This document contains details of a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals for the EHRM Infrastructure Upgrades Construction project at the Salt Lake City VAMC. Offerors should submit proposals in response to solicitation number 36C77623B0041 by the specified deadline to be considered for award of a contract to provide construction services for upgrades and improvements at the medical center's facilities. Key project details include a scope of work involving infrastructure upgrades at the Salt Lake City VAMC, with Attachment 7 of the solicitation package containing relevant construction drawings. The award is expected to be finalized in 2021.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
B
131211 1514
T
T
T
SS-2
14-B-A-E-P4-7,9,11
SS-2
14-G-A-E-P1-7,9,11
SS-2
14-1-A-E-P1-7,9,11
SS-2
14-2-A-E-P1-7,9,11
SS-2
14-3-A-E-P1-7,9,11
W 14-3-A-E-P1-13
SS-2
14-G-C-E-P2-7,9,11
SS-2
14-1-C-E-P7-7,9,11
SS-2
14-2-C-E-P1-7,9,11
SS-2
14-3-C-E-P3-7,9,11
SS-2
14-B-C-E-P3-7,9,11
W14-3-C-E-P3-13
W 14-B-C-E-P3-13
W 14-B-A-E-P4-13
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:3
A M
14-EP140
OVERALL ROOF POWER PLAN EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SHEET
KEYNOTES
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
NORTH
1/16" = 1'-0"F3
OVERALL ROOF POWER PLAN
1 SPLIT CONDENSING UNIT LOCATED ON ROOF. SEE
MECHANICAL DRAWINGS FOR EXACT LOCATION.
2 SPLIT CONDENSING UNIT LOCATED ON ROOF. SEE
MECHANICAL DRAWINGS FOR EXACT LOCATION.
3 PROVIDE A SEPARATE 120 VOLT, 20 AMP, 1 PHASE
CIRCUIT AND WEATHER PROOF GFCI OUTLET
MOUNTED TO SIDE OF CONDENSING UNIT.
Revisions: Date:
06/08/23
DF
DOWN
UPUP
UP
UP
BAE1
BA09
BA06 BA05
BA04B
BA04ABA04C
BA04E
BA04F
BA04DA
BA04
BA07
BA04D
BB03D
B B
03 BB03C
BB03B
BB03A
BB07
BB08
BB09
BB11A
BB10
BB11
BB11B
BB04C
BB04B
BB04A
BB15
BB14
BB13
BB12C
BA03A
BA03BBA03.16
BA08
BA07AA
B A
A
BA03
BA01
BB06
BB05
BBE5
BB04
BB12D
BB12
BB12B
BC09
BC02
BC04
B C
BC10
BC11
BC01BB01
BBA
BD01BB
BD00
BB02
BB00
BC03
B C
BC07
BCOOD
BC08A
BC08B
BC08
BCOOC
BC00B
BCA
BCE1
BC00A
B C
BD01A
BD01B
BD02
BD01
BD03C
BD03A
BD03
BBE2 BBE4
BBB
BBE3
BAA
BA11
BA02
BA02A
BD03B
BBE4
B C
E
BC00F
"H" ELEVATOR LEVEL
EXTRASTITIAL (MECH/ELECT)
ELECTRICAL TEL/DATA
HAC
TOILET (WOMEN)TOILET (MEN)
OFFICE
OFFICE
COLD ROOM
ENTRY (MORGUE)
DEMONSTRATIONS (MORGUE)
MORGUE
OFFICE (90)
M A
IL
R
O O
M
OFFICE (90)
STORAGE (90)
OFFICE
TOILET (WOMEN)
HAC
TOILET (MEN)
OFFICE (04)
OFFICE (04)
OFFICE (04)
OFFICE (PATIENT
RECORDS)
OFFICE
EMS TRAINING
STORAGE (04 RECORDS)
MECHANICAL ROOM
MECHANICAL (WATER TREATMENT)
SHOP
STORAGE (PATIENT
EFFECTS)
OFFICE (136)
OFFICE (136)BREAKRM (136)
MECHANICAL ROOM
PREP (CHEMICAL)
S T
O R
A G
E (S
P E
C
IM
E N
S
OFFICES (136)
EXTRASTITIAL (MECH/ELECT)
EXTRASTITIAL (MECH/ELECT)
MECHANICAL ROOM
DUMBWAITER
STORAGE (04 RECORDS)
CLOTHING ROOM
WAITING (CLOTHING ROOM)
DRESSING
(CLOTHING ROOM)
STORAGE (138E)
CHUTE (TRASH)
CHUTE (LINEN)
S T
O R
A G
E (P
H A
R M
A C
Y R
E C
E
IV
IN
G
TOILET (UNISEX)
EXTRASTITIAL (MECH/ELECT)
EXTRASTITIAL (MECH/ELECT)MECHANICAL
STAIR LEVEL
STORAGE
VESTIBULE
MECH. RM.
CORRIDOR
MECHANICAL
S T
O R
A G
E
TEL/DATA
DOCK (LOADING/UNLOADING)
ELECTRICAL (EMERGENCY GEN)
ELECTRICAL
ELECTRICAL
CORRIDOR (TO LOADING DOCK)
CORRIDOR (TO LOADING DOCK)
STAIR LEVEL
"G" ELEVATOR LEVEL
LOBBY (ELEVATOR)
C O
R R
ID
O
R
LIBRARY CENTER
OFFICE
MECHANICAL
LIBRARY AREA
TEL/DATA
ELECTRICAL
ENTRY (UTILITIES)
"D" ELEVATOR LEVEL "C" ELEVATOR LEVEL
STAIR LEVEL
"E" ELEVATOR LEVEL (FUTURE)
STAIR LEVEL
OFFICE (CAK)
SHOP (LOCKS & KEYS)
SHOP
TEL/DATA
"F" ELEVATOR LEVEL (FUTURE)
C O
R R
ID
O
R
TO
E
LE
V
A T
O R
S /B
.0 1)
LOBBY (ELEVATORS)
CORRIDOR
F .E
.C
F.E.C.
