This document provides details for a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0041 for infrastructure upgrades at the Salt Lake City VAMC. Offerors should provide construction services to upgrade EHRM infrastructure at Project 660-21-700. The attached file is a set of drawings with specifications for the project. Proposals are due by the date listed in the solicitation document. The agency intends to award a firm-fixed-price contract to the responsible offeror with the lowest priced, technically acceptable proposal.

View the file

Other files

File Type Posted
RESPONSE Attachment V5.1.docx DOCX document
Construction Wage Rates- Salt Lake County- 08-11-2023.pdf PDF
ADDENDUM No 01.pdf PDF
Bid opening call-in information.pdf PDF
RESPONSE Attachment V5.1 No. 30 Snippet.JPG JPG image
2017 AHERA 3-Year Reinspection v2.2 2017_1205_BT.xlsx XLSX spreadsheet
RESPONSE V10 - Technical Questions.docx DOCX document
RESPONSE Attachment V7.2.docx DOCX document
36C77623B0041 0004.pdf PDF
RESPONSE Attachment V2.1.docx DOCX document
RESPONSE Attachment V1.1.docx DOCX document
RESPONSE Attachment V7.1.docx DOCX document
RESPONSE Attachment V3.1.docx DOCX document
36C77623B0041 0003.pdf PDF
36C77623B0041 0003.pdf PDF
36C77623B0041 0002.pdf PDF
660-21-700 PreConstruction Site Visit Sing In Sheet 2023 07 14.pdf PDF
36C77623B0041 0001.pdf PDF
Attachment 13-Utah Tax Memo-EHRM-Salt Lake City.pdf PDF
Attachment 7-Part 6 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 12-Construction Wage Rates-Salt Lake County- 04-14-2023.pdf PDF
Attachment 14-Limitations on Subcontracting-EHRM-Salt Lake City.docx DOCX document
Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 15-Contractor Safety-Environmental-EHRM-S.L.C..docx DOCX document
Attachment 1-Specifications-(1 of 1)-EHRM-Salt Lake City.pdf PDF
Attachment 6-Part 5 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 3-Part 2 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 9-Part 8 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
36C77623B0041.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 11-Asbestos Site Survey-EHRM Salt Lake City.pdf PDF
Attachment 10-Part 9 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 4-Part 3 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CG CG

CG

CG

CG

CG

CG

CG

CGCG

CGCG

CG

CGCG

CG CG

CG CG

CGCG

CG

CG

CG

CG

UP

D O W N

DOWN

2C00

2B05

2BA

2A19B

2D00

2D00A

2D00B

2D00C

2D00D

2CAA

2CA

2D32D

2D26

2D24

2D22

2D20

2D18A

2D18

2D16 2D14

2D14A

2D12

2D10

2DO8

2DO6

2D02

2DO4

2D01

2D03

2D07A

2D07

2D09

2DB

2D11

2D13

2D15A

2D15

2D17

2D19

2D21

2D21A

2D23A

2D23

2D25

2D27

2D28

2D30

2DA

2D31

2D29

2D34 2D32F

2D32E

2D32C

2D32B 2D32A

2D32

2C42

2C42A

2C40A

2C38

2C36

2C34A

2C34

2C43

2C41 2C39

2C33

2C31

2C29

2C27

2C25

2C23

2C21

2C192C17

2C15

2C13

2C11

2C09

2C07

2C05A

2C05

2C30

2C26

2C28

2C24

2C22

2C20A 2C20B

2C20

2C18A 2C18B

2C18

2C16

2C14

2C12

2C10

2C10A

2D05

2C08

2C32

2C35

2C00

2B03C

2B00

2BE2

2B07

2B01

2BO3B2B03A

2B08

2B02

2BE1

2B

A

2B04A

2BAA

2A20

2A22

2A

A

2A08

2A

B

2A10

2A12

2A00

2A09 2A03

2A05

2A13

2A11

2A17

2A19A

2A23

2A25

2A00AA

2A29

2A36 2A32

2A28

2A30

2A14

2AAA

2AA

2A18

2A02A 2C37

2C40

2C03 2C01

2A06A

2C06

2C04

2C02

2B03D

2B09

2B03

2B08A

2B06

2BO4

2A01

2A15

2A21

2A07

2A02

2A19

2A06

2A04

2A26

2A24

2A14A

2A27

2A27A

2A34

2A31

2A38

2A33 2A07A

2A16

CORRIDOR

CONFERENCE ROOM (151)

OFFICE, PSYCH

CORRIDOR (TO D-ZONE,EAST)

CORRIDOR (TO LABS)

CORRIDOR (LABS)

CORRIDOR (TO LABS)

(TO D-ZONE,NORTH)

ROOF ACCESS

STAIR

OFFICE

OFFICE (151)

OFFICE

OFFICE

SHOWER

/DRESS (151)

MEN

HAC WOMEN

DRESS (151)

FREZER

OFFICE

OFFICE

ICE

BREAK RM.

STORAGE

LAB

OFFICE

LAB

LAB 1

STO.

STAIR

ELEC.

DATA

OFFICE

LAB 2

LAB 3

LAB 4

LAB 5

OFFICE

TISSUE CULTURE

LAB 6

LAB 7

FREZER

BREAK RM.

CONFERENCE

STAIRS

ELEC.

DATA

STO.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICES

LAB

TC

TC

EXAM

TOILET

EXAM

LAB/FREZER

LAB

LAB/FREZER

STO.

ELEC.

OFFICE

CONFERENCE

OFFICE

OFFICE

OFFICE

OFFICEOFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

OFFICE

BREAK

MECH.

MEN

WOMEN

OFFICE

OFFICE OFFICE

MEETING

OFFICE

OFFICE

MEETING

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STO.

STO.

CORRIDOR

OFFICE ( )

CORRIDOR

ELEVATORKITCHEN

OFFICE ( )OFFICE ( )

STORAGE (151)

FIRE EQUIPMENT

ELEVATOR

LO

B

B Y

(E

LE

V A

T O

R

TOILET (UNISEX)

STAIR (TO ROOF)

ELECTRICAL

OFFICE (151)

C O

R R

ID

O

R

REFRIGERATOR (WALK-IN)

C O

R R

ID

O

R

LAB.OFFICE (151)

LAB/OFFICE (151)

CORRIDOR

LAB (151)

OFFICE (151)

BREAK ROOM

LAB (151)

DARKROOM

LAB (151)

OFFICE (151)

STORAGE (SUPPLY)

TOILET (UNISEX)

MECH (PIPE CHASE)

REFRIGERATOR (WALK-IN)

LAB (151) OFFICE (151)

FIRE EQUIPMENT

LAB (151)

OFFICE (151)

ROOF ACCESS

STAIR

REFRIGERATOR (WALK-IN)

STORAGE COMP LAB

LAB

OFFICES (182,7-WRKSTNS)

CONFERENCE (151)

(UNISEX)

OFFICE

(EDUCATION MNGR)

OFFICE (ED-05)

OFFICE

OFFICE

SHOP, ELEC.

TOILET (UNISEX)

RECEPTION

OFFICE

STAIR

LAB

OFFICE (151)

LAB

LAB

FREEZER

CONFERENCE ROOM

TEL/DATA

FIRE EQUIPMENT

STORAGE (SUPPLY)

AUX.SYS

STORAGE

GLASS WARE WASHING LAB

STORAGE

LAB

LAB

LAB

LAB

OFFICE

TOILET

CORRIDOR

SHOWER/

SHOWER/

(UNISEX)

TOILET

(REFRIGERATOR)

EQUIPMENT

CORRIDOR

CORRIDOR

T

T

T

T

T

02-ED403

F6

02-ED402

D2

02-ED403

D5

02-ED402

F2

02-ED403

D7

EXISTING TR LOCATION TO BE MOVED

EXISTING TR TO REMAIN

NEW TR LOCATION

SEPARATION LINE INDICATES

TERMINATION OF DATA CABLES TO

SPECIFIED TR LOCATION

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:1

A

M

02-ED120

OVERALL SECOND FLOOR

ELECTRICAL DEMOLITION PLAN

EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

1/16" = 1'-0"F1

OVERALL SECOND FLOOR ELECTRICAL DEMOLITION PLAN

1 UNLESS NOTED OTHERWISE REMOVE ALL LIGHTING

FIXTURES DEVICES AND EQUIPMENT SHOWN DASHED.

REMOVE CONDUIT AND WIRING BACK TO PANELBOARD

OF ORIGIN OR TO FIRST ACTIVE DEVICE THAT

REMAINS.

2 SALVAGE ALL LIGHT FIXTURES, TWIST-LOCK

RECEPTACLES AND WALLPLATES, CEILING SPEAKERS

AND SECURITY AND FIRE ALARM DEVICES TO OWNER.

PROTECT SALVAGED EQUIPMENT FROM DAMAGE.

3 PRIOR TO SUBMITTING BID, VISIT THE SITE AND FIELD

VERIFY THE EXTENT OF ELECTRICAL AND DATA

DEMOLITION WORK TO MEET THE INTENT OF THE BID

DOCUMENTS AND INCLUDE ALL COSTS IN BID.

