This document outlines the scope of work for infrastructure upgrades at the George E. Wahlen Department of Veterans Affairs Medical Center in Salt Lake City, Utah. The project involves upgrading electrical systems, HVAC, communications infrastructure, fiber backbone, security systems, and hazardous material abatement across multiple buildings on the medical center campus. Key requirements include installing new data outlets and patch panels, upgrading cable to Category 6A, evaluating and improving the fiber optic backbone, and renovating existing spaces as needed. The contractor must follow safety protocols and minimize disruptions to medical center operations during construction. Testing and commissioning are required at all levels to ensure systems function as designed. The work must be completed according to specifications and drawings provided by the Department of Veterans Affairs.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
06-01-22
EHRM INFRASTRUCTURE UPGRADES, GEORGE E. WAHLEN VAMC (CONSTRUCTION DOCUMENTS)
PROJECT # 660-21-700
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16 Project Schedules
01 33 23 Shop Drawings, Product Data, and Samples 06-21
01 35 26 Safety Requirements 11-21
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 01-21
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 71 00 Door Hardware 05-22
08 80 00 Glazing 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
00 01 10-2
09 06 00 Schedule for Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 19 Resilient Tile Flooring 05-18
09 68 00 Carpeting 01-21
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21
10 21 13 Toilet Compartments 01-21
10 26 00 Wall and Door Protection 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 01-21
12 36 00 Countertops 12-18
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 04-22
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 08 00 Commissioning of HVAC Systems 04-22
23 09 23 Direct-Digital Control System for HVAC 09-11
23 23 00 Refrigerant Piping 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 36 00 Air Terminal Units 02-20
23 81 23 Computer-Room Air-Conditioners 03-20
23 81 43 Air-Source Unitary Heat Pumps 03-20
23 82 00 Convection Heating and Cooling Units 03-20
00 01 10-3
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 39 Underfloor Raceways for Electrical Systems 01-18
26 05 41 Underground Electrical Construction 01-17
26 05 73 Overcurrent Protective Device Coordination Study 01-18
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 24 13 Distribution Switchboards 01-18
26 24 16 Panelboards 01-18
26 26 00 Power Distribution Units for Static Uninterruptible
Power Systems
01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 33 53 Static Uninterruptible Power Supply 01-17
26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 05 36 Cable Trays for Communications Systems 11-21
27 05 53 Identification for Communications Systems 07-21
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Structured Cabling 11-21
27 11 00 Communications Equipment Room Fittings 06-15
27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 11-21
27 11 19 Communications Termination Blocks and Patch Panels 11-21
27 11 26 Communications Rack Mounted Power Protection and Power
Strips
11-21
27 13 23 Communications Optical Fiber Backbone Cabling 11-21
27 15 00 Communications Structured Cabling 01-16
27 15 13 Communications Copper Horizontal Cabling 11-21
27 15 13.13 Communications Optical Fiber Cable Splicing and
Terminations
11-21
27 16 19 Communications Patch Cords, Station Cords, and Cross
Connect Wire
11-21
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 11 Requirements for Electronic Safety and Security installaton.
12-22
00 01 10-4
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 33 Raceways and Boxes for Electronic Safety and Security 12-22
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16
28 13 00 Physical Access Control System 10-11
28 31 00 Fire Detection and Alarm 10-11
05-01-20
PROJECT # 660-21-700
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
SITE PLANNING
ARCHITECTURAL
STRUCTURAL
PLUMBING
HEATING, VENTILATING, AIR
CONDITIONING AND REFRIGERATION
ELECTRICAL
- - - END - - -
PROJECT # 660-21-700
00 01 15 - 2
(SAMPLE LIST OF DRAWINGS)
VAMC (NAME) (SPEC No.)
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
CS001 COVER SHEET VICINITY PLAN
CS002 PROJECT SHEET INDEX
CS003 RISK ASSESSMENT
CS004 IT SECURITY CHECKLIST
EE001 ELECTRICAL SYMBOL LEGEND, ABBRV, AND GEN NOTES
EE002 TELECOM SCHEDULES AND NOTES
EE003 MECHANICAL EQUIPMENT SCHEDULE
EE004 SECURITY SCHEDULE AND NOTES
EE501 ELECTRICAL DETAILS
EE701 TYPICAL MOUNTING HEIGHT DETAILS
ET501 TELECOM DETAILS
ET502 TELECOM DETAILS
ET503 TELECOM DETAILS
ET504 TELECOM SECURITY DETAILS AND RISER DIAGRAMS
ET505 TELECOM EQUIPMENT RACK GROUNDING DETAIL
AE001 GENERAL NOTES, SYMBOLS, ABBREVIATIONS
AE002 CONSTRUCTION SEQUENCING – SITE
AE003 INFECTION CONTROL
HR101 HAZARDOUS MATERIAL ABATEMENT
AE201 WALL SECTIONS
AE202 WALL SECTIONS
AE501 ARCHITECTURAL DETAILS
AE502 ARCHITECTIRAL DETAILS
PE001 PLUMBING SYMBOL LEGEND, ABBRV, AND GEN NOTES
