Attachment 8 Drawings 5 of 11 Fire Protection.pdf

PDF 1000 KB Posted

Attached to
Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
Solicitation number
36C26023R0021
Issued by

About this file

This document package includes construction drawings and specifications for an upgrade project at a Department of Veterans Affairs medical facility. The drawings show demolition, fire protection, and site plans for renovating sterile processing services spaces in Building 100. Fire sprinkler work includes replacing heads in renovation areas, modifying locations to accommodate changes, and adding new sprinkler lines in covered walkways. Demolition plans outline piping and heads to remove. General notes provide design and code compliance requirements.

The related federal contract opportunity is a solicitation from the VA Veterans Health Administration seeking construction services for Project 663-20-102 to upgrade sterile processing operations at the VA Puget Sound Health Care System located in Seattle, Washington. The solicitation number is 36C26023R0021 and was issued by VISN 20. The construction drawings and specifications would be provided to the awardee as part of the contract.

View the file

Other files

File Type Posted
Attachment 23 Partial Architectural Set.pdf PDF
36C26023R0021 0002.docx DOCX document
Attachment 19 RFI Responses Rev 1.pdf PDF
Attachment 24 RFI Supplement.pptx PPTX presentation
Attachment 15 Wage Determination REV 1 20230825.pdf PDF
Attachment 22 Mobile Steris Trailer.pdf PDF
Attachment 21 Site Visit Agenda and Sign-In.pdf PDF
Attachment 20 36C26022Q0073 RFI List FOR INFORMATIONAL PURPOSES ONLY.pdf PDF
36C26023R0021 0001.docx DOCX document
Attachment 19 RFI Responses.pdf PDF
Attachment 20 36C26022Q0073 RFI List.pdf PDF
Attachment 18 Calculation of Self Performed Work REV 1.pdf PDF
Attachment 14 Drawings 11 of 11 Haz Mat.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 9 Drawings 6 of 11 Mechanical.pdf PDF
36C26023R0021.docx DOCX document
Attachment 7 Drawings 4 of 11 Structural.pdf PDF
Attachment 3 Specs 2 of 2.pdf PDF
Attachment 2 Specs 1 of 2.pdf PDF
Attachment 1 Construction SOW Rev5.docx DOCX document
Attachment 13 Drawings 10 of 11 Electrical 3 of 3.pdf PDF
Attachment 10 Drawings 7 of 11 Plumbing.pdf PDF
Attachment 17 Contractor Rules Of Behavior.pdf PDF
Attachment 18 Calculation of Self Performed Work.pdf PDF
Attachment 12 Drawings 9 of 11 Electrical 2 of 3.pdf PDF
Attachment 5 Drawings 2 of 11 Civil.pdf PDF
Attachment 15 Wage Determination.pdf PDF
Attachment 11 Drawings 8 of 11 Electrical 1 of 3.pdf PDF
Attachment 6 Drawings 3 of 11 Architectural.pdf PDF
Attachment 4 Drawings 1 of 11 General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SE

38'-0"

NW

SE

0'-0"

S 176'-7"

S 143'-3"

E 146'-6"

E 197'-4"

E 201'-0"

SE

76-0

SE

114-0

SE

152-0

SE

190-0

SE

179-4

NW

14-9

NW

3-6

SE

152-10

NE

380-0

NE

304-0

NE

342-0

SE

38'-0"

NW

SE

0'-0"

SE

76-0

SE

114-0

NW

14-9

NW

3-6

NE

383'-9"

UP

NE

383'-9"

1 1/2" 1 1/2"

1 1/2" 1 1/2"

1 1/2" 1 1/2"

1 1/4"

1 1/4" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1"x33"

1"x29"

1 1/4"

1"x29"

1 1/4"

1 1/4"

1 1/4"

1"x29"

1 1/4" 1 1/4" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4" 1 1/4" 1 1/4" 1 1/4"

1 1/4"1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1" 1" 1"

1 1/4" 1 1/4"

1"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/2" 1 1/2"

1 1/2" 1 1/2"

6'-2 1/2"

#1-73"

(6 TYP.)