4 PRIOR TO REMOVAL OF ANY ELECTRICAL EQUIPMENT

OR WIRING, FIELD VERIFY THAT THE EQUIPMENT OR

WIRING IS INACTIVE OR NO LONGER IN USE.

5 REMOVE ALL DEVICES, RACEWAYS AND WIRING FROM

WALLS TO BE REMOVED. WHERE ACTIVE RACEWAYS

OCCUR IN WALLS TO BE REMOVED, RE-ROUTE THE

RACEWAY WITH ASSOCIATED WIRING TO KEEP THE

CIRCUIT OPERATIONAL.

6 REMOVE ALL FIRE ALARM DEVICES WHERE EXISTING

WALLS AND CEILINGS ARE BEING REMOVED, WITH

ASSOCIATED CONDUIT AND WIRING. EXISTING FIRE

ALARM DEVICES AND SYSTEM NOT INDICATED FOR

REMOVAL SHALL REMAIN ACTIVE THROUGHOUT

DEMOLITION AND CONSTRUCTION UNTIL THE NEW

SYSTEM IS TESTED AND OPERATIONAL. MAINTAIN ALL

CLASS A FIRE ALARM INITIATING AND INDICATING

LOOPS WHERE EXISTING DEVICES ARE REMOVED.

7 REMOVE ALL ABANDONED RACEWAY, CONDUIT,

WIRING AND CABLING WHETHER ABANDONED

PREVIOUS TO THIS PROJECT OR AS A RESULT OF THIS

PROJECT. NOT ALL ABANDONED ITEMS ARE SHOWN

ON THESE PLANS AND FIELD VERIFICATION OF

DEMOLITION SCOPE EXTENT IS REQUIRED.

8 DEVICES MARKED "RR" ARE TO BE REMOVED AND

RELOCATED PER NEW PLANS. EXTEND CIRCUITING AS

REQUIRED FOR RELOCATION.

9 REFER TO ARCHITECTURAL DRAWINGS FOR REMOVAL

OF MOTORS, CONDUIT, CONDUCTOR AND CONTROL

WIRING ASSOCIATED WITH EXISTING MOTORIZED

DOORS, PARTITIONS AND LIGHTING.

10 DEMOLISH ALL OIT WI-FI ACCESS POINTS WHETHER

SHOWN ON DRAWINGS OR NOT WITHIN SCOPE OF

WORK AREA. DO NOT REMOVE THE BIO-MED PUBLIC

WI-FI ACCESS POINTS.

11 REMOVE FEEDERS FOR ALL DEMOLISHED PANELS,

DISCONNETS, ETC. BACK TO SOURCE

12 ALL ITEMS INDICATED TO REMAIN SHALL BE

PROTECTED DURING ALL PHASES OF CONSTRUCTION.

13 CONTRACTOR TO TRACE AND LABEL ALL EXISTING

LOADS TO REMAIN, THAT ARE CURRENTLY FED FROM

PANELS THAT ARE BEING DEMOLISHED IN THIS PHASE.

THESE LOADS TO BE RE-FED FROM NEW PANELS IN

NEXT PHASE.

14 ALL HVAC UNITS TO BE REMOVED BY MECHANICAL

CONTRACTOR UNLESS NOTED OTHERWISE. REMOVE

ALL ASSOCIATED RACEWAYS AND CONDUCTORS BACK

TO SOURCE.

15 REPLACE DATA DEVICES IN HEADWALLS OF EXISTING

DATA LOCATIONS.

16 ALL DATA DEVICES SHOWN TO BE DEMOLISHED AS

PART OF THIS PROJECT SHALL HAVE RACEWAYS

REMOVED AS PART OF THE DEMOLITION SCOPE OF

WORK. DEMOLISHED DATA DEVICES ARE INDENTIFIED

AS DASHED DEVICES AND KEYNOTED.

17 ALL DATA DEVICES SHOWN ARE TO BE REPLACED

UNLESS OTHERWISE SPECIFIED ON THE FLOOR PLANS.

ALL EXISTING DATA DEVICE PATHWAYS SHALL REMAIN

INTACT AND BE REUSED FOR NEW CABLE

INSTALLATION.

18 REMOVE ALL EXISTING CABLES THAT ARE TO BE

REPLACED BACK TO THE PATCH PANEL.

19 REMOVE ANY WALL MOUNT RACKS, OR FLOOR MOUNT

RACKS ONCE THEY ARE EMPTY AND HAVE NO

ADDITIONAL CABLES OR EQUIPMENT IN THEM.

20 REMOVE EXISTING FIBER FROM TR BACK TO THE MCR

AND ALL FIBER TERMINATION EQUIPMENT AFTER ALL

NETWORK SERVICES HAVE BEEN REMOVED.

21 ALL BIOMED EQUIPMENT TO REMAIN. PRESERVE AND

PROTECT DURING THE STRUCTURED CABLING

UPGRADE.

GENERAL

SHEET NOTES

0' 8' 16' 32' 64'

GRAPHIC SCALE 1/16" = 1'-0"

4'

SHEET

KEYNOTES

TR LEGEND

SPECIAL PROJECT

NOTES

1. DRAWINGS MAY NOT SHOW OR INDICATE ALL DATA

LOCATION THAT MAY BE REMOVED AS PART OF

THIS PROJECT. CONTRACTOR TO VERIFY ALL

CABLES TO BE DEMOLISHED COMPLETELY TO THE

VA PATCH PANEL.

Revisions: Date:

06/08/23

T

1A36

TEL/DATA

OFFICE (182-SOC WKR)

T

GA28

TEL/DATA (142)

T

GC19

GC21

ELECTRICAL

TEL/DATA

STAIR/VESTIBULE

T

GD03

GD05

ELECTRICAL

TEL/DATAT

GC02A

TELEPHONE EQUIPMENT

ENTRY (TELEPHONE EQUIPMT/STORAGE)

T

"2-G-C-C-P1"

"2-G-C-E-P1"

"2EGC1"

"2CGC1"

"2-G-D-E-P3"

"2EDG1"

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:2

A

M

02-ED401

ENLARGED DEMOLITION PLANS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

1 UNLESS NOTED OTHERWISE REMOVE ALL LIGHTING

FIXTURES DEVICES AND EQUIPMENT SHOWN DASHED.

REMOVE CONDUIT AND WIRING BACK TO PANELBOARD

OF ORIGIN OR TO FIRST ACTIVE DEVICE THAT

REMAINS.

2 SALVAGE ALL LIGHT FIXTURES, TWIST-LOCK

RECEPTACLES AND WALLPLATES, CEILING SPEAKERS

AND SECURITY AND FIRE ALARM DEVICES TO OWNER.

PROTECT SALVAGED EQUIPMENT FROM DAMAGE.

3 PRIOR TO SUBMITTING BID, VISIT THE SITE AND FIELD

VERIFY THE EXTENT OF ELECTRICAL AND DATA

DEMOLITION WORK TO MEET THE INTENT OF THE BID

DOCUMENTS AND INCLUDE ALL COSTS IN BID.

4 PRIOR TO REMOVAL OF ANY ELECTRICAL EQUIPMENT

OR WIRING, FIELD VERIFY THAT THE EQUIPMENT OR

WIRING IS INACTIVE OR NO LONGER IN USE.

5 REMOVE ALL DEVICES, RACEWAYS AND WIRING FROM

WALLS TO BE REMOVED. WHERE ACTIVE RACEWAYS

OCCUR IN WALLS TO BE REMOVED, RE-ROUTE THE

RACEWAY WITH ASSOCIATED WIRING TO KEEP THE

CIRCUIT OPERATIONAL.

6 REMOVE ALL FIRE ALARM DEVICES WHERE EXISTING

WALLS AND CEILINGS ARE BEING REMOVED, WITH

ASSOCIATED CONDUIT AND WIRING. EXISTING FIRE

ALARM DEVICES AND SYSTEM NOT INDICATED FOR

REMOVAL SHALL REMAIN ACTIVE THROUGHOUT

DEMOLITION AND CONSTRUCTION UNTIL THE NEW

SYSTEM IS TESTED AND OPERATIONAL. MAINTAIN ALL

CLASS A FIRE ALARM INITIATING AND INDICATING

LOOPS WHERE EXISTING DEVICES ARE REMOVED.

7 REMOVE ALL ABANDONED RACEWAY, CONDUIT,

WIRING AND CABLING WHETHER ABANDONED

PREVIOUS TO THIS PROJECT OR AS A RESULT OF THIS

PROJECT. NOT ALL ABANDONED ITEMS ARE SHOWN

ON THESE PLANS AND FIELD VERIFICATION OF

DEMOLITION SCOPE EXTENT IS REQUIRED.

8 DEVICES MARKED "RR" ARE TO BE REMOVED AND

RELOCATED PER NEW PLANS. EXTEND CIRCUITING AS

REQUIRED FOR RELOCATION.

