Attachment 23 Partial Architectural Set.pdf

PDF 2 MB Posted

Attached to
Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
Solicitation number
36C26023R0021
Issued by

About this file

This document package includes architectural drawings and specifications for renovations to a sterile processing services facility located within a Department of Veterans Affairs medical center. The drawings depict proposed layouts and construction details for areas such as soiled and clean equipment storage and processing rooms, staff toilets and break rooms, and mechanical and electrical spaces. Door schedules, window schedules, and finish and fixture specifications are provided.

The related federal contract opportunity is a solicitation issued by the VA Veterans Health Administration to upgrade the sterile processing services department outlined in the architectural documents. The solicitation references the construction project number and seeks bids from contractors qualified to perform the renovations depicted, which include installation of new walls, doors, finishes and equipment as well as electrical and mechanical system upgrades. The agency aims to award a firm-fixed-price contract for completion of the work by a specified date.

View the file

Other files

File Type Posted
36C26023R0021 0002.docx DOCX document
Attachment 19 RFI Responses Rev 1.pdf PDF
Attachment 24 RFI Supplement.pptx PPTX presentation
Attachment 15 Wage Determination REV 1 20230825.pdf PDF
Attachment 22 Mobile Steris Trailer.pdf PDF
Attachment 21 Site Visit Agenda and Sign-In.pdf PDF
Attachment 20 36C26022Q0073 RFI List FOR INFORMATIONAL PURPOSES ONLY.pdf PDF
36C26023R0021 0001.docx DOCX document
Attachment 19 RFI Responses.pdf PDF
Attachment 20 36C26022Q0073 RFI List.pdf PDF
Attachment 18 Calculation of Self Performed Work REV 1.pdf PDF
Attachment 14 Drawings 11 of 11 Haz Mat.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 9 Drawings 6 of 11 Mechanical.pdf PDF
36C26023R0021.docx DOCX document
Attachment 8 Drawings 5 of 11 Fire Protection.pdf PDF
Attachment 7 Drawings 4 of 11 Structural.pdf PDF
Attachment 3 Specs 2 of 2.pdf PDF
Attachment 2 Specs 1 of 2.pdf PDF
Attachment 1 Construction SOW Rev5.docx DOCX document
Attachment 13 Drawings 10 of 11 Electrical 3 of 3.pdf PDF
Attachment 10 Drawings 7 of 11 Plumbing.pdf PDF
Attachment 17 Contractor Rules Of Behavior.pdf PDF
Attachment 18 Calculation of Self Performed Work.pdf PDF
Attachment 12 Drawings 9 of 11 Electrical 2 of 3.pdf PDF
Attachment 5 Drawings 2 of 11 Civil.pdf PDF
Attachment 15 Wage Determination.pdf PDF
Attachment 11 Drawings 8 of 11 Electrical 1 of 3.pdf PDF
Attachment 6 Drawings 3 of 11 Architectural.pdf PDF
Attachment 4 Drawings 1 of 11 General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GFI

GFI GFI

GFI

GFI

GFI GFI

GFI GFI

GFI GFI

G F

I

GFI

GFI GFI

GFIGFI

D & T

TRUE

NORTH

CENTRAL CORE

NORTH

NURSING

TOWER

AREA SHOWN

SE

38'-0"

NW

SE

0'-0"

S 176'-7"

S143'-3"

E 197'-4"

SE

76'-0"

NW

14'-9"

NE

380'-0"

NE

380'-0"

NE

342'-0"

NE

304'-0"

NW

3'-6"

NE

383'-9"

90 SF

MACHINE

B109

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

64 SF

CLEAN HAC

B110A

194 SF

CLEAN SCOPE

STORAGE

B124

281 SF

ENDO PROCESSING /

HIGH LEVEL

DISINFECTION

B123

173 SF

DIRTY PROCESSING

B122

151 SF

SOILED ANTE

B121

191 SF

FEMALE STAFF

TOILET / SHOWER

B119

75 SF

HAC

B118

182 SF

COORD OFFICE

B115

202 SF

RECEIVING /

BREAKDOWN

B114

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

156 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B120

197 SF

DETERGENT

B117

F O

R C

O N

T

IN

U A

T

IO

N

S E

E S

H E

E T

M A

T C

H L

IN

E

OFF LOAD

COUNTER

UPGRADE CART

ELEVATOR

APPROX 7" PIT

RECESSED

WIRE SHELVING

RACK

43K

U O

N

T Y

P

ALIGN

DEMO

INFIL

ALIGN

44F

11' - 3" 30' - 5" 6' - 0" 19' - 2" 6' - 10"

