Attachment_B_-_Price_Sheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
BCGC – North Building Exterior Restoration
Solicitation number
B-2-26-25
Issued by
Brevard County, Florida

About this file

This is a Price Sheet (Attachment B) for the Brevard County Government Center North Building Exterior Restoration project in Florida. The project encompasses exterior restoration work for a six-level government building, with the primary objective of mitigating active water intrusion through the building envelope and the secondary objective of improving the overall appearance of the exterior assemblies. The scope of work includes restoration of all exterior walls and designated roof components exposed to weather, as detailed in the project drawings and specifications.

The price sheet presents six lump sum options for bidders to price individually. These options include: Option 1, exterior door assemblies restoration with threshold sealing and rain diverters; Option 2, exterior louver resealing and high-performance coating application; Option 3, roofing assembly interface sealing to maintain existing roof warranty; Option 4, exterior ceiling and soffit painting with interface sealing; Option 5, exterior column restoration with backer rod installation and traffic-rated sealants; and Option 6, replacement of existing building expansion joints with new prefabricated units. The base bid requires pricing for labor, materials, equipment, and transportation necessary to execute all work described in the contract documents for the building envelope assemblies, with bidders able to submit pricing for each optional scope element separately.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT B - PRICE SHEET
DescriptionUnitCost
Base BidCost to provide the labor, materials, equipment, and transportation as necessary and/or required to execute all of the work described in the Contract Documents for the building envelope assemblies.Lump Sum
Option 1Exterior door assemblies which include the complete restoration of the existing painted hollow metal doors, including the sealing of the door thresholds and installation of rain diverters over existing unprotected door components. The existing glazed storefront doors will be resealed with the application of new silicone sealants at all metal to metal, glass to metal, and metal to masonry joints.Lump Sum
Option 2Exterior louvers which include the resealing of the louver perimeter with new high-performance seals. All exterior louver surfaces will be painted with a high performance DTM coating system.Lump Sum
Option 3The roofing assembly components at the interface of the exterior wall and window assembly will be sealed as required to provide a watertight building envelope. The existing roof warranty is to be maintained.Lump Sum
Option 4Exterior ceilings, overhangs and soffits will be painted and the interface with adjacent building envelope components sealed.Lump Sum
Option 5Exterior column restoration for all exterior surfaces, new backer rod installed, and traffic rated sealant at all columns to hardscape interfaces.Lump Sum
Option 6The existing building expansion joints will be replaced with new prefabricated expansion joints.Lump Sum