This is an Architect's Supplemental Instructions (ASI #01) document dated July 24, 2026, for the Replace and Expand Chilled Water project at Fresno VA Medical Center in Fresno, California (Project No. 570-20-308).
The ASI contains comprehensive drawing revisions across multiple disciplines including structural, architectural, fire protection, mechanical, and electrical systems. Key structural revisions include removal of cold-formed metal framing notes from sheet S-001, addition of steel decking notes, revisions to exterior chase enclosure framing on sheets S-108A, S-109B, and S-110B, and addition of new details on sheets S-050 and S-501. Architectural revisions primarily involve scope increases captured through updated hatching on demolition plans across numerous sheets (AD101A through AD109B and AE101A through AE109B), along with updated demolition key notes and documentation of existing doorways, walls, and bulkhead conditions. Additionally, reflected ceiling plan legends were updated across multiple sheets (AC101A through AC109B). Fire protection revisions involve the addition of sprinkler head annotations and concealment of sprinkler fittings behind annotations across multiple sheets. Mechanical system revisions are extensive, involving keynote additions and updates, out-of-scope hatching corrections, and scope additions for related projects 570-21-220 and 570-19-107 across numerous plan sheets. Significant mechanical revisions include pipe routing adjustments on sheets MP110B-1 and MP901 to avoid roof drains and facilitate installation of structural and architectural elements. Electrical revisions include the addition of a fourth pump for demolition, correction of an FCU keynote, and updated panel load summary. All contractors must acknowledge receipt of this ASI by inserting its number and date in the Form of Proposal, with failure to do so potentially resulting in bidder disqualification. The ASI consists of ten narrative pages and one combined set of ASI construction drawings dated July 24, 2026.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace and Expand Chilled Water Fresno VA Medical Center
570-20-308 / 90209 July 24, 2026
DATE: July 24, 2026
Architect’s Supplemental Instructions
PROJECT NAME: Replace and Expand Chilled Water
Fresno VA Medical Center, Fresno, CA
PROJECT NO.: 570-20-308
ASI #01
NOTICE:
All contractors shall take note of the following changes, additions, interpretations, clarifications, etc., in connection with the drawings and specifications and other general documents. The following instructions have precedence over anything contrarily shown on the drawings or described in the specification documents, and all such shall be taken into consideration and be included in the Contractor's work. Acknowledge receipt of this Addendum by inserting its number and date in the space provided in the Form of Proposal. Failure to do so may subject bidder to disqualification.
This ASI #1 consists of TEN (10) narrative pages and (1) combined set of ASI Construction Drawings dated July 24, DRAWING REVISIONS
1. General Sheets:
A.
2. Life Safety Sheets:
A. None
3. Civil Sheets:
A. None
4. Structural Sheets:
A. S-001 – “Cold-Formed Metal Framing” notes removed (no longer used).
B. S-001 – “Steel Decking” notes added.
C. S-050 – Detail 3 added.
D. S-108A – Exterior chase enclosure framing revised.
E. S-109B – Exterior chase enclosure framing revised.
F. S-110B – Exterior chase enclosure framing revised.
G. S-501 – Details 1, 2, 3, and 5 added.
H. S-501 – Detail 4 revised.
5. Architectural Sheets:
A. AD101A – Scope increase captured by updated hatch of area not in project scope, Demolition Key
Notes updated, Existing doorways, walls, and bulkhead conditions captured
B. AD101B – Scope increase captured by updated hatch of area not in project scope, Demolition Key
Notes updated, Existing doorways, walls, and bulkhead conditions captured
C. AD102A – Scope increase captured by updated hatch of area not in project scope, Demolition Key
Notes updated, Existing doorways, walls, and bulkhead conditions captured
D. AD102B – Scope increase captured by updated hatch of area not in project scope, Demolition Key
Notes updated, Existing doorways, walls, and bulkhead conditions captured
E. AD103A – Existing doorways, walls, and bulkhead conditions captured
F. AD103B – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
G. AD104A – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
H. AD104B – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
I. AD105A – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
J. AD105B – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
K. AD106A – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
L. AD106B – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
