Attachment 1-Specifications-(1 of 1)-EHRM-Salt Lake City.pdf

PDF 6 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction - Salt Lake City VAMC Project 660-21-700
Solicitation number
36C77623B0041
Issued by

About this file

This document outlines the scope of work for infrastructure upgrades at the George E. Wahlen Department of Veterans Affairs Medical Center in Salt Lake City, Utah. The project involves upgrading electrical systems, HVAC, communications infrastructure, fiber backbone, security systems, and hazardous material abatement across multiple buildings on the medical center campus. Key requirements include installing new data outlets and patch panels, upgrading cable to Category 6A, evaluating and improving the fiber optic backbone, and renovating existing spaces as needed. The contractor must follow safety protocols and minimize disruptions to medical center operations during construction. Testing and commissioning are required at all levels to ensure systems function as designed. The work must be completed according to specifications and drawings provided by the Department of Veterans Affairs.

View the file

Other files

File Type Posted
RESPONSE Attachment V5.1.docx DOCX document
Construction Wage Rates- Salt Lake County- 08-11-2023.pdf PDF
ADDENDUM No 01.pdf PDF
Bid opening call-in information.pdf PDF
RESPONSE Attachment V5.1 No. 30 Snippet.JPG JPG image
2017 AHERA 3-Year Reinspection v2.2 2017_1205_BT.xlsx XLSX spreadsheet
RESPONSE V10 - Technical Questions.docx DOCX document
RESPONSE Attachment V7.2.docx DOCX document
36C77623B0041 0004.pdf PDF
RESPONSE Attachment V2.1.docx DOCX document
RESPONSE Attachment V1.1.docx DOCX document
RESPONSE Attachment V7.1.docx DOCX document
RESPONSE Attachment V3.1.docx DOCX document
36C77623B0041 0003.pdf PDF
36C77623B0041 0003.pdf PDF
36C77623B0041 0002.pdf PDF
660-21-700 PreConstruction Site Visit Sing In Sheet 2023 07 14.pdf PDF
36C77623B0041 0001.pdf PDF
Attachment 13-Utah Tax Memo-EHRM-Salt Lake City.pdf PDF
Attachment 7-Part 6 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 12-Construction Wage Rates-Salt Lake County- 04-14-2023.pdf PDF
Attachment 14-Limitations on Subcontracting-EHRM-Salt Lake City.docx DOCX document
Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 15-Contractor Safety-Environmental-EHRM-S.L.C..docx DOCX document
Attachment 6-Part 5 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 3-Part 2 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 9-Part 8 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
36C77623B0041.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 11-Asbestos Site Survey-EHRM Salt Lake City.pdf PDF
Attachment 10-Part 9 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 4-Part 3 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 8-Part 7 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

06-01-22

EHRM INFRASTRUCTURE UPGRADES, GEORGE E. WAHLEN VAMC (CONSTRUCTION DOCUMENTS)

PROJECT # 660-21-700

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 32 16 Project Schedules

01 33 23 Shop Drawings, Product Data, and Samples 06-21

01 35 26 Safety Requirements 11-21

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 04-22

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 71 00 Door Hardware 05-22

08 80 00 Glazing 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

00 01 10-2

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 19 Resilient Tile Flooring 05-18

09 68 00 Carpeting 01-21

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 21 13 Toilet Compartments 01-21

10 26 00 Wall and Door Protection 01-21

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 01-21

12 36 00 Countertops 12-18

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 04-22

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 08 00 Commissioning of HVAC Systems 04-22

23 09 23 Direct-Digital Control System for HVAC 09-11

23 23 00 Refrigerant Piping 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 36 00 Air Terminal Units 02-20

23 81 23 Computer-Room Air-Conditioners 03-20

23 81 43 Air-Source Unitary Heat Pumps 03-20

23 82 00 Convection Heating and Cooling Units 03-20

00 01 10-3

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 39 Underfloor Raceways for Electrical Systems 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 22 00 Low-Voltage Transformers 01-18

26 24 13 Distribution Switchboards 01-18

26 24 16 Panelboards 01-18

26 26 00 Power Distribution Units for Static Uninterruptible

Power Systems

01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 33 53 Static Uninterruptible Power Supply 01-17

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 05 36 Cable Trays for Communications Systems 11-21

27 05 53 Identification for Communications Systems 07-21

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Structured Cabling 11-21

27 11 00 Communications Equipment Room Fittings 06-15

27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 11-21

27 11 19 Communications Termination Blocks and Patch Panels 11-21

27 11 26 Communications Rack Mounted Power Protection and Power

Strips

11-21

27 13 23 Communications Optical Fiber Backbone Cabling 11-21

27 15 00 Communications Structured Cabling 01-16

27 15 13 Communications Copper Horizontal Cabling 11-21

27 15 13.13 Communications Optical Fiber Cable Splicing and

Terminations

11-21

27 16 19 Communications Patch Cords, Station Cords, and Cross

Connect Wire

11-21

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 11 Requirements for Electronic Safety and Security installaton.

12-22

00 01 10-4

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 33 Raceways and Boxes for Electronic Safety and Security 12-22

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 31 00 Fire Detection and Alarm 10-11

05-01-20

PROJECT # 660-21-700

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

SITE PLANNING

ARCHITECTURAL

STRUCTURAL

PLUMBING

HEATING, VENTILATING, AIR

CONDITIONING AND REFRIGERATION

ELECTRICAL

- - - END - - -

PROJECT # 660-21-700

00 01 15 - 2

(SAMPLE LIST OF DRAWINGS)

VAMC (NAME) (SPEC No.)

