This document provides details for a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0041 for infrastructure upgrades at the Salt Lake City VA Medical Center. Offerors should provide construction services to upgrade EHRM systems as outlined in Attachment 6-Part 5 of 9-Drawings-EHRM-Salt Lake City.pdf, an 18MB file containing project drawings and specifications. Proposals are due by the date listed in the full solicitation. The awarded firm will be expected to complete the upgrades to EHRM infrastructure by the scheduled completion date.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"3C08A-01
RACK A-2"
"3C08A-01
RACK A-1"
6" WIDE SINGLE-
SIDED VERTICAL
WIRE MANAGEMENT
6" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
7'-0" 45RU DATA
EQUIPMENT RACK,
TYPICAL
10" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
UPS (6RU)
UPS (6RU)
POWER DIST. (2RU)
UPS (6RU)
UPS (6RU)
FPP1 (1RU) - PATH "B"
FPP1 (1RU) - PATH "A"
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
DISTRIBUTION
(15RU)
NETWORK/OE
(15RU)
POWER
DISTRIBUTION
(15RU)
"3C08A-01
RACK A-2"
"3C08A-01
RACK A-1"
RBB1 (1RU)RBB1 (1RU)
P D
U
R
U
P D
U
R
U
P D
U
R
U
P D
U
R
U
"4A11A-01
RACK A-1"
"4A11A-01
RACK A-2"
7'-0" 45RU DATA
EQUIPMENT RACK,
TYPICAL
10" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
UPS (6RU)
UPS (6RU)
POWER DIST. (2RU)
UPS (6RU)
UPS (6RU)
6" WIDE SINGLE-
SIDED VERTICAL
WIRE MANAGEMENT
6" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
FPP1 (1RU) - PATH "B"
FPP1 (1RU) - PATH "A"
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
DISTRIBUTION
(15RU)
NETWORK/OE
(15RU)
POWER
DISTRIBUTION
(15RU)
SPP1 (1RU)
OE (1RU) - NIC
OE (1RU) - NIC
BLANK PANEL (1RU)
"4A11A-01
RACK A-2"
"4A11A-01
RACK A-1"
RBB1 (1RU) RBB1 (1RU)
P D
U
R
U
P D
U
R
U
P D
U
R
U
P D
U
R
U
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:0
:0
A
M
01-ET508
TELECOM EQUIPMENT RACK
ELEVATIONS
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: 1" = 1'-0"F6
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 3C08A-01 (FRONT OF RACKS)
SCALE: 1" = 1'-0"C6
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 3C08A-01 (REAR OF RACKS)
SCALE: 1" = 1'-0"F1
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 4A11A-01 (FRONT OF RACKS)
SCALE: 1" = 1'-0"C1
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 4A11A-01 (REAR OF RACKS)
SHEET
KEYNOTES
1 SEE DETAIL E3/ET501 FOR DATA DEVICE DROP
SCHEDULE AND CABLE COUNTS.
2 SEE DETAIL F7/ET502 FOR DATA DEVICE DROP
SCHEDULE AND CABLE COUNTS.
Revisions: Date:
06/08/23
"4C08-01
RACK A-2"
"4C08-01
RACK A-1"
7'-0" 45RU DATA
EQUIPMENT RACK,
TYPICAL
10" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
UPS (6RU)
UPS (6RU)
POWER DIST. (2RU)
UPS (6RU)
UPS (6RU)
6" WIDE SINGLE-
SIDED VERTICAL
WIRE MANAGEMENT
6" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
FPP1 (1RU) - PATH "B"
FPP1 (1RU) - PATH "A"
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
DISTRIBUTION
(15RU)
NETWORK/OE
(15RU)
POWER
DISTRIBUTION
(15RU)
"4C08-01
RACK A-2"
"4C08-01
RACK A-1"
RBB1 (1RU) RBB1 (1RU)
P D
U
R
U
P D
U
R
U
P D
U
R
U
P D
U
R
U
"5B08A-01
RACK A-2"
"5B08A-01
RACK A-1"
6" WIDE SINGLE-
SIDED VERTICAL
WIRE MANAGEMENT
6" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
7'-0" 45RU DATA
EQUIPMENT RACK,
TYPICAL
10" WIDE SINGLE-SIDED
VERTICAL WIRE
MANAGEMENT
UPS (6RU)
UPS (6RU)
POWER DIST. (2RU)
UPS (6RU)
UPS (6RU)
FPP1 (1RU) - PATH "B"
FPP1 (1RU) - PATH "A"
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
SPP1 (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
OE (1RU) - NIC
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
BLANK PANEL (1RU)
DISTRIBUTION
(15RU)
NETWORK/OE
(15RU)
POWER
DISTRIBUTION
(15RU)
RBB1 (1RU)
"5B08A-01
RACK A-1"
"5B08A-01
RACK A-2"
RBB1 (1RU)
P D
U
R
U
P D
U
R
U
P D
U
R
U
P D
U
R
U
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:0
:5
A
M
01-ET509
TELECOM EQUIPMENT RACK
ELEVATIONS
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: 1" = 1'-0"F6
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 4C08-01 (FRONT OF RACKS)
SCALE: 1" = 1'-0"C6
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 4C08-01 (REAR OF RACKS)
SCALE: 1" = 1'-0"F1
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 5B08A-01 (FRONT OF RACKS)
SCALE: 1" = 1'-0"C1
TELECOM EQUIPMENT RACK ELEVATION, TELECOMMUNICATION ROOM 5B08A-01 (REAR OF RACKS)
SHEET
KEYNOTES
1 SEE DETAIL F7/ET502 FOR DATA DEVICE DROP
SCHEDULE AND CABLE COUNTS.
2 SEE DETAIL E7/ET502 FOR DATA DEVICE DROP
SCHEDULE AND CABLE COUNTS.