T
T
C
C
C
W
C
C
C
C
C
C
C
C
C
C
C
C
14-EP402
F7
14-EP402
D7
14-EP403
D5
14-EP403
B5
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:4
A M
14-EP1B0
OVERALL BASEMENT LEVEL
POWER PLAN
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
NORTH
1/16" = 1'-0"F3
OVERALL BASEMENT POWER PLAN
SHEET
KEYNOTES
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
F .E
.C
T
S T
CORRIDOR
GA00-14
"14-G-A-E-P1"
(PG4)
(PG4) (PG4)
(PG4)
14-G-A-E-P1-1,3,5
RACK-30
14-G-A-C1-P2-1,3,5
RACK-30
14-G-A-C1-P2-7
AC-2
14-G-A-E-P1-13,15
14-G-A-E-P1-17
14-G-A-E-P1-19
14-G-A-E-P1-21
14-G-A-E-P1-23
TELECOMMUNICATIONS
ROOM
GA24-14
INTERNAL
MEDICINE
SERVICES
GA26-14
BIOMED
GA28-14
HAC
GA30-14
14-1-B-N-P2
14-1-B-N-P2
14-1-B-N-P2
14-1-B-N-P2
14-1-B-N-P2
14-G-B-C1-P2
14-G-B-C1-P2
14-G-B-C1-P2
14-G-B-C1-P2
(PG4) (PG4)
(G-4)
(G-4)
(G-4)(G-4)
(G-4)
(G-4)
(G-4)
(G-4)
(G-4)
(G-4)(G-4)
(G-1)
(G-4) (G-4)
(G-4)(G-4)
CORRIDOR
GA00-14
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:5
A M
14-EP401
ENLARGED POWER PLANS EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SHEET
KEYNOTES
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
1 PROVIDE AN OVERHEAD POWER DROP CORD WITH
A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK
RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))
COORDINATE INSTALLATION LOCATION WITH
TELECOMMUNICATIONS CONTRACTOR. SEE SHEET
EE002, EE501, AND PANEL SCHEDULE. PROVIDE
RACK MOUNTED POWER DIST. (2RU), RACK
MOUNTED UPS (6RU) AND PDU PER TELECOM
EQUIPMENT RACK ELEVATIONS ON ET500'S.
2 SECONDARY BONDING BUSBAR (SBB). SEE ET
SHEETS FOR PLACEMENT AND GROUNDING
DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY
DERIVED #3/0 GROUND FROM BUILDING GROUND
TO TR BUSBARS. CONTRACTOR TO VERIFY
BUSBAR’S RESISTANCE IS UNDER 4 OHMS
MEASURED BY THE FOUR POINT
FALL-OF-POTENTIAL METHOD PER IEEE 81.
3 PROVIDE A 100 AMP, THREE-PHASE, FOUR WIRE,
208 VOLT SERVICE PANEL. PANEL SHALL BE
EQUIPPED WITH A POWER METER.
4 LIGHTING CONTROL AND POWER TO BE
CONNECTED TO EXISTING LIGHT CIRCUIT FOR THE
SPACE.
5 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.
THERMAL SWITCH TO BE MOUNTED ON SIDE OF
UNIT.
0' 2' 4' 8' 16'
GRAPHIC SCALE 1/4" = 1'-0"
1'
NORTH
3/8" = 1'-0"F1
ENLARGED GROUND FLOOR A-WING -
CORRIDOR - OUTSIDE OF GA24-14 ELECTRICAL PLAN
NORTH
3/8" = 1'-0"F5
ENLARGED GROUND FLOOR A-WING TECHNOLOGY ROOM GA24-14 ELECTRICAL PLAN
F .E
.C
T S
T
F.E.C.
T
ST
F.E.C.
T
ST
F .E
.C
S T
F.E.C.
T
ST
"14-B-A-E-P4"
"14-B-A-C1-P2"
(PG4) (PG4)
(PG4)
(PG4)
14-B-A-C1-P2-1,3,5
RACK-30
14-B-A-E-P4-1,3,5
RACK-30
14-B-A-C1-P2-7
AC-2
14-B-A-E-P4-15,17
14-B-A-E-P4-1914-B-A-E-P4-25
14-B-A-E-P4-21
14-B-A-E-P4-23
TELECOMMUNICATIONS
ROOM
BA04F-14
"14-B-C-C1-P3"
"14-B-C-E-P3"
(PG4)
(PG4) (PG4)
(PG4)
(PG4)
(PG4)
14-B-C-C1-P3-1,3,5
RACK-30
14-B-C-E-P3-1,3,5
RACK-30
14-B-C-C1-P3-2,4,6
RACK-30
14-B-C-E-P3-2,4,6
RACK-30
AC-2
14-B-C-E-P3-15,17
14-B-C-C1-P3-7
14-B-C-E-P3-25
14-B-C-E-P3-23
14-B-C-E-P3-21
14-B-C-E-P3-19
TELECOMMUNICATIONS
ROOM
BC07-14
(PG4) (PG4)
(PG4)(PG4)
"14-G-C-E-P2"
"14-G-C-C1-P3"
14-G-C-C1-P3-1,3,5
RACK-30
14-G-C-E-P2-1,3,5
RACK-30
AC-2
14-G-C-E-P2-15,17
14-G-C-E-P2-13 14-G-C-E-P2-19
14-G-C-E-P2-21
14-G-C-E-P2-23
14-G-C-E-P2-25
TELECOMMUNICATIONS
ROOM
GC31-14
"14-1-A-C1-P1"
"14-1-A-E-P1"
(PG4) (PG4)
(PG4)(PG4)
14-1-A-E-P1-1,3,5
RACK-30
14-1-A-C1-P1-1,3,5
RACK-30
14-1-A-C1-P1-7
AC-2
14-1-A-E-P1-13,15
14-1-A-E-P1-21
14-1-A-E-P1-23
14-1-A-E-P1-17
14-1-A-E-P1-19
TREATMENT
ROOM
1A14-14
TELECOMMUNICATIONS
ROOM
1A16-14
A
"14-1-C-C1-P5"
(PG4) (PG4)
(PG4)(PG4)
14-1-C-E-P7-1,3,5
RACK-30
14-1-C-C1-P5-1,3,5
RACK-30
AC-2
14-1-C-E-P7-13,15
14-1-C-C1-P5-7
14-1-C-E-P7-17 14-1-C-E-P7-21
"14-1-C-E-P7" 14-1-C-E-P7-19
TELECOMMUNICATIONS
ROOM
1C26-14
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:1
A M
14-EP402
ENLARGED POWER PLANS EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
NORTH
1/4" = 1'-0"F7
ENLARGED TECHNOLOGY ROOM BA04F-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D7
ENLARGED TEL/DATA BC07-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"F5
ENLARGED TECHNOLOGY ROOM GC31-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D5
ENLARGED TECHNOLOGY ROOM 1A16-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B7
ENLARGED TECHNOLOGY ROOM 1C25-14 ELECTRICAL PLAN
SHEET
KEYNOTES
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
1 PROVIDE AN OVERHEAD POWER DROP CORD WITH
A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK
RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))
COORDINATE INSTALLATION LOCATION WITH
TELECOMMUNICATIONS CONTRACTOR. SEE SHEET
EE002, EE501, AND PANEL SCHEDULE. PROVIDE
RACK MOUNTED POWER DIST. (2RU), RACK
MOUNTED UPS (6RU) AND PDU PER TELECOM
EQUIPMENT RACK ELEVATIONS ON ET500'S.
2 SECONDARY BONDING BUSBAR (SBB). SEE ET
SHEETS FOR PLACEMENT AND GROUNDING
DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY
DERIVED #3/0 GROUND FROM BUILDING GROUND
TO TR BUSBARS. CONTRACTOR TO VERIFY
BUSBAR’S RESISTANCE IS UNDER 4 OHMS
MEASURED BY THE FOUR POINT
FALL-OF-POTENTIAL METHOD PER IEEE 81.
