H E
E T
P S
.3
AREA OF WORK
AREA OF WORK
AREA OF WORK
LOT C
SEE
PLAN
1/P-101
SEE
PLAN
2/P-101
SEE ENLARGED
PLAN 3/P-101
SEE ENLARGED
PLAN 1/P-102
B27
LOT B
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:3
A M
PS101
PLUMBING SITE PLAN
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
A CONTRACTOR TO ENSURE ALL SERVICE
INTERRUPTIONS ARE COORDINATED WITH THE
COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER
MEETING IS TO OCCUR 2 DAYS PRIOR TO
INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED
SERVICE INTERRUPTION DATES WITH DURATIONS,
AND DETAILED PHASING PLAN IS TO BE PROVIDED TO
THE COR PRIOR TO THE START OF WORK. THIS
SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO
THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT
UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS
DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE
ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA
UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.
MEDICAL GAS PIPES ARE NOT REQUIRED TO BE
PAINTED. SEE SCOPE OF WORK AND SPEC SECTION
09 91 00 - 34.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE
START OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1
MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY
SPECIFICATION 01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
0' 20' 40' 80'Scale: 1" = 40'-0"
1 PLUMBING SITE PLAN - OVERALL
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2P3 B31
B3
B32 P1
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
PLUMBING PROJECT SCOPE
THE OVERHEAD PEDESTRIAN CANOPIES SHALL INCLUDE:
A. CONCEALED RACEWAY CARRYING MEDICAL OXYGEN FROM BUILDING NO. 22 TO BUILDING NO.
31 PENTHOUSE AND FROM FIRST FLOOR ALARM PANEL TO BUILDING 1.
B. REMOVAL OF EXISTING PIPE UTILITY STANDS ASSOCIATED WITH MEDICAL OXYGEN SERVICES WHICH WERE CONSTRUCTED FOR PROJECT NO. 570-13-300, “NEW BUILDING NO. 22A AND CHILLER
INFRASTRUCTURE”.
C. EMERGENCY LOW PRESSURE OXYGEN INLET. SEE SHEET P-102 FOR SCOPE OF WORK.
A
B
C
D
E
F
W
X
B22.4
7.9
P H
A S
E
ADD ALTERNATE
SEE SHEET PS101.5
B22
B22A
P H
A S
E
S E
E S
H E
E T
P S
.2
A R
E A
O F
W O
R K
B31
CLC
AREA OF WORK
OFFICE
CHILLER PLANT
BLDG 22A
CHILLERS, BLDG
EQUIPMENT
ROOM
2 BED ROOM
1A30
HSKPA
1A28
TOILET
1A37A CORRIDOR
2 BED ROOM
1A33
2 BED ROOM
1A32
2 BED ROOM
1A37
2 BED ROOM
1A36
DIABETIC
RESERCH
1A27
DIABETIC CLINIC
1A26
(F) 1-VFS-02
(F) 1-VFW-02
(F) 1-VFS-01
(F) 1-VFW-01
AREA OF WORK
(N) 1-VO-01
SEE ENLARGED PLAN
3/P-101
SEE ENLARGED PLAN
1/P-102
ELECTRICAL
ROOM
CHILLER ROOM
A
B
C
D
E
B31.2 B31.3 B31.4B31.5B31.6B31.7B31.8 B31.9B31.10 B31.11 B31.12
W
X
B22.4
7.9
B22
B22A
B31
CLC
AREA OF WORK
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:4
A M
PS101.1
PLUMBING SITE PLAN - PHASE 1
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
KEYNOTES
1 (N) 2" OXYGEN ROUTED INSIDE WALKWAY ENCLOSURE.
2 VALVE AND CAP (N) 2" OXYGEN PIPE FOR FUTURE
CONNECTION.
3 FUTURE 6" FIRE PROTECTION WATER LINE TO BUILDING
01 AND FUTURE 4" FIRE SPRINKLER TO BUILDING 24.
4 ADD ALTERNATE (N) 6" FIRE PROTECTION AND (N) 4" FIRE
SPRINKLER TO SERVE THE FUTURE CLC ADDITION AND
CANTEEN.
5 FUTURE 6" FIRE PROTECTION AND FUTURE 4" FIRE
SPRINKLER TO BE CONNECTED TO EXISTING MAINS.
0' 4' 8' 16'
Scale: 1/8" = 1'-0"
1 PLUMBING SITE PLAN - PHASE 1
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32 P1
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
PLUMBING VALVE SCHEDULE PHASE 1
SYMBOL VAVLE TYPE VAVLE SIZE
LOCATION IN
PROJECT SYSTEM COUNT
Phase 1
(F) 1-VFW-01 BUTTERFLY 6" COLUMN E-7 FW 1
(F) 1-VFS-02 BUTTERFLY 4" COLUMN E-6 FS 1
(F) 1-VFS-01 BUTTERFLY 4" COLUMN E-7 FS 1
(F) 1-VFW-02 BUTTERFLY 6" COLUMN E-6 FW 1
Grand total: 4
F O
R C
O N
T
IN
U A
T
IO
N O
F O
X E
G E
N P
IP
IN
G S
E E
S H
E E
T P
-1
OXYGEN VALVE SCHEDULE - PAHSE 1
SYMBOL VAVLE TYPE VAVLE SIZE
LOCATION IN
PROJECT SYSTEM COUNT
Phase 1
(N) 1-VO-01 BUTTERFLY 2" COLUMN D-32 O 1
Grand total: 1
Scale: 1/16" = 1'-0"
2 PLUMBING PARTIAL SITE PLAN - PHASE 2 DEMO 0' 8' 16' 32'
EXISTING OXYGEN PIPE TO
EXISTING EMERGENCY OXYGEN
CONNECTION TO BE REMOVED
EXISTING OXYGEN PIPE DROP
TO TUNNEL TO BE REMOVE.