LADDER RACK,
TYPICAL
TR GA16-01
GROUND LEVEL
ACCESSIBLE CEILING
2 EA., 1.25" CND
"HH-1"
3 EA., 4" CND
W/ 1 EA 12710
DURALINE IN EACH
1 EA., 1" CND
W/ PULL STRING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J W
C
LADDER RACK,
TYPICAL
MCR GD13-1/ TELEPHONE
SWITCHGEAR GD03AA-1
(1) #3 CU TO
GROUNDING
ELECTRODE
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
JHOOK BACKBONE
PATHWAY, TYP
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
(1) #3 CU TO
GROUNDING
ELECTRODE
(FLOOR OUTLETS)
FB#
SC
J
A
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
(1) #3 CU TO
GROUNDING
ELECTRODE
(FLOOR OUTLETS)
FB#
SC
J
A
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
F
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
A
C
F
F KP
KP F
6 EA., 4" CND6 EA., 4" CND
GROUND LEVELGROUND LEVEL
TR 1A15A-01
FIRST LEVEL
TR 1E02-01
FIRST LEVEL
J J J J J J J J J JJ J J J J J J J J J
J J J J J J J J J J J J J J J J J J J J
TR 2A11-01
SECOND LEVEL
TR 2C08-01
SECOND LEVEL
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
JHOOK HORIZONTAL
PATHWAY, TYP
JHOOK HORIZONTAL
PATHWAY, TYP
JHOOK HORIZONTAL
PATHWAY, TYP
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
4 EA., 4" CND 4 EA., 4" CND
4 EA., 4" CND 4 EA., 4" CND
4 EA., 4" CND
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
JHOOK BACKBONE
PATHWAY, TYP
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
C
J J J J J J J J J J
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
4 EA., 4" CND
COORIDOR GD00-1, GA00-1,
GB00-1, GC00-1
GROUND LEVEL
COORIDOR GD00-1, GA00-1
4 EA., 4" CND4 EA., 4" CND
6 EA., 4" CND
UP TO
THIRD LEVEL
TR 3C08B-01
6 EA., 4" CND
UP TO
THIRD LEVEL
TR 3A11A-01
SECOND LEVEL
J J J J J J J J J J J
JHOOK HORIZONTAL
PAHTWAY, TYP
J J J J J J J J J J J J J J
J J J J J J J J J J J J J J
J-HOOK BACKBONE
PATHWAY, TYP
J-HOOK HORIZONTAL
PATHWAY, TYP
FIRST LEVEL
4 EA., 4" FIRE RATED
SLEEVES
6 EA., 4" CND
J J J J J J J J J J J J J J
J J J J J J J J J J J J J J
J-HOOK BACKBONE
PATHWAY, TYP
J-HOOK HORIZONTAL
PATHWAY, TYP
4 EA., 4" CND
6 EA., 4" CND
4 EA., 4" CND
TR 1D42B-01
J J J J J J J J J J
J J J J J J J J J J J
JHOOK HORIZONTAL
PAHTWAY, TYP
J J J J J J J J J J
TR GC01-01
C
F KP
W
KP
W W
W
C
4-11/16" BOX W/
5/8" MUD RING
4-11/16" BOX W/
5/8" MUD RING
4-11/16" BOX W/
5/8" MUD RING
4-11/16" BOX W/
5/8" MUD RING
FIRST LEVEL FIRST LEVEL FIRST LEVEL
SECOND LEVELSECOND LEVEL
GROUND LEVELGROUND LEVELGROUND LEVEL
ACCESSIBLE CEILING
ACCESSIBLE CEILING
ACCESSIBLE CEILINGACCESSIBLE CEILING
SLACK LOOPJHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:0
:4
A
M
01-ET601
TELECOM CONDUIT RISER
DIAGRAM
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: NTSF1
TELECOM CONDUIT RISER DIAGRAM
GENERAL
SHEET NOTES
1 FIBER PATH "A" AND FIBER PATH "B" SHALL TAKE
DIVERSE ROUTES FROM MCR TO EACH TR. PATH "A"
SHALL TAKE EAST ROUTE, PATH "B" SHALL TAKE
WEST ROUTE THROUGH TR VERTICAL STACK AND
SHALL CROSS ON EACH FLOOR IN IT'S OWN
DESIGNATED J-HOOK PATHWAY.
2 INDICATION OF TYPICAL PRIMARY CABLE PATHWAYS
REQUIRED. ALL J-HOOK PATHWAYS REQUIRED IN
OFFICE SPACES, LABS, CONFERENCE ROOMS, ETC.
TO BE LAID OUT AND INSTALLED BY THE
CONTRACTOR.
3 J-HOOK PATHWAY SPACING SHALL BE A MAXIMUM OF
48".
4 ALL J-HOOKS TO BE SIZED TO SUPPORT CATEGORY
6A CABLE.
5 SEPARATION LINE INDICATES DATA CABLE
TERMINATION LOCATION TO SPECIFIC TR ROOMS.
REFER TO OVERALL TELECOM PLAN FOR ADDITIONAL
INFORMATION.
6 IN BUILDINGS WHERE FIBER ONLY IS PROVIDED,
CONTRACTOR TO FIELD VERIFY FINAL FIBER
TERMINATION LOCATION WITH EXISTING RACK OR
WALL MOUNTED FIBER PATCH PANELS. CONTRACTOR
TO PROVIDE FIBER PATCH PANEL TO MATCH
EXISTING CONDITIONS.
