Attachment 8 Drawings 5 of 11 Fire Protection.pdf
PDF 1000 KB Posted
- Attached to
- Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
- Solicitation number
- 36C26023R0021
About this file
This document package includes construction drawings and specifications for an upgrade project at a Department of Veterans Affairs medical facility. The drawings show demolition, fire protection, and site plans for renovating sterile processing services spaces in Building 100. Fire sprinkler work includes replacing heads in renovation areas, modifying locations to accommodate changes, and adding new sprinkler lines in covered walkways. Demolition plans outline piping and heads to remove. General notes provide design and code compliance requirements.
The related federal contract opportunity is a solicitation from the VA Veterans Health Administration seeking construction services for Project 663-20-102 to upgrade sterile processing operations at the VA Puget Sound Health Care System located in Seattle, Washington. The solicitation number is 36C26023R0021 and was issued by VISN 20. The construction drawings and specifications would be provided to the awardee as part of the contract.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SE
38'-0"
NW
SE
0'-0"
S 176'-7"
S 143'-3"
E 146'-6"
E 197'-4"
E 201'-0"
SE
76-0
SE
114-0
SE
152-0
SE
190-0
SE
179-4
NW
14-9
NW
3-6
SE
152-10
NE
380-0
NE
304-0
NE
342-0
SE
38'-0"
NW
SE
0'-0"
SE
76-0
SE
114-0
NW
14-9
NW
3-6
NE
383'-9"
UP
NE
383'-9"
1 1/2" 1 1/2"
1 1/2" 1 1/2"
1 1/2" 1 1/2"
1 1/4"
1 1/4" 1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1"x33"
1"x29"
1 1/4"
1"x29"
1 1/4"
1 1/4"
1 1/4"
1"x29"
1 1/4" 1 1/4" 1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4" 1 1/4" 1 1/4" 1 1/4"
1 1/4"1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1" 1" 1"
1 1/4" 1 1/4"
1"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/2" 1 1/2"
1 1/2" 1 1/2"
6'-2 1/2"
#1-73"
(6 TYP.)
1 1/4" 1 1/4" 1 1/4"
#1
#4
1"
1 1/4"
1 1/2"
2 1/2"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
2" SUPPLY TO
6" STANDPIPE
STAIR #5
FIRE ZONE #4
1 1/2" 1 1/2"
1 1/2" 11'-10" 1 1/2"
1 1/2"
1"
1 1/2" 1 1/2"
1"
1 1/2"
5 1/2"
1"
1 1/2" 6"
1"
1 1/2"6"
(6 TYP.)
#3-53"
1"
1"x25"
1 1/2" 6"
1" 1"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1" 1"x14"
1"x33"
1"x33"
1"
1 1/4"
1 1/4" 1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4" 1 1/4"
1 1/4"
1 1/4" 1 1/4" 1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4" 1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4" 1 1/4"
1 1/4"
1 1/4" 1 1/4"
1"x31"
1"x31"
1 1/4"
1 1/4"
1 1/4" 1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4" 1 1/4" 1 1/4"
1 1/4" 1 1/4"
1" 1 1/4"
1 1/4"
1" 1"
4"
1"
1 1/4"
1 1/4"
4" 1"
1 TYP
1 TYP
1 TYP
1 TYP
USE EXISTING SHUT OFF TO ISOLATE
FIRE SPRINKLER ZONE BEFORE
DEMOLITION WORK. LOCATION SHOWN
PER BUILDING 100 FIRE SPRINKLER
RISER DIAGRAM DRAWINGS.
1 TYP
USE EXISTING SHUT OFF TO ISOLATE
FIRE SPRINKLER ZONE BEFORE
DEMOLITION WORK. LOCATION TO BE
FIELD VERIFIED.
USE EXISTING SHUT OFF TO ISOLATE
FIRE SPRINKLER ZONE BEFORE
DEMOLITION WORK. LOCATION TO BE
FIELD VERIFIED.
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
KEY PLAN
LEGEND
FD101
BASEMENT DEMOLITION PLAN -
FIRE PROTECTION
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
1. FOR THE PURPOSES OF CLARITY AND LEGIBILITY, DRAWINGS
ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
4. NFPA STANDARDS: FIRE-SUPPRESSION-SYSTEM EQUIPMENT,
SPECIALTIES, ACCESSORIES, INSTALLATION, AND TESTING
SHALL COMPLY WITH NFPA 13, "INSTALLATION OF SPRINKLER
SYSTEMS."