UON

6" TYP

B115.2

B115.1

B112.1

B112.3

B114.2

B114.1

62F

44F

44F

A E

F O

R C

O N

T

IN

U A

T

IO

N

E S

H E

E T

A E

20A

20B 20B

43K 43K

43K

44F 44F

44F

6' - 0 3/8" 7' - 5 5/8" 5' - 7"

90.00°

6' - 7"

14' - 7"

02A

44F 44F 44F

F

IE

L D

V E

R

IF

Y

14' - 4" 9' - 4" 28' - 2" 3' - 3"

5' - 0" 5' - 6"

B .1

B122.1

B120.1

B119.1

B .1

B .1

B A

.1

B111.1

24"x60"

24"x84"

24"x72"

R 6' - 8"

12 SF

PRZ CLOSET

B116A

2' - 4"

21 21

21 21 21 21 21 21 21 21 21 21 21

2121212121212121212121

02B

05 06

04 06

20B

22 22 22 22

E Q

E Q

02B

02A

02A

6' - 0"

3' - 6" 3' - 6" 3' - 6" 3' - 6" 3' - 6"

V E

R

IF

Y I N

F

IE

L D

/8

C L E

A R

A N

C E

M

IN

62F

62F

V E

R

IF

Y ' - 7

23' - 2" 8' - 0"

VERIFY

2' - 6"

2268 SF

DECONTAM

B116

1941 SF

PREP AND PACK

B126

17A

17A

17A

17A

17A

AE4113

AE411

AE411

P2451

P2451

P2000

P2000

P2451

P2000P2451

B117.2

B A

.1

B121.1

B .2

B110.1

62F

D

D

D

D

D

D D

D

D

AE301

AE301

6"

6"

6"

4' - 10" 2' - 2" 6' - 4" 2' - 2"

10' - 8"

15' - 6"

B116B.1

AE401

AE4127

AE403

AE403

62F

5' - 4" 5' - 4"

43K

43K

26 26

AE411

AE411

6"

WORK STATIONS

REQUIRED POWER AND

DATA

DEMO

INFIL

28 SF

SUPPLY CLOSET

B116B

WORK STATIONS

REQUIRED POWER AND

DATA

116 SF

ANTE

B112

264 SF

IMPLANT

B111

8'

P2000

6' - 4"

12' - 5"

EQ EQ

/8

B112.2

02A

B110.2

AE402

E 201-5

E 201-6

E 201-6

E 201-7

A5082

PROVIDE AND INSTALL NE

EXPANSION JOINT COVER AT ALL

EXISTING EXPANSION JOINTS

WITHIN SCOPE OF WORK

W05

63K

CR

D

COUNTER, WALL OR CEILING

SUSPENDED COMPUTER WORK

STATION

CARD READER ACCESS

KEY PAD ACCESS

MOTION SENSING ACTIVATORS,

WITH ADJUSTABLE SENSITIVITY

NETWORK DROP

EXISTING EXPANSION JOINT AT

WALLS AND CEILING

MA

KP

1-HR FIRE BARRIER

2-HR FIRE BARRIER

1. PROVIDE BLOCKING AS REQUIRED AT STUD WALLS FOR SUPPORT OF WALL MOUNTED ITEMS

AND/OR EQUIPMENT. FOR ALL LOCATIONS, SEE SPECIFICATIONS, ARCHITECTURAL AND

CONSULTANT DRAWINGS FOR LOCATIONS.

2. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL

NOTES AND OR INFORMATION

3. VERIFY CLEARANCES WITH MANUFACTURERS PRIOR TO INSTALLATION OF EQUIPMENT

4. PROVIDE AND INSTALL CORNER GUARDS AT ALL OUTSIDE CORNERS

5. FIELD VERIFY ALL DIMENSIONS AND REPORT DISCREPANCIES, IF ANY, TO ARCHITECT PRIOR TO

CONSTRUCTION

6. NEW WORK DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF STUD, CENTERLINE OF

STRUCTURAL COLUMNS, CENTERLINE OF OPENINGS, UNO

7. DIMENSIONS SHOWN ARE FROM FINISH FACE / OR OPENING TO FINISH FACE OF WALLS

8. DIMENSIONS NOTED WITH THE SUFFIX "CLR", "CLEAR", OR "MIN" ARE FROM FACE OF FINISH

INCLUDING TRIM WORK (UNO)