1 1/4" 1 1/4" 1 1/4"

#1

#4

1"

1 1/4"

1 1/2"

2 1/2"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

2" SUPPLY TO

6" STANDPIPE

STAIR #5

FIRE ZONE #4

1 1/2" 1 1/2"

1 1/2" 11'-10" 1 1/2"

1 1/2"

1"

1 1/2" 1 1/2"

1"

1 1/2"

5 1/2"

1"

1 1/2" 6"

1"

1 1/2"6"

(6 TYP.)

#3-53"

1"

1"x25"

1 1/2" 6"

1" 1"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1" 1"x14"

1"x33"

1"x33"

1"

1 1/4"

1 1/4" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4" 1 1/4"

1 1/4"

1 1/4" 1 1/4" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4" 1 1/4"

1 1/4"

1 1/4" 1 1/4"

1"x31"

1"x31"

1 1/4"

1 1/4"

1 1/4" 1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4" 1 1/4" 1 1/4"

1 1/4" 1 1/4"

1" 1 1/4"

1 1/4"

1" 1"

4"

1"

1 1/4"

1 1/4"

4" 1"

1 TYP

1 TYP

1 TYP

1 TYP

USE EXISTING SHUT OFF TO ISOLATE

FIRE SPRINKLER ZONE BEFORE

DEMOLITION WORK. LOCATION SHOWN

PER BUILDING 100 FIRE SPRINKLER

RISER DIAGRAM DRAWINGS.

1 TYP

USE EXISTING SHUT OFF TO ISOLATE

FIRE SPRINKLER ZONE BEFORE

DEMOLITION WORK. LOCATION TO BE

FIELD VERIFIED.

USE EXISTING SHUT OFF TO ISOLATE

FIRE SPRINKLER ZONE BEFORE

DEMOLITION WORK. LOCATION TO BE

FIELD VERIFIED.

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

KEY PLAN

LEGEND

FD101

BASEMENT DEMOLITION PLAN -

FIRE PROTECTION

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

1. FOR THE PURPOSES OF CLARITY AND LEGIBILITY, DRAWINGS

ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

4. NFPA STANDARDS: FIRE-SUPPRESSION-SYSTEM EQUIPMENT,

SPECIALTIES, ACCESSORIES, INSTALLATION, AND TESTING

SHALL COMPLY WITH NFPA 13, "INSTALLATION OF SPRINKLER

SYSTEMS."

1 DEMO AND REMOVE ALL SPRINKLER HEADS IN THE SCOPE OF

WORK AREAS. MAINTAIN ACTIVE FIRE PROTECTION IN THIS

ARE DURING CONSTRUCTION. DRAIN PIPING AND PROTECT

EXISTING STRUCTURE FROM WATER DAMAGE. USE CARE AND

CAUTION TO PROTECT SURROUNDING AREAS AND

COORDINATE WITH OTHER TRADES DURING REMOVAL OF

SPRINKLER PIPING. DAMAGE TO OTHER TRADES WORK SHALL

BE IMMEDIATELY NOTED BY PROJECT MANAGER.

SPRINKLER PIPING IN AREAS NOT PART OF THE SCOPE OF

WORK AND CONNECTED TO PIPING ROUTED THROUGH THE

PORTION OF WORK BEING A PART OF THE DEMOLITION WORK

SHALL REMAIN ACTIVE DURING THE DEMOLITION AND

CONSTRUCTION PHASES OF THE PROJECT. DURING TIMES

SPRINKLER SYSTEMS ARE NOT ACTIVE THE CONTRACTOR

SHALL PROVIDE A FIRE WATCH IN THE AREAS AFFECTED.