1 DEMO AND REMOVE ALL SPRINKLER HEADS IN THE SCOPE OF
WORK AREAS. MAINTAIN ACTIVE FIRE PROTECTION IN THIS
ARE DURING CONSTRUCTION. DRAIN PIPING AND PROTECT
EXISTING STRUCTURE FROM WATER DAMAGE. USE CARE AND
CAUTION TO PROTECT SURROUNDING AREAS AND
COORDINATE WITH OTHER TRADES DURING REMOVAL OF
SPRINKLER PIPING. DAMAGE TO OTHER TRADES WORK SHALL
BE IMMEDIATELY NOTED BY PROJECT MANAGER.
SPRINKLER PIPING IN AREAS NOT PART OF THE SCOPE OF
WORK AND CONNECTED TO PIPING ROUTED THROUGH THE
PORTION OF WORK BEING A PART OF THE DEMOLITION WORK
SHALL REMAIN ACTIVE DURING THE DEMOLITION AND
CONSTRUCTION PHASES OF THE PROJECT. DURING TIMES
SPRINKLER SYSTEMS ARE NOT ACTIVE THE CONTRACTOR
SHALL PROVIDE A FIRE WATCH IN THE AREAS AFFECTED.
DEMOLITION GENERAL NOTES
DEMOLITION KEYED NOTES
TRUE
NORTH
PROJECT
NORTH
1/8" = 1'-0"1 BASEMENT DEMOLITION PLAN - FIRE PROTECTION
EXISTING SPRINKLER HEAD
EXISTING FIRE SPRINKLER PIPING
SPRINKLER HEAD TO BE REMOVED
PIPING IN AREA OF DEMOLITION TO BE
REMOVED
SPS
SWING
SPACE
WAREHOUSE
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
SE
38'-0"
NW
SE
0'-0"
S 176'-7"
S 143'-3"
E 146'-6"
E 197'-4"
E 201'-0"
SE
76-0
SE
114-0
SE
152-0
SE
190-0
SE
179-4
NW
14-9NW
3-6
SE
152-10
DW
NE
380-0
NE
304-0
NE
342-0
SE
152-0
SE
190-0
SE
179-4
SE
152-10
SE
38'-0"
NW
SE
0'-0"
SE
76-0
SE
114-0
NW
14-9
NW
3-6
NE
383'-9"
NE
383'-9"
E 146'-6"
.9
2°
LOW TEMP
B130
OFFICE
B104
OFFICE
B105
OFFICE
B106
BREAK ROOM
B127
B129
MALE STAFF
TOILET/LOCKER/SHOWER
B128
OFFICE
B107
PREP AND
B126
PACK
FEMALE STAFF
TOILET/ LOCKER/SHOWER
CLEAN ANTE
ROOM
B125
MECHANICAL
ROOM #3
BD-111
ELECTRICAL
CB15K SIGNAL
BD-110B
VESTIBULE
BD-110A
TELE
BD-110A
STERIZATION /
COOL DOWN
B108
HAC
B118
MACHINE
ROOM
B109
DIRTY
PROCESSING
B122 SOILED ANTE
ROOM
B-121
MALE STAFF
B119
IMPLANT
B111
STERILE /
NON-STERILE
EQUIP STORAGE
B110
CLEAN H.A.C.
B110A
RECEIVING/
BREAKDOWN
B114
COORD
OFFICE
B115
CLEAN
B124
B117
DETERGENT
ROOM
TOILET
/SHOWER
FEMALE STAFF
B120
TOILET/
LOCKER/SHOWER
SCOPE
STORAGE
ANTE ROOM
B112
DECOMTAM
B116
TYP
(E) SHUT OFF VALVE
ENDO
HIGH LEVEL
B123
PROCESSING
DISINFECTION
CAP UNUSED
PIPES (TYP)
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
GENERAL NOTES
1. THE MEANING AND INTENTION OF THESE DRAWINGS IS TO
COVER A COMPLETELY INSTALLED, FULLY OPERATING FIRE
PROTECTION SYSTEM FOR THE RENOVATED AREA. TO
ACCOMPLISH THIS PURPOSE, THE CONTRACTOR SHALL
PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT, LABOR
NECESSARY AND REQUIRED, AND BEAR ALL EXPENSES
INCIDENTAL TO THE SATISFACTORY COMPLETION OF THE
WORK. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN
AND INSTALL THE SYSTEM SO THAT NO INTERFERENCES EXIST
BETWEEN THE FIRE PROTECTION PIPING, AND EQUIPMENT AND
SYSTEMS DESIGNED AND INSTALLED BY OTHERS. THE LATEST
ISSUES OF ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS ARE AVAILABLE TO ASSIST THE
CONTRACTOR IN PREPARING THE DESIGN SO AS TO AVOID
INTERFERENCES.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COMPLY WITH ALL APPLICABLE LOCAL CODES, STATE AND
LOCAL FIRE MARSHAL'S STANDARDS, INTERNATIONAL
BUILDING CODE, INTERNATIONAL FIRE CODE, AND NFPA CODES
FOR INSTALLATION OF SYSTEMS. NFPA STANDARDS:
FIRE-SUPPRESSION-SYSTEM EQUIPMENT, SPECIALTIES,
ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY
WITH NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."