9 REFER TO ARCHITECTURAL DRAWINGS FOR REMOVAL

OF MOTORS, CONDUIT, CONDUCTOR AND CONTROL

WIRING ASSOCIATED WITH EXISTING MOTORIZED

DOORS, PARTITIONS AND LIGHTING.

10 DEMOLISH ALL OIT WI-FI ACCESS POINTS WHETHER

SHOWN ON DRAWINGS OR NOT WITHIN SCOPE OF

WORK AREA. DO NOT REMOVE THE BIO-MED PUBLIC

WI-FI ACCESS POINTS.

11 REMOVE FEEDERS FOR ALL DEMOLISHED PANELS,

DISCONNETS, ETC. BACK TO SOURCE

12 ALL ITEMS INDICATED TO REMAIN SHALL BE

PROTECTED DURING ALL PHASES OF CONSTRUCTION.

13 CONTRACTOR TO TRACE AND LABEL ALL EXISTING

LOADS TO REMAIN, THAT ARE CURRENTLY FED FROM

PANELS THAT ARE BEING DEMOLISHED IN THIS PHASE.

THESE LOADS TO BE RE-FED FROM NEW PANELS IN

NEXT PHASE.

14 ALL HVAC UNITS TO BE REMOVED BY MECHANICAL

CONTRACTOR UNLESS NOTED OTHERWISE. REMOVE

ALL ASSOCIATED RACEWAYS AND CONDUCTORS BACK

TO SOURCE.

15 REPLACE DATA DEVICES IN HEADWALLS OF EXISTING

DATA LOCATIONS.

16 ALL DATA DEVICES SHOWN TO BE DEMOLISHED AS

PART OF THIS PROJECT SHALL HAVE RACEWAYS

REMOVED AS PART OF THE DEMOLITION SCOPE OF

WORK. DEMOLISHED DATA DEVICES ARE INDENTIFIED

AS DASHED DEVICES AND KEYNOTED.

17 ALL DATA DEVICES SHOWN ARE TO BE REPLACED

UNLESS OTHERWISE SPECIFIED ON THE FLOOR PLANS.

ALL EXISTING DATA DEVICE PATHWAYS SHALL REMAIN

INTACT AND BE REUSED FOR NEW CABLE

INSTALLATION.

18 REMOVE ALL EXISTING CABLES THAT ARE TO BE

REPLACED BACK TO THE PATCH PANEL.

19 REMOVE ANY WALL MOUNT RACKS, OR FLOOR MOUNT

RACKS ONCE THEY ARE EMPTY AND HAVE NO

ADDITIONAL CABLES OR EQUIPMENT IN THEM.

20 REMOVE EXISTING FIBER FROM TR BACK TO THE MCR

AND ALL FIBER TERMINATION EQUIPMENT AFTER ALL

NETWORK SERVICES HAVE BEEN REMOVED.

21 ALL BIOMED EQUIPMENT TO REMAIN. PRESERVE AND

PROTECT DURING THE STRUCTURED CABLING

UPGRADE.

GENERAL

SHEET NOTES

NORTH

1/2" = 1'-0"F8

ENLARGED EXISITNG TEL/DATA

GB03-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"F3

ENLARGED EXISTING TR 1A36-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"D6

ENLARGED

EXISTING TEL/DATA GA28-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"D8

ENLARGED

EXISTING TEL/DATA GC21-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"D3

ENLARGED EXISTING TEL/DATA GD05-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"B3

ENLARGED EXISTING TELEPHONE EQUIIPMENT GC02A-2 DEMOLITION PLAN

0' 1' 2' 4' 8'

GRAPHIC SCALE 1/2" = 1'-0"

1D37

1D35

UTILITY ROOM

AUX.SYS

T

1B09

1B07

ELECTRCAL

ELECTRICAL

T

1C31

TELE/DATA (142)

CG

T

1D07

1D09

ELECTRICAL

TEL/DATA

T

CG

2C33

2C31

STO.

ELEC.

T

2D13

DATA

T

"2-1-D-C-P5" "2-1-D-C-P6"

"2NRD2""2E1D4"

"2-1-B-E-P1"

"2-1-B-C-P1"

"2E1B1"

"2C1B1"

"2-1-D-C-P2"

"2-1-D-C-P1"

"2NRD1"

"2E1D1"

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:3

A

M

02-ED402

ENLARGED DEMOLITION PLANS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

1 UNLESS NOTED OTHERWISE REMOVE ALL LIGHTING

FIXTURES DEVICES AND EQUIPMENT SHOWN DASHED.

REMOVE CONDUIT AND WIRING BACK TO PANELBOARD

OF ORIGIN OR TO FIRST ACTIVE DEVICE THAT

REMAINS.

2 SALVAGE ALL LIGHT FIXTURES, TWIST-LOCK

RECEPTACLES AND WALLPLATES, CEILING SPEAKERS

AND SECURITY AND FIRE ALARM DEVICES TO OWNER.

PROTECT SALVAGED EQUIPMENT FROM DAMAGE.

3 PRIOR TO SUBMITTING BID, VISIT THE SITE AND FIELD

VERIFY THE EXTENT OF ELECTRICAL AND DATA

DEMOLITION WORK TO MEET THE INTENT OF THE BID

DOCUMENTS AND INCLUDE ALL COSTS IN BID.

4 PRIOR TO REMOVAL OF ANY ELECTRICAL EQUIPMENT

OR WIRING, FIELD VERIFY THAT THE EQUIPMENT OR

WIRING IS INACTIVE OR NO LONGER IN USE.

5 REMOVE ALL DEVICES, RACEWAYS AND WIRING FROM

WALLS TO BE REMOVED. WHERE ACTIVE RACEWAYS

OCCUR IN WALLS TO BE REMOVED, RE-ROUTE THE

RACEWAY WITH ASSOCIATED WIRING TO KEEP THE

CIRCUIT OPERATIONAL.

6 REMOVE ALL FIRE ALARM DEVICES WHERE EXISTING

WALLS AND CEILINGS ARE BEING REMOVED, WITH

ASSOCIATED CONDUIT AND WIRING. EXISTING FIRE

ALARM DEVICES AND SYSTEM NOT INDICATED FOR

REMOVAL SHALL REMAIN ACTIVE THROUGHOUT

DEMOLITION AND CONSTRUCTION UNTIL THE NEW

SYSTEM IS TESTED AND OPERATIONAL. MAINTAIN ALL

CLASS A FIRE ALARM INITIATING AND INDICATING

LOOPS WHERE EXISTING DEVICES ARE REMOVED.

7 REMOVE ALL ABANDONED RACEWAY, CONDUIT,

WIRING AND CABLING WHETHER ABANDONED

PREVIOUS TO THIS PROJECT OR AS A RESULT OF THIS

PROJECT. NOT ALL ABANDONED ITEMS ARE SHOWN

ON THESE PLANS AND FIELD VERIFICATION OF

DEMOLITION SCOPE EXTENT IS REQUIRED.

8 DEVICES MARKED "RR" ARE TO BE REMOVED AND

RELOCATED PER NEW PLANS. EXTEND CIRCUITING AS

REQUIRED FOR RELOCATION.

9 REFER TO ARCHITECTURAL DRAWINGS FOR REMOVAL

OF MOTORS, CONDUIT, CONDUCTOR AND CONTROL

WIRING ASSOCIATED WITH EXISTING MOTORIZED

DOORS, PARTITIONS AND LIGHTING.

10 DEMOLISH ALL OIT WI-FI ACCESS POINTS WHETHER

SHOWN ON DRAWINGS OR NOT WITHIN SCOPE OF

WORK AREA. DO NOT REMOVE THE BIO-MED PUBLIC

WI-FI ACCESS POINTS.

11 REMOVE FEEDERS FOR ALL DEMOLISHED PANELS,

DISCONNETS, ETC. BACK TO SOURCE

12 ALL ITEMS INDICATED TO REMAIN SHALL BE

PROTECTED DURING ALL PHASES OF CONSTRUCTION.

13 CONTRACTOR TO TRACE AND LABEL ALL EXISTING

LOADS TO REMAIN, THAT ARE CURRENTLY FED FROM

PANELS THAT ARE BEING DEMOLISHED IN THIS PHASE.

THESE LOADS TO BE RE-FED FROM NEW PANELS IN

NEXT PHASE.

14 ALL HVAC UNITS TO BE REMOVED BY MECHANICAL

CONTRACTOR UNLESS NOTED OTHERWISE. REMOVE

ALL ASSOCIATED RACEWAYS AND CONDUCTORS BACK

TO SOURCE.

15 REPLACE DATA DEVICES IN HEADWALLS OF EXISTING

DATA LOCATIONS.

16 ALL DATA DEVICES SHOWN TO BE DEMOLISHED AS

PART OF THIS PROJECT SHALL HAVE RACEWAYS

REMOVED AS PART OF THE DEMOLITION SCOPE OF

WORK. DEMOLISHED DATA DEVICES ARE INDENTIFIED

AS DASHED DEVICES AND KEYNOTED.

17 ALL DATA DEVICES SHOWN ARE TO BE REPLACED

UNLESS OTHERWISE SPECIFIED ON THE FLOOR PLANS.

