Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf
PDF 17 MB Posted
- Solicitation number
- 36C77623B0041
About this file
This document provides details for a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0041 for infrastructure upgrades at the Salt Lake City VA Medical Center. Offerors should provide construction services to upgrade EHRM systems as outlined in Attachment 2-Part 1 of 9-Drawings-EHRM-Salt Lake City.pdf, a 17MB file containing project drawings and specifications. Proposals are due by the date listed in the full solicitation. The awarded contractor will be expected to complete the infrastructure upgrade work for the Salt Lake City VAMC.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 742
IN
V 1.4
G R
A T
E
.7
N
O A
C C
ES
S
W a h le n
W a y
K is te rs
S tr e e t
WM
CO
S
CO
SD
SD
IB
IB
IB
IB
SD
SD
SD
S
E
W
D
S
D
D
D
F U T UR E F U EL TA N K
ELEC
ELEC
ELEC
ELEC
SS
WT
(1)
CVB
CVB
(1)
CVB
(1)
CVB
CVB
SIG
N SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
NSIG
N
SIG
N
SIG
N
CB
DR
4 7 4 0
+ 0
0.
+0
0 .
0 0
+0
0 .
0 0
+0
0.
+0
0.
+0
0.
+0
0.
+4
8.
R A
M P
R A
M P
:1
:1
R A
M P
:1
R A
M P
:1
88.0
144.0
144.0
288.0
3 5
2 9
2 8
2 5
2 2
1 9
1 8
1 1
1 3
1 8
2 6
2 6
1 2
1 5
2 1
3 0 2 TOTA L P A R K I N G S TA L L S
I N C L U D I N G 7 A D A S TA L L S
THRU
DRIVE
1 0
3 1 TOTA L P A R K I N G S TA L L S I N C L U D I N G
2 A D A S TA L L S
DRIVE
ATM
2 5
D
D
D
DRAIN DRAIN
VENT
Dog Kennel Line
Cartwasher Line
CU
T2 T1
A
27 40
PH
G
E
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
SS M
H
SDM
H
SDM
H
CO
SDM
H
EXISTING CHILLER
E X
IS
TING
C
HILL
ER
K is te rs
S tr e e t
Kisters Street
W a h le n
W a y
Baker Street
Hall Street
Bennion Blvd.
V a ld e z D ri v e
PARKING
STRUCTURE
5 4
H
NEW 10' GATE
E
D
C
B
A
POLE
F LAG
E n tr y
S e co nd L ev el
Entry
First Level
H os pi ta l M a in E nt ry
E m e rg en cy
E n tra n ce
F H
D R
IV
E
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /G e n
E L
E C
.r v t
/8
/2
:1
:5
P
M
CS001
COVER SHEET-VICINITY PLAN EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
GENERAL
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
NORTH
DIRECTOR
ASSOCIATE DIRECTOR / ADMINISTRATIVE OPERATIONS
CHIEF OF STAFF
ASSOCIATE DIRECTOR / PATIENT SERVICES
ASSOCIATE DIRECTOR / CLINICAL OPERATIONS
FINANCIAL MANAGEMENT SERVICE
GEORGE E. WAHLEN
DEPARTMENT OF VETERANS AFFAIRS
MEDICAL CENTER
500 FOOTHILL DRIVE
SALT LAKE CITY, UTAH 84112
ISSUED FOR
CONSTRUCTION
08 JUN 2023
EHRM
INFRASTRUCTURE
UPGRADES
660-21-700
PROJECT LOCATION
N.T.S.
VICINITY PLAN
Revisions: Date:
06/08/23
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /G e n
E L
E C
.r v t
/8
/2
:5
:3
P M
CS002
PROJECT SHEET INDEX EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
GENERAL
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
GENERAL
CS001 COVER SHEET-VICINITY PLAN
CS002 PROJECT SHEET INDEX
CS003 RISK ASSESSMENT
CS004 IT SECURITY CHECKLIST
HR101 HAZARDOUS MATERIAL ABATEMENT
AE001 GENERAL NOTES, SYMBOLS, ABBREVIATIONS
AE002 CONSTRUCTION SEQUENCING - SITE
AE003 INFECTION CONTROL
AE201 WALL SECTIONS
AE202 WALL SECTIONS
AE501 ARCHITECTURAL DETAILS
AE502 ARCHITECTURAL DETAILS
EE001 ELECTRICAL SYMBOL LEGEND, ABBRV, AND GENERAL NOTES
EE002 TELECOM SCHEDULES AND NOTES
EE003 ELECTRICAL SCHEDULES
EE004 SECURITY SCHEDULE AND NOTES
EE501 ELECTRICAL DETAILS
EE502 ELECTRICAL DETAILS
EE701 TYPICAL MOUNTING HEIGHT DETAILS
ET501 TELECOM DETAILS
ET502 TELECOM DETAILS
ET503 TELECOM DETAILS
ET504 TELECOM SECURITY DETAILS AND RISER DIAGRAMS
ET505 TELECOM EQUIPMENT RACK GROUNDING DETAIL
PE001 PLUMBING SYMBOL LEGEND, ABBRV, AND GENERAL NOTES
PE501 PLUMBING DETAILS
PE601 PLUMBING FIXTURE SCHEDULES - BUILDING 1
PE602 PLUMBING FIXTURE SCHEDULES - BUILDING 3
PE603 PLUMBING FIXTURE SCHEDULES - BUILDING 14
ME001 MECHANICAL SYMBOL LEGEND, ABBRV, AND GENERAL NOTES
ME401 ENLARGED MECHANICAL PLANS
ME501 MECHANICAL DETAILS
ME601 MECHANICAL SCHEDULES
ME701 MECHANICAL CONTROLS LEGENDS & NOTES
ME702 MECHANICAL CONTROLS DIAGRAMS
SITE
ES101 OVERALL SITE RACEWAY PLAN
ES102 OVERALL SITE TUNNEL RACEWAY PLAN
ES501 SITE TELECOM DETAILS
ES502 SITE TELECOM DETAILS
ES503 SITE TELECOM LABELING DETAILS
ES504 SITE TELECOM LABELING DETAILS
ES601 OVERALL SITE MICRODUCT LEGEND
ES602 OVERALL SITE MICRODUCT RISER DIAGRAM
ES603 FIBER CABLE PATH "A" MATRIX
ES604 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 1)
ES605 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 1)
ES606 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 2)
ES607 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 2)
ES608 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 2, 3)
ES609 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 3, 4)
ES610 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 5, 6, 7, 8, 9, 16)
ES611 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 16, 38, 47, 50)
ES612 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 50, 90)
ES613 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 14)
ES614 FIBER CABLE SPLICE DIAGRAM PATH "A" (BLDG. 14)
ES615 FIBER CABLE PATH "B" MATRIX
ES616 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 1)
ES617 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 1)
ES618 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 2)
ES619 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 2)
ES620 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 2, 3)
ES621 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 3, 4)
ES622 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 5, 6, 7, 8, 9, 16)
ES623 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 38, 47, 50, 90)
ES624 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 14)
ES625 FIBER CABLE SPLICE DIAGRAM PATH "B" (BLDG. 14)
BUILDING 01
01-GC100 SEQUENCING PLAN - GROUND FLOOR
01-GC110 SEQUENCING PLAN - FIRST FLOOR
01-GC120 SEQUENCING PLAN - SECOND FLOOR
01-GC130 SEQUENCING PLAN - THIRD FLOOR
