Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf
PDF 18 MB Posted
- Solicitation number
- 36C77623B0041
About this file
This document contains an 18MB file attachment and information on a related federal contract opportunity. The file attachment, labeled "Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf", is construction drawings for infrastructure upgrades at the Salt Lake City VA Medical Center.
The related solicitation, number 36C77623B0041, is for EHRM Infrastructure Upgrades Construction services at the Salt Lake City VAMC project site. It is an unrestricted opportunity issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, seeking construction services to upgrade infrastructure as depicted in the drawings. The response due date and award date are not provided.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN UP
6B00B
6BA
6B00A
6B00
MECHANICAL
STAIR LEVEL
FIRE EQUIPMENT
MECHANICAL (EQUIPMENT)
DN
7B00B
7BA
7B00A
7B00
MECHANICAL (ELEVATOR EQUIPMT)
STAIR LEVEL
(LEASE - CELL EQPMT)
(PAGER EQUIPMENT)
MECHANICAL
MECHANICAL
SS-2
1-5-B-E-P2-7,9,11
W
SS-2
1-4-C-E-P1-7,9,11
SS-2
1-3-C-E-P2-7,9,11
21-5-B-E-P2-13
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:4
:5
A
M
01-EP160
OVERALL SIXTH & SEVENTH
LEVEL POWER PLANS
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
NORTH
1/16" = 1'-0"F1
OVERALL SIXTH LEVEL POWER PLAN
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
NORTH
1/16" = 1'-0"C6
OVERALL SEVENTH LEVEL POWER PLAN
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
SHEET
KEYNOTES
1 PROVIDE A SEPARATE 120 VOLT, 20 AMP, 1 PHASE
CIRCUIT AND WEATHER PROOF GFCI OUTLET
MOUNTED TO SIDE OF CONDENSING UNIT.
2 SPLIT CONDENSING UNIT LOCATED ON ROOF. SEE
MECHANICAL DRAWINGS FOR EXACT LOCATION.
Revisions: Date:
06/08/23
T T
ST
T
ST
T
ST
T
ST
T
S T
T
T
ST
T T
T
(PG4)
(PG4) (PG4)
(PG4)
"1-1-C-E-P2"
"1-1-C-C-P2"
1-1-C-C-P2-1,3,5
RACK-30
1-1-C-E-P2-1,3,5
RACK-30
TELECOMMUNICATIONS
ROOM
1E02-01
WAITING
AREA
1E02A-01
AC-2
1-1-C-E-P2-7,9
1-1-C-C-P2-7 1-1-C-E-P2-11
1-1-C-E-P2-15
1-1-C-E-P2-17
1-1-C-E-P2-13
(G-1)
(G-1)
(G-1)
(G-1)
(G-1)
(G-1)
1-1-C-N-P5
STORAGE
1C06-01
(PG4)
(PG4) (PG4)
(PG4)
1-G-A-E-P3-9,11,13
RACK-30
1-G-A-C-P5-1,3,5
RACK-30
"1-G-A-C-P5"
"1-G-A-E-P3"
1 1
AC-2
1-G-A-E-P3-4,6
1-G-A-E-P3-7 1-G-A-C-P5-7
1-G-A-E-P3-2
1-G-A-E-P3-1
1-G-A-E-P3-3
TELECOMMUNICATIONS
ROOM
GA16-01
(PG4) (PG4)
(PG4) (PG4)
1-G-C-E-P3-1,3,5
RACK-30
1-G-C-C-P2-1,3,5
RACK-30
"1-G-C-C-P2"
"1-G-C-E-P3"
1 1
AC-2
1-G-C-E-P3-7,9
61-G-C-E-P3-13 1-G-C-E-P3-15
1-G-C-C-P2-7
1-G-C-E-P3-11
1-G-C-E-P3-17
(DX-1)
(DX-1)
TELECOMMUNICATIONS
ROOM
GC01-01
(PG4)
(PG4)
(PG4)
1-1-A-E-P2-1,3,5
RACK-30
1-1-A-C-P7-1,3,5
RACK-30
"1-1-A-C-P7"
"1-1-A-E-P2"
AC-2
1-1-A-E-P2-7,9
1-1-A-E-P2-11
1-1-A-E-P2-15
1-1-A-E-P2-13
1-1-A-E-P2-17 1-1-A-C-P7-7
TELECOMMUNICATIONS
ROOM
1A15A-01
(PG4) (PG4)
(PG4)(PG4)
1-1-D-C-P2-1,3,5
RACK-30
1-1-D-E-P4-1,3,5
RACK-30
"1-1-D-E-P4"
"1-1-D-C-P2"
AC-2
1-1-D-E-P4-7,9
1-1-D-E-P4-11 1-1-D-E-P4-13
1-1-D-E-P4-17
1-1-D-C-P2-7
1-1-D-E-P4-15
7 7
TELECOMMUNICATIONS
ROOM
1D42B-01
(PG4)
(PG4) (PG4)
(PG4)
1-2-A-E-P1-1,3,5
RACK-30
1-2-A-C-P2-1,3,5
RACK-30
"1-2-A-E-P1"
"1-2-A-C-P2"
TELECOMMUNICATIONS
ROOM
2A11-01
WORKROOM