ALL EXISTING DATA DEVICE PATHWAYS SHALL REMAIN

INTACT AND BE REUSED FOR NEW CABLE

INSTALLATION.

18 REMOVE ALL EXISTING CABLES THAT ARE TO BE

REPLACED BACK TO THE PATCH PANEL.

19 REMOVE ANY WALL MOUNT RACKS, OR FLOOR MOUNT

RACKS ONCE THEY ARE EMPTY AND HAVE NO

ADDITIONAL CABLES OR EQUIPMENT IN THEM.

20 REMOVE EXISTING FIBER FROM TR BACK TO THE MCR

AND ALL FIBER TERMINATION EQUIPMENT AFTER ALL

NETWORK SERVICES HAVE BEEN REMOVED.

21 ALL BIOMED EQUIPMENT TO REMAIN. PRESERVE AND

PROTECT DURING THE STRUCTURED CABLING

UPGRADE.

GENERAL

SHEET NOTES

NORTH

1/2" = 1'-0"F7

ENLARGED EXISTING AUX SYS 1D35-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"D7

ENLARGED EXISTING TEL/DATA 1B09-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"F4

ENLARGED EXISTING TEL/DATA 1C14-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"D4

ENLARGED EXISTING TEL/DATA 1D09-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"F2

ENLARGED EXISTING DATA 2C33-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"D2

ENLARGED EXISTING DATA 2D13-2 DEMOLITION PLAN

0' 1' 2' 4' 8'

GRAPHIC SCALE 1/2" = 1'-0"

2A24

TEL/DATA

T

2D31

2D29

ELEC.

DATA

T

2B05

2B07

TEL/DATA

SHOP, ELEC.

T

"2-2-B-C-P1"

"2-2-B-E-P1"

"2C2B1"

"2E2B1"

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:4

A

M

02-ED403

ENLARGED DEMOLITION PLANS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

1/2" = 1'-0"F6

ENLARGED EXISTING TR 2A24-2 DEMOLITION PLAN

1 UNLESS NOTED OTHERWISE REMOVE ALL LIGHTING

FIXTURES DEVICES AND EQUIPMENT SHOWN DASHED.

REMOVE CONDUIT AND WIRING BACK TO PANELBOARD

OF ORIGIN OR TO FIRST ACTIVE DEVICE THAT

REMAINS.

2 SALVAGE ALL LIGHT FIXTURES, TWIST-LOCK

RECEPTACLES AND WALLPLATES, CEILING SPEAKERS

AND SECURITY AND FIRE ALARM DEVICES TO OWNER.

PROTECT SALVAGED EQUIPMENT FROM DAMAGE.

3 PRIOR TO SUBMITTING BID, VISIT THE SITE AND FIELD

VERIFY THE EXTENT OF ELECTRICAL AND DATA

DEMOLITION WORK TO MEET THE INTENT OF THE BID

DOCUMENTS AND INCLUDE ALL COSTS IN BID.

4 PRIOR TO REMOVAL OF ANY ELECTRICAL EQUIPMENT

OR WIRING, FIELD VERIFY THAT THE EQUIPMENT OR

WIRING IS INACTIVE OR NO LONGER IN USE.

5 REMOVE ALL DEVICES, RACEWAYS AND WIRING FROM

WALLS TO BE REMOVED. WHERE ACTIVE RACEWAYS

OCCUR IN WALLS TO BE REMOVED, RE-ROUTE THE

RACEWAY WITH ASSOCIATED WIRING TO KEEP THE

CIRCUIT OPERATIONAL.

6 REMOVE ALL FIRE ALARM DEVICES WHERE EXISTING

WALLS AND CEILINGS ARE BEING REMOVED, WITH

ASSOCIATED CONDUIT AND WIRING. EXISTING FIRE

ALARM DEVICES AND SYSTEM NOT INDICATED FOR

REMOVAL SHALL REMAIN ACTIVE THROUGHOUT

DEMOLITION AND CONSTRUCTION UNTIL THE NEW

SYSTEM IS TESTED AND OPERATIONAL. MAINTAIN ALL

CLASS A FIRE ALARM INITIATING AND INDICATING

LOOPS WHERE EXISTING DEVICES ARE REMOVED.

7 REMOVE ALL ABANDONED RACEWAY, CONDUIT,

WIRING AND CABLING WHETHER ABANDONED

PREVIOUS TO THIS PROJECT OR AS A RESULT OF THIS

PROJECT. NOT ALL ABANDONED ITEMS ARE SHOWN

ON THESE PLANS AND FIELD VERIFICATION OF

DEMOLITION SCOPE EXTENT IS REQUIRED.

8 DEVICES MARKED "RR" ARE TO BE REMOVED AND

RELOCATED PER NEW PLANS. EXTEND CIRCUITING AS

REQUIRED FOR RELOCATION.

9 REFER TO ARCHITECTURAL DRAWINGS FOR REMOVAL

OF MOTORS, CONDUIT, CONDUCTOR AND CONTROL

WIRING ASSOCIATED WITH EXISTING MOTORIZED

DOORS, PARTITIONS AND LIGHTING.

10 DEMOLISH ALL OIT WI-FI ACCESS POINTS WHETHER

SHOWN ON DRAWINGS OR NOT WITHIN SCOPE OF

WORK AREA. DO NOT REMOVE THE BIO-MED PUBLIC

WI-FI ACCESS POINTS.

11 REMOVE FEEDERS FOR ALL DEMOLISHED PANELS,

DISCONNETS, ETC. BACK TO SOURCE

12 ALL ITEMS INDICATED TO REMAIN SHALL BE

PROTECTED DURING ALL PHASES OF CONSTRUCTION.

13 CONTRACTOR TO TRACE AND LABEL ALL EXISTING

LOADS TO REMAIN, THAT ARE CURRENTLY FED FROM

PANELS THAT ARE BEING DEMOLISHED IN THIS PHASE.

THESE LOADS TO BE RE-FED FROM NEW PANELS IN

NEXT PHASE.

14 ALL HVAC UNITS TO BE REMOVED BY MECHANICAL

CONTRACTOR UNLESS NOTED OTHERWISE. REMOVE

ALL ASSOCIATED RACEWAYS AND CONDUCTORS BACK

TO SOURCE.

15 REPLACE DATA DEVICES IN HEADWALLS OF EXISTING

DATA LOCATIONS.

16 ALL DATA DEVICES SHOWN TO BE DEMOLISHED AS

PART OF THIS PROJECT SHALL HAVE RACEWAYS

REMOVED AS PART OF THE DEMOLITION SCOPE OF

WORK. DEMOLISHED DATA DEVICES ARE INDENTIFIED

AS DASHED DEVICES AND KEYNOTED.

17 ALL DATA DEVICES SHOWN ARE TO BE REPLACED

UNLESS OTHERWISE SPECIFIED ON THE FLOOR PLANS.

ALL EXISTING DATA DEVICE PATHWAYS SHALL REMAIN

INTACT AND BE REUSED FOR NEW CABLE

INSTALLATION.

18 REMOVE ALL EXISTING CABLES THAT ARE TO BE

REPLACED BACK TO THE PATCH PANEL.

19 REMOVE ANY WALL MOUNT RACKS, OR FLOOR MOUNT

RACKS ONCE THEY ARE EMPTY AND HAVE NO

ADDITIONAL CABLES OR EQUIPMENT IN THEM.

20 REMOVE EXISTING FIBER FROM TR BACK TO THE MCR

AND ALL FIBER TERMINATION EQUIPMENT AFTER ALL

NETWORK SERVICES HAVE BEEN REMOVED.

21 ALL BIOMED EQUIPMENT TO REMAIN. PRESERVE AND

PROTECT DURING THE STRUCTURED CABLING

UPGRADE.

