REVISED Attachment B - Price Sheet Summary

This is a price sheet attachment for Brevard County's Invitation to Bid for the exterior restoration of the Brevard County Government Center North Building in Titusville, Florida. The document establishes the pricing structure for the base bid and six optional scope elements. The base bid requires contractors to provide labor, materials, equipment, and transportation for building envelope assembly restoration work, including a lump sum cost for the complete scope and a unit cost for re-securing mullion covers (with an allowance of 25 units included in the base bid, with credits or additional charges applied if actual quantities differ). The six optional items available for separate pricing include exterior door assembly restoration with rain diverters (Option 1), exterior louver resealing and painting (Option 2), roofing assembly interface sealing (Option 3), exterior ceiling and soffit painting (Option 4), exterior column restoration with traffic-rated sealants (Option 5), and expansion joint replacement (Option 6). All optional items are priced on a lump sum basis.

The price sheet requires bidders to submit firm pricing that remains valid for 90 days from bid opening. This document serves as the bidding template through which contractors will submit their cost proposals for the County to evaluate and compare all bids received by the April 14, 2026 deadline. The pricing structure allows the County flexibility to select base work with optional additions based on available funding and prioritized restoration needs, enabling comparative analysis of contractor pricing across the primary scope and supplemental work items.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

REVISED ATTACHMENT B - PRICE SHEET
DescriptionUnitCost
Base BidCost to provide the labor, materials, equipment, and transportation as necessary and/or required to execute all of the work described in the Contract Documents for the building envelope assemblies. Base bid shall also include the allowance for re-securing mullion covers as described below: Allowance Unit Cost.Lump Sum

Allowance Unit Cost Base bid shall include re-securing 25 mullion covers. If this quantity is not used, the County will receive a credit for the unused quantity based on this same unit cost. If the quantities used are more than 25, paymet to the Contractor shall be at this same unit cost. Provide the unit cost to re-secure one mullion cover. Each

Option 1Exterior door assemblies which include the complete restoration of the existing painted hollow metal doors, including the sealing of the door thresholds and installation of rain diverters over existing unprotected door components. The existing glazed storefront doors will be resealed with the application of new silicone sealants at all metal to metal, glass to metal, and metal to masonry joints.Lump Sum
Option 2Exterior louvers which include the resealing of the louver perimeter with new high-performance seals. All exterior louver surfaces will be painted with a high performance DTM coating system.Lump Sum
Option 3The roofing assembly components at the interface of the exterior wall and window assembly will be sealed as required to provide a watertight building envelope. The existing roof warranty is to be maintained.Lump Sum
Option 4Exterior ceilings, overhangs and soffits will be painted and the interface with adjacent building envelope components sealed.Lump Sum
Option 5Exterior column restoration for all exterior surfaces, new backer rod installed, and traffic rated sealant at all columns to hardscape interfaces.Lump Sum
Option 6The existing building expansion joints will be replaced with new prefabricated expansion joints.Lump Sum