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

CS001 COVER SHEET VICINITY PLAN

CS002 PROJECT SHEET INDEX

CS003 RISK ASSESSMENT

CS004 IT SECURITY CHECKLIST

EE001 ELECTRICAL SYMBOL LEGEND, ABBRV, AND GEN NOTES

EE002 TELECOM SCHEDULES AND NOTES

EE003 MECHANICAL EQUIPMENT SCHEDULE

EE004 SECURITY SCHEDULE AND NOTES

EE501 ELECTRICAL DETAILS

EE701 TYPICAL MOUNTING HEIGHT DETAILS

ET501 TELECOM DETAILS

ET502 TELECOM DETAILS

ET503 TELECOM DETAILS

ET504 TELECOM SECURITY DETAILS AND RISER DIAGRAMS

ET505 TELECOM EQUIPMENT RACK GROUNDING DETAIL

AE001 GENERAL NOTES, SYMBOLS, ABBREVIATIONS

AE002 CONSTRUCTION SEQUENCING – SITE

AE003 INFECTION CONTROL

HR101 HAZARDOUS MATERIAL ABATEMENT

AE201 WALL SECTIONS

AE202 WALL SECTIONS

AE501 ARCHITECTURAL DETAILS

AE502 ARCHITECTIRAL DETAILS

PE001 PLUMBING SYMBOL LEGEND, ABBRV, AND GEN NOTES

PE501 PLUMBING DETAILS

PE602 PLUMBING FIXTURE SCHEDULES – BUILDING 3

PE603 PLUMBING FIXTURE SCHEDULES – BUILDING 14

PROJECT # 660-21-700

00 01 15 - 3

ME001 MECHANICAL SYMBOL LEGEND, ABBRV, AND GEN NOTES

ME401 ENLARGED MECHANICAL PLANS

ME601 MECHANICAL SCHEDULES

ME701 MECHANICAL CONTROLS LEGENDS & NOTES

ME702 MECHANICAL CONTROLS DIAGRAMS

SITE

ES101 OVERALL SITE RACEWAY PLAN

ES102 OVERALL SITE TUNNEL RACEWAY PLAN

ES501 SITE TELECOM DETAILS

ES502 SITE TELECOM DETAILS

ES601 OVERALL SITE MICRODUCT LEGEND

ES602 OVERALL SITE MICRODUCT RISER DIAGRAM

ES603 FIBER CABLE PATH -A- MATRIX

ES604 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 1)

ES605 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 1)

ES606 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 2)

ES607 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 2)

ES608 FIBER CABLE SPLICE DIAG PATH -A- (BLDG- 2, 3)

ES609 FIBER CABLE SPLICE DIAG PATH -A- (BLDG- 3, 4)

ES610 FC SPLICE DIAG PATH -A- (BLDG- 5,6,7,8,9,16)

ES611 FC SPLICE DIAG PATH -A- (BLDG- 16,38,47,50)

ES612 FIBER CABLE SPLICE DIAG PATH -A- (BLDG- 50, 90)

ES613 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 14)

ES614 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 14)

ES615 FIBER CABLE PATH -B- MATRIX

ES616 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 1)

ES617 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 1)

ES618 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 2)

ES619 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 2)

ES620 FIBER CABLE SPLICE DIAG PATH -B- (BLDG- 2, 3)

ES621 FIBER CABLE SPLICE DIAG PATH -B- (BLDG- 3, 4)

ES622 FC SPLICE DIAG PATH -B- (BLDG- 5,6,7,8,9,16)

ES623 FC SPLICE DIAG PATH -B- (BLDG- 38,47,50,90)

ES624 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 14)

ES625 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 14)