GENERAL

SHEET NOTES

NORTH

1/2" = 1'-0"D7

ENLARGED EXISTING DATA 2D29-2 DEMOLITION PLAN

NORTH

1/2" = 1'-0"D5

ENLARGED EXISTING TEL/DATA 2B07-2 DEMOLITION PLAN

UP

DN

DN

GA251

GC00C

GB00BA

GD09C

GD09B

GD09D

GCAA

GC13

GC15

GC17

GC13A

GC11A

GC11

GC09

GC07

GC07A

GC45

GC05

GDB

GA28A

GB03

GC22

GD01A

GD01

GD00

GD03

GD05

GD09A

GD07

GD02

GD00A

GD00B

GD11

GD04

GDA

GD13

GC02A

GC03

GC00A

GC01

GC06

GC04

GC04A

GC02B

GC02

GC10

GC12

GC14 GC16

GC18

GC20

GC27A

GC27

GC27B

GC00

GC29

GC19

GC21

GCA

GC23

GC25

GB00AA

GB09

GB09C

GBE2

GB09B

GB09AG

B

B

GB05

GB01

GB05A

GBA

G B

A

GBE1

GA06

G A

A

GA01GA03

GA05

GA07

GA09

GA38

GA02

GA04A

GA04

GA18

GA16

GA14

GA12

G A

B

GA10

GA00C

GA20

GA19B

GA15

GA26

GAA

GAAA

GA28

GA30

GA34A

GA32

GA34GA36

GA25B

GA25A

GA25I

GA25H

GA25G

GA25F

GA25E

GA25D

GC08

GB07

GA04B

GA22

GA24

GA00

GA07AGA15A

GA11

GA13

GA08

GA25

GA19

GA17

GA25C

GA19A

GA23

GA21

GA21A

GD09

CORRIDOR (TO LABS)

VESTIBULE

MECHANICAL SHAFT (138)

MECHANICAL SHAFT (138)

MECHANICAL SHAFT (138)

VESTIBULE

LAB

LAB

FREEZERS

BREAK ROOM

LAB (151)

LAB

LAB

LAB

LAB

SHAFT

HW STORAGE

STAIR

MECH (138)

TEL/DATA

(PIPE CHASE)

MECHANICAL

MECHANICAL

CORRIDOR

ELECTRICAL

TEL/DATA

ACCESS (138)

MECHANICAL

STORAGE (151)

HALLWAY (TO MECH)

HALLWAY (TO MECH)

AUX.SYS

MECHANICAL

STAIR

ELECTRICAL

TELEPHONE EQUIPMENT

MECHANICAL

CORRIDOR (TO DOCK)

MECHANICAL

COLD ROOM

STORAGE (151)

STORAGE (151)

STORAGE (151)

ENTRY (TELEPHONE EQUIPMT/STORAGE)

DARK ROOM

COLD ROOM

LAB (151) LAB (151)

LAB (151)

LAB (151)

OFFICE (151)

LAB (151)

LAB (151)

CORRIDOR

LAB (151)

ELECTRICAL

TEL/DATA

STAIR/VESTIBULE

HAC

FIRE EQUIPMENT

FIRE EQUIPMENT

DOCK (RECEIVING)

MECH (WATER SYS)

ELEVATOR

LINEN (CLEAN)

HAC

C O

R R

ID

O

R

TO

D

O C

K

ELECTRICAL

ELECTRICAL

ELECTRICAL

STAIR

LO

B

B Y

(E

LE

V A

T O

R

) ELEVATOR

COLD ROOM (151)

C O

R R

ID

O

R

T O

R E

S T

R O

O M

S

(PIPE TUNNEL)STORAGE (151)

STORAGE (151)

ENTRY (TOILET)

OFFICE

MECH (138)

STORAGE (151)

LAB

LAB

LAB (ENDO)

LAB (ENDO)

LAB (ENDO)

LAB (ENDO)

C O

R R

ID

O

R

LAB (ENDO)

MECH (REFRIGERATOR)

LAB (ENDO)

OFFICE

ENTRY (TOILET)

ELECTRICAL (138)

STAIR

(PIPE CHASE)

TEL/DATA (142)

AUX.SYS (138)

MECH (PIPE CHASE)

FIRE EQUIPMENT

STORAGELAB (151)

LAB (151)

STORAGE (151)

OFFICE

STORAGE (151)

STORAGE (151)

COMPUTER ROOM (151)

OFFICE

RECEPTION

MECHANICAL (COLD RM)

LINEN (SOILED)

OFFICE

LAB (ENDO)

LAB (ENDO)

CORRIDOR

TOILET (WOMEN)TOLIET, MEN

MECH (PIPE TUNNEL)

OFFICE

FIRE EQUIPMENT

ENTRY (NEURO/PSYCH RES)

ENTRY (NEUROLOGY)

STORAGE (151)

OFFICE (151)

LOUNGE

OFFICE (151)

CONFERENCE RM (151)

OFFICE (151)

MECH

PIPE TUNNEL

MECH

MECH

MECHANICAL ROOM (138)

CORRIDOR

TT

T

T

T

T

H

H

A WING

B WING

D WING

C WING

02-EP401

F7

02-EP402

F8

02-EP402

E8

02-EP402

D8

02-EP402

B8

Room

TELECOMMUNICATIONS

/ ENTRY

ROOM

GC02A-02

"2-G-B-C-D1"

"2-G-B-E-D1"

"2CMP2B"

"2DPE"

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:5

A

M

02-EP100

OVERALL GROUND FLOOR

POWER PLAN

EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

GENERAL

SHEET NOTES

SHEET

KEYNOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

NORTH

1/16" = 1'-0"F1

OVERALL GROUND FLOOR POWER PLAN 0' 8' 16' 32' 64'

GRAPHIC SCALE 1/16" = 1'-0"

4'

1 PROVIDE CIRCUIT BREAKER IN EXISTING

SWITCHGEAR AND FEEDER AS DIRECTED ON

SHEET 02-EP601 PARTIAL ONE-LINE DIAGRAMS.

1CA

1B00A

1A

A

1C30

1C28

1C26

1C24

1C22

1C31

1C29

1C27

1C25

1C23

1C21

1C19B

1C19

1C19A

1C17

1C15

1C13

1C11

1C09

1C07

1C05

1D37

1A02

1B09

1BE2

1B11A

1B11

1D

C

1D00

1D27

1D27A

1D30A

1D30

1D28

1D

A

1D28A

1DA

1D35

1D00B

1D26

1D33

1D24

1D31

1D29

1D22

1D29A

1D05AA

1D031D01

1D00D

1D05

1D05A

1D07

1DB

1D13

1D11

1D09

1D04

1D15

1D02

1D17A

1D17

1D06

1D10

1D08

1D19

1D14

1D12

1D21

1D20

1D18

1D16

1D25

1D23

1D23A

1C

A

1B00AA

1BA

1B02

1B08

1B06

1BE1

1B00

1B05A

1B05

1B07

1B03

1B00B 1B01

1A35

1A03A

1A03

1A01

1A05

1A07 1A091A11

1A13

1A15

1A17

1A19

1A21 1A23

1A25

1A04 1A06

1A08

1A12

1A10

1A14

1A16

1A26 1A24A

1A32

1A34

1A36

1A38 1A40

1A42

1A44

1A45

1A25A

1A27

1A29

1A41

1A43

1A45A

1C37

1C35 1C39

1C43

1C41

1C471C45

1C33

1C10A

1C08

1C06

1C06A

1C12

1C10

1C02

1C14

1C16 1C18

1C20

1C36

1C40A

1C00DA

1C32

1C40

1C38

1C34

1C40B

1C00DB

1C42

1A22A

1C04

1C01 1C03

1B04

1A31

1A39

1A37

1A00

1A47

1A51

1A49

1A45B

1AA

1A28

1A30

1A24

1A28A

1A22

1A20

1A18

1A53D

1A53C

1A53B

1A53A

1A53

1A50 1A48 1A46

1A44A

1A

B

STAIR

HALLWAY (TO LOBBY)

C O

R R

ID

O

R

MECHANICAL RM

BREAKROOM

TOILET (MEN,151)

PIPE CHASE (138)

TOILET (WOMEN,151)

TELE/DATA (142)

ELECTRICAL (138)

OFFICE

OFFICE (3-WRKSTNS,151)

OFFICE (2-WRKSTNS,151)

OFFICE (2-WRKSTNS,151)

OFFICE (2-WRKSTNS,151)

OFFICE

OFFICE

OFFICE (2-WRKSTNS,151)

OFFICE (4-WRKSTNS,151)

OFFICE

CONFERENCE

OFFICE

STORAGE

STORAGE (138E)

UTILITY ROOM

OFFICE (182-SOCIAL WRKR)

ELECTRCAL

ELEVATOR

OFFICE/STORAGE (EA ASSN

ENTRY

C O

R R

ID

O

R

CORRIDOR

OFFICE

OFFICE

OFFICE

LAB #01

LAB #02

C O

R R

ID

O

R

OFFICE

STAIR LEVEL

AUX.SYS

CORRIDOR

INSTRUMENTS

INSTRUMENTS

DARKROOM

STORAGE

LAB #03

OFFICE

OFFICE

OFFICE (138)

LAB(151,4-WRKSTNS)

CORRIDOR

LAB #08

LAB #09

ELECTRICAL

STAIR

LAB (BONE)

LAB (BONE)

TEL/DATA

DARKROOM

LAB (BONE)

STORAGE

OFFICE

LAB

COLD ROOM

OFFICE

OFFICE

LAB #06

TOILET (WOMEN)

OFFICE

LAB (BONE)

OFFICE DESK

TOILET (MEN)

HAC

LAB #04

LAB #05

OFFICE

C O

R R

ID

O

R

LOBBY (B.02)

STAIR

FIRE EQUIPMENT

VENDING (CANTEEN)

TOILET (WOMEN)

ELEVATOR

CORRIDOR

OFFICE (122)

OFFICE (122)

ELECTRICAL

OFFICE

(TO OFFICES)

OFFICE (114)

KITCHEN (136)

COMPUTER

OFFICE

STORAGE

OFFICE

OFFICE

OFFICEOFFICE

CONFERENCE/TRAINING (136)

OFFICE

OFFICE (136,SUPVSR)

OFFICES (136,3-WRKSTNS)

