Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf

PDF 18 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction - Salt Lake City VAMC Project 660-21-700
Solicitation number
36C77623B0041
Issued by

About this file

This document contains an 18MB file attachment and information on a related federal contract opportunity. The file attachment, labeled "Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf", is construction drawings for infrastructure upgrades at the Salt Lake City VA Medical Center.

The related solicitation, number 36C77623B0041, is for EHRM Infrastructure Upgrades Construction services at the Salt Lake City VAMC project site. It is an unrestricted opportunity issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, seeking construction services to upgrade infrastructure as depicted in the drawings. The response due date and award date are not provided.

View the file

Other files

File Type Posted
RESPONSE Attachment V5.1.docx DOCX document
Construction Wage Rates- Salt Lake County- 08-11-2023.pdf PDF
ADDENDUM No 01.pdf PDF
Bid opening call-in information.pdf PDF
RESPONSE Attachment V5.1 No. 30 Snippet.JPG JPG image
2017 AHERA 3-Year Reinspection v2.2 2017_1205_BT.xlsx XLSX spreadsheet
RESPONSE V10 - Technical Questions.docx DOCX document
RESPONSE Attachment V7.2.docx DOCX document
36C77623B0041 0004.pdf PDF
RESPONSE Attachment V2.1.docx DOCX document
RESPONSE Attachment V1.1.docx DOCX document
RESPONSE Attachment V7.1.docx DOCX document
RESPONSE Attachment V3.1.docx DOCX document
36C77623B0041 0003.pdf PDF
36C77623B0041 0003.pdf PDF
36C77623B0041 0002.pdf PDF
660-21-700 PreConstruction Site Visit Sing In Sheet 2023 07 14.pdf PDF
36C77623B0041 0001.pdf PDF
Attachment 13-Utah Tax Memo-EHRM-Salt Lake City.pdf PDF
Attachment 7-Part 6 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 12-Construction Wage Rates-Salt Lake County- 04-14-2023.pdf PDF
Attachment 14-Limitations on Subcontracting-EHRM-Salt Lake City.docx DOCX document
Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 15-Contractor Safety-Environmental-EHRM-S.L.C..docx DOCX document
Attachment 1-Specifications-(1 of 1)-EHRM-Salt Lake City.pdf PDF
Attachment 6-Part 5 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 3-Part 2 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 9-Part 8 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
36C77623B0041.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 11-Asbestos Site Survey-EHRM Salt Lake City.pdf PDF
Attachment 10-Part 9 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 4-Part 3 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 8-Part 7 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN UP

6B00B

6BA

6B00A

6B00

MECHANICAL

STAIR LEVEL

FIRE EQUIPMENT

MECHANICAL (EQUIPMENT)

DN

7B00B

7BA

7B00A

7B00

MECHANICAL (ELEVATOR EQUIPMT)

STAIR LEVEL

(LEASE - CELL EQPMT)

(PAGER EQUIPMENT)

MECHANICAL

MECHANICAL

SS-2

1-5-B-E-P2-7,9,11

W

SS-2

1-4-C-E-P1-7,9,11

SS-2

1-3-C-E-P2-7,9,11

21-5-B-E-P2-13

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:4

:5

A

M

01-EP160

OVERALL SIXTH & SEVENTH

LEVEL POWER PLANS

EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 01

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

1/16" = 1'-0"F1

OVERALL SIXTH LEVEL POWER PLAN

0' 8' 16' 32' 64'

GRAPHIC SCALE 1/16" = 1'-0"

4'

NORTH

1/16" = 1'-0"C6

OVERALL SEVENTH LEVEL POWER PLAN

GENERAL

SHEET NOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

SHEET

KEYNOTES

1 PROVIDE A SEPARATE 120 VOLT, 20 AMP, 1 PHASE

CIRCUIT AND WEATHER PROOF GFCI OUTLET

MOUNTED TO SIDE OF CONDENSING UNIT.

2 SPLIT CONDENSING UNIT LOCATED ON ROOF. SEE

MECHANICAL DRAWINGS FOR EXACT LOCATION.

Revisions: Date:

06/08/23

T T

ST

T

ST

T

ST

T

ST

T

S T

T

T

ST

T T

T

(PG4)

(PG4) (PG4)

(PG4)

"1-1-C-E-P2"

"1-1-C-C-P2"

1-1-C-C-P2-1,3,5

RACK-30

1-1-C-E-P2-1,3,5

RACK-30

TELECOMMUNICATIONS

ROOM

1E02-01

WAITING

AREA

1E02A-01

AC-2

1-1-C-E-P2-7,9

1-1-C-C-P2-7 1-1-C-E-P2-11

1-1-C-E-P2-15

1-1-C-E-P2-17

1-1-C-E-P2-13

(G-1)

(G-1)

(G-1)

(G-1)

(G-1)

(G-1)

1-1-C-N-P5

STORAGE

1C06-01

(PG4)

(PG4) (PG4)

(PG4)

1-G-A-E-P3-9,11,13

RACK-30

1-G-A-C-P5-1,3,5

RACK-30

"1-G-A-C-P5"

"1-G-A-E-P3"

1 1

AC-2

1-G-A-E-P3-4,6

1-G-A-E-P3-7 1-G-A-C-P5-7

1-G-A-E-P3-2

1-G-A-E-P3-1

1-G-A-E-P3-3

TELECOMMUNICATIONS

ROOM

GA16-01

(PG4) (PG4)

(PG4) (PG4)

1-G-C-E-P3-1,3,5

RACK-30

1-G-C-C-P2-1,3,5

RACK-30

"1-G-C-C-P2"

"1-G-C-E-P3"

1 1

AC-2

1-G-C-E-P3-7,9

61-G-C-E-P3-13 1-G-C-E-P3-15

1-G-C-C-P2-7

1-G-C-E-P3-11

1-G-C-E-P3-17

(DX-1)

(DX-1)

TELECOMMUNICATIONS

ROOM

GC01-01

(PG4)

(PG4)

(PG4)

1-1-A-E-P2-1,3,5

RACK-30

1-1-A-C-P7-1,3,5

RACK-30

"1-1-A-C-P7"

"1-1-A-E-P2"