3 PROVIDE A 100 AMP, THREE-PHASE, FOUR WIRE,
208 VOLT SERVICE PANEL. PANEL SHALL BE
EQUIPPED WITH A POWER METER.
4 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.
THERMAL SWITCH TO BE MOUNTED ON SIDE OF
UNIT.
5 COORDINATE NEW POWER CONFIGURATION WITH
EXISTING RACKS AND EQUIPMENT.
0' 2' 4' 8' 16'
GRAPHIC SCALE 1/4" = 1'-0"
1'
ADDENDUM #1 Date 1 06/08/23
F.E.C.
T
S T
F.E.C.
T
ST
F .E
.C
ST
CR
F .E
.C
S T
(PG4)
(PG4)(PG4)
(PG4)
"14-2-A-C1-P1"
"14-2-A-E-P1"
2 3
14-2-A-E-P1-1,3,5
RACK-30
14-2-A-C1-P1-1,3,5
RACK-30
AC-2
14-2-A-E-P1-13,15
14-2-A-C1-P1-7
14-2-A-E-P1-1714-2-A-E-P1-21
14-2-A-E-P1-19
TELECOMMUNICATIONS
ROOM
2A17-14
"14-2-C-E-P1"
"14-2-C-C1-P6"
(PG4)
(PG4)(PG4)
(PG4)
14-2-C-C1-P6-1,3,5
RACK-30
14-2-C-E-P1-1,3,5
RACK-30
AC-2
14-2-C-E-P1-13,15
14-2-C-E-P1-17 14-2-C-E-P1-21
14-2-C-E-P1-19
HAC
2C16-14
TELECOMMUNICATIONS
ROOM
2C32-14
(PG4) (PG4)
(PG4)(PG4)
"14-3-A-E-P1"
"14-3-A-C1-P3"
1 12
14-3-A-E-P1-1,3,5
RACK-30
14-3-A-C1-P3-1,3,5
RACK-30
AC-2
14-3-A-E-P1-15,17
14-3-A-E-P1-19
14-3-A-C1-P3-7
14-3-A-E-P1-23
14-3-A-E-P1-21
(G-4)
HAC
3A12-14
TELECOMMUNICATIONS
ROOM
3A08-14
RR
"14-3-C-C1-P1"
"14-3-C-E-P3"
(PG4)
(PG4) (PG4)
(PG4)
14-3-C-C1-P1-1,3,5
RACK-30
14-3-C-E-P3-1,3,5
RACK-30
AC-2
14-3-C-E-P3-15,17
14-3-C-C1-P1-7
14-3-C-E-P3-21
14-3-C-E-P3-23
14-3-C-E-P3-19
14-3-C-E-P3-25
TELECOMMUNICATIONS
ROOM
3C16-14
"14-B-C-C1-P1"
"14-B-A-E-P3"
"14-B-A-C1-TR1"
"14-B-A-E-TR1"
F8
14-EP603
ELECTRICAL
BA05-14
"14-B-C-E-P2"
"14-B-C-C1-P2"
"14-B-A-C1-TR1"
"14-B-A-E-TR1"
F8
14-EP603
14-2-B-N-P12
14-2-B-N-P12
CHIEF
RESIDENTS
IN QUALITY
AND PATIENT
SAFETY
2C20-14
UTILITY
(SOILED)
2C18A-14
LOCKERS
2C18-14
+42"
14-2-B-C1-P5
14-2-B-N-P12
14-2-B-N-P12
UC-REF
A
14-2-B-N-P4
(G-1) (G-1)
(G-4) (G-4) (G-4)
(G-4)
CHANGING
ROOM
3A28A-14
OFFICE
3A26-14
WHEELCHAIR
HOLDING
3A26A-14
CHANGING
ROOM
3A28-14
14-2-B-C2-P3
14-2-B-C2-P314-2-B-N-P414-2-B-N-P4
(G-1) (G-4)
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:2
A M
14-EP403
ENLARGED POWER PLANS EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
NORTH
1/4" = 1'-0"F7
ENLARGED TECHNOLOGY ROOM 2A17-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D7
ENLARGED TECHNOLOGY ROOM 2C32-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B7
ENLARGED TECHNOLOGY ROOM 3A08-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"F5
ENLARGED TECHNOLOGY ROOM 3C16-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D5
ENLARGED TELE/DATA BA05 & ELECTRICAL BA06 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"B5
ENLARGED ELECTRICAL BD03A ELECTRICAL PLAN
SHEET
KEYNOTES
GENERAL
SHEET NOTES
1 VERIFY ALL EXISTING CONDITIONS BEFORE BID.
2 CONTRACTOR IS RESPONSIBLE FOR ALL DEVICES,
GEAR, CABLE, CONDUCTORS, TERMINATIONS,
OVERCURRENT PROTECTION DEVICES, AND HEAD
END EQUIPMENT AS PART OF THIS PROJECT.
3 CONTRACTOR IS RESPONSIBLE FOR ALL LINE
VOLTAGE AS PART OF THIS PROJECT. PROVIDE
LINE VOLTAGE REQUIRED TO ALL SYSTEMS
PROVIDED AS PART OF THIS PROJECT.
COORDINATE WITH ALL OTHER DISCIPLINES AND
DRAWINGS.
4 ALL RACEWAYS SHALL BE CONCEALED IN WALLS,
FLOORS, AND CEILING UNLESS OTHERWISE
NOTED. INSTANCES WHERE EXPOSED OR
SURFACE MOUNTED RACEWAYS IS REQUIRED A
ROUTING SKETCH SHALL BE PROVIDED TO
ARCHITECT AND ENGINEER. RACEWAY TYPE
SHALL BE SELECTED BY ENGINEER. FINISH OF
RACEWAY SHALL BE SELECTED BY ARCHITECT.
5 PROVIDE A NEW DEVICE AND TRIM PLATE IN
EXISTING DEVICE LOCATION. THE DEVICE SHALL
MATCH EXISTING TYPE OR AS SHOWN WHICHEVER
IS MORE STRINGENT. PROVIDE NEW RACEWAYS
AND CONDUCTORS ONLY AS REQUIRED.
6 PROVIDE NEW CIRCUIT BREAKERS IN EXISTING
PANEL FOR ALL NEW CIRCUITS. FIELD VERIFY
PANELBOARD TYPE AND BREAKER TYPE.
7 LOCATIONS OF MECHANICAL EQUIPMENT SHOWN
IS APPROXIMATE. COORDINATE EXACT LOCATIONS
OF MECHANICAL EQUIPMENT WITH MECHANICAL
DRAWINGS AND INSTALLER PRIOR TO ROUGH-IN.