OFFICES (136,6-WRKSTNS)

OFFICE

OFFICE

CONFERENCE

SHOWER/TOILET (WOMEN)

WOMENS TOILET

FIRE EQUIPMENT

COPIER

OFFICE

OFFICE

(SUPPLIES)

CHASE)

STORAGE

ELECTRICAL

TEL/DATA

TEL/DATA

FIRE EQUIPMENT

OFFICE (182-SOC WKR)

OFFICE

ENTRY

OFFICE

PIPE CHASE

RESTROOM MEN

OFFICE

OFFICE

OFFICE

OFFICE

INVESTIGATOR) OFFICE

LAB (TISSUE)

LAB (TISSUE)

LAB (TISSUE)LAB (TISSUE)

HAC (137)

(UNISEX)

WORKROOM

OFFICE (151,WRKSTNS)

(UNISEX)

OFFICE

OFFICE (151,3-WRKSTNS)

OFFICE (3-WRKSTNS,151)

OFFICE (151,DATA MGR)

OFFICE

LAB (UofU/151)

CONFERENCE

PREP

OFFICE

ICE MACHINE

OFFICE

(TO LAB)

COLDROOM

OFFICE

OFFICE

EYEWASH

LAB (BIOCHEM)

OFFICE

STORAGE

(182T,SW CONSULT)

OFFICE

TOILET (MEN)

PIPE CHASE

HAC

(UNISEX)

CORRIDOR

OFFICE/EXAM

BED ROOM (2-BED)

OFFICE/EXAM

STORAGE

STAIRS

OFFICE

OFFICE

OFFICE

(UNISEX)

BREAKROOM

OFFICE (182 FELLOWS)

OFFICE

OFFICE/EXAM

OFFICE/EXAM

OFFICE/EXAM

WAITING

ENTRY

OFFICE OFFICE

OFFICE (GULF WAR)

(PATIENT)

TOILET/SHOWER

STORAGE

(PIPE

MECH

TOILET

HALLWAY

OFFICE OFFICE (151- LAB #07

TOILETTOILET

TOILET

C O

R R

ID

O

R

ENTRY

CORRIDOR

CORRIDOR

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

UP

DN

T

T

TT

T

T

02-EP402

B6

02-EP402

F3

02-EP402

E6

02-EP402

C6

02-EP402

F6

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:0

A

M

02-EP110

OVERALL FIRST FLOOR POWER

PLAN

EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

1/16" = 1'-0"F1

OVERALL FIRST FLOOR POWER PLAN

GENERAL

SHEET NOTES

SHEET

KEYNOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

0' 8' 16' 32' 64'

GRAPHIC SCALE 1/16" = 1'-0"

4'

CG

CG

CG

CG

CG

CG

CGCG

CGCG

CG

CGCG

CG CG

CG CG

CGCG

CG

CG

CG

CG

UP

D O W N

DOWN

2C00

2B05

2BA

2A19B

2D00

2D00A

2D00B

2D00C

2D00D

2CAA

2CA

2D32D

2D26

2D24

2D22

2D20

2D18A

2D18

2D16 2D14

2D14A

2D12

2D10

2DO8

2DO6

2D02

2DO4

2D01

2D03

2D07A

2D07

2D09

2DB

2D11

2D13

2D15A

2D15

2D17

2D19

2D21

2D21A

2D23A

2D23

2D25

2D27

2D28

2D30

2DA

2D31

2D29

2D34 2D32F

2D32E

2D32C

2D32B 2D32A

2D32

2C42

2C42A

2C40A

2C38

2C36

2C34A

2C34

2C43

2C41 2C39

2C33

2C31

2C29

2C27

2C25

2C23

2C21

2C192C17

2C15

2C13

2C11

2C09

2C07

2C05A

2C05

2C30

2C26

2C28

2C24

2C22

2C20A 2C20B

2C20

2C18A 2C18B

2C18

2C16

2C14

2C12

2C10

2C10A

2D05

2C08

2C32

2C35

2C00

2B03C

2B00

2BE2

2B07

2B01

2BO3B2B03A

2B08

2B02

2BE1

2B

A

2B04A

2BAA

2A20

2A22

2A

A

2A08

2A

B

2A10

2A12

2A00

2A09 2A03

2A05

2A13

2A11

2A17

2A19A

2A23

2A25

2A00AA

2A29

2A36 2A32

2A28

2A30

2A14

2AAA

2AA

2A18

2A02A 2C37

2C40

2C03 2C01

2A06A

2C06

2C04

2C02

2B03D

2B09

2B03

2B08A

2B06

2BO4

2A01

2A15

2A21

2A07

2A02

2A19

2A06

2A04

2A26

2A24

2A14A

2A27

2A27A

2A34

2A31

2A38

2A33 2A07A

2A16

CORRIDOR

CONFERENCE ROOM (151)

OFFICE, PSYCH

CORRIDOR (TO D-ZONE,EAST)

CORRIDOR (TO LABS)

CORRIDOR (LABS)

CORRIDOR (TO LABS)

(TO D-ZONE,NORTH)

ROOF ACCESS

STAIR

OFFICE

OFFICE (151)

OFFICE

OFFICE

SHOWER

/DRESS (151)

MEN

HAC WOMEN

DRESS (151)

FREZER

OFFICE

OFFICE

ICE

BREAK RM.

STORAGE

LAB

OFFICE

LAB

LAB 1

STO.

STAIR

ELEC.

DATA

OFFICE

LAB 2

LAB 3

LAB 4

LAB 5

OFFICE

TISSUE CULTURE

LAB 6

LAB 7

FREZER

BREAK RM.

CONFERENCE

STAIRS

ELEC.

DATA

STO.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICES

LAB

TC

TC

EXAM

TOILET

EXAM

LAB/FREZER

LAB

LAB/FREZER

STO.

ELEC.

OFFICE

CONFERENCE

OFFICE

OFFICE

OFFICE

OFFICEOFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

EXAM

OFFICE

BREAK

MECH.

MEN

WOMEN

OFFICE

OFFICE OFFICE

MEETING

OFFICE

OFFICE

MEETING

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STO.

STO.

CORRIDOR

OFFICE ( )

CORRIDOR

ELEVATOR

TEL/DATA

KITCHEN

OFFICE ( )OFFICE ( )

STORAGE (151)

FIRE EQUIPMENT

ELEVATOR

LO

B

B Y

(E

LE

V A

T O

R

TOILET (UNISEX)

STAIR (TO ROOF)

ELECTRICAL

OFFICE (151)

C O

R R

ID

O

R

REFRIGERATOR (WALK-IN)

C O

R R

ID

O

R

LAB.OFFICE (151)

LAB/OFFICE (151)

CORRIDOR

LAB (151)

OFFICE (151)

BREAK ROOM

LAB (151)

DARKROOM

LAB (151)

OFFICE (151)

STORAGE (SUPPLY)

TOILET (UNISEX)

MECH (PIPE CHASE)

REFRIGERATOR (WALK-IN)

LAB (151) OFFICE (151)

FIRE EQUIPMENT

LAB (151)

OFFICE (151)

ROOF ACCESS

STAIR

REFRIGERATOR (WALK-IN)

STORAGE COMP LAB

LAB

OFFICES (182,7-WRKSTNS)

CONFERENCE (151)

(UNISEX)

OFFICE

(EDUCATION MNGR)

OFFICE (ED-05)

OFFICE

OFFICE

SHOP, ELEC.

TOILET (UNISEX)

RECEPTION

OFFICE

STAIR

LAB

OFFICE (151)

LAB

LAB

FREEZER

CONFERENCE ROOM

TEL/DATA

FIRE EQUIPMENT

STORAGE (SUPPLY)

AUX.SYS

STORAGE

GLASS WARE WASHING LAB

STORAGE

LAB

LAB

LAB

LAB

OFFICE

TOILET

CORRIDOR

SHOWER/

SHOWER/

(UNISEX)

TOILET

(REFRIGERATOR)

EQUIPMENT

CORRIDOR

CORRIDOR

T

T

T

T

T

02-EP402

E4

02-EP402

C2

02-EP402

B4

02-EP402

E2

02-EP402

C4

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:1

A

M

02-EP120

OVERALL SECOND FLOOR POWER

PLAN

EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

1/16" = 1'-0"F1

OVERALL SECOND FLOOR POWER PLAN

GENERAL

SHEET NOTES

SHEET

KEYNOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

0' 8' 16' 32' 64'

GRAPHIC SCALE 1/16" = 1'-0"

4'

.8

.4

.3

.7

6.

.0

.2

6.

2.

.1

.2

.2

.1

.5

.7

.2

6.

