This file is Part 3 of 5 of the technical specifications for the P1360 Joint Maritime Facility project in Newfoundland, Canada. It contains detailed construction specifications for roofing systems, flashing, sheet metal work, and firestopping, organized by construction trade divisions and sections following the MasterFormat specification system.
The specifications prescribe three primary roofing system options: modified bituminous membrane roofing (Section 07 52 00), aluminum standing seam metal roofing (Section 07 61 15.00), and associated flashing and sheet metal components (Section 07 60 00). For modified bituminous systems, the specifications require a minimum three-ply SBS modified bitumen membrane set in cold-applied adhesive, with materials meeting ASTM standards for base sheets (minimum 2.0 mm thick), interply sheets (2.0 mm), and cap sheets (3.7 mm minimum). Roofing applicators must have a minimum five years' experience as an approved applicator with the manufacturer and provide references for five similar projects completed within three years. The specifications mandate a 20-year no-dollar-limit warranty covering materials and labor, with an additional two-year installer warranty. For aluminum standing seam roofing systems, panels must be fabricated from 3004 aluminum alloy per ASTM B209M with a minimum 1.0 mm thickness, fluorocarbon baked enamel finish on both faces, and a minimum 30 percent recycled content. Wind uplift resistance must be rated for 235 km/h winds, and the system must demonstrate no water infiltration at 125 mm per hour rainfall with 200 km/h winds. Sheet metal flashing and trim components must be fabricated from compatible materials (copper, aluminum, stainless steel, zinc-coated steel, or terne-coated steel) in specified thicknesses, with all exposed items manufactured from the same material. Firestopping systems (Section 07 84 00) must be FM approved or UL listed, asbestos-free, nontoxic, with flame spread ratings of 25 or less and smoke development ratings of 50 or less per ASTM E84, and must provide fire resistance ratings matching the construction elements being penetrated. The specifications require qualified, independent inspectors with minimum two years' experience and dedicated firestop contractors with FM Research approval or UL certification, along with pre-installation preroofing conferences, manufacturer field inspections throughout installation, and comprehensive submittal documentation including shop drawings, product data, test reports, and warranties.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
PROJECT NUMBER: 1838720
CONTRACT NUMBER:
TASK ORDER NUMBER:
P1360 JOINT MAIRITIME FACILITY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
ATLANTIC
HAVING PARTICIPATED IN THE DESIGN OF PROJECT NO. 1838720, P1360 JOINT MARITIME
FACILITY AND HAVING THOROUGHLY REVIEWED THE COMPLETED PROJECT DOCUMENTS, I
DECLARE THAT THE FACILITY DESIGN INCLUDED HEREIN COMPLIES WITH ALL APPLICABLE
CANADIAN CODES AND LAWS.
DATE SIGNATURE (PROFESSIONAL SEAL)
REIGSTERED ENGINEER
2026-01-23
PERMIT HOLDER
PROVINCE OF NEWFOUNDLAND AND LABRADOR
CLASS "A"
This Permit Allows
WSP CANADA INC.
pegnl
January 23, 202 Digitally signed by Matthew.Rodgers@wsp.com
DN:
cn=Matthew.Rodgers@wsp.com Date: 2026.01.22 13:03:53 -04'00'
Matthew.Rodgers@wsp.com
Joint Maritime Facility P1360
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/24 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 31 20 05/22 PROJECT TECHNICAL DATA MANAGEMENT AND
VISUALIZATION
01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 11/23 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 11/15, CHG 1: 08/22 HEALTH, SAFETY, AND EMERGENCY RESPONSE
PROCEDURES FOR CONTAMINATED SITES
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/24 METRIC MEASUREMENTS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)
01 91 00.15 05/23, CHG 3: 08/24 BUILDING COMMISSIONING
01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 42 51 11/19 CARPET REMOVAL AND RECLAMATION
02 51 19 02/21 SOLIDIFICATION AND STABILIZATION
DECONTAMINATION
02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 61 23 04/06 REMOVAL AND DISPOSAL OF PCB
CONTAMINATED SOILS
02 65 00 11/22 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
PROJECT TABLE OF CONTENTS Page 1
03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE
03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE
DIVISION 05 - METALS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/23 BITUMINOUS DAMPPROOFING
07 14 00 08/23 FLUID-APPLIED WATERPROOFING
07 21 13 08/23 BOARD AND BLOCK INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 08/23, CHG 1: 08/24 SELF-ADHERING AIR BARRIERS
07 27 26 08/23 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 08/23 FLASHING AND SHEET METAL
07 61 15.00 20 08/16, CHG 2: 11/18 ALUMINUM STANDING SEAM ROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 22 00 08/24 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 67 23.15 02/21 FUEL RESISTIVE RESINOUS FLOORING,
3-COAT SYSTEM
09 69 13 11/24 RIGID GRID ACCESS FLOORING
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
PROJECT TABLE OF CONTENTS Page 2
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 08/24 LOCKERS