CAP PIPE A TUNNEL
PENETRATION
EXISTING OXYGEN PIPE ON PIPE
BRIDGE TO BE REMOVED
EXISTING OXYGEN
PIPE TO BE REMOVED
POINT OF
DISCONNEC
T
A CONTRACTOR TO ENSURE ALL SERVICE
INTERRUPTIONS ARE COORDINATED WITH THE
COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER
MEETING IS TO OCCUR 2 DAYS PRIOR TO
INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED
SERVICE INTERRUPTION DATES WITH DURATIONS,
AND DETAILED PHASING PLAN IS TO BE PROVIDED TO
THE COR PRIOR TO THE START OF WORK. THIS
SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO
THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT
UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS
DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE
ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA
UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.
MEDICAL GAS PIPES ARE NOT REQUIRED TO BE
PAINTED. SEE SCOPE OF WORK AND SPEC SECTION
09 91 00 - 34.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE
START OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1
MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY
SPECIFICATION 01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
D
E
W
X
4344454647
Z
W.0
40.9
FF
HH
X.0
42.8
Y
B22.4
7.9
42.1
58.1
57.5
49.9
GG.1
FF.1
Z.0
Y.0
P H
A S
E
S E
E S
H E
E T
P S
.1
P H
A S
E
P H
A S
E
ADD ALTERNATE
SEE SHEET PS101.5
B36
B3
B24
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
P H
A S
E
S E
E S
H E
E T
P S
.3
P H
A S
E
S E
E S
H E
E T
P S
.3
(N) 2-VO-02
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:4
A M
PS101.2
PLUMBING SITE PLAN - PHASE 2
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
KEYNOTES
0' 4' 8' 16'
Scale: 1/8" = 1'-0"
1 PLUMBING SITE PLAN - PHASE 2
1 (N) 2" OXYGEN ROUTED INSIDE WALKWAY ENCLOSURE.
2 VALVE AND CAP (N) 2" OXYGEN PIPE FOR FUTURE
CONNECTION.
3 CONNECT (N) 2" OXYGEN TO (E) 2" OXYGEN PIPE.
4 (F) 6" FIRE PROTECTION WATER LINE TO BUILDING 01 AND
(F)4" FIRE SPRINKLER TO BUILDING 24.
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P2 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
OXYGEN VALVE SCHEDULE - PHASE 2
SYMBOL VAVLE TYPE VAVLE SIZE
LOCATION IN
PROJECT SYSTEM COUNT
Phase 2
(N) 2-VO-02 BUTTERFLY 2" COLUMN Y-48 O 1
Grand total: 1
A CONTRACTOR TO ENSURE ALL SERVICE
INTERRUPTIONS ARE COORDINATED WITH THE
COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER
MEETING IS TO OCCUR 2 DAYS PRIOR TO
INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED
SERVICE INTERRUPTION DATES WITH DURATIONS,
AND DETAILED PHASING PLAN IS TO BE PROVIDED TO
THE COR PRIOR TO THE START OF WORK. THIS
SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO
THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT
UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS
DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE
ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA
UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.
MEDICAL GAS PIPES ARE NOT REQUIRED TO BE
PAINTED. SEE SCOPE OF WORK AND SPEC SECTION
09 91 00 - 34.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE
START OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1
MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY
SPECIFICATION 01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
2" O
Z
AABB
FF
HH
CC
GG
Y
58.9
58.1
57.5
57.2
49.9
GG.1
FF.1
HH.1
DD
58.5
Z.0
Y.0
M A
C H
IN
E
P H
A S
E
M A
C H
IN
E
P H
A S
E
B24
BREEZEWAY
S E
E S
H E
E T
P S
.2
B24
B01
A R
E A
O F
W O
R K
A R
E A
O F
W O
R K
AREA OF WORK
B24
AUDITORIUM
AREA OF WORK
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:4
A M
PS101.3
PLUMBING SITE PLAN - PHASE 3
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
KEYNOTES
0' 4' 8' 16'
Scale: 1/8" = 1'-0"
1 PLUMBING SITE PLAN - PHASE 3
1 (N) 2" OXYGEN ROUTED INSIDE WALKWAY ENCLOSURE.
2 CONNECT (N) 2" OXYGEN TO (E) 2" OXYGEN PIPE
LOCATED IN SUB-BASEMENT
3 CONNECT (N) 2" OXYGEN TO (E) 2" OXYGEN PIPE.
4 (F) 6" FIRE PROTECTION WATER LINE TO BUILDING 01.
5 (N) 2" OXYGEN ROUTED OVER EXISTING CANOPY.
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
P3 B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
A CONTRACTOR TO ENSURE ALL SERVICE
INTERRUPTIONS ARE COORDINATED WITH THE
COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER
MEETING IS TO OCCUR 2 DAYS PRIOR TO
INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED
SERVICE INTERRUPTION DATES WITH DURATIONS,
AND DETAILED PHASING PLAN IS TO BE PROVIDED TO
THE COR PRIOR TO THE START OF WORK. THIS
SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO
THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT
UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS
DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE
ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA
UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.
MEDICAL GAS PIPES ARE NOT REQUIRED TO BE
PAINTED. SEE SCOPE OF WORK AND SPEC SECTION
09 91 00 - 34.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE
START OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1
MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY
SPECIFICATION 01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
HH
E
F
G
B25.B B25.A.5 B25.A.1B25.AB25.AA
B31.K
B31.L
H
J
L
M
N
P
S
T
89101112
2425262728
Q
R
W
31U
V
35 33
K
3.9
7.9
VV UU
WW
XX
B-25
MENTAL HEALTH
FREEDOM BLDG
ADD ALTERNATE
B25
B24
AREA OF WORK
A D
D A
L T
E R
N A
T E
PHASE 2
SEE SHEET MS101.2
P H
A S
E
S
E S
H E
E T
M S
.3
(F)1-VFW-03
(F) 1-VFS-03AREA OF WORK
AREA OF WORK
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:5
A M
PS101.5
PLUMBING SITE PLAN - PHASE 1 ADD
ALTERNATE
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
GENERAL SHEET NOTES
KEYNOTES
1 FUTURE 6" FIRE PROTECTION AND 4" FIRE SPRINKLER TO
SERVE THE FUTURE CLC ADDITION AND CANTEEN .