9. ALL DOORS NOT DIMENSIONS ARE LOCATED 6" TO AN INTERSECTING WALL OR CENTERED ON

WALL

10. PATCH AND REPAIR ALL NEW WALL REFILL TO MATCH SURROUNDING CONDITION

11. PROVIDE AND INSTALL NEW EXPANSIOM JOINT COVER PLATES AT ALL EXISTING EXPANSION

JOINT AT WALL AND CEILING, REFERENCE DETAILS AND

12. PROVIDE AND INSTALL NEW INTERIOR SIGNAGE WITHIN SCOPE OF WORK, REFERENCE SIGNAGE

PLAN FOR MORE INFORMATION

FIN TO FIN

/5 AE401 /6 AE401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE111

PARTIAL FLOOR PLAN - NORTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 Checker Author

100% CD

1/4" = 1'-0"1

PARTIAL BASEMENT PLAN - NORTH

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

Revisions: Date:

G F

I

D & T

TRUE

NORTH

CENTRAL CORE

SOUTH

NURSING

TOWER

AREA SHOWN

SE

76'-0"

SE

114'-0"

SE

152'-0"

SE

179'-4"

NE

380'-0"

NE

342'-0"

NE

304'-0"

SE

152'-10"

NE

383'-9"

PROVIDE AND INSTALL

NE EXPANSION JOINT

COVER AT ALL EXISTING

EXPANSION JOINTS

WITHIN SCOPE OF

WORK

/1 AE111

F O

R C

O N

T

IN

U A

T

IO

N S

H E

E T

A E

151 SF

OFFICE

B106

128 SF

OFFICE

B107

1391 SF

STERILIZATION COOL

DOWN

B108

241 SF

OFFICE

B104

513 SF

LOW TEMP

B130

174 SF

FEMALE STAFF

TOILET / LOCKER /

SHOWER

B129

403 SF

BREAK

B127

178 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B128

55 SF

CLEAN ANTE

B125

ALIGN

7" 13' - 5" 5' - 2" 19' - 0" 5' - 5" 14' - 0"

FIELD VERIFY

5' - 8 5/8" +/-

ALIGN

B129.1 B128.1

B .1

B .1

B .2

B104.2

B .2B105.1

B104.1

B .1

B .1

44F

42H 47F

47F

AE412

44F

21F

42H

3' - 0"8 1/2"

"44F

44F

W04

W04

1941 SF

PREP AND PACK

B126

B107.2

44F

47F

42H

EQ EQ

11' - 4" 13' - 0" 11' - 4"

47F

10 10 10 10

11 11 11 11

10 10 10 10

08 08 08 08

/8

/4

17' - 6" 8' - 6"

4' - 6"

3' - 0" 5' - 10"

44F

44F

42H44F

2' - 4" 8' - 3" 7' - 8" 7' - 8"

AE41113

AE411

36"x96"

WRAP TABLE

36"x96"

WRAP TABLE

"x

W R

A P

T A

B L E

72"Wx24"D WIRE

SHELVING RACK

RME TRAYS

"x

W R

A P

T

A B

L E

RME TRAYS

36"x96"

WRAP TABLE

24"x72"

ASSEMBLY

WORKSTATION

CEILING

SUSPENDED

COMPUTER WORK

STATION

B .1

W04

131 SF

OFFICE

B105

CR

MA

AE401

AE401

A1080

A5082

A5145 M0515

R7250

26 26

MA

MA

MA

MA

WORK STATIONS

REQUIRED POWER AND

DATA

BIOLOGICAL

INDICATORS

WORK COUNTER

/ STORAGE

CR

B .2

B .1

12' - 0"

2' - 6"

EXISTING BUMP IN WALL

25' - 4"

22' - 4" 11' - 3" 2' - 2 1/4"

A5220

E 201-7

41B

44F

EXTEND FLOORING

UNDER STERILIZERS

CR

D

COUNTER, WALL OR CEILING

SUSPENDED COMPUTER WORK

STATION

CARD READER ACCESS

KEY PAD ACCESS

MOTION SENSING ACTIVATORS,

WITH ADJUSTABLE SENSITIVITY

NETWORK DROP

EXISTING EXPANSION JOINT AT

WALLS AND CEILING

MA

KP

1-HR FIRE BARRIER

2-HR FIRE BARRIER

1. PROVIDE BLOCKING AS REQUIRED AT STUD WALLS FOR SUPPORT OF WALL MOUNTED ITEMS

AND/OR EQUIPMENT. FOR ALL LOCATIONS, SEE SPECIFICATIONS, ARCHITECTURAL AND

CONSULTANT DRAWINGS FOR LOCATIONS.

2. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL

NOTES AND OR INFORMATION

3. VERIFY CLEARANCES WITH MANUFACTURERS PRIOR TO INSTALLATION OF EQUIPMENT

4. PROVIDE AND INSTALL CORNER GUARDS AT ALL OUTSIDE CORNERS

5. FIELD VERIFY ALL DIMENSIONS AND REPORT DISCREPANCIES, IF ANY, TO ARCHITECT PRIOR TO

CONSTRUCTION

6. NEW WORK DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF STUD, CENTERLINE OF

STRUCTURAL COLUMNS, CENTERLINE OF OPENINGS, UNO

7. DIMENSIONS SHOWN ARE FROM FINISH FACE / OR OPENING TO FINISH FACE OF WALLS

8. DIMENSIONS NOTED WITH THE SUFFIX "CLR", "CLEAR", OR "MIN" ARE FROM FACE OF FINISH

INCLUDING TRIM WORK (UNO)

9. ALL DOORS NOT DIMENSIONS ARE LOCATED 6" TO AN INTERSECTING WALL OR CENTERED ON

WALL

10. PATCH AND REPAIR ALL NEW WALL REFILL TO MATCH SURROUNDING CONDITION

11. PROVIDE AND INSTALL NEW EXPANSIOM JOINT COVER PLATES AT ALL EXISTING EXPANSION

JOINT AT WALL AND CEILING, REFERENCE DETAILS AND

12. PROVIDE AND INSTALL NEW INTERIOR SIGNAGE WITHIN SCOPE OF WORK, REFERENCE SIGNAGE

PLAN FOR MORE INFORMATION

FIN TO FIN

/5 AE401 /6 AE401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE112

PARTIAL FLOOR PLAN - SOUTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 Checker Author