NORTH
1/4" = 1'-0"F2
ENLARGED CHIEF RESIDENTS OFFICE 2C20-14 ELECTRICAL PLAN
NORTH
1/4" = 1'-0"D2
ENLARGED OFFICE 3A26-14 ELECTRICAL PLAN
1 PROVIDE AN OVERHEAD POWER DROP CORD WITH
A 30 AMP 208 VOLT THREE-PHASE TWISTED LOCK
RECEPTACLE (L21-30R); 8.5 FT AFF (WYE(5-WIRE))
COORDINATE INSTALLATION LOCATION WITH
TELECOMMUNICATIONS CONTRACTOR. SEE SHEET
EE002, EE501, AND PANEL SCHEDULE. PROVIDE
RACK MOUNTED POWER DIST. (2RU), RACK
MOUNTED UPS (6RU) AND PDU PER TELECOM
EQUIPMENT RACK ELEVATIONS ON ET500'S.
2 SECONDARY BONDING BUSBAR (SBB). SEE ET
SHEETS FOR PLACEMENT AND GROUNDING
DETAIL. CONTRACTOR TO PROVIDE A SEPARATELY
DERIVED #3/0 GROUND FROM BUILDING GROUND
TO TR BUSBARS. CONTRACTOR TO VERIFY
BUSBAR’S RESISTANCE IS UNDER 4 OHMS
MEASURED BY THE FOUR POINT
FALL-OF-POTENTIAL METHOD PER IEEE 81.
3 PROVIDE A 100 AMP, THREE-PHASE, FOUR WIRE,
208 VOLT SERVICE PANEL. PANEL SHALL BE
EQUIPPED WITH A POWER METER.
4 PROVIDE GFCI CIRCUIT BREAKER IN PANEL
SERVING REFRIGERATOR.
5 PROVIDE THERMAL SWITCH FOR SPLIT SYSTEM.
THERMAL SWITCH TO BE MOUNTED ON SIDE OF
UNIT.
6 LIGHTING CONTROL AND POWER TO BE
CONNECTED TO EXISTING LIGHT CIRCUIT FOR THE
SPACE.
7 PROTECT BIOMED EQUIPMENT AND COPPER
TELEPHONE FROM CONSTRUCTION. BIOMED
EQUIPMENT AND COPPER TELEPHONE TO STAY IN
PLACE AND OPERATIONAL.
0' 2' 4' 8' 16'
GRAPHIC SCALE 1/4" = 1'-0"
1'
BASEMENT FLOOR
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
BASEMENT FLOOR
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
(PARTIAL) CRITICAL BRANCH
"14-B-C-C1-D1" 1000A, 480/277V, 3Ø, 4W
"14CDP" (EXISTING)
(PARTIAL) CRITICAL BRANCH
"14-B-C-C1-D1" 1000A, 480/277V, 3Ø, 4W
"14CDP" (EXISTING)
(PARTIAL) EQUIPMENT BRANCH
"14-B-C-E-D2" 1600A, 480/277V, 3Ø, 4W
"14EDP" (EXISTING)
(PARTIAL) EQUIPMENT BRANCH
"14-B-C-E-D2" 1600A, 480/277V, 3Ø, 4W
"14EDP" (EXISTING)
175/3
300/3
100/3
"14-G-A-E-P1"
100/3
"14-1-A-E-P1"
100/3
"14-2-A-E-P1"
100/3
"14-3-A-E-P1"
100/3
"14-B-A-E-P4"
100/3
100/3
100/3
100/3
100/3
"14-B-A-E-P3"
"14-B-A-E-TR1"
75 KVA
480-208Y/120V
3Ø, 4W
200/3
#2 CU
SE
175/3
300/3
100/3
"14-G-C-E-P2"
100/3
"14-1-C-E-P7"
100/3
"14-2-C-E-P1"
100/3
"14-3-C-E-P3"
100/3
"14-B-C-E-P3"
100/3
100/3
100/3
100/3
100/3
"14-B-C-E-P2"
"14-B-C-E-TR1"
75 KVA
480-208Y/120V
3Ø, 4W
200/3
#2 CU
SE
175/3
300/3
100/3
"14-G-A-C1-P2"
100/3
"14-1-A-C1-P1"
100/3
"14-2-A-C1-P1"
100/3
"14-3-A-C1-P3"
100/3
"14-B-A-C1-P2"
100/3
100/3
100/3
100/3
100/3
"14-B-A-C1-P1"
"14-B-A-C1-TR1"
75 KVA
480-208Y/120V
3Ø, 4W
200/3
#2 CU
SE
175/3
300/3
100/3
"14-G-C-C1-P1"
100/3
"14-1-C-C1-P5"
100/3
"14-2-C-C1-P6"
100/3
"14-3-C-C1-P1"
100/3
"14-B-C-C1-P3"
100/3
100/3
100/3
100/3
100/3
"14-B-C-C1-P2"
"14-B-C-C1-TR1"
75 KVA
480-208Y/120V
3Ø, 4W
200/3
#2 CU
SE
F5
POWER RISER ONE-LINE DIAGRAM -
BUILDING #14 - AREA "A"
F8
POWER RISER ONE-LINE DIAGRAM -
BUILDING #14 - AREA "C"
NO SCALE NO SCALE
TR
3AXX-14
TR
2A17-14
TR
1A16-14
TR
GB24-14
TELE/DATA
BA05
TR
3C16-14
TR
2C32-14
TR
1C25-14
TR
GC31-14
ELECTRICAL
BB03A
TR
BA04F-14
TR
BA04F-14
TR
BC07-14
TR
BC07-14
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:3
A M
14-EP601
PARTIAL ONE-LINE DIAGRAMS EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
GENERAL
SHEET NOTES
1 PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT
LOCATED OUTDOORS. REFER TO PLANS FOR
EQUIPMENT LOCATIONS.
2 REFER TO PLANS FOR CONSTRAINTS ON PHYSICAL
DIMENSIONS AND CLEARANCE REQUIREMENTS OF
EQUIPMENT. PROVIDE EQUIPMENT DIMENSIONS
THAT FALL WITHIN THE CONSTRAINTS OF EACH
SPECIFIC LOCATION.
3 ALL EQUIPMENT SHALL BE CONSTRUCTED AND
BRACED FOR THE SEISMIC CONDITIONS OF THE
PROJECT. REFER TO ELECTRICAL SPECIFICATIONS
FOR REQUIREMENTS.
4 PROVIDE PERFORMANCE TESTING FOR
GROUND-FAULT PROTECTION SYSTEMS ON SITE
WITH A WRITTEN RECORD OF THIS TEST
SUBMITTED TO THE AUTHORITY HAVING
JURISDICTION PER NEC 230.95(C).