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND
(1) #3 CU TO
GROUNDING
ELECTRODE
(FLOOR OUTLETS)
FB#
SC
J
C
BASKET TRAY,
TYPICAL
ACCESSIBLE CEILING
SLACK LOOP
2 EA., 1.25" CND 1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
(1) #3 CU TO
GROUNDING
ELECTRODE
SC
J
A
C
F 4
F
THIRD LEVEL
TR 3C08A-01
THIRD LEVEL
FOURTH LEVEL
TR 4C08-01
FOURTH LEVEL
FIFTH LEVEL
6 EA., 4" CND
6 EA., 4" CND
DOWN TO
SECOND LEVEL
TR 2C08-01
4 EA., 4" CND
4 EA., 4" CND
4 EA., 4" CND
4 EA., 4" CND
4 EA., 4" CND
4 EA., 4" CND
4 EA., 4" CND
6 EA., 4" CND
DOWN TO
SECOND LEVEL
TR 2A11-01
TR 3A11B-01
THIRD LEVEL
TR 4A11A-01
TR 5A08B-01
THIRD LEVEL
J J J J J J J J J J J J J J J J J J J J J J J J J J J J JJJ J JJJJ
JHOOK HORIZONTAL
PAHTWAY, TYP
ACCESSIBLE CEILING
J J J J J J J J J J J J J J J J J J J J J J J J J J J J JJJ J JJJJ
JHOOK HORIZONTAL
PAHTWAY, TYP
ACCESSIBLE CEILING
A W
C
F KP
W
C
FOURTH LEVEL FOURTH LEVEL
1 EA., 1" CND
W/ PULL
STRING
4-11/16" BOX W/
5/8" MUD RING
F 4
C
KP
W W
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
JHOOK HORIZONTAL
PATHWAY, TYP
J J J J J J J J J J
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:0
:5
A
M
01-ET602
TELECOM CONDUIT RISER
DIAGRAM
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: NTSF1
TELECOM CONDUIT RISER DIAGRAM
GENERAL
SHEET NOTES
1 FIBER PATH "A" AND FIBER PATH "B" SHALL TAKE
DIVERSE ROUTES FROM MCR TO EACH TR. PATH "A"
SHALL TAKE EAST ROUTE, PATH "B" SHALL TAKE
WEST ROUTE THROUGH TR VERTICAL STACK AND
SHALL CROSS ON EACH FLOOR IN IT'S OWN
DESIGNATED J-HOOK PATHWAY.
2 INDICATION OF TYPICAL PRIMARY CABLE PATHWAYS
REQUIRED. ALL J-HOOK PATHWAYS REQUIRED IN
OFFICE SPACES, LABS, CONFERENCE ROOMS, ETC.
TO BE LAID OUT AND INSTALLED BY THE
CONTRACTOR.
3 J-HOOK PATHWAY SPACING SHALL BE A MAXIMUM OF
48".
4 ALL J-HOOKS TO BE SIZED TO SUPPORT CATEGORY
6A CABLE.
5 SEPARATION LINE INDICATES DATA CABLE
TERMINATION LOCATION TO SPECIFIC TR ROOMS.
REFER TO OVERALL TELECOM PLAN FOR ADDITIONAL
INFORMATION.
6 IN BUILDINGS WHERE FIBER ONLY IS PROVIDED,
CONTRACTOR TO FIELD VERIFY FINAL FIBER
TERMINATION LOCATION WITH EXISTING RACK OR
WALL MOUNTED FIBER PATCH PANELS. CONTRACTOR
TO PROVIDE FIBER PATCH PANEL TO MATCH
EXISTING CONDITIONS.
GROUND LEVEL, TELEPHONE SWITCH GEAR GD03AA-01GROUND LEVEL, TR GA16-01
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
C
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
C
A
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
C
A
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
C
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
F
1 EA., CAT 6A UTP CABLE, BLUE 1 EA., CAT 6A UTP CABLE, BLUE
C
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
RACK MOUNTED
GROUND LEVEL, COMPUTER ROOM, MCR GC13-01
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
OWNERS
EQUIPMENT
(NIC)
FIBER
PATCH
PANEL
PATH "A"
(FPP4)
FIBER
PATCH
PANEL
PATH "B"
(FPP4)
PATH "A" TO EACH TR
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
C
A
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
2 EA., CAT 6A UTP CABLE, BLUE
F
1 EA., CAT 6A UTP CABLE, BLUE
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
GROUND LEVEL, TR GC01-01
FIRST LEVEL, TR 1A15A-01FIRST LEVEL, TR 1D42B-01
SECOND LEVEL, TR 2A11-01 SECOND LEVEL, TR 2C08-01
PATH "B" TO EACH TR
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELOW
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
C
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
2 EA., CAT 6A UTP CABLE, BLUE
F
1 EA., CAT 6A UTP CABLE, BLUE
C
PATH "A" TO MCR GD13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GD13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
RACK MOUNTED
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
FIRST LEVEL, TR 1F02-01 FIRST LEVEL, TR 1F33G-01
SECOND LEVEL, TR 2F55-01
KP
1 EA., CAT 6A UTP CABLE, BLUE
KP
1 EA., CAT 6A UTP CABLE, BLUE
KP
1 EA., CAT 6A UTP CABLE, BLUE
W
1 EA., CAT 6A UTP CABLE, BLUE
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
RACK MOUNTED
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
RACK MOUNTED
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
FIRST LEVEL, TR 1E02-01
W
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
C
A
2 EA., CAT 6A UTP CABLE, BLUE
F
1 EA., CAT 6A UTP CABLE, BLUE
KP
1 EA., CAT 6A UTP CABLE, BLUE
1 EA., CAT 6A UTP CABLE, BLUE
W
1 EA., CAT 6A UTP CABLE, BLUE
W
2 EA., CAT 6A UTP CABLE,YELLOW
W
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:0
:0
A
M
01-ET603
TELECOM CABLE RISER DIAGRAM EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: NTSF1
TELECOM CABLE RISER DIAGRAM
GENERAL
SHEET NOTES
1 FIBER PATH "A" AND FIBER PATH "B" SHALL TAKE
DIVERSE ROUTES FROM MCR TO EACH TR. PATH "A"
SHALL TAKE EAST ROUTE, PATH "B" SHALL TAKE
WEST ROUTE THROUGH TR VERTICAL STACK AND
SHALL CROSS ON EACH FLOOR IN IT'S OWN
DESIGNATED J-HOOK PATHWAY.
2 INDICATION OF TYPICAL PRIMARY CABLE PATHWAYS
REQUIRED. ALL J-HOOK PATHWAYS REQUIRED IN
OFFICE SPACES, LABS, CONFERENCE ROOMS, ETC.
TO BE LAID OUT AND INSTALLED BY THE
CONTRACTOR.
