Attachment F_P1360 DWG_Part 7 of 12.pdf
PDF 10 MB Posted
- Solicitation number
- N6247026R0011
About this file
This document is a set of architectural construction drawings for a Joint Maritime Facility project prepared by Naval Facilities Engineering Systems Command (NAVFAC) Atlantic. The drawings include reflected ceiling plans, roof plans, exterior elevations, building sections, wall sections, interior elevations, casework details, and exterior details across multiple sheets (A-106 through A-507).
The project specifications encompass structural and architectural components including insulated structural precast concrete sandwich panels with wood texture finishes, factory-formed foam-insulation core metal wall panels, 100mm fabricated wall panel assemblies, prefabricated aluminum gutters and downspouts, standing seam metal roof panels, steel door frames and panels, concrete splash blocks, and various interior finishes including casework, shelving, and plumbing fixtures. Mechanical and electrical systems are integrated throughout, with equipment rooms for fire pump generators, UPS systems, and operational equipment noted on floor plans. The documents specify materials such as EPDM roofing, continuous waterproofing on precast concrete panels, asphalt damp proofing, suspended acoustic ceiling systems, raised access flooring, and multiple wall section assemblies with fire-rated partition details. Interior spaces include secured corridors, operational equipment areas, mechanical rooms, toilets with comprehensive accessory schedules, showers, and unsecured areas. The work keynotes reference numerous exterior details, interior finishes, structural elements, and building systems integration requirements consistent with federal facility standards.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRAPHIC SCALE
A-106
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 REFLECTED CEILING PLAN
GENERAL SHEET NOTES
REFLECTED CEILING PLAN LEGEND
BUNK
BUNK
BREAK
TOILET
SHOWER
JANITOR
SECURE VESTIBULE
COMMERCIAL TELECOM
CORRIDOR
MECHANICAL
FIRE PUMP
GENERATOR ROOM
UPS A
UPS B
ELECTRICAL
STAGING AREA
OPEN OFFICEUNSECURE CORRIDOR
GENERATOR FUEL ROOM
OPS EQUIPMENT
O
O
O
O
O O
O
O
O
O
O
O
O O
O
O O
O O
O O
O O
O O
O
O
O
O
A-107
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 ROOF PLAN
GENERAL SHEET NOTES
A-201
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
WORK KEYNOTES - ELEVATIONS
EXTERIOR MATERIAL LEGEND
A-205
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 WEST ELEVATION
B1 NORTH ELEVATION
A-206
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 EAST ELEVATION
B1 SOUTH ELEVATION
A-301
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
WORK KEYNOTES - BUILDING SECTIONS
A-302
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
WORK KEYNOTES - WALL SECTIONS
A-305
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 BUILDING SECTION
GENERAL SHEET NOTES
C1
BUILDING SECTION
ELECTRICALOPS EQUIPMENTSTAGING AREA
OPS EQUIPMENT MECHANICAL
A-306
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 WALL SECTION
A2 WALL SECTION A3 WALL SECTION
A-307
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 WALL SECTION
GENERAL SHEET NOTES
A2 WALL SECTION
A5 WALL SECTION
A-401
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
KEYNOTES: ENLARGED PLANS AND INTERIOR ELEVATIONS KEYNOTES: CASEWORK
A-405
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 ENLARGED FLOORPLANS
B3
COLUMN FURRING PLAN DETAIL
B4
COLUMN FURRING PLAN DETAIL
D3
ENLARGED PLAN ABOVE EXTERIOR SOFFIT AT ROOMS 112, 113, 114
A3
STUD WALL TO INTERIOR CONCRETE WALL DETAIL
A-406
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 INTERIOR ELEVATION - ROOM 105
B1 INTERIOR ELEVATION - ROOM 103 B2 INTERIOR ELEVATION - ROOM 103 B3 INTERIOR ELEVATION - ROOM 104 B4 INTERIOR ELEVATION - ROOM 104
GENERAL SHEET NOTES
D1 SHOWER PAN DETAIL
A2 INTERIOR ELEVATION - ROOM 102
TOILET ACCESSORIES SCHEDULE
A3 INTERIOR ELEVATION - ROOM 104
A5 INTERIOR ELEVATION - ROOM 106
TOILET
SHOWER
SHOWERSHOWER
BREAK
UNSECURE CORRIDOR
TOILET
A-407
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
A1 SECTION AT CASEWORK - ROOM 105 A2 SECTION AT CASEWORK - ROOM 105 A3 SECTION AT CASEWORK - ROOM 105
D1
PLANNED SECTION AT CONCEALED COUNTERTOP BRACKET
A4 SECTION AT CASEWORK - ROOM 104
A-501
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
WORK KEYNOTES - EXTERIOR DETAILS
A-502
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
WORK KEYNOTES - CEILING, PENETRATION, FIRE RATED PARTITION, AND RAISED ACCESS FLOOR DETAILS
A-505
JO
IN
T M
A R
IT
IM
E F
A C
IL
IT
Y
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
A
TL
A N
TI
C
C1 PARAPET DETAIL C2 OVERFLOW SCUPPER DETAIL C3 SCUPPER DETAIL
A1 HIGH ROOF EAVE DETAIL A2 HIGH ROOF EAVE DETAIL A3 ROOF CURB DETAIL
A5 HIGH ROOF RAKE DETAIL
A5 ROOF RIDGE DETAIL
| A-106 REFLECTED CEILING PLAN |
| A-107 ROOF PLAN |
| A-201 WORK KEYNOTES - ELEVATIONS |
| A-205 ELEVATIONS |
| A-206 ELEVATIONS |
| A-301 WORK KEYNOTES - BUILDING SECTIONS |
| A-302 WORK KEYNOTES - WALL SECTIONS |
| A-305 BUILDING SECTIONS |
| A-306 WALL SECTIONS |
| A-307 WALL SECTIONS |
| A-401 KEY NOTES - ENLARGED PLAN & INTERIOR ELEVATIONS |
| A-405 ENLARGED FLOOR PLANS |
| A-406 INTERIOR ELEVATIONS AND TOILET ACCESSORIES SCHEDULES |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
| 2026-01-28T16:56:57-0500 | |
| signature |
File details come from the government source that posted it. Updated .