SYM AMP
HH
AMPS
CONDUIT
SIZE
CONDUCTOR (NOTE 1)
IG/HH SE NOTESQTY SIZE G
1 20 - .75 2 12 12 12 8 2
2 20 - .75 3 12 12 12 8 2,3
3 20 24 .75 4 12 12 12 8 2,3
4 30 - .75 2 10 10 10 8 2
5 30 - .75 3 10 10 10 8 2
6 30 32 .75 4 10 10 10 8 2
7 40 - 1 2 8 10 8 6 2
8 40 - 1 3 8 10 8 6 2
9 40 44 1 4 8 10 8 6 2
10 55 - 1 2 6 10 8 4 2
11 55 - 1 3 6 10 8 4 2
12 55 60 1.25 4 6 10 8 4 2
13 70 - 1 2 4 8 4 2 2
14 70 - 1.25 3 4 8 4 2 2
15 70 76 1.25 4 4 8 4 2 2
16 85 - 1.25 2 3 8 3 2 2
17 85 - 1.25 3 3 8 3 2 2
18 85 92 1.25 4 3 8 3 2 2
19 95 - 1.25 3 2 8 2 2 2
20 95 104 1.50 4 2 8 2 2 2
21 130 - 1.50 3 1 6 2 2 2
22 130 116 1.50 4 1 6 2 2 2
23 150 - 2 3 1/0 6 2 1/0 2
24 150 136 2 4 1/0 6 2 1/0 2
25 175 - 2 3 2/0 6 2 2/0 2
26 175 156 2 4 2/0 6 2 2/0 2
27 200 - 2 3 3/0 6 2 2/0 2
28 200 180 2.50 4 3/0 6 2 2/0 2
29 230 - 2.50 3 4/0 4 2 2/0 2
30 230 208 2.50 4 4/0 4 2 2/0 2
31 255 - 2.50 3 250 4 1 2/0 2
32 255 232 2.50 4 250 4 1 2/0 2
33 310 - 3 3 350 3 1/0 3/0 2
34 310 280 3 4 350 3 1/0 3/0 2
35 380 - 3.50 3 500 3 3/0 3/0 2
36 380 344 4 4 500 3 3/0 3/0 2
37 400 - 2 EA 2 3 3/0 3 3/0 3/0 2
38 400 360 2 EA 2.50 4 3/0 3 3/0 3/0 2
39 510 - 2 EA 2.50 3 250 1 4/0 3/0 2
40 510 464 2 EA 3 4 250 1 4/0 3/0 2
41 620 - 2 EA 3 3 350 1/0 4/0 3/0 2,4
42 620 560 2 EA 3 4 350 1/0 4/0 3/0 2,4
43 760 - 2 EA 3.50 3 500 1/0 4/0 3/0 2,4
44 760 688 2 EA 4 4 500 1/0 4/0 3/0 2,4
45 855 - 3 EA 3 3 300 2/0 4/0 3/0 2,4
46 855 768 3 EA 3 4 300 2/0 4/0 3/0 2,4
47 1000 - 3 EA 3.50 3 400 2/0 4/0 3/0 4
48 1000 912 3 EA 3.50 4 400 2/0 4/0 3/0 4
49 1140 - 3 EA 4 3 500 3/0 4/0 3/0 4
50 1140 1032 3 EA 4 4 500 3/0 4/0 3/0 4
51 1240 - 4 EA 3 3 350 3/0 4/0 3/0 4
52 1240 1120 4 EA 3 4 350 3/0 4/0 3/0 4
53 1675 1520 5 EA 4 4 400 4/0 4/0 4/0 4
54 2010 1824 6 EA 4 4 400 250 250 250 4
55 2660 2408 7 EA 4 4 500 350 350 350 4
56 3040 2752 8 EA 4 4 500 500 500 500 4
57 4180 3784 11 EA 4 4 500 500 500 500 4
58 - - 5 EA 4 - - - - - 6
59 - - 5 - - - - - 6
60 - - 10 EA 4 - - - - - 6
IG
(E.G.)
COPPER CONDUCTOR AND
CONDUIT SCHEDULE
SUBSCRIPT (NOTE 5)
SCHEDULE NUMBER
1. CONDUCTORS SHOWN ARE SHOWN FOR EACH CONDUIT WITH MODIFICATIONS
AS NOTED IN NOTE 5. ALL CONDUCTORS SHOWN ARE THWN UNLESS
OTHERWISE NOTED.
2. PROVIDE EQUIPMENT GROUND CONDUCTORS PER TABLE 250-122 WHEN
CIRCUIT BREAKERS ARE SIZED GREATER THAN AMPERE RATING SHOWN IN
TABLE.
3. PROVIDE #10 NEUTRALS FOR MULTIWIRE BRANCH CIRCUITS SERVING
COMPUTERS.
4. GROUND (G) CONDUCTOR MAY BE DELETED ON SERVICE ENTRANCE
CONDUCTORS.
5. SYMBOL SUBSCRIPTS:
"2N": INCLUDE TWO NEUTRAL CONDUCTORS SIZED AS SCHEDULED FOR
PHASE AND NEUTRAL CONDUCTORS WHERE THE CONDUCTOR IS #1/0
OR LARGER. INCLUDE A SINGLE 200% RATED CONDUCTOR THAT IS
TWICE THE AMPACITY OF THE SCHEDULED PHASE AND NEUTRAL
CONDUCTOR WHERE THE CONDCUTOR IS BELOW #1/0 IN SIZE.
"CI": PROVIDE CIRCUIT INTEGRITY CABLE; TYPE TWO-HOUR FIRE
RESISTIVE CABLES IN CONDUIT OR PROVIDE FEEDER ENCASED IN
CONCRETE.
"FG" FULL SIZE GROUND, SIZE EQUIPMENT GROUNDING CONDUCTOR TO
BE SAME SIZE AS THE PHASE CONDUCTORS.
"HH": NEUTRAL CURRENTS EXIST DUE TO HIGH HARMONIC "NONLINEAR"
LOADS. CURRENT CARRYING CONDUCTORS DERATED
ACCORDINGLY. PROVIDE THE IG/HH SIZE FOR THE EQUIPMENT
GROUNDING CONDUCTOR.
"IG": INCLUDE IG (INSULATED/ISOLATED GROUND CONDUCTOR)
SCHEDULED ALONG WITH THE GROUND OF EQUIPMENT GROUND
CONDUCTOR.
"MC": PROVIDE FEEDER IN METAL-CLAD CABLE; TYPE MC IN PLACE OF
SINGLE CONDUCTORS IN CONDUIT.
"SE": SUBSTITUTE "SE" CONDUCTOR FOR "G" CONDUCTOR SHOWN, WHICH
IS SIZED FOR THE GROUNDING OF THE SECONDARY OF THE
SEPARATELY DERIVED SYSTEM.
"SER": PROVIDE SERVICE-ENTRANCE CABLE; TYPE SE OR SER IN PLACE OF
SINGLE CONDUCTORS IN CONDUIT.
CONDUCTOR AND CONDUIT SCHEDULE NOTES
EQUIPMENT NAMEPLATE
SCHEDULE
EQUIPMENT ID SCHEME
LABEL FORMAT [NAME]
[SYSTEM]
[VOLTAGE]
[FED FROM]
[SOURCE(S)]
LABEL EXAMPLE PANEL "14-4-A-C-P1"
STANDBY POWER
120/208V
FED FROM
BUS-A / XFMR 4TA
BUSWAY
OTHER
COLOR SCHEME
SYSTEM EQUIPMENT
NORMAL POWER ALL GEAR NOT INCLUDED BELOW
TEXT BACKGROUND
NAMEPLATE COLOR
STANDBY POWER
EMERGENCY POWER
LEGALLY-REQUIRED
STANDBY POWER
UPS "A" POWER
UPS "B" POWER
LABEL BUSWAY EVERY 6' WHERE EXPOSED TO VIEW AND
EVERY 15' WHERE NOT EXPOSED TO VIEW
WHITE
WHITE
WHITE
RED
WHITE
BLACK
BLACK
ORANGE
RED
WHITE
BLUE
YELLOW
MDPS1 AND ALL DOWNSTREAM
GEAR, EXCEPT UPS GEAR AS
NOTED
GDP1, GDP2, ATS-E AND ALL
DOWNSTREAM GEAR
ATS-S AND ALL DOWNSTREAM
GEAR
UPSA AND ALL DOWNSTREAM
GEAR
UPSB AND ALL DOWNSTREAM
GEAR
CIRCUIT
AMPACITY/VOLTAGE
CIRCUIT
LENGTH
CONDUCTOR SIZE
(PHASE, NEUTRAL AND GR) CONDUIT SIZE
20A/120V 0' - 60' #12 AWG 0.75" Ø
20A/120V 60' - 95' #10 AWG 0.75" Ø
20A/120V 95' - 150' #8 AWG 1" Ø
20A/120V 150' - 240' #6 AWG 1.25" Ø
20A/277V 0' - 140' #12 AWG 0.75" Ø
20A/277V 140' - 220' #10 AWG 0.75" Ø
20A/277V 220' - 350' #8 AWG 1" Ø
20A/277V 350' - 550' #6 AWG 1.25" Ø
NOTES:
1. WIRE SIZING IS BASED ON COPPER CONDUCTORS SUPPLYING A 20A,
120V CIRCUIT AT THE INDICATED VOLTAGE, ASSUMED TO BE 80%
LOADED (16A), WITH MAXIMUM VOLTAGE DROP OF 3% AT THE LOAD.
2. DOWN-SIZED WIRE AT DEVICE/LOAD AS REQUIRED AND TERMINATE
CONDUCTORS IN A SAFE AND CODE COMPLIANT MANNER.
3. CONDUIT SIZE IS BASED ON A MAXIMUM OF 3 CIRCUITS PER CONDUIT,
EACH WITH A SEPARATE NEUTRAL CONDUCTOR.
BRANCH CIRCUIT CONDUCTOR
AND CONDUIT SIZING TABLE
6. RACEWAY ONLY. CONDUCTORS PROVIDED BY UTILITY.
FIRST DIGIT - BUILDING NUMBER (1, 2, 3, ETC)
SECOND DIGIT - BUILDING LEVEL (0, 1, 2, ETC)
THIRD DIGIT - BUILDING AREA (A, B, C, ETC)
FOURTH DIGIT - ELECTRICAL SYSTEM TYPE
N - NORMAL
C- CRITICAL (C, C1, C2, ETC)
L - LIFE SAFETY
E - EMERGENCY
FIFTH DIGIT - EQUIPMENT TYPE
S - SWITCHGEAR
D - DISTRIBUTION PANEL
TR - TRANSFORMER
P - BRANCH PANEL
ATS - AUTOMATIC TRANSFER SWITCH
SIXTH DIGIT SEQUENCE # (1,2,3,...)
SYM
GROUNDING SCHEDULE
ALL CONDUCTORS ARE INSULATED UNLESS
INDICATED OTHERWISE
#500 KCMIL CU
#350 KCMIL CU
#250 KCMIL CU
#4/0 CU
#1/0 CU
#4 CU
#6 CU
12"X2"X1/4" COPPER BUS WITH
PRE-DRILLED HOLES MOUNTED ON
INSULATORS IN MAIN ELECTRICAL ROOM
GROUNDING CONDUCTOR PER POWER
ONE-LINE DIAGRAM
12"X2"X1/4" COPPER BUS WITH
PRE-DRILLED HOLES MOUNTED ON
INSULATORS IN ELECTRICAL & TELECOMM.
CLOSETS
SIZE
BASEMENT FLOOR
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1
G2
G3
G4
G5
G6
G7
G8
G9
G10
TR
BA04F-14
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
TR
GB24-14
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
TR
1A16-14
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
TR
2A17-14
G4
TR
3AXX-14
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
EXISTING BUILDING MAIN
GROUNDING BUSBAR
G4
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
G1G1
G1
TO EQUIPMENT
RACKS (TYP)
TO LADDER
RACK (TYP)
BOND TO ELEC
PANEL GR BUSES
G8
G4
TR
BC07-14
TR
GC31-14
TR
1C25-14
TR
2C32-14
TR
3C16-14
ROOF
MAIN ELECTRICAL ROOM
BC08B-14
GROUND FLOOR
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:4
A M
14-EP602
GROUNDING RISER DIAGRAM EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
SCALE: NTSF1
GROUNDING RISER DIAGRAM
SIDE VIEW
FRONT VIEW
TOP VIEW
TRANSFORMER, SEE ELECTRICAL
CONNECT TO UNISTRUT WITH 1/2" θ A325
THRU BOLT AND STANDARD WASHERS (4)
TOTAL OR PER MANUF. WHICHEVER IS
MORE STRINGENT.
P1000T UNISTRUT,
TYPICAL ALL BEAM
UNLESS NOTED
OTHERWISE
P1001T UNISTRUT
COLUMN, TYPICAL ALL
COLUMNS UNLESS
NOTED OTHERWISE
UNISTRUT P2037SQ POST
BASE WITH (2) 1/2"⌀
HILT KWIK BOLT TZ- 2-5/8"
EMBEDMENT MIN.
UNISTRUT P1000T KICKER
BRACE, TYPICAL UNLESS
NOTED OTHERWISE. PROVIDE
UNISTRUT (2) P2260 ANGLED
CONNECTORS TOP AND
BOTTOM OF BRACE WITH (4)
1/2"θ
THRU BOLTS WITH STANDARD
WASHERS AND SPRING NUTS
(P1010 OR SIM.)
UNISTRUT P1026
CONNECTOR WITH 1/2"θ
THRU BOLTS, STANDARD
WASHERS AND SPRING
NUTS (P1010 OR SIM.)
STACKED
TRANSFORMER
FLOOR MOUNTED TRANSFORMER
WITH (4) 1/2"⌀
HILTI KWIK BOLT TZ ANCHORS
WITH 2-5/8" MIN EMBEDMENT.
INSTALL ANCHOR BOLTS IN
HOLES PROVIDED BY MANUF.
(E)
CONCRETE
FLOOR
DOTTED LINE IS
THE OUTLINE OF
THE TOP OF THE
TRANSFORMER
DETAIL A
UNISTRUT BEAM
1/2"⌀ THRU BOLT WITH
STANDARD WASHER AND
UNISTRUT P1010 SPRING NUT OR
SIMILAR
A
A
48" max; 36" min
48" max; 36" min
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:4
A M
14-EP603
DETAILS & LIGHTING FIXTURE
SCHEDULES
EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
ID DESCRIPTION
NOMINAL SIZE
M O
U N
T
IN
G
T Y
P E
C O
L O
R T
E M
P
C R
I
D R
IV
E
R C
O N
F
IG
U R
A T
IO
N
V O
L T
A G
E
W A
T T
S
F
IN
IS
H
F
IX
T U
R E
L U
M E
N S
D
IF
F U
S E
R /L
E N
S
R E
F L
E C
T O
R
O P
T
IO
N S
N O
T E
S
MANUFACTURER (CATALOG SERIES)
L E
N G
T H
D E
P T
H
H E
IG
H
T
D
IA
M E
T E
R A
P E
R T
U R
E
OPTION 1 OPTION 2 OPTION 3
(G-1) 2X2 LED FLAT PANEL, GRID LAY-IN 24" 24" 3" - CR LED 3500K LED DRIVER
(0-10V DIMMING)
120/277 41 - 3400 - - - METALUX (22FP4735C) APPROVED EQUAL APPROVED EQUAL
(G-4) 2X4 LED FLAT PANEL, GRID LAY-IN 48" 24" 3" - CR LED 3500K LED DRIVER
(0-10V DIMMING)
120/277 41 - 4300 - - - METALUX (24FP4735C) APPROVED EQUAL APPROVED EQUAL
(PG4) STRIPLIGHT, GENERAL 48" 4" 4" - CP LED 4000K LED DRIVER
(0-10V DIMMING)
120/277 38 CBA 5000 - - - LITHONIA
(ZL1D-L48-5000LM-FST-M
VOLT-40K-80CRI-WH-HC3
6)
ILP (SS4) WILLIAMS (75R)
DIFFUSER/LENSFINISH PROVIDE UNIT PRICES AND FIXTURE BRAND SELECTED FOR ADD/DELETE CHANGES
FOR EACH FIXTURE TYPES SHOWN WITHIN 48 BUSINESS HOURS OF THE BID DATE.
FAILURE TO COMPLY WITH THIS REQUIREMENT MAY DISQUALIFY THE PRODUCTS
AND EMPOWER THE ENGINEER TO DETERMINE FAIR VALUE FOR FIXTURE AND
INSTALLATION CHANGES, WITHOUT FURTHER INPUT FROM THE CONTRACTOR OR
INSTALLER.
CONTRACTOR ALLOWANCE PRICES ARE ACCURATE WHEN THIS JOB WAS
SPECIFIED, CONTRACTOR AND ELECTRICAL DISTRIBUTOR SHALL VERIFY THIS
ALLOWANCE AND REPORT ANY PROBLEMS TO THE ENGINEER BEFORE THE BID.
ALLOWANCE PRICE MAY OR MAY NOT INCLUDE LAMP(S) OR FREIGHT AS NOTED,
AND DO NOT INCLUDE ANY TAXES.
SUBSTITUTIONS AND/OR EQUAL FIXTURES MUST RECEIVE APPROVAL PRIOR TO
BIDDING, THEY MUST BE SUBMITTED TO THE ENGINEER NO LESS THAN 2 WEEKS
PRIOR TO BID OPENING.
SAMPLES MUST BE PROVIDED FOR ANY AND ALL FIXTURES UPON A/E REQUEST
PRIOR TO RELEASING FIXTURES.
ALL FIXTURES SHALL BE LISTED AND APPROVED FOR THEIR INTENDED USE AND
LOCATION.
VERIFY THE PROPER MOUNTING KITS OR ACCESSORIES TO FACILITATE
INSTALLATION AS SHOWN AT EACH LOCATION ON THE DRAWINGS.
COMPLY WITH THE "INTERIOR LIGHTING" SECTION OF THE SPECIFICATIONS.
REFER TO SPECIFICATIONS FOR IMPORTANT TECHNICAL REQUIREMENTS FOR
LIGHTING FIXTURES, DRIVERS, AND LAMPS.
ALL LIGHT FIXTURES TO BE EITHER "DLC" OR "LIGHTING FACTS" LISTED OR TO BE
APPROVED BY ARCHITECT/ENGINEER AND OWNER.
LUMINAIRE OPTIONSMOUNTING REFLECTOR 1.
2.
3.
4.
5.
6.
7.
8.
9.
DIAMETER
H E
IG
H
T
LENGTH DEPTH
H E
IG
H
T
LENGTH
DEPTH
HEIGHT
NOTES
INTERIOR LIGHTING FIXTURE SCHEDULE
ABBREVIATIONS GENERAL NOTES
ARHR - AIR RETURN AND HEAT REJECTION
DL - DAMP LOCATION
EQC - EARTHQUAKE CLIPS
F - FUSING
HLD - HINGED AND LATCHED DOOR
HS - HOUSE SIDE SHIELD
PS - PHOTOCELL SWITCH
QRS - QUARTZ RESTRIKE
ST - STATIC
WG - WIRE GUARD
WL - WET LOCATION
B - BASE
C - CEILING
F - FLANGE
G - GRID
P - PENDANT
PL POLE
R - RECESSED
S - SURFACE
W - WALL
MW - MATTE WHITE
BL - BLACK
SL - SILVER
GL - GOLD
CL - CLEAR
PW - PAINTED WHITE
EA - EXTRUDED ALUMINUM
S - STEEL
GS - GALVANIZED STEEL
C - CAST
CBA - COLOR BY ARCHITECT
SCBA - STANDARD COLOR BY
ARCHITECT
CCA - CUSTOM COLOR BY
ARCHITECT
FS
209D
- MEETS FEDERAL
STANDARD 209D
TP - THERMALLY
PROTECTED
FL - FLUSH
R - REGRESS
M - MITERED
OP - NONE/OPEN
SP - SPECULAR
SS - SEMI-SPECULAR
D - DIFFUSE (WHITE ENAMEL)
SC - SPECULAR (COLORED)
PR - PRISMATIC
FDR - FULL DEPTH REFLECTOR
DS - DIFFUSE (SEMI SPECULAR) SILVER
LI - LOW IRIDESCENT
IR - IRIDESCENT
SL - SILVER
GL - GOLD
CA - CLEAR ALZAK
#A - ACRYLIC #THICK
#OA - ACRYLIC #THICK (OPAL)
GC - GLASS (CLEAR)
GO - GLASS (OPAL)
GF - GLASS (FROSTED)
SGL - SOFT GLOW LENS
HPL - HIGH PERFORMANCE LENS
DO - DROP OPAL
CGL - CONVEX GLASS LENS
S - SATIN LENS
F8
STACKED TRANSFORMER DETAIL
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /B ld g
E
L E
C .r v t
/8
/2
:2
:5
A M
14-EP604
PANEL SCHEDULES EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
BUILDING 14
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 87.5 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: 7.2 kVA @ 100% = 7.2 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 263
LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 95
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 258 266 254 AVERAGE CONNECTED AMPS PER PHASE = 259
TOTALS: CONNECTED kVA PER PHASE 31 32 30 CONNECTED TOTAL kVA = 93
41 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 42
39 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 40
37 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 38
35 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 36
33 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 34
31 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 32
29 -- -- -- -- -- -- -- 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 -- -- -- -- -- -- -- 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 100 3 0.0 17.2 1.6 14-B-A-E-P4 6.1 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 -- -- -- -- -- -- -- 5.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 -- -- -- -- -- -- -- 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 100 3 0.0 17.2 1.4 14-1-A-E-P1 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 -- -- -- -- -- -- -- 6.6 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 -- -- -- -- -- -- -- 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 100 3 0.0 17.2 1.4 14-3-A-E-P1 5.7 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 -- -- -- -- -- -- -- 5.7 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 -- -- -- -- -- -- -- 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 100 3 0.0 17.2 1.3 14-2-A-E-P1 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 5.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 100 3 0.0 17.2 1.4 14-G-A-E-P1 6.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 300 AMPERE MAIN CB SURFACE ELECTRICAL BA05-14