2A11A-01
AC-2
1-2-A-E-P1-15,17
1-2-A-C-P2-7
1-2-A-E-P1-19
1-2-A-E-P1-21
1-2-A-E-P1-23
1-2-A-E-P1-25
(G-4)
(G-4)
(G-4)
1-2-A-N-P2
1-2-A-N-P2
1-2-A-C-P1
1-2-A-C-P1
HAC
GC10B-01
SHOP
PLUMBING
GC10CA-01
"1-G-C-N-P2"
1-G-C-N-P2 1-G-C-N-P2
1-G-C-N-P2
1-G-C-N-P2
(G-4) (G-4)
(G-4) (G-4)
ENTRY
(UTILITIES)
GC10-01
RR RR
8 8
A A A
A
REF REF
4 4
UNISEX
2D04-01
WAITING
AREA
2D02-01
TOILET
PATIENT
2D24A-01
LOCKER/LOUNGE
2D02A-01
ELECTRICAL
2D03-01
ELECTRICAL
2D03-01
"1-2-D-N-P2"
1-2-D-N-P2
1-2-D-N-P21-2-D-N-P2
1-2-D-N-P2
1-2-D-N-P2
1-2-D-N-P2
(G-1)
(G-1) (G-1)
(G-4) (G-4) (G-4)
(G-4) (G-4)
(G-1)
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:4
:1
A
M
01-EP401
ENLARGED POWER PLANS EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
NORTH
1/4" = 1'-0"D5
ENLARGED TR 1E02-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"F7
ENLARGED TR GA16-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D7
ENLARGED TR GC01-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B7
ENLARGED TR 1A15A-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B5
ENLARGED TR 1D42B-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"F5
ENLARGED TR 2A11-01 ELETRICAL PLAN
NORTH
1/4" = 1'-0"F1
ENLARGED C-WING HAC - GC10-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D2
ENLARGED D-WING - LOUNGE & WAITING ROOM - 2D02A-01 ELECTRICAL PLAN
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
SHEET
KEYNOTES
1 PROVIDE AN OVERHEAD POWER DROP CORD WITH
A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK
RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))
COORDINATE INSTALLATION LOCATION WITH
TELECOMMUNICATIONS CONTRACTOR. SEE SHEET
EE002, EE501, AND PANEL SCHEDULE. PROVIDE
RACK MOUNTED POWER DIST. (2RU), RACK
MOUNTED UPS (6RU) AND PDU PER TELECOM
EQUIPMENT RACK ELEVATIONS ON ET500'S.
2 SECONDARY BONDING BUSBAR (SBB). SEE ET
SHEETS FOR PLACEMENT AND GROUNDING
DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY
DERIVED #3/0 GROUND FROM BUILDING GROUND
TO TR BUSBARS. CONTRACTOR TO VERIFY
BUSBAR9S RESISTANCE IS UNDER 4 OHMS
MEASURED BY THE FOUR POINT
FALL-OF-POTENTIAL METHOD PER IEEE 81.
3 PROVIDE A 100 AMP, THREE-PHASE, FOUR WIRE,
208 VOLT SERVICE PANEL. PANEL SHALL BE
EQUIPPED WITH A POWER METER.
4 PROVIDE GFCI CIRCUIT BREAKER IN PANEL
SERVING REFRIGERATOR.
5 LIGHTING CONTROL AND POWER TO BE
CONNECTED TO EXISTING LIGHT CIRCUIT FOR THE
SPACE.
6 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.
THERMAL SWITCH TO BE MOUNTED ON SIDE OF
UNIT.
7 PROVIDE AN OVERHEAD CEILING MOUNTED 60 AMP
208 VOLT THREE-PHASE CIRCUIT. COORDINATE
INSTALLATION LOCATION WITH
TELECOMMUNICATIONS CONTRACTOR. SEE
ELECTRICAL FIXTURE SCHEDULE AND PANEL
SCHEDULE FOR DETAILED INFORMATION.
8 LOW VOLTAGE HVAC CONTROL BOXES
TO BE REMOVED AND RELOCATED AS SHOWN ON
DRAWINGS. RE-CIRCUIT LOW VOLTAGE CIRCUITS
AS NECESSARY TO RELOCATE THE HVAC CONTROL
BOX. COORDINATE WITH VA MAINTENANCE
STAFF.
9 EXTEND EXISTING POWER RECEPTACLES 5 INCHES
TO NEW FURRED OUT WALL.
10 PROVIDE A 13U WALL MOUNTED RACK
ENCLOSURE. RELOCATE PAMNS SYSTEM INTO NEW
ENCLOSURE FROM OTHER SIDE OF WALL.
COORDINATE LOCATION AND TRANSFER WITH VA
BIOMED, AND CRITICAL CARE UNIT AS TO NOT
DISRUPT ANY PATIENT CARE.
0' 2' 4' 8' 16'
GRAPHIC SCALE 1/4" = 1'-0"
1'
T
T
ST
T
ST
ST
CHASE
CHASE
HASE
T
ST
T
ST
T
T
ST
ST
ST
T
T
T
T
T
"1-5-B-E-P2"
"1-5-B-C-P2"
1-5-B-C-P2-1,3,5
RACK-30
1-5-B-E-P2-1,3,5
RACK-30
(PG4)
(PG4)(PG4)
(PG4)
WRKRM
(HBHC
STAFF)
5B08-01
AC-2
1-5-B-E-P2-15,17
1-5-B-C-P2-7
1-5-B-E-P2-19
1-5-B-E-P2-21
1-5-B-E-P2-25
1-5-B-E-P2-23
1-5-B-N-P4
(G-1)
(G-1)(G-1)
(G-1)
TELECOMMUNICATIONS
ROOM
5B08A-01
(PG4)
(PG4) (PG4)
(PG4)
"1-4-C-E-P1"
"1-4-C-C-P1"
1-4-C-C-P1-1,3,5
RACK-30
1-4-C-E-P1-1,3,5
RACK-30
AC-2
1-4-C-E-P1-13,15
1-4-C-E-P1-17
1-4-C-E-P1-21
1-4-C-E-P1-23
1-4-C-C-P1-7
1-4-C-E-P1-19
TELECOMMUNICATIONS
ROOM
4C08-01
(PG4) (PG4)
(PG4)(PG4)
1-4-A-C-P2-1,3,5
RACK-30
1-4-A-E-P1-1,3,5
RACK-30
"1-4-A-C-P2"
"1-4-A-E-P1"
AC-2
1-4-A-E-P1-15,17
1-4-A-C-P2-7
1-4-A-E-P1-19
1-4-A-E-P1-21
1-4-A-E-P1-23
-4
-A -E
-P -2
(DX-1) (DX-1)
(G-4)
(G-4)
1-4-A-C-P1
+48"
+48"
1-4-A-C-P1
1-4-A-N-P2
1-4-A-N-P2
VITALS
ROOM
4A11B-01ALCOVE
4A11-01
TELECOMMUNICATIONS
ROOM
4A11A-01
1-3-C-C-P2-1,3,5
RACK-30
1-3-C-E-P2-1,3,5
RACK-30
(PG4)
(PG4)
(PG4)(PG4)"1-3-C-E-P2"
"1-3-C-C-P2"
AC-2
1-3-C-E-P2-13,15
1-3-C-C-P2-7
1-3-C-E-P2-17
1-3-C-E-P2-19
1-3-C-E-P2-21
1-3-C-E-P2-23
(G-4)
(G-4)
(G-2)
(G-4)
(G-4)
(G-2)
6 6
PROCEDURE
3C06-01
PROCEDURE
3C08-01
TECHNOLOGY
ROOM
3C08A-01
(PG4)
(PG4)
1-3-A-C-P2-1,3,5
RACK-30
1-3-A-E-P1-1,3,5
RACK-30
"1-3-A-C-P2"
"1-3-A-E-P1"
1 1
CLEAN
ROOM
3A11C-01
+48"
+48"
+48"
+48" +48"
+48"
+48"
+48"
+48"
AC-2
1-3-A-E-P1-13,15
1-3-A-C-P2-7
1-3-A-E-P1-17
1-3-A-E-P1-19
1-3-A-E-P1-21
1-3-A-E-P1-23
(G-4)
(G-4)
(DX-1) (DX-1)
6 1-3-A-C-P1
1-3-A-C-P1
1-3-A-C-P11-3-A-C-P1
TELECOMMUNICATIONS
ROOM
3A11B-01
ALCOVE
3A11A-01
(PG4) (PG4)
(PG4)
(PG4)
1-2-C-E-P2-1,3,5
RACK-30
1-2-C-C-P2-1,3,5
RACK-30
"1-2-C-C-P2"
"1-2-C-E-P2"
TELECOMMUNICATIONS
ROOM
2C08-01
LOCKERS
2C08A-01
AC-2
1-2-C-E-P2-7,9
1-2-C-E-P2-11
1-2-C-C-P2-7 1-2-C-E-P2-13
1-2-C-E-P2-15
1-2-C-E-P2-17
(G-4)
(G-4)
(G-4)
1-2-C-N-P1
"1-1-F-E-P1" "1-1-F-C2-P1"
AC-2
1-1-F-E-P1-7,9
5 5
RACK-20
1-1-F-C2-P1
RACK-20
1-1-F-E-P1
TELE/DATA
1F33G-01
AC-2
1-2-F-E-P1-1,3
2 RACK-20
1-2-F-C2-P1
RACK-20
1-2-F-E-P1
(G-4)
(G-4)
1-4-A-N-P2
1-4-A-N-P2
(G-2)
EXAM
ROOM
4A12-01
DF 7
(G-4) (G-4)
(G-4)(G-4)
1-4-A-N-P2
1-4-A-N-P2
WAITING
ROOM
4A07-01
+48" A
A
UC/REF
(G-1) (G-1)
A
1-4-A-C-P1
1-4-A-C-P1
1-4-A-C-P1
1-4-A-N-P21-4-A-N-P2
A +48"
MED. ROOM
4A05A-01
TEAM
ROOM
3A20-01
1-3-A-C-P1
1-3-A-N-P3
1-3-A-C-P1 1-3-A-N-P3
(G-4)(G-4)
(G-4) (G-4)
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:4
:4
A
M
01-EP402
ENLARGED POWER PLANS EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
SHEET
KEYNOTES
NORTH
1/4" = 1'-0"F5
ENLARGED TR 5B08A-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D5
ENLARGED TR 4C08-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B5
ENLARGED TR 4A11A-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"F7
ENLARGED TR 3C08A-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D7
ENLARGED TR 3A11B-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B7
ENLARGED TR 2C08-01 ELECTRICAL PLAN
1 PROVIDE AN OVERHEAD POWER DROP CORD WITH
A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK
RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))
COORDINATE INSTALLATION LOCATION WITH
TELECOMMUNICATIONS CONTRACTOR. SEE SHEET
EE002, EE501, AND PANEL SCHEDULE. PROVIDE
RACK MOUNTED POWER DIST. (2RU), RACK
MOUNTED UPS (6RU) AND PDU PER TELECOM
EQUIPMENT RACK ELEVATIONS ON ET500'S.
2 SECONDARY BONDING BUSBAR (SBB). SEE ET
SHEETS FOR PLACEMENT AND GROUNDING
DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY
DERIVED #3/0 GROUND FROM BUILDING GROUND
TO TR BUSBARS. CONTRACTOR TO VERIFY
BUSBAR9S RESISTANCE IS UNDER 4 OHMS
MEASURED BY THE FOUR POINT
FALL-OF-POTENTIAL METHOD PER IEEE 81.
3 PROVIDE A 100 AMP, THREE-PHASE, FOUR WIRE,
208 VOLT SERVICE PANEL. PANEL SHALL BE
EQUIPPED WITH A POWER METER.
4 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.
THERMAL SWITCH TO BE MOUNTED ON SIDE OF
UNIT.
5 PROVIDE AN OVERHEAD POWER DROP CORD WITH
A 20 AMP 208 VOLT THREE-PHASE TWISTED LOCK
RECEPTACLE (L21-20R); 8.5 FT AFF (WYE(5-WIRE))
COORDINATE INSTALLATION LOCATION WITH
TELECOMMUNICATIONS CONTRACTOR. SEE SHEET
EE002, EE501, AND PANEL SCHEDULE. PROVIDE
TWO UPS (6RU) AND TWO PDU (0RU) FOR EVERY
TWO RACK-20 (ONE RACK TR). EXISTING RACK TO
REMAIN. CONTRACTOR TO COORDINATE
INSTALLATION OF NEW PDU AND UPS ON EXISTING
RACK CONFIGURATION.
6 LIGHTING CONTROL AND POWER TO BE
CONNECTED TO EXISTING LIGHT CIRCUIT FOR THE
SPACE.
7 PROVIDE GFCI CIRCUIT BREAKER IN PANEL
SERVING DRINKING FOUNTAIN.
0' 2' 4' 8' 16'
GRAPHIC SCALE 1/4" = 1'-0"
1'
NORTH
1/4" = 1'-0"F3
ENLARGED TR ROOM 1F33G-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"F1
ENLARGED TR ROOM 2F55-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D3
ENLARGED EXAM ROOM - 4A10CA-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B1
ENLARGED WAITING ROOM - 4A07-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B3
ENLARGED MED ROOM 4A05A-01 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D1
ENLARGED TEAM ROOM 3A20-01 ELECTRICAL PLAN
(PARTIAL) CRITICAL SWITCHBOARD
"1-G-A-C-D1" SECTION 1 208/120V 3Ø,
4W 800A "E2" (EXISTING)
(PARTIAL) CRITICAL SWITCHBOARD
"1-G-A-C-D1" SECTION 1 208/120V 3Ø,
4W 800A "E2" (EXISTING)
225/3
"1 -1
-D -C
-P
"1C1G1"
(PARTIAL) EMERGENCY
SWITCHBOARD "1-G-A-E-D1" SECTION
1 208/120V 3Ø, 4W 1600A "E1"
(EXISTING)
(PARTIAL) EMERGENCY
SWITCHBOARD "1-G-A-E-D1" SECTION
1 208/120V 3Ø, 4W 1600A "E1"
(EXISTING)
"1 -1
-D -E
-P
"1E1G1"
225/3
(EXISTING) (EXISTING)
250/3250/3
100/3
"1-G-A-E-P3"
100/3
"1-1-A-E-P2"
100/3
"1-2-A-E-P1"
100/3
"1-3-A-E-P1"
100/3
"1-4-A-E-P1"
250/3250/3
100/3
"1-G-C-E-P3"
100/3
"1-1-C-E-P2"
100/3
"1-2-C-E-P2"
100/3
"1-3-C-E-P2"
100/3
"1-4-C-E-P1"
100/3
"1-5-B-E-P2"
100/3
100/3
"1-1-D-E-P4"
250/3 250/3
100/3
"1-G-A-C-P5"
100/3
"1-1-A-C-P7"
100/3
"1-2-A-C-P2"
100/3
"1-3-A-C-P2"
100/3
"1-4-A-C-P2"
250/3 250/3
100/3
"1-G-C-C-P2"
100/3
"1-1-C-C-P2"
100/3
"1-2-C-C-P2"
100/3
"1-3-C-C-P2"
100/3
"1-4-C-C-P1"
100/3
"1-5-B-C-P2"
100/3
100/3
"1-1-D-C-P2"
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
FIRST FLOOR
F7
POWER RISER ONE-LINE DIAGRAM - BUILDING #01 - AREA "A"
F4
POWER RISER ONE-LINE DIAGRAM - BUILDING #01 - AREAS "B" &"C"
C7
POWER RISER ONE-LINE DIAGRAM - BUILDING #01 - AREA "D"
NO SCALENO SCALE
NO SCALE
ELECTRICAL
GA01
ELECTRICAL
GA01
TR
4A11A-1
TR
3A11B-1
TR
2A11-1
TR
1A15A-1
TR
GA16-1
ELECTRICAL
GA01
ELECTRICAL
GA01
TR
4C08-1
TR
3C08A-1
TR
2C08-1
TR
1E02-1
TR
GC01-1
TR
5B08A-1
ELECTRICAL
1D36
TR
1D42B-1
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:4
:5
A
M
01-EP601
PARTIAL ONE-LINE DIAGRAMS EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
GENERAL
SHEET NOTES
1 PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT
LOCATED OUTDOORS. REFER TO PLANS FOR
EQUIPMENT LOCATIONS.
2 REFER TO PLANS FOR CONSTRAINTS ON PHYSICAL
DIMENSIONS AND CLEARANCE REQUIREMENTS OF
EQUIPMENT. PROVIDE EQUIPMENT DIMENSIONS
THAT FALL WITHIN THE CONSTRAINTS OF EACH
SPECIFIC LOCATION.
3 ALL EQUIPMENT SHALL BE CONSTRUCTED AND
BRACED FOR THE SEISMIC CONDITIONS OF THE
PROJECT. REFER TO ELECTRICAL SPECIFICATIONS
FOR REQUIREMENTS.
4 PROVIDE PERFORMANCE TESTING FOR
GROUND-FAULT PROTECTION SYSTEMS ON SITE
WITH A WRITTEN RECORD OF THIS TEST SUBMITTED
TO THE AUTHORITY HAVING JURISDICTION PER NEC
230.95(C).