AC-2

1-1-A-E-P2-7,9

1-1-A-E-P2-11

1-1-A-E-P2-15

1-1-A-E-P2-13

1-1-A-E-P2-17 1-1-A-C-P7-7

TELECOMMUNICATIONS

ROOM

1A15A-01

(PG4) (PG4)

(PG4)(PG4)

1-1-D-C-P2-1,3,5

RACK-30

1-1-D-E-P4-1,3,5

RACK-30

"1-1-D-E-P4"

"1-1-D-C-P2"

AC-2

1-1-D-E-P4-7,9

1-1-D-E-P4-11 1-1-D-E-P4-13

1-1-D-E-P4-17

1-1-D-C-P2-7

1-1-D-E-P4-15

7 7

TELECOMMUNICATIONS

ROOM

1D42B-01

(PG4)

(PG4) (PG4)

(PG4)

1-2-A-E-P1-1,3,5

RACK-30

1-2-A-C-P2-1,3,5

RACK-30

"1-2-A-E-P1"

"1-2-A-C-P2"

TELECOMMUNICATIONS

ROOM

2A11-01

WORKROOM

2A11A-01

AC-2

1-2-A-E-P1-15,17

1-2-A-C-P2-7

1-2-A-E-P1-19

1-2-A-E-P1-21

1-2-A-E-P1-23

1-2-A-E-P1-25

(G-4)

(G-4)

(G-4)

1-2-A-N-P2

1-2-A-N-P2

1-2-A-C-P1

1-2-A-C-P1

HAC

GC10B-01

SHOP

PLUMBING

GC10CA-01

"1-G-C-N-P2"

1-G-C-N-P2 1-G-C-N-P2

1-G-C-N-P2

1-G-C-N-P2

(G-4) (G-4)

(G-4) (G-4)

ENTRY

(UTILITIES)

GC10-01

RR RR

8 8

A A A

A

REF REF

4 4

UNISEX

2D04-01

WAITING

AREA

2D02-01

TOILET

PATIENT

2D24A-01

LOCKER/LOUNGE

2D02A-01

ELECTRICAL

2D03-01

ELECTRICAL

2D03-01

"1-2-D-N-P2"

1-2-D-N-P2

1-2-D-N-P21-2-D-N-P2

1-2-D-N-P2

1-2-D-N-P2

1-2-D-N-P2

(G-1)

(G-1) (G-1)

(G-4) (G-4) (G-4)

(G-4) (G-4)

(G-1)

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:4

:1

A

M

01-EP401

ENLARGED POWER PLANS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 01

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

1/4" = 1'-0"D5

ENLARGED TR 1E02-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"F7

ENLARGED TR GA16-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"D7

ENLARGED TR GC01-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"B7

ENLARGED TR 1A15A-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"B5

ENLARGED TR 1D42B-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"F5

ENLARGED TR 2A11-01 ELETRICAL PLAN

NORTH

1/4" = 1'-0"F1

ENLARGED C-WING HAC - GC10-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"D2

ENLARGED D-WING - LOUNGE & WAITING ROOM - 2D02A-01 ELECTRICAL PLAN

GENERAL

SHEET NOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

SHEET

KEYNOTES

1 PROVIDE AN OVERHEAD POWER DROP CORD WITH

A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK

RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))

COORDINATE INSTALLATION LOCATION WITH

TELECOMMUNICATIONS CONTRACTOR. SEE SHEET

EE002, EE501, AND PANEL SCHEDULE. PROVIDE

RACK MOUNTED POWER DIST. (2RU), RACK

MOUNTED UPS (6RU) AND PDU PER TELECOM

EQUIPMENT RACK ELEVATIONS ON ET500'S.

2 SECONDARY BONDING BUSBAR (SBB). SEE ET

SHEETS FOR PLACEMENT AND GROUNDING

DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY

DERIVED #3/0 GROUND FROM BUILDING GROUND

TO TR BUSBARS. CONTRACTOR TO VERIFY

BUSBAR9S RESISTANCE IS UNDER 4 OHMS

MEASURED BY THE FOUR POINT

FALL-OF-POTENTIAL METHOD PER IEEE 81.

3 PROVIDE A 100 AMP, THREE-PHASE, FOUR WIRE,

208 VOLT SERVICE PANEL. PANEL SHALL BE

EQUIPPED WITH A POWER METER.

4 PROVIDE GFCI CIRCUIT BREAKER IN PANEL

SERVING REFRIGERATOR.

5 LIGHTING CONTROL AND POWER TO BE

CONNECTED TO EXISTING LIGHT CIRCUIT FOR THE

SPACE.

6 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.

THERMAL SWITCH TO BE MOUNTED ON SIDE OF

UNIT.

7 PROVIDE AN OVERHEAD CEILING MOUNTED 60 AMP

208 VOLT THREE-PHASE CIRCUIT. COORDINATE

INSTALLATION LOCATION WITH

TELECOMMUNICATIONS CONTRACTOR. SEE

ELECTRICAL FIXTURE SCHEDULE AND PANEL

SCHEDULE FOR DETAILED INFORMATION.

8 LOW VOLTAGE HVAC CONTROL BOXES

TO BE REMOVED AND RELOCATED AS SHOWN ON

DRAWINGS. RE-CIRCUIT LOW VOLTAGE CIRCUITS

AS NECESSARY TO RELOCATE THE HVAC CONTROL

BOX. COORDINATE WITH VA MAINTENANCE

STAFF.

9 EXTEND EXISTING POWER RECEPTACLES 5 INCHES

TO NEW FURRED OUT WALL.

10 PROVIDE A 13U WALL MOUNTED RACK

ENCLOSURE. RELOCATE PAMNS SYSTEM INTO NEW

ENCLOSURE FROM OTHER SIDE OF WALL.

COORDINATE LOCATION AND TRANSFER WITH VA

BIOMED, AND CRITICAL CARE UNIT AS TO NOT

DISRUPT ANY PATIENT CARE.