KEY NOTES
KEY PLAN
REPLACE ALL SPRINKLER HEADS IN SCOPE OF WORK AREAS
WITH NEW QUICK RESPONSE SPRINKLER HEADS. MODIFY
EXISTING SPRINKLER HEADS AND PIPING LOCATIONS AS
REQUIRED TO ACCOMMODATE SPACE RENOVATION IN THIS
AREA. CONTRACTOR TO PROVIDE SPRINKLER HEAD LAYOUT IN
THIS AREA TO COMPLY WITH NFPA 13. MAINTAIN ACTIVE FIRE
PROTECTION IN THIS ARE DURING CONSTRUCTION. DRAIN
PIPING AND PROTECT EXISTING STRUCTURE FROM WATER
DAMAGE. USE CARE AND CAUTION TO PROTECT
SURROUNDING AREAS AND COORDINATE WITH OTHER TRADES
DURING REMOVAL OF SPRINKLER PIPING. DAMAGE TO OTHER
TRADES WORK SHALL BE IMMEDIATELY NOTED BY PROJECT
MANAGER.
FIELD VERIFY EXISTING PIPING IN THIS AREA AND CONNECT
NEW SPRINKLER HEAD TO EXISTING PIPING.
REMOVE UNUSED FIRE PROTECTION PIPING BACK TO MAIN
AND CAP.
EXISTING SPRINKLER HEAD
EXISTING FIRE SPRINKLER PIPING
NEW UPTURNED SPRINKLER HEAD
NEW FIRE SPRINKLER PIPING
LEGEND
FX102
BASEMENT FLOOR PLAN -
FIRE PROTECTION
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
TRUE
NORTH
PROJECT
NORTH
1/8" = 1'-0"1 BASEMENT FLOOR PLAN - FIRE PROTECTION
SPS
SWING
SPACE
WAREHOUSE
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
E 197'-4"
E 201'-0"
S 176'-7"
S 143'-3"
NW
14-9
NW
14-9
USE EXISTING SHUT OFF TO ISOLATE
FIRE SPRINKLER ZONE BEFORE
DEMOLITION WORK.
6" F.S.P DN
ELEVATOR MACHINE ROOM
AVOID LOCATING SPRINKLER HEAD
DIRECTLY OVER ANY EQUIPMENT
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
GENERAL NOTES
1. THE MEANING AND INTENTION OF THESE DRAWINGS IS TO
COVER A COMPLETELY INSTALLED, FULLY OPERATING FIRE
PROTECTION SYSTEM FOR THE RENOVATED AREA. TO
ACCOMPLISH THIS PURPOSE, THE CONTRACTOR SHALL
PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT, LABOR
NECESSARY AND REQUIRED, AND BEAR ALL EXPENSES
INCIDENTAL TO THE SATISFACTORY COMPLETION OF THE
WORK. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN
AND INSTALL THE SYSTEM SO THAT NO INTERFERENCES EXIST
BETWEEN THE FIRE PROTECTION PIPING, AND EQUIPMENT AND
SYSTEMS DESIGNED AND INSTALLED BY OTHERS. THE LATEST
ISSUES OF ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS ARE AVAILABLE TO ASSIST THE
CONTRACTOR IN PREPARING THE DESIGN SO AS TO AVOID
INTERFERENCES.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COMPLY WITH ALL APPLICABLE LOCAL CODES, STATE AND
LOCAL FIRE MARSHAL'S STANDARDS, INTERNATIONAL
BUILDING CODE, INTERNATIONAL FIRE CODE, AND NFPA CODES
FOR INSTALLATION OF SYSTEMS. NFPA STANDARDS:
FIRE-SUPPRESSION-SYSTEM EQUIPMENT, SPECIALTIES,
ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY
WITH NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."
KEY NOTES
CONTRACTOR TO PROVIDE NEW QUICK RESPONSE SPRINKLER
HEAD LAYOUT IN THIS AREA TO COMPLY WITH NFPA 13.