DEMOLITION GENERAL NOTES

DEMOLITION KEYED NOTES

TRUE

NORTH

PROJECT

NORTH

1/8" = 1'-0"1 BASEMENT DEMOLITION PLAN - FIRE PROTECTION

EXISTING SPRINKLER HEAD

EXISTING FIRE SPRINKLER PIPING

SPRINKLER HEAD TO BE REMOVED

PIPING IN AREA OF DEMOLITION TO BE

REMOVED

SPS

SWING

SPACE

WAREHOUSE

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

SE

38'-0"

NW

SE

0'-0"

S 176'-7"

S 143'-3"

E 146'-6"

E 197'-4"

E 201'-0"

SE

76-0

SE

114-0

SE

152-0

SE

190-0

SE

179-4

NW

14-9NW

3-6

SE

152-10

DW

NE

380-0

NE

304-0

NE

342-0

SE

152-0

SE

190-0

SE

179-4

SE

152-10

SE

38'-0"

NW

SE

0'-0"

SE

76-0

SE

114-0

NW

14-9

NW

3-6

NE

383'-9"

NE

383'-9"

E 146'-6"

.9

2°

LOW TEMP

B130

OFFICE

B104

OFFICE

B105

OFFICE

B106

BREAK ROOM

B127

B129

MALE STAFF

TOILET/LOCKER/SHOWER

B128

OFFICE

B107

PREP AND

B126

PACK

FEMALE STAFF

TOILET/ LOCKER/SHOWER

CLEAN ANTE

ROOM

B125

MECHANICAL

ROOM #3

BD-111

ELECTRICAL

CB15K SIGNAL

BD-110B

VESTIBULE

BD-110A

TELE

BD-110A

STERIZATION /

COOL DOWN

B108

HAC

B118

MACHINE

ROOM

B109

DIRTY

PROCESSING

B122 SOILED ANTE

ROOM

B-121

MALE STAFF

B119

IMPLANT

B111

STERILE /

NON-STERILE

EQUIP STORAGE

B110

CLEAN H.A.C.

B110A

RECEIVING/

BREAKDOWN

B114

COORD

OFFICE

B115

CLEAN

B124

B117

DETERGENT

ROOM

TOILET

/SHOWER

FEMALE STAFF

B120

TOILET/

LOCKER/SHOWER

SCOPE

STORAGE

ANTE ROOM

B112

DECOMTAM

B116

TYP

(E) SHUT OFF VALVE

ENDO

HIGH LEVEL

B123

PROCESSING

DISINFECTION

CAP UNUSED

PIPES (TYP)

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

GENERAL NOTES

1. THE MEANING AND INTENTION OF THESE DRAWINGS IS TO

COVER A COMPLETELY INSTALLED, FULLY OPERATING FIRE

PROTECTION SYSTEM FOR THE RENOVATED AREA. TO

ACCOMPLISH THIS PURPOSE, THE CONTRACTOR SHALL

PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT, LABOR

NECESSARY AND REQUIRED, AND BEAR ALL EXPENSES

INCIDENTAL TO THE SATISFACTORY COMPLETION OF THE

WORK. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN

AND INSTALL THE SYSTEM SO THAT NO INTERFERENCES EXIST

BETWEEN THE FIRE PROTECTION PIPING, AND EQUIPMENT AND

SYSTEMS DESIGNED AND INSTALLED BY OTHERS. THE LATEST

ISSUES OF ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL

AND ELECTRICAL DRAWINGS ARE AVAILABLE TO ASSIST THE

CONTRACTOR IN PREPARING THE DESIGN SO AS TO AVOID

INTERFERENCES.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COMPLY WITH ALL APPLICABLE LOCAL CODES, STATE AND

LOCAL FIRE MARSHAL'S STANDARDS, INTERNATIONAL

BUILDING CODE, INTERNATIONAL FIRE CODE, AND NFPA CODES

FOR INSTALLATION OF SYSTEMS. NFPA STANDARDS:

FIRE-SUPPRESSION-SYSTEM EQUIPMENT, SPECIALTIES,

ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY

WITH NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."

KEY NOTES

KEY PLAN

REPLACE ALL SPRINKLER HEADS IN SCOPE OF WORK AREAS

WITH NEW QUICK RESPONSE SPRINKLER HEADS. MODIFY

EXISTING SPRINKLER HEADS AND PIPING LOCATIONS AS

REQUIRED TO ACCOMMODATE SPACE RENOVATION IN THIS

AREA. CONTRACTOR TO PROVIDE SPRINKLER HEAD LAYOUT IN

THIS AREA TO COMPLY WITH NFPA 13. MAINTAIN ACTIVE FIRE

PROTECTION IN THIS ARE DURING CONSTRUCTION. DRAIN

PIPING AND PROTECT EXISTING STRUCTURE FROM WATER

DAMAGE. USE CARE AND CAUTION TO PROTECT

SURROUNDING AREAS AND COORDINATE WITH OTHER TRADES

DURING REMOVAL OF SPRINKLER PIPING. DAMAGE TO OTHER

TRADES WORK SHALL BE IMMEDIATELY NOTED BY PROJECT

MANAGER.