BUILDING 01

PROJECT # 660-21-700

00 01 15 - 4

01-GC100 SEQUENCING PLAN – GROUND FLOOR

01-GC110 SEQUENCING PLAN – FIRST FLOOR

01-GC120 SEQUENCING PLAN – SECOND FLOOR

01-GC130 SEQUENCING PLAN – THIRD FLOOR

01-GC140 SEQUENCING PLAN – FOURTH FLOOR

01-GC150 SEQUENCING PLAN - FIFTH FLOOR

01-SF140 OVERALL FOURTH FLOOR STRUCTURAL PLAN

01-SF340 ENLARGED FOURTH FLOOR STRUCTURAL PLAN

01-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN

01-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

01-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

01-AD130 OVERALL THIRD FLOOR DEMOLITION PLANS

01-AD140 OVERALL FOURTH FLOOR DEMOLITION PLANS

01-AD150 OVERALL FIFTH FLOOR DEMOLITION PLANS

01-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS

01-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

01-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS

01-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS

01-AD321 ENLARGED SECOND FLOOR DEMOLITION PLANS

01-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS

01-AD331 ENLARGED THIRD FLOOR DEMOLITION PLANS

01-AD340 ENLARGED FOURTH FLOOR DEMOLITION PLANS

01-AD341 ENLARGED FOURTH FLOOR DEMOLITION PLANS

01-AD350 ENLARGED FIFTH FLOOR DEMOLITION PLANS

01-AE100 OVERALL GROUND FLOOR PLAN

01-AE110 OVERAL FIRST FLOOR PLAN

01-AE120 OVERALL SECOND FLOOR PLAN

01-AE130 OVERALL THIRD FLOOR PLAN

01-AE140 OVERALL FOURTH FLOOR PLAN

01-AE150 OVERALL FIFTH FLOOR PLAN

01-AE300 ENLARGED GROUND FLOOR PLANS

01-AE310 ENLARGED FIRST FLOOR PLANS

01-AE311 ENLARGED FIRST FLOOR PLANS

01-AE320 ENLARGED SECOND FLOOR PLANS

01-AE321 ENLARGED SECOND FLOOR PLANS

01-AE330 ENLARGED THIRD FLOOR PLANS

01-AE331 ENLARGED THIRD FLOOR PLANS

PROJECT # 660-21-700

00 01 15 - 5

01-AE340 ENLARGED FOURTH FLOOR PLANS

01-AE341 ENLARGED FOURTH FLOOR PLANS

01-AE350 ENLARGED FIFTH FLOOR PLANS

01-AE400 INTERIOR ELEVATIONS

01-AE401 INTERIOR ELEVATIONS

01-AE600 SCHEDULES

01-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN

01-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

01-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

01-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN

01-FX140 OVERALL FOURTH FLOOR FIRE SPRINKLER PLAN

01-FX150 OVERALL FIFTH FLOOR FIRE SPRINKLER PLAN

01-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN

01-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

01-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

01-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN

01-MH140 OVERALL FOURTH FLOOR MECHANICAL PLAN

01-MH150 OVERALL FIFTH FLOOR MECHANICAL PLAN

01-MH160 OVERALL ROOF MECHANICAL PLAN

01-MH401 ENLARGED MECHANICAL PLANS

01-MH402 ENLARGED MECHANICAL PLANS

01-MH403 ENLARGED MECHANICAL PLANS

01-MH404 ENLARGED MECHANICAL PLANS

01-MH405 ENLARGED MECHANICAL PLANS

01-MH406 ENLARGED MECHANICAL PLANS

01-MH407 ENLARGED MECHANICAL PLANS

01-MH408 ENLARGED MECHANICAL PLANS

01-MH409 ENLARGED MECHANICAL PLANS

01-MH410 ENLARGED MECHANICAL PLANS

01-MH411 ENLARGED MECHANICAL PLANS

01-MH412 ENLARGED MECHANICAL PLANS

01-MH413 ENLARGED MECHANICAL PLANS

01-MH414 ENLARGED MECHANICAL PLANS

01-MH415 ENLARGED MECHANICAL PLANS

01-MH416 ENLARGED MECHANICAL PLANS

01-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN

01-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN A WING

PROJECT # 660-21-700

00 01 15 - 6

01-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN B WING

01-ED100C GROUND LEVEL ELECTRICAL DEMOLITION PLAN C WING

01-ED100D GROUND LEVEL ELECTRICAL DEMOLITION PLAN D WING

01-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN

01-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN A WING

01-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN B WING

01-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN C WING

01-ED110D FIRST LEVEL ELECTRICAL DEMOLITION PLAN D WING

01-ED110E FIRST LEVEL ELECTRICAL DEMOLITION PLAN E WING

01-ED110F FIRST LEVEL ELECTRICAL DEMOLITION PLAN F WING

01-ED110H FIRST LEVEL ELECTRICAL DEMOLITION PLAN H WING

01-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN

01-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN A WING

01-ED120B SECOND LEVEL ELECTRICAL DEMOLITION PLAN B WING

01-ED120C SECOND LEVEL ELECTRICAL DEMOLITION PLAN C WING

01-ED120D SECOND LEVEL ELECTRICAL DEMOLITION PLAN D WING