DIVISION 12 - FURNISHINGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 22 00 04/20 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 05/24 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 05/25 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 08/24 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 08/24 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 08/24 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 02/25 HVAC AIR DISTRIBUTION
23 64 10 05/25 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 7: 02/24 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL HVAC SYSTEMS
25 05 11.02 08/24 CYBERSECURITY FOR LOW IMPACT EMERGENCY
AND BACK-UP ELECTRICAL POWER SYSTEMS
25 05 11.03 08/24 CYBERSECURITY FOR LOW IMPACT
ELECTRICITY METERING SYSTEM
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR
FACILITY-RELATED CONTROL SYSTEMS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 26 - ELECTRICAL
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER AND STATIC TRANSFER
SWITCHES
26 36 23.01 05/20, CHG 1: 08/21 AUTOMATIC AND STATIC TRANSFER SWITCHES
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 08/23 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/24 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 21 13 11/18 RADON MITIGATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
AND RIDGID PAVING
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 08 53 08/18 AVIATION FUEL DISTRIBUTION SYSTEM
START-UP
33 09 52 11/18 FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (NON-HYDRANT)
PROJECT TABLE OF CONTENTS Page 4
33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 46 13 05/20 FOUNDATION DRAINAGE
33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 05/25 POL SERVICE PIPING WELDING
33 56 10 05/25 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 11/18, CHG 1: 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
P1360 Joint Maritime Facility 1783264
SECTION 07 52 00
MODIFIED BITUMINOUS MEMBRANE ROOFING
05/12, CHG 5: 11/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.24 (2022) Roofing - Safety Requirements for Low-Sloped Roofs
ASPHALT ROOFING MANUFACTURER'S ASSOCIATION (ARMA)
ARMA 410BUR88 (2001) Manual of Roof Maintenance and Repair
ARMA PMBRG98 (1998) Quality Control Guideline for the Application of Polymer Modified Bitumen Roofing
ASTM INTERNATIONAL (ASTM)
ASTM C1153 (2023) Standard Practice for Location of Wet Insulation in Roofing Systems Using Infrared Imaging
ASTM C1289 (2023a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D1970/D1970M (2019) Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D4073/D4073M (2006; E 2019; R 2019) Standard Test Method for Tensile-Tear Strength of Bituminous Roofing Membranes
ASTM D4586/D4586M (2007; R 2018) Asphalt Roof Cement, Asbestos-Free
SECTION 07 52 00 Page 1
ASTM D4637/D4637M (2015) EPDM Sheet Used in Single-Ply Roof Membrane
ASTM D5147/D5147M (2014) Standard Test Methods for Sampling and Testing Modified Bituminous Sheet Material
ASTM D6162/D6162M (2016) Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using a Combination of Polyester and Glass Fiber Reinforcements
ASTM D6164/D6164M (2016) Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Polyester Reinforcements
ASTM E108 (2020a) Standard Test Methods for Fire Tests of Roof Coverings
CSA Group (CSA)
CSA A123.21 (2010) Wind Uplift Standards
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide https://www.approvalguide.com/
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2024) International Building Code
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA C3701 (1997) Repair Manual for Low Slope Membrane Roof Systems
NRCA CONDET (2014) Construction Details Manual
NRCA RoofMan (2020) The NRCA Roofing Manual
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
SINGLE PLY ROOFING INDUSTRY (SPRI)
ANSI/SPRI/FM 4435/ES-1 (2017) Test Standard for Edge Systems Used with Low Slope Roofing Systems
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
SECTION 07 52 00 Page 2
UL SOLUTIONS (UL)
UL 790 (2022) UL Standard for Safety Test Methods for Fire Tests of Roof Coverings
UL RMSD (2012) Roofing Materials and Systems Directory
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM
Minimum three-ply SBS modified bitumen roof membrane consisting of modified bitumen base sheetbase sheet,interply sheet and cap sheet.
Modified bitumen roof membrane must be set in cold-applied adhesive.
All work must follow the NRCA RoofMan guidelines and standards stated within this Section.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Roof Plan; G drawing depicting wind loads and boundaries of enhanced perimeter and corner attachments of roof system components, as applicable
Field Inspection and Existing Conditions Report
Identify all fire safety issues including exposed or concealed combustible materials, which may require additional protection during roof installation.
SD-03 Product Data
Modified Bitumen Sheets; G
Heat Island Reduction; S
Energy Star Label for Top Coating; S
Cold-Applied Membrane Adhesive; G
Primer; G
Modified Bitumen Roof Cement; G
Pre-Manufactured Accessories
Fasteners And Plates; G
SECTION 07 52 00 Page 3
Sample Warranty certificate; G
Submit all data required by Section 07 22 00 ROOF AND DECK INSULATION, together with requirements of this section. Include in data written acceptance by the roof membrane manufacturer of the products and accessories provided. Provide oroducts as listed in the applicable wind uplift and fire rating classification listings, unless approved otherwise by the Contracting Officer.