3 J-HOOK PATHWAY SPACING SHALL BE A MAXIMUM OF
48".
4 ALL J-HOOKS TO BE SIZED TO SUPPORT CATEGORY
6A CABLE.
5 SEPARATION LINE INDICATES DATA CABLE
TERMINATION LOCATION TO SPECIFIC TR ROOMS.
REFER TO OVERALL TELECOM PLAN FOR ADDITIONAL
INFORMATION.
6 IN BUILDINGS WHERE FIBER ONLY IS PROVIDED,
CONTRACTOR TO FIELD VERIFY FINAL FIBER
TERMINATION LOCATION WITH EXISTING RACK OR
WALL MOUNTED FIBER PATCH PANELS. CONTRACTOR
TO PROVIDE FIBER PATCH PANEL TO MATCH
EXISTING CONDITIONS.
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
C
A
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
C
A
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
C
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
C
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
RACK MOUNTED
DUPLEX SM PATCH
CORD, LC CONNECTOR,
TYPICAL
CAT 6A PATCH
CORD
2 EA., CAT 6A UTP CABLE,YELLOW
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
C
A
OWNERS
EQUIPMENT
(NIC)
STATION
PATCH
PANEL,
(SPP1)
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
4 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
4 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
2 EA., CAT 6A UTP CABLE, BLUE
F
F
F
F
1 EA., CAT 6A UTP CABLE, BLUE
1 EA., CAT 6A UTP CABLE, BLUE 1 EA., CAT 6A UTP CABLE, BLUE
1 EA., CAT 6A UTP CABLE, BLUE
1 EA., CAT 6A UTP CABLE, BLUE
C
C C
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "A" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
THIRD LEVEL, TR 3A11B-01 THIRD LEVEL, TR 3C08A-01
FOURTH LEVEL, TR 4A11A-01 FOURTH LEVEL, TR 4C08-01
FIFTH LEVEL, TR 5B08A-01
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
PATH "B" TO MCR GC13-01
" 1 EA., 12 STRAND SM
" 1 EA., 24 STRAND MM OM4
KP
1 EA., CAT 6A UTP CABLE, BLUE
KP
1 EA., CAT 6A UTP CABLE, BLUE
1 EA., CAT 6A UTP CABLE, BLUE
W W
1 EA., CAT 6A UTP CABLE, BLUE
W
1 EA., CAT 6A UTP CABLE, BLUE
W
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
FIBER
PATCH
PANEL
PATH "A"
(FPP1)
FIBER
PATCH
PANEL
PATH "B"
(FPP1)
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:0
:1
A
M
01-ET604
TELECOM CABLE RISER DIAGRAM EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: NTSF1
TELECOM CABLE RISER DIAGRAM
GENERAL
SHEET NOTES
1 FIBER PATH "A" AND FIBER PATH "B" SHALL TAKE
DIVERSE ROUTES FROM MCR TO EACH TR. PATH "A"
SHALL TAKE EAST ROUTE, PATH "B" SHALL TAKE
WEST ROUTE THROUGH TR VERTICAL STACK AND
SHALL CROSS ON EACH FLOOR IN IT'S OWN
DESIGNATED J-HOOK PATHWAY.
2 INDICATION OF TYPICAL PRIMARY CABLE PATHWAYS
REQUIRED. ALL J-HOOK PATHWAYS REQUIRED IN
OFFICE SPACES, LABS, CONFERENCE ROOMS, ETC.
TO BE LAID OUT AND INSTALLED BY THE
CONTRACTOR.
3 J-HOOK PATHWAY SPACING SHALL BE A MAXIMUM OF
48".
4 ALL J-HOOKS TO BE SIZED TO SUPPORT CATEGORY
6A CABLE.
5 SEPARATION LINE INDICATES DATA CABLE
TERMINATION LOCATION TO SPECIFIC TR ROOMS.
REFER TO OVERALL TELECOM PLAN FOR ADDITIONAL
INFORMATION.
6 IN BUILDINGS WHERE FIBER ONLY IS PROVIDED,
CONTRACTOR TO FIELD VERIFY FINAL FIBER
TERMINATION LOCATION WITH EXISTING RACK OR
WALL MOUNTED FIBER PATCH PANELS. CONTRACTOR
TO PROVIDE FIBER PATCH PANEL TO MATCH
EXISTING CONDITIONS.
DF
DOWN
UPUP
UP
UP
A WING
B WING
C WING
MECHANICAL
MECHANICAL
ELECTRICAL
MECHANICAL MECHANICAL
SHOP
EMS
EMS
VACANT
PHARMACY
DIRECTOR'S
SUITE
SWING
MORGUE
LOGISTICS
WHOLE HEALTH
PHARMACY
WHOLE
HEALTH
D WING
BC07-14
CONSTRUCTION ENTRANCE
BA05-14
BA04F-14
STAIR PATHSTAIR PATH
MEDICAL MEDIA
IRM
NURSING SERVICE ADMINISTRATION
CENTRALIZED STAFF
DIRECTOR'S SUITE
VOLUNTARY SERVICE
REHAB MEDICE
EMS
RECREATIONAL THERAPY
MEDICAL RESEARCH AND DEPT.
PHARMACY
SWING
NUTRITION FOOD SPACE
ACS - PRIMARY CARE
BEHAVIORAL HEALTH
PROSTHETICS
BEHAVIORAL MEDICINE
PSYCHIATRIC RESIDENTIAL
REHABILITATION
ACS - SPECIALTY CARE
BED'S - ICU
BED'S MEDICAL - SURGICAL
VACANT
LOW VISION CLINIC -
OPTOMETRY
SURGICAL
EYE CLINIC - OPHTHAMOLOGY
DIGESTIVE DISEASES, GI, ENDOSCOPY
SOCIAL WORK
ON-CALL PROGRAM
HBPC
POLICE SECURITY SERVICE
PATHOLOGY AND LAB
HRS
CHAPLIN
SPD SERVICE
DIAGNOSTIC IMAGING
UNDER CONSTRUCTION
REHAB - BED'S
MAS
HOSPICE PALLIATIVE
DIALYSIS
CARDILOLOGY
VETERANS ASSISTANCE/SERVICE
ORGANIZATION/ UNION
CANTEEN
ENGINEERING
LINEN
LOGISTICS
LOW VISION CLINIC
ACS - URGENT CARE
WHOLE HEALTH
SEQUENCING PLAN GENERAL NOTES
1. FOR SEQUENCING PHASES AND GENERAL NOTES, SEE AE001.
EXISTING TELECOMMUNICATION SPACE
NEW CONSTRUCTION
CONTRACTOR PATH OF TRAVEL
CONSTRUCTION ENTRANCE
RAND M.