01-ED120E SECOND LEVEL ELECTRICAL DEMOLITION PLAN E WING

01-ED120F SECOND LEVEL ELECTRICAL DEMOLITION PLAN F WING

01-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN

01-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN A WING

01-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN B WING

01-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN C WING

01-ED130D THIRD LEVEL ELECTRICAL DEMOLITION PLAN D WING

01-ED140 OVERALL FOURTH LEVEL ELECTRICAL DEMOLITION PLAN

01-ED140A FOURTH LEVEL ELECTRICAL DEMOLITION PLAN A WING

01-ED140B FOURTH LEVEL ELECTRICAL DEMOLITION PLAN B WING

01-ED140C FOURTH LEVEL ELECTRICAL DEMOLITION PLAN C WING

01-ED140D FOURTH LEVEL ELECTRICAL DEMOLITION PLAN D WING

01-ED150 OVERALL FIFTH LEVEL ELECTRICAL DEMOLITION PLAN

01-ED150A FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - A WING

01-ED150B FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - B WING

01-ED150C FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - C WING

01-ED160 OVERALL SIXTH & SEVENTH LEVEL ELECTRICAL DEMO

01-ED401 ENLARGED DEMOLITION PLANS

01-ED402 ENLARGED DEMOLITION PLANS

01-ED403 ENLARGED DEMOLITION PLANS

01-ED404 ENLARGED DEMOLITION PLANS

PROJECT # 660-21-700

00 01 15 - 7

01-ED405 ENLARGED DEMOLITION PLANS

01-ED406 ENLARGED DEMOLITION PLANS

01-ED407 ENLARGED DEMOLITION PLANS

01-ED408 ENLARGED DEMOLITION PLANS

01-ED409 ENLARGED DEMOLITION PLANS

01-ED410 ENLARGED DEMOLITION PLANS

01-ED411 ENLARGED DEMOLITION PLANS

01-ED412 ENLARGED DEMOLITION PLANS

01-EP100 OVERALL GROUND LEVEL POWER PLAN

01-EP110 OVERALL FIRST LEVEL POWER PLAN

01-EP120 OVERALL SECOND LEVEL POWER PLAN

01-EP130 OVERALL THIRD LEVEL POWER PLAN

01-EP140 OVERALL FOURTH LEVEL POWER PLAN

01-EP150 OVERALL FIFTH LEVEL POWER PLAN

01-EP160 OVERALL SIXTH & SEVENTH LEVEL POWER PLANS

01-EP401 ENLARGED POWER PLANS

01-EP402 ENLARGED POWER PLANS

01-EP601 PARTIAL ONE-LINE DIAGRAMS

01-EP602 DEVICE & LIGHTING FIXTURE SCHEDULES

01-EP603 PANEL SCHEDULES

01-EP604 PANEL SCHEDULES

01-EP605 PANEL SCHEDULE

01-EP606 PANEL SCHEDULES

01-ET100 OVERAL GROUND LEVEL TELECOM PLAN

01-ET100A GROUND LEVEL TELECOM PLAN - A WING

01-ET100B GROUND LEVEL TELECOM PLAN - B WING

01-ET100C GROUND LEVEL TELECOM PLAN - C WING

01-ET100D GROUND LEVEL TELECOM PLAN - D WING

01-ET110 OVERALL FIRST LEVEL TELECOM PLAN

01-ET110A FIRST LEVEL TELECOM PLAN - A WING

01-ET110B FIRST LEVEL TELECOM PLAN - B WING

01-ET110C FIRST LEVEL TELECOM PLAN - C WING

01-ET110D FIRST LEVEL TELECOM PLAN - D WING

01-ET110E FIRST LEVEL TELECOM PLAN - E WING

01-ET110F FIRST LEVEL TELECOM PLAN - F WING

01-ET110H FIRST LEVEL TELECOM PLAN - H WING

01-ET120 OVERALL SECOND LEVEL TELECOM PLAN

PROJECT # 660-21-700

00 01 15 - 8

01-ET120A SECOND LEVEL TELECOM PLAN - A WING

01-ET120B SECOND LEVEL TELECOM PLAN - B WING

01-ET120C SECOND LEVEL TELECOM PLAN - C WING

01-ET120D SECOND LEVEL TELECOM PLAN - D WING

01-ET120E SECOND LEVEL TELECOM PLAN - E WING

01-ET120F SECOND LEVEL TELECOM PLAN - F WING

01-ET130 OVERALL THIRD LEVEL TELECOM PLAN

01-ET130A THIRD LEVEL TELECOM PLAN - A WING

01-ET130B THIRD LEVEL TELECOM PLAN - B WING

01-ET130C THIRD LEVEL TELECOM PLAN - C WING

01-ET130D THIRD LEVEL TELECOM PLAN - D WING

01-ET140 OVERALL FOURTH LEVEL TELECOM PLAN

01-ET140A FOURTH LEVEL TELECOM PLAN - A WING

01-ET140B FOURTH LEVEL TELECOM PLAN - B WING

01-ET140C FOURTH LEVEL TELECOM PLAN - C WING

01-ET140D FOUTH LEVEL TELECOM PLAN - D WING

01-ET150 OVERALL FIFTH LEVEL TELECOM PLAN

01-ET150A FIFTH LEVEL TELECOM PLAN - A WING

01-ET150B FIFTH LEVEL TELECOM PLAN - B WING

01-ET150C FIFTH LEVEL TELECOM PLAN - C WING

01-ET160 OVERAL SIXTH & SEVENTH LEVEL TELECOM PLANS

01-ET401 ENLARGED TELECOM PLANS

01-ET402 ENLARGED TELECOM PLANS

01-ET403 ENLARGED TELECOM PLANS

01-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET502 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET503 TELECOM EQUIPMENT RACK ELEVATOINS

01-ET504 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET505 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET506 TELECOM EQUIPMENT RACK ELECATIONS

01-ET507 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET508 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET509 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET601 TELECOM CONDUIT RISER DIAGRAM