01-GC140 SEQUENCING PLAN - FOURTH FLOOR
01-GC150 SEQUENCING PLAN - FIFTH FLOOR
01-SF140 OVERALL FOURTH FLOOR STRUCTURAL PLAN
01-SF340 ENLARGED FOURTH FLOOR STRUCTURAL PLAN
01-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN
01-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
01-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
01-AD130 OVERALL THIRD FLOOR DEMOLITION PLANS
01-AD140 OVERALL FOURTH FLOOR DEMOLITION PLANS
01-AD150 OVERALL FIFTH FLOOR DEMOLITION PLANS
01-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS
01-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
01-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS
01-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS
01-AD321 ENLARGED SECOND FLOOR DEMOLITION PLANS
01-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS
01-AD331 ENLARGED THIRD FLOOR DEMOLITION PLANS
01-AD340 ENLARGED FOURTH FLOOR DEMOLITION PLANS
01-AD341 ENLARGED FOURTH FLOOR DEMOLITION PLANS
01-AD350 ENLARGED FIFTH FLOOR DEMOLITION PLANS
01-AE100 OVERALL GROUND FLOOR PLAN
01-AE110 OVERALL FIRST FLOOR PLAN
01-AE120 OVERALL SECOND FLOOR PLAN
01-AE130 OVERALL THIRD FLOOR PLAN
01-AE140 OVERALL FOURTH FLOOR PLAN
01-AE150 OVERALL FIFTH FLOOR PLAN
01-AE300 ENLARGED GROUND FLOOR PLANS
01-AE310 ENLARGED FIRST FLOOR PLANS
01-AE311 ENLARGED FIRST FLOOR PLANS
01-AE320 ENLARGED SECOND FLOOR PLANS
01-AE321 ENLARGED SECOND FLOOR PLANS
01-AE330 ENLARGED THIRD FLOOR PLANS
01-AE331 ENLARGED THIRD FLOOR PLANS
01-AE340 ENLARGED FOURTH FLOOR PLANS
01-AE341 ENLARGED FOURTH FLOOR PLANS
01-AE350 ENLARGED FIFTH FLOOR PLANS
01-AE400 INTERIOR ELEVATIONS
01-AE401 INTERIOR ELEVATIONS
01-AE600 SCHEDULES
01-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN
01-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
01-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
01-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN
01-FX140 OVERALL FOURTH FLOOR FIRE SPRINKLER PLAN
01-FX150 OVERALL FIFTH FLOOR FIRE SPRINKLER PLAN
01-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN
01-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
01-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
01-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN
01-MH140 OVERALL FOURTH FLOOR MECHANICAL PLAN
01-MH150 OVERALL FIFTH FLOOR MECHANICAL PLAN
01-MH160 OVERALL ROOF MECHANICAL PLAN
01-MH401 ENLARGED MECHANICAL PLANS
01-MH402 ENLARGED MECHANICAL PLANS
01-MH403 ENLARGED MECHANICAL PLANS
01-MH404 ENLARGED MECHANICAL PLANS
01-MH405 ENLARGED MECHANICAL PLANS
01-MH406 ENLARGED MECHANICAL PLANS
01-MH407 ENLARGED MECHANICAL PLANS
01-MH408 ENLARGED MECHANICAL PLANS
01-MH409 ENLARGED MECHANICAL PLANS
01-MH410 ENLARGED MECHANICAL PLANS
01-MH411 ENLARGED MECHANICAL PLANS
01-MH412 ENLARGED PLUMBING PLANS
01-MH413 ENLARGED MECHANICAL PLANS
01-MH414 ENLARGED MECHANICAL PLANS
01-MH415 ENLARGED MECHANICAL PLANS
01-MH416 ENLARGED MECHANICAL PLANS
01-MH417 ENLARGED MECHANICAL PLANS
01-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN
01-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN - A WING
01-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN - B WING
01-ED100C GROUND LEVEL ELECTRICAL DEMOLITION PLAN - C WING
01-ED100D GROUND LEVEL ELECTRICAL DEMOLITION PLAN - D WING
01-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN
01-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - A WING
01-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - B WING
01-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - C WING
01-ED110D FIRST LEVEL ELECTRICAL DEMOLITION PLAN - D WING
01-ED110E FIRST LEVEL ELECTRICAL DEMOLITION PLAN - E WING
01-ED110F FIRST LEVEL ELECTRICAL DEMOLITION PLAN - F WING
01-ED110H FIRST LEVEL ELECTRICAL DEMOLITION PLAN - H WING
01-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN
01-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN - A WING
01-ED120B SECOND LEVEL ELECTRICAL DEMOLITION PLAN - B WING
01-ED120C SECOND LEVEL ELECTRICAL DEMOLITION PLAN - C WING
01-ED120D SECOND LEVEL ELECTRICAL DEMOLITION PLAN - D WING
01-ED120E SECOND LEVEL ELECTRICAL DEMOLITION PLAN - E WING
01-ED120F SECOND LEVEL ELECTRICAL DEMOLITION PLAN - F WING
01-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN
01-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN - A WING
01-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN - B WING
01-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN - C WING
01-ED130D THIRD LEVEL ELECTRICAL DEMOLITION PLAN - D WING
01-ED140 OVERALL FOURTH LEVEL ELECTRICAL DEMOLITION PLAN
01-ED140A FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - A WING
01-ED140B FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - B WING
01-ED140C FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - C WING
01-ED140D FOURTH LEVEL ELECTRICAL DEMOLITION PLAN - D WING
01-ED150 OVERALL FIFTH LEVEL ELECTRICAL DEMOLITION PLAN
01-ED150B FIFTH LEVEL ELECTRICAL DEMOLITION PLAN - B WING
01-ED401 ENLARGED DEMOLITION PLANS
01-ED402 ENLARGED DEMOLITION PLANS
01-ED403 ENLARGED DEMOLITION PLANS
01-ED404 ENLARGED DEMOLITION PLANS
01-ED405 ENLARGED DEMOLITION PLANS
01-ED406 ENLARGED DEMOLITION PLANS
01-ED407 ENLARGED DEMOLITION PLANS
01-ED408 ENLARGED DEMOLITION PLANS
01-ED409 ENLARGED DEMOLITION PLANS
01-ED410 ENLARGED DEMOLITION PLANS
01-ED411 ENLARGED DEMOLITION PLANS
01-ED412 ENLARGED DEMOLITION PLANS
01-EP100 OVERALL GROUND LEVEL POWER PLAN
01-EP110 OVERALL FIRST LEVEL POWER PLAN
01-EP120 OVERALL SECOND LEVEL POWER PLAN
01-EP130 OVERALL THIRD LEVEL POWER PLAN
01-EP140 OVERALL FOURTH LEVEL POWER PLAN
01-EP150 OVERALL FIFTH LEVEL POWER PLAN
01-EP160 OVERALL SIXTH & SEVENTH LEVEL POWER PLANS
01-EP401 ENLARGED POWER PLANS
01-EP402 ENLARGED POWER PLANS
01-EP601 PARTIAL ONE-LINE DIAGRAMS
01-EP602 GROUNDING RISER DIAGRAM
01-EP603 LIGHTING FIXTURE SCHEDULE
01-EP604 PANEL SCHEDULES
01-EP605 PANEL SCHEDULES