EARDLEY
128806
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
N S
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
A
R C
H .r v t
/3
/2
:5
:0
P
M
14-GC1B0
SEQUENCING PLAN - BASEMENT
FLOOR
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 PURCELL ROOKER
06/02/23
NORTH
1/16" = 1'-0"1
SEQUENCING PLAN - BASEMENT FLOOR
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
DEPARTMENT PLAN LEGEND
SEQUENCING LEGEND
UP
DN
A WING
B WING
C WING
ENROLLMENT
POLICE
EMERGENCY
DEPARTMENT PRIMARY CARE
TRANSITION AND
CARE
MANAGMENT
D WING
GB38-14
GB34-14
GB64-14
GB51A-14
GB33-14 & GB31-14
STAIR PATHSTAIR PATH
G A
-1
MEDICAL MEDIA
IRM
NURSING SERVICE ADMINISTRATION
CENTRALIZED STAFF
DIRECTOR'S SUITE
VOLUNTARY SERVICE
REHAB MEDICE
EMS
RECREATIONAL THERAPY
MEDICAL RESEARCH AND DEPT.
PHARMACY
SWING
NUTRITION FOOD SPACE
ACS - PRIMARY CARE
BEHAVIORAL HEALTH
PROSTHETICS
BEHAVIORAL MEDICINE
PSYCHIATRIC RESIDENTIAL
REHABILITATION
ACS - SPECIALTY CARE
BED'S - ICU
BED'S MEDICAL - SURGICAL
VACANT
LOW VISION CLINIC -
OPTOMETRY
SURGICAL
EYE CLINIC - OPHTHAMOLOGY
DIGESTIVE DISEASES, GI, ENDOSCOPY
SOCIAL WORK
ON-CALL PROGRAM
HBPC
POLICE SECURITY SERVICE
PATHOLOGY AND LAB
HRS
CHAPLIN
SPD SERVICE
DIAGNOSTIC IMAGING
UNDER CONSTRUCTION
REHAB - BED'S
MAS
HOSPICE PALLIATIVE
DIALYSIS
CARDILOLOGY
VETERANS ASSISTANCE/SERVICE
ORGANIZATION/ UNION
CANTEEN
ENGINEERING
LINEN
LOGISTICS
LOW VISION CLINIC
ACS - URGENT CARE
WHOLE HEALTH
SEQUENCING PLAN GENERAL NOTES
1. FOR SEQUENCING PHASES AND GENERAL NOTES, SEE AE001.
EXISTING TELECOMMUNICATION SPACE
NEW CONSTRUCTION
CONTRACTOR PATH OF TRAVEL
CONSTRUCTION ENTRANCE
RAND M.
EARDLEY
128806
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
N S
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
A
R C
H .r v t
/3
/2
:5
:1
P
M
14-GC100
SEQUENCING PLAN - GROUND
FLOOR
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 PURCELL ROOKER
06/02/23
NORTH
1/16" = 1'-0"1
SEQUENCING PLAN - GROUND FLOOR
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
DEPARTMENT PLAN LEGEND
SAFE
UP
A WING
B WING
C WING
WHOLE HEALTH
DIRECTOR'S
SUITE
SWING SPACE
ACADEMIC
AFFILIATION
LAB
BREAK
HOUSEKEEPING
OFFICE
HOUSEKEEPING
CLINICAL LAB / BLOOD DRAW
PATHOLOGY
CHRONIC PAIN
PATHOLOGY
1A16-14
1B03-14
1B25-14
1C24-14 &1C26-14
STAIR PATHSTAIR PATH
1A
-1
MEDICAL MEDIA
IRM
NURSING SERVICE ADMINISTRATION
CENTRALIZED STAFF
DIRECTOR'S SUITE
VOLUNTARY SERVICE
REHAB MEDICE
EMS
RECREATIONAL THERAPY
MEDICAL RESEARCH AND DEPT.
PHARMACY
SWING
NUTRITION FOOD SPACE
ACS - PRIMARY CARE
BEHAVIORAL HEALTH
PROSTHETICS
BEHAVIORAL MEDICINE
PSYCHIATRIC RESIDENTIAL
REHABILITATION
ACS - SPECIALTY CARE
BED'S - ICU
BED'S MEDICAL - SURGICAL
VACANT
LOW VISION CLINIC -
OPTOMETRY
SURGICAL
EYE CLINIC - OPHTHAMOLOGY
DIGESTIVE DISEASES, GI, ENDOSCOPY
SOCIAL WORK
ON-CALL PROGRAM
HBPC
POLICE SECURITY SERVICE
PATHOLOGY AND LAB
HRS
CHAPLIN
SPD SERVICE
DIAGNOSTIC IMAGING
UNDER CONSTRUCTION
REHAB - BED'S
MAS
HOSPICE PALLIATIVE
DIALYSIS
CARDILOLOGY
VETERANS ASSISTANCE/SERVICE
ORGANIZATION/ UNION
CANTEEN
ENGINEERING
LINEN
LOGISTICS
LOW VISION CLINIC
ACS - URGENT CARE
WHOLE HEALTH
SEQUENCING PLAN GENERAL NOTES
1. FOR SEQUENCING PHASES AND GENERAL NOTES, SEE AE001.
EXISTING TELECOMMUNICATION SPACE
NEW CONSTRUCTION
CONTRACTOR PATH OF TRAVEL
CONSTRUCTION ENTRANCE
RAND M.