100% CD

SYMBOL LEGEND

GENERAL PLAN NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

PROJECT

NORTH

1/4" = 1'-0"1

PARTIAL BASEMENT PLAN - SOUTH

1941 SF

PREP AND PACK

B126513 SF

LOW TEMP

B130

02A

11111111

W04

B126.2

B108.1

B116A.1

2268 SF

DECONTAM

B116

STAINLESS STEEL PANEL

FLUSH WITH EQUIPMENT

FACE BELOW

2268 SF

DECONTAM

B116

2268 SF

DECONTAM

B116 1941 SF

PREP AND PACK

B126

P2000

IN-04.01-07

02B

15 16

DUPLEX

RECEPTACLE, TYP

STAINLESS STEEL PANEL

FLUSH WITH EQUIPMENT

FACE BELOW

M1801M1801 M18017

AE401

2268 SF

DECONTAM

B116

CONTINUE SS PANEL

TO CEILING

02A

20B

173 SF

DIRTY PROCESSING

B122

24" DEEP

COUNTER

281 SF

ENDO PROCESSING /

HIGH LEVEL

DISINFECTION

B123

24" DEEP

COUNTER

20B

02A

20A

194 SF

CLEAN SCOPE

STORAGE

B124

20B

194 SF

CLEAN SCOPE

STORAGE

B124

194 SF

CLEAN SCOPE

STORAGE

B124

194 SF

CLEAN SCOPE

STORAGE

B124

1941 SF

PREP AND PACK

B126

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

01 01

11 11 11 11

B108.1

521 202RR 202SS 202TT B126.2

CONTINUE SS PANEL TO CEILING

BIOLOGICAL INDICATORS

WORK COUNTER / STORAGE

POTENTIAL ILOCATION FOR

EMERGENCY EYE WASH

STATION

AUTOMATIC OPEN PUSH

PLATE

03 03

1941 SF

PREP AND PACK

B126

DIRTY SIDE

ACCESS PANEL

02A

/2

STAINLESS

STEEL TOP CAP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE411

INTERIOR ELEVATIONS

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 Checker Author

100% CD

1/4" = 1'-0"1

B116,B126,B130 - DECONTAM, PREP AND PACK, LOW TEMP NORTH ELEVATION

1/4" = 1'-0"2

B116 - DECONTAM EAST ELEVATION

1/4" = 1'-0"5

B116,B126,B - DECONTAM, PREP AND PACK SOUTH ELEVATION

1/4" = 1'-0"3

B116 - DECONTAM WEST ELEVATION

1/4" = 1'-0"6

B122 & B123 - NORTH ELEVATION

1/4" = 1'-0"9

B124 - EAST ELEVATION

1/4" = 1'-0"8

B124 - NORTH ELEVATION

1/4" = 1'-0"10

B124 - SOUTH ELEVATION

1/4" = 1'-0"11

B124 - WEST ELEVATION

1/4" = 1'-0"13

B126 - PREP AND PACK WEST ELEVATION

1/4" = 1'-0"12

B110 - STERILE/NON-STERILE EQUIP STORAGE - SOUTH ELEVATION

1/4" = 1'-0"14

B126 - EAST ELEVATION

1/4" = 1'-0"7

B116 - DECONTAM NORTH ELEVATION

A1067

PAINT AS

SCHEDULED

WAINSCOTT PER FINISH

SCHEDULE

COVE TILE BASE AS

SCHEDULED

BLOCKING

191 SF

FEMALE STAFF

TOILET / SHOWER

B119

PIPE WRAP

A1030

SOFFIT,

PAINT AS

SCHEDULED

A5075

A5020

A5082

FULL HEIGHT

SOLID SURFACE

COVE TILE BASE

CERAMIC TILE

PER SCHEDULE

PAINT PER SCHEDULE

A1067

PROVIDE PIPE

WRAP

A5082

A5205

A5110

FULL HEIGHT

SOLID SURFACE

COVE TILE

BASE

CERAMIC TILE

PER SCHEDULE

PAINT PER

SCHEDULE

BLOCKING

PHENOLIC FLOOR MOUNTED

TOILET COMPARTMENT

A5109

A5110

A5090

A5145 A5145

156 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B120

FULL HEIGHT

SOLID SURFACE

COVE TILE

BASE

CERAMIC TILE

PER SCHEDULE

PAINT PER

SCHEDULE PHENOLIC FLOOR MOUNTED

TOILET COMPARTMENT

BLOCKING

A5109

A5110

A5200

156 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B120

PAINT AS

SCHEDULED

WAINSCOTT PER FINISH

SCHEDULE

COVE TILE BASE AS

SCHEDULED

BLOCKING

PIPE WRAP

SOFFIT, PAINT

AS SCHEDULED

A5082

A5075

CLEAR ONODIZED

FINISH ALUMINUM

COVER PLATE, TYP :

CM-3

COVE TILE BASE

CERAMIC TILE

PER SCHEDULE

PAINT PER SCHEDULE

PAINT

SOFFIT

FULL HEIGHT

SOLID SURFACE

COVE TILE BASE

CERAMIC TILE

PER SCHEDULE

PAINT PER

SCHEDULE

BLOCKING

A5110

BLOCKING

A5109A5109

PAINT AS

SCHEDULED WAINSCOTT PER FINISH

SCHEDULE

COVE TILE BASE AS

SCHEDULED

BLOCKING

PIPE WRAP

A1067

URINAL DIVIDERA5082 A5075

A5020

PAINT AS

SCHEDULED

WAINSCOTT PER FINISH

SCHEDULE

COVE TILE BASE AS

SCHEDULED

BLOCKING

PIPE WRAP

FULL HEIGHT

SOLID SURFACE

COVE TILE

BASE

SOLID SURFACE

PER SCHEDULE

PAINT PER

SCHEDULE

BLOCKING

A1067

A5082 A5109

A5110

A5170

A5090

A5200

A5075

A1030

SOFFIT PAIN PER

SCHEDULE

COVE TILE BASE

CERAMIC TILE

PER SCHEDULE

PAINT PER

SCHEDULE

403 SF

BREAK

B127

A5082

R7250

K4465

K1552

A5075

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE412

INTERIOR ELEVATIONS

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 Checker Author

100% CD

1/2" = 1'-0"1

B119 - NORTH ELEVATION

1/2" = 1'-0"2

B119 - EAST ELEVATION

1/2" = 1'-0"3

B119 - SOUTH ELEVATION

1/2" = 1'-0"5

B120 - NORTH ELEVATION

1/2" = 1'-0"6

B120 - SOUTH ELEVATION

1/2" = 1'-0"7

B120 - WEST ELEVATION

1/2" = 1'-0"8

B128 - EAST ELEVATION

1/2" = 1'-0"9

B128 - WEST ELEVATION

1/2" = 1'-0"10

B129 - WEST ELEVATION

1/2" = 1'-0"11

B129 - EAST ELEVATION

1/2" = 1'-0"12

B117 BREAK ROOM ELEVATION - NORTH

2A

GLAZING

1A 2B

9" 9"