01-EP606 PANEL SCHEDULES
01-ET100 OVERALL GROUND LEVEL TELECOM PLAN
01-ET100A GROUND LEVEL TELECOM PLAN - A WING
01-ET100B GROUND LEVEL TELECOM PLAN - B WING
01-ET100C GROUND LEVEL TELECOM PLAN - C WING
01-ET100D GROUND LEVEL TELECOM PLAN - D WING
01-ET110 OVERALL FIRST LEVEL TELECOM PLAN
01-ET110A FIRST LEVEL TELECOM PLAN - A WING
01-ET110B FIRST LEVEL TELECOM PLAN - B WING
01-ET110C FIRST LEVEL TELECOM PLAN - C WING
01-ET110D FIRST LEVEL TELECOM PLAN - D WING
01-ET110E FIRST LEVEL TELECOM PLAN - E WING
01-ET110F FIRST LEVEL TELECOM PLAN - F WING
01-ET110H FIRST LEVEL TELECOM PLAN - H WING
01-ET120 OVERALL SECOND LEVEL TELECOM PLAN
01-ET120A SECOND LEVEL TELECOM PLAN - A WING
01-ET120B SECOND LEVEL TELECOM PLAN - B WING
01-ET120C SECOND LEVEL TELECOM PLAN - C WING
01-ET120D SECOND LEVEL TELECOM PLAN - D WING
01-ET120E SECOND LEVEL TELECOM PLAN - E WING
01-ET120F SECOND LEVEL TELECOM PLAN - F WING
01-ET130 OVERALL THIRD LEVEL TELECOM PLAN
01-ET130A THIRD LEVEL TELECOM PLAN - A WING
01-ET130B THIRD LEVEL TELECOM PLAN - B WING
01-ET130C THIRD LEVEL TELECOM PLAN - C WING
01-ET130D THIRD LEVEL TELECOM PLAN - D WING
01-ET140 OVERALL FOURTH LEVEL TELECOM PLAN
01-ET140A FOURTH LEVEL TELECOM PLAN - A WING
01-ET140B FOURTH LEVEL TELECOM PLAN - B WING
01-ET140C FOURTH LEVEL TELECOM PLAN - C WING
01-ET140D FOURTH LEVEL TELECOM PLAN - D WING
01-ET150 OVERALL FIFTH LEVEL TELECOM PLAN
01-ET150B FIFTH LEVEL TELECOM PLAN - B WING
01-ET401 ENLARGED TELECOM PLANS
01-ET402 ENLARGED TELECOM PLANS
01-ET403 ENLARGED TELECOM PLANS
01-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET502 TELECOM DATA OUTLET DROP SCHEDULES
01-ET503 TELECOM DATA OUTLET DROP SCHEDULES
01-ET504 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET505 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET506 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET507 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET508 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET509 TELECOM EQUIPMENT RACK ELEVATIONS
01-ET601 TELECOM CONDUIT RISER DIAGRAM
01-ET602 TELECOM CONDUIT RISER DIAGRAM
01-ET603 TELECOM CABLE RISER DIAGRAM
01-ET604 TELECOM CABLE RISER DIAGRAM
BUILDING 14
14-GC1B0 SEQUENCING PLAN - BASEMENT FLOOR
14-GC100 SEQUENCING PLAN - GROUND FLOOR
14-GC110 SEQUENCING PLAN - FIRST FLOOR
14-GC120 SEQUENCING PLAN - SECOND FLOOR
14-GC130 SEQUENCING PLAN - THIRD FLOOR
14-SF001 GENERAL STRUCTURAL NOTES
14-SF100 OVERALL GROUND FLOOR STRUCTURAL PLAN
14-SF110 OVERALL FIRST FLOOR STRUCTURAL PLAN
14-SF120 OVERALL SECOND FLOOR STRUCTURAL PLAN
14-SF130 OVERALL THIRD FLOOR STRUCTURAL PLAN
14-SF300 ENLARGED PLANS
14-SJ600 SCHEDULES & DETAILS
14-AD1B0 OVERALL BASEMENT DEMOLITION PLAN
14-AD3B0 ENLARGED BASEMENT DEMOLITION PLANS
14-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN
14-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
14-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
14-AD130 OVERALL THIRD FLOOR DEMOLITION PLAN
14-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS
14-AD301 ENLARGED GROUND FLOOR DEMOLITION PLANS
14-AD302 ENLARGED GROUND FLOOR DEMOLITION PLANS
14-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
14-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS
14-AD330 ENLARGED THIRD FLOOR DEMOLITION PLANS
14-AE1B0 OVERALL BASEMENT FLOOR PLAN
14-AE3B0 ENLARGED BASEMENT PLANS
14-AE100 OVERALL GROUND FLOOR PLAN
14-AE110 OVERALL FIRST FLOOR PLAN
14-AE120 OVERALL SECOND FLOOR PLAN
14-AE130 OVERALL THIRD FLOOR PLAN
14-AE300 ENLARGED GROUND FLOOR PLANS
14-AE301 ENLARGED GROUND FLOOR PLANS
14-AE302 ENLARGED GROUND FLOOR PLANS
14-AE310 ENLARGED FIRST FLOOR PLANS
14-AE320 ENLARGED SECOND FLOOR PLANS
14-AE330 ENLARGED THIRD FLOOR PLANS
14-AE400 INTERIOR ELEVATIONS
14-AE600 SCHEDULES
14-FX1B0 OVERALL BASEMENT FLOOR FIRE SPRINKLER PLAN
14-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN
14-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
14-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
14-FX130 OVERALL THIRD FLOOR FIRE SPRINKLER PLAN
14-MH1B0 OVERALL BASEMENT FLOOR MECHANICAL PLAN
14-MH100 OVERALL GROUND FLOOR MECHANICAL PLAN
14-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
14-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
14-MH130 OVERALL THIRD FLOOR MECHANICAL PLAN
14-MH140 OVERALL ROOF MECHANICAL PLAN
14-MH401 ENLARGED MECHANICAL PLANS
14-MH402 ENLARGED MECHANICAL PLANS
14-MH403 ENLARGED MECHANICAL PLANS
14-MH404 ENLARGED MECHANICAL PLANS
14-MH405 ENLARGED MECHANICAL PLANS
14-MH406 ENLARGED PLUMBING PLANS
14-MH407 ENLARGED MECHANICAL PLANS
14-MH408 ENLARGED MECHANICAL PLANS
14-MH409 ENLARGED MECHANICAL PLANS
14-MH410 ENLARGED MECHANICAL PLANS
14-MH411 ENLARGED MECHANICAL PLANS
14-MH412 ENLARGED PLUMBING PLANS
14-MH413 ENLARGED MECHANICAL PLANS
14-MH414 ENLARGED MECHANICAL PLANS
14-MH415 ENLARGED PLUMBING PLANS
14-MH416 ENLARGED MECHANICAL PLANS
14-ED1B0 OVERALL BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN
14-ED1B0A BASEMENT LEVEL ELECTRICAL DEMOLITION PLAN - A WING
14-ED1B0B BASEMENT LEVEL ELCTRICAL DEMOLITION PLAN - B WING
14-ED1B0C BASEMENT LEVEL ELCTRICAL DEMOLITION PLAN - C WING
14-ED100 OVERALL GROUND LEVEL ELECTRICAL DEMOLITION PLAN
14-ED100A GROUND LEVEL ELECTRICAL DEMOLITION PLAN - A WING
14-ED100B GROUND LEVEL ELECTRICAL DEMOLITION PLAN - B WING
14-ED100C GROUND LEVEL ELECTRICAL DEMOLITION PLAN - C WING
14-ED110 OVERALL FIRST LEVEL ELECTRICAL DEMOLITION PLAN
14-ED110A FIRST LEVEL ELECTRICAL DEMOLITION PLAN - A WING
14-ED110B FIRST LEVEL ELECTRICAL DEMOLITION PLAN - B WING
14-ED110C FIRST LEVEL ELECTRICAL DEMOLITION PLAN - C WING
14-ED120 OVERALL SECOND LEVEL ELECTRICAL DEMOLITION PLAN
14-ED120A SECOND LEVEL ELECTRICAL DEMOLITION PLAN - A WING
14-ED120B SECOND LEVEL ELECTRICAL DEMOLITION PLAN - B WING
14-ED120C SECOND LEVEL ELECTRICAL DEMOLITION PLAN - C WING
14-ED130 OVERALL THIRD LEVEL ELECTRICAL DEMOLITION PLAN