01-ET602 TELECOM CONDUIT RISER DIAGRAM

01-ET603 TELECOM CABLE RISER DIAGRAM

01-ET604 TELECOM CABLE RISER DIAGRAM

PROJECT # 660-21-700

00 01 15 - 9

BUILDING 14

14-GC1B0 SEQUENCING PLAN – BASEMENT FLOOR

14-GC100 SEQUENCING PLAN - GROUND FLOOR

14-GC110 SEQUENCING PLAN – FIRST FLOOR

14-GC120 SEQUENCING PLAN – SECOND FLOOR

14-GC130 SEQUENCING PLAN - THIRD FLOOR

14-SF001 GENERAL STRUCTURAL NOTES

14-SF100 OVERALL GROUND FLOOR STRUCTURAL PLAN

14-SF110 OVERALL FIRST FLOOR STRUCTURAL PLAN

14-SF120 OVERALL SECOND FLOOR STRUCTURAL PLAN

14-SF130 OVERALL THIRD FLOOR STRUCTURAL PLAN

14-SF300 ENLARGED PLANS

14-SJ600 SCHEDULES & DETAILS

14-AD1B0 OVERALL BASEMENT DEMOLITION PLAN

14-AD3B0 ENLARGED BASEMENT DEMOLITION PLANS

14-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN

14-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

14-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

14-AD130 OVERALL THIRD FLOOR DEMOLITION PLAN

14-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS

14-AD301 ENLARGED GROUND FLOOR DEMOLITION PLANS

14-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

14-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS

14-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS

14-AE1B0 OVERALL BASEMENT FLOOR PLAN

14-AE3B0 ENLARGED BASEMENT PLANS

14-AE100 OVERALL GROUND FLOOR PLAN

14-AE110 OVERALL FIRST FLOOR PLAN

14-AE120 OVERALL SECOND FLOOR PLAN

14-AE130 OVERALL THIRD FLOOR PLAN

14-AE300 ENLARGED GROUND FLOOR PLANS

14-AE301 ENLARGED GROUND FLOOR PLANS

14-AE310 ENLARGED FIRST FLOOR PLANS

14-AE320 ENLARGED SECOND FLOOR PLANS

14-AE330 ENLARGED THIRD FLOOR PLANS

14-AE400 INTERIOR ELEVATIONS

14-AE600 SCHEDULES

PROJECT # 660-21-700

00 01 15 - 10

14-FX1B0 OVERALL BASEMENT FLOOR FIRE SPRINKLER PLAN

14-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN

14-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

14-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

14-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN

14-MH1B0 OVERALL BASEMENT FLOOR MECHANICAL PLAN

14-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN

14-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

14-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

14-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN

14-MH140 OVERALL ROOF MECHANICAL PLAN

14-MH401 ENLARGED MECHANICAL PLANS

14-MH402 ENLARGED MECHANICAL PLANS

14-MH403 ENLARGED MECHANICAL PLANS

14-MH404 ENLARGED MECHANICAL PLANS

14-MH405 ENLARGED MECHANICAL PLANS

14-MH406 ENLARGED MECHANICAL PLANS

14-MH407 ENLARGED MECHANICAL PLANS

14-MH408 ENLARGED MECHANICAL PLANS

14-MH409 ENLARGED MECHANICAL PLANS

14-MH410 ENLARGED MECHANICAL PLANS

14-MH411 ENLARGED MECHANICAL PLANS

14-MH412 ENLARGED PLUMBING PLANS

14-MH413 ENLARGED MECHANICAL PLANS

14-MH414 ENLARGED MECHANICAL PLANS

14-MH415 ENLARGED PLUMBING PLANS

14-MH416 ENLARGED MECHANICAL PLANS

14-ED1B0 OVERALL BASEMENT LEVEL ELECTRICAL DEMO PLAN

14-ED1B0A BASEMENT LEVEL ELECTRICAL DEMO PLAN - A WING

14-ED1B0B BASEMENT LEVEL ELECTRICAL DEMO PLAN – B WING

14-ED1B0C BASEMENT LEVEL ELECTRICAL DEMO PLAN - C WING

14-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN

14-ED100A GROUND LEVEL ELECTRICAL DEMO PLAN - A WING

14-ED100B GROUND LEVEL ELECTRICAL DEMO PLAN - B WING

14-ED100C GROUND LEVEL ELECTRICAL DEMO PLAN - C WING

14-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN

14-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN – A WING

PROJECT # 660-21-700

00 01 15 - 11

14-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN – B WING

14-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN – C WING

14-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN

14-ED120A SECOND LEVEL ELECTRICAL DEMO PLAN – A WING

14-ED120B SECOND LEVEL ELECTRICAL DEMO PLAN – B WING

14-ED120C SECOND LEVEL ELECTRICAL DEMO PLAN – C WING

14-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN

14-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN – A WING

14-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN – B WING

14-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN – C WING

14-ED401 ENLARGED DEMOLITION PLANS

14-ED402 ENLARGED DEMOLITION PLANS

14-ED403 ENLARGED DEMOLITION PLANS

14-ED404 ENLARGED DEMOLITION PLANS

14-ED405 ENLARGED DEMOLITION PLANS

14-EP1B0 OVERALL BASEMENT LEVEL POWER PLAN

14-EP100 OVERALL GROUND LEVEL POWER PLAN

14-EP110 OVERALL FIRST LEVEL POWER PLAN

14-EP120 OVERALL SECOND LEVEL POWER PLAN

14-EP130 OVERALL THIRD LEVEL POWER PLAN

14-EP140 OVERALL ROOF POWER PLAN

14-EP401 ENLARGED POWER PLANS

14-EP402 ENLARGED POWER PLANS

14-EP601 PARTIAL ONE-LINE DIAGRAMS

14-EP602 DEVICE & LIGHTING FIXTURE SCHEDULES

14-EP603 PANEL SCHEDULES

14-EP604 PANEL SCHEDULES

14-EP605 PANEL SCHEDULES

14-EP606 PANEL SCHEDULES

14-ET1B0 OVERALL BASEMENT LEVEL TELECOM PLAN

14-ET1B0A BASEMENT LEVEL TELECOM PLAN - A WING

14-ET1B0B BASEMENT LEVEL TELECOM PLAN - B WING

14-ET1B0C BASEMENT LEVEL TELECOM PLAN - C WING

14-ET100 OVERALL GROUND LEVEL TELECOM PLAN

14-ET100A GROUND LEVEL TELECOM PLAN - A WING

14-ET100B GROUND LEVEL TELECOM PLAN - B WING

14-ET100C GROUND LEVEL TELECOM PLAN - C WING

PROJECT # 660-21-700

00 01 15 - 12

14-ET110 OVERALL FIRST LEVEL TELECOM PLAN

14-ET110A FIRST LEVEL TELECOM PLAN - A WING

14-ET110B FIRST LEVEL TELECOM PLAN - B WING

14-ET110C FIRST LEVEL TELECOM PLAN - C WING

14-ET120 OVERALL SECOND LEVEL TELECOM PLAN

14-ET120A SECOND LEVEL TELECOM PLAN - A WING

14-ET120B SECOND LEVEL TELECOM PLAN - B WING

14-ET120C SECOND LEVEL TELECOM PLAN - C WING

14-ET130 OVERALL THIRD LEVEL TELECOM PLAN

14-ET130A THIRD LEVEL TELECOM PLAN - A WING

14-ET130B THIRD LEVEL TELECOM PLAN - B WING

14-ET130C THIRD LEVEL TELECOM PLAN - C WING

14-ET401 ENLARGED TELECOM PLANS

14-ET402 ENLARGED TELECOM PLANS

14-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET502 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET503 TELECOM EQUIPMENT RACK ELEVATOINS

14-ET504 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET505 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET506 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET601 TELECOM CONDUIT RISER DIAGRAM