SD-05 Design Data
Wind Uplift Calculations; G
Provide Engineering calculations, signed, sealed, and dated by a qualified Engineer validating the wind resistance per ASCE 7-16 , ASTM D4073/D4073M , and ANSI/SPRI/FM 4435/ES-1 of non-rated roof system.
SD-07 Certificates
Provide evidence that products used within this specification are manufactured in the United States.
Qualification of Manufacturer
Certify that the manufacturer of the modified bitumen membrane meets requirements specified under paragraph QUALIFICATION OF
MANUFACTURER.
Qualification of Applicator
Certify that the applicator meets requirements specified under paragraph QUALIFICATION OF APPLICATOR.
Qualification of Engineer of Record
Certify that the Engineer of Record is fully qualified, competent, and currently licensed to practice in the project jurisdiction.
Wind Uplift Resistance; G classification, as applicable
Fire Resistance classification; G
Submit the roof system assembly wind uplift and fire rating classification listings.
SD-08 Manufacturer's Instructions
Modified Bitumen Membrane Application; G
Flashing; G
Cold Adhesive Applied Modified Bitumen Membrane; G
Base Sheet attachment, including pattern and frequency of mechanical attachments required in field of roof, corners, and perimeters to provide for the specified wind resistance.
SECTION 07 52 00 Page 4
Primer
Fasteners
Cold Weather Installation; G
Include detailed application instructions and standard manufacturer drawings altered as required by these specifications.
Explicitly identify in writing, differences between manufacturer's instructions and the specified requirements.
SD-11 Closeout Submittals
Warranty
Information Card
Instructions To Government Personnel
Include copies of Safety Data Sheets for maintenance/repair materials.
Submit 20 year "No-Dollar-Limit" warranty for labor and materials.
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
Modified bitumen sheet roofing system manufacturer must have a minimum of 5 five years experience in manufacturing modified bitumen roofing products.
1.4.2 Qualification of Applicator
Roofing system applicator must be approved, authorized, or licensed in writing by the modified bitumen sheet roofing system manufacturer and have a minimum of 5 five years experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty. The applicator must supply the names, locations and client contact information of five projects of similar size and scope that the applicator has constructed using the manufacturer's roofing products submitted for this project within the previous three years.
1.4.3 Qualification of Engineer of Record
Engineer of Record must be currently licensed within the jurisdiction of the project.
Wind uplift requirementsin accordance with Local and Newfoundland, Canada
ASCE 7-16 ,in accordance with International Building Code.
Snow load requirements per ICC IBC Chapter 16 Section 1608.3 and Section 7 of ASCE 7-16
SECTION 07 52 00 Page 5
1.4.4 Fire Resistance
Complete roof covering assembly must:
a. Be Class A rated in accordance with ASTM E108, CSA A123.21 , or UL 790 ;
and
b. Be listed as part of Fire-Classified roof deck construction in UL RMSD, or Class I roof deck construction in FM APP GUIDE.
FM or UL approved components of the roof covering assembly must bear the appropriate FM or UL label.
1.4.5 Wind Uplift Resistance
Provide a complete roof system assembly that is rated and installed to resist wind loads calculated in accordance with ASCE 7-16 , CSA A123.21 and validated by uplift resistance testing in accordance with Factory Mutual (FM) test procedures. Do not install non-rated systems, except as approved by the Contracting Officer. Submit licensed engineer's Wind uplift calculations and substantiating data to validate any non-rated roof system. Base wind uplift measurements on a design wind speed as indicated on structural drawings and in accordance with ASCE 7-16 and other applicable building code requirements.
1.4.6 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
a. Drawings, including Roof Plan, specifications and submittals related to the roof work
b. Roof system components installation
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roof structure, and roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representatives to roof manufacturer
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing
e. Quality control, (ARMA PMBRG98) plan for the roof system installation
f. Safety requirements
Coordinate preroofing conference scheduling with the Contracting Officer.
The conference must be attended by the Contractor, the Contracting Officer's designated personnel, and personnel directly responsible for the installation of roofing and insulation, flashing and sheet metal work, mechanicalelectrical work, other trades interfacing with the roof work, designated safety personnel trained to enforce and comply with ASSP A10.24 , SECTION 07 52 00 Page 6
Fire Marshall, and a representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials in manufacturers' original unopened containers and rolls with labels intact and legible. Mark and remove wet or damaged materials from the site. Where materials are covered by a referenced specification, the container must bear the specification number, type, and class, as applicable. Deliver materials in sufficient quantity to allow work to proceed without interruption.
