Attachment D - Schedule B Price Proposal Form.pdf
PDF 370 KB Posted
- Solicitation number
- N6247026R0011
About this file
This is a Schedule B Price Proposal Form for Project P1360: Joint Maritime Facility. The form requires contractors to provide line item pricing for construction and installation work associated with a new maritime facility.
The base price (CLIN 0001) encompasses the entire project and is subdivided into five components: (1A) work to complete the 1.5-meter line outside the building; (1B) all project site work and supporting facilities outside the 1.5-meter line; (1C) removal and disposal of contaminated soils at 250 cubic meters; (1D) undercut and disposal of geotechnically unsuitable soils and replacement with structural fill at 250 cubic meters; and (1E) removal and disposal of oily water and sludge from tanks at 30,000 liters. Three optional line items are included: CLIN 0002 for purchase of a second generator and associated tank; CLIN 0003 for Electronic Security System (ESS) equipment, testing, and training with a government estimated price of $56,681.86 and a Hardware and Related (HAR) adder not to exceed 5 percent; and CLIN 0004 for Furniture, Fixtures, and Equipment (FF&E) with a government estimated price of $125,244.16 and a HAR adder not to exceed 5 percent. Contractors must provide unit costs and calculate subtotals for each line item, with a final total for all CLINs required at the conclusion of the form.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE B PRICE PROPOSAL FORM
Provide line item prices, where indicated by blank underlines, for the following items:
Line Item
Description Quantity Unit Unit Cost Sub-Total Total Price
1 BASE PRICE (CLIN 0001):
Total Price for the entire work for Project P1360:
Joint Maritime Facility in accordance with the drawings and specifications, complete, but excluding work provided in another line item.
1 EA $_____________
1A Subtotal of Base Price for the entire work for Project P1360: Joint Maritime Facility to complete the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_________ $___________
1B Subtotal of Base Price for the entire project site work, outside the facility 1.5-meter line, for all supporting facilities, complete in accordance with the drawings and specifications, but excluding work described in another line item.
1 EA $_________ $___________
1C Subtotal of Base Price for removal and disposal of contaminated soils, unknown and unidentified on drawings, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
250 CM $________ $___________
1D Subtotal of Base Price for undercut and disposal of geotechnically unsuitable subgrade soils and replacement with imported structural fill material or with Canadian Type A stone, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
250 CM $_________ $___________
1E Subtotal of Base Price for providing removal and disposal of oily water and sludge inside tanks, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
30,000 L $_________ $___________
2 Option Item 1 (CLIN 0002):
Price for purchase of second generator and associated tank for Joint Maritime Facility primary building in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_________ $___________ $_____________
3 Option Item 2 (CLIN 0003):
Price for providing Electronic Security System (ESS) equipment, testing, and associated training, but excluding work provided in another Priced line item.
The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Video Systems complete in accordance with the drawings and specifications. Equipment includes items such as
Government Estimated Price:
$56,681.86
HAR
Percent
(NTE
5%)
HAR Subtotal
Total ESS Estimated Price
Premise Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together.
Include the price for supporting permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door-hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior duct banks, manholes, utility poles, utility connections, and power connections.
4 Option Item 3 (CLIN 0004):
Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another line item.
Government Estimated Price:
$125,244.16
HAR
Percent
(NTE
5%)
HAR Subtotal
Total FF&E Estimated Price
Total All CLINs (CLIN 0001 + CLIN 0002 + CLIN 0003 + CLIN 0004) = $__________________
File details come from the government source that posted it. Updated .