MAINTAIN ACTIVE FIRE PROTECTION IN THIS ARE DURING
CONSTRUCTION. DRAIN PIPING AND PROTECT EXISTING
STRUCTURE FROM WATER DAMAGE. USE CARE AND CAUTION
TO PROTECT SURROUNDING AREAS AND COORDINATE WITH
OTHER TRADES DURING REMOVAL OF SPRINKLER PIPING.
DAMAGE TO OTHER TRADES WORK SHALL BE IMMEDIATELY
NOTED BY PROJECT MANAGER.
FIELD VERIFY EXISTING PIPING IN THIS AREA AND CONNECT
NEW SPRINKLER HEAD TO EXISTING PIPING.
EXISTING SPRINKLER HEAD
EXISTING FIRE SPRINKLER PIPING
NEW UPTURNED SPRINKLER HEAD
NEW FIRE SPRINKLER PIPING
LEGEND
FX401
CART LIFT EQUIPMENT ROOM -
FIRE PROTECTION
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
TRUE
NORTH
PROJECT
NORTH
1/4" = 1'-0"1 CART LIFT EQUIPMENT ROOM - FIRE PROTECTION
SPS
SWING
SPACE
WAREHOUSE
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
EXISTING COVERED WALKWAY
NEW PET / CT COVERED
WALKWAY
NEW PET / CT COVERED
WALKWAY
RADIATION THERAPY BUILDING
HVAC ENCLOSURE
TEMP SPS
EXISTING SPRINKLER HEADS TO REMAIN. (TYP)
NEW PET / CT COVERED
WALKWAY
CONNECT NEW PIPE TO EXISTING
SPRINKLER PIPE SYSTEM
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
GENERAL NOTES
1. THE MEANING AND INTENTION OF THESE DRAWINGS IS TO
COVER A COMPLETELY INSTALLED, FULLY OPERATING FIRE
PROTECTION SYSTEM FOR THE RENOVATED AREA. TO
ACCOMPLISH THIS PURPOSE, THE CONTRACTOR SHALL
PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT, LABOR
NECESSARY AND REQUIRED, AND BEAR ALL EXPENSES
INCIDENTAL TO THE SATISFACTORY COMPLETION OF THE
WORK. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN
AND INSTALL THE SYSTEM SO THAT NO INTERFERENCES EXIST
BETWEEN THE FIRE PROTECTION PIPING, AND EQUIPMENT AND
SYSTEMS DESIGNED AND INSTALLED BY OTHERS. THE LATEST
ISSUES OF ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS ARE AVAILABLE TO ASSIST THE
CONTRACTOR IN PREPARING THE DESIGN SO AS TO AVOID
INTERFERENCES.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COMPLY WITH ALL APPLICABLE LOCAL CODES, STATE AND
LOCAL FIRE MARSHAL'S STANDARDS, INTERNATIONAL
BUILDING CODE, INTERNATIONAL FIRE CODE, AND NFPA CODES
FOR INSTALLATION OF SYSTEMS. NFPA STANDARDS:
FIRE-SUPPRESSION-SYSTEM EQUIPMENT, SPECIALTIES,
ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY
WITH NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."
KEY NOTES
ADD NEW DRY SYSTEM SPRINKLER HEADS AND PIPING
LOCATIONS AS REQUIRED TO ACCOMMODATE SPACE
RENOVATION IN THIS AREA. CONTRACTOR TO PROVIDE
SPRINKLER HEAD LAYOUT IN THIS AREA TO COMPLY WITH
NFPA 13. MAINTAIN ACTIVE FIRE PROTECTION IN THIS ARE
DURING CONSTRUCTION. DRAIN PIPING AND PROTECT
EXISTING STRUCTURE FROM WATER DAMAGE. USE CARE AND
CAUTION TO PROTECT SURROUNDING AREAS AND
COORDINATE WITH OTHER TRADES DURING REMOVAL OF
SPRINKLER PIPING. DAMAGE TO OTHER TRADES WORK SHALL
BE IMMEDIATELY NOTED BY PROJECT MANAGER.
EXISTING SPRINKLER HEAD
EXISTING FIRE SPRINKLER PIPING
NEW UPTURNED SPRINKLER HEAD
NEW FIRE SPRINKLER PIPING
LEGEND
FX402
COVERED WALKWAY - FIRE PROTECTION
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
TRUE
NORTH
PROJECT
NORTH
1/4" = 1'-0"1 COVERED WALKWAY - FIRE PROTECTION
SPS
SWING
SPACE
LOADING DOCK
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
| 663-102.100.FD101.20210625 |
| 663-102.100.FX102.20210625 |
| 663-102.100.FX401.20210625 |
| Sheets and Views |
| FX401 |
| 663-102.100.FX402.20210625 |
| Sheets and Views |
| FX402 |