PE501 PLUMBING DETAILS
PE602 PLUMBING FIXTURE SCHEDULES – BUILDING 3
PE603 PLUMBING FIXTURE SCHEDULES – BUILDING 14
PROJECT # 660-21-700
00 01 15 - 3
ME001 MECHANICAL SYMBOL LEGEND, ABBRV, AND GEN NOTES
ME401 ENLARGED MECHANICAL PLANS
ME601 MECHANICAL SCHEDULES
ME701 MECHANICAL CONTROLS LEGENDS & NOTES
ME702 MECHANICAL CONTROLS DIAGRAMS
SITE
ES101 OVERALL SITE RACEWAY PLAN
ES102 OVERALL SITE TUNNEL RACEWAY PLAN
ES501 SITE TELECOM DETAILS
ES502 SITE TELECOM DETAILS
ES601 OVERALL SITE MICRODUCT LEGEND
ES602 OVERALL SITE MICRODUCT RISER DIAGRAM
ES603 FIBER CABLE PATH -A- MATRIX
ES604 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 1)
ES605 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 1)
ES606 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 2)
ES607 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 2)
ES608 FIBER CABLE SPLICE DIAG PATH -A- (BLDG- 2, 3)
ES609 FIBER CABLE SPLICE DIAG PATH -A- (BLDG- 3, 4)
ES610 FC SPLICE DIAG PATH -A- (BLDG- 5,6,7,8,9,16)
ES611 FC SPLICE DIAG PATH -A- (BLDG- 16,38,47,50)
ES612 FIBER CABLE SPLICE DIAG PATH -A- (BLDG- 50, 90)
ES613 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 14)
ES614 FIBER CABLE SPLICE DIAGRAM PATH -A- (BLDG- 14)
ES615 FIBER CABLE PATH -B- MATRIX
ES616 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 1)
ES617 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 1)
ES618 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 2)
ES619 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 2)
ES620 FIBER CABLE SPLICE DIAG PATH -B- (BLDG- 2, 3)
ES621 FIBER CABLE SPLICE DIAG PATH -B- (BLDG- 3, 4)
ES622 FC SPLICE DIAG PATH -B- (BLDG- 5,6,7,8,9,16)
ES623 FC SPLICE DIAG PATH -B- (BLDG- 38,47,50,90)
ES624 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 14)
ES625 FIBER CABLE SPLICE DIAGRAM PATH -B- (BLDG- 14)
BUILDING 01
PROJECT # 660-21-700
00 01 15 - 4
01-GC100 SEQUENCING PLAN – GROUND FLOOR
01-GC110 SEQUENCING PLAN – FIRST FLOOR
01-GC120 SEQUENCING PLAN – SECOND FLOOR
01-GC130 SEQUENCING PLAN – THIRD FLOOR
01-GC140 SEQUENCING PLAN – FOURTH FLOOR
01-GC150 SEQUENCING PLAN - FIFTH FLOOR
01-SF140 OVERALL FOURTH FLOOR STRUCTURAL PLAN
01-SF340 ENLARGED FOURTH FLOOR STRUCTURAL PLAN
01-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN
01-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
01-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
01-AD130 OVERALL THIRD FLOOR DEMOLITION PLANS
01-AD140 OVERALL FOURTH FLOOR DEMOLITION PLANS
01-AD150 OVERALL FIFTH FLOOR DEMOLITION PLANS
01-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS
01-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
01-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS
01-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS
01-AD321 ENLARGED SECOND FLOOR DEMOLITION PLANS
01-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS
01-AD331 ENLARGED THIRD FLOOR DEMOLITION PLANS
01-AD340 ENLARGED FOURTH FLOOR DEMOLITION PLANS
01-AD341 ENLARGED FOURTH FLOOR DEMOLITION PLANS
01-AD350 ENLARGED FIFTH FLOOR DEMOLITION PLANS
01-AE100 OVERALL GROUND FLOOR PLAN
01-AE110 OVERAL FIRST FLOOR PLAN
01-AE120 OVERALL SECOND FLOOR PLAN
01-AE130 OVERALL THIRD FLOOR PLAN
01-AE140 OVERALL FOURTH FLOOR PLAN
01-AE150 OVERALL FIFTH FLOOR PLAN
01-AE300 ENLARGED GROUND FLOOR PLANS
01-AE310 ENLARGED FIRST FLOOR PLANS
01-AE311 ENLARGED FIRST FLOOR PLANS
01-AE320 ENLARGED SECOND FLOOR PLANS
01-AE321 ENLARGED SECOND FLOOR PLANS
01-AE330 ENLARGED THIRD FLOOR PLANS
01-AE331 ENLARGED THIRD FLOOR PLANS
PROJECT # 660-21-700
00 01 15 - 5
01-AE340 ENLARGED FOURTH FLOOR PLANS
01-AE341 ENLARGED FOURTH FLOOR PLANS
01-AE350 ENLARGED FIFTH FLOOR PLANS
01-AE400 INTERIOR ELEVATIONS
01-AE401 INTERIOR ELEVATIONS
01-AE600 SCHEDULES
01-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN
01-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
01-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
01-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN
01-FX140 OVERALL FOURTH FLOOR FIRE SPRINKLER PLAN
01-FX150 OVERALL FIFTH FLOOR FIRE SPRINKLER PLAN
01-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN
01-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
01-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
01-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN
01-MH140 OVERALL FOURTH FLOOR MECHANICAL PLAN
01-MH150 OVERALL FIFTH FLOOR MECHANICAL PLAN
01-MH160 OVERALL ROOF MECHANICAL PLAN
01-MH401 ENLARGED MECHANICAL PLANS
01-MH402 ENLARGED MECHANICAL PLANS
01-MH403 ENLARGED MECHANICAL PLANS
01-MH404 ENLARGED MECHANICAL PLANS
01-MH405 ENLARGED MECHANICAL PLANS
01-MH406 ENLARGED MECHANICAL PLANS
01-MH407 ENLARGED MECHANICAL PLANS
01-MH408 ENLARGED MECHANICAL PLANS
01-MH409 ENLARGED MECHANICAL PLANS
01-MH410 ENLARGED MECHANICAL PLANS
01-MH411 ENLARGED MECHANICAL PLANS
01-MH412 ENLARGED MECHANICAL PLANS
01-MH413 ENLARGED MECHANICAL PLANS
01-MH414 ENLARGED MECHANICAL PLANS
01-MH415 ENLARGED MECHANICAL PLANS
01-MH416 ENLARGED MECHANICAL PLANS
01-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN
01-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN A WING
PROJECT # 660-21-700
00 01 15 - 6
01-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN B WING
01-ED100C GROUND LEVEL ELECTRICAL DEMOLITION PLAN C WING
01-ED100D GROUND LEVEL ELECTRICAL DEMOLITION PLAN D WING
01-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN
01-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN A WING
01-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN B WING
01-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN C WING
01-ED110D FIRST LEVEL ELECTRICAL DEMOLITION PLAN D WING
01-ED110E FIRST LEVEL ELECTRICAL DEMOLITION PLAN E WING
01-ED110F FIRST LEVEL ELECTRICAL DEMOLITION PLAN F WING
01-ED110H FIRST LEVEL ELECTRICAL DEMOLITION PLAN H WING
01-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN
01-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN A WING
01-ED120B SECOND LEVEL ELECTRICAL DEMOLITION PLAN B WING
01-ED120C SECOND LEVEL ELECTRICAL DEMOLITION PLAN C WING
01-ED120D SECOND LEVEL ELECTRICAL DEMOLITION PLAN D WING
01-ED120E SECOND LEVEL ELECTRICAL DEMOLITION PLAN E WING
01-ED120F SECOND LEVEL ELECTRICAL DEMOLITION PLAN F WING
01-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN
01-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN A WING
01-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN B WING
01-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN C WING
01-ED130D THIRD LEVEL ELECTRICAL DEMOLITION PLAN D WING
01-ED140 OVERALL FOURTH LEVEL ELECTRICAL DEMOLITION PLAN
01-ED140A FOURTH LEVEL ELECTRICAL DEMOLITION PLAN A WING
01-ED140B FOURTH LEVEL ELECTRICAL DEMOLITION PLAN B WING
01-ED140C FOURTH LEVEL ELECTRICAL DEMOLITION PLAN C WING
01-ED140D FOURTH LEVEL ELECTRICAL DEMOLITION PLAN D WING
01-ED150 OVERALL FIFTH LEVEL ELECTRICAL DEMOLITION PLAN
01-ED150A FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - A WING
01-ED150B FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - B WING
01-ED150C FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - C WING
01-ED160 OVERALL SIXTH & SEVENTH LEVEL ELECTRICAL DEMO
01-ED401 ENLARGED DEMOLITION PLANS
01-ED402 ENLARGED DEMOLITION PLANS
01-ED403 ENLARGED DEMOLITION PLANS
01-ED404 ENLARGED DEMOLITION PLANS
PROJECT # 660-21-700
00 01 15 - 7
01-ED405 ENLARGED DEMOLITION PLANS
01-ED406 ENLARGED DEMOLITION PLANS
01-ED407 ENLARGED DEMOLITION PLANS
01-ED408 ENLARGED DEMOLITION PLANS
01-ED409 ENLARGED DEMOLITION PLANS
01-ED410 ENLARGED DEMOLITION PLANS
01-ED411 ENLARGED DEMOLITION PLANS
01-ED412 ENLARGED DEMOLITION PLANS
01-EP100 OVERALL GROUND LEVEL POWER PLAN
01-EP110 OVERALL FIRST LEVEL POWER PLAN
01-EP120 OVERALL SECOND LEVEL POWER PLAN
01-EP130 OVERALL THIRD LEVEL POWER PLAN
01-EP140 OVERALL FOURTH LEVEL POWER PLAN
01-EP150 OVERALL FIFTH LEVEL POWER PLAN
01-EP160 OVERALL SIXTH & SEVENTH LEVEL POWER PLANS
01-EP401 ENLARGED POWER PLANS
01-EP402 ENLARGED POWER PLANS
01-EP601 PARTIAL ONE-LINE DIAGRAMS
01-EP602 DEVICE & LIGHTING FIXTURE SCHEDULES
01-EP603 PANEL SCHEDULES
01-EP604 PANEL SCHEDULES
01-EP605 PANEL SCHEDULE
01-EP606 PANEL SCHEDULES
01-ET100 OVERAL GROUND LEVEL TELECOM PLAN
01-ET100A GROUND LEVEL TELECOM PLAN - A WING
01-ET100B GROUND LEVEL TELECOM PLAN - B WING
01-ET100C GROUND LEVEL TELECOM PLAN - C WING
01-ET100D GROUND LEVEL TELECOM PLAN - D WING
01-ET110 OVERALL FIRST LEVEL TELECOM PLAN
01-ET110A FIRST LEVEL TELECOM PLAN - A WING
01-ET110B FIRST LEVEL TELECOM PLAN - B WING
01-ET110C FIRST LEVEL TELECOM PLAN - C WING
01-ET110D FIRST LEVEL TELECOM PLAN - D WING
01-ET110E FIRST LEVEL TELECOM PLAN - E WING
01-ET110F FIRST LEVEL TELECOM PLAN - F WING
01-ET110H FIRST LEVEL TELECOM PLAN - H WING
01-ET120 OVERALL SECOND LEVEL TELECOM PLAN
PROJECT # 660-21-700
00 01 15 - 8
01-ET120A SECOND LEVEL TELECOM PLAN - A WING
01-ET120B SECOND LEVEL TELECOM PLAN - B WING
01-ET120C SECOND LEVEL TELECOM PLAN - C WING
01-ET120D SECOND LEVEL TELECOM PLAN - D WING
01-ET120E SECOND LEVEL TELECOM PLAN - E WING
01-ET120F SECOND LEVEL TELECOM PLAN - F WING
01-ET130 OVERALL THIRD LEVEL TELECOM PLAN
01-ET130A THIRD LEVEL TELECOM PLAN - A WING
01-ET130B THIRD LEVEL TELECOM PLAN - B WING
01-ET130C THIRD LEVEL TELECOM PLAN - C WING
01-ET130D THIRD LEVEL TELECOM PLAN - D WING
01-ET140 OVERALL FOURTH LEVEL TELECOM PLAN
01-ET140A FOURTH LEVEL TELECOM PLAN - A WING
01-ET140B FOURTH LEVEL TELECOM PLAN - B WING
01-ET140C FOURTH LEVEL TELECOM PLAN - C WING
01-ET140D FOUTH LEVEL TELECOM PLAN - D WING
01-ET150 OVERALL FIFTH LEVEL TELECOM PLAN
01-ET150A FIFTH LEVEL TELECOM PLAN - A WING
01-ET150B FIFTH LEVEL TELECOM PLAN - B WING
01-ET150C FIFTH LEVEL TELECOM PLAN - C WING
01-ET160 OVERAL SIXTH & SEVENTH LEVEL TELECOM PLANS
01-ET401 ENLARGED TELECOM PLANS
01-ET402 ENLARGED TELECOM PLANS
01-ET403 ENLARGED TELECOM PLANS
01-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET502 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET503 TELECOM EQUIPMENT RACK ELEVATOINS
01-ET504 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET505 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET506 TELECOM EQUIPMENT RACK ELECATIONS
01-ET507 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET508 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET509 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET601 TELECOM CONDUIT RISER DIAGRAM
01-ET602 TELECOM CONDUIT RISER DIAGRAM
01-ET603 TELECOM CABLE RISER DIAGRAM
01-ET604 TELECOM CABLE RISER DIAGRAM
PROJECT # 660-21-700
00 01 15 - 9
BUILDING 14
14-GC1B0 SEQUENCING PLAN – BASEMENT FLOOR
14-GC100 SEQUENCING PLAN - GROUND FLOOR
14-GC110 SEQUENCING PLAN – FIRST FLOOR
14-GC120 SEQUENCING PLAN – SECOND FLOOR
14-GC130 SEQUENCING PLAN - THIRD FLOOR
14-SF001 GENERAL STRUCTURAL NOTES
14-SF100 OVERALL GROUND FLOOR STRUCTURAL PLAN
14-SF110 OVERALL FIRST FLOOR STRUCTURAL PLAN
14-SF120 OVERALL SECOND FLOOR STRUCTURAL PLAN
14-SF130 OVERALL THIRD FLOOR STRUCTURAL PLAN
14-SF300 ENLARGED PLANS
14-SJ600 SCHEDULES & DETAILS
14-AD1B0 OVERALL BASEMENT DEMOLITION PLAN
14-AD3B0 ENLARGED BASEMENT DEMOLITION PLANS
14-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN
14-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
14-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
14-AD130 OVERALL THIRD FLOOR DEMOLITION PLAN
14-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS
14-AD301 ENLARGED GROUND FLOOR DEMOLITION PLANS
14-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
14-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS
14-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS
14-AE1B0 OVERALL BASEMENT FLOOR PLAN
14-AE3B0 ENLARGED BASEMENT PLANS
14-AE100 OVERALL GROUND FLOOR PLAN
14-AE110 OVERALL FIRST FLOOR PLAN
14-AE120 OVERALL SECOND FLOOR PLAN
14-AE130 OVERALL THIRD FLOOR PLAN
14-AE300 ENLARGED GROUND FLOOR PLANS
14-AE301 ENLARGED GROUND FLOOR PLANS
14-AE310 ENLARGED FIRST FLOOR PLANS
14-AE320 ENLARGED SECOND FLOOR PLANS
14-AE330 ENLARGED THIRD FLOOR PLANS
14-AE400 INTERIOR ELEVATIONS
14-AE600 SCHEDULES
PROJECT # 660-21-700
00 01 15 - 10
14-FX1B0 OVERALL BASEMENT FLOOR FIRE SPRINKLER PLAN
14-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN
14-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
14-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
14-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN
14-MH1B0 OVERALL BASEMENT FLOOR MECHANICAL PLAN
14-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN
14-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
14-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
14-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN
14-MH140 OVERALL ROOF MECHANICAL PLAN
14-MH401 ENLARGED MECHANICAL PLANS
14-MH402 ENLARGED MECHANICAL PLANS
14-MH403 ENLARGED MECHANICAL PLANS
14-MH404 ENLARGED MECHANICAL PLANS
14-MH405 ENLARGED MECHANICAL PLANS
14-MH406 ENLARGED MECHANICAL PLANS
14-MH407 ENLARGED MECHANICAL PLANS
14-MH408 ENLARGED MECHANICAL PLANS
14-MH409 ENLARGED MECHANICAL PLANS
14-MH410 ENLARGED MECHANICAL PLANS
14-MH411 ENLARGED MECHANICAL PLANS
14-MH412 ENLARGED PLUMBING PLANS
14-MH413 ENLARGED MECHANICAL PLANS
14-MH414 ENLARGED MECHANICAL PLANS
14-MH415 ENLARGED PLUMBING PLANS
14-MH416 ENLARGED MECHANICAL PLANS
14-ED1B0 OVERALL BASEMENT LEVEL ELECTRICAL DEMO PLAN
14-ED1B0A BASEMENT LEVEL ELECTRICAL DEMO PLAN - A WING
14-ED1B0B BASEMENT LEVEL ELECTRICAL DEMO PLAN – B WING
14-ED1B0C BASEMENT LEVEL ELECTRICAL DEMO PLAN - C WING
14-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN
14-ED100A GROUND LEVEL ELECTRICAL DEMO PLAN - A WING
14-ED100B GROUND LEVEL ELECTRICAL DEMO PLAN - B WING
14-ED100C GROUND LEVEL ELECTRICAL DEMO PLAN - C WING
14-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN
14-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN – A WING
PROJECT # 660-21-700
00 01 15 - 11
14-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN – B WING
14-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN – C WING
14-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN
14-ED120A SECOND LEVEL ELECTRICAL DEMO PLAN – A WING
14-ED120B SECOND LEVEL ELECTRICAL DEMO PLAN – B WING
14-ED120C SECOND LEVEL ELECTRICAL DEMO PLAN – C WING
14-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN
14-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN – A WING
14-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN – B WING
14-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN – C WING
14-ED401 ENLARGED DEMOLITION PLANS
14-ED402 ENLARGED DEMOLITION PLANS
14-ED403 ENLARGED DEMOLITION PLANS
14-ED404 ENLARGED DEMOLITION PLANS
14-ED405 ENLARGED DEMOLITION PLANS
14-EP1B0 OVERALL BASEMENT LEVEL POWER PLAN
14-EP100 OVERALL GROUND LEVEL POWER PLAN
14-EP110 OVERALL FIRST LEVEL POWER PLAN
14-EP120 OVERALL SECOND LEVEL POWER PLAN
14-EP130 OVERALL THIRD LEVEL POWER PLAN
14-EP140 OVERALL ROOF POWER PLAN
14-EP401 ENLARGED POWER PLANS
14-EP402 ENLARGED POWER PLANS
14-EP601 PARTIAL ONE-LINE DIAGRAMS
14-EP602 DEVICE & LIGHTING FIXTURE SCHEDULES
14-EP603 PANEL SCHEDULES
14-EP604 PANEL SCHEDULES
14-EP605 PANEL SCHEDULES
14-EP606 PANEL SCHEDULES
14-ET1B0 OVERALL BASEMENT LEVEL TELECOM PLAN
14-ET1B0A BASEMENT LEVEL TELECOM PLAN - A WING
14-ET1B0B BASEMENT LEVEL TELECOM PLAN - B WING
14-ET1B0C BASEMENT LEVEL TELECOM PLAN - C WING
14-ET100 OVERALL GROUND LEVEL TELECOM PLAN
14-ET100A GROUND LEVEL TELECOM PLAN - A WING
14-ET100B GROUND LEVEL TELECOM PLAN - B WING
14-ET100C GROUND LEVEL TELECOM PLAN - C WING
PROJECT # 660-21-700
00 01 15 - 12
14-ET110 OVERALL FIRST LEVEL TELECOM PLAN
14-ET110A FIRST LEVEL TELECOM PLAN - A WING
14-ET110B FIRST LEVEL TELECOM PLAN - B WING
14-ET110C FIRST LEVEL TELECOM PLAN - C WING
14-ET120 OVERALL SECOND LEVEL TELECOM PLAN
14-ET120A SECOND LEVEL TELECOM PLAN - A WING
14-ET120B SECOND LEVEL TELECOM PLAN - B WING
14-ET120C SECOND LEVEL TELECOM PLAN - C WING
14-ET130 OVERALL THIRD LEVEL TELECOM PLAN
14-ET130A THIRD LEVEL TELECOM PLAN - A WING
14-ET130B THIRD LEVEL TELECOM PLAN - B WING
14-ET130C THIRD LEVEL TELECOM PLAN - C WING
14-ET401 ENLARGED TELECOM PLANS
14-ET402 ENLARGED TELECOM PLANS
14-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET502 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET503 TELECOM EQUIPMENT RACK ELEVATOINS
14-ET504 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET505 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET506 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET601 TELECOM CONDUIT RISER DIAGRAM
14-ET602 TELECOM CONDUIT RISER DIAGRAM
14-ET603 TELECOM CABLE RISER DIAGRAM
14-ET604 TELECOM CABLE RISER DIAGRAM
BUILDING 02
02-GC100 SEQUENCING PLAN – GROUND FLOOR
02-GC110 SEQUENCING PLAN – FIRST FLOOR
02-GC120 SEQUENCING PLAN – SECOND FLOOR
02-MH100 OVERALL GROUND MECHANICAL PLAN
02-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
02-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
02-MH130 ROOF MECHANICAL PLAN
02-MH401 ENLARGED MECHANICAL PLANS
02-MH402 ENLARGED MECHANICAL PLANS – GROUND FLOOR
02-MH403 ENLARGED MECHANICAL PLANS – FIRST FLOOR
02-MH404 ENLARGED MECHANICAL PLANS – FIRST FLOOR
02-MH405 ENLARGED MECHANICAL PLANS – SECOND FLOOR
PROJECT # 660-21-700
00 01 15 - 13
02-MH406 ENLARGED MECHANICAL PLANS – SECOND FLOOR
02-ED100 OVERALL GROUND FLOOR ELECTRICAL DEMOLITION PLAN
02-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
02-ED120 OVERALL SECOND FLOOR ELECTRICAL DEMOLITION PLAN
02-ED401 ENLARGED DEMOLITION PLANS
02-ED402 ENLARGED DEMOLITION PLANS
02-ED403 ENLARGED DEMOLITION PLANS
02-EP100 OVERALL GROUND LEVEL POWER PLAN
02-EP110 OVERALL FIRST LEVEL POWER PLAN
02-EP120 OVERALL SECOND LEVEL POWER PLAN
02-EP130 OVERALL ROOF POWER PLAN
02-EP401 ENLARGED POWER PLANS
02-EP402 ENLARGED POWER PLANS
02-EP601 PARTIAL ONE-LINE DIAGRAMS
02-EP602 GROUNDING RISER DIAGRAM
02-EP603 PANEL SCHEDULES
02-ET100 OVERAL GROUND LEVEL TELECOM PLAN
02-ET100A GROUND LEVEL TELECOM PLAN - A WING
02-ET100B GROUND LEVEL TELECOM PLAN - B WING
02-ET100C GROUND LEVEL TELECOM PLAN - C WING
02-ET100D GROUND LEVEL TELECOM PLAN - D WING
02-ET110 OVERALL FIRST LEVEL TELECOM PLAN
02-ET110A FIRST LEVEL TELECOM PLAN - A WING
02-ET110B FIRST LEVEL TELECOM PLAN - B WING
02-ET110C FIRST LEVEL TELECOM PLAN - C WING
02-ET110D FIRST LEVEL TELECOM PLAN - D WING
02-ET120 OVERALL SECOND LEVEL TELECOM PLAN
02-ET120A SECOND LEVEL TELECOM PLAN - A WING
02-ET120B SECOND LEVEL TELECOM PLAN - B WING
02-ET120C SECOND LEVEL TELECOM PLAN - C WING
02-ET120D SECOND LEVEL TELECOM PLAN - D WING
02-ET601 TELECOM CONDUIT RISER DIAGRAM
BUILDING 03
03-GC100 SEQUENCING PLAN – GROUND FLOOR
03-GC110 SEQUENCING PLAN – FIRST FLOOR
03-GC120 SEQUENCING PLAN - SECOND FLOOR
03-AD100 OVERALL FROUND FLOOR DEMOLITION PLAN
PROJECT # 660-21-700
00 01 15 - 14
03-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
03-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
03-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS
03-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
03-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS
03-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS
03-AE100 OVERALL GROUND FLOOR PLAN
03-AE110 OVERALL FIRST FLOOR PLAN
03-AE120 OVERALL SECOND FLOOR PLAN
03-AE300 ENLARGED GROUND FLOOR PLANS
03-AE310 ENLARGED FIRST FLOOR PLANS
03-AE311 ENLARGED FIRST FLOOR PLANS
03-AE320 ENLARGED SECOND FLOOR PLANS
03-AE400 INTERIOR ELEVATIONS
03-AE600 SCHEDULES
03-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN
03-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
03-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
03-MH100 OVERALL GROUND MECHANICAL PLAN
03-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
03-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
03-MH130 ROOF MECHANICAL PLAN
03-MH401 ENLARGED MECHANICAL PLANS
03-MH402 ENLARGED MECHANICAL PLANS
03-MH403 ENLARGED MECHANICAL PLANS
03-MH404 ENLARGED MECHANICAL PLANS
03-MH405 ENLARGED MECHANICAL PLANS
03-MH406 ENLARGED MECHANICAL PLANS
03-MH407 ENLARGED MECHANICAL PLANS
03-MH408 ENLARGED MECHANICAL PLANS
03-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN
03-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN A WING
03-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN B-DWING
03-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN
03-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - A WING
03-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN B-D WING
03-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN
PROJECT # 660-21-700
00 01 15 - 15
03-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN A WING
03-ED120B SECOND LEVEL ELECTRICAL DEMO PLAN B&C WING
03-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
03-ED402 ENLARGED ELECTRICAL DEMOLITION PLANS
03-ED403 ENLARGED ELECTRICAL DEMOLITION PLANS
03-ED404 ENLARGED DEMOLITION PLANS
03-ED405 ENLARGED DEMOLITION PLANS
03-EP100 OVERALL GROUND LEVEL POWER PLAN
03-EP110 OVERALL FIRST LEVEL POWER PLAN
03-EP120 OVERALL SECOND LEVEL POWER PLAN
03-EP401 ENLARGED POWER PLANS
03-EP601 PARTIAL ONE-LINE DIAGRAMS
03-EP602 DEVICE & LIGHTING FIXTURE SCHEDULES
03-EP603 PANEL SCHEDULES
03-EP604 PANEL SCHEDULES
03-EP605 PANEL SCHEDULES
03-ET100 OVERALL GROUND LEVEL TELECOM PLAN
03-ET100A GROUND LEVEL TELECOM PLAN - A WING
03-ET100B GROUND LEVEL TELECOM PLAN - B-D WINGS
03-ET110 OVERALL FIRST LEVEL TELECOM PLAN
03-ET110A FIRST LEVEL TELECOM PLAN - A WING
03-ET110B FIRST LEVEL TELECOM PLAN - B-D WINGS
03-ET120 OVERALL SECOND LEVEL TELECOM PLAN
03-ET120A SECOND LEVEL TELECOM PLAN - A WING
03-ET120B SECOND LEVEL TELECOM PLAN - B&C WINGS
03-ET401 ENLARGED TELECOM PLANS
03-ET402 ENLARGED TELECOM PLANS
03-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
03-ET502 TELECOM EQUIPMENT RACK ELEVATIONS
03-ET503 TELECOM EQUIPMENT RACK ELEVATIONS
03-ET504 TELECOM EQUIPMENT RACK ELEVATIONS
03-ET601 TELECOM CONDUIT RISER DIAGRAM
03-ET602 TELECOM CABLE RISER DIAGRAM
BUILDING 04
04-GC110 SEQUENCING PLAN – FIRST FLOOR
04-MD120 ROOF MECHANICAL DEMO PLAN
04-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
PROJECT # 660-21-700
00 01 15 - 16
04-MH120 ROOF MECHANICAL PLAN
04-MH401 ENLARGED MECHANICAL PLANS
04-ED1B0 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN
04-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
04-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING
04-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN – B WING
04-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN – C WING
04-ED401 ENLARGED DEMOLITION PLANS
04-EP1B0 BASEMENT FLOOR POWER PLAN
04-EP110 OVERALL FIRST FLOOR POWER PLAN
04-EP601 DEVICE & LIGHTING FIXTURE SCHEDULES
04-ET1B0 BASEMENT FLOOR TELECOM PLAN
04-ET110 OVERALL FIRST FLOOR TELECOM PLAN
04-ET110A FIRST FLOOR TELECOM PLAN - A WING
04-ET110B FIRST FLOOR TELECOM PLAN - B WING
04-ET110C FIRST FLOOR TELECOM PLAN - C WING
04-ET601 TELECOM CABLE RISER DIAGRAM
04-ET602 TELECOM CONDUIT RISER DIAGRAM
BUILDING 05
05-GC110 SEQUENCING PLAN - FIRST FLOOR
05-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
05-AD410 ENLARGED FIRST FLOOR DEMOLITION PLANS
05-AE110 OVERALL FIRST FLOOR PLAN
05-AE410 ENLARGED FIRST FLOOR PLANS & SCHEDULES
05-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
05-MH100 OVERALL GROUND MECHANICAL PLAN
05-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
05-MH120 ROOF MECHANICAL PLAN
05-MH401 ENLARGED MECHANICAL PLANS
05-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN
05-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN
05-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
05-EP100 OVERALL GROUND LEVEL POWER PLAN
05-EP110 OVERALL FIRST LEVEL POWER PLAN
05-EP401 ENLARGED POWER PLANS
05-EP601 ONE-LINE DIAGRAM - NORMAL
05-ET100 OVERALL GROUND FLOOR TELECOM PLAN
PROJECT # 660-21-700
00 01 15 - 17
05-ET110 OVERALL FIRST FLOOR TELECOM PLAN
05-ET401 ENLARGED TELECOM PLANS
05-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
05-ET601 TELECOM RISER DIAGRAMS
BUILDING 06
06-GC1BO SEQUENCING PLAN – BASEMENT FLOOR
06-GC110 SEQUENCING PLAN – FIRST FLOOR
06-MH100 OVERALL GROUND MECHANICAL PLAN
06-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
06-MH120 ROOF MECHANICAL PLAN
06-MH401 ENLARGED MECHANICAL PLANS
06-ED1B1 OVERALL BASEMENT LEVEL ELECTRICAL DEMO PLAN
06-ED1B1A BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN AWING
06-ED1B1B BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN BWING
06-ED1B1C BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN CWING
06-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN
06-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN – A WING
06-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - B WING
06-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN – C WING
06-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
06-EP1B1 OVERALL BASEMENT LEVEL POWER PLAN
06-EP110 OVERALL FIRST LEVEL POWER PLAN
06-EP401 ENLARGED POWER PLANS
06-ET1B1 OVERALL BASEMENT LEVEL TELECOM PLAN
06-ET1B1A BASEMENT LEVEL TELECOM PLAN - A WING
06-ET1B1B BASEMENT LEVEL TELECOM PLAN - B WING
06-ET1B1C BASEMENT LEVEL TELECOM PLAN - C WING
06-ET110 OVERALL FIRST FLOOR TELECOM PLAN
06-ET110A FIRST FLOOR TELECOM PLAN - A WING
06-ET110B FIRST FLOOR TELECOM PLAN - B WING
06-ET110C FIRST FLOOR TELECOM PLAN - C WING
06-ET401 ENLARGED TELECOM PLANS
06-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
06-ET601 TELECOM CONDUIT RISER DIAGRAM
06-ET602 TELECOM CABLE RISER DIAGRAM
BUILDING 07
07-GC110 SEQUENCING PLAN - FIRST FLOOR
PROJECT # 660-21-700
00 01 15 - 18
07-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
07-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
07-AE110 OVERALL FIRST FLOOR PLAN
07-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES
07-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
07-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
07-MH401 ENLARGED MECHANICAL PLANS
07-ED1B1 OVERALL BASEMENT FLOOR ELECTRICAL DEMO PLAN
07-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
07-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING
07-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING
07-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING
07-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
07-EP1B1 OVERALL BASEMENT FLOOR POWER PLAN
07-EP110 OVERALL FIRST FLOOR POWER PLAN
07-EP401 ENLARGED POWER PLANS
07-EP601 PARTIAL ONE-LINE DIAGRAM
07-ET1B1 OVERALL BASEMENT FLOOR TELECOM PLAN
07-ET110 OVERALL FIRST FLOOR TELECOM PLAN
07-ET110A FIRST FLOOR TELECOM PLAN - A WING
07-ET110B FIRST FLOOR TELECOM PLAN - B WING
07-ET110C FIRST FLOOR TELECOM PLAN - C WING
07-ET401 ENLARGED TELECOM PLANS
07-ET501 TELECOM EQUIPMENT RACK ELEVATRIONS
07-ET601 TELECOM CONDUIT RISER DIAGRAM
07-ET602 TELECOM CABLE RISER DIAGRAM
BUILDING 08
08-GC100 SEQUENCING PLAN – GROUND FLOOR
08-GC110 SEQUENCING PLAN - FIRST FLOOR
08-GC120 SEQUENCING PLAN - SECOND FLOOR
08-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
08-AD320 ENLARGED SECOND FLOOR DEMOLITION PLAN
08-AE120 OVERALL SECOND FLOOR PLAN
08-AE320 ENLARGED SECOND FLOOR PLAN & SCHEDULES
08-AE601 DOOR AND FINISH SCHEDULE
08-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
08-MH111 SECOND FLOOR MECHANICAL PLAN
PROJECT # 660-21-700
00 01 15 - 19
08-MH113 OVERALL ROOF MECHANICAL PLAN
08-MH401 ENLARGED MECHANICAL PLANS
08-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN
08-ED110 FIRST FLOOR ELECTRICAL DEMOLIITION PLAN
08-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
08-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
08-EP100 GROUND FLOOR POWER PLAN
08-EP110 FIRST FLOOR POWER PLAN
08-EP120 SECOND FLOOR POWER PLAN
08-EP401 ENLARGED POWER PLANS
08-EP601 PARTIAL ONE-LINE DIAGRAM
08-ET100 GROUND FLOOR TELECOM PLAN
08-ET110 FIRST FLOOR TELECOM PLAN
08-ET120 SECOND FLOOR TELECOM PLAN
08-ET401 ENLARGED TELECOM PLANS
08-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
08-ET601 TELECOM CONDUIT RISER DIAGRAM
BUILDING 09
09-GC110 SEQUENCING PLAN - FIRST FLOOR
09-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
09-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
09-AE110 OVERALL FIRST FLOOR PLAN
09-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES
09-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
09-MH110 FIRST FLOOR MECHANICAL PLAN
09-MH112 OVERALL ROOF MECHANICAL PLAN
09-MH401 ENLARGED MECHANICAL PLANS
09-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
09-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
09-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
09-EP110 FIRST FLOOR POWER PLAN
09-EP120 SECOND FLOOR POWER PLAN
09-EP401 ENLARGED POWER PLANS
09-EP601 PARTIAL ONE-LINE DIAGRAM
09-ET110 FIRST FLOOR TELECOM PLAN
09-ET120 SECOND FLOOR TELECOM PLAN
09-ET401 ENLARGED TELECOM PLANS
PROJECT # 660-21-700
00 01 15 - 20
09-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
09-ET601 TELECOM CONDUIT RISER DIAGRAM
BUILDING 16
16-MH100 GROUND FLOOR MECHANICAL PLAN
16-MH110 FIRST FLOOR MECHANICAL PLAN
16-MH120 SECOND FLOOR MECHANICAL PLAN
16-MH130 ROOF MECHANICAL PLAN
16-MH401 ENLARGED MECHANICAL PLANS
16-MH402 ENLARGED MECHANICAL PLANS
16-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN
16-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
16-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
16-ED401 ENLARGED DEMOLITION PLANS
16-EP100 GROUND FLOOR POWER PLAN
16-EP110 FIRST FLOOR POWER PLAN
16-EP120 SECOND FLOOR POWER PLAN
16-EP401 ENLARGED POWER PLANS
16-ET100 GROUND FLOOR TELECOM PLAN
16-ET110 FIRST FLOOR TELECOM PLAN
16-ET120 SECOND FLOOR TELECOM PLAN
16-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
16-ET601 TELECOM CONDUIT RISER DIAGRAM
BUILDING 38
38-MD120 OVERALL ROOF MECHANICAL DEMO PLAN
38-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
38-MH120 OVERALL ROOF MECHANICAL PLAN
38-MH401 ENLARGED MECHANICAL PLANS
38-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
38-ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
38-EP110 FIRST FLOOR POWER PLAN
38-ET110 FIRST FLOOR TELECOM PLAN
38-ET401 ENLARGED TELECOM PLANS
38-ET601 TELECOM RISER DIAGRAMS
BUILDING 47
47-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
47-MH120 OVERALL ROOF MECHANICAL PLAN
47-MH401 ENLARGED MECHANICAL PLANS
PROJECT # 660-21-700
00 01 15 - 21
47-EP110 FIRST FLOOR POWER PLAN
47-ET110 FIRST FLOOR TELECOM PLAN
47-ET501 TELECOM EQUIPMENT RACK ELEVATION
47-ET601 TELECOM RISER DIAGRAMS
BUILDING 550
550-ET110 FIRST FLOOR TELECOM PLAN
550-ET120 SECOND FLOOR TELECOM PLAN
550-ET130 THIRD FLOOR TELECOM PLAN
550-ET501 TELECOM EQUIPMENT RACK ELEVATION
550-ET601 TELECOM RISER DIAGRAMS
BUILDING 590
590-ET100 GROUND FLOOR TELECOM PLAN
590-ET110 FIRST FLOOR TELECOM PLAN
590-ET120 SECOND FLOOR TELECOM PLAN
590-ET501 TELECOM EQUIPMENT RACK ELEVATION
590-ET601 TELECOM RISER DIAGRAMS
- - - E N D - - -
11-01-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to upgrade the facility infrastructure to support the new Electronic Health
Record Modernization (EHRM) system in accordance with VA OEHRM
Site Infrastructure Requirements (provided by VHA). The scope of this project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building
Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement. Normal working hours for this contract will be from
7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays. Performing on-site work outside normal working hours will require approval from the
Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
B. as required by drawings and specifications.
01 00 00 -2
C. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the
Contracting Officer.
D. Offices of RDC+EA, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the
Government without affirmations by Contracting Officer or his duly authorized representative.
E. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection.
Such prior notice shall be not less than three workdays unless otherwise designated by the COR. Procurement of testing services is the responsibility of the general contractor.
F. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
ITEM I, GENERAL CONSTRUCTION: BASE BID : This work is to upgrade the facility infrastructure to support the new Electronic Health
Record Modernization (EHRM) system in accordance with VA OEHRM
Site Infrastructure Requirements (provided by VHA). The scope of this project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building
Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication
01 00 00 -3 infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings (1, 14, 2, 3, 5, 6, 7, 8, 9, 4, 16, 32, 38, 47, 550, 590) as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement and commissioning. This work includes all general construction, alterations, roads, walks, grading, drainage, and commissioning necessary removal of existing structures and construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice
01 00 00 -4 is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08
71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it
01 00 00 -5 for the project. Return the information to the Contracting
Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from
01 00 00 -6 liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR .
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical
01 00 00 -7 personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to
Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
H. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the
01 00 00 -8 work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:
Phase 1: Site Fiber Backbone
This phase of the construction would include coordination of new pathways from the campus MRC located in the basement of building 1 into the new or remodeled demarcation facility. In addition to bringing in new fiber-based utility this will create a secondary services path, providing the needed redundancy during construction.
During this phase, no existing carrier services would be disrupted and there would be no potential adverse impact on the ongoing medical operations.
Phase 2: Pathways & Backbone Fiber
In a parallel and concurrent time frame with phase one, construction phase two will be working on the internal side, building a secondary fiber feed from the core to the edge. Once this new fiber ring is fully installed and tested, it will be connected to the new core service, providing fully operational and redundant services. During this phase, existing pathways or backbone fiber will remain in operation to ensure no impact to service or operation of the hospital.
Phase 3: Telecommunication Data Room buildout
The third phase of construction includes the buildout of the existing and new Telecommunication Data Rooms (TDRs) and the install of new equipment in the TDRs. It will include redundant power and HVAC in
01 00 00 -9 each of the TDRs. The TDR buildout will include pulling A-side and B-side redundant fiber paths to ensure network continuity.
Phase 4: Horizontal Cabling, Owner Equipment
The fourth phase includes the installation of horizontal cabling followed by the installation of active owner equipment. For the completion of the horizontal cabling, this will be phased by providing a service loop near the area to be refit; the cutover of the cabling will occur at a time approved and coordinated by the owner. Though a distinct phase of the project, the installation of horizontal cabling and the acquisition of active owner equipment may overlap with the earlier phases, to ensure a timely sequence of construction and seamless switch of services across the entire campus. Many of these phases will run concurrently and in tight coordination with the designers, contractors and owner representatives.
Phase 5: Owner Coordination for Edge Turnover
We recommend switching of service starting with the least impactful areas of the campus to the most critical areas. In addition to the ongoing testing and commissioning of the entire system throughout the phased process, this approach of switching services greatly minimizes the…
This is the start of the file's text. The full file is on GovTribe.