EARDLEY
128806
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
N S
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
A
R C
H .r v t
/3
/2
:5
:1
P
M
14-GC110
SEQUENCING PLAN - FIRST
FLOOR
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 PURCELL ROOKER
06/02/23
NORTH
1/16" = 1'-0"1
SEQUENCING PLAN - FIRST FLOOR
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
DEPARTMENT PLAN LEGEND
RAMP
DOWN
RAMP
UP
DN
A WING
B WING
PHYSICIAN
OFFICES
AMU
RESPIRATORY
CARE CENTER
SPD SERVICE
DIALYSIS
PHYSICIAN
OFFICES
RENAL EXAM
LOGISTICS
2A17-14
2B02-14
2C20-14
2C18-14
2C34-14
2C24-14
2B43-14
STAIR PATH
STAIR PATH
2B
C -1
MEDICAL MEDIA
IRM
NURSING SERVICE ADMINISTRATION
CENTRALIZED STAFF
DIRECTOR'S SUITE
VOLUNTARY SERVICE
REHAB MEDICE
EMS
RECREATIONAL THERAPY
MEDICAL RESEARCH AND DEPT.
PHARMACY
SWING
NUTRITION FOOD SPACE
ACS - PRIMARY CARE
BEHAVIORAL HEALTH
PROSTHETICS
BEHAVIORAL MEDICINE
PSYCHIATRIC RESIDENTIAL
REHABILITATION
ACS - SPECIALTY CARE
BED'S - ICU
BED'S MEDICAL - SURGICAL
VACANT
LOW VISION CLINIC -
OPTOMETRY
SURGICAL
EYE CLINIC - OPHTHAMOLOGY
DIGESTIVE DISEASES, GI, ENDOSCOPY
SOCIAL WORK
ON-CALL PROGRAM
HBPC
POLICE SECURITY SERVICE
PATHOLOGY AND LAB
HRS
CHAPLIN
SPD SERVICE
DIAGNOSTIC IMAGING
UNDER CONSTRUCTION
REHAB - BED'S
MAS
HOSPICE PALLIATIVE
DIALYSIS
CARDILOLOGY
VETERANS ASSISTANCE/SERVICE
ORGANIZATION/ UNION
CANTEEN
ENGINEERING
LINEN
LOGISTICS
LOW VISION CLINIC
ACS - URGENT CARE
WHOLE HEALTH
SEQUENCING PLAN GENERAL NOTES
1. FOR SEQUENCING PHASES AND GENERAL NOTES, SEE AE001.
EXISTING TELECOMMUNICATION SPACE
NEW CONSTRUCTION
CONTRACTOR PATH OF TRAVEL
CONSTRUCTION ENTRANCE
RAND M.
EARDLEY
128806
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
N S
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
A
R C
H .r v t
/3
/2
:5
:1
P
M
14-GC120
SEQUENCING PLAN - SECOND
FLOOR
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 PURCELL ROOKER
06/02/23
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
NORTH
1/16" = 1'-0"1
SEQUENCING PLAN - SECOND FLOOR
DEPARTMENT PLAN LEGEND
VITREO
US CHINA
C_FO
UNTAINS
M
ILLBROO
K K-5264
DN
UP
DN
UP
A WING
B WING
SURGERY / O.R. SURGERY / OFFICES
SURGERY: ANESTHESIA, PRE AND
POST-OPERATIVE CARE
STAIR PATH
3A24-14 & 3A26-14
3A12-14
3A08-14
3B02-14
3B14-14
3C16-14 & 3C18-14
3A10-14
STAIR PATH
MEDICAL MEDIA
IRM
NURSING SERVICE ADMINISTRATION
CENTRALIZED STAFF
DIRECTOR'S SUITE
VOLUNTARY SERVICE
REHAB MEDICE
EMS
RECREATIONAL THERAPY
MEDICAL RESEARCH AND DEPT.
PHARMACY
SWING
NUTRITION FOOD SPACE
ACS - PRIMARY CARE
BEHAVIORAL HEALTH
PROSTHETICS
BEHAVIORAL MEDICINE
PSYCHIATRIC RESIDENTIAL
REHABILITATION
ACS - SPECIALTY CARE
BED'S - ICU
BED'S MEDICAL - SURGICAL
VACANT
LOW VISION CLINIC -
OPTOMETRY
SURGICAL
EYE CLINIC - OPHTHAMOLOGY
DIGESTIVE DISEASES, GI, ENDOSCOPY
SOCIAL WORK
ON-CALL PROGRAM
HBPC
POLICE SECURITY SERVICE
PATHOLOGY AND LAB
HRS
CHAPLIN
SPD SERVICE
DIAGNOSTIC IMAGING
UNDER CONSTRUCTION
REHAB - BED'S
MAS
HOSPICE PALLIATIVE
DIALYSIS
CARDILOLOGY
VETERANS ASSISTANCE/SERVICE
ORGANIZATION/ UNION
CANTEEN
ENGINEERING
LINEN
LOGISTICS
LOW VISION CLINIC
ACS - URGENT CARE
WHOLE HEALTH
SEQUENCING PLAN GENERAL NOTES
1. FOR SEQUENCING PHASES AND GENERAL NOTES, SEE AE001.
EXISTING TELECOMMUNICATION SPACE
NEW CONSTRUCTION
CONTRACTOR PATH OF TRAVEL
CONSTRUCTION ENTRANCE
RAND M.
EARDLEY
128806
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
N S
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
A
R C
H .r v t
/3
/2
:5
:1
P
M
14-GC130
SEQUENCING PLAN - THIRD
FLOOR
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 PURCELL ROOKER
06/02/23
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
NORTH
1/16" = 1'-0"1
SEQUENCING PLAN - THIRD FLOOR
DEPARTMENT PLAN LEGEND
1.0 GENERAL NOTES, INSTRUCTIONS, AND SUBMITTALS
1.1 GENERAL INSTRUCTIONS
a. Construction, material testing, workmanship, inspections etc. shall conform to the to the requirements of the governing edition of the International Building Code (IBC), American Society for Civil Engineers (ASCE7)(ASCE7), OSHA STANDARD and other standards as required by the
Authority having jurisdiction (AHJ) or as required by owner.
b. Contractor shall be become familiar with the contract documents and shall ensure subcontractors understand the portion of the work pertaining to their area of work. Any changes to the construction documents shall be submitted in writing to the EOR/Arch prior to implementation.