1.5.2 Storage
Protect materials against moisture absorption and contamination or other damage. Avoid crushing or crinkling of roll materials. Store roll materials on end on clean raised platforms or pallets one level high in dry locations with adequate ventilation, such as an enclosed building or closed trailer. Do not store roll materials in buildings under construction until concrete, mortar, and plaster work is finished and dry. Maintain roll materials at temperatures above 10 degrees C for 24 hours immediately before application. Do not store materials outdoors unless approved by the Contracting Officer. Completely cover felts stored outdoors, on and off roof, with waterproof canvas protective covering. Do not use polyethylene sheet as a covering. Tie covering securely to pallets to make completely weatherproof. Provide sufficient ventilation to prevent condensation. Do not store more materials on roof than can be installed the same day and remove unused materials at end of each days work. Distribute materials temporarily stored on roof to stay within live load limits of the roof construction.
Maintain a minimum distance of 10.67 meters for all stored flammable materials, including materials covered with shrink wraps, craft paper or tarps from all torch/welding applications.
Immediately remove wet, contaminated or otherwise damaged or unsuitable materials from the site. Damaged materials may be marked by the Contracting Officer.
1.5.3 Handling
Prevent damage to edges and ends of roll materials. Do not install damaged materials in the work. Select and operate material handling equipment to prevent damage to materials or applied roofing.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not install roofing system when air temperature is below 4.44 degrees C, during any form of precipitation, including fog, or when there is ice, frost, moisture, or any other visible dampness on the roof deck. Follow manufacturer's printed instructions for Cold Weather Installation.
1.7 SEQUENCING
Coordinate the work with other trades to ensure that components which are
SECTION 07 52 00 Page 7 to be secured to or stripped into the roofing system are available and that permanent flashing and counter flashing, per NRCA CONDET, and are installed as the work progresses. Ensure temporary protection measures are in place to preclude moisture intrusion or damage to installed materials. Apply roofing immediately following application of insulation as a continuous operation. Coordinate roofing operations with insulation work so that all roof insulation applied each day is covered with roof membrane installation the same day.
1.8 WARRANTY
Provide roof system material and workmanship warranties meeting specified requirements. Provide revision or amendment to standard membrane manufacturer warranty as required to comply with the specified requirements. Provide a manufacturer's warranty that has no dollar limit, covers full system water-tightness, and has a minimum duration of 20 years.
1.8.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 20-year no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation in compliance with ASTM C1289, and accessories necessary for a watertight roof system construction. Provide warranty directly to the Government and commence warranty effective date at time of Government's acceptance of the roof work. The warranty must state that:
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, blisters, splits, tears, delaminates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship are the responsibility of the roof membrane manufacturer. All costs associated with the repair or replacement work are the responsibility of the roof membrane manufacturer.
b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, emergency temporary repairs performed by others does not void the warranty.
c. Upon completion of installation, and acceptance by the Contracting Officer and Roofing System Engineer of Record, the manufacturer must supply the appropriate warranty to the Owner.
d. Installer must submit a minimum two year warranty to the membrane manufacturer from the date of acceptance, with a copy to the Contracting Officer and Roofing System Engineer of Record.
1.8.2 Roofing System Installer Warranty
The roof system installer must warrant for a period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected
SECTION 07 52 00 Page 8 materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
1.8.3 Continuance of Warranty
Repair or replacement work, ARMA 410BUR88, NRCA C3701 that becomes necessary within the warranty period and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the roof membrane manufacturer warranty for the remainder of the manufacturer warranty period.
1.9 CONFORMANCE AND COMPATIBILITY
Provide the entire roofing and flashing system in accordance with specified and indicated requirements, including fire and wind resistance ( ANSI/SPRI/FM 4435/ES-1 ) requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the NRCA Roofing and Waterproofing Manual, membrane manufacturer published recommendations and details, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the Contracting Officer for approval prior to installation.
1.10 ELIMINATION, PREVENTION OF FALL HAZARDS
1.10.1 Fall Protection
PART 2 PRODUCTS
2.1 MATERIALS
Coordinate with other specification sections related to the roof work.
Furnish a combination of specified materials that comprise a roof system acceptable to the roof membrane manufacturer and meeting specified requirements. Protect materials provided from defects and make suitable for the service and climatic conditions of the installation.
2.1.1 Energy Performance
Install a roof system that meets an overall performance as specified on the drawings or by insulation specified in other sections.
2.2 MODIFIED BITUMEN SHEETS MATERIALS
Furnish a combination of specified materials that comprise the modified bitumen manufacturer's standard system of the number and type of plies specified. Provide materials suitable for the service and climatic conditions of the installation. Modified bitumen sheets must be watertight and visually free of pinholes, particles of foreign matter, non-dispersed raw material, factory splices, or other conditions that might affect serviceability. Polymer modifier must comply with ARMA PMBRG98 and be uniformly dispersed throughout the sheet. Edges of sheet must be straight and flat.
c. SBS Base Sheet: ASTM D6162/D6162M or ASTM D6164/D6164M , Type II, Grade S, minimum 2.0 mm thick.
SECTION 07 52 00 Page 9
d. SBS Interply Sheet: ASTM D6162/D6162M or ASTM D6164/D6164M , Type II, Grade S, minimum 2.0 mm thick.
e. SBS Cap Sheet: ASTM D6162/D6162M or ASTM D6164/D6164M ; Type II, Grade G, minimum 3.7 mm thick, and as required to provide specified fire safety rating.
2.3 BASE FLASHING MEMBRANE
Membrane manufacturer's standard, minimum two-ply modified bitumen membrane flashing system compatible with the roof membrane specified and as recommended in membrane manufacturer's published literature. Provide flashing membranes that meet or exceed the properties of the material standards specified for the modified bitumen base, interply and cap sheet, except that flashing membrane thickness must be as recommended by the membrane manufacturer.
2.4 COLD-APPLIED MEMBRANE ADHESIVE
Membrane manufacturer's recommended low volatile organic compound (VOC) cold process adhesive for application of the membrane plies.
2.5 MEMBRANE SURFACING
Provide modified bitumen roof membrane cap sheet with factory-applied granule surfacing of dark color as selected from membrane manufacturer's standard colors.
2.6 PRIMER
ASTM D41/D41M, or other primer compatible with the application and as approved in writing by the modified bitumen membrane manufacturer.
2.7 MODIFIED BITUMEN ROOF CEMENT
ASTM D4586/D4586M , Type II for vertical surfaces, Type I for horizontal surfaces, compatible with the modified bitumen roof membrane and as recommended by the modified bitumen membrane manufacturer.
2.8 CANT AND TAPERED EDGE STRIPS
Provide standard cants and tapered edge strips of the same material as the roof insulation treated with bituminous impregnation, sizing, or waxing and fabricated to provide maximum 45 degree change in direction of membrane. Cant strips must be minimum 38.1 mm thick and provide for minimum 127 mm face and 88.9 mm vertical height when installed at 45 degree face angle, except where clearance restricts height to lesser dimension. Taper edge strips at a rate of 25.4 mm to 38.1 mm per 304.8 mm to a minimum of 3.175 mmof thickness. Provide kiln-dried preservative-treated wood cants, in compliance with requirements of Section 06 10 00 ROUGH CARPENTRY at base of wood nailers set on edge and wood curbing and where otherwise indicated.
2.9 FASTENERS AND PLATES
Provide coated, corrosion-resistant fasteners as recommended by the modified bitumen sheet manufacturer's printed instructions and meeting the requirements of CSA A123.21 and FM APP GUIDE for Class I roof deck construction and the wind uplift resistance specified. For fastening of
SECTION 07 52 00 Page 10 membrane or felts to wood materials, provide fasteners driven through 25.4 mm diameter metal discs, or one piece composite fasteners with heads not less than 25.4 mm in diameter or 25.4 mm square with rounded or 45 degree tapered corners.
2.9.1 Masonry or Concrete Walls and Vertical Surfaces
Use hardened steel nails or screws with flat heads, diamond shaped points, and mechanically deformed shanks not less than 25.4 mm long for securing felts, modified bitumen sheets, metal items, and accessories to masonry or concrete walls and vertical surfaces. Use power-driven fastenersonly when approved in writing by the Contracting Officer.
2.10 PRE-MANUFACTURED ACCESSORIES
Pre-manufactured accessories must be manufacturer's standard for intended purpose, compatible with the membrane roof system and approved for use by the modified bitumen membrane manufacturer.
2.11 WALKPADS
Provide roof walkpads that are polyester reinforced, granule-surfaced modified bitumen membrane material, minimum 5 mm thick, compatible with the modified bitumen sheet roofing and as recommended by the modified bitumen sheet roofing manufacturer. Panels must not exceed 1.219 meters in length. Other walkpad materials require approval of the Contracting Officer prior to installation.
2.12 ROOF INSULATION BELOW MODIFIED BITUMEN MEMBRANE SYSTEM
Provide insulation compatible with the roof membrane, approved by the membrane manufacturer and meeting all the requirements as specified in Section 07 22 00 ROOF AND DECK INSULATION.
2.13 MEMBRANE LINER
Provide self-adhering modified bitumen underlayment conforming to ASTM D1970/D1970M , EPDM membrane liner conforming to ASTM D4637/D4637M , or other waterproof membrane liner material as approved by the Contracting Officer.
2.14 TOP COATING
Provide a top coating product that is Energy Star labeled and is produced and compatible with the roof material of this specification. Provide data identifying Energy Star label for top coating product. Install to the manufacturer's written installation methods. Provide written confirmation that installation of a top coat will not modify or void the required roof warranty.
PART 3 EXECUTION
3.1 EXAMINATION
Ensure that the following conditions exist prior to application of the roofing materials:
a. Do not install items that show visual evidence of biological growth.
SECTION 07 52 00 Page 11
b. Drains, curbs, cants, control joints, expansion joints, perimeter walls, roof penetrating components, and equipment supports are in place.
c. Surfaces are rigid, clean, dry, smooth, and free from cracks, holes, and sharp changes in elevation. Joints in the substrate are sealed to prevent dripping of bitumen into building or down exterior walls.
d. The plane of the substrate does not vary more than 6.35 mmwithin an area 3.048 by 3.048 meters when checked with a 3.048 meter straight edge placed anywhere on the substrate.
e. Substrate is sloped as indicated to provide positive drainage.
f. Walls and vertical surfaces are constructed to receive counter flashing, and will permit mechanical fastening of the base flashing materials.
g. Treated wood nailers are in place on non-nailable surfaces, to permit nailing of base flashing at minimum height of 203.2 mm above finished roofing surface.
h. Protect all combustible materials and surfaces which may contain concealed combustible or flammable materials. All fire extinguishing equipment has been placed as specified.
i. Verify all Fire Watch personnel assignments.
j. Treated wood nailers are fastened in place at eaves, gable ends, openings, and intersections with vertical surfaces for securing of membrane, edging strips, attachment flanges of sheet metal, and roof fixtures. Surface-applied nailers are the same thickness as the roof insulation.
k. Cants are securely fastened in place in the angles formed by walls and other vertical surfaces. The angle of the cant is 45 degrees and the height of the vertical leg is not less than 88.9 mm.
l. Insulation boards are installed smoothly and evenly, and are not broken, cracked, or curled. There are no gaps in insulation board joints exceeding 6.35 mm in width. Insulation is being roofed over on the same day the insulation is installed.
m. Cast-in-place substrates have been allowed to cure and the surface dryness requirements specified under paragraph FIELD QUALITY CONTROL have been met.
n. Roof deck and framing are sloped as indicated to provide positive drainage.
3.2 PREPARATION
3.2.1 Protection of Property
3.2.1.1 Protective Coverings
Install protective coverings at paving and building walls adjacent to hoists prior to starting the work. Lap protective coverings not less than
SECTION 07 52 00 Page 12
15.24 cm , secure against wind, and vent to prevent collection of moisture on covered surfaces. Keep protective coverings in place for the duration of the roofing work.
3.2.2 Equipment
3.2.2.1 Mechanical Application Devices
Mount mechanical application devices on pneumatic-tired wheels. Use devices designed and maintained to operate without damaging the insulation, roofing membrane, or structural components.
3.2.2.2 Electric-Heated Equipment
Provide adequate electrical service as required by manufacturer of electrical equipment to ensure against damage to equipment and property and to ensure proper application of roofing materials.
3.2.3 Priming of Surfaces
Prime all surfaces to be in contact with adhered membrane materials.
Apply primer at the rate of 3 liters per 10 sq. metersor as recommended by modified bitumen sheet manufacturer's printed instructions to promote adhesion of membrane materials. Allow primer to dry prior to application of membrane materials to primed surface. Avoid flammable primer material conditions in torch applied membrane applications.
3.2.3.1 Priming of Metal Surfaces
Prime flanges of metal components to be embedded into the roof system prior to setting in bituminous materials or stripping into roofing system.
3.2.4 Membrane Preparation
Unroll modified bitumen membrane materials and allow to relax a minimum of 30 minutes prior to installation. In cold weather, adhere to membrane manufacturer's additional recommendations for pre-installation membrane handling and preparation. Inspect for damage, pinholes, particles of foreign matter, non-dispersed raw material, factory splices, or other conditions that might affect serviceability. Edges of seams must be straight and flat so that they may be seamed to one another without forming fish mouths or wrinkles. Discard damaged or defective materials.
3.2.5 Substrate Preparation
Apply membrane to clean, dry surfaces only. Do not apply membrane to surfaces that have been wet by rain or frozen precipitation within the previous 12 hours. Provide cleaning and artificial drying with heated blowers or torches as necessary to ensure clean, dry surface prior to membrane application. Torches may not be used to ensure clean, dry surfaces prior to membrane applications if the roof deck or materials used in the installation of the roofing system are combustible.
3.3 APPLICATION
Apply roofing materials as specified herein unless approved otherwise by the Contracting Officer. Keep roofing materials dry before and during application. Complete application of roofing in a continuous operation.
Begin and apply only as much roofing in one day as can be completed that
SECTION 07 52 00 Page 13 same day. Maintain specified temperatures for asphalt.
3.3.1 Phased Membrane Construction
Phased application of membrane plies is prohibited unless otherwise approved by the Contracting Officer and supported by the membrane manufacturer's written application instructions. If cap sheet installation is delayed, thoroughly clean the applied membrane material surface and dry immediately prior to cap sheet installation. Priming of the applied membrane surface may be required at the discretion of the Contracting Officer prior to cap sheet installation.
3.3.2 Temporary Roofing and Flashing
Provide watertight temporary roofing and flashing where considerable work by other trades, such as installing antennas,and pipes, is to be performed on the roof or where construction scheduling or weather conditions require protection of the building's interior before permanent roofing system can be installed. Do not install temporary roofing over permanently installed insulation. Provide rigid pads for traffic over temporary roofing.
3.3.2.1 Removal
Completely remove temporary roofing and flashing before continuing with application of the permanent roofing system.