2 FUTURE ISOLATION VALVE FOR CONNECTION TO FUTURE
CLC EXPANSION AND CANTEEN.
0' 5' 10' 20'
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
ADD- ALT.
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
Scale: 1" = 10'-0"
1 PLUMBING SITE PLAN - PHASE 1
PLUMBING VALVE SCHEDULE ADD ALTERNATE
SYMBOL VAVLE TYPE VAVLE SIZE
LOCATION IN
PROJECT SYSTEM COUNT
Phase 1
(F)1-VFW-03 BUTTERFLY 6" COLUMN N-4 FW 1
(F) 1-VFS-03 BUTTERFLY 4" COLUMN N-4 FS 1
Grand total: 2
ADD ALTERNATE
ADD ALTERNATE
ADD ALTERNATE
A CONTRACTOR TO ENSURE ALL SERVICE
INTERRUPTIONS ARE COORDINATED WITH THE
COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER
MEETING IS TO OCCUR 2 DAYS PRIOR TO
INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED
SERVICE INTERRUPTION DATES WITH DURATIONS,
AND DETAILED PHASING PLAN IS TO BE PROVIDED TO
THE COR PRIOR TO THE START OF WORK. THIS
SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO
THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT
UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS
DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE
ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA
UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING.
MEDICAL GAS PIPES ARE NOT REQUIRED TO BE
PAINTED. SEE SCOPE OF WORK AND SPEC SECTION
09 91 00 - 34.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE
START OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1
MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY
SPECIFICATION 01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
UPUP
LAUNDRY
B1B16
OFFICE
B1B16D
STORAGE
B1B16C
CORRIDOR
B1B-5
STORAGE
B1B16B
LOCKER ROOM
B1B16A
CLOTHING ROOM
LOST & FOUND
B1B15
SOILED LAUNDRY
B1B16G2
LAUNDRY
B1B16DRYERS
MACHINE RM
B1B16F
LAUNDRY
B1B16
OFFICE
B1B16G
COMM
B1B16G1
IRM SERVICE
B1B17A
CHIEF IRM
OFFICE
B1B17
C O
R R
ID
O
R
B
B -4
Room
B2A07
Room
B2A06
Room
B2A05
MECHANICAL
B2A05A
EMS LOCKER
B2A02
HVAC/
ELECTRICAL
OFFICES
B2A01A
SERVICE
ELEVATOR
S-3
SERVICE
ELEVATOR PIT
S-6
MECHANICAL
EQUIPMENT
ROOM
B2A03
BATTERY
CHARGING ROOM
B2A08A
Room
B2A08
Room
B2A08
Room
B2A04
VAULT
B2A04B
NARCOTIC VAULT
B2A04A
B22.A
B22.3
B22.2
B22.1
B22.B B22.C
CHILLERS, BLDG
EQUIPMENT
ROOM
118 CHILLER PLANT
BLDG 22A
BOILER ROOM,
BLDG 2
BOILER BLDG
BOILER BLDG
A
567 4
B22.A
B22.3
B22.2
B22.1
B22.B B22.C o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:1
A M
P-101
PLUMBING PARTIAL PLANS - BUILDINGS 1
AND 22
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
Scale: 1/8" = 1'-0"
1 PLUMBING PARTIAL BASEMENT PLAN - BUILDING 1
Scale: 1/8" = 1'-0"
2 PLUMBING PARTIAL SUB-BASEMENT PLAN - BUILDING 1
GENERAL SHEET NOTES
KEYNOTES
1 EXISTING MEDICAL GAS MASTER ALARM PANEL TO BE RELABELED IN
ACCORDANCE WITH NFPA99 ALARM LABELING REQUIREMENTS. SEE SHEET
P-501.1
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
Scale: 1/8" = 1'-0"
3 PLUMBING PARTIAL FIRST FLOOR PLAN - BUILDING 22 AND 22A
A CONTRACTOR TO ENSURE ALL SERVICE
INTERRUPTIONS ARE COORDINATED WITH THE COR 30
DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED
SERVICE INTERRUPTION DATES WITH DURATIONS, AND
DETAILED PHASING PLAN IS TO BE PROVIDED TO THE
COR PRIOR TO THE START OF WORK. THIS SUBMITTAL
MUST BE ACCEPTED BY THE COR PRIOR TO THE START
OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT
UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS
DESIGNED.
D SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
B31.1 B31.2 B31.3 B31.7 B31.10 B31.11 B31.12
B31.A
B31.B
B31.C
B31.D
B31.E
B31.F
B31.G
B31.H
B31.I
B31.K
B31.L
B31.J
B31.4 B31.6B31.5 B31.8 B31.9 B31.13 B31.14
RECREATION
ROOM
1A09
CORRIDOR
1A-1
CORRIDOR
1A-2
CORRIDOR
TOILET
1A37A
LOBBY
C1-1
HOME BASED
PRIMARY CARE
1A13
CLEAN SUPPLY
1A15
HSKPA
1A28
2 BED ROOM
1A30
NURSES STATION
C1-3
TOILET
1A30A
OXYGEN
1A29
HSKPG
1A14
ACN-GEC PMG
ASST
1A04
Room
SOILED UTILITY
1C21
HEAD NURSE
MDS CO-ORDR
1A05
ACOS-GERIATRIC
EXTENDED CARE
1A06
OCCUPATIONAL
ACTIVITIES
1A08STORAGE
1A08A
GERIATRIC /
PRIMARY PMG
ASST
1A07
REHAB MEDICINE
1A13A
TOILET
1A16
COMM
1A17
HOME BASED
CARE
1A18
EXAM ROOM
1A19C
EXAM ROOM
1A19D
GERIATRIC
PRIMARY CARE
CLINIC
1A19
MENS RR
1A12
WOMENS RR
1A11
PATIENT CHECK
IN
1A19B
TELEMED
1A31
2" O
(N)
(N)
2" O
2" (N)
(N)2" EOSC
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:1
A M
P-102
PLUMBING FIRST FLOOR PLAN - BUILDING 31
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
SCALE: 1/8" = 1'-0"1
PLUMBING FIRST FLOOR PLAN - BUILDING 31
GENERAL SHEET NOTES
KEYNOTES
1 PROVIDE NEW EMERGENCY OXYGEN SUPPLY CONNECTION IN ACCESSIBLE
AREA BY EMERGENCY SUPPLY VEHICLES AT ALL TIMES IN ALL WEATHER
CONDITIONS PER NFPA99 REQUIREMENTS. SEE VALVE ARRANGEMENT
DETAIL B1/P502.