14-ET602 TELECOM CONDUIT RISER DIAGRAM

14-ET603 TELECOM CABLE RISER DIAGRAM

14-ET604 TELECOM CABLE RISER DIAGRAM

BUILDING 02

02-GC100 SEQUENCING PLAN – GROUND FLOOR

02-GC110 SEQUENCING PLAN – FIRST FLOOR

02-GC120 SEQUENCING PLAN – SECOND FLOOR

02-MH100 OVERALL GROUND MECHANICAL PLAN

02-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

02-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

02-MH130 ROOF MECHANICAL PLAN

02-MH401 ENLARGED MECHANICAL PLANS

02-MH402 ENLARGED MECHANICAL PLANS – GROUND FLOOR

02-MH403 ENLARGED MECHANICAL PLANS – FIRST FLOOR

02-MH404 ENLARGED MECHANICAL PLANS – FIRST FLOOR

02-MH405 ENLARGED MECHANICAL PLANS – SECOND FLOOR

PROJECT # 660-21-700

00 01 15 - 13

02-MH406 ENLARGED MECHANICAL PLANS – SECOND FLOOR

02-ED100 OVERALL GROUND FLOOR ELECTRICAL DEMOLITION PLAN

02-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

02-ED120 OVERALL SECOND FLOOR ELECTRICAL DEMOLITION PLAN

02-ED401 ENLARGED DEMOLITION PLANS

02-ED402 ENLARGED DEMOLITION PLANS

02-ED403 ENLARGED DEMOLITION PLANS

02-EP100 OVERALL GROUND LEVEL POWER PLAN

02-EP110 OVERALL FIRST LEVEL POWER PLAN

02-EP120 OVERALL SECOND LEVEL POWER PLAN

02-EP130 OVERALL ROOF POWER PLAN

02-EP401 ENLARGED POWER PLANS

02-EP402 ENLARGED POWER PLANS

02-EP601 PARTIAL ONE-LINE DIAGRAMS

02-EP602 GROUNDING RISER DIAGRAM

02-EP603 PANEL SCHEDULES

02-ET100 OVERAL GROUND LEVEL TELECOM PLAN

02-ET100A GROUND LEVEL TELECOM PLAN - A WING

02-ET100B GROUND LEVEL TELECOM PLAN - B WING

02-ET100C GROUND LEVEL TELECOM PLAN - C WING

02-ET100D GROUND LEVEL TELECOM PLAN - D WING

02-ET110 OVERALL FIRST LEVEL TELECOM PLAN

02-ET110A FIRST LEVEL TELECOM PLAN - A WING

02-ET110B FIRST LEVEL TELECOM PLAN - B WING

02-ET110C FIRST LEVEL TELECOM PLAN - C WING

02-ET110D FIRST LEVEL TELECOM PLAN - D WING

02-ET120 OVERALL SECOND LEVEL TELECOM PLAN

02-ET120A SECOND LEVEL TELECOM PLAN - A WING

02-ET120B SECOND LEVEL TELECOM PLAN - B WING

02-ET120C SECOND LEVEL TELECOM PLAN - C WING

02-ET120D SECOND LEVEL TELECOM PLAN - D WING

02-ET601 TELECOM CONDUIT RISER DIAGRAM

BUILDING 03

03-GC100 SEQUENCING PLAN – GROUND FLOOR

03-GC110 SEQUENCING PLAN – FIRST FLOOR

03-GC120 SEQUENCING PLAN - SECOND FLOOR

03-AD100 OVERALL FROUND FLOOR DEMOLITION PLAN

PROJECT # 660-21-700

00 01 15 - 14

03-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

03-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

03-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS

03-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

03-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS

03-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS

03-AE100 OVERALL GROUND FLOOR PLAN

03-AE110 OVERALL FIRST FLOOR PLAN

03-AE120 OVERALL SECOND FLOOR PLAN

03-AE300 ENLARGED GROUND FLOOR PLANS

03-AE310 ENLARGED FIRST FLOOR PLANS

03-AE311 ENLARGED FIRST FLOOR PLANS

03-AE320 ENLARGED SECOND FLOOR PLANS

03-AE400 INTERIOR ELEVATIONS

03-AE600 SCHEDULES

03-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN

03-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

03-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

03-MH100 OVERALL GROUND MECHANICAL PLAN

03-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

03-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

03-MH130 ROOF MECHANICAL PLAN

03-MH401 ENLARGED MECHANICAL PLANS

03-MH402 ENLARGED MECHANICAL PLANS

03-MH403 ENLARGED MECHANICAL PLANS

03-MH404 ENLARGED MECHANICAL PLANS

03-MH405 ENLARGED MECHANICAL PLANS

03-MH406 ENLARGED MECHANICAL PLANS

03-MH407 ENLARGED MECHANICAL PLANS

03-MH408 ENLARGED MECHANICAL PLANS

03-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN

03-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN A WING

03-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN B-DWING

03-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN

03-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - A WING

03-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN B-D WING

03-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN

PROJECT # 660-21-700

00 01 15 - 15

03-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN A WING

03-ED120B SECOND LEVEL ELECTRICAL DEMO PLAN B&C WING

03-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

03-ED402 ENLARGED ELECTRICAL DEMOLITION PLANS

03-ED403 ENLARGED ELECTRICAL DEMOLITION PLANS

03-ED404 ENLARGED DEMOLITION PLANS

03-ED405 ENLARGED DEMOLITION PLANS

03-EP100 OVERALL GROUND LEVEL POWER PLAN

03-EP110 OVERALL FIRST LEVEL POWER PLAN

03-EP120 OVERALL SECOND LEVEL POWER PLAN

03-EP401 ENLARGED POWER PLANS

03-EP601 PARTIAL ONE-LINE DIAGRAMS

03-EP602 DEVICE & LIGHTING FIXTURE SCHEDULES

03-EP603 PANEL SCHEDULES

03-EP604 PANEL SCHEDULES

03-EP605 PANEL SCHEDULES

03-ET100 OVERALL GROUND LEVEL TELECOM PLAN

03-ET100A GROUND LEVEL TELECOM PLAN - A WING

03-ET100B GROUND LEVEL TELECOM PLAN - B-D WINGS

03-ET110 OVERALL FIRST LEVEL TELECOM PLAN

03-ET110A FIRST LEVEL TELECOM PLAN - A WING

03-ET110B FIRST LEVEL TELECOM PLAN - B-D WINGS

03-ET120 OVERALL SECOND LEVEL TELECOM PLAN

03-ET120A SECOND LEVEL TELECOM PLAN - A WING

03-ET120B SECOND LEVEL TELECOM PLAN - B&C WINGS

03-ET401 ENLARGED TELECOM PLANS

03-ET402 ENLARGED TELECOM PLANS

03-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

03-ET502 TELECOM EQUIPMENT RACK ELEVATIONS

03-ET503 TELECOM EQUIPMENT RACK ELEVATIONS

03-ET504 TELECOM EQUIPMENT RACK ELEVATIONS

03-ET601 TELECOM CONDUIT RISER DIAGRAM

03-ET602 TELECOM CABLE RISER DIAGRAM

BUILDING 04

04-GC110 SEQUENCING PLAN – FIRST FLOOR

04-MD120 ROOF MECHANICAL DEMO PLAN

04-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

PROJECT # 660-21-700

00 01 15 - 16

04-MH120 ROOF MECHANICAL PLAN

04-MH401 ENLARGED MECHANICAL PLANS

04-ED1B0 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN

04-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

04-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING

04-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN – B WING

04-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN – C WING

04-ED401 ENLARGED DEMOLITION PLANS

04-EP1B0 BASEMENT FLOOR POWER PLAN

04-EP110 OVERALL FIRST FLOOR POWER PLAN

04-EP601 DEVICE & LIGHTING FIXTURE SCHEDULES

04-ET1B0 BASEMENT FLOOR TELECOM PLAN

04-ET110 OVERALL FIRST FLOOR TELECOM PLAN

04-ET110A FIRST FLOOR TELECOM PLAN - A WING

04-ET110B FIRST FLOOR TELECOM PLAN - B WING

04-ET110C FIRST FLOOR TELECOM PLAN - C WING

04-ET601 TELECOM CABLE RISER DIAGRAM

04-ET602 TELECOM CONDUIT RISER DIAGRAM

BUILDING 05

05-GC110 SEQUENCING PLAN - FIRST FLOOR

05-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

05-AD410 ENLARGED FIRST FLOOR DEMOLITION PLANS

05-AE110 OVERALL FIRST FLOOR PLAN

05-AE410 ENLARGED FIRST FLOOR PLANS & SCHEDULES

05-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

05-MH100 OVERALL GROUND MECHANICAL PLAN

05-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

05-MH120 ROOF MECHANICAL PLAN

05-MH401 ENLARGED MECHANICAL PLANS

05-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN

05-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN

05-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

05-EP100 OVERALL GROUND LEVEL POWER PLAN

05-EP110 OVERALL FIRST LEVEL POWER PLAN

05-EP401 ENLARGED POWER PLANS

05-EP601 ONE-LINE DIAGRAM - NORMAL

05-ET100 OVERALL GROUND FLOOR TELECOM PLAN

PROJECT # 660-21-700

00 01 15 - 17

05-ET110 OVERALL FIRST FLOOR TELECOM PLAN

05-ET401 ENLARGED TELECOM PLANS

05-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

05-ET601 TELECOM RISER DIAGRAMS

BUILDING 06

06-GC1BO SEQUENCING PLAN – BASEMENT FLOOR

06-GC110 SEQUENCING PLAN – FIRST FLOOR

06-MH100 OVERALL GROUND MECHANICAL PLAN

06-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

06-MH120 ROOF MECHANICAL PLAN

06-MH401 ENLARGED MECHANICAL PLANS

06-ED1B1 OVERALL BASEMENT LEVEL ELECTRICAL DEMO PLAN

06-ED1B1A BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN AWING

06-ED1B1B BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN BWING

06-ED1B1C BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN CWING

06-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN

06-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN – A WING

06-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - B WING

06-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN – C WING

06-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

06-EP1B1 OVERALL BASEMENT LEVEL POWER PLAN

06-EP110 OVERALL FIRST LEVEL POWER PLAN

06-EP401 ENLARGED POWER PLANS

06-ET1B1 OVERALL BASEMENT LEVEL TELECOM PLAN

06-ET1B1A BASEMENT LEVEL TELECOM PLAN - A WING

06-ET1B1B BASEMENT LEVEL TELECOM PLAN - B WING

06-ET1B1C BASEMENT LEVEL TELECOM PLAN - C WING

06-ET110 OVERALL FIRST FLOOR TELECOM PLAN

06-ET110A FIRST FLOOR TELECOM PLAN - A WING

06-ET110B FIRST FLOOR TELECOM PLAN - B WING

06-ET110C FIRST FLOOR TELECOM PLAN - C WING

06-ET401 ENLARGED TELECOM PLANS

06-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

06-ET601 TELECOM CONDUIT RISER DIAGRAM

06-ET602 TELECOM CABLE RISER DIAGRAM

BUILDING 07

07-GC110 SEQUENCING PLAN - FIRST FLOOR

PROJECT # 660-21-700

00 01 15 - 18

07-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

07-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

07-AE110 OVERALL FIRST FLOOR PLAN

07-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES

07-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

07-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

07-MH401 ENLARGED MECHANICAL PLANS

07-ED1B1 OVERALL BASEMENT FLOOR ELECTRICAL DEMO PLAN

07-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

07-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING

07-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING

07-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING

07-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

07-EP1B1 OVERALL BASEMENT FLOOR POWER PLAN

07-EP110 OVERALL FIRST FLOOR POWER PLAN

07-EP401 ENLARGED POWER PLANS

07-EP601 PARTIAL ONE-LINE DIAGRAM

07-ET1B1 OVERALL BASEMENT FLOOR TELECOM PLAN

07-ET110 OVERALL FIRST FLOOR TELECOM PLAN

07-ET110A FIRST FLOOR TELECOM PLAN - A WING

07-ET110B FIRST FLOOR TELECOM PLAN - B WING

07-ET110C FIRST FLOOR TELECOM PLAN - C WING

07-ET401 ENLARGED TELECOM PLANS

07-ET501 TELECOM EQUIPMENT RACK ELEVATRIONS

07-ET601 TELECOM CONDUIT RISER DIAGRAM

07-ET602 TELECOM CABLE RISER DIAGRAM

BUILDING 08

08-GC100 SEQUENCING PLAN – GROUND FLOOR

08-GC110 SEQUENCING PLAN - FIRST FLOOR

08-GC120 SEQUENCING PLAN - SECOND FLOOR

08-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

08-AD320 ENLARGED SECOND FLOOR DEMOLITION PLAN

08-AE120 OVERALL SECOND FLOOR PLAN

08-AE320 ENLARGED SECOND FLOOR PLAN & SCHEDULES

08-AE601 DOOR AND FINISH SCHEDULE

08-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

08-MH111 SECOND FLOOR MECHANICAL PLAN

PROJECT # 660-21-700

00 01 15 - 19

08-MH113 OVERALL ROOF MECHANICAL PLAN

08-MH401 ENLARGED MECHANICAL PLANS

08-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN

08-ED110 FIRST FLOOR ELECTRICAL DEMOLIITION PLAN

08-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

08-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

08-EP100 GROUND FLOOR POWER PLAN

08-EP110 FIRST FLOOR POWER PLAN

08-EP120 SECOND FLOOR POWER PLAN

08-EP401 ENLARGED POWER PLANS

08-EP601 PARTIAL ONE-LINE DIAGRAM

08-ET100 GROUND FLOOR TELECOM PLAN

08-ET110 FIRST FLOOR TELECOM PLAN

08-ET120 SECOND FLOOR TELECOM PLAN

08-ET401 ENLARGED TELECOM PLANS

08-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

08-ET601 TELECOM CONDUIT RISER DIAGRAM

BUILDING 09

09-GC110 SEQUENCING PLAN - FIRST FLOOR

09-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

09-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

09-AE110 OVERALL FIRST FLOOR PLAN

09-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES

09-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

09-MH110 FIRST FLOOR MECHANICAL PLAN

09-MH112 OVERALL ROOF MECHANICAL PLAN

09-MH401 ENLARGED MECHANICAL PLANS

09-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

09-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

09-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

09-EP110 FIRST FLOOR POWER PLAN

09-EP120 SECOND FLOOR POWER PLAN

09-EP401 ENLARGED POWER PLANS

09-EP601 PARTIAL ONE-LINE DIAGRAM

09-ET110 FIRST FLOOR TELECOM PLAN

09-ET120 SECOND FLOOR TELECOM PLAN

09-ET401 ENLARGED TELECOM PLANS

PROJECT # 660-21-700

00 01 15 - 20

09-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

09-ET601 TELECOM CONDUIT RISER DIAGRAM

BUILDING 16

16-MH100 GROUND FLOOR MECHANICAL PLAN

16-MH110 FIRST FLOOR MECHANICAL PLAN

16-MH120 SECOND FLOOR MECHANICAL PLAN

16-MH130 ROOF MECHANICAL PLAN

16-MH401 ENLARGED MECHANICAL PLANS

16-MH402 ENLARGED MECHANICAL PLANS

16-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN

16-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

16-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

16-ED401 ENLARGED DEMOLITION PLANS

16-EP100 GROUND FLOOR POWER PLAN

16-EP110 FIRST FLOOR POWER PLAN

16-EP120 SECOND FLOOR POWER PLAN

16-EP401 ENLARGED POWER PLANS

16-ET100 GROUND FLOOR TELECOM PLAN

16-ET110 FIRST FLOOR TELECOM PLAN

16-ET120 SECOND FLOOR TELECOM PLAN

16-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

16-ET601 TELECOM CONDUIT RISER DIAGRAM

BUILDING 38

38-MD120 OVERALL ROOF MECHANICAL DEMO PLAN

38-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

38-MH120 OVERALL ROOF MECHANICAL PLAN