3.3.3 Application Method
3.3.3.1 Cold Adhesive Applied Modified Bitumen Membrane
Apply cold adhesive with airless sprayer or 6.35 mm saw-toothed rubber squeegee to prepared surfaces in accordance with membrane manufacturer's application instructions. Fully cover substrate with adhesive. Roll or lay membrane in adhesive in accordance with manufacturer's recommendations and within the time limitations of adhesive application. Broom the membrane to ensure full contact with adhesive. Seal laps with adhesive or by heat fusing with hot air welder as required by membrane manufacturer.
Minimize traffic on installed membrane during the adhesive cure and set time.
3.3.4 Modified Bitumen Base Sheet
Fully adhere base sheets in accordance with membrane manufacturer's printed instructions. Apply cold adhesive with airless sprayer or a 6.35 mm saw-toothed rubber squeegee and at application rate recommended by the membrane manufacturer. Fully cover substrate with cold adhesive. Ensure laps areas of base sheet are fully sealed. Roll and broom in the base sheet to ensure full contact with the adhesive application. Apply sheets in a continuous operation. Apply sheets with side laps at a minimum of
50.8 mm unless greater side lap is recommended by the manufacturer's standard written application instructions. Provide end laps of not less than 152.4 mm and staggered a minimum of 914.4 mm. Apply sheets at right angles to the roof slope so that the direction of water flow is over and not against the laps. Extend base sheets approximately 50.8 mm above the top of cant strips at vertical surfaces and to the top of cant strips elsewhere. Trim base sheet to a neat fit around vent pipes, roof drains, and other projections through the roof. Application must be free of ridges, wrinkles, and buckles.
SECTION 07 52 00 Page 14
3.3.5 Modified Bitumen Membrane Application
Ensure proper sheet alignment prior to installation. Apply membrane layers perpendicular to slope of roof in shingle fashion to shed water, including application on areas of tapered insulation that change slope direction. Bucking or backwater laps are prohibited. Fully adhere membrane sheets to underlying substrate materials. Provide minimum 76.2 mm side laps and minimum 152.4 mm end laps and as otherwise required by membrane manufacturer. Stagger end laps minimum 914.4 mm . Offset side laps between membrane layers a minimum of 304.8 mm. Offset end laps between membrane layers a minimum of 914.4 mm . Install all membrane layers the same workday, unless supported otherwise by roof membrane manufacturer application instructions and approved by the Contracting Officer. Provide tight smooth laminations of each membrane layer without wrinkles, ridges, buckles, kinks, fishmouths, or voids. Ensure full membrane adhesion and full lap seals. Rework to seal any open laps prior to application of subsequent membrane layers. The completed membrane application must be free of surface abrasions, air pockets, blisters, ridges, wrinkles, buckles, kinks, fishmouths, voids, or open seams.
3.3.5.1 Cap Sheet Installation
Underlying applied membrane must be inspected and repaired free of damage, holes, puncture, gouges, abrasions, and any other defects, and free of moisture, loose materials, debris, sediments, dust, and any other conditions required by the membrane manufacturer prior to cap sheet installation. Do not apply cap sheet if rain or frozen precipitation has occurred within the previous 24 hours. Align cap membrane and apply by the specified method with the proper side and end lap widths. Cut at a 45 degree angle across selvage edge of cap membrane to be overlapped in end lap areas prior to applying overlapping cap membrane. Apply matching granules in any areas of adhesive bleed out while the adhesive is still tacky. Minimize traffic on newly installed cap sheet membrane.
3.3.6 Membrane Flashing
Apply two-ply modified bitumen strip flashing and sheet flashing in the angles formed where the roof deck abuts walls, curbs, ventilators, pipes, and other vertical surfaces, and where necessary to make the work watertight. Apply membrane flashing in accordance with the roof membrane manufacturers printed instructions and as specified. Cut at a 45 degree angle across terminating end lap area of cap membrane prior to applying adjacent overlapping cap membrane. Press flashing into place to ensure full adhesion and avoid bridging. Ensure full lap seal in all lap areas.
Mechanically fasten top edge of modified bituminous base flashing 150 mm (6 inches) on center through minimum 25.4 mm diameter tin caps with fasteners of sufficient length to embed minimum one inch into attachment substrate. Apply matching granules in any areas of adhesive bleed out while the adhesive is still tacky. Apply membrane liner over top of exposed nailers and blocking and to overlap top edge of base flashing installation at curbs, parapet walls, expansion joints and as otherwise indicated to serve as waterproof lining under sheet metal flashing components. Metal flashing per SMACNA 1793 guidelines and standards is specified under Section 07 60 00 FLASHING AND SHEET METAL. Do not set metal flashing in hot asphalt.
3.3.6.1 Membrane Strip Flashing
Set primed flanges of metal flashing in full bed of modified bituminous
SECTION 07 52 00 Page 15 cement material and securely fasten through to attachment substrate.