M. AD107A – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
N. AD107B – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
O. AD108B – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
P. AD109B – Demolition Key Notes updated, Existing doorways, walls, and bulkhead conditions captured
Q. AE101A-Scope increase captured by updated hatch of area not in project scope, Existing doorways, walls, and bulkhead conditions captured
R. AE101B-Scope increase captured by updated hatch of area not in project scope, Existing doorways, walls, and bulkhead conditions captured
S. AE102A-Scope increase captured by updated hatch of area not in project scope, Existing doorways, walls, and bulkhead conditions captured
T. AE102B-Scope increase captured by updated hatch of area not in project scope, Existing doorways, walls, and bulkhead conditions captured
U. AE103A-Existing doorways, walls, and bulkhead conditions captured
V. AE103B-Existing doorways, walls, and bulkhead conditions captured
W. AE104A-Existing doorways, walls, and bulkhead conditions captured
X. AE104B-Existing doorways, walls, and bulkhead conditions captured
Y. AE105A-Existing doorways, walls, and bulkhead conditions captured
Z. AE105B-Existing doorways, walls, and bulkhead conditions captured
AA. AE106A-Existing doorways, walls, and bulkhead conditions captured
BB. AE106B-Existing doorways, walls, and bulkhead conditions captured
CC. AE107A-Existing doorways, walls, and bulkhead conditions captured
DD. AE107B-Existing doorways, walls, and bulkhead conditions captured
EE. AE108B-Wall Section notes updated, New Exterior Chase dimensions updated, Existing doorways, walls, and bulkhead conditions captured
FF. AE109B-Existing doorways, walls, and bulkhead conditions captured
GG. AC101A – Scope increase captured by updated hatch of area not in project scope, Reflected Ceiling
Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
HH. AC101B – Scope increase captured by updated hatch of area not in project scope, Reflected Ceiling
Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
II. AC102A – Scope increase captured by updated hatch of area not in project scope, Reflected Ceiling
Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
JJ. AC102B – Scope increase captured by updated hatch of area not in project scope, Reflected Ceiling
Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
KK. AC103A – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
LL. AC103B – Reflected Ceiling Plan Legend updated, Existing doorways and bulkheads captured
MM. AC104A – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
NN. AC104B – Reflected Ceiling Plan Legend updated, OO. Existing doorways, walls, and bulkhead conditions captured
PP. AC105A – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
QQ. AC105B – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
RR. AC106A – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
SS. AC106B – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
TT. AC107A – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
UU. AC107B – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
VV. AC108B – Reflected Ceiling Plan Legend updated, WW. Existing doorways, walls, and bulkhead conditions captured
XX. AC109B – Reflected Ceiling Plan Legend updated, Existing doorways, walls, and bulkhead conditions captured
YY. AI420- Updated notation and finish information.
6. Fire Protection Sheets:
A. FP101A - Sprinkler head annotations added.
B. FP101B - Sprinkler fittings hidden behind sprinkler head annotation.
C. FP101B – Dimension added to room.
D. FP102B – Sprinkler fittings hidden behind sprinkler head annotation.
E. FP103A – Sprinkler fittings hidden behind sprinkler head annotation.
F. FP105B – Sprinkler fittings hidden behind sprinkler head annotation.
G. FP106B – Sprinkler fittings hidden behind sprinkler head annotation.
H. FP107A – Sprinkler fittings hidden behind sprinkler head annotation.
I. FP107B – Sprinkler fittings hidden behind sprinkler head annotation.
J. FP108B – Sprinkler fittings hidden behind sprinkler head annotation.
K. FP109B – Sprinkler fittings hidden behind sprinkler head annotation.
7. Fire Alarm Sheets:
A. None
8. Mechanical Sheets:
A. MP101A-1
• Keynote 3 added
B. MP101B-1
• Keynote 1 updated
• Out of scope hatching updated
C. MD101A-1
• Keynote 2 added
D. MD101B-1
• Keynote 2 updated
• Out of scope hatching updated
E. MP101A-2
• Keynote 2 updated
F. MP101B-2
• Keynote 1 updated
• Out of scope hatching updated
G. MP101A-3
• Keynote 2 added
H. MP101B-3
• Keynote 1 updated
• Out of scope hatching updated
I. MP101A-4
• Keynote 2 added
J. MP101B-4
• Keynote 1 updated
• Out of scope hatching updated
K. MD101A-3
• Keynote 2 added
L. MD101B-3
• Keynote 2 updated
• Out of scope hatching updated
M. MP102A-1