14-ED130A THIRD LEVEL ELECTRICAL DEMOLITION PLAN - A WING
14-ED130B THIRD LEVEL ELECTRICAL DEMOLITION PLAN - B WING
14-ED130C THIRD LEVEL ELECTRICAL DEMOLITION PLAN - C WING
14-ED401 ENLARGED DEMOLITION PLANS
14-ED402 ENLARGED DEMOLITION PLANS
14-ED403 ENLARGED DEMOLITION PLANS
14-ED404 ENLARGED DEMOLITION PLANS
14-ED405 ENLARGED DEMOLITION PLANS
14-ED406 ENLARGED DEMOLITION PLANS
14-EP1B0 OVERALL BASEMENT LEVEL POWER PLAN
14-EP100 OVERALL GROUND LEVEL POWER PLAN
14-EP110 OVERALL FIRST LEVEL POWER PLAN
14-EP120 OVERALL SECOND LEVEL POWER PLAN
14-EP130 OVERALL THIRD LEVEL POWER PLAN
14-EP140 OVERALL ROOF POWER PLAN
14-EP401 ENLARGED POWER PLANS
14-EP402 ENLARGED POWER PLANS
14-EP403 ENLARGED POWER PLANS
14-EP601 PARTIAL ONE-LINE DIAGRAMS
14-EP602 GROUNDING RISER DIAGRAM
14-EP603 DETAILS & LIGHTING FIXTURE SCHEDULES
14-EP604 PANEL SCHEDULES
14-EP605 PANEL SCHEDULES
14-EP606 PANEL SCHEDULES
14-ET1B0 OVERALL BASEMENT LEVEL TELECOM PLAN
14-ET1B0A BASEMENT LEVEL TELECOM PLAN - A WING
14-ET1B0B BASEMENT LEVEL TELECOM PLAN - B WING
14-ET1B0C BASEMENT LEVEL TELECOM PLAN - C WING
14-ET100 OVERALL GROUND LEVEL TELECOM PLAN
14-ET100A GROUND LEVEL TELECOM PLAN - A WING
14-ET100B GROUND LEVEL TELECOM PLAN - B WING
14-ET100C GROUND LEVEL TELECOM PLAN - C WING
14-ET110 OVERALL FIRST LEVEL TELECOM PLAN
14-ET110A FIRST LEVEL TELECOM PLAN - A WING
14-ET110B FIRST LEVEL TELECOM PLAN - B WING
14-ET110C FIRST LEVEL TELECOM PLAN - C WING
14-ET120 OVERALL SECOND LEVEL TELECOM PLAN
14-ET120A SECOND LEVEL TELECOM PLAN - A WING
14-ET120B SECOND LEVEL TELECOM PLAN - B WING
14-ET120C SECOND LEVEL TELECOM PLAN - C WING
14-ET130 OVERALL THIRD LEVEL TELECOM PLAN
14-ET130A THIRD LEVEL TELECOM PLAN - A WING
14-ET130B THIRD LEVEL TELECOM PLAN - B WING
14-ET130C THIRD LEVEL TELECOM PLAN - C WING
14-ET401 ENLARGED TELECOM PLANS
14-ET402 ENLARGED TELECOM PLANS
14-ET501 TELECOM DATA OUTLET DROP SCHEDULES
14-ET502 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET503 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET504 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET505 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET506 TELECOM EQUIPMENT RACK ELEVATIONS
14-ET601 TELECOM CONDUIT RISER DIAGRAM
14-ET602 TELECOM CONDUIT RISER DIAGRAM
14-ET603 TELECOM CABLE RISER DIAGRAM
14-ET604 TELECOM CABLE RISER DIAGRAM
BUILDING 02
02-GC100 SEQUENCING PLAN - GROUND FLOOR
02-GC110 SEQUENCING PLAN - FIRST FLOOR
02-GC120 SEQUENCING PLAN - SECOND FLOOR
02-AE100 OVERALL GROUND FLOOR PLAN
02-AE400 ENLARGED GROUND FLOOR PLANS
02-FX100 OVERALL GROUND FLOOR FIRE PROTECTION PLAN
02-MH100 OVERALL GROUND MECHANICAL PLAN
02-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
02-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
02-MH130 ROOF MECHANICAL PLAN
02-MH401 ENLARGED MECHANICAL PLANS - GROUND FLOOR
02-MH402 ENLARGED MECHANICAL PLANS - GROUND FLOOR
02-MH403 ENLARGED MECHANICAL PLANS - FIRST FLOOR
02-MH404 ENLARGED MECHANICAL PLANS - FIRST FLOOR
02-MH405 ENLARGED MECHANICAL PLANS - SECOND FLOOR
02-MH406 ENLARGED MECHANICAL PLANS - SECOND FLOOR
02-ED100 OVERALL GROUND FLOOR ELECTRICAL DEMOLITION PLAN
02-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
02-ED120 OVERALL SECOND FLOOR ELECTRICAL DEMOLITION PLAN
02-ED401 ENLARGED DEMOLITION PLANS
02-ED402 ENLARGED DEMOLITION PLANS
02-ED403 ENLARGED DEMOLITION PLANS
02-EP100 OVERALL GROUND FLOOR POWER PLAN
02-EP110 OVERALL FIRST FLOOR POWER PLAN
02-EP120 OVERALL SECOND FLOOR POWER PLAN
02-EP130 OVERALL ROOF POWER PLAN
02-EP401 ENLARGED POWER PLANS
02-EP402 ENLARGED POWER PLANS
02-EP601 PARTIAL ONE-LINE DIAGRAMS
02-EP602 GROUNDING RISER DIAGRAM
02-EP603 PANEL SCHEDULES
02-ET100 OVERALL GROUND FLOOR TELECOM PLAN
02-ET100A GROUND FLOOR TELECOM PLAN - A WING
02-ET100B GROUND FLOOR TELECOM PLAN - B WING
02-ET100C GROUND FLOOR TELECOM PLAN - C WING
02-ET110 OVERALL FIRST FLOOR TELECOM PLAN
02-ET110A FIRST FLOOR TELECOM PLAN - A WING
02-ET110B FIRST FLOOR TELECOM PLAN - B WING
02-ET110C FIRST FLOOR TELECOM PLAN - C WING
02-ET110D FIRST FLOOR TELECOM PLAN - D WING
02-ET120 OVERALL SECOND FLOOR TELECOM PLAN
02-ET120A SECOND FLOOR TELECOM PLAN - A WING
02-ET120B SECOND FLOOR TELECOM PLAN - B WING
02-ET120C SECOND FLOOR TELECOM PLAN - C WING
02-ET120D SECOND FLOOR TELECOM PLAN - D WING
02-ET601 TELECOM CABLE RISER DIAGRAM
BUILDING 03
03-GC100 SEQUENCING PLAN - GROUND FLOOR
03-GC110 SEQUENCING PLAN - FIRST FLOOR
03-GC120 SEQUENCING PLAN - SECOND FLOOR
03-AD100 OVERALL GROUND FLOOR DEMOLITION PLAN
03-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
03-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
03-AD300 ENLARGED GROUND FLOOR DEMOLITION PLANS
03-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
03-AD311 ENLARGED FIRST FLOOR DEMOLITION PLANS
03-AD320 ENLARGED SECOND FLOOR DEMOLITION PLANS
03-AE100 OVERALL GROUND FLOOR PLAN
03-AE110 OVERALL FIRST FLOOR PLAN
03-AE120 OVERALL SECOND FLOOR PLAN
03-AE300 ENLARGED GROUND FLOOR PLANS
03-AE310 ENLARGED FIRST FLOOR PLANS
03-AE311 ENLARGED FIRST FLOOR PLANS
03-AE320 ENLARGED SECOND FLOOR PLANS
03-AE400 INTERIOR ELEVATIONS
03-AE600 SCHEDULES
03-FX100 OVERALL GROUND FLOOR FIRE SPRINKLER PLAN
03-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
03-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
03-MH100 OVERALL GROUND MECHANICAL PLAN
03-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
03-MH120 OVERALL SECOND FLOOR MECHANICAL PLAN
03-MH130 ROOF MECHANICAL PLAN
03-MH401 ENLARGED MECHANICAL PLANS
03-MH402 ENLARGED MECHANICAL PLANS
03-MH403 ENLARGED MECHANICAL PLANS
03-MH404 ENLARGED MECHANICAL PLANS
03-MH405 ENLARGED MECHANICAL PLANS
03-MH406 ENLARGED PLUMBING PLANS
03-MH407 ENLARGED MECHANICAL PLANS
03-MH408 ENLARGED MECHANICAL PLANS
03-ED100 OVERALL GROUND FLOOR ELECTRICAL DEMOLITION PLAN
03-ED100A GROUND FLOOR ELECTRICAL DEMOLITION PLAN - A WING
03-ED100B GROUND FLOOR ELECTRICAL DEMOLITION PLAN - B-D WINGS
03-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
03-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING
03-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B-D WINGS
03-ED120 OVERALL SECOND FLOOR ELECTRICAL DEMOLITION PLAN
03-ED120A SECOND FLOOR ELECTRICAL DEMOLITION PLAN - A WING
03-ED120B SECOND FLOOR ELECTRICAL DEMOLITION PLAN - B&C WING
03-ED401 ENLARGED DEMOLITION PLANS
03-ED402 ENLARGED DEMOLITION PLANS
03-ED403 ENLARGED DEMOLITION PLANS
03-ED404 ENLARGED DEMOLITION PLANS
03-ED405 ENLARGED DEMOLITION PLANS
03-EP100 OVERALL GROUND FLOOR POWER PLAN
03-EP110 OVERALL FIRST FLOOR POWER PLAN
03-EP120 OVERALL SECOND FLOOR POWER PLAN
03-EP401 ENLARGED POWER PLANS
03-EP601 PARTIAL ONE-LINE DIAGRAMS
03-EP602 GROUNDING RISER DIAGRAM
03-EP603 LIGHTING FIXTURE SCHEDULE
03-EP604 PANEL SCHEDULES
03-EP605 PANEL SCHEDULES
03-ET100 OVERALL GROUND FLOOR TELECOM PLAN
03-ET100A GROUND FLOOR TELECOM PLAN - A WING
03-ET100B GROUND FLOOR TELECOM PLAN - B-D WINGS
03-ET110 OVERALL FIRST FLOOR TELECOM PLAN
03-ET110A FIRST FLOOR TELECOM PLAN - A WING
03-ET110B FIRST FLOOR TELECOM PLAN - B-D WINGS
03-ET120 OVERALL SECOND FLOOR TELECOM PLAN
03-ET120A SECOND FLOOR TELECOM PLAN - A WING
03-ET120B SECOND FLOOR TELECOM PLAN - B-C WINGS
03-ET401 ENLARGED TELECOM PLANS
03-ET402 ENLARGED TELECOM PLANS
03-ET501 TELECOM DATA OUTLET DROP SCHEDULES
03-ET502 TELECOM EQUIPMENT RACK ELEVATIONS
03-ET503 TELECOM EQUIPMENT RACK ELEVATIONS
03-ET504 TELECOM EQUIPMENT RACK ELEVATIONS
03-ET601 TELECOM CONDUIT RISER DIAGRAM
03-ET602 TELECOM CABLE RISER DIAGRAM
BUILDING 04
04-GC110 SEQUENCING PLAN - FIRST FLOOR
04-MD120 ROOF MECHANICAL DEMO PLAN
04-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
04-MH120 ROOF MECHANICAL PLAN
04-MH401 ENLARGED MECHANICAL PLANS
04-ED1B0 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN
04-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
04-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING
04-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING
04-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - C WING
04-ED401 ENLARGED DEMOLITION PLANS
04-EP1B0 BASEMENT FLOOR POWER PLAN
04-EP110 OVERALL FIRST FLOOR POWER PLAN
04-ET1B0 BASEMENT FLOOR TELECOM PLAN
04-ET110 OVERALL FIRST FLOOR TELECOM PLAN
04-ET110A FIRST FLOOR TELECOM PLAN - A WING
04-ET110B FIRST FLOOR TELECOM PLAN - B WING
04-ET110C FIRST FLOOR TELECOM PLAN - C WING
04-ET501 TELECOM DATA OUTLET DROP SCHEDULES
04-ET601 TELECOM CABLE RISER DIAGRAM
04-ET602 TELECOM CONDUIT RISER DIAGRAM
BUILDING 05
05-GC110 SEQUENCING PLAN - FIRST FLOOR
05-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
05-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
05-AE110 OVERALL FIRST FLOOR PLAN
05-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES
05-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
05-MH100 OVERALL GROUND MECHANICAL PLAN
05-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
05-MH120 ROOF MECHANICAL PLAN
05-MH401 ENLARGED MECHANICAL PLANS
05-ED100 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN
05-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
05-ED401 ENLARGED DEMOLITION PLANS
05-EP100 OVERALL BASEMENT FLOOR POWER PLAN
05-EP110 OVERALL FIRST FLOOR POWER PLAN
05-EP401 ENLARGED POWER PLANS
05-EP601 PARTIAL ONE-LINE DIAGRAM
05-ET100 BASEMENT FLOOR TELECOM PLAN
05-ET110 FIRST FLOOR TELECOM PLAN
05-ET401 ENLARGED TELECOM PLANS
05-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
05-ET601 TELECOM RISER DIAGRAMS
BUILDING 06
06-GC1B0 SEQUENCING PLAN - BASEMENT FLOOR
06-GC110 SEQUENCING PLAN - FIRST FLOOR
06-MH100 OVERALL GROUND MECHANICAL PLAN
06-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
06-MH120 ROOF MECHANICAL PLAN
06-MH401 ENLARGED MECHANICAL PLANS
06-ED1B1 OVERALL BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN
06-ED1B1A BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - A WING
06-ED1B1B BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - B WING
06-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
06-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING
06-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING
06-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - C WING
06-ED401 ENLARGED DEMOLITION PLANS
06-EP110 OVERALL FIRST FLOOR POWER PLAN
06-EP401 ENLARGED POWER PLANS
06-ET1B1 OVERALL BASEMENT FLOOR TELECOM PLAN
06-ET1B1A BASEMENT FLOOR TELECOM PLAN - A WING
06-ET1B1B BASEMENT FLOOR TELECOM PLAN - B WING
06-ET1B1C BASEMENT FLOOR TELECOM PLAN - C WING
06-ET110 OVERALL FIRST FLOOR TELECOM PLAN
06-ET110A FIRST FLOOR TELECOM PLAN - A WING
06-ET110B FIRST FLOOR TELECOM PLAN - B WING
06-ET110C FIRST FLOOR TELECOM PLAN - C WING
06-ET401 ENLARGED TELECOM PLANS
06-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
06-ET601 TELECOM CONDUIT RISER DIAGRAM
06-ET602 TELECOM CABLE RISER DIAGRAM
BUILDING 07
07-GC110 SEQUENCING PLAN - FIRST FLOOR
07-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
07-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
07-AE110 OVERALL FIRST FLOOR PLAN
07-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES
07-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
07-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
07-MH120 OVERALL ROOF MECHANICAL PLAN
07-MH401 ENLARGED MECHANICAL PLANS
07-ED1B1 OVERALL BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN
07-ED110 OVERALL FIRST FLOOR ELECTRICAL DEMOLITION PLAN
07-ED110A FIRST FLOOR ELECTRICAL DEMOLITION PLAN - A WING
07-ED110B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - B WING
07-ED110C FIRST FLOOR ELECTRICAL DEMOLITION PLAN - C WING
07-ED401 ENLARGED DEMOLITION PLANS
07-EP1B1 OVERALL BASEMENT FLOOR POWER PLAN
07-EP110 OVERALL FIRST FLOOR POWER PLAN
07-EP401 ENLARGED POWER PLANS
07-EP601 PARTIAL ONE-LINE DIAGRAM
07-ET110 OVERALL FIRST FLOOR TELECOM PLAN
07-ET110A FIRST FLOOR TELECOM PLAN - A WING
07-ET110B FIRST FLOOR TELECOM PLAN - B WING
07-ET110C FIRST FLOOR TELECOM PLAN - C WING
07-ET401 ENLARGED TELECOM PLANS
07-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
07-ET601 TELECOM CONDUIT RISER DIAGRAM
07-ET602 TELECOM CABLE RISER DIAGRAM
BUILDING 08
08-GC100 SEQUENCING PLAN - GROUND FLOOR
08-GC110 SEQUENCING PLAN - FIRST FLOOR
08-GC120 SEQUENCING PLAN - SECOND FLOOR
08-AD120 OVERALL SECOND FLOOR DEMOLITION PLAN
08-AD320 ENLARGED SECOND FLOOR DEMOLITION PLAN
08-AE120 OVERALL SECOND FLOOR PLAN
08-AE320 ENLARGED SECOND FLOOR PLAN & SCHEDULES
08-FX120 OVERALL SECOND FLOOR FIRE SPRINKLER PLAN
08-MH111 SECOND FLOOR MECHANICAL PLAN
08-MH113 OVERALL ROOF MECHANICAL PLAN
08-MH401 ENLARGED MECHANICAL PLANS
08-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN
08-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
08-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
08-ED401 ENLARGED DEMOLITION PLANS
08-EP100 GROUND FLOOR POWER PLAN
08-EP110 FIRST FLOOR POWER PLAN
08-EP120 SECOND FLOOR POWER PLAN
08-EP401 ENLARGED POWER PLANS
08-EP601 PARTIAL ONE-LINE DIAGRAM
08-ET100 GROUND FLOOR TELECOM PLAN
08-ET110 FIRST FLOOR TELECOM PLAN
08-ET120 SECOND FLOOR TELECOM PLAN
08-ET401 ENLARGED TELECOM PLANS
INDEX TO DRAWINGS
08-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
08-ET601 TELECOM RISER DIAGRAMS
BUILDING 09
09-GC110 SEQUENCING PLAN - FIRST FLOOR
09-AD110 OVERALL FIRST FLOOR DEMOLITION PLAN
09-AD310 ENLARGED FIRST FLOOR DEMOLITION PLANS
09-AE110 OVERALL FIRST FLOOR PLAN
09-AE310 ENLARGED FIRST FLOOR PLANS & SCHEDULES
09-FX110 OVERALL FIRST FLOOR FIRE SPRINKLER PLAN
09-MH110 FIRST FLOOR MECHANICAL PLAN
09-MH112 OVERALL ROOF MECHANICAL PLAN
09-MH401 ENLARGED MECHANICAL PLANS
09-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
09-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
09-ED401 ENLARGED DEMOLITION PLANS
09-EP110 FIRST FLOOR POWER PLAN
09-EP120 SECOND FLOOR POWER PLAN
09-EP401 ENLARGED POWER PLANS
09-EP601 PARTIAL ONE-LINE DIAGRAM
09-ET110 FIRST FLOOR TELECOM PLAN
09-ET120 SECOND FLOOR TELECOM PLAN
09-ET401 ENLARGED TELECOM PLANS
09-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
09-ET601 TELECOM RISER DIAGRAMS
BUILDING 16
16-GC100 SEQUENCING PLAN - GROUND FLOOR
16-GC110 SEQUENCING PLAN - FIRST FLOOR
16-GC120 SEQUENCING PLAN - SECOND FLOOR
16-MH100 GROUND FLOOR MECHANICAL PLAN
16-MH110 FIRST FLOOR MECHANICAL PLAN
16-MH120 SECOND FLOOR MECHANICAL PLAN
16-MH130 ROOF MECHANICAL PLAN
16-MH401 ENLARGED MECHANICAL PLANS
16-MH402 ENLARGED MECHANICAL PLANS
16-ED100 GROUND FLOOR ELECTRICAL DEMOLITION PLAN
16-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
16-ED120 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
16-ED401 ENLARGED DEMOLITION PLANS
16-EP100 GROUND FLOOR POWER PLAN
16-EP110 FIRST FLOOR POWER PLAN
16-EP120 SECOND FLOOR POWER PLAN
16-EP401 ENLARGED POWER PLANS
16-ET100 GROUND FLOOR TELECOM PLAN
16-ET110 FIRST FLOOR TELECOM PLAN
16-ET120 SECOND FLOOR TELECOM PLAN
16-ET501 TELECOM EQUIPMENT RACK ELEVATIONS
16-ET601 TELECOM CABLE RISER DIAGRAM
BUILDING 38
38-GC110 SEQUENCE PLAN - FIRST FLOOR
38-MD120 OVERALL ROOF MECHANICAL DEMO PLAN
38-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
38-MH120 OVERALL ROOF MECHANICAL PLAN
38-MH401 ENLARGED MECHANICAL PLANS
38-ED110 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
38-ED401 ENLARGED DEMOLITION PLANS
38-EP110 FIRST FLOOR POWER PLAN
38-ET110 FIRST FLOOR TELECOM PLAN
38-ET401 ENLARGED TELECOM PLANS
38-ET601 TELECOM RISER DIAGRAMS
BUILDING 47
47-GC110 SEQUENCE PLAN - FIRST FLOOR
47-MH110 OVERALL FIRST FLOOR MECHANICAL PLAN
47-MH120 OVERALL ROOF MECHANICAL PLAN
47-MH401 ENLARGED MECHANICAL PLANS
47-EP110 FIRST FLOOR POWER PLAN
47-ET110 FIRST FLOOR TELECOM PLAN
47-ET501 TELECOM EQUIPMENT RACK ELEVATION
47-ET601 TELECOM RISER DIAGRAMS
BUILDING 550
550-GC110 SEQUENCE PLAN - FIRST FLOOR
550-GC120 SEQUENCE PLAN - SECOND FLOOR
550-GC130 SEQUENCE PLAN - THIRD FLOOR
550-ET110 FIRST FLOOR TELECOM PLAN
550-ET120 SECOND FLOOR TELECOM PLAN
550-ET130 THIRD FLOOR TELECOM PLAN
550-ET501 TELECOM EQUIPMENT RACK ELEVATION
550-ET601 TELECOM RISER DIAGRAMS
BUILDING 590
590-GC100 SEQUENCING PLAN - GROUND LEVEL
590-GC110 SEQUENCING PLAN - FIRST LEVEL
590-GC120 SEQUENCING PLAN - SECOND LEVEL
590-ET100 GROUND FLOOR TELECOM PLAN
590-ET110 FIRST FLOOR TELECOM PLAN
590-ET120 SECOND FLOOR TELECOM PLAN
590-ET501 TELECOM EQUIPMENT RACK ELEVATION
590-ET601 TELECOM RISER DIAGRAMS
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Project Name: EHRM INFRASTRUCTURE UPGRADES Hazard Likelihood: High: 76% - 100%
Project Number: 660-21-700 Medium: 51% - 75%
Date: - Low: 0% - 50%
Project Manager: -
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
Mitigation Strategies
Implemented?
Comments
Hazard Communication
L L Y MSDS required to be maintained on site by contractor
Respiratory Protection
L L Y respiratory protection required when air debris present
Personal Protective Equipment
M M Y hearing protection Steel toed boots, clothing when required.
Fire Protection L L Y contractor required to follow VA hot work permit procedure& VA Interim Life Safety Measure
Traffic Control & Site Security
L L Y Work affecting traffic flow or site security must be coordinated with VA
Wire Rope and Rigging Equipment
M M Y OSHA Procedure to be followed
Pest Control within Construction Area
L L Y Pest control precautions must be utilized for any openings introduced to existing facility
Approval Signatures:
Project Manager: Date:
Contractor: Date:
Safety Manager: Date:
Svc./Section/Program Director: Date:
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
Mitigation Strategies
Implemented?
Comments
Process Safety Management - Piping Systems
L L Y Coordination with VA for affects on existing systems
Cranes and Hoists M H Y Rigging Plan to be approved by VA.
Preventative maintenance logs required on site
Steel Erection M H Y OSHA procedure to be followed
Fall Protection H H Y OSHA procedure to be followed
Scaffolds M M Y OSHA procedure to be followed
Ladders M M Y OSHA procedure to be followed
Demolition M M Y Any work causing noise or vibration to interior
Of Medical Center must be coordinated with
VA
Hand and Power Tools
L M Y OSHA Procedure to be followed
Electrical L L Y All hot work on electrical systems must receive prior approval by VA
Lockout / Tagout L L Y Lockout tagout procedure required in contractor submitted Safety plan (pre-construction)
Welding and Cutting L L Y VA signed hot work permit required to be obtained by contractor
Confined Spaces L L Y OSHA Procedures & VA Confined
Space Policy must be followed
Tunnels and Shafts L L Y OSHA Procedures & VA Confined
Space Policy must be followed
Vapors/Fumes L L Y Anything that may introduce vapor fumes to interior of Medical Center must be coordinated with VA prior to commencement
Noise M L Y Any work causing noise to interior Of Medical
Center must be coordinated with VA
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
Mitigation Strategies
Implemented?
Comments
Vibration L L Y Any work causing vibration to interior Of
Medical Center must be coordinated with VA
Open Outside Walls L M N All site security deficiencies that may be introduced must be coordinated with VA
Impact to Levels Above and Below
L M Y Coordinate with VA prior to impact to facility
Proximity of Air Intakes
M M Y Relocation of Intake
Trenching and Excavation
M M Y OSHA procedure to be followed
Motor Vehicles, Earthmoving, and Mechanized Equipment
M L Y Preventative maintenance logs required on site
Concrete and Masonry
M M Y OSHA procedure to be followed
Lead, Asbestos, and Silica
L L Y Coordination with VA required to identify all accessible suspect ACM building materials in affected facility where demolition will occur
Utility Interruptions L L Y Must receive approval from VA
Dust L L Y respiratory protection required when air debris present. Dust partitions must be utilized as needed
Moisture/Water Leaks L L Y Notification to VA required for all moisture/Water leaks
Water lines flushed at site & adjacent areas.
3. Transportation route or storage for clean supplies not 2. Install dust partitions (including work in ceilings) prior to start.
near contaminated materials Partitions must be well-sealed from floor to ceiling. Vent system cleaned & balanced after completion of
(Solid Wall) construction.
2. Educate VA staff regarding construction activity. 4. Mist debris-removal chutes & dumpsters.
10. Remove and replace wet ceiling tiles if the porous type.
3. Block & seal air vents before starting. (1C22 and 1C24) 5. Assure adjacent air filtering systems are functioning.
11. If ceiling tiles are nonporous, remove and clean with hospital
4. Coordinate air filter maintenance with Operations. approved disinfectant and dry before replacement. 6. Maintain negative pressure in construction area.
5. Contain area to one room with walls from floor to ceiling. 12. Use only designated elevators (e.g. utility) for debris removal.
Class IV In Addition to Class I, II, and III Precautions Above:
Class II In Addition to Class I Precautions: 8. Wet mop area daily & place "tack" mats at all entrances/exits.
Refresh tack mats frequently (at least daily). 3. Remove dust partitions carefully to minimize spread of Construction area thoroughly wet mopped and disinfected.
1. Consult Infection Control Nurse prior to beginning work. dust & dirt.
9. Use HEPA vacuum to capture dust during dust-producing work. Check room temperatures and adjust if needed.
6. Close non-access doors and duct tape frames and doors.
1. Consult Infection Control Nurse
7. Transport debris in covered containers that are wiped down.
2. Relocate patients to area remote from construction area.
Infectious Control Construction Precautions
Class I 1. Execute work by methods to minimize raising dust. 4. Worker traffic routes should minimize contact with patients. Class III In Addition to Class I and II Precautions Above:
(inside and outside)
2. Immediately replace ceiling tiles removed for inspection. 5. Minimize exposure of patients to construction and maintenance. 1. Consult Infection Control Nurse prior to beginning work. Prior to Patient Occupancy:
B) CONSTRUCTION ACTIVITY TYPES:
Type A Inspection and Non-Invasive Activities, includes but is not limited to, manipulation of ceiling tiles, painting (but not sanding), wallcovering, electrical trim work, minor plumbing, installation of telephone and computer cabling, and activities which do not (1) generate dust or (2) require cutting of walls.
Type B Small scale, short duration activities which create minimal dust. Includes, but is not limited to,
(1) access to chase spaces, (2) cutting of walls or ceilings, where dust migration can be controlled.
Infection Control Risk Assessment for Construction
Project Name / EWO Description: EHRM INFRASTRUCTURE UPGRADES Project # / EWO # 660-21-700
Location of Activity: Start Date: Estimated Duration:
Project Manager: Contractor: ICN:
Project Manager Phone #: Contractor Phone #: ICN Phone #: ext.
STEP #1: Select Risk Group Below and Mark Bottom of Column
A) INFECTION CONTROL RISK GROUPS
Type D Major demolition and construction projects. Includes, but is not limited to, (1) activities which require consecutive work shifts,
(2) requires heavy demolition or (3) removal of a complete cabling system, (4) new construction.
and (5) any activity which cannot be contained within a single workshift.
STEP 3: Determine Class of Precautions Using Matrix Below:
CONSTRUCTION ACTIVITY/INFECTION CONTROL MATRIX TO DETERMINE CLASS
** ICN must be consulted when the assessment indicates that Class II, III, or IV precautions are required.
Type C Any work which generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes, but is not limited to,
(1) sanding of walls for painting or wall covering, (2) removal of floorcoverings, (3) multiple ceiling panels and (4) casework, (5) new wall construction, (6) minor duct work or (7) electrical work above ceilings, (8) major cabling activities, and
(9) any activity which can be contained within a single workshift.
Cardiology Pharmacy (In & Out Patient) Sterile Processing
Decontamination PT / OT Ambulatory Medicine Unit (2 West)
Dental Public Corridor (patient activity) Cardiac Cath/Angiography
Distribution Pulmonary / Bronchoscopy Dialysis Unit
G.I. Lab Telemetry Pharmacy IV Prep (Inpatient)
Hoptel
STEP #2: Select Activity Type Below:
Group 0 Group 1 Group 2 - Medium Risk Group 3 - Medium High Risk
Lowest Risk Low Risk Laboratories Imaging Emergency Room (ECU)
Nonmedical Office Areas 3 West Laundry Post Anesthesia Care associated spaces (associated with Acute Medicine (2 East, 2 North) Nuclear Medicine All ICUs
(no patient patient activity) B.2 Out Patient Clinics activity) B.3 Inpatient Mental Health Ward Out Patient Surgery Group 4 - Highest Risk
Canteen Kitchen Patient Kitchen & Dining All OR's
Construction Activity Type
Risk Level Type "A" Type "B" Type "C" Type"D"
Group 0 Refer to OSHA Requirements Refer to OSHA Requirements II II
Group 1 I I II III
Group 2 I II III IV
Group 3 I II III / IV IV
Group 4 II III III / IV IV
Safety Officer Review: ____________________________________ Date: _______________
Lacking a code complying fire or smoke barrier NO
Fire exit stairs discharge improperly
NO
Excessive travel distance to an approved exit NO
Lack of two remote exits
NO
Additional Assessment Notes :
Assessment Performed by: ________________________________ Date: ________________
Nonconforming building construction type
NO
Improperly protected vertical openings
NO
Large penetrations in fire or smoke barriers
NO
Corridor walls do not extend to the structure (or to drop ceiling smoke seal)
NO
Taking a fire alarm system off-line
NO
Taking a sprinkler system off-line
NO
Disconnecting alarm devices
NO
Other
Hazardous areas not properly protected
NO
Blocking off an approved exit
NO
Rerouting emergency room traffic
NO
Major renovation of an occupied floor
YES X X X X X X X X X X X
Replacing fire alarm system (out of service) > 4 hrs.
/ 24 hr. period
NO
Installing a sprinkler system (out of service) > 4 hrs.
/ 24 hr. period
NO
Significantly modifying smoke or fire barrier walls
NO
Adding an addition to an existing structure
YES X X X X X X X X X X X
INTERIM LIFE SAFETY MEASURES ASSESSMENT
Project Name and Number:
EHRM
INFRASTRUST
URE
UPGRADS -
660-21-700
Y E
S /N
O
A
N o ti fy
E m e rg e n c y
F o rc e s
Im p le m e n t
F ir e W a tc h
B
P o s t s ig n a g e i d e n ti fy in g lo c a ti o n o f a lt e rn a te e x it s
C
S p e c ia l m e a s u re
D
In s p e c t e x it s i n a ff e c te d a d a ily
E
E n s u re f ir e a la rm a e te c ti o n s y s te m s o r e q u iv a le n t
F
A d d it io n a l fi re
-f ig h ti g q u ip m e n t
G
T e m p o ra ry c o n s tr u c ti o b rr ie rs
H
H a z a rd s u rv e ill a n c e o f b ld g s g ro u n d s e q u ip m e n t
I) E n fo rc e s to ra g e h s k p in g a n d d e b ri s r e m o v a l
J
A d d it io n a l tr a in in g o n u o f fi re
-f ig h ti n g e q u ip m e n t.
K
C o n d u c ti n g
A d d it io n a l
F ir e D ri lls
P e r
S h if t in
A a
L
In s p e c t, T e s t, D o c u m e n t te m p o ra ry s y s te m s m o n th ly
M
E d u c a ti o n o f b ld g d e fs c o n s tr u c ti o n h a z a rd s
IL
S
M s
N
T ra in in g f o r im p a ir tr u c tu ra l o r c o m p a rt m e n ta l fi re s a fe ty f e a tu re s
Patient room door latching problem
NO
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
A u to d e s k D o c s /2
S
L C
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s /G e n
E L
E C
.r v t
/8
/2
:1
:1
P
M
CS003
RISK ASSESSMENT EHRM INFRASTRUCTURE
UPGRADES
SALT LAKE CITY, UT 84148
660-21-700
GENERAL
08 JUN 2023 ARNOLD,
FELT
TAYLOR,
SOUTHERN
YES__ NO__ NA__
a. The site positions information system components within the facility to minimize potential damage from physical and environmental hazards.
Construction Standards for New and Existing Areas
Containing Information Systems Equipment and/or Wiring
Construction
Documents
Compliant
THESE STANDARDS APPLY TO THE FOLLOWING: COMPUTER ROOMS, TELEPHONE SWITCH ROOMS,
COMMUNICATIONS/DATA CLOSETS CONTAINING IT EQUIPMENT AND/OR WIRING
1 Physical Access
YES__ NO__ NA__
a. Windows with access to facilities that contain information systems, below 12 m (40 ft.) from ground level or the roof of a lower abutment, or less than 7.5 m (25 ft.) from windows of an adjoining building, or accessible by a building ledge leading to
YES__ NO__ NA__
b. Windows that require security mesh screening, the security screen mesh consists of #304 stainless steel woven mesh 0.7 mm (0.028 in.) wire diameter, with tensile strength of 15 kg/mm (800 pounds per lineal inch).
YES__ NO__ NA__
c. Doors to data communications areas containing information systems equipment and/or wiring shall be 45 mm (1-3/4 in.) solid core hardwood or hollow steel construction.
YES__ NO__ NA__
d. Dutch (a door divided horizontally such that the bottom half may remain shut while the top half opens) or half doors are not permitted in data communications areas containing information systems equipment and/or wiring.
YES__ NO__ NA__ e. Removable hinge pins on door exteriors shall be retained with set pins or spot-welded, preventing their removal.
YES__ NO__ NA__
f. Where mechanical lock systems are used, installed lock sets allow for single motion egress (user must make only one motion in order to open a door, typically by turning a knob or pushing a lever or attached bar) to exit.
YES__ NO__ NA__
g. For glass doors or doors with glass panes that have mechanical lock systems and are NOT set in steel frames, one of the two locks a jimmy proof rim dead lock.
YES__ NO__ NA__
h. Doors that have mechanical lock systems shall be fitted with a lock that is contained within the door, NOT attached to the surface of the door.
YES__ NO__ NA__
i. For doors that have mechanical lock systems, the day lock on the main door shall be automatically locking, with a minimum 19 mm (3/4 in.) dead bolt and inside thumb latch.
YES__ NO__ NA__ h. The automatic emergency lighting system must properly cover emergency exits and evacuation routes.
5 Fire Safety/Security
YES__ NO__ NA__
a. The area containing information systems must employ fire detection devices/systems that activate in the event of a fire.
YES__ NO__ NA__ b. The area containing information systems must employ fire extinguishers in accordance with site policy.
YES__ NO__ NA__ c. Fire extinguishers must be in obvious locations and easily accessible.
6 Temperature/Humidity
YES__ NO__ NA__ a. There must be an intrusion detection system.
YES__ NO__ NA__
b. The intrusion detection equipment must operate on principles OTHER THAN narrow beam interception, door contacts, microwave, or photoelectric eye.
YES__ NO__ NA__
c. The intrusion detection equipment must have both an internal, automatic charging DC standby power supply and a primary AC power operation.
YES__ NO__ NA__
d. The intrusion detection equipment must have a remote, key operated activation/deactivation switch installed outside the room and adjacent to the room entrance door frame and/or a central alarm ON-OFF control in the security guard office.
YES__ NO__ NA__ e. The intrusion detection equipment must have an automatic reset capability following intrusion detection.
YES__ NO__ NA__
f. The intrusion detection equipment must have a local alarm level of 80 dB (min) to 90 dB (max) within the configuration of the protected area?
YES__ NO__ NA__
g. The intrusion detection equipment must have an integral capability for the attachment of wiring for remote alarm and intrusion indicator equipment (visual or audio)?
YES__ NO__ NA__ a. Temperature and humidity sensors must exist in areas containing information systems.
7 Water damage/security
YES__ NO__ NA__ a. No water pipes may be located in the ceiling above the information system.
YES__ NO__ NA__ b. No bathrooms, kitchens, or other facilities with running water may be positioned above the information system.
YES__ NO__ NA__
c. Facilities that contain information systems must have a raised or false floor, and water sensors located below the floor.
8 Location of information systems
YES__ NO__ NA__
j. Electronic (magnetic) locking systems include a “request to exit” sensor and a “push to exit” manual lock release switch.
YES__ NO__ NA__
k. Interstitial (space between two parts or areas) overhead areas, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents “up and over” access.
YES__ NO__ NA__
l. Interstitial areas beneath raised floors, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents access.
YES__ NO__ NA__
m. Ventilation grills on doors and air circulation ducts that exceed 0.06 m2 (100 square inches) and may enable entry into a secure room from an unsecured room must be reinforced to prevent their removal from outside the room.
YES__ NO__ NA__
n. Other possible access means, such as dumbwaiter shafts, roof or wall ventilator housings, trapdoors, etc., shall be secured by appropriate means.
YES__ NO__ NA__
o. Room door lock keys and day lock combinations must NOT be mastered (as defined in VHA Supplement, MP-3, Part I, Chapter 2, Maintenance and Operations).
2 Intrusion Detection
3 Electrical Safety/Security
YES__ NO__ NA__ a. The area containing information systems must have an emergency electrical shutoff switch.
YES__ NO__ NA__ b. The emergency shutoff switch shall be easily located and in plain sight.
YES__ NO__ NA__ c. The emergency shutoff switch shall be protected by a plastic cover to prevent accidental activation.
YES__ NO__ NA__ d. The site shall provide a long-term alternate power supply for the information system.
YES__ NO__ NA__ e. The site must consistently provide an emergency power capability for the information system on an ongoing basis.
YES__ NO__ NA__
f. The site must provide a short-term uninterruptible power supply (UPS) to facilitate an orderly shutdown of the information system in the event of a…