Changes not approved by the EOR will be redone, fixed or corrected at the contractor’s expense.
c. Contractor shall be responsible to verify site dimensions and conditions. Discrepancies between site conditions and the Contract Documents shall be brought to the attention of the Arch/EOR prior to proceeding with work in the affected area. Existing conditions have been verified to the best of the EOR’s ability, however if actual conditions differ significantly notify EOR before proceeding with work.
d. The drawing and specifications show the finished structure . The contractors shall be responsible for designing and providing mean and methods of construction including, but not limited to, shoring forming, temporary bracing etc unless noted otherwise (UNO) Adequate shoring and bracing shall be provided until the final structural support systems are in place.
e. Contractor shall keep record of modifications made to the original contract documents and report them to the Arch/EOR to be added to the as-built drawings
f. Contractor shall be responsible to verify MEP component size and weight prior to fabrication of the structural supporting systems. Size and locations that do not match drawings may require additional framing members and supports.
g. In the event that certain features of the construction are not fully shown on the drawing or call for in the General Notes or specifications, their construction shall be of the same character and quality as for similar conditions that are specified elsewhere in the construction documents.
h In the event that conflicting notes or details are encountered the more stringent or restrictive items shall apply unless a written clarification of details is provided by the engineer of record for the project. Typical details may be used as long as reasonably similar to the encountered situation.
I. The Architect/Engineer shall be contacted in the event that any portion of the new construction (as shown on these construction documents) can not be accomplished due to conflicts with other portions of the construction documents. The contractor is responsible to verify dimensions and on-sire conditions prior to start of work of fabrication of building components.
j. The plans and details have been prepared to visually represent the actual condition UNO.
However, DO NOT scale the drawings for dimensional information. Refer to Architectural drawings for dimensions UNO. Dimensions, where shown, on structural drawings are to stud line, rough concrete, or concrete block surface unless shown or called out otherwise.
k. Construction, material testing, workmanship, inspections etc. shall conform with the requirements of the governing code in sections 1.1. Contractor shall coordinate inspections, testing, and observations as the work proceeds.
l. The contractor and owner shall be responsible for maintaining the design loads listed herein at all times. This includes during and after construction. The contractor shall use “good judgement” in placing building materials around the site as to not overload structural members.
1.2 STRUCTURAL OBSERVATION
a. Where required STRUCTURAL observations shall be performed by a licensed structural engineer in the state where the project is located. Observation reports shall be submitted to the Architect and persons having Jurisdiction over the project. Observations performed by EA Solutions representatives shall not take the place of special Inspections, or building inspections as required by code. Structural observations are intended to provide an opportunity to clarify misunderstandings and verify overall understanding of the design intent. It is not approval or certification of construction. Refer to the Structural Observations Schedule for items and sequencing of visits.
1.3 SUBMITTALS
a. Submittals shall be made for items designed by others and shop drawings. Spectrum Engineers shall review for overall compliance and understanding of the design intent. The contractor retains responsibility for verifying member sizes, quantities, dimensions, elevations etc. on all submittals related to contract documents. Approved shop drawing and materials must be on site prior to commencement of work.
THE FOLLOWING ITEMS SHALL BE SUBMITTED FOR REVIEW:
1. Concrete material and mix designs
2. Reinforcing Steel
3. Structural Steel
4. Welding procedures and certifications
2.0 BASIS OF DESIGN
2.1 GRAVITY LOADING
1. The governing code for vertical load resisting elements shall be the 2018 IBC & ASEC7-16 "Minimum Design Loads and Associated Criteria for Buildings and other Structures"
2. Building Risk Category III
3. Dead Loads
Roof 20 psf
4. Floor Live Load:
Offices 40 psf Partition 15 psf Corridor 100 psf
5. Roof Live Load:
Roof Live Load: 20 psf
5.0 CONCRETE
5.1 CONCRETE STRENGTH AND DESIGN PARAMETERS
a. Concrete construction shall be performed in accordance with ACI 318 and other approved standards.
b. The minimum 28 day compressive strength for each type of item on this project is shown in the table below. Table also includes Water/Cement Ratio (W/C), Air Content, Max Aggregate size and Exposure class (see ACI 318 19.3.2.1). Exposure class refer to the following: F- Freeze & Thaw, S- Sulfate, C-Chloride
c. Portland Cement (ASTM ) Type I- General Purpose Type II- Moderate Sulfate Resistance Type III- High early strength Type IV- Slow Reacting Type V- High Sulfate Resistance
d. Fly Ash - (ASTM Class C or F) max content to weight ratio is 25 percent
e. Concrete Density
1. Normal weight concrete 150 pounds per cubic foot
2. Lightweight concrete shall be 110 pounds per cubic foot
f. Aggregate
1. Normal weight in accordance with ASTM C33.
2. lightweight in accordance with ASTM C330.
g. Admixtures
1. Super plasticizers and water reducers are permitted.
2. Calcium chloride admixtures are not permitted
3. Water shall be clean potable and free of refuse.
h. Slump
1. Maximum slump prior to addition of water reducers or plasticizer shall be 4”.
Submittal shall include final slump to used on submittal package.
j. Special Inspection and Testing
1. All concrete placed shall be subject to special inspections and testing per IBC chapter 17, see special inspection section for additional information.