9" 9"

2C

9"9"

GLAZING

EQ EQ

1C1B

S E

E S

C H

E D

S E

E S

C H

E D

S E

E S

C H

E D

S E

E S

C H

E D

SEE SCHEDSEE SCHED SEE SCHED

S E

E S

C H

E D

SEE SCHED

4' - 0"

SEE SCHED

S E

E S

C H

E D

SEE SCHED

EQ EQ

9"4"

GLAZING

CAULK ALL

AROUND

ADJUSTABLE

ANCHOR

STANDARD FRAME

EXPOSED MASONRY OR BRICK

1/2"

S.F.T.U.

NOMINAL

CMU OR 1/2"

FRAMES IN MASONRY PARTITION

CASING BEAD

ADJUSTABLE

ANCHOR

STANDARD FRAME

MASONRY BLOCK PLASTERED

GROUT

5/8"

S.F.T.U.

NOMINAL

CMU OR 7/8"

PLASTER ON

METAL LATH

CAULK ALL

AROUND

GROUT

CERAMIC TILE

ADJUSTABLE

ANCHOR

STANDARD FRAME

MASONRY BLOCK WITH CERAMIC TILE FINISH

GROUT

SETTING BED

CAULK ALL

AROUND

1/2"

S.F.T.U.

NOMINAL

CMU OR 3/4"

*** FRAME WIDTH FOR NOMINAL MASONRY

4 3/4" W/ 4" CMU

6 3/4" W/ 6" CMU

8 3/4" W/ 8" CMU

METAL STUD AND PLASTER FINISH

FRAMES WITH METAL STUD

AND PLASTER PARTITIONS

GAUGE AS

SPECIFIED

ADD RETURN ON

FRAME WHERE

DRYWALL FINISH

IS REQUIRED

STANDARD DOOR FRAME

FRAMES IN METAL STUD PARTITIONS

CERAMIC TILE

FINISH WHERE

REQUIRED

CAULK ALL

AROUND BOTH

SIDES

STANDARD FRAME

FOR DRYWALL

JAMB ANCHORS

DOUBLE STUDS

BACK TO BACK

DRYWALL, THICKNESS

SINGLE OR DOUBLE AS

REQUIRED

FRAMES IN MASONRY PARTITION

FACED WITH GWB

STANDARD FRAME

ADJUSTABLE

ANCHORS

GROUT

CAULK ALL

AROUND

CERAMIC TILE

FINISH WHERE

REQUIRED

TILE FINISH

FRAME AT CONCRETE WALLS

DOUBLE EGRESS DOOR FRAME

PLAN

JAMB 'B'

HEAD 'A'

NOTE: SHOWING SWING OF

DOUBLE EGRESS DOORS

A B

C

A C

B

NOTE: SHOWING SWING OF

DOUBLE EGRESS DOORS

DOOR

DOOR

DOOR STOP (BEYOND)

PLATE WELDED

TO FRAME

/2

"2 1/2" MIN

+/- 1/4"

/4

7/8"

08 11 13-01

METAL STUDS

PER STD DTL 3/4"

1/4"

7/8"

08 11 13-01

MTL STUDS

PER STD DTL 11/16"

1/4"

1/4"

1/4"

CAULK ALL

AROUND

CASING BEAD

WHERE PLASTER

IS REQUIRED

CONCRETE

GROUT

VENEER

PLASTER ON

PLASTER BASE

TROWEL CUT

AT FRAME

EDGES

ANCHOR

STANDARD

FRAME

CONVENTIONAL

PLASTER

GYP LATH

CERAMIC TILE

CAULK BOTH

SIDES

ANCHOR

STANDARD

FRAME

CERAMIC TILE

GWB

CEMENT

BACKER BOARD

PIPE SEPARATORS

WELDED TO PLATE

F.H. CSK.