FIELD VERIFY EXISTING PIPING IN THIS AREA AND CONNECT

NEW SPRINKLER HEAD TO EXISTING PIPING.

REMOVE UNUSED FIRE PROTECTION PIPING BACK TO MAIN

AND CAP.

EXISTING SPRINKLER HEAD

EXISTING FIRE SPRINKLER PIPING

NEW UPTURNED SPRINKLER HEAD

NEW FIRE SPRINKLER PIPING

LEGEND

FX102

BASEMENT FLOOR PLAN -

FIRE PROTECTION

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

TRUE

NORTH

PROJECT

NORTH

1/8" = 1'-0"1 BASEMENT FLOOR PLAN - FIRE PROTECTION

SPS

SWING

SPACE

WAREHOUSE

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

E 197'-4"

E 201'-0"

S 176'-7"

S 143'-3"

NW

14-9

NW

14-9

USE EXISTING SHUT OFF TO ISOLATE

FIRE SPRINKLER ZONE BEFORE

DEMOLITION WORK.

6" F.S.P DN

ELEVATOR MACHINE ROOM

AVOID LOCATING SPRINKLER HEAD

DIRECTLY OVER ANY EQUIPMENT

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

GENERAL NOTES

1. THE MEANING AND INTENTION OF THESE DRAWINGS IS TO

COVER A COMPLETELY INSTALLED, FULLY OPERATING FIRE

PROTECTION SYSTEM FOR THE RENOVATED AREA. TO

ACCOMPLISH THIS PURPOSE, THE CONTRACTOR SHALL

PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT, LABOR

NECESSARY AND REQUIRED, AND BEAR ALL EXPENSES

INCIDENTAL TO THE SATISFACTORY COMPLETION OF THE

WORK. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN

AND INSTALL THE SYSTEM SO THAT NO INTERFERENCES EXIST

BETWEEN THE FIRE PROTECTION PIPING, AND EQUIPMENT AND

SYSTEMS DESIGNED AND INSTALLED BY OTHERS. THE LATEST

ISSUES OF ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL

AND ELECTRICAL DRAWINGS ARE AVAILABLE TO ASSIST THE

CONTRACTOR IN PREPARING THE DESIGN SO AS TO AVOID

INTERFERENCES.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COMPLY WITH ALL APPLICABLE LOCAL CODES, STATE AND

LOCAL FIRE MARSHAL'S STANDARDS, INTERNATIONAL

BUILDING CODE, INTERNATIONAL FIRE CODE, AND NFPA CODES

FOR INSTALLATION OF SYSTEMS. NFPA STANDARDS:

FIRE-SUPPRESSION-SYSTEM EQUIPMENT, SPECIALTIES,

ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY

WITH NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."

KEY NOTES

CONTRACTOR TO PROVIDE NEW QUICK RESPONSE SPRINKLER

HEAD LAYOUT IN THIS AREA TO COMPLY WITH NFPA 13.

MAINTAIN ACTIVE FIRE PROTECTION IN THIS ARE DURING

CONSTRUCTION. DRAIN PIPING AND PROTECT EXISTING

STRUCTURE FROM WATER DAMAGE. USE CARE AND CAUTION

TO PROTECT SURROUNDING AREAS AND COORDINATE WITH

OTHER TRADES DURING REMOVAL OF SPRINKLER PIPING.

DAMAGE TO OTHER TRADES WORK SHALL BE IMMEDIATELY

NOTED BY PROJECT MANAGER.

FIELD VERIFY EXISTING PIPING IN THIS AREA AND CONNECT

NEW SPRINKLER HEAD TO EXISTING PIPING.