5.2 CONSTRUCTION
a. Formwork and shoring shall be at the discretion of the contractor. Contractor shall remove all forms and shoring after adequate strength has been obtained.
b. Do not allow penetration through any structural element unless specifically instructed to do so.
c. Mechanical vibrate concrete during placement.
d. Before placing concrete,see Electrical , Mechanical, Piping, and Architectural drawings for for addtional penetrations, embeds, sleeves floor drains, conduit blockouts,etc. that are note shwon on the structural drawings
E. Embedded items: Bolts, rebar, Welded wore fabrci and inserts shall be positively held in place before concrete placement. The contractor shall verify location and projection of equipment and anchorage with the apporved vendor submirred drawings. Slab reinforcement, including welded wire fabric shall be held up on chairs or spacer blocks.
F. Expansion joint material shall conform to ASTM D944 for bituminous impregnated fiberboard.
5.3 FOOTINGS
a. Center footing below wall or column, unless specifically instructed otherwise.
b. Footings shall be place below the effects of frost, UNO (exterior only)
c. Footings shall bear on properly prepared sub-surface, See Basis of Design.
d. Stagger footing cold joints from wall cold joints 48” min.
5.4 SLAB-ON-GRADE
a. Interior slab shall be 4” thick min. with 4” of free draining gravel below UNO.
b. Slab reinforcement shall be #4 bars at 24” O.C. each directions UNO.
5.5 WALL
a. Minimum wall reinforcing shall be as follow, (unless noted otherwise):
Wall Horizontal Vertical Thickness Reinforcing Reinforcing
(in) 6 #4 @ 12" o.c. #4 @ 18" o.c.
8 #5 @ 12" o.c. #4 @ 16" o.c.
10 #5 @ 12" o.c. #4 @ 12" o.c.
12 #5 @ 12" o.c. E.F #4 @ 12" o.c. EF
EF= Each Face o.c.=on center
6.0 REINFORCING STEEL
6.1 MATERIALS
a. Steel Reinforcing shall conform to ASTM 615 or ASTM A706 (weldable) and shall be grade 60 (fy=
60,000 psi) minimum unless noted otherwise.
6.2 CONSTRUCTION
a. Minimum cover requirements of steel deformed bar reinforcing shall comply with ACI 318 Table
20.6.1.3.2 – Specified concrete cover for cast-in-place non-prestressed concrete.
Concrete Member Reinforcement Specified Exposure Size Cover (in)
Cast against and permanently ALL All 3 in contact with Ground
Exposed to Weather or in All #6-#18 bars 2 Contact with Ground #5 and smaller 1-1/2
Not Exposed to Weather or in Slab, Joists #14-#18 bars 1-1/2 Contact with Ground & Walls #11 and smaller 3/4
Beams, Ties, Primary Reinforcement Column, stirrups, ties, spirals 1-1/2 Pedestals and hoops
b. Lap splices of reinforcement shall conform to the "TYPICAL REBAR DEVELOPMENT/LAP LENGTH SCHEDULE" unless note otherwise 125% of the spliced bars yield strength.
d. All reinforcing shall be bent cold. Do not heat reinforcing steel. Rebar may be bent one time only. Do not re-bend bars.
e. All reinforcing shall be securely held in place while placing concrete.
f. All reinforcing shall be marked such that identification can be made during final inspection.
g. Use of epoxy coated reinforcing requires additional lap length. Epoxy coated reinforcing should only be used when specifically noted, unless EOR in notified prior.
7.0 ANCHOR BOLTS
7.1 POST INSTALLED CONCRETE ANCHOR BOLTS
a. Anchor design for structural and nonstructural components shall be in accordance with
Chapter 17 of ACI 318-19.
b. Concrete anchors shall be approved for use in cracked concrete and have an approved ICC report UNO.
c. Post installed anchors shall be installed by qualified personnel and in accordance with the manufacturers printed installation instructions (MPII). Existing reinforcing bars shall not be damaged. Drilled holes striking rebar shall immediately be abandoned and patched. The hole shall be relocated or where not feasible contact EOR. Where anchors are installed in pre or post tensioned slabs the reinforcing strands shall be located via X-ray or similar scan.
Do not install anchor within 1-1/2" inches pre-stressing strand.
d. Subcontractor shall supply all equipment required for anchor bolt installation according to MPII. This includes but is not limited to drills, setting tools, clean out brushes, blow-out bulbs, oil free compressed air, vacuums, wrenches etc. as required for installation per manufacturer.
e. Anchors installed in exterior applications or exposed to the moisture shall be hot-dip galvanized per ASTM A153 or stainless steel of type 304/316 per ASTM A193,A320 and F593.
f. Nuts, washers, and other hardware used with an all-threaded bar adhesive anchor system or with a mechanical (expansion or screw) anchor shall have a material or an alloy designation that is compatible with the anchor rod/alloy. Galvanized assemblies shall be hot-dip galvanized in accordance with ASTM A153 Class C. Electroplate galvanizing is not acceptable. Dissimilar metal assemblies shall be separated by nylon, EPDM, or other approved non-metallic washers.
g. Concrete at time of adhesive anchor installation shall have a minimum age of 21 days. For installation of adhesive anchors in concrete having an age less than 21 days, tests shall be conducted to verify the performance of the product in accordance with ACI 355.4
h. Installation of adhesive anchors in orientations from horizontal to vertical to support sustained tension loads shall be performed by personnel certified by the ACI Adhesive Anchor Installer Certification program or equivalent. These anchors are designated with a (CERT) after the anchor callout.
Mechanical anchors shall be tested and assessed in accordance with the most recent edition of ACI
355.2 Qualification of Post Installed Mechanical Anchors in Concrete and Commentary. Acceptable mechanical anchors are as follows:
Screw anchor:
1. Kwik HUS-EZ (ESR 3027) by Hilti Corporation
2. Screw-Bolt + (ESR 3889) by DeWalt-Powers
3. Titen HD (ESR-1056) by Simpson Strong Tie Inc.
4. Alternate screw anchors may be used if an ESR-ICC approval report for use in
Cracked concrete is submitted to the EOR prior to use.
Wedge anchor:
1. Kwik Bolt TZ (ESR-1917) by Hilti Corporation
2. Powers-Stud + (ESR 2818) by DeWalt-Powers
3. Strong Bolt 2 (ESR-3037) by Simpson Strong Tie Inc.
4. Alternate…