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/4" = 1'-0"

1'

T

T

ST

T

ST

ST

CHASE

CHASE

HASE

T

ST

T

ST

T

T

ST

ST

ST

T

T

T

T

T

"1-5-B-E-P2"

"1-5-B-C-P2"

1-5-B-C-P2-1,3,5

RACK-30

1-5-B-E-P2-1,3,5

RACK-30

(PG4)

(PG4)(PG4)

(PG4)

WRKRM

(HBHC

STAFF)

5B08-01

AC-2

1-5-B-E-P2-15,17

1-5-B-C-P2-7

1-5-B-E-P2-19

1-5-B-E-P2-21

1-5-B-E-P2-25

1-5-B-E-P2-23

1-5-B-N-P4

(G-1)

(G-1)(G-1)

(G-1)

TELECOMMUNICATIONS

ROOM

5B08A-01

(PG4)

(PG4) (PG4)

(PG4)

"1-4-C-E-P1"

"1-4-C-C-P1"

1-4-C-C-P1-1,3,5

RACK-30

1-4-C-E-P1-1,3,5

RACK-30

AC-2

1-4-C-E-P1-13,15

1-4-C-E-P1-17

1-4-C-E-P1-21

1-4-C-E-P1-23

1-4-C-C-P1-7

1-4-C-E-P1-19

TELECOMMUNICATIONS

ROOM

4C08-01

(PG4) (PG4)

(PG4)(PG4)

1-4-A-C-P2-1,3,5

RACK-30

1-4-A-E-P1-1,3,5

RACK-30

"1-4-A-C-P2"

"1-4-A-E-P1"

AC-2

1-4-A-E-P1-15,17

1-4-A-C-P2-7

1-4-A-E-P1-19

1-4-A-E-P1-21

1-4-A-E-P1-23

-4

-A -E

-P -2

(DX-1) (DX-1)

(G-4)

(G-4)

1-4-A-C-P1

+48"

+48"

1-4-A-C-P1

1-4-A-N-P2

1-4-A-N-P2

VITALS

ROOM

4A11B-01ALCOVE

4A11-01

TELECOMMUNICATIONS

ROOM

4A11A-01

1-3-C-C-P2-1,3,5

RACK-30

1-3-C-E-P2-1,3,5

RACK-30

(PG4)

(PG4)

(PG4)(PG4)"1-3-C-E-P2"

"1-3-C-C-P2"

AC-2

1-3-C-E-P2-13,15

1-3-C-C-P2-7

1-3-C-E-P2-17

1-3-C-E-P2-19

1-3-C-E-P2-21

1-3-C-E-P2-23

(G-4)

(G-4)

(G-2)

(G-4)

(G-4)

(G-2)

6 6

PROCEDURE

3C06-01

PROCEDURE

3C08-01

TECHNOLOGY

ROOM

3C08A-01

(PG4)

(PG4)

1-3-A-C-P2-1,3,5

RACK-30

1-3-A-E-P1-1,3,5

RACK-30

"1-3-A-C-P2"

"1-3-A-E-P1"

1 1

CLEAN

ROOM

3A11C-01

+48"

+48"

+48"

+48" +48"

+48"

+48"

+48"

+48"

AC-2

1-3-A-E-P1-13,15

1-3-A-C-P2-7

1-3-A-E-P1-17

1-3-A-E-P1-19

1-3-A-E-P1-21

1-3-A-E-P1-23

(G-4)

(G-4)

(DX-1) (DX-1)

6 1-3-A-C-P1

1-3-A-C-P1

1-3-A-C-P11-3-A-C-P1

TELECOMMUNICATIONS

ROOM

3A11B-01

ALCOVE

3A11A-01

(PG4) (PG4)

(PG4)

(PG4)

1-2-C-E-P2-1,3,5

RACK-30

1-2-C-C-P2-1,3,5

RACK-30

"1-2-C-C-P2"

"1-2-C-E-P2"

TELECOMMUNICATIONS

ROOM

2C08-01

LOCKERS

2C08A-01

AC-2

1-2-C-E-P2-7,9

1-2-C-E-P2-11

1-2-C-C-P2-7 1-2-C-E-P2-13

1-2-C-E-P2-15

1-2-C-E-P2-17

(G-4)

(G-4)

(G-4)

1-2-C-N-P1

"1-1-F-E-P1" "1-1-F-C2-P1"

AC-2

1-1-F-E-P1-7,9

5 5

RACK-20

1-1-F-C2-P1

RACK-20

1-1-F-E-P1

TELE/DATA

1F33G-01

AC-2

1-2-F-E-P1-1,3

2 RACK-20

1-2-F-C2-P1

RACK-20

1-2-F-E-P1

(G-4)

(G-4)

1-4-A-N-P2

1-4-A-N-P2

(G-2)

EXAM

ROOM

4A12-01

DF 7

(G-4) (G-4)

(G-4)(G-4)

1-4-A-N-P2

1-4-A-N-P2

WAITING

ROOM

4A07-01

+48" A

A

UC/REF

(G-1) (G-1)

A

1-4-A-C-P1

1-4-A-C-P1

1-4-A-C-P1

1-4-A-N-P21-4-A-N-P2

A +48"

MED. ROOM

4A05A-01

TEAM

ROOM

3A20-01

1-3-A-C-P1

1-3-A-N-P3

1-3-A-C-P1 1-3-A-N-P3

(G-4)(G-4)

(G-4) (G-4)

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:4

:4

A

M

01-EP402

ENLARGED POWER PLANS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 01

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

GENERAL

SHEET NOTES

1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.

2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,

GEAR, CABLE, CONDUCTORS, TERMINATIONS,

OVERCURRENT PROTECTION DEVICES, AND HEAD

END EQUIPMENT AS PART OF THIS PROJECT.

3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE

VOLTAGE AS PART OF THIS PROJECT. PROVIDE

LINE VOLTAGE REQUIRED TO ALL SYSTEMS

PROVIDED AS PART OF THIS PROJECT.

COORDINATE WITH ALL OTHER DISCIPLINES AND

DRAWINGS.

4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,

FLOORS, AND CEILING UNLESS OTHERWISE

NOTED. INSTANCES WHERE EXPOSED OR

SURFACE MOUNTED RACEWAYS IS REQUIRED A

ROUTING SKETCH SHALL BE PROVIDED TO

ARCHITECT AND ENGINEER. RACEWAY TYPE

SHALL BE SELECTED BY ENGINEER. FINISH OF

RACEWAY SHALL BE SELECTED BY ARCHITECT.

5 PROVIDE A NEW DEVICE AND TRIM PLATE IN

EXISTING DEVICE LOCATION. THE DEVICE SHALL

MATCH EXISTING TYPE OR AS SHOWN WHICHEVER

IS MORE STRINGENT. PROVIDE NEW RACEWAYS

AND CONDUCTORS ONLY AS REQUIRED.

6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING

PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY

PANELBOARD TYPE AND BREAKER TYPE.

7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN

IS APPROXIMATE. COORDINATE EXACT LOCATIONS

OF MECHANICAL EQUIPMENT WITH MECHANICAL

DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.

SHEET

KEYNOTES

NORTH

1/4" = 1'-0"F5

ENLARGED TR 5B08A-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"D5

ENLARGED TR 4C08-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"B5

ENLARGED TR 4A11A-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"F7

ENLARGED TR 3C08A-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"D7

ENLARGED TR 3A11B-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"B7

ENLARGED TR 2C08-01 ELECTRICAL PLAN

1 PROVIDE AN OVERHEAD POWER DROP CORD WITH

A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK

RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))

COORDINATE INSTALLATION LOCATION WITH

TELECOMMUNICATIONS CONTRACTOR. SEE SHEET

EE002, EE501, AND PANEL SCHEDULE. PROVIDE

RACK MOUNTED POWER DIST. (2RU), RACK

MOUNTED UPS (6RU) AND PDU PER TELECOM

EQUIPMENT RACK ELEVATIONS ON ET500'S.

2 SECONDARY BONDING BUSBAR (SBB). SEE ET

SHEETS FOR PLACEMENT AND GROUNDING

DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY

DERIVED #3/0 GROUND FROM BUILDING GROUND

TO TR BUSBARS. CONTRACTOR TO VERIFY

BUSBAR9S RESISTANCE IS UNDER 4 OHMS

MEASURED BY THE FOUR POINT

FALL-OF-POTENTIAL METHOD PER IEEE 81.

3 PROVIDE A 100 AMP, THREE-PHASE, FOUR WIRE,

208 VOLT SERVICE PANEL. PANEL SHALL BE

EQUIPPED WITH A POWER METER.

4 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.

THERMAL SWITCH TO BE MOUNTED ON SIDE OF

UNIT.

5 PROVIDE AN OVERHEAD POWER DROP CORD WITH

A 20 AMP 208 VOLT THREE-PHASE TWISTED LOCK

RECEPTACLE (L21-20R); 8.5 FT AFF (WYE(5-WIRE))

COORDINATE INSTALLATION LOCATION WITH

TELECOMMUNICATIONS CONTRACTOR. SEE SHEET

EE002, EE501, AND PANEL SCHEDULE. PROVIDE

TWO UPS (6RU) AND TWO PDU (0RU) FOR EVERY

TWO RACK-20 (ONE RACK TR). EXISTING RACK TO

REMAIN. CONTRACTOR TO COORDINATE

INSTALLATION OF NEW PDU AND UPS ON EXISTING

RACK CONFIGURATION.

6 LIGHTING CONTROL AND POWER TO BE

CONNECTED TO EXISTING LIGHT CIRCUIT FOR THE

SPACE.

7 PROVIDE GFCI CIRCUIT BREAKER IN PANEL

SERVING DRINKING FOUNTAIN.

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/4" = 1'-0"

1'

NORTH

1/4" = 1'-0"F3

ENLARGED TR ROOM 1F33G-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"F1

ENLARGED TR ROOM 2F55-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"D3

ENLARGED EXAM ROOM - 4A10CA-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"B1

ENLARGED WAITING ROOM - 4A07-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"B3

ENLARGED MED ROOM 4A05A-01 ELECTRICAL PLAN

NORTH

1/4" = 1'-0"D1

ENLARGED TEAM ROOM 3A20-01 ELECTRICAL PLAN

(PARTIAL) CRITICAL SWITCHBOARD

"1-G-A-C-D1" SECTION 1 208/120V 3Ø,

4W 800A "E2" (EXISTING)

(PARTIAL) CRITICAL SWITCHBOARD

"1-G-A-C-D1" SECTION 1 208/120V 3Ø,

4W 800A "E2" (EXISTING)

225/3

"1 -1

-D -C

-P

"1C1G1"

(PARTIAL) EMERGENCY

SWITCHBOARD "1-G-A-E-D1" SECTION

1 208/120V 3Ø, 4W 1600A "E1"

(EXISTING)

(PARTIAL) EMERGENCY

SWITCHBOARD "1-G-A-E-D1" SECTION

1 208/120V 3Ø, 4W 1600A "E1"

(EXISTING)

"1 -1

-D -E

-P

"1E1G1"

225/3

(EXISTING) (EXISTING)

250/3250/3

100/3

"1-G-A-E-P3"

100/3

"1-1-A-E-P2"

100/3

"1-2-A-E-P1"

100/3

"1-3-A-E-P1"

100/3

"1-4-A-E-P1"

250/3250/3

100/3

"1-G-C-E-P3"

100/3

"1-1-C-E-P2"

100/3

"1-2-C-E-P2"

100/3

"1-3-C-E-P2"

100/3

"1-4-C-E-P1"

100/3

"1-5-B-E-P2"

100/3

100/3

"1-1-D-E-P4"

250/3 250/3

100/3

"1-G-A-C-P5"

100/3

"1-1-A-C-P7"

100/3

"1-2-A-C-P2"

100/3

"1-3-A-C-P2"

100/3

"1-4-A-C-P2"

250/3 250/3

100/3

"1-G-C-C-P2"

100/3

"1-1-C-C-P2"

100/3

"1-2-C-C-P2"

100/3

"1-3-C-C-P2"

100/3

"1-4-C-C-P1"

100/3

"1-5-B-C-P2"

100/3

100/3

"1-1-D-C-P2"

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FOURTH FLOOR

FIFTH FLOOR

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FOURTH FLOOR

FIFTH FLOOR

FIRST FLOOR

F7

POWER RISER ONE-LINE DIAGRAM - BUILDING #01 - AREA "A"

F4

POWER RISER ONE-LINE DIAGRAM - BUILDING #01 - AREAS "B" &"C"

C7

POWER RISER ONE-LINE DIAGRAM - BUILDING #01 - AREA "D"

NO SCALENO SCALE

NO SCALE

ELECTRICAL

GA01

ELECTRICAL

GA01

TR

4A11A-1

TR

3A11B-1

TR

2A11-1

TR

1A15A-1

TR

GA16-1

ELECTRICAL

GA01

ELECTRICAL

GA01

TR

4C08-1

TR

3C08A-1

TR

2C08-1

TR

1E02-1

TR

GC01-1

TR

5B08A-1

ELECTRICAL

1D36

TR

1D42B-1

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:4

:5

A

M

01-EP601

PARTIAL ONE-LINE DIAGRAMS EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 01

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

GENERAL

SHEET NOTES

1 PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT

LOCATED OUTDOORS. REFER TO PLANS FOR

EQUIPMENT LOCATIONS.

2 REFER TO PLANS FOR CONSTRAINTS ON PHYSICAL

DIMENSIONS AND CLEARANCE REQUIREMENTS OF

EQUIPMENT. PROVIDE EQUIPMENT DIMENSIONS

THAT FALL WITHIN THE CONSTRAINTS OF EACH

SPECIFIC LOCATION.

3 ALL EQUIPMENT SHALL BE CONSTRUCTED AND

BRACED FOR THE SEISMIC CONDITIONS OF THE

PROJECT. REFER TO ELECTRICAL SPECIFICATIONS

FOR REQUIREMENTS.

4 PROVIDE PERFORMANCE TESTING FOR

GROUND-FAULT PROTECTION SYSTEMS ON SITE

WITH A WRITTEN RECORD OF THIS TEST SUBMITTED

TO THE AUTHORITY HAVING JURISDICTION PER NEC

230.95(C).

SYM AMP

HH

AMPS

CONDUIT

SIZE

CONDUCTOR (NOTE 1)

IG/HH SE NOTESQTY SIZE G

1 20 - .75 2 12 12 12 8 2

2 20 - .75 3 12 12 12 8 2,3

3 20 24 .75 4 12 12 12 8 2,3

4 30 - .75 2 10 10 10 8 2

5 30 - .75 3 10 10 10 8 2

6 30 32 .75 4 10 10 10 8 2

7 40 - 1 2 8 10 8 6 2

8 40 - 1 3 8 10 8 6 2

9 40 44 1 4 8 10 8 6 2

10 55 - 1 2 6 10 8 4 2

11 55 - 1 3 6 10 8 4 2

12 55 60 1.25 4 6 10 8 4 2

13 70 - 1 2 4 8 4 2 2

14 70 - 1.25 3 4 8 4 2 2

15 70 76 1.25 4 4 8 4 2 2

16 85 - 1.25 2 3 8 3 2 2

17 85 - 1.25 3 3 8 3 2 2

18 85 92 1.25 4 3 8 3 2 2

19 95 - 1.25 3 2 8 2 2 2

20 95 104 1.50 4 2 8 2 2 2

21 130 - 1.50 3 1 6 2 2 2

22 130 116 1.50 4 1 6 2 2 2

23 150 - 2 3 1/0 6 2 1/0 2

24 150 136 2 4 1/0 6 2 1/0 2

25 175 - 2 3 2/0 6 2 2/0 2

26 175 156 2 4 2/0 6 2 2/0 2

27 200 - 2 3 3/0 6 2 2/0 2

28 200 180 2.50 4 3/0 6 2 2/0 2

29 230 - 2.50 3 4/0 4 2 2/0 2

30 230 208 2.50 4 4/0 4 2 2/0 2

31 255 - 2.50 3 250 4 1 2/0 2

32 255 232 2.50 4 250 4 1 2/0 2

33 310 - 3 3 350 3 1/0 3/0 2

34 310 280 3 4 350 3 1/0 3/0 2

35 380 - 3.50 3 500 3 3/0 3/0 2

36 380 344 4 4 500 3 3/0 3/0 2

37 400 - 2 EA 2 3 3/0 3 3/0 3/0 2

38 400 360 2 EA 2.50 4 3/0 3 3/0 3/0 2

39 510 - 2 EA 2.50 3 250 1 4/0 3/0 2

40 510 464 2 EA 3 4 250 1 4/0 3/0 2

41 620 - 2 EA 3 3 350 1/0 4/0 3/0 2,4

42 620 560 2 EA 3 4 350 1/0 4/0 3/0 2,4

43 760 - 2 EA 3.50 3 500 1/0 4/0 3/0 2,4

44 760 688 2 EA 4 4 500 1/0 4/0 3/0 2,4

45 855 - 3 EA 3 3 300 2/0 4/0 3/0 2,4

46 855 768 3 EA 3 4 300 2/0 4/0 3/0 2,4

47 1000 - 3 EA 3.50 3 400 2/0 4/0 3/0 4

48 1000 912 3 EA 3.50 4 400 2/0 4/0 3/0 4

49 1140 - 3 EA 4 3 500 3/0 4/0 3/0 4

50 1140 1032 3 EA 4 4 500 3/0 4/0 3/0 4

51 1240 - 4 EA 3 3 350 3/0 4/0 3/0 4

52 1240 1120 4 EA 3 4 350 3/0 4/0 3/0 4

53 1675 1520 5 EA 4 4 400 4/0 4/0 4/0 4

54 2010 1824 6 EA 4 4 400 250 250 250 4

55 2660 2408 7 EA 4 4 500 350 350 350 4

56 3040 2752 8 EA 4 4 500 500 500 500 4

57 4180 3784 11 EA 4 4 500 500 500 500 4

58 - - 5 EA 4 - - - - - 6

59 - - 5 - - - - - 6

60 - - 10 EA 4 - - - - - 6

IG

(E.G.)

COPPER CONDUCTOR AND

CONDUIT SCHEDULE

SUBSCRIPT (NOTE 5)

SCHEDULE NUMBER

1. CONDUCTORS SHOWN ARE SHOWN FOR EACH CONDUIT WITH MODIFICATIONS

AS NOTED IN NOTE 5. ALL CONDUCTORS SHOWN ARE THWN UNLESS

OTHERWISE NOTED.

2. PROVIDE EQUIPMENT GROUND CONDUCTORS PER TABLE 250-122 WHEN

CIRCUIT BREAKERS ARE SIZED GREATER THAN AMPERE RATING SHOWN IN

TABLE.

3. PROVIDE #10 NEUTRALS FOR MULTIWIRE BRANCH CIRCUITS SERVING

COMPUTERS.

4. GROUND (G) CONDUCTOR MAY BE DELETED ON SERVICE ENTRANCE

CONDUCTORS.

5. SYMBOL SUBSCRIPTS:

"2N": INCLUDE TWO NEUTRAL CONDUCTORS SIZED AS SCHEDULED FOR

PHASE AND NEUTRAL CONDUCTORS WHERE THE CONDUCTOR IS #1/0

OR LARGER. INCLUDE A SINGLE 200% RATED CONDUCTOR THAT IS

TWICE THE AMPACITY OF THE SCHEDULED PHASE AND NEUTRAL

CONDUCTOR WHERE THE CONDCUTOR IS BELOW #1/0 IN SIZE.

"CI": PROVIDE CIRCUIT INTEGRITY CABLE; TYPE TWO-HOUR FIRE

RESISTIVE CABLES IN CONDUIT OR PROVIDE FEEDER ENCASED IN

CONCRETE.

"FG" FULL SIZE GROUND, SIZE EQUIPMENT GROUNDING CONDUCTOR TO

BE SAME SIZE AS THE PHASE CONDUCTORS.

"HH": NEUTRAL CURRENTS EXIST DUE TO HIGH HARMONIC "NONLINEAR"

LOADS. CURRENT CARRYING CONDUCTORS DERATED

ACCORDINGLY. PROVIDE THE IG/HH SIZE FOR THE EQUIPMENT

GROUNDING CONDUCTOR.

"IG": INCLUDE IG (INSULATED/ISOLATED GROUND CONDUCTOR)

SCHEDULED ALONG WITH THE GROUND OF EQUIPMENT GROUND

CONDUCTOR.

"MC": PROVIDE FEEDER IN METAL-CLAD CABLE; TYPE MC IN PLACE OF

SINGLE CONDUCTORS IN CONDUIT.

"SE": SUBSTITUTE "SE" CONDUCTOR FOR "G" CONDUCTOR SHOWN, WHICH

IS SIZED FOR THE GROUNDING OF THE SECONDARY OF THE

SEPARATELY DERIVED SYSTEM.

"SER": PROVIDE SERVICE-ENTRANCE CABLE; TYPE SE OR SER IN PLACE OF

SINGLE CONDUCTORS IN CONDUIT.

CONDUCTOR AND CONDUIT SCHEDULE NOTES

EQUIPMENT NAMEPLATE

SCHEDULE

EQUIPMENT ID SCHEME

LABEL FORMAT [NAME]

[SYSTEM]

[VOLTAGE]

[FED FROM]

[SOURCE(S)]

LABEL EXAMPLE PANEL "14-4-A-C-P1"

STANDBY POWER

120/208V

FED FROM

BUS-A / XFMR 4TA

BUSWAY

OTHER

COLOR SCHEME

SYSTEM EQUIPMENT

NORMAL POWER ALL GEAR NOT INCLUDED BELOW

TEXT BACKGROUND

NAMEPLATE COLOR

STANDBY POWER

EMERGENCY POWER

LEGALLY-REQUIRED

STANDBY POWER

UPS "A" POWER

UPS "B" POWER

LABEL BUSWAY EVERY 6' WHERE EXPOSED TO VIEW AND

EVERY 15' WHERE NOT EXPOSED TO VIEW

WHITE

WHITE

WHITE

RED

WHITE

BLACK

BLACK

ORANGE

RED

WHITE

BLUE

YELLOW

MDPS1 AND ALL DOWNSTREAM

GEAR, EXCEPT UPS GEAR AS

NOTED

GDP1, GDP2, ATS-E AND ALL

DOWNSTREAM GEAR

ATS-S AND ALL DOWNSTREAM

GEAR

UPSA AND ALL DOWNSTREAM

GEAR

UPSB AND ALL DOWNSTREAM

GEAR

FIRST DIGIT - BUILDING NUMBER (1, 2, 3, ETC)

SECOND DIGIT - BUILDING LEVEL (0, 1, 2, ETC)

THIRD DIGIT - BUILDING AREA (A, B, C, ETC)

FOURTH DIGIT - ELECTRICAL SYSTEM TYPE

N - NORMAL

C- CRITICAL (C, C1, C2, ETC)

L - LIFE SAFETY

E - EMERGENCY

FIFTH DIGIT - EQUIPMENT TYPE

S - SWITCHGEAR

D - DISTRIBUTION PANEL

TR - TRANSFORMER

P - BRANCH PANEL

ATS - AUTOMATIC TRANSFER SWITCH

SIXTH DIGIT SEQUENCE # (1,2,3,...)

CIRCUIT

AMPACITY/VOLTAGE

CIRCUIT

LENGTH

CONDUCTOR SIZE

(PHASE, NEUTRAL AND GR) CONDUIT SIZE

20A/120V 0' - 60' #12 AWG 0.75" Ø

20A/120V 60' - 95' #10 AWG 0.75" Ø

20A/120V 95' - 150' #8 AWG 1" Ø

20A/120V 150' - 240' #6 AWG 1.25" Ø

20A/277V 0' - 140' #12 AWG 0.75" Ø

20A/277V 140' - 220' #10 AWG 0.75" Ø

20A/277V 220' - 350' #8 AWG 1" Ø

20A/277V 350' - 550' #6 AWG 1.25" Ø

NOTES:

1. WIRE SIZING IS BASED ON COPPER CONDUCTORS SUPPLYING A 20A,

120V CIRCUIT AT THE INDICATED VOLTAGE, ASSUMED TO BE 80%

LOADED (16A), WITH MAXIMUM VOLTAGE DROP OF 3% AT THE LOAD.

2. DOWN-SIZED WIRE AT DEVICE/LOAD AS REQUIRED AND TERMINATE

CONDUCTORS IN A SAFE AND CODE COMPLIANT MANNER.

3. CONDUIT SIZE IS BASED ON A MAXIMUM OF 3 CIRCUITS PER CONDUIT,

EACH WITH A SEPARATE NEUTRAL CONDUCTOR.

BRANCH CIRCUIT CONDUCTOR

AND CONDUIT SIZING TABLE

6. RACEWAY ONLY. CONDUCTORS PROVIDED BY UTILITY.

SYM

GROUNDING SCHEDULE

ALL CONDUCTORS ARE INSULATED UNLESS

INDICATED OTHERWISE

#500 KCMIL CU

#350 KCMIL CU

#250 KCMIL CU

#4/0 CU

#1/0 CU

#4 CU

#6 CU

12"X2"X1/4" COPPER BUS WITH

PRE-DRILLED HOLES MOUNTED ON

INSULATORS IN MAIN ELECTRICAL ROOM

GROUNDING CONDUCTOR PER POWER

ONE-LINE DIAGRAM

12"X2"X1/4" COPPER BUS WITH

PRE-DRILLED HOLES MOUNTED ON

INSULATORS IN ELECTRICAL & TELECOMM.

CLOSETS

SIZE

GROUND FLOOR

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

G1

G2

G3

G4

G5

G6

G7

G8

G9

G10

TR

GA16-1

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

TR

1A15A-1

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

TR

2A11-1

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

TR

3A11B-1

G4

TR

4A11A-1

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

EXISTING BUILDING MAIN

GROUNDING BUSBAR

G4

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

ELECTRICAL

1D36

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

TR

1D42B-1

G4

THIRD FLOOR

SECOND FLOOR

FOURTH FLOOR

FIRST FLOOR

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

FIFTH FLOOR

G4

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

G4

TR

GC01-1

TR

1E02-1

TR

2C08-1

TR

3A11B-1

TR

4A11A-1

SIXTH, SEVENTH, & ROOF

ROOF

G4

G1G1

G1

TO EQUIPMENT

RACKS (TYP)

TO LADDER

RACK (TYP)

BOND TO ELEC

PANEL GR BUSES

G8

TR

4A11A-1

MAIN ELECTRICAL ROOM

GA01-1

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:4

:0

A

M

01-EP602

GROUNDING RISER DIAGRAM EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 01

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

SCALE: NTSF1

GROUNDING RISER DIAGRAM

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:4

:1

A

M

01-EP603

LIGHTING FIXTURE SCHEDULE EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 01

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

ID DESCRIPTION

NOMINAL SIZE

M O

U N

T

IN

G

T Y

P E

C O

L O

R T

E M

P

C R

I

D R

IV

E

R C

O N

F

IG

U R

A T

IO

N

V O

L T

A G

E

W A

T T

S

F

IN

IS

H

F

IX

T U

R E

L U

M E

N S

D

IF

F U

S E

R /L

E N

S

R E

F L

E C

T O

R

O P

T

IO

N S

N O

T E

S

MANUFACTURER (CATALOG SERIES)

L E

N G

T H

D E

P T

H

H E

IG

H

T

D

IA

M E

T E

R A

P E

R T

U R

E

OPTION 1 OPTION 2 OPTION 3

(DX-1) 6" ROUND, RECESSED LED DOWNLIGHT,

SEMI-SPECULAR REFLECTOR, WHITE TRIM FINISH

- - - 6" CR LED 3500K LED DRIVER

(0-10V DIMMING)

120/277 19 - 1500 - - - PORTFOLIO

(LD6B15D010/EU6

B10208035/6LBW2 H

HB26)

GOTHAM

(EVO-35/15-6AR-WD-LSS-

MVOLT-EZ10-TWR)

LITON

(CH618UE-D10/CR6L22S

W-T35)

(G-1) 2X2 LED FLAT PANEL, GRID LAY-IN 24" 24" 3" - CR LED 3500K LED DRIVER

(0-10V DIMMING)

120/277 41 - 3400 - - - METALUX (22FP4735C) APPROVED EQUAL APPROVED EQUAL

(G-2) 1X4 LED FLAT PANEL, GRID LAY-IN 48" 12" 3" - CR LED 3500K LED DRIVER

(0-10V DIMMING)

120/277 41 - 4000 - - - METALUX (14FP4235C) APPROVED EQUAL APPROVED EQUAL

(G-4) 2X4 LED FLAT PANEL, GRID LAY-IN 48" 24" 3" - CR LED 3500K LED DRIVER

(0-10V DIMMING)

120/277 41 - 4300 - - - METALUX (24FP4735C) APPROVED EQUAL APPROVED EQUAL

(PG4) STRIPLIGHT, GENERAL 48" 4" 4" - CP LED 4000K LED DRIVER

(0-10V DIMMING)

120/277 38 CBA 5000 - - - LITHONIA

(ZL1D-L48-5000LM-FST-M

VOLT-40K-80CRI-WH-HC3

6)

ILP (SS4) WILLIAMS (75R)

DIFFUSER/LENSFINISH PROVIDE UNIT PRICES AND FIXTURE BRAND SELECTED FOR ADD/DELETE CHANGES

FOR EACH FIXTURE TYPES SHOWN WITHIN 48 BUSINESS HOURS OF THE BID DATE.

FAILURE TO COMPLY WITH THIS REQUIREMENT MAY DISQUALIFY THE PRODUCTS

AND EMPOWER THE ENGINEER TO DETERMINE FAIR VALUE FOR FIXTURE AND

INSTALLATION CHANGES, WITHOUT FURTHER INPUT FROM THE CONTRACTOR OR

INSTALLER.

CONTRACTOR ALLOWANCE PRICES ARE ACCURATE WHEN THIS JOB WAS

SPECIFIED, CONTRACTOR AND ELECTRICAL DISTRIBUTOR SHALL VERIFY THIS

ALLOWANCE AND REPORT ANY PROBLEMS TO THE ENGINEER BEFORE THE BID.

ALLOWANCE PRICE MAY OR MAY NOT INCLUDE LAMP(S) OR FREIGHT AS NOTED,

AND DO NOT INCLUDE ANY TAXES.

SUBSTITUTIONS AND/OR EQUAL FIXTURES MUST RECEIVE APPROVAL PRIOR TO

BIDDING, THEY MUST BE SUBMITTED TO THE ENGINEER NO LESS THAN 2 WEEKS

PRIOR TO BID OPENING.

SAMPLES MUST BE PROVIDED FOR ANY AND ALL FIXTURES UPON A/E REQUEST

PRIOR TO RELEASING FIXTURES.

ALL FIXTURES SHALL BE LISTED AND APPROVED FOR THEIR INTENDED USE AND

LOCATION.

VERIFY THE PROPER MOUNTING KITS OR ACCESSORIES TO FACILITATE

INSTALLATION AS SHOWN AT EACH LOCATION ON THE DRAWINGS.

COMPLY WITH THE "INTERIOR LIGHTING" SECTION OF THE SPECIFICATIONS.

REFER TO SPECIFICATIONS FOR IMPORTANT TECHNICAL REQUIREMENTS FOR

LIGHTING FIXTURES, DRIVERS, AND LAMPS.

ALL LIGHT FIXTURES TO BE EITHER "DLC" OR "LIGHTING FACTS" LISTED OR TO BE

APPROVED BY ARCHITECT/ENGINEER AND OWNER.

LUMINAIRE OPTIONSMOUNTING REFLECTOR 1.

2.

3.

4.

5.

6.

7.

8.

9.

DIAMETER

H E

IG

H

T

LENGTH DEPTH

H E

IG

H

T

LENGTH

DEPTH

HEIGHT

NOTES

INTERIOR LIGHTING FIXTURE SCHEDULE

ABBREVIATIONS GENERAL NOTES

ARHR - AIR RETURN AND HEAT REJECTION

DL - DAMP LOCATION

EQC - EARTHQUAKE CLIPS

F - FUSING

HLD - HINGED AND LATCHED DOOR

HS - HOUSE SIDE SHIELD

PS - PHOTOCELL SWITCH

QRS - QUARTZ RESTRIKE

ST - STATIC

WG - WIRE GUARD

WL - WET LOCATION

B - BASE

C - CEILING

F - FLANGE

G - GRID

P - PENDANT

PL POLE

R - RECESSED

S - SURFACE

W - WALL

MW - MATTE WHITE

BL - BLACK

SL - SILVER

GL - GOLD

CL - CLEAR

PW - PAINTED WHITE

EA - EXTRUDED ALUMINUM

S - STEEL

GS - GALVANIZED STEEL

C - CAST

CBA - COLOR BY ARCHITECT

SCBA - STANDARD COLOR BY

ARCHITECT

CCA - CUSTOM COLOR BY

ARCHITECT

FS

209D

- MEETS FEDERAL

STANDARD 209D

TP - THERMALLY

PROTECTED

FL - FLUSH

R - REGRESS

M - MITERED

OP - NONE/OPEN

SP - SPECULAR

SS - SEMI-SPECULAR

D - DIFFUSE (WHITE ENAMEL)

SC - SPECULAR (COLORED)

PR - PRISMATIC

FDR - FULL DEPTH REFLECTOR

DS - DIFFUSE (SEMI SPECULAR) SILVER

LI - LOW IRIDESCENT

IR - IRIDESCENT

SL - SILVER

GL - GOLD

CA - CLEAR ALZAK

#A - ACRYLIC #THICK

#OA - ACRYLIC #THICK (OPAL)

GC - GLASS (CLEAR)

GO - GLASS (OPAL)

GF - GLASS (FROSTED)

SGL - SOFT GLOW LENS

HPL - HIGH PERFORMANCE LENS

DO - DROP OPAL

CGL - CONVEX GLASS LENS

S - SATIN LENS

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /B ld g

E

L E

C .r v t

/8

/2

:4

:2

A

M

01-EP604

PANEL SCHEDULES EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

BUILDING 01

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 10.0 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28

LIGHTING & CONTINUOUS LOADS: 0.1 kVA @ 125% = 0.1 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28

TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 20 1 0.1 0.0 0.0 LIGHTING... 0.1 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-1-A-C-P7"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 18.6 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: 1.6 kVA @ 100% = 1.6 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 56

LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 20

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 53 53 51 AVERAGE CONNECTED AMPS PER PHASE = 52

TOTALS: CONNECTED kVA PER PHASE 6 6 6 CONNECTED TOTAL kVA = 19

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 30 3 0.0 5.6 0.0 PWR: SS-2 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 0.0 0.0 0.5 CO TELECOMMUNICATIONS... 0.5 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 15 2 0.0 1.7 0.0 PWR:AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-1-A-E-P2"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 10.0 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28

LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28

TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-G-A-C-P5"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 18.6 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: 1.4 kVA @ 100% = 1.4 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 56

LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 20

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 53 53 50 AVERAGE CONNECTED AMPS PER PHASE = 52

TOTALS: CONNECTED kVA PER PHASE 6 6 6 CONNECTED TOTAL kVA = 19

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 -- -- -- -- -- -- -- 3.3 1.9 -- -- -- -- -- -- -- 12

9 30 3 0.0 10.0 0.0 RACK POWER 3.3 1.9 -- -- -- -- -- -- -- 10

7 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 1.9 PWR: SS-2 0.0 5.6 0.0 3 30 8

5 0.8 -- -- -- -- -- -- -- 6

3 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 0.8 PWR: AC-2 TELECOMMUNICATIONS... 0.0 1.7 0.0 2 20 4

1 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 0.4 CO TELECOMMUNICATIONS ROOM... 0.4 0.0 0.0 1 20 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-G-A-E-P3"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 10.0 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28

LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28

TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-G-C-C-P2"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 12.1 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: 1.4 kVA @ 100% = 1.4 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 38

LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 14

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 38 38 34 AVERAGE CONNECTED AMPS PER PHASE = 36

TOTALS: CONNECTED kVA PER PHASE 5 5 4 CONNECTED TOTAL kVA = 13

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 15 2 0.0 1.7 0.0 PWR: AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-G-C-E-P3"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 10.0 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28

LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28

TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-1-C-C-P2"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 12.1 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: 1.4 kVA @ 100% = 1.4 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 38

LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 14

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 38 38 34 AVERAGE CONNECTED AMPS PER PHASE = 36

TOTALS: CONNECTED kVA PER PHASE 5 5 4 CONNECTED TOTAL kVA = 13

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 15 2 0.0 1.7 0.0 PWR:AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-1-C-E-P2"

BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI

ALL OTHER LOADS @ 100% : 10.0 kVA -

MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH

LARGEST MOTOR CALCULATED @ 125% PER NEC

RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28

LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10

NEC DIVERSIFIED LOAD CALCULATIONS

CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28

TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10

29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30

27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28

25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26

23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24

21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22

19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20

17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18

15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16

13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14

11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12

9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10

7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8

5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6

3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4

1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2

NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO

CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT

ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0

120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:

PANEL: "1-1-D-C-P2"