Strip-in with membrane flashing so that strip extends not less than 101.6 mm beyond outer edge of flange. Where multiple membrane stripping plies are installed, extend each additional stripping ply minimum 101.6 mm beyond edge of previous ply.
3.3.6.2 Membrane Flashing at Roof Drain
Roof drains are specified in Section 22 00 00 PLUMBING, GENERAL PURPOSE.
Flashing for roof drains, is specified in Section 07 60 00 FLASHING AND SHEET METAL. Extend membrane sheets to edge of drain bowl opening at the roof drain deck flange in accordance with membrane manufacturer's printed application instructions. Securely clamp membrane sheets and metal roof drain flashing and strip flashing in the flashing clamping ring. Secure clamps so that sheets and metal flashing are free from wrinkles and folds. Trim stripping must be flush with inside of clamping ring.
3.3.6.3 Pre-fabricated Curbs
Securely anchor prefabricated curbs to nailer or other base substrate and flash with modified bitumen membrane.
3.3.6.4 Set-On Accessories
Where pipe or conduit blocking, supports and similar roof accessories are set on the membrane, adhere walkpad material to bottom of accessories prior to setting on roofing membrane. Install set-on accessories to permit normal movement due to expansion, contraction, vibration, and similar occurrences without damaging roofing membrane. Do not mechanically secure set-on accessories through roofing membrane into roof deck substrate.
3.3.6.5 Lightning Protection
Flash and attach lightning protection system components to the roof membrane in a manner acceptable to the roof membrane manufacturer.
3.3.7 Roof Walkpads
Install walkpads at roof access points and where otherwise indicated for traffic areas and for access to mechanical equipment, in accordance with the modified bitumen sheet roofing manufacturer's printed instructions.
Provide minimum 152.4 mm separation between adjacent walkpads to accommodate drainage. Provide walkpad or an additional layer of cap sheet under precast concrete paver blocks to protect the roofing.
3.3.8 Correction of Deficiencies
Where any form of deficiency is found, take additional measures as deemed necessary by the Contracting Officer to determine the extent of the deficiency and perform corrective actions as directed by the Contracting Officer.
3.3.9 Clean Up
Remove debris, scraps, containers and other rubbish and trash resulting from installation of the roofing system from job site each day.
SECTION 07 52 00 Page 16
3.4 CORRECTION OF DEFICIENCIES
Where any form of deficiency is found, take additional measures as deemed necessary by the Contracting Officer to determine the extent of the deficiency and perform corrective actions as directed by the Contracting Officer.
3.5 PROTECTION OF APPLIED ROOFING
At the end of the day's work and when precipitation is imminent, protect applied modified bitumen roofing system from water intrusion.
3.5.1 Water Cutoffs
Straighten insulation line using loose-laid cut insulation sheets and seal the terminated edge of modified bitumen roofing system in an effective manner. Seal off flutes in metal decking along the cutoff edge. Remove the water cut-offs to expose the insulation when resuming work, and remove the insulation sheets used for fill-in.
3.5.2 Temporary Flashing for Permanent Roofing
Provide temporary flashing at drains, curbs, walls and other penetrations and terminations of roofing sheets until permanent flashing can be applied. Remove temporary flashing before applying permanent flashing.
3.5.3 Temporary Walkways, Runways, and Platforms
Do not permit storing, walking, wheeling, and trucking directly on applied roofing materials. Provide temporary walkways, runways, and platforms of smooth clean boards, mats or planks as necessary to avoid damage to applied roofing materials, and to distribute weight to conform to live load limits of roof construction. Use rubber-tired equipment for roofing work.
3.6 FIELD QUALITY CONTROL
Perform field tests in the presence of the Contracting Officer. Notify the Contracting Officer one day before performing tests.
3.6.1 Construction Monitoring
During progress of the roof work, make visual inspections as necessary to ensure compliance with specified parameters. Additionally, verify the following:
a. Materials comply with the specified requirements.
b. Materials are not installed in adverse weather conditions.
All materials are properly stored, handled and protected from moisture or other damages.
c. Equipment is in working order. Metering devices are accurate.
d. Substrates are in acceptable condition, in compliance with specification, prior to application of subsequent materials.
(1) Nailers and blocking are provided where and as needed.
SECTION 07 52 00 Page 17
Insulation substrate is smooth, properly secured to its substrate, and without excessive gaps prior to membrane application.
(2) The proper number, type, and spacing of fasteners are installed.
Membrane heating, hot mopping, or adhesive application is provided uniformly and as necessary to ensure full adhesion of roll materials. Asphalt is heated and applied within the specified temperature range.
The proper number and types of plies are installed, with the specified overlaps.
Applied membrane surface is inspected, cleaned, dry, and repaired as necessary prior to cap sheet installation.
(3) Lap areas of all plies are completely sealed.
Membrane is fully adhered without ridges, wrinkles, kinks, fishmouths, or other voids or delaminations.
Installer adheres to specified and detailed application parameters.
Associated flashing and sheet…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .