RESPONSE Attachment V7.2.docx

DOCX document 106 KB Posted

Attached to
EHRM Infrastructure Upgrades Construction - Salt Lake City VAMC Project 660-21-700
Solicitation number
36C77623B0041
Issued by

About this file

This document contains correspondence regarding electrical hardware specifications for the EHRM Infrastructure Upgrades Construction project at the Salt Lake City VAMC. The responses clarify that card readers, request to exit devices, and door position switches will be provided by the Division 8 door hardware contractor as part of an integrated electrified mortise lock. However, the part number listed is incomplete without a reader format specification. Security plans or drawings showing device locations could not be found. Power for door hardware will be provided by the security contractor, and secure doors are shown on drawings ET and listed in the door hardware specifications.

View the file

Other files

File Type Posted
RESPONSE Attachment V5.1.docx DOCX document
Construction Wage Rates- Salt Lake County- 08-11-2023.pdf PDF
ADDENDUM No 01.pdf PDF
Bid opening call-in information.pdf PDF
RESPONSE Attachment V5.1 No. 30 Snippet.JPG JPG image
2017 AHERA 3-Year Reinspection v2.2 2017_1205_BT.xlsx XLSX spreadsheet
RESPONSE V10 - Technical Questions.docx DOCX document
36C77623B0041 0004.pdf PDF
RESPONSE Attachment V2.1.docx DOCX document
RESPONSE Attachment V1.1.docx DOCX document
RESPONSE Attachment V7.1.docx DOCX document
RESPONSE Attachment V3.1.docx DOCX document
36C77623B0041 0003.pdf PDF
36C77623B0041 0003.pdf PDF
36C77623B0041 0002.pdf PDF
660-21-700 PreConstruction Site Visit Sing In Sheet 2023 07 14.pdf PDF
36C77623B0041 0001.pdf PDF
Attachment 13-Utah Tax Memo-EHRM-Salt Lake City.pdf PDF
Attachment 7-Part 6 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 12-Construction Wage Rates-Salt Lake County- 04-14-2023.pdf PDF
Attachment 14-Limitations on Subcontracting-EHRM-Salt Lake City.docx DOCX document
Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 15-Contractor Safety-Environmental-EHRM-S.L.C..docx DOCX document
Attachment 1-Specifications-(1 of 1)-EHRM-Salt Lake City.pdf PDF
Attachment 6-Part 5 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 3-Part 2 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 9-Part 8 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
36C77623B0041.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 11-Asbestos Site Survey-EHRM Salt Lake City.pdf PDF
Attachment 10-Part 9 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 4-Part 3 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 8-Part 7 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

· Section 281300, item 2.5, 2.6 & 2.7 state that the contacts and EL locking hardware will be provided by Div. 8 door hardware contractor and REX will be integral to EL locking hardware. This conflicts with security details on drawing number ET504. See snapshots.

· Div. 8 Door hardware schedule set B01-3 and B03-6 show an electrified mortise lock. Part number SN200-82271-24V LNL. This is an integrated lockset with an integrated DPS, REX AND card reader. If this is the case, Div. 28 would NOT need to provide a separate card reader.

The part number for this lock is not complete however. It is missing the reader format. See snapshot.

· Lastly, I am not able to find the security plans or plans with security device locations. Please advise.

RESPONSE: Card reader, Rex, DPS are provided by Div 8 as part of the SN200 Hardware. Power for door hardware by Sec Contractor. Will update the drawings and specs to match.

RESPONSE: SEC Doors shown on ET Drawings and listed in the door Hardware Spec.

image4.gif image5.gif image1.gif image2.gif image3.gif

File details come from the government source that posted it. Updated .