2 ROUTE (N) 2" OXYGEN SUPPLY PIPING FROM EXISTING EMERGENCY OXYGEN
CONNECTION TO NEW EMERGENCY OXYGEN SUPPLY CONNECTION. SEE
VALVE ARRANGEMENT DETAIL B1/P502.
3 PROVIDE 2" ISOLATION VALVE AND CHECK VALVE AT BUILDING ENTRY.
0' 4' 8' 16'
M A
T C
H L
IN
E S
E E
S H
E E
T P
S -1
.1
N O R T H
F R E S N O
S T R E E T
EAST HARVARD AVENUE
N O R T H
A N G U S
S T R E E T
EAST CLINTON AVENUE
TANK
O2
TANK
O2
KEY PLAN
B31
B3
B32
B24
B25
B2
B22A
B1
OPC
B27
B34
B
B19& B19A
F O
R C
O N
T
IN
U A
T
IO
N O
F O
X E
G
N
P
IP
IN
G
S E
E S
H E
E T
P S
.1
A CONTRACTOR TO ENSURE ALL SERVICE
INTERRUPTIONS ARE COORDINATED WITH THE
COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER
MEETING IS TO OCCUR 2 DAYS PRIOR TO
INTERRUPTION.
B A DETAILED SCHEDULE, INCLUDING PROJECTED
SERVICE INTERRUPTION DATES WITH DURATIONS,
AND DETAILED PHASING PLAN IS TO BE PROVIDED TO
THE COR PRIOR TO THE START OF WORK. THIS
SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO
THE START OF WORK.
C FUTURE WORK IS CONSIDERED NIC EXCEPT THAT
UTILITY BANK ENCLOSURE IS TO BE PROVIDED AS
DESIGNED.
D COORDINATE UTILITY VALVES, JACKET SEAMS, GAUGES,
AND TEST PORTS WITH ACCESS PANELS. CENTER
SERVICE POINT IN ACCESS PANEL TO MAXIMIZE
ACCESS.
E ALL PIPING TO BE PAINTED AND LABELED PER VA
UTILITY STANDARD AND AS IDENTIFIED IN THE PAINTING
SPECIFICATION 09900.
F CONTRACTOR TO SUBMIT PROPOSED UTILITY STACKING
CONFIGURATION FOR COR REVIEW PRIOR TO THE
START OF WORK.
G ALL INSULATION AND JACKETING TO BE PROVIDED AS
REQUIRED BY THE SPECIFICATIONS AND VA UTILITY
STANDARDS.
H CONTRACTOR TO PURCHASE AND LEAVE ON SITE 1
MAN-LIFT AND 1 FORKLIFT AS REQUIRED BY
SPECIFICATION 01 00 00.
I ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO
COMMISSIONING.
J SEE COMMISSIONING REQUIREMENTS FOR ADDITIONAL
INFORMATION.
POWER
MAINTENANCE
PUSH
TO
TEST
ALARM
SILENCE
MEDICAL GAS
ALARM SYSTEM
MICROPROCESSOR
EXISTING #22 AWG TWISTED SHIELDED
PAIR HIGH QUALITY ALARM CABLING
(BELDEN #8451 OR APPROVED
EQUIVALENT)
EXISTING MASTER ALARM PANEL (BOILER ROOM)
EXISTING MASTER ALARM PANEL (SUB-BASEMENT)
EXISTING MASTER ALARM PANEL (BLDG 1 - BASEMENT EMERGENCY DEPARTMENT)
EMER RES CYL IN USE
EMER RES CYL LOW
44 02 ROOM PS
RESR GAS PRES LOW
SEC TANK LOW
SEC TANK IN USE
PRIM LIQ LEVEL LOW
OXY LINE PRES LOW
OXY LINE PRES HIGH
#6 RES MAN
POWER
LAG COMP IN USE
COMP HI TEMP SHDN
CARBN MONOX HIGH
DEW POINT HIGH
LINE PRES HIGH
LINE PRES LOW
LINE PRES LOW
LINE PRES HIGH
GECU OXYGEN
LAG PUMP IN USE
LINE PRESS. LOW
LAG PUMP IN USE
VACUUM LOW
LINE PRESSURE LOW
CLC MED VACUUM
RESERVE CYL IN USE
LINE PRESS. HIGH
LINE PRESS. LOW
LINE PRESS. LOW
LINE PRESS. HIGH
RESERVE CYL IN USE
NITROUS OXIDE
MAINTENANCE
POWER
MAINTENANCE
POWER
MAINTENANCE
POWER
POWER
MAINTENANCE
PUSH
TO
TEST
ALARM
SILENCE
MEDICAL GAS
ALARM SYSTEM
MICROPROCESSOR
OXYGEN EMERGENCY
RESERVE IN USE
OXYGEN PRIMARY
LIQUID LEVEL LOW
MEDICAL SUPPLY
STATUS
POWER
OXYGEN LINE
PRESSURE LOW
BLDG 31
MEDICAL VACUUM LOW
PUMP IN USE
MEDICAL VACUUM LOW
MAINTENANCE
POWER
MAINTENANCE
POWER
MAINTENANCE
POWER
OXYGEN MEDICAL AIR VACUUM NITROGEN
RESERVE GAS
PRESSURE LOW
OXYGEN EMERGENCY
RESERVE LOW
OXYGEN EMERGENCY
RESERVE CYL. IN USE
OXYGEN EMERGENCY
RESERVE CYC. LOW
BLDG 1
OXYGEN LINE
PRESSURE LOW
OXYGEN LINE
PRESSURE HIGH
OXYGEN LINE
PRESSURE HIGH
MEDICAL AIR LINE
PRESSURE HIGH
MEDICAL AIR
LINE PRESSURE LOW
CARBON MONOXIDE
LEVEL HIGH
MEDICAL AIR
HIGH DEW POINT
MEDICAL AIR LAG
COMPRESSOR IN USE
MEDICAL AIR COMPRESSOR
HIGH TEMP. SHUTDOWN
NITROGEN LINE
PRESSURE HIGH
NITROGEN RESERVE
CYLINDERS IN USE
NITROGEN LINE
PRESSURE LOW
NITROUS OXIDE LINE
PRESSURE HIGH
NITROUS OXIDE RESERVE
CYLINDERS IN USE
NITROUS OXIDE LINE
PRESSURE LOW
MAINTENANCE
POWER
MAINTENANCE
POWER
POWER
MAINTENANCE
PUSH
TO
TEST
ALARM
SILENCE
MEDICAL GAS
ALARM SYSTEM
MICROPROCESSOR
OXYGEN EMERGENCY
RESERVE IN USE
OXYGEN PRIMARY
LIQUID LEVEL LOW
OXYGEN MEDICAL AIR
POWER
VACUUM
OXYGEN LINE
PRESSURE LOW
BLDG 31 LAG PUMP IN USE
VACUUM LAG
PUMP IN USE
VACUUM LOW
LOW VAC
CLC MED VACUUM
02 LOW
NITROGEN
CLC MED OXYGEN
MAINTENANCE
POWER
MAINTENANCE
POWER
MAINTENANCE
POWER
RESERVE GAS
PRESSURE LOW
OXYGEN EMERGENCY
RESERVE LOW
OXYGEN EMERGENCY
RESERVE CYL. IN USE
OXYGEN EMERGENCY
RESERVE CYC. LOW
BLDG 1
OXYGEN LINE
PRESSURE LOW
OXYGEN LINE
PRESSURE HIGH
OXYGEN LINE
PRESSURE HIGH
MEDICAL AIR LINE
PRESSURE HIGH
MEDICAL AIR
LINE PRESSURE LOW
CARBON MONOXIDE
LEVEL HIGH
MEDICAL AIR
HIGH DEW POINT
MEDICAL AIR LAG
COMPRESSOR IN USE
MEDICAL AIR COMPRESSOR
HIGH TEMP SHUTDOWN
NITROGEN LINE
PRESSURE HIGH
NITROGEN RESERVE
CYLINDERS IN USE
NITROGEN LINE
PRESSURE LOW
NITROUS OXIDE
RESERVE LOW
NITROUS OXIDE LINE
PRESSURE HIGH
NITROUS OXIDE RESERVE
CYLINDERS IN USE
NITROUS OXIDE LINE
PRESSURE LOW
MEDICAL SUPPLY STATUS
MAINTENANCE
POWER
MAINTENANCE
POWER
MEDICAL SUPPLY
STATUS
MEDICAL SUPPLY
STATUS
MEDICAL SUPPLY
STATUS
MEDICAL SUPPLY
STATUS
MEDICAL SUPPLY
STATUS
EXISTING #22 AWG TWISTED SHIELDED
PAIR HIGH QUALITY ALARM CABLING
(BELDEN #8451 OR APPROVED
EQUIVALENT)
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:2
A M
P-501
PLUMBING DETAILS
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
POWER
MAINTENANCE
PUSH
TO
TEST
ALARM
SILENCE
MEDICAL GAS
ALARM SYSTEM
MICROPROCESSOR
RELABELING OF EXISTING MASTER ALARM PANEL (BOILER ROOM)
RELABELING OF EXISTING MASTER ALARM PANEL (SUB-BASEMENT)
RELABELING OF EXISTING MASTER ALARM PANEL (BLDG 1 - BASEMENT EMERGENCY
DEPARTMENT)
EMERGENCY RESERVE SUPPLY
LESS THAN ONE DAY (LOW
CONTENTS)
EMERERGENCY RESERVE
PRESSURE LOW (NOT FUNCTIONAL)
BLDG 1. 44 02 ROOM PS
RESERVE PRESSURE LOW
(NOT FUNCTIONAL)
RESERVE SUPPLY LESS THAN
ONE DAY (LOW CONTENTS)
RESERVE IN USE
PRIMARY LIQUID LEVEL LOW
BLDG 1, MAIN LINE PRESSURE LOW
BLDG 1, MAIN LINE PRESSURE HIGH
BLDG1, #6 RES MAN
POWER
CHANGEOVER TO
SECONDARY SUPPLY
COMPRESSOR HIGH
TEMPERATUR SHUTDOWN
CARBON MONOXIDE LEVEL
HIGH
DEW POINT HIGH
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE LOW
BLDG 31
LAG PUMP IN USE
MAIN LINE PRESSURE LOW
LAG PUMP IN USE
MEDICAL VACUUM LOW
MAIN LINE PRESSURE LOW
BLDG 31
MAINTENANCE
POWER
MAINTENANCE
POWER
MAINTENANCE
POWER
POWER
MAINTENANCE
PUSH
TO
TEST
ALARM
SILENCE
MEDICAL GAS
ALARM SYSTEM
MICROPROCESSOR
PRIMARY LIQUID LEVEL LOW
POWER
BLDG 31
MEDICAL VACUUM LOW
MAINTENANCE
POWER
MAINTENANCE
POWER
MAINTENANCE
POWER
OXYGEN MEDICAL AIR MEDICAL VACUUM NITROGEN
BLDG 1, MAIN LINE PRESSURE
LOW
BLDG1, MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE LOW
CARBON MONOXIDE LEVEL
HIGH
DEW POINT HIGH
MAINTENANCE
POWER
MAINTENANCE
POWER
POWER
MAINTENANCE
PUSH
TO
TEST
ALARM
SILENCE
MEDICAL GAS
ALARM SYSTEM
MICROPROCESSOR
OXYGEN MEDICAL AIR
POWER
VACUUM
BLDG 31
BLDG 31
NITROGEN CLC MED OXYGEN
MAINTENANCE
POWER
MAINTENANCE
POWER
MAINTENANCE
POWER
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE LOW
NITROUS OXIDE
MAINTENANCE
POWER
MAINTENANCE
POWER
MAIN LINE PRESSURE LOW
MAIN LINE PRESSURE HIGH
CHANGEOVER TO
SECONDARY SUPPLY
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE LOW
CHANGEOVER TO
SECONDARY SUPPLY
NITROUS OXIDE
MAIN LINE PRESSURE LOW
MAIN LINE PRESSURE HIGH
MAINTENANCE
POWER
MAINTENANCE
POWER
OXYGEN MEDICAL AIR MEDICAL VACUUM NITROGEN NITROUS OXIDE
RESERVE IN USE
MAIN LINE PRESSURE LOW
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE LOW
CHANGEOVER TO
SECONDARY SUPPLY
MAIN LINE PRESSURE LOW
MAIN LINE PRESSURE HIGH
LAG PUMP IN USE
MEDICAL VACUUM LOW
MEDICAL VACUUM LOW
LAG PUMP IN USE
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE LOW
MAIN LINE PRESSURE HIGH
MAIN LINE PRESSURE LOW
CARBON MONOXIDE LEVEL
HIGH
DEW POINT HIGH
COMPRESSOR HIGH
TEMPERATUR SHUTDOWN
MAIN LINE PRESSURE LOW
MAIN LINE PRESSURE HIGH
CHANGEOVER TO
SECONDARY SUPPLY
CHANGEOVER TO
SECONDARY SUPPLY
EXISTING #22 AWG TWISTED SHIELDED
PAIR HIGH QUALITY ALARM CABLING
(BELDEN #8451 OR APPROVED
EQUIVALENT)
EXISTING #22 AWG TWISTED SHIELDED
PAIR HIGH QUALITY ALARM CABLING
(BELDEN #8451 OR APPROVED
EQUIVALENT)
BLDG 1, 44 02 ROOM PS
BLDG1, #6 RES MAN
EMERGENCY RESERVE SUPPLY
LESS THAN ONE DAY (LOW
CONTENTS)
EMERERGENCY RESERVE
PRESSURE LOW (NOT FUNCTIONAL)
RESERVE PRESSURE LOW
(NOT FUNCTIONAL)
RESERVE SUPPLY LESS THAN
ONE DAY (LOW CONTENTS)
CHANGEOVER TO
SECONDARY SUPPLY
COMPRESSOR HIGH
TEMPERATUR SHUTDOWN
LAG PUMP IN USE
MAIN LINE PRESSURE LOW
LAG PUMP IN USE
MAIN LINE PRESSURE LOW
BLDG 31
CHANGEOVER TO
SECONDARY SUPPLY
PRIMARY LIQUID LEVEL LOW
BLDG 1, MAIN LINE PRESSURE
LOW
BLDG1, MAIN LINE PRESSURE HIGH
RESERVE IN USE
BLDG 1, 44 02 ROOM PS
BLDG1, #6 RES MAN
EMERGENCY RESERVE SUPPLY
LESS THAN ONE DAY (LOW
CONTENTS)
EMERERGENCY RESERVE
PRESSURE LOW (NOT FUNCTIONAL)
RESERVE PRESSURE LOW
(NOT FUNCTIONAL)
RESERVE SUPPLY LESS THAN
ONE DAY (LOW CONTENTS)
CHANGEOVER TO
SECONDARY SUPPLY
MAIN LINE PRESSURE LOW
RESERVE PRESSURE LOW
(NOT FUNCTIONAL)
MAIN LINE PRESSURE LOW
CLC MED OXYGEN
RESERVE PRESSURE LOW
(NOT FUNCTIONAL)
MAIN LINE PRESSURE LOW
CLC MED OXYGEN
RESERVE PRESSURE LOW
(NOT FUNCTIONAL)
MAIN LINE PRESSURE LOW
SCALE = NONE
EMERGENCY OXYGEN SUPPLY CONNECTION (PHASE
1)
B1
(E) BALL VALVE
EMERGENCY
OXYGEN
CONNECTION POINT
TO BE REMOVED.
PATCH WALL PER
ARCHITECTURAL
SPECIFICATIONS
2" SHUTTOFF
BALL VALVE
RELIEF
VALVE AND
VENT
CHECK
VALVE
EMERGENCY
OXYGEN
CONNECTION
POINT
(N) 2" OXYGEN PIPE TO
CONNECTION POINT
2" OXYGEN PIPE
EXISTING EMERGENCY
CONNECTION POINT
(E) CHECK VALVE
VALVE ARRANGEMENT AT NEW LOCATION IN RECREATION
ROOM 1A09
VALVE ARRANGEMENT AT EXISTING LOCATION IN CORRIDOR 2
OUTSID
E
INSIDE
OUTSID
E
INSIDE
VENT TO OUTSIDE
VIA SIDEWALL OR
ROOF
(E) 1-1/2" MAIN
OXYGEN SUPPLY
TO BE REMOVED
DURING PHASE 2
(N) LOCKABLE, RECESSED,
WEATHER TIGHT OXYGEN
INLET BOX
(E) 1-1/2" TO CLC BLDG 31
(E) 3/4" TO CLC EXPANSION
CAP
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and Facilities Management
Department of Veterans Affairs
7 8 9
TRIPLE C - THE A-E GROUP
4401 ATLANTIC AVE. SUITE 200
LONG BEACH, CA 90807
CONTACT: DAVID POTTER
PHONE: 307 460-2054
BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.