SYM AMP
HH
AMPS
CONDUIT
SIZE
CONDUCTOR (NOTE 1)
IG/HH SE NOTESQTY SIZE G
1 20 - .75 2 12 12 12 8 2
2 20 - .75 3 12 12 12 8 2,3
3 20 24 .75 4 12 12 12 8 2,3
4 30 - .75 2 10 10 10 8 2
5 30 - .75 3 10 10 10 8 2
6 30 32 .75 4 10 10 10 8 2
7 40 - 1 2 8 10 8 6 2
8 40 - 1 3 8 10 8 6 2
9 40 44 1 4 8 10 8 6 2
10 55 - 1 2 6 10 8 4 2
11 55 - 1 3 6 10 8 4 2
12 55 60 1.25 4 6 10 8 4 2
13 70 - 1 2 4 8 4 2 2
14 70 - 1.25 3 4 8 4 2 2
15 70 76 1.25 4 4 8 4 2 2
16 85 - 1.25 2 3 8 3 2 2
17 85 - 1.25 3 3 8 3 2 2
18 85 92 1.25 4 3 8 3 2 2
19 95 - 1.25 3 2 8 2 2 2
20 95 104 1.50 4 2 8 2 2 2
21 130 - 1.50 3 1 6 2 2 2
22 130 116 1.50 4 1 6 2 2 2
23 150 - 2 3 1/0 6 2 1/0 2
24 150 136 2 4 1/0 6 2 1/0 2
25 175 - 2 3 2/0 6 2 2/0 2
26 175 156 2 4 2/0 6 2 2/0 2
27 200 - 2 3 3/0 6 2 2/0 2
28 200 180 2.50 4 3/0 6 2 2/0 2
29 230 - 2.50 3 4/0 4 2 2/0 2
30 230 208 2.50 4 4/0 4 2 2/0 2
31 255 - 2.50 3 250 4 1 2/0 2
32 255 232 2.50 4 250 4 1 2/0 2
33 310 - 3 3 350 3 1/0 3/0 2
34 310 280 3 4 350 3 1/0 3/0 2
35 380 - 3.50 3 500 3 3/0 3/0 2
36 380 344 4 4 500 3 3/0 3/0 2
37 400 - 2 EA 2 3 3/0 3 3/0 3/0 2
38 400 360 2 EA 2.50 4 3/0 3 3/0 3/0 2
39 510 - 2 EA 2.50 3 250 1 4/0 3/0 2
40 510 464 2 EA 3 4 250 1 4/0 3/0 2
41 620 - 2 EA 3 3 350 1/0 4/0 3/0 2,4
42 620 560 2 EA 3 4 350 1/0 4/0 3/0 2,4
43 760 - 2 EA 3.50 3 500 1/0 4/0 3/0 2,4
44 760 688 2 EA 4 4 500 1/0 4/0 3/0 2,4
45 855 - 3 EA 3 3 300 2/0 4/0 3/0 2,4
46 855 768 3 EA 3 4 300 2/0 4/0 3/0 2,4
47 1000 - 3 EA 3.50 3 400 2/0 4/0 3/0 4
48 1000 912 3 EA 3.50 4 400 2/0 4/0 3/0 4
49 1140 - 3 EA 4 3 500 3/0 4/0 3/0 4
50 1140 1032 3 EA 4 4 500 3/0 4/0 3/0 4
51 1240 - 4 EA 3 3 350 3/0 4/0 3/0 4
52 1240 1120 4 EA 3 4 350 3/0 4/0 3/0 4
53 1675 1520 5 EA 4 4 400 4/0 4/0 4/0 4
54 2010 1824 6 EA 4 4 400 250 250 250 4
55 2660 2408 7 EA 4 4 500 350 350 350 4
56 3040 2752 8 EA 4 4 500 500 500 500 4
57 4180 3784 11 EA 4 4 500 500 500 500 4
58 - - 5 EA 4 - - - - - 6
59 - - 5 - - - - - 6
60 - - 10 EA 4 - - - - - 6
IG
(E.G.)
COPPER CONDUCTOR AND
CONDUIT SCHEDULE
SUBSCRIPT (NOTE 5)
SCHEDULE NUMBER
1. CONDUCTORS SHOWN ARE SHOWN FOR EACH CONDUIT WITH MODIFICATIONS
AS NOTED IN NOTE 5. ALL CONDUCTORS SHOWN ARE THWN UNLESS
OTHERWISE NOTED.
2. PROVIDE EQUIPMENT GROUND CONDUCTORS PER TABLE 250-122 WHEN
CIRCUIT BREAKERS ARE SIZED GREATER THAN AMPERE RATING SHOWN IN
TABLE.
3. PROVIDE #10 NEUTRALS FOR MULTIWIRE BRANCH CIRCUITS SERVING
COMPUTERS.
4. GROUND (G) CONDUCTOR MAY BE DELETED ON SERVICE ENTRANCE
CONDUCTORS.
5. SYMBOL SUBSCRIPTS:
"2N": INCLUDE TWO NEUTRAL CONDUCTORS SIZED AS SCHEDULED FOR
PHASE AND NEUTRAL CONDUCTORS WHERE THE CONDUCTOR IS #1/0
OR LARGER. INCLUDE A SINGLE 200% RATED CONDUCTOR THAT IS
TWICE THE AMPACITY OF THE SCHEDULED PHASE AND NEUTRAL
CONDUCTOR WHERE THE CONDCUTOR IS BELOW #1/0 IN SIZE.
"CI": PROVIDE CIRCUIT INTEGRITY CABLE; TYPE TWO-HOUR FIRE
RESISTIVE CABLES IN CONDUIT OR PROVIDE FEEDER ENCASED IN
CONCRETE.