EXP. BOLT

THROAT OPENING = PARTITION

WIDTH + 1/8" MIN

1/2" 1/2"

/8

1 15/16"VARIESVARIES

A

PER SCHED

(FIXED)

P E

R E

L E

V P

E R

S C

H E

D

MTL DOOR

FRAME

SHIM AS

REQ'D

RUNNER

BETWEEN

STUDS

1/2"

CONST

JOINT

SEE NOTE 1

VERTICAL STUDS @ 2'-0" MAX. W/

GYPSUM WALL BOARD. 1'-4" W/ GYPSUM

LATH & PLASTER DOUBLE STUDS FOR

SUPPORTING CONC. BACKER BOARD

PROVIDE CONTINUOUS BRACING

WHEN STUDS EXCEED 10'-0" AND

ARE FINISHED BOTH SIDES

JAMB ANCHOR CLIPS 3 PER

SIDE - COORDINATE W/

HINGE REINFORCEMENT

NOTE 1: OMIT BRACE WHEN 'D' DIMENSION

IS LESS THAN 2'-0" FOR GYP. WALL BOARD

OR 16" FOR PLASTER PARTITION

ELEVATION AT DOOR FRAME

DETAIL D

JAMB ANCHORS

(FURNISHED W/ FRAME)

DETAIL C

FRAME FACE

MIN

US 3/16"

E Q

E Q

D

E Q

E Q

V A

R

IE

S S

E E

D O

O R

S C

H E

D

VARIES SEE DOOR SCHED

DETAIL B

A A

1/2" M

IN

5/8" M

AX

FRAME FACE

MIN

US 3/16"

/4

M

IN

STUD

W

IDTH

/4

M

IN

JAMB DEPTH

MINUS 3/16"

STUD

W

IDTH

1/2"

DETAIL D, TYP

M A

X

DETAIL B

PROVIDE SOUND

DEADENING WHERE

REQUIRED

/8

SECTION A

DOUBLE STUDS JAMB ANCHOR

GYPSUM WALL

BOARD PANELS

CONTROL JOINT2 1/8"

ISOMETRIC OF

CONSTRUCT JOINT

/4

M

IN

DETAIL C

SANITARY

STOP

MTL DOOR FRAME

MTL ANCHOR CLIP

SHIM AS

REQ'D

CRIPPLE STUD, DO NOT

ANCHOR TO BEARING STUD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-602

DOOR & WINDOW SCHEDULE &

TYPES, INTERIOR DOOR DETAILSSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 MK AK

100% CD

DOOR SCHEDULE

DOOR # ROOM NAME ROOM #

DOOR SIZE DOOR

TYPE HW

GLAZING

TYPE

FIRE

RATING

SOUND

RATING

MATERIAL

COMMENTSWIDTH HT THK DOOR FRAME

PENTHOUSE

T-13 EQUIPMENT T-13 3' - 0" 7' - 0" 0' - 1 3/4" 1A 5G - - - HM HM

SPS

B101.1 RME COOR / SPD SECRETARY B101 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G FR 90 MIN STC 45 HM HM

B104.1 OFFICE B104 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G T 45 MIN STC 45 HM HM

B104.2 OFFICE B104 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G FR 45 MIN STC 45 HM HM

B105.1 OFFICE B105 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G T 45 MIN STC 45 HM HM

B106.1 OFFICE B106 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G FR 45 MIN STC 45 HM HM

B106.2 OFFICE B106 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G FR 45 MIN STC 45 HM HM

B107.1 OFFICE B107 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G FR 45 MIN STC 45 HM HM

B107.2 OFFICE B107 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G T - STC 45 HM HM

B108.1 STERILIZATION COOL DOWN B108 3' - 6" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM MOTION SENSING ACTIVATORS

B110.1 STERILE/ NON-STERILE EQUIP STORAGE B110 6' - 0" 7' - 0" 0' - 1 3/4" 2C 8B FR - - HM HM DOUBLE DOOR. MOTION SENSING

ACTIVATORS

B110.2 STERILE/ NON-STERILE EQUIP STORAGE B110 3' - 6" 7' - 0" 0' - 1 3/4" 1A 2 - 45 MIN - HM HM

B110A.1 CLEAN HAC B110A 4' - 0" 7' - 0" 0' - 1 3/4" 1A 5D - - - HM HM

B111.1 IMPLANT B111 4' - 0" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM MOTION SENSING ACTIVATORS

B112.1 ANTE B112 3' - 6" 7' - 0" 0' - 1 3/4" 2A 4M FR 90 MIN - HM HM CARD READER ACCESS CONTROL

B112.2 ANTE B112 3' - 6" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM MOTION SENSING ACTIVATORS

B112.3 ANTE B112 3' - 6" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM MOTION SENSING ACTIVATORS

B114.1 RECEIVING / BREAKDOWN B114 4' - 0" 7' - 0" 0' - 1 3/4" 2B 4M FR 90 MIN - HM HM CARD READER ACCESS CONTROL

B114.2 RECEIVING / BREAKDOWN B114 3' - 0" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM

B115.1 COORD OFFICE B115 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G FR 90 MIN STC 45 HM HM

B115.2 COORD OFFICE B115 3' - 0" 7' - 0" 0' - 1 3/4" 2A 3G FR 45 MIN STC 45 HM HM

B116A.1 PRZ CLOSET B116A 5' - 0" 7' - 0" 0' - 1 3/4" 1C 11C - - - HM HM DOUBLE DOOR.

