This is the NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0), a template used to collect and evaluate contractor past performance information for federal contract proposals.

The form is divided into two main sections: contractor-completed blocks and client-completed blocks. The contractor section (Blocks 1-4) requires submission of company information (firm name, CAGE code, address, contact details), work role classification (prime contractor, subcontractor, joint venture), contract details (contract number, type, title, location, award and completion dates, pricing), and project description with complexity rating and relevance to the current submission. The client section (Blocks 5-8) requires the contracting officer or project client to provide their contact information, describe their role, and sign/date the completed questionnaire. The form includes instructions that NAVFAC requests clients complete and submit questionnaires directly to offerors, though direct submission to NAVFAC is permitted, with government reservation to verify all provided information.

The evaluation criteria section presents five adjective rating levels—Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), Unsatisfactory (U), and Not Applicable (N)—with detailed definitions for each. Clients rate contractor performance across seven major categories: Quality (technical data preparation, quality standards, problem resolution, quality control); Schedule/Timeliness (delivery compliance, resource utilization); Customer Satisfaction (end user satisfaction, contractor cooperation, staff interaction); Management/Personnel/Labor (on-site management, workforce qualification, small business utilization, change management, overall leadership); Cost/Financial Management (price compliance, innovative cost reductions, invoice accuracy, accounting system adequacy, contract terminations, financial stability); Safety/Security (safety environment maintenance, security compliance); and General factors (emergency response, contractual compliance, rehire willingness, overall performance rating). Clients provide narrative responses addressing specific strengths, weaknesses, deficiencies, and performance risk factors.

View the file

Other files

File Type Posted
N6247026R00110005 SF 30.pdf PDF
Attachment K _Moll Point Joint Maritime Facility NL Tech Memo.pdf PDF
AMENDMENT 0005.pdf PDF
Solicitation Amendment N6247026R00110005 SF 30.pdf PDF
Attachment J _ Hazardous Materials Report_2024_Appendix D of SEI.pdf PDF
P1360-Drawings- Amendment 0005.pdf PDF
N6247026R0011 Amendment 0004.pdf PDF
P1360 Site Visit Attendance Log.pdf PDF
N6247026R0011 Amendment 0003.pdf PDF
Amendment 0003 Revised P1360 Demo-DWGS.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 Revised P1360 DWGS.pdf PDF
Amendment 0003 Revised P1360 Specifications.pdf PDF
Amendment N6247026R0008 0005.pdf PDF
Solicitation Amendment N6247026R0011 (0002).pdf PDF
Solicitation Amendment N6247026R00110001 (0001).pdf PDF
Attachment F_P1360 DWG_Part 1 of 12.pdf PDF
Attachment F_P1360 DWG_Part 5 of 12.pdf PDF
Attachment F_P1360 DWG_Part 7 of 12.pdf PDF
Attachment G - Representations and Certifications.pdf PDF
Solicitation - N6247026R0011.pdf PDF
Attachment E_P1360 SPECS_Part 4 of 5.pdf PDF
Attachment E_P1360 SPECS_Part 5 of 5.pdf PDF
Attachment F_P1360 DWG_Part 3 of 12.pdf PDF
Attachment F_P1360 DWG_Part 4 of 12.pdf PDF
Attachment F_P1360 DWG_Part 6 of 12.pdf PDF
Attachment F_P1360 DWG_Part 11 of 12.pdf PDF
Attachment E_P1360 SPECS_Part 1 of 5.pdf PDF
Attachment E_P1360 SPECS_Part 3 of 5.pdf PDF
Attachment F_P1360 DWG_Part 9 of 12.pdf PDF
Attachment F_P1360 DWG_Part 12 of 12.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment B - Construction Experience Project Data Sheet.pdf PDF
Attachment D - Schedule B Price Proposal Form.pdf PDF
Attachment E_P1360 SPECS_Part 2 of 5.pdf PDF
Attachment F_P1360 DWG_Part 2 of 12.pdf PDF
Attachment F_P1360 DWG_Part 8 of 12.pdf PDF
Attachment F_P1360 DWG_Part 10 of 12.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: Entity Identifier Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS.

CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO

NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON

THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the

Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the

Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per

DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than

Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the

Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not

Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

Contractor Information (Firm Name): ________________________________________________

Client Information (Name): ________________________________________________________

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

Contractor Information (Firm Name): ________________________________________________

Client Information (Name): ________________________________________________________

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations

(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):