38-MH401 ENLARGED MECHANICAL PLANS

38-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

38-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

38-EP110 FIRST FLOOR POWER PLAN

38-ET110 FIRST FLOOR TELECOM PLAN

38-ET401 ENLARGED TELECOM PLANS

38-ET601 TELECOM RISER DIAGRAMS

BUILDING 47

47-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

47-MH120 OVERALL ROOF MECHANICAL PLAN

47-MH401 ENLARGED MECHANICAL PLANS

PROJECT # 660-21-700

00 01 15 - 21

47-EP110 FIRST FLOOR POWER PLAN

47-ET110 FIRST FLOOR TELECOM PLAN

47-ET501 TELECOM EQUIPMENT RACK ELEVATION

47-ET601 TELECOM RISER DIAGRAMS

BUILDING 550

550-ET110 FIRST FLOOR TELECOM PLAN

550-ET120 SECOND FLOOR TELECOM PLAN

550-ET130 THIRD FLOOR TELECOM PLAN

550-ET501 TELECOM EQUIPMENT RACK ELEVATION

550-ET601 TELECOM RISER DIAGRAMS

BUILDING 590

590-ET100 GROUND FLOOR TELECOM PLAN

590-ET110 FIRST FLOOR TELECOM PLAN

590-ET120 SECOND FLOOR TELECOM PLAN

590-ET501 TELECOM EQUIPMENT RACK ELEVATION

590-ET601 TELECOM RISER DIAGRAMS

- - - E N D - - -

11-01-21

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to upgrade the facility infrastructure to support the new Electronic Health

Record Modernization (EHRM) system in accordance with VA OEHRM

Site Infrastructure Requirements (provided by VHA). The scope of this project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building

Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement. Normal working hours for this contract will be from

7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays. Performing on-site work outside normal working hours will require approval from the

Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

B. as required by drawings and specifications.

01 00 00 -2

C. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the

Contracting Officer.

D. Offices of RDC+EA, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by Contracting Officer or his duly authorized representative.

E. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection.

Such prior notice shall be not less than three workdays unless otherwise designated by the COR. Procurement of testing services is the responsibility of the general contractor.

F. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

ITEM I, GENERAL CONSTRUCTION: BASE BID : This work is to upgrade the facility infrastructure to support the new Electronic Health

Record Modernization (EHRM) system in accordance with VA OEHRM

Site Infrastructure Requirements (provided by VHA). The scope of this project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building

Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication

01 00 00 -3 infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings (1, 14, 2, 3, 5, 6, 7, 8, 9, 4, 16, 32, 38, 47, 550, 590) as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement and commissioning. This work includes all general construction, alterations, roads, walks, grading, drainage, and commissioning necessary removal of existing structures and construction and certain other items.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice

01 00 00 -4 is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall install all permanent cores at completion of the work turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08

71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it

01 00 00 -5 for the project. Return the information to the Contracting

Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted

24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from

01 00 00 -6 liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the

Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR .

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical

01 00 00 -7 personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to

Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .

All such actions shall be coordinated with the COR or Utility

Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

H. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the

01 00 00 -8 work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the

Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:

Phase 1: Site Fiber Backbone

This phase of the construction would include coordination of new pathways from the campus MRC located in the basement of building 1 into the new or remodeled demarcation facility. In addition to bringing in new fiber-based utility this will create a secondary services path, providing the needed redundancy during construction.

During this phase, no existing carrier services would be disrupted and there would be no potential adverse impact on the ongoing medical operations.

Phase 2: Pathways & Backbone Fiber

In a parallel and concurrent time frame with phase one, construction phase two will be working on the internal side, building a secondary fiber feed from the core to the edge. Once this new fiber ring is fully installed and tested, it will be connected to the new core service, providing fully operational and redundant services. During this phase, existing pathways or backbone fiber will remain in operation to ensure no impact to service or operation of the hospital.

Phase 3: Telecommunication Data Room buildout

The third phase of construction includes the buildout of the existing and new Telecommunication Data Rooms (TDRs) and the install of new equipment in the TDRs. It will include redundant power and HVAC in

01 00 00 -9 each of the TDRs. The TDR buildout will include pulling A-side and B-side redundant fiber paths to ensure network continuity.

Phase 4: Horizontal Cabling, Owner Equipment

The fourth phase includes the installation of horizontal cabling followed by the installation of active owner equipment. For the completion of the horizontal cabling, this will be phased by providing a service loop near the area to be refit; the cutover of the cabling will occur at a time approved and coordinated by the owner. Though a distinct phase of the project, the installation of horizontal cabling and the acquisition of active owner equipment may overlap with the earlier phases, to ensure a timely sequence of construction and seamless switch of services across the entire campus. Many of these phases will run concurrently and in tight coordination with the designers, contractors and owner representatives.

Phase 5: Owner Coordination for Edge Turnover

We recommend switching of service starting with the least impactful areas of the campus to the most critical areas. In addition to the ongoing testing and commissioning of the entire system throughout the phased process, this approach of switching services greatly minimizes the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .