Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf

PDF 17 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction - Salt Lake City VAMC Project 660-21-700
Solicitation number
36C77623B0041
Issued by

About this file

This document provides details for a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0041 for infrastructure upgrades at the Salt Lake City VA Medical Center. Offerors should provide construction services to upgrade EHRM systems as outlined in Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf, a 17MB file containing project drawings and specifications. Proposals are due by the date listed in the full solicitation. The awarded contractor will be expected to complete the infrastructure upgrade work for the Salt Lake City VAMC.

View the file

Other files

File Type Posted
RESPONSE Attachment V5.1.docx DOCX document
Construction Wage Rates- Salt Lake County- 08-11-2023.pdf PDF
ADDENDUM No 01.pdf PDF
Bid opening call-in information.pdf PDF
RESPONSE Attachment V5.1 No. 30 Snippet.JPG JPG image
2017 AHERA 3-Year Reinspection v2.2 2017_1205_BT.xlsx XLSX spreadsheet
RESPONSE V10 - Technical Questions.docx DOCX document
RESPONSE Attachment V7.2.docx DOCX document
36C77623B0041 0004.pdf PDF
RESPONSE Attachment V2.1.docx DOCX document
RESPONSE Attachment V1.1.docx DOCX document
RESPONSE Attachment V7.1.docx DOCX document
RESPONSE Attachment V3.1.docx DOCX document
36C77623B0041 0003.pdf PDF
36C77623B0041 0003.pdf PDF
36C77623B0041 0002.pdf PDF
660-21-700 PreConstruction Site Visit Sing In Sheet 2023 07 14.pdf PDF
36C77623B0041 0001.pdf PDF
Attachment 13-Utah Tax Memo-EHRM-Salt Lake City.pdf PDF
Attachment 7-Part 6 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 12-Construction Wage Rates-Salt Lake County- 04-14-2023.pdf PDF
Attachment 14-Limitations on Subcontracting-EHRM-Salt Lake City.docx DOCX document
Attachment 15-Contractor Safety-Environmental-EHRM-S.L.C..docx DOCX document
Attachment 1-Specifications-(1 of 1)-EHRM-Salt Lake City.pdf PDF
Attachment 6-Part 5 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 3-Part 2 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 9-Part 8 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 5-Part 4 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
36C77623B0041.pdf PDF
Attachment 16 - Site Visit Instructions.pdf PDF
Attachment 11-Asbestos Site Survey-EHRM Salt Lake City.pdf PDF
Attachment 10-Part 9 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 4-Part 3 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Attachment 8-Part 7 of 9-Drawings-EHRM-Salt Lake City.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 742

IN

V 1.4

G R

A T

E

.7

N

O A

C C

ES

S

W a h le n

W a y

K is te rs

S tr e e t

WM

CO

S

CO

SD

SD

IB

IB

IB

IB

SD

SD

SD

S

E

W

D

S

D

D

D

F U T UR E F U EL TA N K

ELEC

ELEC

ELEC

ELEC

SS

WT

(1)

CVB

CVB

(1)

CVB

(1)

CVB

CVB

SIG

N SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

N

SIG

NSIG

N

SIG

N

SIG

N

CB

DR

4 7 4 0

+ 0

0.

+0

0 .

0 0

+0

0 .

0 0

+0

0.

+0

0.

+0

0.

+0

0.

+4

8.

R A

M P

R A

M P

:1

:1

R A

M P

:1

R A

M P

:1

88.0

144.0

144.0

288.0

3 5

2 9

2 8

2 5

2 2

1 9

1 8

1 1

1 3

1 8

2 6

2 6

1 2

1 5

2 1

3 0 2 TOTA L P A R K I N G S TA L L S

I N C L U D I N G 7 A D A S TA L L S

THRU

DRIVE

1 0

3 1 TOTA L P A R K I N G S TA L L S I N C L U D I N G

2 A D A S TA L L S

DRIVE

ATM

2 5

D

D

D

DRAIN DRAIN

VENT

Dog Kennel Line

Cartwasher Line

CU

T2 T1

A

27 40

PH

G

E

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

SS M

H

SDM

H

SDM

H

CO

SDM

H

EXISTING CHILLER

E X

IS

TING

C

HILL

ER

K is te rs

S tr e e t

Kisters Street

W a h le n

W a y

Baker Street

Hall Street

Bennion Blvd.

V a ld e z D ri v e

PARKING

STRUCTURE

5 4

H

NEW 10' GATE

E

D

C

B

A

POLE

F LAG

E n tr y

S e co nd L ev el

Entry

First Level

H os pi ta l M a in E nt ry

E m e rg en cy

E n tra n ce

F H

D R

IV

E

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /G e n

E L

E C

.r v t

/8

/2

:1

:5

P

M

CS001

COVER SHEET-VICINITY PLAN EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

GENERAL

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

NORTH

DIRECTOR

ASSOCIATE DIRECTOR / ADMINISTRATIVE OPERATIONS

CHIEF OF STAFF

ASSOCIATE DIRECTOR / PATIENT SERVICES

ASSOCIATE DIRECTOR / CLINICAL OPERATIONS

FINANCIAL MANAGEMENT SERVICE

GEORGE E. WAHLEN

DEPARTMENT OF VETERANS AFFAIRS

MEDICAL CENTER

500 FOOTHILL DRIVE

SALT LAKE CITY, UTAH 84112

ISSUED FOR

CONSTRUCTION

08 JUN 2023

EHRM

INFRASTRUCTURE

UPGRADES

660-21-700

PROJECT LOCATION

N.T.S.

VICINITY PLAN

Revisions: Date:

06/08/23

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /G e n

E L

E C

.r v t

/8

/2

:5

:3

P M

CS002

PROJECT SHEET INDEX EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

GENERAL

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

GENERAL

CS001 COVER SHEET-VICINITY PLAN

CS002 PROJECT SHEET INDEX

CS003 RISK ASSESSMENT

CS004 IT SECURITY CHECKLIST

HR101 HAZARDOUS MATERIAL ABATEMENT

AE001 GENERAL NOTES, SYMBOLS, ABBREVIATIONS

AE002 CONSTRUCTION SEQUENCING - SITE

AE003 INFECTION CONTROL

AE201 WALL SECTIONS

AE202 WALL SECTIONS

AE501 ARCHITECTURAL DETAILS

AE502 ARCHITECTURAL DETAILS

EE001 ELECTRICAL SYMBOL LEGEND, ABBRV, AND GENERAL NOTES

EE002 TELECOM SCHEDULES AND NOTES

EE003 ELECTRICAL SCHEDULES

EE004 SECURITY SCHEDULE AND NOTES

EE501 ELECTRICAL DETAILS

EE502 ELECTRICAL DETAILS

EE701 TYPICAL MOUNTING HEIGHT DETAILS

ET501 TELECOM DETAILS

ET502 TELECOM DETAILS

ET503 TELECOM DETAILS

ET504 TELECOM SECURITY DETAILS AND RISER DIAGRAMS

ET505 TELECOM EQUIPMENT RACK GROUNDING DETAIL

PE001 PLUMBING SYMBOL LEGEND, ABBRV, AND GENERAL NOTES

PE501 PLUMBING DETAILS

PE601 PLUMBING FIXTURE SCHEDULES - BUILDING 1

PE602 PLUMBING FIXTURE SCHEDULES - BUILDING 3

PE603 PLUMBING FIXTURE SCHEDULES - BUILDING 14

ME001 MECHANICAL SYMBOL LEGEND, ABBRV, AND GENERAL NOTES

ME401 ENLARGED MECHANICAL PLANS

ME501 MECHANICAL DETAILS

ME601 MECHANICAL SCHEDULES

ME701 MECHANICAL CONTROLS LEGENDS & NOTES

ME702 MECHANICAL CONTROLS DIAGRAMS

SITE

ES101 OVERALL SITE RACEWAY PLAN

ES102 OVERALL SITE TUNNEL RACEWAY PLAN

ES501 SITE TELECOM DETAILS

ES502 SITE TELECOM DETAILS

ES503 SITE TELECOM LABELING DETAILS

ES504 SITE TELECOM LABELING DETAILS

ES601 OVERALL SITE MICRODUCT LEGEND

ES602 OVERALL SITE MICRODUCT RISER DIAGRAM

ES603 FIBER CABLE PATH "A" MATRIX

ES604 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 1)

ES605 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 1)

ES606 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 2)

ES607 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 2)

ES608 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 2, 3)

ES609 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 3, 4)

ES610 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 5, 6, 7, 8, 9, 16)

ES611 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 16, 38, 47, 50)

ES612 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 50, 90)

ES613 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 14)

ES614 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 14)

ES615 FIBER CABLE PATH "B" MATRIX

ES616 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 1)

ES617 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 1)

ES618 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 2)

ES619 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 2)

ES620 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 2, 3)

ES621 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 3, 4)

ES622 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 5, 6, 7, 8, 9, 16)

ES623 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 38, 47, 50, 90)

ES624 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 14)

ES625 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 14)

BUILDING 01

01-GC100 SEQUENCING PLAN - GROUND FLOOR

01-GC110 SEQUENCING PLAN - FIRST FLOOR

01-GC120 SEQUENCING PLAN - SECOND FLOOR

01-GC130 SEQUENCING PLAN - THIRD FLOOR

01-GC140 SEQUENCING PLAN - FOURTH FLOOR

01-GC150 SEQUENCING PLAN - FIFTH FLOOR

01-SF140 OVERALL FOURTH FLOOR STRUCTURAL PLAN

01-SF340 ENLARGED FOURTH FLOOR STRUCTURAL PLAN

01-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN

01-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

01-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

01-AD130 OVERALL THIRD FLOOR DEMOLITION PLANS

01-AD140 OVERALL FOURTH FLOOR DEMOLITION PLANS

01-AD150 OVERALL FIFTH FLOOR DEMOLITION PLANS

01-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS

01-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

01-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS

01-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS

01-AD321 ENLARGED SECOND FLOOR DEMOLITION PLANS

01-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS

01-AD331 ENLARGED THIRD FLOOR DEMOLITION PLANS

01-AD340 ENLARGED FOURTH FLOOR DEMOLITION PLANS

01-AD341 ENLARGED FOURTH FLOOR DEMOLITION PLANS

01-AD350 ENLARGED FIFTH FLOOR DEMOLITION PLANS

01-AE100 OVERALL GROUND FLOOR PLAN

01-AE110 OVERALL FIRST FLOOR PLAN

01-AE120 OVERALL SECOND FLOOR PLAN

01-AE130 OVERALL THIRD FLOOR PLAN

01-AE140 OVERALL FOURTH FLOOR PLAN

01-AE150 OVERALL FIFTH FLOOR PLAN

01-AE300 ENLARGED GROUND FLOOR PLANS

01-AE310 ENLARGED FIRST FLOOR PLANS

01-AE311 ENLARGED FIRST FLOOR PLANS

01-AE320 ENLARGED SECOND FLOOR PLANS

01-AE321 ENLARGED SECOND FLOOR PLANS

01-AE330 ENLARGED THIRD FLOOR PLANS

01-AE331 ENLARGED THIRD FLOOR PLANS

01-AE340 ENLARGED FOURTH FLOOR PLANS

01-AE341 ENLARGED FOURTH FLOOR PLANS

01-AE350 ENLARGED FIFTH FLOOR PLANS

01-AE400 INTERIOR ELEVATIONS

01-AE401 INTERIOR ELEVATIONS

01-AE600 SCHEDULES

01-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN

01-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

01-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

01-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN

01-FX140 OVERALL FOURTH FLOOR FIRE SPRINKLER PLAN

01-FX150 OVERALL FIFTH FLOOR FIRE SPRINKLER PLAN

01-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN

01-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

01-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

01-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN

01-MH140 OVERALL FOURTH FLOOR MECHANICAL PLAN

01-MH150 OVERALL FIFTH FLOOR MECHANICAL PLAN

01-MH160 OVERALL ROOF MECHANICAL PLAN

01-MH401 ENLARGED MECHANICAL PLANS

01-MH402 ENLARGED MECHANICAL PLANS

01-MH403 ENLARGED MECHANICAL PLANS

01-MH404 ENLARGED MECHANICAL PLANS

01-MH405 ENLARGED MECHANICAL PLANS

01-MH406 ENLARGED MECHANICAL PLANS

01-MH407 ENLARGED MECHANICAL PLANS

01-MH408 ENLARGED MECHANICAL PLANS

01-MH409 ENLARGED MECHANICAL PLANS

01-MH410 ENLARGED MECHANICAL PLANS

01-MH411 ENLARGED MECHANICAL PLANS

01-MH412 ENLARGED PLUMBING PLANS

01-MH413 ENLARGED MECHANICAL PLANS

01-MH414 ENLARGED MECHANICAL PLANS

01-MH415 ENLARGED MECHANICAL PLANS

01-MH416 ENLARGED MECHANICAL PLANS

01-MH417 ENLARGED MECHANICAL PLANS

01-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN

01-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN - A WING

01-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN - B WING

01-ED100C GROUND LEVEL ELECTRICAL DEMOLITION PLAN - C WING

01-ED100D GROUND LEVEL ELECTRICAL DEMOLITION PLAN - D WING

01-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN

01-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - A WING

01-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - B WING

01-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - C WING

01-ED110D FIRST LEVEL ELECTRICAL DEMOLITION PLAN - D WING

01-ED110E FIRST LEVEL ELECTRICAL DEMOLITION PLAN - E WING

01-ED110F FIRST LEVEL ELECTRICAL DEMOLITION PLAN - F WING

01-ED110H FIRST LEVEL ELECTRICAL DEMOLITION PLAN - H WING

01-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN

01-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN - A WING

01-ED120B SECOND LEVEL ELECTRICAL DEMOLITION PLAN - B WING

01-ED120C SECOND LEVEL ELECTRICAL DEMOLITION PLAN - C WING

01-ED120D SECOND LEVEL ELECTRICAL DEMOLITION PLAN - D WING

01-ED120E SECOND LEVEL ELECTRICAL DEMOLITION PLAN - E WING

01-ED120F SECOND LEVEL ELECTRICAL DEMOLITION PLAN - F WING

01-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN

01-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN - A WING

01-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN - B WING

01-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN - C WING

01-ED130D THIRD LEVEL ELECTRICAL DEMOLITION PLAN - D WING

01-ED140 OVERALL FOURTH LEVEL ELECTRICAL DEMOLITION PLAN

01-ED140A FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - A WING

01-ED140B FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - B WING

01-ED140C FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - C WING

01-ED140D FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - D WING

01-ED150 OVERALL FIFTH LEVEL ELECTRICAL DEMOLITION PLAN

01-ED150B FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - B WING

01-ED401 ENLARGED DEMOLITION PLANS

01-ED402 ENLARGED DEMOLITION PLANS

01-ED403 ENLARGED DEMOLITION PLANS

01-ED404 ENLARGED DEMOLITION PLANS

01-ED405 ENLARGED DEMOLITION PLANS

01-ED406 ENLARGED DEMOLITION PLANS

01-ED407 ENLARGED DEMOLITION PLANS

01-ED408 ENLARGED DEMOLITION PLANS

01-ED409 ENLARGED DEMOLITION PLANS

01-ED410 ENLARGED DEMOLITION PLANS

01-ED411 ENLARGED DEMOLITION PLANS

01-ED412 ENLARGED DEMOLITION PLANS

01-EP100 OVERALL GROUND LEVEL POWER PLAN

01-EP110 OVERALL FIRST LEVEL POWER PLAN

01-EP120 OVERALL SECOND LEVEL POWER PLAN

01-EP130 OVERALL THIRD LEVEL POWER PLAN

01-EP140 OVERALL FOURTH LEVEL POWER PLAN

01-EP150 OVERALL FIFTH LEVEL POWER PLAN

01-EP160 OVERALL SIXTH & SEVENTH LEVEL POWER PLANS

01-EP401 ENLARGED POWER PLANS

01-EP402 ENLARGED POWER PLANS

01-EP601 PARTIAL ONE-LINE DIAGRAMS

01-EP602 GROUNDING RISER DIAGRAM

01-EP603 LIGHTING FIXTURE SCHEDULE

01-EP604 PANEL SCHEDULES

01-EP605 PANEL SCHEDULES

01-EP606 PANEL SCHEDULES

01-ET100 OVERALL GROUND LEVEL TELECOM PLAN

01-ET100A GROUND LEVEL TELECOM PLAN - A WING

01-ET100B GROUND LEVEL TELECOM PLAN - B WING

01-ET100C GROUND LEVEL TELECOM PLAN - C WING

01-ET100D GROUND LEVEL TELECOM PLAN - D WING

01-ET110 OVERALL FIRST LEVEL TELECOM PLAN

01-ET110A FIRST LEVEL TELECOM PLAN - A WING

01-ET110B FIRST LEVEL TELECOM PLAN - B WING

01-ET110C FIRST LEVEL TELECOM PLAN - C WING

01-ET110D FIRST LEVEL TELECOM PLAN - D WING

01-ET110E FIRST LEVEL TELECOM PLAN - E WING

01-ET110F FIRST LEVEL TELECOM PLAN - F WING

01-ET110H FIRST LEVEL TELECOM PLAN - H WING

01-ET120 OVERALL SECOND LEVEL TELECOM PLAN

01-ET120A SECOND LEVEL TELECOM PLAN - A WING

01-ET120B SECOND LEVEL TELECOM PLAN - B WING

01-ET120C SECOND LEVEL TELECOM PLAN - C WING

01-ET120D SECOND LEVEL TELECOM PLAN - D WING

01-ET120E SECOND LEVEL TELECOM PLAN - E WING

01-ET120F SECOND LEVEL TELECOM PLAN - F WING

01-ET130 OVERALL THIRD LEVEL TELECOM PLAN

01-ET130A THIRD LEVEL TELECOM PLAN - A WING

01-ET130B THIRD LEVEL TELECOM PLAN - B WING

01-ET130C THIRD LEVEL TELECOM PLAN - C WING

01-ET130D THIRD LEVEL TELECOM PLAN - D WING

01-ET140 OVERALL FOURTH LEVEL TELECOM PLAN

01-ET140A FOURTH LEVEL TELECOM PLAN - A WING

01-ET140B FOURTH LEVEL TELECOM PLAN - B WING

01-ET140C FOURTH LEVEL TELECOM PLAN - C WING

01-ET140D FOURTH LEVEL TELECOM PLAN - D WING

01-ET150 OVERALL FIFTH LEVEL TELECOM PLAN

01-ET150B FIFTH LEVEL TELECOM PLAN - B WING

01-ET401 ENLARGED TELECOM PLANS

01-ET402 ENLARGED TELECOM PLANS

01-ET403 ENLARGED TELECOM PLANS

01-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET502 TELECOM DATA OUTLET DROP SCHEDULES

01-ET503 TELECOM DATA OUTLET DROP SCHEDULES

01-ET504 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET505 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET506 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET507 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET508 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET509 TELECOM EQUIPMENT RACK ELEVATIONS

01-ET601 TELECOM CONDUIT RISER DIAGRAM

01-ET602 TELECOM CONDUIT RISER DIAGRAM

01-ET603 TELECOM CABLE RISER DIAGRAM

01-ET604 TELECOM CABLE RISER DIAGRAM

BUILDING 14

14-GC1B0 SEQUENCING PLAN - BASEMENT FLOOR

14-GC100 SEQUENCING PLAN - GROUND FLOOR

14-GC110 SEQUENCING PLAN - FIRST FLOOR

14-GC120 SEQUENCING PLAN - SECOND FLOOR

14-GC130 SEQUENCING PLAN - THIRD FLOOR

14-SF001 GENERAL STRUCTURAL NOTES

14-SF100 OVERALL GROUND FLOOR STRUCTURAL PLAN

14-SF110 OVERALL FIRST FLOOR STRUCTURAL PLAN

14-SF120 OVERALL SECOND FLOOR STRUCTURAL PLAN

14-SF130 OVERALL THIRD FLOOR STRUCTURAL PLAN

14-SF300 ENLARGED PLANS

14-SJ600 SCHEDULES & DETAILS

14-AD1B0 OVERALL BASEMENT DEMOLITION PLAN

14-AD3B0 ENLARGED BASEMENT DEMOLITION PLANS

14-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN

14-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

14-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

14-AD130 OVERALL THIRD FLOOR DEMOLITION PLAN

14-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS

14-AD301 ENLARGED GROUND FLOOR DEMOLITION PLANS

14-AD302 ENLARGED GROUND FLOOR DEMOLITION PLANS

14-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

14-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS

14-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS

14-AE1B0 OVERALL BASEMENT FLOOR PLAN

14-AE3B0 ENLARGED BASEMENT PLANS

14-AE100 OVERALL GROUND FLOOR PLAN

14-AE110 OVERALL FIRST FLOOR PLAN

14-AE120 OVERALL SECOND FLOOR PLAN

14-AE130 OVERALL THIRD FLOOR PLAN

14-AE300 ENLARGED GROUND FLOOR PLANS

14-AE301 ENLARGED GROUND FLOOR PLANS

14-AE302 ENLARGED GROUND FLOOR PLANS

14-AE310 ENLARGED FIRST FLOOR PLANS

14-AE320 ENLARGED SECOND FLOOR PLANS

14-AE330 ENLARGED THIRD FLOOR PLANS

14-AE400 INTERIOR ELEVATIONS

14-AE600 SCHEDULES

14-FX1B0 OVERALL BASEMENT FLOOR FIRE SPRINKLER PLAN

14-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN

14-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

14-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

14-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN

14-MH1B0 OVERALL BASEMENT FLOOR MECHANICAL PLAN

14-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN

14-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

14-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

14-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN

14-MH140 OVERALL ROOF MECHANICAL PLAN

14-MH401 ENLARGED MECHANICAL PLANS

14-MH402 ENLARGED MECHANICAL PLANS

14-MH403 ENLARGED MECHANICAL PLANS

14-MH404 ENLARGED MECHANICAL PLANS

14-MH405 ENLARGED MECHANICAL PLANS

14-MH406 ENLARGED PLUMBING PLANS

14-MH407 ENLARGED MECHANICAL PLANS

14-MH408 ENLARGED MECHANICAL PLANS

14-MH409 ENLARGED MECHANICAL PLANS

14-MH410 ENLARGED MECHANICAL PLANS

14-MH411 ENLARGED MECHANICAL PLANS

14-MH412 ENLARGED PLUMBING PLANS

14-MH413 ENLARGED MECHANICAL PLANS

14-MH414 ENLARGED MECHANICAL PLANS

14-MH415 ENLARGED PLUMBING PLANS

14-MH416 ENLARGED MECHANICAL PLANS

14-ED1B0 OVERALL BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN

14-ED1B0A BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN - A WING

14-ED1B0B BASEMENT LEVEL ELCTRICAL DEMOLITION PLAN - B WING

14-ED1B0C BASEMENT LEVEL ELCTRICAL DEMOLITION PLAN - C WING

14-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN

14-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN - A WING

14-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN - B WING

14-ED100C GROUND LEVEL ELECTRICAL DEMOLITION PLAN - C WING

14-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN

14-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - A WING

14-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - B WING

14-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - C WING

14-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN

14-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN - A WING

14-ED120B SECOND LEVEL ELECTRICAL DEMOLITION PLAN - B WING

14-ED120C SECOND LEVEL ELECTRICAL DEMOLITION PLAN - C WING

14-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN

14-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN - A WING

14-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN - B WING

14-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN - C WING

14-ED401 ENLARGED DEMOLITION PLANS

14-ED402 ENLARGED DEMOLITION PLANS

14-ED403 ENLARGED DEMOLITION PLANS

14-ED404 ENLARGED DEMOLITION PLANS

14-ED405 ENLARGED DEMOLITION PLANS

14-ED406 ENLARGED DEMOLITION PLANS

14-EP1B0 OVERALL BASEMENT LEVEL POWER PLAN

14-EP100 OVERALL GROUND LEVEL POWER PLAN

14-EP110 OVERALL FIRST LEVEL POWER PLAN

14-EP120 OVERALL SECOND LEVEL POWER PLAN

14-EP130 OVERALL THIRD LEVEL POWER PLAN

14-EP140 OVERALL ROOF POWER PLAN

14-EP401 ENLARGED POWER PLANS

14-EP402 ENLARGED POWER PLANS

14-EP403 ENLARGED POWER PLANS

14-EP601 PARTIAL ONE-LINE DIAGRAMS

14-EP602 GROUNDING RISER DIAGRAM

14-EP603 DETAILS & LIGHTING FIXTURE SCHEDULES

14-EP604 PANEL SCHEDULES

14-EP605 PANEL SCHEDULES

14-EP606 PANEL SCHEDULES

14-ET1B0 OVERALL BASEMENT LEVEL TELECOM PLAN

14-ET1B0A BASEMENT LEVEL TELECOM PLAN - A WING

14-ET1B0B BASEMENT LEVEL TELECOM PLAN - B WING

14-ET1B0C BASEMENT LEVEL TELECOM PLAN - C WING

14-ET100 OVERALL GROUND LEVEL TELECOM PLAN

14-ET100A GROUND LEVEL TELECOM PLAN - A WING

14-ET100B GROUND LEVEL TELECOM PLAN - B WING

14-ET100C GROUND LEVEL TELECOM PLAN - C WING

14-ET110 OVERALL FIRST LEVEL TELECOM PLAN

14-ET110A FIRST LEVEL TELECOM PLAN - A WING

14-ET110B FIRST LEVEL TELECOM PLAN - B WING

14-ET110C FIRST LEVEL TELECOM PLAN - C WING

14-ET120 OVERALL SECOND LEVEL TELECOM PLAN

14-ET120A SECOND LEVEL TELECOM PLAN - A WING

14-ET120B SECOND LEVEL TELECOM PLAN - B WING

14-ET120C SECOND LEVEL TELECOM PLAN - C WING

14-ET130 OVERALL THIRD LEVEL TELECOM PLAN

14-ET130A THIRD LEVEL TELECOM PLAN - A WING

14-ET130B THIRD LEVEL TELECOM PLAN - B WING

14-ET130C THIRD LEVEL TELECOM PLAN - C WING

14-ET401 ENLARGED TELECOM PLANS

14-ET402 ENLARGED TELECOM PLANS

14-ET501 TELECOM DATA OUTLET DROP SCHEDULES

14-ET502 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET503 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET504 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET505 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET506 TELECOM EQUIPMENT RACK ELEVATIONS

14-ET601 TELECOM CONDUIT RISER DIAGRAM

14-ET602 TELECOM CONDUIT RISER DIAGRAM

14-ET603 TELECOM CABLE RISER DIAGRAM

14-ET604 TELECOM CABLE RISER DIAGRAM

BUILDING 02

02-GC100 SEQUENCING PLAN - GROUND FLOOR

02-GC110 SEQUENCING PLAN - FIRST FLOOR

02-GC120 SEQUENCING PLAN - SECOND FLOOR

02-AE100 OVERALL GROUND FLOOR PLAN

02-AE400 ENLARGED GROUND FLOOR PLANS

02-FX100 OVERALL GROUND FLOOR FIRE PROTECTION PLAN

02-MH100 OVERALL GROUND MECHANICAL PLAN

02-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

02-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

02-MH130 ROOF MECHANICAL PLAN

02-MH401 ENLARGED MECHANICAL PLANS - GROUND FLOOR

02-MH402 ENLARGED MECHANICAL PLANS - GROUND FLOOR

02-MH403 ENLARGED MECHANICAL PLANS - FIRST FLOOR

02-MH404 ENLARGED MECHANICAL PLANS - FIRST FLOOR

02-MH405 ENLARGED MECHANICAL PLANS - SECOND FLOOR

02-MH406 ENLARGED MECHANICAL PLANS - SECOND FLOOR

02-ED100 OVERALL GROUND FLOOR ELECTRICAL DEMOLITION PLAN

02-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

02-ED120 OVERALL SECOND FLOOR ELECTRICAL DEMOLITION PLAN

02-ED401 ENLARGED DEMOLITION PLANS

02-ED402 ENLARGED DEMOLITION PLANS

02-ED403 ENLARGED DEMOLITION PLANS

02-EP100 OVERALL GROUND FLOOR POWER PLAN

02-EP110 OVERALL FIRST FLOOR POWER PLAN

02-EP120 OVERALL SECOND FLOOR POWER PLAN

02-EP130 OVERALL ROOF POWER PLAN

02-EP401 ENLARGED POWER PLANS

02-EP402 ENLARGED POWER PLANS

02-EP601 PARTIAL ONE-LINE DIAGRAMS

02-EP602 GROUNDING RISER DIAGRAM

02-EP603 PANEL SCHEDULES

02-ET100 OVERALL GROUND FLOOR TELECOM PLAN

02-ET100A GROUND FLOOR TELECOM PLAN - A WING

02-ET100B GROUND FLOOR TELECOM PLAN - B WING

02-ET100C GROUND FLOOR TELECOM PLAN - C WING

02-ET110 OVERALL FIRST FLOOR TELECOM PLAN

02-ET110A FIRST FLOOR TELECOM PLAN - A WING

02-ET110B FIRST FLOOR TELECOM PLAN - B WING

02-ET110C FIRST FLOOR TELECOM PLAN - C WING

02-ET110D FIRST FLOOR TELECOM PLAN - D WING

02-ET120 OVERALL SECOND FLOOR TELECOM PLAN

02-ET120A SECOND FLOOR TELECOM PLAN - A WING

02-ET120B SECOND FLOOR TELECOM PLAN - B WING

02-ET120C SECOND FLOOR TELECOM PLAN - C WING

02-ET120D SECOND FLOOR TELECOM PLAN - D WING

02-ET601 TELECOM CABLE RISER DIAGRAM

BUILDING 03

03-GC100 SEQUENCING PLAN - GROUND FLOOR

03-GC110 SEQUENCING PLAN - FIRST FLOOR

03-GC120 SEQUENCING PLAN - SECOND FLOOR

03-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN

03-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

03-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

03-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS

03-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

03-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS

03-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS

03-AE100 OVERALL GROUND FLOOR PLAN

03-AE110 OVERALL FIRST FLOOR PLAN

03-AE120 OVERALL SECOND FLOOR PLAN

03-AE300 ENLARGED GROUND FLOOR PLANS

03-AE310 ENLARGED FIRST FLOOR PLANS

03-AE311 ENLARGED FIRST FLOOR PLANS

03-AE320 ENLARGED SECOND FLOOR PLANS

03-AE400 INTERIOR ELEVATIONS

03-AE600 SCHEDULES

03-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN

03-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

03-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

03-MH100 OVERALL GROUND MECHANICAL PLAN

03-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

03-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN

03-MH130 ROOF MECHANICAL PLAN

03-MH401 ENLARGED MECHANICAL PLANS

03-MH402 ENLARGED MECHANICAL PLANS

03-MH403 ENLARGED MECHANICAL PLANS

03-MH404 ENLARGED MECHANICAL PLANS

03-MH405 ENLARGED MECHANICAL PLANS

03-MH406 ENLARGED PLUMBING PLANS

03-MH407 ENLARGED MECHANICAL PLANS

03-MH408 ENLARGED MECHANICAL PLANS

03-ED100 OVERALL GROUND FLOOR ELECTRICAL DEMOLITION PLAN

03-ED100A GROUND FLOOR ELECTRICAL DEMOLITION PLAN - A WING

03-ED100B GROUND FLOOR ELECTRICAL DEMOLITION PLAN - B-D WINGS

03-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

03-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING

03-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B-D WINGS

03-ED120 OVERALL SECOND FLOOR ELECTRICAL DEMOLITION PLAN

03-ED120A SECOND FLOOR ELECTRICAL DEMOLITION PLAN - A WING

03-ED120B SECOND FLOOR ELECTRICAL DEMOLITION PLAN - B&C WING

03-ED401 ENLARGED DEMOLITION PLANS

03-ED402 ENLARGED DEMOLITION PLANS

03-ED403 ENLARGED DEMOLITION PLANS

03-ED404 ENLARGED DEMOLITION PLANS

03-ED405 ENLARGED DEMOLITION PLANS

03-EP100 OVERALL GROUND FLOOR POWER PLAN

03-EP110 OVERALL FIRST FLOOR POWER PLAN

03-EP120 OVERALL SECOND FLOOR POWER PLAN

03-EP401 ENLARGED POWER PLANS

03-EP601 PARTIAL ONE-LINE DIAGRAMS

03-EP602 GROUNDING RISER DIAGRAM

03-EP603 LIGHTING FIXTURE SCHEDULE

03-EP604 PANEL SCHEDULES

03-EP605 PANEL SCHEDULES

03-ET100 OVERALL GROUND FLOOR TELECOM PLAN

03-ET100A GROUND FLOOR TELECOM PLAN - A WING

03-ET100B GROUND FLOOR TELECOM PLAN - B-D WINGS

03-ET110 OVERALL FIRST FLOOR TELECOM PLAN

03-ET110A FIRST FLOOR TELECOM PLAN - A WING

03-ET110B FIRST FLOOR TELECOM PLAN - B-D WINGS

03-ET120 OVERALL SECOND FLOOR TELECOM PLAN

03-ET120A SECOND FLOOR TELECOM PLAN - A WING

03-ET120B SECOND FLOOR TELECOM PLAN - B-C WINGS

03-ET401 ENLARGED TELECOM PLANS

03-ET402 ENLARGED TELECOM PLANS

03-ET501 TELECOM DATA OUTLET DROP SCHEDULES

03-ET502 TELECOM EQUIPMENT RACK ELEVATIONS

03-ET503 TELECOM EQUIPMENT RACK ELEVATIONS

03-ET504 TELECOM EQUIPMENT RACK ELEVATIONS

03-ET601 TELECOM CONDUIT RISER DIAGRAM

03-ET602 TELECOM CABLE RISER DIAGRAM

BUILDING 04

04-GC110 SEQUENCING PLAN - FIRST FLOOR

04-MD120 ROOF MECHANICAL DEMO PLAN

04-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

04-MH120 ROOF MECHANICAL PLAN

04-MH401 ENLARGED MECHANICAL PLANS

04-ED1B0 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN

04-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

04-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING

04-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING

04-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - C WING

04-ED401 ENLARGED DEMOLITION PLANS

04-EP1B0 BASEMENT FLOOR POWER PLAN

04-EP110 OVERALL FIRST FLOOR POWER PLAN

04-ET1B0 BASEMENT FLOOR TELECOM PLAN

04-ET110 OVERALL FIRST FLOOR TELECOM PLAN

04-ET110A FIRST FLOOR TELECOM PLAN - A WING

04-ET110B FIRST FLOOR TELECOM PLAN - B WING

04-ET110C FIRST FLOOR TELECOM PLAN - C WING

04-ET501 TELECOM DATA OUTLET DROP SCHEDULES

04-ET601 TELECOM CABLE RISER DIAGRAM

04-ET602 TELECOM CONDUIT RISER DIAGRAM

BUILDING 05

05-GC110 SEQUENCING PLAN - FIRST FLOOR

05-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

05-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

05-AE110 OVERALL FIRST FLOOR PLAN

05-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES

05-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

05-MH100 OVERALL GROUND MECHANICAL PLAN

05-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

05-MH120 ROOF MECHANICAL PLAN

05-MH401 ENLARGED MECHANICAL PLANS

05-ED100 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN

05-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

05-ED401 ENLARGED DEMOLITION PLANS

05-EP100 OVERALL BASEMENT FLOOR POWER PLAN

05-EP110 OVERALL FIRST FLOOR POWER PLAN

05-EP401 ENLARGED POWER PLANS

05-EP601 PARTIAL ONE-LINE DIAGRAM

05-ET100 BASEMENT FLOOR TELECOM PLAN

05-ET110 FIRST FLOOR TELECOM PLAN

05-ET401 ENLARGED TELECOM PLANS

05-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

05-ET601 TELECOM RISER DIAGRAMS

BUILDING 06

06-GC1B0 SEQUENCING PLAN - BASEMENT FLOOR

06-GC110 SEQUENCING PLAN - FIRST FLOOR

06-MH100 OVERALL GROUND MECHANICAL PLAN

06-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

06-MH120 ROOF MECHANICAL PLAN

06-MH401 ENLARGED MECHANICAL PLANS

06-ED1B1 OVERALL BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN

06-ED1B1A BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - A WING

06-ED1B1B BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - B WING

06-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

06-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING

06-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING

06-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - C WING

06-ED401 ENLARGED DEMOLITION PLANS

06-EP110 OVERALL FIRST FLOOR POWER PLAN

06-EP401 ENLARGED POWER PLANS

06-ET1B1 OVERALL BASEMENT FLOOR TELECOM PLAN

06-ET1B1A BASEMENT FLOOR TELECOM PLAN - A WING

06-ET1B1B BASEMENT FLOOR TELECOM PLAN - B WING

06-ET1B1C BASEMENT FLOOR TELECOM PLAN - C WING

06-ET110 OVERALL FIRST FLOOR TELECOM PLAN

06-ET110A FIRST FLOOR TELECOM PLAN - A WING

06-ET110B FIRST FLOOR TELECOM PLAN - B WING

06-ET110C FIRST FLOOR TELECOM PLAN - C WING

06-ET401 ENLARGED TELECOM PLANS

06-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

06-ET601 TELECOM CONDUIT RISER DIAGRAM

06-ET602 TELECOM CABLE RISER DIAGRAM

BUILDING 07

07-GC110 SEQUENCING PLAN - FIRST FLOOR

07-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

07-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

07-AE110 OVERALL FIRST FLOOR PLAN

07-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES

07-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

07-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

07-MH120 OVERALL ROOF MECHANICAL PLAN

07-MH401 ENLARGED MECHANICAL PLANS

07-ED1B1 OVERALL BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN

07-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN

07-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING

07-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING

07-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - C WING

07-ED401 ENLARGED DEMOLITION PLANS

07-EP1B1 OVERALL BASEMENT FLOOR POWER PLAN

07-EP110 OVERALL FIRST FLOOR POWER PLAN

07-EP401 ENLARGED POWER PLANS

07-EP601 PARTIAL ONE-LINE DIAGRAM

07-ET110 OVERALL FIRST FLOOR TELECOM PLAN

07-ET110A FIRST FLOOR TELECOM PLAN - A WING

07-ET110B FIRST FLOOR TELECOM PLAN - B WING

07-ET110C FIRST FLOOR TELECOM PLAN - C WING

07-ET401 ENLARGED TELECOM PLANS

07-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

07-ET601 TELECOM CONDUIT RISER DIAGRAM

07-ET602 TELECOM CABLE RISER DIAGRAM

BUILDING 08

08-GC100 SEQUENCING PLAN - GROUND FLOOR

08-GC110 SEQUENCING PLAN - FIRST FLOOR

08-GC120 SEQUENCING PLAN - SECOND FLOOR

08-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN

08-AD320 ENLARGED SECOND FLOOR DEMOLITION PLAN

08-AE120 OVERALL SECOND FLOOR PLAN

08-AE320 ENLARGED SECOND FLOOR PLAN & SCHEDULES

08-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN

08-MH111 SECOND FLOOR MECHANICAL PLAN

08-MH113 OVERALL ROOF MECHANICAL PLAN

08-MH401 ENLARGED MECHANICAL PLANS

08-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN

08-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

08-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

08-ED401 ENLARGED DEMOLITION PLANS

08-EP100 GROUND FLOOR POWER PLAN

08-EP110 FIRST FLOOR POWER PLAN

08-EP120 SECOND FLOOR POWER PLAN

08-EP401 ENLARGED POWER PLANS

08-EP601 PARTIAL ONE-LINE DIAGRAM

08-ET100 GROUND FLOOR TELECOM PLAN

08-ET110 FIRST FLOOR TELECOM PLAN

08-ET120 SECOND FLOOR TELECOM PLAN

08-ET401 ENLARGED TELECOM PLANS

INDEX TO DRAWINGS

08-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

08-ET601 TELECOM RISER DIAGRAMS

BUILDING 09

09-GC110 SEQUENCING PLAN - FIRST FLOOR

09-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN

09-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS

09-AE110 OVERALL FIRST FLOOR PLAN

09-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES

09-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN

09-MH110 FIRST FLOOR MECHANICAL PLAN

09-MH112 OVERALL ROOF MECHANICAL PLAN

09-MH401 ENLARGED MECHANICAL PLANS

09-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

09-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

09-ED401 ENLARGED DEMOLITION PLANS

09-EP110 FIRST FLOOR POWER PLAN

09-EP120 SECOND FLOOR POWER PLAN

09-EP401 ENLARGED POWER PLANS

09-EP601 PARTIAL ONE-LINE DIAGRAM

09-ET110 FIRST FLOOR TELECOM PLAN

09-ET120 SECOND FLOOR TELECOM PLAN

09-ET401 ENLARGED TELECOM PLANS

09-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

09-ET601 TELECOM RISER DIAGRAMS

BUILDING 16

16-GC100 SEQUENCING PLAN - GROUND FLOOR

16-GC110 SEQUENCING PLAN - FIRST FLOOR

16-GC120 SEQUENCING PLAN - SECOND FLOOR

16-MH100 GROUND FLOOR MECHANICAL PLAN

16-MH110 FIRST FLOOR MECHANICAL PLAN

16-MH120 SECOND FLOOR MECHANICAL PLAN

16-MH130 ROOF MECHANICAL PLAN

16-MH401 ENLARGED MECHANICAL PLANS

16-MH402 ENLARGED MECHANICAL PLANS

16-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN

16-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

16-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

16-ED401 ENLARGED DEMOLITION PLANS

16-EP100 GROUND FLOOR POWER PLAN

16-EP110 FIRST FLOOR POWER PLAN

16-EP120 SECOND FLOOR POWER PLAN

16-EP401 ENLARGED POWER PLANS

16-ET100 GROUND FLOOR TELECOM PLAN

16-ET110 FIRST FLOOR TELECOM PLAN

16-ET120 SECOND FLOOR TELECOM PLAN

16-ET501 TELECOM EQUIPMENT RACK ELEVATIONS

16-ET601 TELECOM CABLE RISER DIAGRAM

BUILDING 38

38-GC110 SEQUENCE PLAN - FIRST FLOOR

38-MD120 OVERALL ROOF MECHANICAL DEMO PLAN

38-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

38-MH120 OVERALL ROOF MECHANICAL PLAN

38-MH401 ENLARGED MECHANICAL PLANS

38-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

38-ED401 ENLARGED DEMOLITION PLANS

38-EP110 FIRST FLOOR POWER PLAN

38-ET110 FIRST FLOOR TELECOM PLAN

38-ET401 ENLARGED TELECOM PLANS

38-ET601 TELECOM RISER DIAGRAMS

BUILDING 47

47-GC110 SEQUENCE PLAN - FIRST FLOOR

47-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN

47-MH120 OVERALL ROOF MECHANICAL PLAN

47-MH401 ENLARGED MECHANICAL PLANS

47-EP110 FIRST FLOOR POWER PLAN

47-ET110 FIRST FLOOR TELECOM PLAN

47-ET501 TELECOM EQUIPMENT RACK ELEVATION

47-ET601 TELECOM RISER DIAGRAMS

BUILDING 550

550-GC110 SEQUENCE PLAN - FIRST FLOOR

550-GC120 SEQUENCE PLAN - SECOND FLOOR

550-GC130 SEQUENCE PLAN - THIRD FLOOR

550-ET110 FIRST FLOOR TELECOM PLAN

550-ET120 SECOND FLOOR TELECOM PLAN

550-ET130 THIRD FLOOR TELECOM PLAN

550-ET501 TELECOM EQUIPMENT RACK ELEVATION

550-ET601 TELECOM RISER DIAGRAMS

BUILDING 590

590-GC100 SEQUENCING PLAN - GROUND LEVEL

590-GC110 SEQUENCING PLAN - FIRST LEVEL

590-GC120 SEQUENCING PLAN - SECOND LEVEL

590-ET100 GROUND FLOOR TELECOM PLAN

590-ET110 FIRST FLOOR TELECOM PLAN

590-ET120 SECOND FLOOR TELECOM PLAN

590-ET501 TELECOM EQUIPMENT RACK ELEVATION

590-ET601 TELECOM RISER DIAGRAMS

Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System

Project Name: EHRM INFRASTRUCTURE UPGRADES Hazard Likelihood: High: 76% - 100%

Project Number: 660-21-700 Medium: 51% - 75%

Date: - Low: 0% - 50%

Project Manager: -

Identify Hazards Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

Mitigation Strategies

Implemented?

Comments

Hazard Communication

L L Y MSDS required to be maintained on site by contractor

Respiratory Protection

L L Y respiratory protection required when air debris present

Personal Protective Equipment

M M Y hearing protection Steel toed boots, clothing when required.

Fire Protection L L Y contractor required to follow VA hot work permit procedure& VA Interim Life Safety Measure

Traffic Control & Site Security

L L Y Work affecting traffic flow or site security must be coordinated with VA

Wire Rope and Rigging Equipment

M M Y OSHA Procedure to be followed

Pest Control within Construction Area

L L Y Pest control precautions must be utilized for any openings introduced to existing facility

Approval Signatures:

Project Manager: Date:

Contractor: Date:

Safety Manager: Date:

Svc./Section/Program Director: Date:

Identify Hazards Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

Mitigation Strategies

Implemented?

Comments

Process Safety Management - Piping Systems

L L Y Coordination with VA for affects on existing systems

Cranes and Hoists M H Y Rigging Plan to be approved by VA.

Preventative maintenance logs required on site

Steel Erection M H Y OSHA procedure to be followed

Fall Protection H H Y OSHA procedure to be followed

Scaffolds M M Y OSHA procedure to be followed

Ladders M M Y OSHA procedure to be followed

Demolition M M Y Any work causing noise or vibration to interior

Of Medical Center must be coordinated with

VA

Hand and Power Tools

L M Y OSHA Procedure to be followed

Electrical L L Y All hot work on electrical systems must receive prior approval by VA

Lockout / Tagout L L Y Lockout tagout procedure required in contractor submitted Safety plan (pre-construction)

Welding and Cutting L L Y VA signed hot work permit required to be obtained by contractor

Confined Spaces L L Y OSHA Procedures & VA Confined

Space Policy must be followed

Tunnels and Shafts L L Y OSHA Procedures & VA Confined

Space Policy must be followed

Vapors/Fumes L L Y Anything that may introduce vapor fumes to interior of Medical Center must be coordinated with VA prior to commencement

Noise M L Y Any work causing noise to interior Of Medical

Center must be coordinated with VA

Identify Hazards Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

Mitigation Strategies

Implemented?

Comments

Vibration L L Y Any work causing vibration to interior Of

Medical Center must be coordinated with VA

Open Outside Walls L M N All site security deficiencies that may be introduced must be coordinated with VA

Impact to Levels Above and Below

L M Y Coordinate with VA prior to impact to facility

Proximity of Air Intakes

M M Y Relocation of Intake

Trenching and Excavation

M M Y OSHA procedure to be followed

Motor Vehicles, Earthmoving, and Mechanized Equipment

M L Y Preventative maintenance logs required on site

Concrete and Masonry

M M Y OSHA procedure to be followed

Lead, Asbestos, and Silica

L L Y Coordination with VA required to identify all accessible suspect ACM building materials in affected facility where demolition will occur

Utility Interruptions L L Y Must receive approval from VA

Dust L L Y respiratory protection required when air debris present. Dust partitions must be utilized as needed

Moisture/Water Leaks L L Y Notification to VA required for all moisture/Water leaks

Water lines flushed at site & adjacent areas.

3. Transportation route or storage for clean supplies not 2. Install dust partitions (including work in ceilings) prior to start.

near contaminated materials Partitions must be well-sealed from floor to ceiling. Vent system cleaned & balanced after completion of

(Solid Wall) construction.

2. Educate VA staff regarding construction activity. 4. Mist debris-removal chutes & dumpsters.

10. Remove and replace wet ceiling tiles if the porous type.

3. Block & seal air vents before starting. (1C22 and 1C24) 5. Assure adjacent air filtering systems are functioning.

11. If ceiling tiles are nonporous, remove and clean with hospital

4. Coordinate air filter maintenance with Operations. approved disinfectant and dry before replacement. 6. Maintain negative pressure in construction area.

5. Contain area to one room with walls from floor to ceiling. 12. Use only designated elevators (e.g. utility) for debris removal.

Class IV In Addition to Class I, II, and III Precautions Above:

Class II In Addition to Class I Precautions: 8. Wet mop area daily & place "tack" mats at all entrances/exits.

Refresh tack mats frequently (at least daily). 3. Remove dust partitions carefully to minimize spread of Construction area thoroughly wet mopped and disinfected.

1. Consult Infection Control Nurse prior to beginning work. dust & dirt.

9. Use HEPA vacuum to capture dust during dust-producing work. Check room temperatures and adjust if needed.

6. Close non-access doors and duct tape frames and doors.

1. Consult Infection Control Nurse

7. Transport debris in covered containers that are wiped down.

2. Relocate patients to area remote from construction area.

Infectious Control Construction Precautions

Class I 1. Execute work by methods to minimize raising dust. 4. Worker traffic routes should minimize contact with patients. Class III In Addition to Class I and II Precautions Above:

(inside and outside)

2. Immediately replace ceiling tiles removed for inspection. 5. Minimize exposure of patients to construction and maintenance. 1. Consult Infection Control Nurse prior to beginning work. Prior to Patient Occupancy:

B) CONSTRUCTION ACTIVITY TYPES:

Type A Inspection and Non-Invasive Activities, includes but is not limited to, manipulation of ceiling tiles, painting (but not sanding), wallcovering, electrical trim work, minor plumbing, installation of telephone and computer cabling, and activities which do not (1) generate dust or (2) require cutting of walls.

Type B Small scale, short duration activities which create minimal dust. Includes, but is not limited to,

(1) access to chase spaces, (2) cutting of walls or ceilings, where dust migration can be controlled.

Infection Control Risk Assessment for Construction

Project Name / EWO Description: EHRM INFRASTRUCTURE UPGRADES Project # / EWO # 660-21-700

Location of Activity: Start Date: Estimated Duration:

Project Manager: Contractor: ICN:

Project Manager Phone #: Contractor Phone #: ICN Phone #: ext.

STEP #1: Select Risk Group Below and Mark Bottom of Column

A) INFECTION CONTROL RISK GROUPS

Type D Major demolition and construction projects. Includes, but is not limited to, (1) activities which require consecutive work shifts,

(2) requires heavy demolition or (3) removal of a complete cabling system, (4) new construction.

and (5) any activity which cannot be contained within a single workshift.

STEP 3: Determine Class of Precautions Using Matrix Below:

CONSTRUCTION ACTIVITY/INFECTION CONTROL MATRIX TO DETERMINE CLASS

** ICN must be consulted when the assessment indicates that Class II, III, or IV precautions are required.

Type C Any work which generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes, but is not limited to,

(1) sanding of walls for painting or wall covering, (2) removal of floorcoverings, (3) multiple ceiling panels and (4) casework, (5) new wall construction, (6) minor duct work or (7) electrical work above ceilings, (8) major cabling activities, and

(9) any activity which can be contained within a single workshift.

Cardiology Pharmacy (In & Out Patient) Sterile Processing

Decontamination PT / OT Ambulatory Medicine Unit (2 West)

Dental Public Corridor (patient activity) Cardiac Cath/Angiography

Distribution Pulmonary / Bronchoscopy Dialysis Unit

G.I. Lab Telemetry Pharmacy IV Prep (Inpatient)

Hoptel

STEP #2: Select Activity Type Below:

Group 0 Group 1 Group 2 - Medium Risk Group 3 - Medium High Risk

Lowest Risk Low Risk Laboratories Imaging Emergency Room (ECU)

Nonmedical Office Areas 3 West Laundry Post Anesthesia Care associated spaces (associated with Acute Medicine (2 East, 2 North) Nuclear Medicine All ICUs

(no patient patient activity) B.2 Out Patient Clinics activity) B.3 Inpatient Mental Health Ward Out Patient Surgery Group 4 - Highest Risk

Canteen Kitchen Patient Kitchen & Dining All OR's

Construction Activity Type

Risk Level Type "A" Type "B" Type "C" Type"D"

Group 0 Refer to OSHA Requirements Refer to OSHA Requirements II II

Group 1 I I II III

Group 2 I II III IV

Group 3 I II III / IV IV

Group 4 II III III / IV IV

Safety Officer Review: ____________________________________ Date: _______________

Lacking a code complying fire or smoke barrier NO

Fire exit stairs discharge improperly

NO

Excessive travel distance to an approved exit NO

Lack of two remote exits

NO

Additional Assessment Notes :

Assessment Performed by: ________________________________ Date: ________________

Nonconforming building construction type

NO

Improperly protected vertical openings

NO

Large penetrations in fire or smoke barriers

NO

Corridor walls do not extend to the structure (or to drop ceiling smoke seal)

NO

Taking a fire alarm system off-line

NO

Taking a sprinkler system off-line

NO

Disconnecting alarm devices

NO

Other

Hazardous areas not properly protected

NO

Blocking off an approved exit

NO

Rerouting emergency room traffic

NO

Major renovation of an occupied floor

YES X X X X X X X X X X X

Replacing fire alarm system (out of service) > 4 hrs.

/ 24 hr. period

NO

Installing a sprinkler system (out of service) > 4 hrs.

/ 24 hr. period

NO

Significantly modifying smoke or fire barrier walls

NO

Adding an addition to an existing structure

YES X X X X X X X X X X X

INTERIM LIFE SAFETY MEASURES ASSESSMENT

Project Name and Number:

EHRM

INFRASTRUST

URE

UPGRADS -

660-21-700

Y E

S /N

O

A

N o ti fy

E m e rg e n c y

F o rc e s

Im p le m e n t

F ir e W a tc h

B

P o s t s ig n a g e i d e n ti fy in g lo c a ti o n o f a lt e rn a te e x it s

C

S p e c ia l m e a s u re

D

In s p e c t e x it s i n a ff e c te d a d a ily

E

E n s u re f ir e a la rm a e te c ti o n s y s te m s o r e q u iv a le n t

F

A d d it io n a l fi re

-f ig h ti g q u ip m e n t

G

T e m p o ra ry c o n s tr u c ti o b rr ie rs

H

H a z a rd s u rv e ill a n c e o f b ld g s g ro u n d s e q u ip m e n t

I) E n fo rc e s to ra g e h s k p in g a n d d e b ri s r e m o v a l

J

A d d it io n a l tr a in in g o n u o f fi re

-f ig h ti n g e q u ip m e n t.

K

C o n d u c ti n g

A d d it io n a l

F ir e D ri lls

P e r

S h if t in

A a

L

In s p e c t, T e s t, D o c u m e n t te m p o ra ry s y s te m s m o n th ly

M

E d u c a ti o n o f b ld g d e fs c o n s tr u c ti o n h a z a rd s

IL

S

M s

N

T ra in in g f o r im p a ir tr u c tu ra l o r c o m p a rt m e n ta l fi re s a fe ty f e a tu re s

Patient room door latching problem

NO

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

A u to d e s k D o c s /2

S

L C

V A

M C

E H

R M

I n fr a s tr u c tu re U p g ra d e s /G e n

E L

E C

.r v t

/8

/2

:1

:1

P

M

CS003

RISK ASSESSMENT EHRM INFRASTRUCTURE

UPGRADES

SALT LAKE CITY, UT 84148

660-21-700

GENERAL

08 JUN 2023 ARNOLD,

FELT

TAYLOR,

SOUTHERN

YES__ NO__ NA__

a. The site positions information system components within the facility to minimize potential damage from physical and environmental hazards.

Construction Standards for New and Existing Areas

Containing Information Systems Equipment and/or Wiring

Construction

Documents

Compliant

THESE STANDARDS APPLY TO THE FOLLOWING: COMPUTER ROOMS, TELEPHONE SWITCH ROOMS,

COMMUNICATIONS/DATA CLOSETS CONTAINING IT EQUIPMENT AND/OR WIRING

1 Physical Access

YES__ NO__ NA__

a. Windows with access to facilities that contain information systems, below 12 m (40 ft.) from ground level or the roof of a lower abutment, or less than 7.5 m (25 ft.) from windows of an adjoining building, or accessible by a building ledge leading to

YES__ NO__ NA__

b. Windows that require security mesh screening, the security screen mesh consists of #304 stainless steel woven mesh 0.7 mm (0.028 in.) wire diameter, with tensile strength of 15 kg/mm (800 pounds per lineal inch).

YES__ NO__ NA__

c. Doors to data communications areas containing information systems equipment and/or wiring shall be 45 mm (1-3/4 in.) solid core hardwood or hollow steel construction.

YES__ NO__ NA__

d. Dutch (a door divided horizontally such that the bottom half may remain shut while the top half opens) or half doors are not permitted in data communications areas containing information systems equipment and/or wiring.

YES__ NO__ NA__ e. Removable hinge pins on door exteriors shall be retained with set pins or spot-welded, preventing their removal.

YES__ NO__ NA__

f. Where mechanical lock systems are used, installed lock sets allow for single motion egress (user must make only one motion in order to open a door, typically by turning a knob or pushing a lever or attached bar) to exit.

YES__ NO__ NA__

g. For glass doors or doors with glass panes that have mechanical lock systems and are NOT set in steel frames, one of the two locks a jimmy proof rim dead lock.

YES__ NO__ NA__

h. Doors that have mechanical lock systems shall be fitted with a lock that is contained within the door, NOT attached to the surface of the door.

YES__ NO__ NA__

i. For doors that have mechanical lock systems, the day lock on the main door shall be automatically locking, with a minimum 19 mm (3/4 in.) dead bolt and inside thumb latch.

YES__ NO__ NA__ h. The automatic emergency lighting system must properly cover emergency exits and evacuation routes.

5 Fire Safety/Security

YES__ NO__ NA__

a. The area containing information systems must employ fire detection devices/systems that activate in the event of a fire.

YES__ NO__ NA__ b. The area containing information systems must employ fire extinguishers in accordance with site policy.

YES__ NO__ NA__ c. Fire extinguishers must be in obvious locations and easily accessible.

6 Temperature/Humidity

YES__ NO__ NA__ a. There must be an intrusion detection system.

YES__ NO__ NA__

b. The intrusion detection equipment must operate on principles OTHER THAN narrow beam interception, door contacts, microwave, or photoelectric eye.

YES__ NO__ NA__

c. The intrusion detection equipment must have both an internal, automatic charging DC standby power supply and a primary AC power operation.

YES__ NO__ NA__

d. The intrusion detection equipment must have a remote, key operated activation/deactivation switch installed outside the room and adjacent to the room entrance door frame and/or a central alarm ON-OFF control in the security guard office.

YES__ NO__ NA__ e. The intrusion detection equipment must have an automatic reset capability following intrusion detection.

YES__ NO__ NA__

f. The intrusion detection equipment must have a local alarm level of 80 dB (min) to 90 dB (max) within the configuration of the protected area?

YES__ NO__ NA__

g. The intrusion detection equipment must have an integral capability for the attachment of wiring for remote alarm and intrusion indicator equipment (visual or audio)?

YES__ NO__ NA__ a. Temperature and humidity sensors must exist in areas containing information systems.

7 Water damage/security

YES__ NO__ NA__ a. No water pipes may be located in the ceiling above the information system.

YES__ NO__ NA__ b. No bathrooms, kitchens, or other facilities with running water may be positioned above the information system.

YES__ NO__ NA__

c. Facilities that contain information systems must have a raised or false floor, and water sensors located below the floor.

8 Location of information systems

YES__ NO__ NA__

j. Electronic (magnetic) locking systems include a “request to exit” sensor and a “push to exit” manual lock release switch.

YES__ NO__ NA__

k. Interstitial (space between two parts or areas) overhead areas, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents “up and over” access.

YES__ NO__ NA__

l. Interstitial areas beneath raised floors, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents access.

YES__ NO__ NA__

m. Ventilation grills on doors and air circulation ducts that exceed 0.06 m2 (100 square inches) and may enable entry into a secure room from an unsecured room must be reinforced to prevent their removal from outside the room.

YES__ NO__ NA__

n. Other possible access means, such as dumbwaiter shafts, roof or wall ventilator housings, trapdoors, etc., shall be secured by appropriate means.

YES__ NO__ NA__

o. Room door lock keys and day lock combinations must NOT be mastered (as defined in VHA Supplement, MP-3, Part I, Chapter 2, Maintenance and Operations).

2 Intrusion Detection

3 Electrical Safety/Security

YES__ NO__ NA__ a. The area containing information systems must have an emergency electrical shutoff switch.

YES__ NO__ NA__ b. The emergency shutoff switch shall be easily located and in plain sight.

YES__ NO__ NA__ c. The emergency shutoff switch shall be protected by a plastic cover to prevent accidental activation.

YES__ NO__ NA__ d. The site shall provide a long-term alternate power supply for the information system.

YES__ NO__ NA__ e. The site must consistently provide an emergency power capability for the information system on an ongoing basis.

YES__ NO__ NA__

f. The site must provide a short-term uninterruptible power supply (UPS) to facilitate an orderly shutdown of the information system in the event of a…