• Keynote 5 added
N. MD102A-1
• Keynote 6 added
O. MD102B-1
• Keynote 5 updated
P. MP102A-2
• Keynote 4 added
• Out of scope hatching updated
Q. MP102B-2
• Keynote 4 updated
• Out of scope hatching updated
R. MD102A-2
• Keynote 5 added
• Out of scope hatching updated
S. MD102B-2
• Keynote 5 updated
• Out of scope hatching updated
T. MP102A-3
• Keynote 3 added
• Out of scope hatching updated
U. MP102B-3
• Keynote 4 updated
• Out of scope hatching updated
V. MP103A-1
• Keynote 5 added
• Keynote 6 added
• Out of scope hatching updated
W. MD103A-1
• Keynote 5 added
• Keynote 6 added
• Out of scope hatching updated
X. MD103B-1
• Keynote 3 updated
• Keynote 4 added
• Keynote 5 added
• Keynote 6 added
• Scope for project 570-21-220 added
• Scope for project 570-19-107 added
• Out of scope hatching updated
Y. MP103A-2
• Keynote 4 added
• Keynote 5 added
• Out of scope hatching updated
Z. MP103B-2
• Keynote 3 updated
• Keynote 4 updated
• Keynote 5 added
• Keynote 6 added
• Scope for project 570-21-220 added
• Scope for project 570-19-107 added
• Out of scope hatching updated
AA. MD103A-2
• Keynote 5 added
• Keynote 6 added
• Out of scope hatching updated
BB. MD103B-2
• Keynote 3 updated
• Keynote 4 added
• Keynote 5 added
• Keynote 6 added
• Scope for project 570-21-220 added
• Scope for project 570-19-107 added
• Out of scope hatching updated
CC. MP103A-3
• Keynote 3 added
• Keynote 4 added
• Out of scope hatching updated
DD. MP103B-3
• Keynote 3 updated
• Keynote 4 added
• Keynote 5 added
• Keynote 6 added
• Scope for project 570-21-220 added
• Scope for project 570-19-107 added
• Out of scope hatching updated
EE. MP104A-1
• Keynote 3 added
• Keynote 4 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
FF. MD104A-1
• Keynote 3 added
• Keynote 4 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
GG. MD104B-1
• Keynote 4 updated
• Keynote 6 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
HH. MP104A-2
• Keynote 2 added
• Keynote 3 added
• Scope for project 570-21-220 added
II. MP104B-2
• Keynote 3 updated
• Keynote 4 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
JJ. MD104A-2
• Keynote 1 added
• Keynote 2 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
KK. MD104B-2
• Keynote 4 updated
• Keynote 6 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
LL. MP104A-3
• Keynote 1 added
• Keynote 2 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
MM. MP104B-3
• Keynote 3 updated
• Keynote 4 added
• Scope for project 570-21-220 added
• Out of scope hatching updated
NN. MP105A-1
• Keynote 3 added
• Out of scope hatching updated
OO. MD105B-1
• Keynote 3 updated
• Keynote 4 updated
• Keynote 5 updated
PP. MP105B-2
• Keynote 2 updated
• Keynote 3 updated
• Keynote 4 updated
• Out of scope hatching updated
QQ. MD105A-2
• Keynote 1 added
• Out of scope hatching updated
RR. MD105B-2
• Keynote 3 updated
• Keynote 4 updated
• Keynote 5 updated
• Out of scope hatching updated
SS. MP105B-3
• Keynote 2 updated
• Keynote 3 updated
• Keynote 4 updated
• Out of scope hatching updated
TT. MP106A-1
• Keynote 4 added
UU. MD106A-2
• Keynote 2 added
VV. MD106B-2
• Keynote 2 updated
WW. MP106B-3
• Keynote 2 updated
XX. MP107A-1
• Keynote 2 added
YY. MD107A-1
• Keynote 2 added
• Out of scope hatching updated
ZZ. MD107B-1
• Keynote 2 updated
• Out of scope hatching corrected
AAA. MP107A-2
• Keynote 2 added
BBB. MP107B-2
• Keynote 2 updated
• Out of scope hatching updated
CCC. MD107A-2
• Keynote 1 added
DDD. MD107B-2
• Keynote 2 updated
• Out of scope hatching updated
EEE. MP107A-3
• Keynote 2 added
FFF. MP107B-3
• Keynote 2 updated
• Out of scope hatching updated
GGG. MP108A-1
• Keynote 1 updated
• Keynote 3 added
• Section view 2 added
• Out of scope hatching updated
HHH. MP108B-1
• Keynote 5 updated
• Keynote 6 updated
• Out of scope hatching updated
III. MD108B-1
• Keynote 3 updated
• Keynote 4 updated
JJJ. MP108B-2
• Keynote 2 updated
• Keynote 3 updated
• Out of scope hatching updated
KKK. MD108B-2
• Keynote 3 updated
• Keynote 4 updated
• Out of scope hatching updated
LLL. MP108B-3
• Keynote 2 updated
• Keynote 3 updated
• Out of scope hatching updated
MMM. MP109B-1
• Keynote 2 updated
• Pipe penetrations updated (see MP110B-1)
NNN. MD109B-2
• Keynote 1 updated
OOO. MP109B-3
Page 10 of
• Keynote 2 updated
PPP. MP110B-1
• Pipe routing adjusted to avoid roof drains and increase ease of installing structural and architectural elements around the piping
• Section view 2 updated
• Section view 3 added
QQQ. MP901
• Pipe routing adjusted. See note above on MP110B-1
9. Electrical Sheets:
A. ED-101B – Additional fourth pump shown for demo
B. ED-102A – Corrected keynote number for FCU
C. E-601 – Updated panel load summary and demo one-line
Alexander P. Boucher, P.E.
Project Manager – Davenergy Solutions