1839 S. ALMA SCHOOL ROAD, SUITE 300
MESA, AZ 85210
CONTACT: JOHN MONTANO
PHONE: 602 336-5415
UNITED STRUCTURAL DESIGN, LLC
720 W. COMMERCE AVE OR P.O. BOX 33245
GILBERT, AZ 85233 PHOENIX, AZ 85067
CONTACT: DAVID GRAPSAS
PHONE: 480 382-9768
A ut od es k D oc s:
//5
-1 6-
V A
F re sn o
C hi lle r
P la nt P
/V
A F re sn o C hi lle r P la nt
M P
E _A
D D
_S E
R V
IC
E
.r vt
/1
5/
0:
:2
A M
P-502
PLUMBING DETAILS
R. REIF R. SCHAMP10/10/2024
570-16-302PHASE 2 CHILLER
INFRASTRUCTURE ON FRESNO
CAMPUS
RECORD DRAWINGS
2615 E CLINTON AVE, FRESNO, CA 93703
V
HWR
HWS
DOWN
CHR
CHS
GENERAL NOTES:MECHANICAL SYMBOL LEGENDABBREVIATIONS
VALVE ASSEMBLY
XX - ## NUMBERS REFER TO SPECIFIC EQUIPMENT
SYMBOL INDICATES NEW EQUIPMENT
EQUIPMENT SYMBOLS
IDENTIFIED IN EQUIPMENT SCHEDULE
CFM
SYMBOL INDICATES GRILLE OR
DIFFUSER IDENTIFIED IN EQUIPMENT
SCHEDULE
SIDEWALL GRILLE DIMENSION WHERE
SHOWN ON PLANS
LETTERS REFER TO THE EQUIPMENT TYPE
ACCESS DOOR
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
ACOUSTIC LINING
ACU
AD
AFF
AL
BOP
BOD
BOTTOM OF PIPE
BOTTOM OF DUCT
CUBIC FEET PER MINUTE
CLEANOUT
CFM
CO
MOTOR CONTROL CENTERMCC
NOT APPLICABLE
NOT IN CONTRACT
NUMBER (QUANTITY)
NA
NIC
NO.
OUTSIDE AIR
OPPOSED BLADE DAMPER
OA
OBD
PSIG
PRV PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH GAGE
QUADRANT
QUANTITYQTY
QUAD
RETURN AIRR.A.
SMOKE CONTROL DAMPERSCD
EXHAUSTEXH
FLAT TOP
FEET PER MINUTE
FT
FPM
DEGREES FAHRENHEIT
FAN COIL UNIT
FLOOR DRAIN
FLEXIBLE
FCU
FD
FLEX
°F
TOPT TOP OF PIPE TRAPEZE
VENT THRU ROOFVTR
VEL
VAV VARIABLE AIR VOLUME
VELOCITY
GALLONS PER HOUR
GALLONS PER MINUTE
GPH
GPM
HAND DAMPER (VOLUME DAMPER)
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HD
HEPA
INCHESIN
MAKE-UP WATER
CONDENSATE DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
PIPING SYMBOLS
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH (DOWN) WATER FLOW MEASURING DEVICE
PLUG VALVE
VALVE SYMBOLS
GATE VALVE
GLOBE VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
THREE-WAY MODULATING CONTROL VALVE
TWO-WAY CONTROL VALVE
SAFETY VALVE OR PRESSURE RELIEF
MANUAL AIR VENT
SOLENOID VALVE
3/4" GATE VALVE WITH ADAPTER TO 3/4"
HOSE THREAD
BUTTERFLY VALVE
BALL VALVE
VALVE IN RISE
WCO
WH
WALL CLEANOUT
WALL HYDRANT
V
VAC
VOLTS
VOLTS, ALTERNATING CURRENT
TP TOTAL PRESSURE (INCHES OF WATER)
SP STATIC PRESSURE (INCHES OF WATER)
Rh
RPM
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
KWH
KW KILOWATT
KILOWATT HOUR
HB HOSE BIBB
FS FLOOR SINK
FCO FLOOR CLEANOUT
ENT ENTERING
DX DIRECT EXPANSION
BTU
BTUH
BRITISH THERMAL UNIT
BTU PER HOUR
BHP BRAKE HORSEPOWER
VENT
SECTION SYMBOLS
SDVV SINGLE DUCT VARIABLE VOLUME
ST SOUND TRAP
TYP. TYPICAL
CONT. CONTINUATION
D DRAIN
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
FT. FEET
F.G. FILTER GAUGE
FB FLAT BOTTOM
MA MAIN AIR (CONTROLS)
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
CD
ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED
CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.
PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING
AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS
REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES
OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE
PROVIDE HOSE CONNECTION ON VALVE.
REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE
RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. ALL PIPE AND DUCTWORK
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND FIRE
PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN EQUIPMENT
ACCESS AND SERVICEABILITY.
CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS, SLEEVES,
AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND PLUMBING
EQUIPMENT, AND PIPING, ETC. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND ALL BUILDING TRADES TO AVOID CONFLICTS AND TO MAINTAIN
EQUIPMENT ACCESS AND SERVICEABILITY.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY
MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO
ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT IN A
MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE BUILDING
STRUCTURAL SYSTEM.
WHERE SIZES ARE INDICATED FOR EXISTING PIPES, THESE SIZES ARE
APPROXIMATE. VERIFY IN FIELD
SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR
MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.
1.
2.
3.
6.
7.
8.
XX - #
##x#
SINGLE LINE PIPE SYMBOLS
DOUBLE LINE PIPE SYMBOLS
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
ELBOW - DOWN
ELBOW - UP
PIPE RISE - DROP
ELBOW - DOWN TO TEE
TEE - DOWN
TEE - UP
ELBOW - UP TO TEE
END CAP
FLEX CONNECTION
PIPE REDUCER - CONCENTRIC
PIPE REDUCER - ECCENTRIC
PIPE STRAINER
UNION - SCREWED
AIR VENT - AUTOMATIC
AIR VENT - MANUAL
GAUGE - DIFFERENTIAL
GAUGE - PRESSURE
GAUGE - PRESSURE
GAUGE - PRESSURE WITH COCK
GAUGE - TEMPERATURE
PIPE - CAPPED WITH SHUT-OFF VALVE
PIPE ANCHOR
PIPE EXPANSION JOINT
P
PS
A
F
PS
TS
PIPE GUIDE
SENSOR - FLOW
SWITCH - FLOW
SWITCH - PRESSURE
SWITCH - TEMPERATURE
TEMPERATURE - PRESSURE TEST FITTING
THERMOMETER
THERMOMETER WELL
SECTION NUMBER
DRAWING NUMBER WHERE
DETAILED
DETAIL LOCATION
DRAWING NUMBER WHERE
DETAILED
X#
X###
X#/X###
DETAIL LOCATION X#
SECTION LOCATION X#
SECTION
DETAIL
SCALE
SCALE
FITTING SYMBOLS
RS REFRIGERATION SUCTION
RL REFRIGERATION LIQUID
VALVE - BALL LEVER
VALVE - GATE MANUAL
VALVE - BUTTERFLY MOTORIZED
VALVE - GLOBE MANUAL
VALVE - GLOBE LEVER
VALVE - PLUG LEVER
VALVE - PLUG MANUAL
VALVE - PRESSURE REGULATING
VALVE - CHECK
VALVE - PRESSURE RELIEF
TWS TOWER WATER SUPPLY
TWR TOWER WATER RETURN
TWB TOWER WATER BYPASS
HPS STEAM - HIGH PRESSURE SUPPLY
HPR STEAM - HIGH PRESSURE RETURN
LPR STEAM - LOW PRESSURE RETURN
CND STEAM - CONDENSATE RETURN
PC STEAM - PUMPED CONDENSATE
R REFRIGERATION
MU
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
DRAIND
SOLENOID VALVE
PLUG VALVE
GATE VALVE
DIAPHRAGM VALVE
GLOBE VALVE
CIRCUIT SETTER
STEAM TRAP INVERTED BUCKET
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
RELIEF VALVE
PRESSURE REDUCING VALVE
ELBOW - DOWN
ELBOW - UP
PIPE RISE - DROP
ELBOW - DOWN TO TEE
TEE - DOWN
END CAP
PIPE REDUCER - CONCENTRIC
PIPE REDUCER - ECCENTRIC
UNION - SCREWED
SINGLE LINE PIPE SYMBOLS
DOUBLE LINE PIPE SYMBOLS
PIPE STRAINER
THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING
SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE
PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,
ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING
BUILDING MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVALS WITH THE COR AUTHORIZED REPRESENTATIVE AND
SHALL CONFORM TO THEIR REQUIREMENTS.
DISRUPTION OF NORMAL HOSPITAL ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE
MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO AFFECT
THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE MEDICAL CENTER WHICH
ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT AND THE
OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE CONDUCTED
OUTSIDE OF THE REMODEL AREA WHICH MAY AFFECT THE OPERATION OF THE
MEDICAL CENTER. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION
(MAINTAIN WORK ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST
SCREENS, ETC. FOR ALL WORK AREAS AFFECTED BY DEMOLITION FOR NEW
INSTALLATION TO MINIMIZE DUST AND FUMES. SOME ASPECTS OF THE WORK WILL
BE REQUIRED TO BE PERFORMED DURING OFF NORMAL HOURS, INCLUDING NIGHTS
AND WEEKENDS.
THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN
ADVANCE TO THE ARCHITECT AND THE COR'S AUTHORIZED REPRESENTATIVE FOR
APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE AN
OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR SHALL
COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO ESTABLISH
ACCEPTABLE ROUTING AND ACCESS WITHIN THE MEDICAL CENTER FOR MATERIALS
REQUIRED FOR THE NEW INSTALLATION.
ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED ON
FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND MEASUREMENT
DATA.
ALL DATA OBTAINED VIA TESTING AND MEASURING OF THE EXISTING AIR HANDLING
UNIT, AND THE ASSOCIATED RETURN/RELIEF FAN, SUPPLY AIR DUCTS, EXHAUST, AND
RETURN AIR DUCTS PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW WORK
SCOPE OF WORK SHALL BE UTILIZED TO ESTABLISH NEW HVAC SYSTEM
PERFORMANCE AND BALANCE DATA FOR THE RENOVATION. DATA SHALL BE
FORWARDED TO THE PROJECT ENGINEER FOR REVIEW AND COMMENT PRIOR TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
TRADES INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND
ARCHITECTURAL. ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO THE
ARCHITECT PRIOR TO START OF WORK.
A
B
C
D
E
F
G
GENERAL DEMO NOTES:
ACCESS DOORAD
AIR HANDLING UNITAHU
COMPRESSED AIR
CONDENSATE DRAIN
CA
CD
DETAIL REFERENCE
SECTION AND DETAIL TITLES
MPS STEAM - MEDIUM PRESSURE SUPPLY
MPR STEAM - MEDIUM PRESSURE RETURN
LPS STEAM - LOW PRESSURE SUPPLY
SCAN OR PHOTO NUMBER
LIDAR SCAN OR PHOTO
FUTURE PIPE
EXISTING(E)
(N) NEW
(F) FUTURE
RR REFRIGERATION RELIEF
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Project Number
Checked by
Drawing Title
Approved : Project Director
1 2 3 4 5 6
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
PROJECT TEAM ARCHITECTS/ENGINEERS Office of Construction and…