B116B.1 SUPPLY CLOSET B116B 3' - 0" 7' - 0" 0' - 1 3/4" 1A 5D - 90 MIN - HM HM

B117.1 DETERGENT B117 6' - 0" 7' - 0" 0' - 1 3/4" 1B 10B - 90 MIN - HM HM UNEVEN DOUBLE DOOR. KEY PAD

ACCESS CONTROL

B117.2 DETERGENT B117 3' - 0" 7' - 0" 0' - 1 3/4" 1A 4M - - - HM HM

B118.1 HAC B118 3' - 0" 7' - 0" 0' - 1 3/4" 1A 5D - - - HM HM

B119.1 FEMALE STAFF TOILET / SHOWER B119 3' - 0" 7' - 0" 0' - 1 3/4" 1A 4B - - STC 45 HM HM

B120.1 MALE STAFF TOILET / LOCKER / SHOWER B120 3' - 0" 7' - 0" 0' - 1 3/4" 1A 4B - - STC 45 HM HM

B121.1 SOILED ANTE B121 3' - 6" 7' - 0" 0' - 1 3/4" 2A 4M FR 90 MIN - HM HM CARD READER ACCESS CONTROL

B121.2 DECONTAM B116 3' - 6" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM MOTION SENSING ACTIVATORS

B122.1 DIRTY PROCESSING B122 3' - 6" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM MOTION SENSING ACTIVATORS

B124.1 CLEAN SCOPE STORAGE B124 3' - 6" 7' - 0" 0' - 1 3/4" 2A 4M FR 90 MIN - HM HM CARD READER ACCESS CONTROL

B125.1 CLEAN ANTE B125 3' - 6" 7' - 0" 0' - 1 3/4" 2A 4M FR 90 MIN - HM HM CARD READER ACCESS CONTROL

B126.1 CLEAN ANTE B125 3' - 6" 7' - 0" 0' - 1 3/4" 2B 1 T - - HM HM

B126.2 PREP AND PACK B126 5' - 0" 7' - 0" 0' - 1 3/4" 2C 8B T - - HM HM DOUBLE DOOR. MOTION SENSING

ACTIVATORS

B127.1 BREAK B127 3' - 0" 7' - 0" 0' - 1 3/4" 2A 4M T - - HM HM CARD READER ACCESS CONTROL

B127.2 BREAK B127 3' - 0" 7' - 0" 0' - 1 3/4" 2B 1 FR 45 MIN - HM HM

B128.1 MALE STAFF TOILET / LOCKER / SHOWER B128 3' - 0" 7' - 0" 0' - 1 3/4" 1A 4B - - STC 45 HM HM

B129.1 FEMALE STAFF TOILET / LOCKER /

SHOWER

B129 3' - 0" 7' - 0" 0' - 1 3/4" 1A 4B - - STC 45 HM HM

TEMPORARY SITE

TS102 STORAGE TS102 3' - 6" 7' - 0" 0' - 1 3/4" 1A 5G - - - HM HM

1/4" = 1'-0"1

DOOR TYPES

3" = 1'-0"2

INTERIOR DOOR AND FRAME DETAILS

WINDOW SCHEDULE

# WIDTH HEIGHT TYPE

FIRE

RATING GLAZING COMMENTS

W04 4' - 0" 4' - 0" A 45 MINUTE FR

W05 3' - 0" 6' - 0" A FR

1/4" = 1'-0"5

WINDOW TYPES

GENERAL NOTESGENERAL NOTES

1. SEE SPECIFICATION SECTION 08 71 00 - DOOR HARDWARE

FOR HW SETS.

3/4" = 1'-0"3

PARTITION FRAMING FOR DOORS

Sheets
AE111 - PARTIAL FLOOR PLAN - NORTH
AE112 - PARTIAL FLOOR PLAN - SOUTH
AE411 - INTERIOR ELEVATIONS
AE412 - INTERIOR ELEVATIONS
A-602 - DOOR & WINDOW SCHEDULE & TYPES, INTERIOR DOOR DETAILS

File details come from the government source that posted it. Updated .