This is a Key Personnel Evaluation template for solicitation 36C26126R0028, "Replace and Expand Chilled Water Infrastructure in Building 1," a construction services procurement for the Department of Veterans Affairs Palo Alto Health Care System. The template requires offerors to submit detailed qualifications for four key personnel positions: Project Manager, Superintendent, Safety Officer, and Quality Control Manager. For each position, offerors must provide the individual's name, proposed assignment, employment history with current and previous firms (including dates and years of experience), educational background from U.S. accredited universities, professional registrations, and relevant training courses completed (such as construction quality management and safety certifications). Additionally, offerors must demonstrate familiarity with safety compliance and sustainability practices.

The template mandates that each key personnel member be supported by documentation of up to five completed projects within the past six years. For each project, offerors must provide the contract number, project title, contract amount, start and completion dates, the personnel member's specific role (PM, Superintendent, QC, or Safety Officer), and a detailed description of the work performed that adequately describes building construction activities. The submission must clearly delineate Project Manager and Project Superintendent experience separately rather than combining these roles, ensuring transparency regarding individual qualifications and hands-on construction experience relevant to the chilled water infrastructure replacement and expansion project.

View the file

Other files

File Type Posted
Wage Determinaton CA202600148 07.14.26.pdf PDF
36C26126R0028 0007.docx DOCX document
36C26126R0028 0006.docx DOCX document
90209 - 570-20-308 - VA CA Fresno CHW - ASI-01 Drawings- 20260724.pdf PDF
RFI LOG UPDATE AMENDMENT 005.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno CHW - ASI 01 - 20260724.pdf PDF
36C26126R0028 0005.docx DOCX document
36C26126R0028 0004.docx DOCX document
36C26126R0028 -0003.docx DOCX document
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.pdf PDF
Construction Clause 52.212-4.docx DOCX document
36C26126R0028-0002.docx DOCX document
RFI LOG UPDATE AMENDMENT 003.xlsx XLSX spreadsheet
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504r1.pdf PDF
VA Specific Clause Payments Fixed Price Construction.docx DOCX document
36C26126R0028 0003.docx DOCX document
VA Specific Clause Payments under Fixed Price Construction.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part1.pdf PDF
Construction 52.212-4.docx DOCX document
VA Fresno Chiller Plant MEP Record Drawings 11-15-24_Part2.pdf PDF
RFI LOG UPDATE AMENDMENT 002.xlsx XLSX spreadsheet
36C26126R0028 0002.docx DOCX document
36C26126R0028 Site Visit Log In Sheet.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Summary - 20260701.pdf PDF
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Narrative - 20260701.pdf PDF
Question RFI No. 4 - Asbestos Abatement Scope and Allowance.docx DOCX document
RFI LOG.xlsx XLSX spreadsheet
Question RFI No. 7 - Buy American Domestic Materials.docx DOCX document
Question RFI No. 12 - Temporary Pumps Piping.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bulletin 01 Drawings - 20260701.pdf PDF
36C26126R0028 0001.docx DOCX document
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING DEV 2023.docx DOCX document
90209 - 570-20-308 - Fresno CHW - Bid Set Basis Of Design - 20260504.pdf PDF
Attachment C - Key Personnel Evaluation.docx DOCX document
36C26126R0028_1.docx DOCX document
ID Me Information.docx DOCX document
Attachment E - Past Performance Questionnaire.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part3.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.doc DOC document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part2.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Specs-20260504.pdf PDF
90209 - 570-20-308 - Fresno Chilled Water Bid Set Combined Drawings-20260504_Part1.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
Site Visit Location Details.pdf PDF
852.219-75 Fillable.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0028

ATTACHMENT: PERSONNEL RESUMES EVALUATION

OFFERORS’s NAME: ________________________________

OFFEROR’S KEY PERSONNEL

EXPERIENCE/QUALIFICATIONS

Replace and Expand Chilled Water Infrastructure 570-20-308

Provide the following information, on separate sheets, to demonstrate the key personnel's experience (one for each: Project Manager, Superintendent, Safety Officer, Quality Control Manager.

Name:

Proposed Assignment to this Project:

Name of Firm, Position held, Dates of Employment:

Number of Years with other Firms, Position held, dates of employment:

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training Course Completed: (COE construction quality management, Safety, etc.)

Familiar with Safety Compliance and Sustainability:

Provide a list of projects on a maximum of five projects that were completed by the key personnel within the past six years:

PROJECT 1:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 2:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 3:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 4:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety): .

PROJECT 5:

Title:

Contract Amount:

Contract Start/Completion Date:

IF it is not clear from the information provided on the five projects described above, the proposal shall clearly indicate the number of years of Project Manager and Project Superintendent experience and shall NOT show combined experience, for example, Project Manager/Project Engineer for three years.