"FG" FULL SIZE GROUND, SIZE EQUIPMENT GROUNDING CONDUCTOR TO
BE SAME SIZE AS THE PHASE CONDUCTORS.
"HH": NEUTRAL CURRENTS EXIST DUE TO HIGH HARMONIC "NONLINEAR"
LOADS. CURRENT CARRYING CONDUCTORS DERATED
ACCORDINGLY. PROVIDE THE IG/HH SIZE FOR THE EQUIPMENT
GROUNDING CONDUCTOR.
"IG": INCLUDE IG (INSULATED/ISOLATED GROUND CONDUCTOR)
SCHEDULED ALONG WITH THE GROUND OF EQUIPMENT GROUND
CONDUCTOR.
"MC": PROVIDE FEEDER IN METAL-CLAD CABLE; TYPE MC IN PLACE OF
SINGLE CONDUCTORS IN CONDUIT.
"SE": SUBSTITUTE "SE" CONDUCTOR FOR "G" CONDUCTOR SHOWN, WHICH
IS SIZED FOR THE GROUNDING OF THE SECONDARY OF THE
SEPARATELY DERIVED SYSTEM.
"SER": PROVIDE SERVICE-ENTRANCE CABLE; TYPE SE OR SER IN PLACE OF
SINGLE CONDUCTORS IN CONDUIT.
CONDUCTOR AND CONDUIT SCHEDULE NOTES
EQUIPMENT NAMEPLATE
SCHEDULE
EQUIPMENT ID SCHEME
LABEL FORMAT [NAME]
[SYSTEM]
[VOLTAGE]
[FED FROM]
[SOURCE(S)]
LABEL EXAMPLE PANEL "14-4-A-C-P1"
STANDBY POWER
120/208V
FED FROM
BUS-A / XFMR 4TA
BUSWAY
OTHER
COLOR SCHEME
SYSTEM EQUIPMENT
NORMAL POWER ALL GEAR NOT INCLUDED BELOW
TEXT BACKGROUND
NAMEPLATE COLOR
STANDBY POWER
EMERGENCY POWER
LEGALLY-REQUIRED
STANDBY POWER
UPS "A" POWER
UPS "B" POWER
LABEL BUSWAY EVERY 6' WHERE EXPOSED TO VIEW AND
EVERY 15' WHERE NOT EXPOSED TO VIEW
WHITE
WHITE
WHITE
RED
WHITE
BLACK
BLACK
ORANGE
RED
WHITE
BLUE
YELLOW
MDPS1 AND ALL DOWNSTREAM
GEAR, EXCEPT UPS GEAR AS
NOTED
GDP1, GDP2, ATS-E AND ALL
DOWNSTREAM GEAR
ATS-S AND ALL DOWNSTREAM
GEAR
UPSA AND ALL DOWNSTREAM
GEAR
UPSB AND ALL DOWNSTREAM
GEAR
FIRST DIGIT - BUILDING NUMBER (1, 2, 3, ETC)
SECOND DIGIT - BUILDING LEVEL (0, 1, 2, ETC)
THIRD DIGIT - BUILDING AREA (A, B, C, ETC)
FOURTH DIGIT - ELECTRICAL SYSTEM TYPE
N - NORMAL
C- CRITICAL (C, C1, C2, ETC)
L - LIFE SAFETY
E - EMERGENCY
FIFTH DIGIT - EQUIPMENT TYPE
S - SWITCHGEAR
D - DISTRIBUTION PANEL
TR - TRANSFORMER
P - BRANCH PANEL
ATS - AUTOMATIC TRANSFER SWITCH
SIXTH DIGIT SEQUENCE # (1,2,3,...)
CIRCUIT
AMPACITY/VOLTAGE
CIRCUIT
LENGTH
CONDUCTOR SIZE
(PHASE, NEUTRAL AND GR) CONDUIT SIZE
20A/120V 0' - 60' #12 AWG 0.75" Ø
20A/120V 60' - 95' #10 AWG 0.75" Ø
20A/120V 95' - 150' #8 AWG 1" Ø
20A/120V 150' - 240' #6 AWG 1.25" Ø
20A/277V 0' - 140' #12 AWG 0.75" Ø
20A/277V 140' - 220' #10 AWG 0.75" Ø
20A/277V 220' - 350' #8 AWG 1" Ø
20A/277V 350' - 550' #6 AWG 1.25" Ø
NOTES:
1. WIRE SIZING IS BASED ON COPPER CONDUCTORS SUPPLYING A 20A,
120V CIRCUIT AT THE INDICATED VOLTAGE, ASSUMED TO BE 80%
LOADED (16A), WITH MAXIMUM VOLTAGE DROP OF 3% AT THE LOAD.
2. DOWN-SIZED WIRE AT DEVICE/LOAD AS REQUIRED AND TERMINATE
CONDUCTORS IN A SAFE AND CODE COMPLIANT MANNER.
3. CONDUIT SIZE IS BASED ON A MAXIMUM OF 3 CIRCUITS PER CONDUIT,
EACH WITH A SEPARATE NEUTRAL CONDUCTOR.
BRANCH CIRCUIT CONDUCTOR
AND CONDUIT SIZING TABLE
6. RACEWAY ONLY. CONDUCTORS PROVIDED BY UTILITY.
SYM
GROUNDING SCHEDULE
ALL CONDUCTORS ARE INSULATED UNLESS
INDICATED OTHERWISE
#500 KCMIL CU
#350 KCMIL CU
#250 KCMIL CU
#4/0 CU
#1/0 CU
#4 CU
#6 CU
12"X2"X1/4" COPPER BUS WITH
PRE-DRILLED HOLES MOUNTED ON
INSULATORS IN MAIN ELECTRICAL ROOM
GROUNDING CONDUCTOR PER POWER
ONE-LINE DIAGRAM
12"X2"X1/4" COPPER BUS WITH
PRE-DRILLED HOLES MOUNTED ON
INSULATORS IN ELECTRICAL & TELECOMM.
CLOSETS
SIZE
GROUND FLOOR
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1
G2
G3
G4
G5
G6
G7
G8
G9
G10
TR
GA16-1
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
TR
1A15A-1
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
TR
2A11-1
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
TR
3A11B-1
G4
TR
4A11A-1
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
EXISTING BUILDING MAIN
GROUNDING BUSBAR
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
ELECTRICAL
1D36
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
TR
1D42B-1
G4
THIRD FLOOR
SECOND FLOOR
FOURTH FLOOR
FIRST FLOOR
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
FIFTH FLOOR
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
TR
GC01-1
TR
1E02-1
TR
2C08-1
TR
3A11B-1
TR
4A11A-1
SIXTH, SEVENTH, & ROOF
ROOF
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
TR
4A11A-1
MAIN ELECTRICAL ROOM
GA01-1
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:4
:0
A
M
01-EP602
GROUNDING RISER DIAGRAM EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: NTSF1
GROUNDING RISER DIAGRAM
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:4
:1
A
M
01-EP603
LIGHTING FIXTURE SCHEDULE EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
ID DESCRIPTION
NOMINAL SIZE
M O
U N
T
IN
G
T Y
P E
C O
L O
R T
E M
P
C R
I
D R
IV
E
R C
O N
F
IG
U R
A T
IO
N
V O
L T
A G
E
W A
T T
S
F
IN
IS
H
F
IX
T U
R E
L U
M E
N S
D
IF
F U
S E
R /L
E N
S
R E
F L
E C
T O
R
O P
T
IO
N S
N O
T E
S
MANUFACTURER (CATALOG SERIES)
L E
N G
T H
D E
P T
H
H E
IG
H
T
D
IA
M E
T E
R A
P E
R T
U R
E
OPTION 1 OPTION 2 OPTION 3
(DX-1) 6" ROUND, RECESSED LED DOWNLIGHT,
SEMI-SPECULAR REFLECTOR, WHITE TRIM FINISH
- - - 6" CR LED 3500K LED DRIVER
(0-10V DIMMING)
120/277 19 - 1500 - - - PORTFOLIO
(LD6B15D010/EU6
B10208035/6LBW2 H
HB26)
GOTHAM
(EVO-35/15-6AR-WD-LSS-
MVOLT-EZ10-TWR)
LITON
(CH618UE-D10/CR6L22S
W-T35)
(G-1) 2X2 LED FLAT PANEL, GRID LAY-IN 24" 24" 3" - CR LED 3500K LED DRIVER
(0-10V DIMMING)
120/277 41 - 3400 - - - METALUX (22FP4735C) APPROVED EQUAL APPROVED EQUAL
(G-2) 1X4 LED FLAT PANEL, GRID LAY-IN 48" 12" 3" - CR LED 3500K LED DRIVER
(0-10V DIMMING)
120/277 41 - 4000 - - - METALUX (14FP4235C) APPROVED EQUAL APPROVED EQUAL
(G-4) 2X4 LED FLAT PANEL, GRID LAY-IN 48" 24" 3" - CR LED 3500K LED DRIVER
(0-10V DIMMING)
120/277 41 - 4300 - - - METALUX (24FP4735C) APPROVED EQUAL APPROVED EQUAL
(PG4) STRIPLIGHT, GENERAL 48" 4" 4" - CP LED 4000K LED DRIVER
(0-10V DIMMING)
120/277 38 CBA 5000 - - - LITHONIA
(ZL1D-L48-5000LM-FST-M
VOLT-40K-80CRI-WH-HC3
6)
ILP (SS4) WILLIAMS (75R)
DIFFUSER/LENSFINISH PROVIDE UNIT PRICES AND FIXTURE BRAND SELECTED FOR ADD/DELETE CHANGES
FOR EACH FIXTURE TYPES SHOWN WITHIN 48 BUSINESS HOURS OF THE BID DATE.
FAILURE TO COMPLY WITH THIS REQUIREMENT MAY DISQUALIFY THE PRODUCTS
AND EMPOWER THE ENGINEER TO DETERMINE FAIR VALUE FOR FIXTURE AND
INSTALLATION CHANGES, WITHOUT FURTHER INPUT FROM THE CONTRACTOR OR
INSTALLER.
CONTRACTOR ALLOWANCE PRICES ARE ACCURATE WHEN THIS JOB WAS
SPECIFIED, CONTRACTOR AND ELECTRICAL DISTRIBUTOR SHALL VERIFY THIS
ALLOWANCE AND REPORT ANY PROBLEMS TO THE ENGINEER BEFORE THE BID.
ALLOWANCE PRICE MAY OR MAY NOT INCLUDE LAMP(S) OR FREIGHT AS NOTED,
AND DO NOT INCLUDE ANY TAXES.
SUBSTITUTIONS AND/OR EQUAL FIXTURES MUST RECEIVE APPROVAL PRIOR TO
BIDDING, THEY MUST BE SUBMITTED TO THE ENGINEER NO LESS THAN 2 WEEKS
PRIOR TO BID OPENING.
SAMPLES MUST BE PROVIDED FOR ANY AND ALL FIXTURES UPON A/E REQUEST
PRIOR TO RELEASING FIXTURES.
ALL FIXTURES SHALL BE LISTED AND APPROVED FOR THEIR INTENDED USE AND
LOCATION.
VERIFY THE PROPER MOUNTING KITS OR ACCESSORIES TO FACILITATE
INSTALLATION AS SHOWN AT EACH LOCATION ON THE DRAWINGS.
COMPLY WITH THE "INTERIOR LIGHTING" SECTION OF THE SPECIFICATIONS.
REFER TO SPECIFICATIONS FOR IMPORTANT TECHNICAL REQUIREMENTS FOR
LIGHTING FIXTURES, DRIVERS, AND LAMPS.
ALL LIGHT FIXTURES TO BE EITHER "DLC" OR "LIGHTING FACTS" LISTED OR TO BE
APPROVED BY ARCHITECT/ENGINEER AND OWNER.
LUMINAIRE OPTIONSMOUNTING REFLECTOR 1.
2.
3.
4.
5.
6.
7.
8.
9.
DIAMETER
H E
IG
H
T
LENGTH DEPTH
H E
IG
H
T
LENGTH
DEPTH
HEIGHT
NOTES
INTERIOR LIGHTING FIXTURE SCHEDULE
ABBREVIATIONS GENERAL NOTES
ARHR - AIR RETURN AND HEAT REJECTION
DL - DAMP LOCATION
EQC - EARTHQUAKE CLIPS
F - FUSING
HLD - HINGED AND LATCHED DOOR
HS - HOUSE SIDE SHIELD
PS - PHOTOCELL SWITCH
QRS - QUARTZ RESTRIKE
ST - STATIC
WG - WIRE GUARD
WL - WET LOCATION
B - BASE
C - CEILING
F - FLANGE
G - GRID
P - PENDANT
PL POLE
R - RECESSED
S - SURFACE
W - WALL
MW - MATTE WHITE
BL - BLACK
SL - SILVER
GL - GOLD
CL - CLEAR
PW - PAINTED WHITE
EA - EXTRUDED ALUMINUM
S - STEEL
GS - GALVANIZED STEEL
C - CAST
CBA - COLOR BY ARCHITECT
SCBA - STANDARD COLOR BY
ARCHITECT
CCA - CUSTOM COLOR BY
ARCHITECT
FS
209D
- MEETS FEDERAL
STANDARD 209D
TP - THERMALLY
PROTECTED
FL - FLUSH
R - REGRESS
M - MITERED
OP - NONE/OPEN
SP - SPECULAR
SS - SEMI-SPECULAR
D - DIFFUSE (WHITE ENAMEL)
SC - SPECULAR (COLORED)
PR - PRISMATIC
FDR - FULL DEPTH REFLECTOR
DS - DIFFUSE (SEMI SPECULAR) SILVER
LI - LOW IRIDESCENT
IR - IRIDESCENT
SL - SILVER
GL - GOLD
CA - CLEAR ALZAK
#A - ACRYLIC #THICK
#OA - ACRYLIC #THICK (OPAL)
GC - GLASS (CLEAR)
GO - GLASS (OPAL)
GF - GLASS (FROSTED)
SGL - SOFT GLOW LENS
HPL - HIGH PERFORMANCE LENS
DO - DROP OPAL
CGL - CONVEX GLASS LENS
S - SATIN LENS
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:4
:2
A
M
01-EP604
PANEL SCHEDULES EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 01
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 10.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28
LIGHTING & CONTINUOUS LOADS: 0.1 kVA @ 125% = 0.1 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28
TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 20 1 0.1 0.0 0.0 LIGHTING... 0.1 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-1-A-C-P7"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 18.6 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: 1.6 kVA @ 100% = 1.6 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 56
LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 20
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 53 53 51 AVERAGE CONNECTED AMPS PER PHASE = 52
TOTALS: CONNECTED kVA PER PHASE 6 6 6 CONNECTED TOTAL kVA = 19
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 30 3 0.0 5.6 0.0 PWR: SS-2 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 0.0 0.0 0.5 CO TELECOMMUNICATIONS... 0.5 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 15 2 0.0 1.7 0.0 PWR:AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-1-A-E-P2"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 10.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28
LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28
TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-G-A-C-P5"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 18.6 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: 1.4 kVA @ 100% = 1.4 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 56
LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 20
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 53 53 50 AVERAGE CONNECTED AMPS PER PHASE = 52
TOTALS: CONNECTED kVA PER PHASE 6 6 6 CONNECTED TOTAL kVA = 19
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 -- -- -- -- -- -- -- 3.3 1.9 -- -- -- -- -- -- -- 12
9 30 3 0.0 10.0 0.0 RACK POWER 3.3 1.9 -- -- -- -- -- -- -- 10
7 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 1.9 PWR: SS-2 0.0 5.6 0.0 3 30 8
5 0.8 -- -- -- -- -- -- -- 6
3 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 0.8 PWR: AC-2 TELECOMMUNICATIONS... 0.0 1.7 0.0 2 20 4
1 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 0.4 CO TELECOMMUNICATIONS ROOM... 0.4 0.0 0.0 1 20 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-G-A-E-P3"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 10.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28
LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28
TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-G-C-C-P2"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 12.1 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: 1.4 kVA @ 100% = 1.4 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 38
LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 14
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 38 38 34 AVERAGE CONNECTED AMPS PER PHASE = 36
TOTALS: CONNECTED kVA PER PHASE 5 5 4 CONNECTED TOTAL kVA = 13
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 15 2 0.0 1.7 0.0 PWR: AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-G-C-E-P3"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 10.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28
LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28
TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-1-C-C-P2"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 12.1 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: 1.4 kVA @ 100% = 1.4 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 38
LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 14
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 38 38 34 AVERAGE CONNECTED AMPS PER PHASE = 36
TOTALS: CONNECTED kVA PER PHASE 5 5 4 CONNECTED TOTAL kVA = 13
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 15 2 0.0 1.7 0.0 PWR:AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-1-C-E-P2"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 10.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28
LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28
TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "1-1-D-C-P2"