Attachment_B_-_Price_Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- BCGC – North Building Exterior Restoration
- Solicitation number
- B-2-26-25
- Issued by
- Brevard County, Florida
About this file
This is a Price Sheet attachment for an Invitation to Bid issued by Brevard County, Florida, for the exterior restoration of the Brevard County Government Center North Building, a six-level, 81,194 square-foot government structure in Titusville. The base bid requires contractors to furnish all labor, materials, equipment, and transportation necessary to execute comprehensive building envelope restoration work, including restoration of glazed curtain wall and storefront assemblies, precast concrete and stucco cladding restoration, building signage removal and reinstallation, and metal panel refinishing. Six optional scope elements are available for separate pricing: exterior door assembly restoration with rain diverters and silicone sealant resealing, exterior louver resealing and high-performance coating, roofing assembly interface sealing, exterior ceiling and soffit painting, exterior column restoration with traffic-rated sealants, and expansion joint replacement. The pre-bid walk-through is scheduled for March 17, 2026, at 11:00 AM, with a question deadline of March 27, 2026, and sealed bids due April 14, 2026, at 10:00 AM. Substantial completion is required within 150 calendar days from Notice to Proceed, with final completion within an additional 30 calendar days.
All pricing must be submitted as lump sum amounts for the base bid and each optional scope element. The contractor must be licensed by the State of Florida in respective trades, maintain general liability insurance of $1,000,000 combined single limit and workers' compensation insurance, and submit a 5% bid bond with the proposal. For projects exceeding $200,000, a 100% public construction bond is required. Pricing must remain firm for 90 days from bid opening. The contractor must demonstrate a minimum of ten years of experience in exterior building envelope restoration for governmental facilities of similar size and provide three recent project examples with manufacturer pre-approval verification. Work must comply with the 2023 Florida Building Code and meet UL 790 Class A fire rating standards, with specified materials including Dowsil structural sealants, EMSEAL Colorseal, and SOPREMA roof coating systems. Required warranties include a 20-year manufacturer warranty for roof coating, 10-year warranties for joint sealants and paint systems, and 2-year installer warranties. Liquidated damages are assessed at $500 per calendar day for delays, and progress payments will be made with five percent retainage held until Final Completion.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT B - PRICE SHEET | |||
| Description | Unit | Cost | |
| Base Bid | Cost to provide the labor, materials, equipment, and transportation as necessary and/or required to execute all of the work described in the Contract Documents for the building envelope assemblies. | Lump Sum |
| Option 1 | Exterior door assemblies which include the complete restoration of the existing painted hollow metal doors, including the sealing of the door thresholds and installation of rain diverters over existing unprotected door components. The existing glazed storefront doors will be resealed with the application of new silicone sealants at all metal to metal, glass to metal, and metal to masonry joints. | Lump Sum |
| Option 2 | Exterior louvers which include the resealing of the louver perimeter with new high-performance seals. All exterior louver surfaces will be painted with a high performance DTM coating system. | Lump Sum |
| Option 3 | The roofing assembly components at the interface of the exterior wall and window assembly will be sealed as required to provide a watertight building envelope. The existing roof warranty is to be maintained. | Lump Sum |
| Option 4 | Exterior ceilings, overhangs and soffits will be painted and the interface with adjacent building envelope components sealed. | Lump Sum |
| Option 5 | Exterior column restoration for all exterior surfaces, new backer rod installed, and traffic rated sealant at all columns to hardscape interfaces. | Lump Sum |
| Option 6 | The existing building expansion joints will be replaced with new prefabricated expansion joints. | Lump Sum |