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "14-B-A-E-P3"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 18.6 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: 1.6 kVA @ 100% = 1.6 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 56
LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 20
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 51 53 53 AVERAGE CONNECTED AMPS PER PHASE = 52
TOTALS: CONNECTED kVA PER PHASE 6 6 6 CONNECTED TOTAL kVA = 19
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 15 2 0.0 1.7 0.0 PWR: AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 0.0 0.0 0.2 CO EXTERIOR TO SS-2 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 30 3 0.0 5.6 0.0 PWR: SS-2 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB 14-B-A-E-P3 SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "14-B-A-E-P4"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 50.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 141
LIGHTING & CONTINUOUS LOADS: 0.8 kVA @ 125% = 1.0 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 51
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 145 139 139 AVERAGE CONNECTED AMPS PER PHASE = 141
TOTALS: CONNECTED kVA PER PHASE 17 17 17 CONNECTED TOTAL kVA = 51
41 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 42
39 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 40
37 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 38
35 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 36
33 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 34
31 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 32
29 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 100 3 0.2 10.0 0.0 14-3-A-C1-P3 3.5 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 100 3 0.2 10.0 0.0 14-2-A-C1-P1 3.5 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 100 3 0.2 10.0 0.0 14-1-A-C1-P1 3.5 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 100 3 0.2 10.0 0.0 14-G-A-C1-P2 3.5 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 100 3 0.2 10.0 0.0 14-B-A-C1-P2 3.5 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 300 AMPERE MAIN CB SURFACE ELECTRICAL BA05-14
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "14-B-C-C1-P1"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 10.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28
LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28
TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB 14-B-C-C1-P1 SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "14-B-A-C1-P2"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 10.0 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 28
LIGHTING & CONTINUOUS LOADS: 0.2 kVA @ 125% = 0.2 kVA - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 10
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 29 28 28 AVERAGE CONNECTED AMPS PER PHASE = 28
TOTALS: CONNECTED kVA PER PHASE 3 3 3 CONNECTED TOTAL kVA = 10
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 20 1 0.2 0.0 0.0 LIGHTING... 0.2 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB 14-B-C-C1-P1 SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "14-G-A-C1-P2"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER LOADS @ 100% : 18.6 kVA -
MOTOR TOTALS INCLUDED IN ALL OTHER LOADS WITH
LARGEST MOTOR CALCULATED @ 125% PER NEC
RECEPTACLES: 1.4 kVA @ 100% = 1.4 kVA - FIRST 10kVA @ 100%, REMAINDER @ 50% AVERAGE AMPS PER PHASE = 56
LIGHTING & CONTINUOUS LOADS: - 100% CONNECTED LOAD PLUS 25% DIVERSIFIED TOTAL kVA = 20
NEC DIVERSIFIED LOAD CALCULATIONS
CONNECTED AMPS PER PHASE 54 54 49 AVERAGE CONNECTED AMPS PER PHASE = 52
TOTALS: CONNECTED kVA PER PHASE 6 6 6 CONNECTED TOTAL kVA = 19
29 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 30
27 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 28
25 20 1 -- 0.0 0.0 0.0 SPARE 0.0 -- SPACE 0.0 0.0 0.0 -- 1 -- 26
23 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 24
21 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 22
19 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 20
17 20 1 0.0 0.0 0.4 CO TELECOMMUNICATIONS... 0.4 -- SPACE 0.0 0.0 0.0 -- 1 -- 18
15 -- -- -- -- -- -- -- 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 16
13 15 2 0.0 1.7 0.0 PWR: AC-2... 0.8 -- SPACE 0.0 0.0 0.0 -- 1 -- 14
11 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 12
9 -- -- -- -- -- -- -- 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 10
7 30 3 0.0 5.6 0.0 PWR: SS-2 1.9 -- SPACE 0.0 0.0 0.0 -- 1 -- 8
5 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 6
3 -- -- -- -- -- -- -- 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 4
1 30 3 0.0 10.0 0.0 RACK POWER 3.3 -- SPACE 0.0 0.0 0.0 -- 1 -- 2
NO AMP POLE BKR LTG PWR CO DESCRIPTION A B C DESCRIPTION CO PWR LTG BKR POLE AMP NO
CKT OCP LOAD (kVA) PHASE LOAD LOAD (kVA) OCP CKT
ACCESSORIES: PANEL DIRECTORY, IDENTIFICATION, GROUNDING BAR AIC RATING: 0
120/208V, 3 PH 4 WIRE 22" W x 6" D, BOLT-ON 100 AMPERE MAIN CB 14-B-A-E-P3 SURFACE TELECOMMUNICATIONS...
VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE AND TYPE: FED FROM: CABINET: LOCATION: NOTES:
PANEL: "14-G-A-E-P1"
BKR: GF=GFCI, GF3=30mA GFCI CAPABLE OF BEING LOCKED OUT IN OPEN POSITION, IG=ISOLATED GROUND, AF=AFCI, ST=SHUNT TRIP, RED=PROVIDE RED COLORED BREAKER, AF=ARC FAULT CURRENT INTERRUPTER, GA=COMBINATION OF GROUND FAULT AND ARC FAULT CIRCUIT INTERRUPTER, GS=COMBINATION OF SHUNT TRIP WITH GFCI
ALL OTHER…