EXISTING SPRINKLER HEAD

EXISTING FIRE SPRINKLER PIPING

NEW UPTURNED SPRINKLER HEAD

NEW FIRE SPRINKLER PIPING

LEGEND

FX401

CART LIFT EQUIPMENT ROOM -

FIRE PROTECTION

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

TRUE

NORTH

PROJECT

NORTH

1/4" = 1'-0"1 CART LIFT EQUIPMENT ROOM - FIRE PROTECTION

SPS

SWING

SPACE

WAREHOUSE

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

EXISTING COVERED WALKWAY

NEW PET / CT COVERED

WALKWAY

NEW PET / CT COVERED

WALKWAY

RADIATION THERAPY BUILDING

HVAC ENCLOSURE

TEMP SPS

EXISTING SPRINKLER HEADS TO REMAIN. (TYP)

NEW PET / CT COVERED

WALKWAY

CONNECT NEW PIPE TO EXISTING

SPRINKLER PIPE SYSTEM

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

GENERAL NOTES

1. THE MEANING AND INTENTION OF THESE DRAWINGS IS TO

COVER A COMPLETELY INSTALLED, FULLY OPERATING FIRE

PROTECTION SYSTEM FOR THE RENOVATED AREA. TO

ACCOMPLISH THIS PURPOSE, THE CONTRACTOR SHALL

PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT, LABOR

NECESSARY AND REQUIRED, AND BEAR ALL EXPENSES

INCIDENTAL TO THE SATISFACTORY COMPLETION OF THE

WORK. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN

AND INSTALL THE SYSTEM SO THAT NO INTERFERENCES EXIST

BETWEEN THE FIRE PROTECTION PIPING, AND EQUIPMENT AND

SYSTEMS DESIGNED AND INSTALLED BY OTHERS. THE LATEST

ISSUES OF ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL

AND ELECTRICAL DRAWINGS ARE AVAILABLE TO ASSIST THE

CONTRACTOR IN PREPARING THE DESIGN SO AS TO AVOID

INTERFERENCES.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE VA STANDARDS.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COMPLY WITH ALL APPLICABLE LOCAL CODES, STATE AND

LOCAL FIRE MARSHAL'S STANDARDS, INTERNATIONAL

BUILDING CODE, INTERNATIONAL FIRE CODE, AND NFPA CODES

FOR INSTALLATION OF SYSTEMS. NFPA STANDARDS:

FIRE-SUPPRESSION-SYSTEM EQUIPMENT, SPECIALTIES,

ACCESSORIES, INSTALLATION, AND TESTING SHALL COMPLY

WITH NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."

KEY NOTES

ADD NEW DRY SYSTEM SPRINKLER HEADS AND PIPING

LOCATIONS AS REQUIRED TO ACCOMMODATE SPACE

RENOVATION IN THIS AREA. CONTRACTOR TO PROVIDE

SPRINKLER HEAD LAYOUT IN THIS AREA TO COMPLY WITH

NFPA 13. MAINTAIN ACTIVE FIRE PROTECTION IN THIS ARE

DURING CONSTRUCTION. DRAIN PIPING AND PROTECT

EXISTING STRUCTURE FROM WATER DAMAGE. USE CARE AND

CAUTION TO PROTECT SURROUNDING AREAS AND

COORDINATE WITH OTHER TRADES DURING REMOVAL OF

SPRINKLER PIPING. DAMAGE TO OTHER TRADES WORK SHALL

BE IMMEDIATELY NOTED BY PROJECT MANAGER.

EXISTING SPRINKLER HEAD

EXISTING FIRE SPRINKLER PIPING

NEW UPTURNED SPRINKLER HEAD

NEW FIRE SPRINKLER PIPING

LEGEND

FX402

COVERED WALKWAY - FIRE PROTECTION

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

TRUE

NORTH

PROJECT

NORTH

1/4" = 1'-0"1 COVERED WALKWAY - FIRE PROTECTION

SPS

SWING

SPACE

LOADING DOCK

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

663-102.100.FD101.20210625
663-102.100.FX102.20210625
663-102.100.FX401.20210625
Sheets and Views
FX401
663-102.100.FX402.20210625
Sheets and Views
FX402

File details come from the government source that posted it. Updated .