+9

+9

+9 +0

+9

+9

+9

+0

+1

+9

+10

+9

+9

+9

+0

+9

+9

+8

+10

+8

+0

3C00

3C00A

3B00 3A00A

3A00

MECHANICAL

MECHANICAL

PENTHOUSE (ELEVATOR)

MECHANICAL

MECHANICAL

TRUE NORTH PROJECT NORTH

2-1-D-E-P2-1

SS-1

2-1-D-E-P2-6,8,10

SS-1

2-1-D-E-P2-9,11,13

2-1-D-E-P2-3

SS-1

2-1-D-E-P2-15,17,19

SS-1

2-1-D-E-P2-18,20,22

SS-1

2-1-D-E-P2-12,14,161

2-2-B-E-P1-8

SS-1

2-2-B-E-P1-31,33,35

SS-1

2-2-B-E-P1-37,39,41

SS-1

2-2-B-E-P1-2,4,6

2-2-B-E-P1-29

SS-1

2-2-B-E-P1-23,25,27

SS-1

2-2-B-E-P1-17,19,21

SS-1

2-2-B-E-P1-11,13,15

2-1-A-E-P2-1 SS-1

2-1-A-E-P2-10,12,14

SS-1

2-1-A-E-P2-7,9,11

SS-1

2-1-A-E-P2-13,15,17

W

W

W

W

W

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:2

A

M

02-EP130

OVERALL ROOF POWER PLAN EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

GENERAL

SHEET NOTES

SHEET

KEYNOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

0' 8' 16' 32' 64'

GRAPHIC SCALE 1/16" = 1'-0"

4'

1 PROVIDE A SEPARATE 120 VOLT, 20 AMP, 1 PHASE

CIRCUIT AND WEATHER PROOF GFCI OUTLET

MOUNTED TO SIDE OF CONDENSING UNIT.

2 SPLIT CONDENSING UNIT LOCATED ON ROOF. SEE

MECHANICAL DRAWINGS FOR EXACT LOCATION.

NORTH

1/16" = 1'-0"1

OVERALL ROOF POWER PLAN

GC02A

TELEPHONE EQUIPMENT

ENTRY (TELEPHONE EQUIPMT/STORAGE)

TT ST

(PG4)

(PG4) (PG4) (PG4) (PG4)

(PG4)(PG4)(PG4)

"2-G-C-C-P5"

"2-G-C-E-P2"

2-G-C-C-P5-1,3,5

RACK-30

2-G-C-E-P2-15,17,19

RACK-30

2-G-C-E-P2-2

AC-1

2-G-C-E-P2-6,8

2-G-C-E-P2-4

2-G-C-E-P2-5

2-G-C-E-P2-3

2-G-C-E-P2-1

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:4

A

M

02-EP401

ENLARGED POWER PLANS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

1/4" = 1'-0"F7

ENLARGED TR GC02A-2 POWER PLAN

ID DESCRIPTION

NOMINAL SIZE

M O

U N

T

IN

G

T Y

P E

C O

L O

R T

E M

P

C R

I

D R

IV

E

R C

O N

F

IG

U R

A T

IO

N

V O

L T

A G

E

W A

T T

S

F

IN

IS

H

F

IX

T U

R E

L U

M E

N S

D

IF

F U

S E

R /L

E N

S

R E

F L

E C

T O

R

O P

T

IO

N S

N O

T E

S

MANUFACTURER (CATALOG SERIES)

L E

N G

T H

D E

P T

H

H E

IG

H

T

D

IA

M E

T E

R A

P E

R T

U R

E

OPTION 1 OPTION 2 OPTION 3

(PG4) STRIPLIGHT, GENERAL 48" 4" 4" - CP LED 4000K LED DRIVER

(0-10V DIMMING)

120/277 38 CBA 5000 - - - LITHONIA

(ZL1D-L48-5000LM-FST-M

VOLT-40K-80CRI-WH-HC3

6)

ILP (SS4) WILLIAMS (75R)

DIFFUSER/LENSFINISH PROVIDE UNIT PRICES AND FIXTURE BRAND SELECTED FOR ADD/DELETE CHANGES

FOR EACH FIXTURE TYPES SHOWN WITHIN 48 BUSINESS HOURS OF THE BID DATE.

FAILURE TO COMPLY WITH THIS REQUIREMENT MAY DISQUALIFY THE PRODUCTS

AND EMPOWER THE ENGINEER TO DETERMINE FAIR VALUE FOR FIXTURE AND

INSTALLATION CHANGES, WITHOUT FURTHER INPUT FROM THE CONTRACTOR OR

INSTALLER.

CONTRACTOR ALLOWANCE PRICES ARE ACCURATE WHEN THIS JOB WAS

SPECIFIED, CONTRACTOR AND ELECTRICAL DISTRIBUTOR SHALL VERIFY THIS

ALLOWANCE AND REPORT ANY PROBLEMS TO THE ENGINEER BEFORE THE BID.

ALLOWANCE PRICE MAY OR MAY NOT INCLUDE LAMP(S) OR FREIGHT AS NOTED,

AND DO NOT INCLUDE ANY TAXES.

SUBSTITUTIONS AND/OR EQUAL FIXTURES MUST RECEIVE APPROVAL PRIOR TO

BIDDING, THEY MUST BE SUBMITTED TO THE ENGINEER NO LESS THAN 2 WEEKS

PRIOR TO BID OPENING.

SAMPLES MUST BE PROVIDED FOR ANY AND ALL FIXTURES UPON A/E REQUEST

PRIOR TO RELEASING FIXTURES.

ALL FIXTURES SHALL BE LISTED AND APPROVED FOR THEIR INTENDED USE AND

LOCATION.

VERIFY THE PROPER MOUNTING KITS OR ACCESSORIES TO FACILITATE

INSTALLATION AS SHOWN AT EACH LOCATION ON THE DRAWINGS.

COMPLY WITH THE "INTERIOR LIGHTING" SECTION OF THE SPECIFICATIONS.

REFER TO SPECIFICATIONS FOR IMPORTANT TECHNICAL REQUIREMENTS FOR

LIGHTING FIXTURES, DRIVERS, AND LAMPS.

ALL LIGHT FIXTURES TO BE EITHER "DLC" OR "LIGHTING FACTS" LISTED OR TO BE

APPROVED BY ARCHITECT/ENGINEER AND OWNER.

LUMINAIRE OPTIONSMOUNTING REFLECTOR 1.

2.

3.

4.

5.

6.

7.

8.

9.

DIAMETER

H E

IG

H

T

LENGTH DEPTH

H E

IG

H

T

LENGTH

DEPTH

HEIGHT

NOTES

INTERIOR LIGHTING FIXTURE SCHEDULE

ABBREVIATIONS GENERAL NOTES

ARHR - AIR RETURN AND HEAT REJECTION

DL - DAMP LOCATION

EQC - EARTHQUAKE CLIPS

F - FUSING

HLD - HINGED AND LATCHED DOOR

HS - HOUSE SIDE SHIELD

PS - PHOTOCELL SWITCH

QRS - QUARTZ RESTRIKE

ST - STATIC

WG - WIRE GUARD

WL - WET LOCATION

B - BASE

C - CEILING

F - FLANGE

G - GRID

P - PENDANT

PL POLE

R - RECESSED

S - SURFACE

W - WALL

MW - MATTE WHITE

BL - BLACK

SL - SILVER

GL - GOLD

CL - CLEAR

PW - PAINTED WHITE

EA - EXTRUDED ALUMINUM

S - STEEL

GS - GALVANIZED STEEL

C - CAST

CBA - COLOR BY ARCHITECT

SCBA - STANDARD COLOR BY

ARCHITECT

CCA - CUSTOM COLOR BY

ARCHITECT

FS

209D

- MEETS FEDERAL

STANDARD 209D

TP - THERMALLY

PROTECTED

FL - FLUSH

R - REGRESS

M - MITERED

OP - NONE/OPEN

SP - SPECULAR

SS - SEMI-SPECULAR

D - DIFFUSE (WHITE ENAMEL)

SC - SPECULAR (COLORED)

PR - PRISMATIC

FDR - FULL DEPTH REFLECTOR

DS - DIFFUSE (SEMI SPECULAR) SILVER

LI - LOW IRIDESCENT

IR - IRIDESCENT

SL - SILVER

GL - GOLD

CA - CLEAR ALZAK

#A - ACRYLIC #THICK

#OA - ACRYLIC #THICK (OPAL)

GC - GLASS (CLEAR)

GO - GLASS (OPAL)

GF - GLASS (FROSTED)

SGL - SOFT GLOW LENS

HPL - HIGH PERFORMANCE LENS

DO - DROP OPAL

CGL - CONVEX GLASS LENS

S - SATIN LENS

GENERAL

SHEET NOTES

SHEET

KEYNOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

1 PROVIDE AN OVERHEAD POWER DROP CORD WITH

A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK

RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))

COORDINATE INSTALLATION LOCATION WITH

TELECOMMUNICATIONS CONTRACTOR. SEE SHEET

EE002, EE501, AND PANEL SCHEDULE. PROVIDE

ONE POWER DIST. (2RU), FOUR UPS (6RU), AND SIX

PDU FOR EXISTING TWO RACKS. EXISTING RACKS

ARE TO REMAIN. CONTRACTOR TO COORDINATE

INSTALLATION OF NEW PDU, POWER DIST. (2RU),

AND UPS (6RU) ON EXISTING RACK

CONFIGURATION.

2 SECONDARY BONDING BUSBAR (SBB). SEE ET

SHEETS FOR PLACEMENT AND GROUNDING

DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY

DERIVED #3/0 GROUND FROM BUILDING GROUND

TO TR BUSBARS. CONTRACTOR TO VERIFY

BUSBAR’S RESISTANCE IS UNDER 4 OHMS

MEASURED BY THE FOUR POINT

FALL-OF-POTENTIAL METHOD PER IEEE 81.

3 PROVIDE A 225 AMP, THREE-PHASE, FOUR WIRE,

208 VOLT SERVICE PANEL. PANEL SHALL BE

EQUIPPED WITH A POWER METER.

4 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.

THERMAL SWITCH TO BE MOUNTED ON SIDE OF

UNIT.

5 COORDINATE NEW POWER CONFIGURATION WITH

EXISTING RACKS AND EQUIPMENT.

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/4" = 1'-0"

1'

Revision 1 Date 1 06/08/23

GD03

GD05

ELECTRICAL

TEL/DATAT

S

T

GA28

GA30

TEL/DATA (142)

AUX.SYS (138)

T

ST

GB03

GB01

TEL/DATA

ELECTRICAL

TH

S T

S T

GC19

GC21

ELECTRICAL

TEL/DATA

STAIR/VESTIBULE

TH

S T

S T

1D37

1D35

UTILITY ROOM

AUX.SYS

T

ST

1B09

1B07

ELECTRCAL

ELECTRICAL

T

ST

1C31

TELE/DATA (142)

CG

TT

ST

1D07

1D09

ELECTRICAL

TEL/DATA

TS

T

1A34

1A36

1AA

ELECTRICAL

TEL/DATA

STAIRS

T S

T

2D13

DATA

T S

T

2D31

2D29

ELEC.

DATA

T

ST

2B05

2B07

TEL/DATA

SHOP, ELEC.

T ST

CG

2C33

2C31

STO.

ELEC.

T ST

2A24

TEL/DATAT

ST

"2-G-D-E-P3"

W-RACK-30

2-1-D-C-P7

W-RACK-30

2-1-D-E-P1

AC-1

2-G-D-E-P3-1,3

1 1

W-RACK-30

2-1-A-C-P3

W-RACK-30

2-1-A-E-P2

AC-1

2-1-A-E-P2-3,5

"2-G-B-C-P1"

W-RACK-30

2-G-B-C-P1

AC-1

2-1-B-E-P1

"2-G-B-E-P1"

W-RACK-30

2-G-B-E-P1 HM-1

2-1-B-E-P1

"2-G-C-E-P1"

"2-G-C-C-P1"

W-RACK-30

2-G-C-C-P1

W-RACK-30

2-G-C-E-P1

AC-1

2-G-C-E-P1

HM-1

2-G-C-E-P1

1 1

"2-1-D-C-P5" "2-1-D-C-P6"

"2-1-D-C-P8" "2-1-D-E-P2"

W-RACK-30

2-1-D-C-P8

W-RACK-30

2-1-D-E-P2

AC-1

2-1-D-E-P2-2,4

"2-1-B-C-P1"

"2-1-B-E-P1"

1 1 2

W-RACK-30

2-1-B-E-P1

W-RACK-30

2-1-B-C-P1

AC-1

2-1-B-E-P1-11,13

1 1

W-RACK-30

2-G-C-C-P5

W-RACK-30

2-G-C-E-P2

AC-1

2-G-C-E-P2-10,12

"2-1-D-C-P2"

"2-1-D-C-P1"

"2-1-D-C-P7"

"2-1-D-E-P1"W-RACK-30

2-1-D-E-P1

W-RACK-30

2-1-D-C-P7

AC-1

2-1-D-E-P1-1,3

"2-1-A-C-P2"

"2-1-A-E-P1"

1 2

"2-1-A-C-P3"

"2-1-A-E-P2"

W-RACK-30

2-1-A-C-P3

W-RACK-30

2-1-A-E-P2

AC-1

2-1-A-E-P2-2,4

W-RACK-30

2-1-D-C-P7

W-RACK-30

2-1-D-E-P1

AC-1

2-1-D-E-P1-2,4

1 1

W-RACK-30

2-1-D-C-P8

W-RACK-30

2-1-D-E-P2

AC-1

2-1-D-E-P2-5,7

1 1

"2-2-B-C-P1"

"2-2-B-E-P1"

W-RACK-30

2-2-B-C-P1

W-RACK-30

2-2-B-E-P1

AC-1

2-2-B-E-P1

1 1

W-RACK-30

2-G-C-E-P2

W-RACK-30

2-G-C-C-P5

AC-1

2-G-C-E-P2-7,9

1 2

W-RACK-30

2-1-A-C-P3

W-RACK-30

2-1-A-E-P2

AC-1

2-1-A-E-P2-6,8

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:1

:5

A

M

02-EP402

ENLARGED POWER PLANS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 02

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

GENERAL

SHEET NOTES

SHEET

KEYNOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

NORTH

1/4" = 1'-0"F8

ENLARGED EXISTING TEL/DATA

GD05 POWER PLAN

1 PROVIDE AN OVERHEAD POWER DROP CORD WITH

A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK

RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))

COORDINATE INSTALLATION LOCATION WITH

TELECOMMUNICATIONS CONTRACTOR. SEE SHEET

EE002, EE501, AND PANEL SCHEDULE. PROVIDE

ONE POWER DIST. (2RU), FOUR UPS (6RU), AND SIX

PDU FOR EXISTING TWO RACKS. EXISTING RACKS

ARE TO REMAIN. CONTRACTOR TO COORDINATE

INSTALLATION OF NEW PDU, POWER DIST. (2RU),

AND UPS (6RU) ON EXISTING RACK

CONFIGURATION.

2 SECONDARY BONDING BUSBAR (SBB). SEE ET

SHEETS FOR PLACEMENT AND GROUNDING

DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY

DERIVED #3/0 GROUND FROM BUILDING GROUND

TO TR BUSBARS. CONTRACTOR TO VERIFY

BUSBAR’S RESISTANCE IS UNDER 4 OHMS

MEASURED BY THE FOUR POINT

FALL-OF-POTENTIAL METHOD PER IEEE 81.

3 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.

THERMAL SWITCH TO BE MOUNTED ON SIDE OF

UNIT.

4 PROVIDE A 225 AMP, THREE-PHASE, FOUR WIRE,

208 VOLT SERVICE PANEL. PANEL SHALL BE

EQUIPPED WITH A POWER METER.

NORTH

1/4" = 1'-0"E8

ENLARGED EXISTING TEL/DATA GA28 POWER PLAN

NORTH

1/4" = 1'-0"D8

ENLARGED EXISTING TEL/DATA GB03 POWER PLAN

NORTH

1/4" = 1'-0"B8

ENLARGED EXISTING TEL/DATA GC21 POWER PLAN

NORTH

1/4" = 1'-0"F6

ENLARGED EXISTING AUX SYS 1D35-2 POWER PLAN

NORTH

1/4" = 1'-0"E6

ENLARGED EXISTING TEL/DATA 1B09-2 POWER PLAN

NORTH

1/4" = 1'-0"C6

ENLARGED EXISTING TEL/DATA 1C31-2 POWER PLAN

NORTH

1/4" = 1'-0"B6

ENLARGED EXISTING TEL/DATA 1D09-2 POWER PLAN

NORTH

1/4" = 1'-0"F3

ENLARGED EXISTING TR 1A36-2 POWER PLAN

NORTH

1/4" = 1'-0"E4

ENLARGED EXISTING DATA 2D13-2 POWER PLAN

NORTH

1/4" = 1'-0"C4

ENLARGED EXISTING DATA 2D29-2 POWER PLAN

NORTH

1/4" = 1'-0"B4

ENLARGED EXISTING TEL/DATA 2B07-2 POWER PLAN

NORTH

1/4" = 1'-0"E2

ENLARGED EXISTING TEL/DATA 2C33-2 POWER PLAN

NORTH

1/4" = 1'-0"C2

ENLARGED EXISTING TR 2A24 POWER PLAN

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/4" = 1'-0"

1'

SWITCHBOARD "2-G-B-E-D1"

SECTION I 208/120V 3Ø, 4W

800/3 "2DPE" (EXISTING)

SWITCHBOARD "2-G-B-C-D1"

208/120V 3Ø, 4W "2CMP2B"

(EXISTING)

225/3

225/3

"2-G-C-E-P2"

225/3

"2-1-D-E-P2"

225/3

"2-1-A-E-P2"

225/3

"2-1-D-E-P1"

225/3

225/3

225/3

225/3

225/3

"2-G-C-C-P5"

225/3

"2-1-D-C-P8"

225/3

"2-1-A-C-P3"

225/3

"2-1-D-C-P7"

225/3

225/3

225/3

GROUND FLOOR

FIRST FLOOR

F7

POWER RISER ONE-LINE DIAGRAM - BUILDING #02 - AREA "C"

NO SCALE

TR

GC02A-2

TR

1D07

TR

1A34

TR

1D37

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .