Attachment 13 Drawings 10 of 11 Electrical 3 of 3.pdf
PDF 13 MB Posted
- Attached to
- Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
- Solicitation number
- 36C26023R0021
About this file
This document provides details for a federal solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20. The solicitation, numbered 36C26023R0021, seeks proposals for upgrades to the SPS OM system under the contract name Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation. Responses are due by the date specified in the solicitation. The opportunity type is listed as a solicitation. The attached file is a technical drawing numbered 10 of 11 for the electrical specifications. No other salient details regarding the required products, services, pricing, or response timeline are provided in this document.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
SE
38-0
NW
SE
0-0
NE
421'-9"
S143-3
201-0
SE
76-0
SE
114-0
SE
152-0
SE
190-0
SE
179-4
NW
14-9
NE
380-0
NE
342-0
NE
304-0
NW
3-6
SE
152-10
201-1
1 1
AREA OF WORK
1 1 1
1 1
1 1 1
1 1
5 5
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3
3 3 3
3 3 3
3 3 3
3 3
3 3
3 3 3 3
3 3 3
3 3
3 3
3 3 3
3 3
3 3 3
3 3
3 3
3 3 3
3 3
D & T NORTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORE
NORTH
CENTRAL CORE
SOUTH
CENTRAL CORECENTRAL CORE
116 SF
CONTAINMENT ROOM
BD-100C
641 SF
OFFICE
BD-104D
179 SF
OFFICE
BD-100
169 SF
COMMON SPACE
594 SF
SOILED RECEIVING /
DECONTAMINATION
BD-100F
74 SF
HAC
BD-100A
149 SF
CART WASH
BA-100D
2536 SF
STERILE STORAGE
BD-104B
96 SF
HAC
BD-104C
159 SF
M TOILET
BD-101
3089 SF
NON-STERILE
STORAGE
BD-104
225 SF
M TOILET
BD-103
94 SF
HAC
BD-103A303 SF
BREAK ROOM
BD-112D
206 SF
OFFICE
BD-112C
204 SF
OFFICE
BD-112B
120 SF
OFFICE
BD-112A
226 SF
OFFICE
BD-112
999 SF
CORRIDOR
CB-14
1606 SF
MECHANICAL #3
BD-111
370 SF
CORRIDOR
CB-12
338 SF
CONFERENCE
BD-113
157 SF
SPD CORRIDOR
CB-18B 1273 SF
EDUCATION LAB
BD-152
90 SF
MACHINE
BD-104E
147 SF
BD-149J
141 SF
OFFICE
BD-149H
176 SF
OFFICE
BD-149G
224 SF
SUPERVISOR OFFICE
BD-143F
221 SF
STAFF
BD-143E
173 SF
STAIR #1
BA-S01
172 SF
OFFICE
BD-149F
299 SF
OFFICE
BA-102I 99 SF
OFFICE
BA-102J
135 SF
OFFICE
BA-103
145 SF
OFFICE
BA-103A
283 SF
MALE
LOCKERS/TOILET
BA-106
538 SF
CORRIDOR
CB-10
124 SF
ELECTRICAL
BD-110
18 SF
SIGNAL
BD-110B
20 SF
TELE
BD-110A
44 SF
VESTIBULE
BD-110C
C O
M M
O N
S
PA
C E
576 SF
OUTPATIENT LOBBY
CB-15A
2895 SF
DISTRIBUTION
BD-143D
977 SF
579 SF
CORRIDOR
CB-15
456 SF
CORRIDOR
CB-16
ELEV #10
ELEV #9
ELEV #6
ELEV #5
363 SF
STAFF ELEV LOBBY
CB-16A
554 SF
BULK STORAGE
BD-105A 389 SF
MAILROOM
BD-105
1117 SF
DRY STORAGE
BA-104
313 SF
STAFF LOUNGE
BA-102L
300 SF
FOOD SERVICE
BD-100I
6671 SF
SUPPLY WAREHOUSE
BD-106
307 SF
FEMALE LOCKERS /
TOILET
BA-105
3991 SF
KITCHEN
BA-102
1731 SF
LOADING DOCK
BD-107
143 SF
F TOILET
BD-103D
214 SF
F TOILET
BD-103C
467 SF
CORRIDOR
CB-8
647 SF
CORRIDOR
CB-9
169 SF
STAIR
BD-103K
EXISTING LUMINAIRE TO BE DEMOLISHED.1
SCALE : 1/8" = 1'-0"
OVERALL LIGHTING DEMOLITION PLAN1
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY LIGHTING
AND LIGHTING CONTROL EQUIPMENT AND CIRCUITRY AS
REQUIRED. ALL CIRCUITS TO BE DEMOLISHED SHALL BE
DEMOLISHED BACK TO ITS SOURCE. ALL RACEWAYS
FEEDING THE SPS AREA SHALL BE DEMOLISHED IN
THEIR ENTIRETY.
1 TYP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ED101
OVERALL LIGHTING DEMOLITION
PLANSPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
100% CD
Revisions: Date:
PROJECT
NORTH
0 4' 8' 16'
641 SF
OFFICE
BD-104D
178 SF
OFFICE
BD-100
170 SF
COMMON SPACE
592 SF
SOILED RECEIVING
/DECONTAMINATION
BD-100F
74 SF
HAC
BD-100A
149 SF
CART WASH
BA-100D
2538 SF
STERILE STORAGE
BD-104B
96 SF
HAC
BD-104C
159 SF
M TOILET
BD-101
116 SF
CONTAINMENT ROOM
BD-100C
3089 SF
NON-STERILE
STORAGE
BD-104
226 SF
MALE TOILET
BD-103
94 SF
HAC
BD-103A
304 SF
BREAK ROOM
BD-112D
206 SF
OFFICE
BD-112C
204 SF
OFFICE
BD-112B
120 SF
OFFICE
BD-112A
226 SF
OFFICE
BD-112
999 SF
CORRIDOR
CB-14
1606 SF
MECHANICAL ROOM
#3
BD-111
370 SF
CORRIDOR
CB-12
338 SF
CONFERENCE
BD-113
157 SF
SPD CORRIDOR
CB-18B 871 SF
EDUCATION LAB
BD-152
138 SF
MACHINE ROOM
BD-104E
72 SF
PASSAGE
BD-151F
92 SF
M LOCKER
BD-151C
34 SF
F TOILET
BD-151D
401 SF
RESIDENT CUBICLES
BD-151
468 SF
CORRIDOR
CB-22
147 SF
OFFICE
BD-149J
141 SF
OFFICE
BD-149H
176 SF
OFFICE
BD-149G
224 SF
SUPERVISOR OFFICE
BD-143F
221 SF
STAFF
BD-143E
173 SF
STAIR #1
BA-S01
172 SF
OFFICE
BD-149F
573 SF
PASSAGE
BD-149J
170 SF
OFFICE
BD-149E
299 SF
OFFICE
BA-102I
99 SF
OFFICE
BA-102J
135 SF
OFFICE
BA-103
152 SF
OFFICE
BA-103A
283 SF
MALE
LOCKERS/TOILET
BA-106
538 SF
CORRIDOR
CB-10
124 SF
ELECTRICAL
BD-110
18 SF
SIGNAL
BD-110B
20 SF
TELE
BD-110A
44 SF
VESTIBULE
BD-110C
141 SF
COMMON SPACE
576 SF
OUTPATIENT LOBBY
CB-15A
761 SF
CORRIDOR
CB-13
320 SF
BD-149
89 SF
F LOCKER
BD-151E
46 SF
M TOILET
BD-151B
2895 SF
DISTRIBUTION
BD-143D 983 SF
CORRIDOR
CB-17
579 SF
CORRIDOR
CB-15
456 SF
CORRIDOR
CB-16
106 SF
ELEV #10
87 SF
ELEV #9
116 SF
ELEV #6
96 SF
ELEV #5
359 SF
STAFF ELEV LOBBY
CB-16A
554 SF
BULK STORAGE
BD-105A 389 SF
MAILROOM
BD-105
1117 SF
DRY STORAGE
BA-104
313 SF
STAFF LOUNGE
BA-102L
300 SF
FOOD SERVICE
BD-100I
6671 SF
SUPPLY WAREHOUSE
BD-106
307 SF
FEMALE LOCKERS /
TOILET
BA-105
3991 SF
KITCHEN
BA-102
1731 SF
LOADING DOCK
BD-107
143 SF
Room
BD-103D
214 SF
FEMALE TOILET
BD-103C
1434 SF
CORRIDOR
CB-7
466 SF
CORRIDOR
CB-8
647 SF
CORRIDOR
CB-9
169 SF
Room
BD-103K
M A
TC
H
L
IN
E
MATCH LINE
UP
SE
38'-0"
NW
SE
0'-0"
NE
421'-9"
S 176'-7"
S143'-3"
S 128'-9"
E 146'-6"
E 197'-4"
E 201'-0"
S 120'-0"
SE
76-0
SE
114-0
SE
152-0
SE
190-0
SE
179-4
NW
14-9
NE
380-0
NE
342-0
NE
304-0
NE
266-0
NW
3-6
SE
152-10
NE
383'-9"
E 201-1
AREA OF WORK
WT
WT
W T
WT WT
WT
WTWT
WT
WT
WT
WT WT WT
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
4 4 2 2
T
T
TW
P
T
P
P
VACUUM TUBE EQUIPMENT
DUMBWAITER
W R
W R P
P
P
CART WASHER
DECONTAMINATION100A
CENSITAK WASHERS
P
P
P
W R
S
S S
S
S
P
P
CC
C
C
C
T
W
AP2
WT
T C
WAP
WAP
T
T
P
P T
P W R
S
T
WT
WAP
S
S
S
S
AC-11
EF-11X
QMCC-B2
NMCC-B3
AREA OF WORK
BDN3
PBN4
LTCP 3/11
MER 3CP
CCP 3/0
MER 3 DGP
EF-44
EF-11
CONDENSATE
PUMPS CP-6
FAN COIL
HEAT TRANSFER
MODULE
D & T NORTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORE
NORTH
CENTRAL CORE
SOUTH
CENTRAL CORECENTRAL CORE
ETHYLENE OXIDE DEVICE.1
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN.
CONTRACTOR SHALL FIELD VERIFY ALL POWER, DATA,
SIGNAL EQUIPMENT AND CIRCUITRY AS REQUIRED. ALL
CIRCUITS AND RACEWAYS TO BE DEMOLISHED SHALL BE
DEMOLISHED BACK TO ITS SOURCE.
SCALE : 1/8" = 1'-0"
OVERALL POWER AND SPECIAL SYSTEMS DEMOLITION PLAN1
0 4' 8' 16'
TR
UE
NO
RT
H
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
E-401
E-401
E-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ED102
OVERALL POWER AND SPECIAL
SYSTEMS DEMOLITION PLANSPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
100% CD
Revisions: Date:
38-0
NW
SE
0-0
S 176-7
S143-3
E 197-4
SE
76-0
NW
14-9
NE
380-0
NE
380-0
NE
342-0
NE
304-0
NW
3-6
NE
383'-9"
E 201-1
90 SF
MACHINE
B109
2151 SF
STERILE/
NON-STERILE EQUIP
STORAGE
B110
64 SF
CLEAN HAC
B110A
194 SF
CLEAN SCOPE
STORAGE
B124
281 SF
ENDO PROCESSING /
HIGH LEVEL
DISINFECTION
B123
173 SF
DIRTY PROCESSING
B122
151 SF
SOILED ANTE
B121
191 SF
FEMALE STAFF
TOILET / SHOWER
B119
75 SF
HAC
B118
182 SF
COORD OFFICE
B115
202 SF
RECEIVING /
BREAKDOWN
B114
2151 SF
STERILE/
NON-STERILE EQUIP
STORAGE
B110
156 SF
MALE STAFF TOILET /
LOCKER / SHOWER
B120
197 SF
DETERGENT
B117
12 SF
PRZ CLOSET
B116A
2303 SF
DECONTAM
B116
1952 SF
PREP AND PACK
B126
SUPPLY CLOSET
116 SF
ANTE
B112
264 SF
IMPLANT
B111
SE
76-0
NE
380-0
NE
342-0
AC
AC
G25
G25
G25E
G25
G25
G25E
G3E
G3
G5 G5E
G26E
G3
G5
G5E
G5
G5G5
G5G5
G5
G5
G5E
G5
G5G5E
G5
G5
G5
G5E
G5
G5E
G5E
G3E
G3G3E
G3
G24G3E
G3
G3E
G26E
G26E
G26E
G26E
G26
G26E
G26EG26G26E
G26G26EG26
G26E
G26G5E
G5
G5E
G5E
G5
G5E G5
G5
G5
G3E G3E
G3
G3E
G3
G3
G3
G3
G3E
G3 G3E
G3
D2E
D2
WS1
D2
D2
D2
D2
WS1
D2E
D2
D2
D2
3 3
OS
OS
OS
OS
1 43
L1e
L1a L1a
L1b L1b
L1c L1c
L1d L1d
G5E
G25
G25
L1f L1f L1e
G5E
X
X
X
X
X
X
X
X
X
X f e
BDE4-1
BDE4-1
BDE4-1
BDE4-2
BDE4-2
BDE4-2
BDE4-1
BDE4-1
BDE4-1
BDE4-3
BDE4-1
BDE4-3
BDE4-3
BDE4-3
BDE4-3 BDE4-3
BDE4-3
BDE4-3
BDE4-4
BDE4-4
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-4
BDE4-2
BDE4-2
BDE4-4
BDE4-4
BDE4-4
BDE4-4
BDE4-4BDE4-4
BDE4-4
BDE4-4
BDE4-4
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-3BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-3
BDE4-3BDE4-3
BDE4-3
BDE4-3BDE4-3
BDE4-3
BDE4-2
BDE4-4 BDE4-4
BDE4-4 BDE4-4
BDE4-4 BDE4-4
BDE4-4 BDE4-4
BDE4-2 BDE4-2 BDE4-2
BDE4-4
BDE4-4
BDE4-4
BDE4-4
BDE4-4
BDE4-4
BDE4-4 BDE4-4 BDE4-4
BDE4-4 BDE4-4
BDE4-4
BDE4-4
BDE4-2
BDE4-2 BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-4
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-4
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-2
BDE4-3
BDE4-3
BDE4-4
BDE4-2BDE4-2
BDE4-2
a b c d
4 4
OS
OS
G5
BDE4-3
AREA OF WORK
BDE4-1
E-501 TYP.
E-501 TYP.
BDE4-2
OS
G24E
BDE4-2
OS
OS
X
BDE4-2
OS
G3E
BDE4-2
G26
G26G26G26G26G26G26
G26 G26 G26 G26
G26
G26
G26
G26
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
CENTRAL CORE
NORTH
D & T NORTH
CENTRAL CORE
SOUTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORECENTRAL CORE
-1
1. -
SCALE : 1/4" = 1'-0"
LIGHTING PLAN - NORTH1
0 4' 8' 16'
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
M A
TC
H
LI
N E
TO
S
H
EE
L
EL
M A
TC
H
LI
N E
TO
S
H
EE
L
EL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EL101
LIGHTING PLAN - NORTH
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
100% CD
Revisions: Date:
PROJECT
3 3
DW
513 SF
LOW TEMP
B130
1381 SF
STERILIZATION
COOL DOWN
B108
151 SF
OFFICE
B106 138 SF
MACHINE
ROOM
B109
404 SF
BREAK ROOM
B127
179 SF
FEMALE
STAFF
TOILET/LOCKER
/SHOWER
B129
55 SF
CLEAN ANTE
ROOM
B125
241 SF
OFFICE
B104
128 SF
OFFICE
B107
189 SF
MALE STAFF
TOILET/
LOCKER/SHOWER
B128
1953 SF
PREP AND
PACK
B126
131 SF
OFFICE
B105
INE ROOM
B109
PREP AND PACK
B126
622 SF
CORR
CB-18B
124 SF
ELECTRICAL
CB15K
141 SF
COMMON
SPACE
18 SF
SIGNAL
BD-110B
VESTIBULE
BD-110A
20 SF
TELE
BD-110A
169 SF
STAIR
AREA OF WORK
G5
G5E
G5E
G5G5E
G3E
G5E
G3
G5
G3E
G5
G5
G5E
G5E
G22
G22E
G22
G22
G22E
G22
G22E
G22 G22 G22
G22
G5EG5G5E
G5G5EG5
G5EG5G5E
G5G5EG5
G5E
G5
G5E
G5
G5E
G5
G5E
G5
G5E
G5
G5E
G5
D2
D2
D2D2
D2
D2EWS1
G25G25
D2 D2
D2
D2E
WS1
D2
G3E
D2
1 1
OS
OS
OS
OS
1 1 1
1 1
1 1
1 1
5 5
X
X
X
BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-3BDE4-3
BDE4-3
BDE4-3 BDE4-3 BDE4-3
BDE4-1
BDE4-1BDE4-1
BDE4-1
BDE4-1BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1BDE4-1
BDE4-1
BDE4-1BDE4-1
BDE4-1BDE4-1
BDE4-1 BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-3 BDE4-3
BDE4-3
BDE4-3 BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-3
BDE4-1 BDE4-1
BDE4-1
BDE4-1 BDE4-1
BDE4-1 BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-1
BDE4-3
BDE4-3
BDE4-1
BDE4-3
BDE4-3
BDE4-3BDE4-3
BDE4-3
X
X
BDE4-1
BDE4-1
G22
G22
G22E
G22
G22
BDE4-3
BDE4-3 BDE4-3
BDE4-3
G22
G22
BDE4-3
BDE4-3
1606 SF
MECHANICAL
ROOM #3
BD-111
D2
BDE4-1
X
BDE4-3
G5
BDE4-3
3 1
OS
OS
BDE4-3
G25E
BDE4-1
G25
BDE4-1
OS OS
G25
BDE4-1
G25
BDE4-1
G25
BDE4-1
X
BDE4-1
X
BDE4-3
TYP.
TYP. 2
TYP.
E-501
E-502
E-501
OS
OS
OS
OS
OS
OS
OS
OSOSOS
OS
TYP.
CENTRAL CORE
NORTH
D & T NORTH
CENTRAL CORE
SOUTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORECENTRAL CORE
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
SPS
SWING
SPACE
WAREHOUSE
NE
380-0
NE
342-0
NE
304-0
COORDINATE EXISTING LIGHTING DURING THE DEMOLITION OF EQUIPMENT IN
THE MECHANICAL ROOM. RELOCATE EXISTING LIGHTING AS REQUIRED TO NOT
INTERFERE WITH NEW EQUIPMENT.
1. -
SCALE : 1/4" = 1'-0"
LIGHTING PLAN - SOUTH1
0 4' 8' 16'
TR
UE
SO
UT
H
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
M A
TC
H
LI
N E
TO
S
H
EE
L
EL
M A
TC
H
LI
N E
TO
S
H
EE
L
EL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EL102
LIGHTING PLAN - SOUTH
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
38-0
NW
SE
0-0
S 176-7
S143-3
E 197-4
SE
76-0
NW
14-9
NE
380-0
NW
3-6
NE
383'-9"
E 201-1
90 SF
MACHINE
B109
2151 SF
STERILE/
NON-STERILE EQUIP
STORAGE
B110
64 SF
CLEAN HAC
B110A
194 SF
CLEAN SCOPE
STORAGE
B124
281 SF
ENDO PROCESSING /
HIGH LEVEL
DISINFECTION
B123 173 SF
DIRTY PROCESSING
B122
151 SF
SOILED ANTE
B121
191 SF
FEMALE STAFF
TOILET / SHOWER
B119
75 SF
HAC
B118
182 SF
COORD OFFICE
B115
202 SF
RECEIVING /
BREAKDOWN
B114
2151 SF
STERILE/
NON-STERILE EQUIP
STORAGE
B110
156 SF
MALE STAFF TOILET /
LOCKER / SHOWER
B120
197 SF
DETERGENT
B117
12 SF
PRZ CLOSET
B116A
2303 SF
DECONTAM
B116
1952 SF
PREP AND PACK
B126
SUPPLY CLOSET
116 SF
ANTE
B112
264 SF
IMPLANT
B111
48"AFF
48"AFF
48"AFF
A
EQ13
EQ15
EQ01
EQ4
EQ4
EQ4
EQ5
EQ5
EQ07 6
7 7
EQ16
EQ18
EQ19
12EQ20A
EQ20B
EQ20B
EQ20B
48"AFF
48"AFFEQ02
BDN2.1-3
E
EQ15 8
E
EQ15 8
EQ15
E
E
E E
BDQ4-1,3,5
BDQ4-8,10,12
PBN4-13,15,17
PBN4-31,33,35
PBN4-19,21,23
PBD4-1,3,5
BDQ2-17,19,21
BDQ2-12BDN2.1-1
BDQ2-9,11,13
BDQ2-30,32,34
BDN2.1-21,23,25
BDN2.1-15,17,19
BDQ2-12
BDQ2-12
BDN2.1-4
BDQ2-28
BDN2.1-40
BDN2.1-40
BDN2.1-30
BDN2.1-40
BDN2.1-32
BDN2.1-32
BDN2.1-32
BDN2.1-28
BDN2.1-28
BDN2.1-26
BDN2.1-34
BDN2.1-36
BDN2.1-36
BDN2.1-36BDN2.1-36BDN2.1-36
BDN2.1-26 BDN2.1-26
BDN2.1-38
BDN2.1-38
BDN2.1-38BDN2.1-24
BDN2.1-36
BDN2.2-59
BDN2.2-57
BDN2.2-55
BDN2.2-53
BDN2.2-49
BDN2.2-49
BDN2.2-51
BDN2.2-45
BDN2.2-45
BDN2.2-43
BDN2.2-43
BDN2.2-43
BDN2.2-43
BDN2.1-28
BDN2.2-43
BDN2.1-28
BDN2.2-45BDN2.2-49
BDN2.2-45
BDN2.1-28 BDN2.1-28
BDN2.2-20
BDN2.2-45
BDN2.2-45BDN2.2-49
BDN2.2-49
EQ13
BDN2.2-43
BDN2.1-24
BDN2.1-24
BDN2.1-22
BDN2.1-22
BDN2.2-47
BDN2.2-47
BDN2.2-47
BDN2.2-47
BDN2.2-47
EQ02
BDN2.1-1
EQ02
BDQ2-7
EQ02
BDQ2-5
EQ02
BDN2.1-7 EQ02
BDN2.1-5
BDQ2-8,10 BDN2.1-39,41
AREA OF WORK
BDN2.1-26
EQ8
BDN2.1-26
EQ8
BDN2.1-32
EQ8
BDN2.1-32
EQ8
EQ8 EQ8
EQ8
BDN2.1-42
BDN2.1-42
BDN2.1-42
BDN2.1-42
W
R W
R W
R W
R W
R W
R W
R
R W
TP-1
BDN3-15
W R W R
TP-1
BDN3-17
TP-1
BDN3-19
TP-1
BDN3-13
TP-1
BDN3-9
TP-1
BDN3-7
TP-1
BDN3-11
TP-1
BDN3-5
TP-1
BDN3-3
TP-1
BDN3-1
BDN2.1-2
EQ17A
BDN2.1-2
EQ17A
EQ17A
BDN2.1-2
EQ17A
BDN2.1-2
WRWR
WR WR
WR
WR
BDQ2-33 BDQ2-33
EQ8
BDQ2-31 BDQ2-31
BDQ2-12
EQ01
BDQ4-1,3,5
BDN2.1-2
EQ17A
A
CENTRAL CORE
NORTH
D & T NORTH
CENTRAL CORE
SOUTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORECENTRAL CORE
PREP AND PACK WORK STATION.
AUTOMATIC DOOR OPENER WITH PUSH BUTTONS. COORDINATE INSTALLATION
DOOR AND AUTOMATIC DOOR OPERATOR MANUFACTURER AS REQUIRED.
CIRCUIT ALL DOOR OPERATORS TO PANELBOARD BDN3; REFERENCE PANEL
SCHEDULE ON SHEET E-605 FOR ADDITIONAL INFORMATION.
CART AND UTENSIL DISINFECTOR.
WASHER/DISINFECTOR .
SCOPE CABINET, QTY = 5. ALL SCOPE CABINET RECEPTACLES TO BE MOUNTED
96"AFF.
MOTORIZED RETURN CONVEYOR SYSTEM.
WASHER/DISINFECTOR, ENDOSCOPE.
SONIC IRRIGATOR.
ULTRASONIC IRRIGATOR.
TEE PROBE DISINFECTOR.
DRYING CABINET PASS-THROUGH.
AUTOMATED PASS-THROUGH WINDOW TYPE 1.
AUTOMATED PASS-THROUGH WINDOW TYPE 2.
WIREMOLD, SIMPLEX RECEPTACLE EVERY 12".
ALL AUTOMATIC LAVATORIES SHALL BE HARDWIRED TO A REMOTE MOUNTED
120V - 24V TRANSFORMER. TRANSFORMER SHALL BE LOCATED IN ACCESSIBLE
CEILING SPACE. COORDINATE WITH PLUMBING AS REQUIRED. ALL LAVATORIES
SHALL BE CIRCUITED TO PANEL "BDN3"; REFERENCE PANEL SCHEDULE ON
SHEET E-605 FOR ADDITIONAL INFORMATION.
DENTAL CLEANING UNIT. UTILIZE ADJACENT RECEPTACLE FOR POWER.
PANELBOARD "BDN3".
1. REFERENCE EQUIPMENT SCHEDULE FOR ADDITIONAL EQUIPMENT
INFORMATION.
2. NOTE ALL EQUIPMENT MAY BE SHOWN FOR CLARITY. REFERENCE
ARCHITECTURAL AND MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.
SCALE : 1/4" = 1'-0"
POWER PLAN - NORTH1
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
M A
TC
H
LI
N E
TO
S
H
EE
P
EP
M A
TC
H
LI
N E
TO
S
H
EE
P
EP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EP101
POWER PLAN - NORTH
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
100% CD
Revisions: Date:
PROJECT
0 4' 8' 16'
DW
76-0
SE
114-0
SE
152-0
SE
179-4
SE
152-10
151 SF
OFFICE
B106
128 SF
OFFICE
B107
1391 SF
STERILIZATION COOL
DOWN
B108
241 SF
OFFICE
B104
513 SF
LOW TEMP
B130
174 SF
FEMALE STAFF
TOILET / LOCKER /
SHOWER
B129
403 SF
BREAK
B127
177 SF
MALE STAFF TOILET /
LOCKER / SHOWER
B128
CLEAN ANTE
1952 SF
PREP AND PACK
B126
131 SF
OFFICE
B105
138 SF
MACHINE ROOM
PREP AND PACK
B126
CLEAN ANTE
AREA OF WORK
E-402
A
A A A
QMCC-B2
NMCC-B3
E-402
E-402
EQ9
EQ9
EQ9
EQ8 EQ8 EQ8 EQ8
3EQ11 EQ11 EQ11 EQ11
USB
USB
48"AFF
EQ8 EQ8 EQ8 EQ8
3 3 3
TP-1
BDQ4-8,10,12 BDQ4-14,16,18 PBN4-2,4,6 PBN4-8,10,12
BDN3-27
BDN2.1-38
BDN2.1-18
BDN2.1-18
BDN2.1-18 BDN2.1-18
BDN2.1-18
BDN2.1-18
BDN2.1-16
BDN2.1-16
BDN2.1-16
BDN2.1-16
BDN2.1-16
BDN2.1-16
BDN2.1-14
BDN2.1-14
BDN2.1-14
BDN2.1-14
BDN2.1-12
BDN2.1-10 BDN2.1-10
BDN2.1-12
BDN2.1-10
BDN2.1-33,35,37
BDN2.1-27,29,31
BDQ2-22,24,26
BDN2.1-11 BDN2.1-11 BDN2.1-9 BDN2.1-9 BDQ2-37BDQ2-37 BDQ2-35BDQ2-35
BDN2.2-20BDN2.2-20BDN2.2-20
BDN2.1-22
BDN2.1-22
BDN2.2-20
BDN2.2-20
BDN2.2-20
BDN3-8
BDN3-8
BDN3-8
K4665
BDN3-41
BDN3-8K1552
BDN3-39
BDN3-6
BDN2.2-23
BDN2.1-22
BDN2.1-13
EQ8
BDN2.1-13
EQ8
5 5 5
DW-1
BDN3-37
BDN3-2
BDN3-2
BDN3-4 BDN3-4 BDN3-4
R7250
TP-1
BND3-21
TP-1
BND3-25
MECHANICAL
ROOM #3
BD-111
S
EF-11
QMCCB2
EF-11A
QMCCB2
AC-11
QMCCB2
FC-1
BDQ2-1
ACP-1
QMCCB2
P-1
BDQ2-6
P-2
BDQ2-6
TP - 1
BND3-23
C
C C C
C
ACP-1 DRYER
BDQ2-16
RO-1
QMCCB2
RO-1
BDQ2-18
RO-1
BDQ2-20
CENTRAL CORE
NORTH
D & T NORTH
CENTRAL CORE
SOUTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORECENTRAL CORE ELECTRICAL RM
CB15K
TELECOM RM
BD-110
NE
380-0
PREP AND PACK WORK STATION.
SMALL STEAM STERILIZER.
STEAM STERILIZER.
AUTOMATIC DOOR OPENER WITH PUSH BUTTONS. COORDINATE INSTALLATION
DOOR AND AUTOMATIC DOOR OPERATOR MANUFACTURER AS REQUIRED.
CIRCUIT ALL DOOR OPERATORS TO PANELBOARD BDN3; REFERENCE PANEL
SCHEDULE ON SHEET E-605 FOR ADDITIONAL INFORMATION.
CEILING SUSPENDED COMPUTER WORK STATION. PROVIDE POWER AND DATA
CORD DROPS AS SHOWN ON POWER AND TELECOMMUNICATIONS PLANS.
ALL AUTOMATIC LAVATORIES SHALL BE HARDWIRED TO A REMOTE MOUNTED
120V - 24V TRANSFORMER. TRANSFORMER SHALL BE LOCATED IN ACCESSIBLE
CEILING SPACE. COORDINATE WITH PLUMBING AS REQUIRED. ALL LAVATORIES
SHALL BE CIRCUITED TO PANEL "BDN3"; REFERENCE PANEL SCHEDULE ON
SHEET E-605 FOR ADDITIONAL INFORMATION.
PANELBOARD "PBN4".
1. REFERENCE EQUIPMENT SCHEDULE FOR ADDITIONAL EQUIPMENT
INFORMATION.
2. NOT ALL EQUIPMENT MAY BE SHOWN FOR CLARITY, REFERENCE
ARCHITECTURAL AND MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.
SCALE : 1/4" = 1'-0"
POWER PLAN - SOUTH1
0 4' 8' 16'
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
M A
TC
H
LI
N E
TO
S
H
EE
P
EP
M A
TC
H
LI
N E
TO
S
H
EE
P
EP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EP102
POWER PLAN - SOUTH
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
100% CD
Revisions: Date:
D & T NORTH
NURSING
TOWER
AREA SHOWN
WAREHOUSE
CORRIDOR
CB-13
STOREKEEPER
OFFICE
BD-106A
VALILT
BD-106B
SLIPPLY
WAREHOUSE
BD-106
CORRIDOR
CB-14
MECHANICAL
BD-109
CORRIDOR
CB-15
6"Ø
PAC-1
PAC-2
BDQ2-39
BDQ2-41
WIU
WIU
POWER PLAN - BASEMENT WAREHOUSE
1. COORDINATE WITH MECHANICAL DRAWINGS FOR EXACT EQUIPMENT PLACEMENT AS
REQUIRED.
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
SCALE : 1/4" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
100% CD
Revisions: Date:
EP103
POWER PLAN - BASEMENT
WAREHOUSE
PROJECT
NORTH
0 4' 8' 16'
PROVIDE CORD AND PLUG SET TO POWER PAC UNIT VIA ADJACENT
RECEPTACLE. PROVIDE SURFACE MOUNTED RACEWAY AS REQUIRED TO
PROVIDE PROTECTION TO POWER CORD FROM PAC UNIT TO RECEPTACLE.
GFI
DN
RENOVATION
AREA
EXISTING 10'-0" H
COVERED
WALKWAY
BEAC
O
N
AVE SO
ENERGY PLANT
D & T WING
BUILDING 100
BUILDING 33
BUILDING 1
BD
-1
EN
TR
Y
CD
-2 9B
VE
ST
BD
-1
EN
TR
Y
CD
-2 9B
VE
ST
E
U
ES101
(E)MH-B
(E)MH-A
(E)MH-B
(E)MH-A
SUBSTATION 1B (BLDG
1 9TH FLOOR) REFER
TO SHT E3.2
UP TO 9TH FLOOR
(E) PULLBOX IN
500kVA PAD MTD
XFMR (T-17)
(E)REACTOR
(FOR FAULT
LIMITING)
(E)5kV SVC
SWITCHBOARD
HI VOLT
(E)ELECTRICAL
METERS (2)
(E)VA EAST SERVICE SUBSTATION (2)
MVA 26kV: 4160kV SCL XFMRS
(E)SUBSTATION 'A'
E-403
E-502
E-502
E-502
MOBILE
STERILIZATION
TRAILER
RELOCATED
"PET/CT"
CONTINUE POWER AND SPECIAL SYSTEMS CONNECTIONS TO MOBILE
STERILIZATION TRAILER. WHERE RACEWAYS EXTEND FROM BUILDING 33
EXTERIOR WALL TO TRAILER, PROVIDE PVC SCH. 80 CONDUIT FOR
PROTECTION AND ROUTE AS REQUIRED TO AVOID TRIPPING HAZARDS.
MOBILE STERILIZATION TRAILER EQUIPMENT DISCONNECTS.
EXISTING IT CLOSET. PROVIDE TELECOMMUNICATION AND FIRE ALARM
SYSTEM CONNECTION AS REQUIRED. PROVIDE (1) 2"C. WITH (2) CAT 6
ETHERNET CABLES (FOR TELECOMMUNICATION), (6) 14AWG (FOR FIRE ALARM
SYSTEM) AND (1) 14 AWG GND. COORDINATE WITH TRAILER MANUFACTURER
AS REQUIRED.
EXISTING DISCONNECT FOR PET/CT TRAILER.
CONTRACTOR SHALL PROVIDE A TEMPORARY 3RD PARTY FIRE ALARM DIALER
TO INTERCEPT TRAILER FIRE ALARM SIGNALS (NOTE: THE SPS MOBILE
TRAILER OFFERS (3) DRY CONTACTS FOR THE FOLLOWING STATUTES-
"TROUBLE", "SUPERVISORY", AND "ALARM"). THE FIRE ALARM DIALER SHALL BE
HOUSED IN BUILDING 33 EXISTING IT ROOM AS INDICATED; UTILIZE EXISTING
RECEPTACLES TO POWER TEMPORARY DIALER. DIALER SHALL BE UTILIZED
FOR THE DURATION OF THE PROJECT AND SHALL BE REMOVED WHEN THE
PROJECT IS COMPLETED. THE TRAILER FIRE ALARM STATUS "ALARM" SHALL
DIAL/NOTIFY THE SEATTLE FIRE DEPARTMENT. THE TRAILER FIRE ALARM
STATUSES "TROUBLE" AND "SUPERVISORY" SHALL DIAL/NOTIFY BOTH THE 3RD
PARTY VENDOR AND ENERGY PLANT. CONTRACTOR SHALL USE CURRENT
FACILITY WIDE 3RD PARTY VENDOR "GUARDIAN SECURITY" (800-282-6998).
1. COORDINATE ALL SITE WORK WITH ALL UTILITIES AND CIVIL DOCUMENTS
PRIOR TO COMMENCING WORK.
2. EXISTING PET/CT TRAILER SHALL BE RELOCATED VIA VA. CONTRACTOR
SHALL COORDINATE AS REQUIRED.
SCALE : 1" = 30'-0"
SITE ELECTRICAL PLAN1
0 30' 60'
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ES100
SITE ELECTRICAL PLAN
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
100% CD
Revisions: Date:
DW
G
FI
SE
38-0
NW
SE
0-0
S 176-7
S143-3
S 128-9
E 146-6
E 197-4
E 201-0
SE
76-0
SE
114-0
SE
152-0
SE
190-0
SE
179-4
NW
14-9
NE
380-0
NE
342-0
NE
304-0
NW
3-6
SE
152-10
LOW TEMP
B130
STERILIZATION COOL
DOWN
B108
OFFICE
B106
DIRTY PROCESSING
B122
STERILE/
NON-STERILE EQUIP
STORAGE
B110
CLEAN HAC
B110A
MACHINE
B109
CORR
CB-18B
RECEIVING /
BREAKDOWN
B114
CORRIDOR
CB-14
OUTPATIENT LOBBY
CB15A
CORRIDOR
CB-16
CORRIDOR
CB15C
CONFERENCE
B102
CORRIDOR
CB13
CORRIDOR
CB-12
MECHANICAL ROOM
#3
BD-111
AUTOPSY PREP
ROOM
BD-117
CORRIDOR
CB-10
ELECTRICAL
CB15K SIGNAL
BD-110B
VESTIBULE
BD-110A
TELE
BD-110A
EDUCATION LAB
BD-152
OFFICE
BD-149H
OFFICE
BD-149I OFFICE
BD-149F
OFFICE
BD-149G
SUPERVISOR OFFICE
BD143F
STAFF
BD-143E
CORRIDOR
CB-15
SPD CORRIDOR
CB-18B
ELEV #10
CB-18C
ELEV #9
CB-18D
STAIR #1
CB-18E
ELEV #6
CB-18F
ELEV #5
CB-18G
STAFF ELEV LOBBY
CB-16A
OFFICE
BA-102I
OFFICE
BA-102J
FEMALE LOCKERS /
TOILET
BA-105
MALE LOCKERS /
TOILET
BA-106
BULK STORAGE
BD-105A
MAIL ROOM
BD-105
OFFICE
BA-103
RME COOR / SPD
SECRETARY
B101
ENDO PROCESSING /
HIGH LEVEL
DISINFECTION
B123
DETERGENT
B117
COORD OFFICE
B115
BREAK
B127
FEMALE STAFF
TOILET / LOCKER /
SHOWER
B129
C
LE
A N
A N
TE
B1
OFFICE
B104
OFFICE
B107
UPGRADE
CART
ELEVATOR
PROVIDE
PROJECTOR
SYSTEM WITH
SPEAKERS
CLEAN SCOPE
STORAGE
B124
MALE STAFF TOILET /
LOCKER / SHOWER
B128
FEMALE STAFF
TOILET / SHOWER
B119
MALE STAFF TOILET /
LOCKER / SHOWER
B120
HAC
B118
Room B405
AE111
AE112
PREP AND PACK
B126
OFFICE
B105
DECONTAM
B116
PRZ CLOSET
B116A
SO
IL
ED
A
N
TE
B1
ANTE
B112
IMPLANT
B111
SUPPLY CLOSET
S 176'-7"
E-402
E-402
EL102
EP102
ET102
EL101
EP101
ET101
D & T NORTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORE
NORTH
CENTRAL CORE
SOUTH
CENTRAL CORECENTRAL CORE
1. DRAWING SHOWN FOR CLARITY ONLY. SEE REFERENCED DRAWINGS FOR
ADDITIONAL INFORMATION AS REQUIRED.
SCALE : 1/8" = 1'-0"
OVERALL ELECTRICAL PLAN1
0 4' 8' 16'
TR
UE
NO
RT
H
GENERAL NOTES
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ES101
OVERALL ELECTRICAL PLAN
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL JPS/FEB
38'-0"
NW
SE
0'-0"
S 176'-7"
SE
76'-0"
NW
14'-9"
NW
3'-6"
UPGRADE
CART
ELEVATOR
90 SF
MACHINE
B109
2151 SF
STERILE/
NON-STERILE EQUIP
STORAGE
B110
64 SF
CLEAN HAC
B110A
194 SF
CLEAN SCOPE
STORAGE
B124
281 SF
ENDO PROCESSING /
HIGH LEVEL
DISINFECTION
B123
173 SF
DIRTY PROCESSING
B122
151 SF
SOILED ANTE
B121
191 SF
FEMALE STAFF
TOILET / SHOWER
B119
75 SF
HAC
B118
182 SF
COORD OFFICE
B115
202 SF
RECEIVING /
BREAKDOWN
B114
2151 SF
STERILE/
NON-STERILE EQUIP
STORAGE
B110
156 SF
MALE STAFF TOILET /
LOCKER / SHOWER
B120
197 SF
DETERGENT
B117
12 SF
PRZ CLOSET
B116A
2303 SF
DECONTAM
B116
1952 SF
PREP AND PACK
B126
SUPPLY CLOSET
116 SF
ANTE
B112
264 SF
IMPLANT
B111
FSFS
W
WAP
W
W
W
W
W
WAP WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
W
WAP
FS
UC
UC
UC
UC
UC
UC
1S
S
S
S
S s I s I s I s
I s I s I s I
+48 AFF
+48 AFF
s I
W
2 TYP
CENTRAL CORE
NORTH
D & T NORTH
CENTRAL CORE
SOUTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORECENTRAL CORE
1. ALL DATA CONNECTIONS SHALL BE ROUTED TO EXISTING IT'S
CLOSET BD-110. REFERENCE SHEET E-402 FOR ADDITIONAL
INFORMATION.
2. COORDINATE ALL DATA CONNECTIONS WITH EQUIPMENT
MANUFACTURER.
3. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED
WITH THE CONTRACTORS PHASING OF THE PROJECT.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER
TRADES.
4. MAKE ALL CONNECTIONS TO EQUIPMENT PER
MANUFACTURER'S REQUIREMENTS.
5. ROUTE ALL CONDUIT HOME RUNS TO PANELS OVERHEAD
AND ABOVE ACCESSIBLE CEILINGS WHERE AVAILABLE.
6. PROVIDE POWER RELAYS, LOW VOLTAGE TRANSFORMERS,
CONDUIT AND JUNCTION BOXES FOR FIRE ALARM AND
TELECOMMUNICATION SYSTEMS AS REQUIRED.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. COORDINATE WITH OWNERS AGENT FOR FINAL LOCATIONS
OF ALL DATA PORTS AND SPECIAL CONNECTIONS FOR
EQUIPMENT PRIOR TO ROUGH-IN. COORDINATE RECEPTACLE
INSTALLATION WITH MILLWORK AND BACKSPLASH
INSTALLERS TO AVOID INTERFERENCES.
9. ELECTRICAL POWER AND TELECOMMUNICATIONS
CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW EACH
OTHER'S DRAWING AND SUBMITTALS AND COORDINATE FOR
FULLY OPERATIONAL SYSTEM.
10. COORDINATE MOUNTING HEIGHTS AND ORIENTATION OF
DEVICES IN MILLWORK WITH ARCHITECTURAL ELEVATIONS.
11. PROVIDE MODIFICATIONS TO THE EXISTING FIRE ALARM
SYSTEM TO SUPPORT THE ADDED FIRE ALARM FIELD
DEVICES AS REQUIRED. PROVIDE ADDITIONAL I/O
CARDS/MODULES, EQUIPMENT, CONNECTIONS, AND
APPERTENANCES AS REQUIRED TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. CONTRACTOR SHALL
COORDINATE ALL FIRE ALARM WORK WITH VA PRIOR TO
INITIATING WORK.
SCALE : 1/4" = 1'-0"
SPECIAL SYSTEMS PLAN - NORTH1
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
M A
TC
H
LI
N E
TO
S
H
EE
T
ET
M A
TC
H
LI
N E
TO
S
H
EE
T
ET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ET101
SPECIAL SYSTEMS PLAN - NORTH
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL/WNM JPS/FEB
100% CD
Revisions: Date:
1 PROVIDE WALL MOUNTED PHONE. PHONE SHALL
PROVIDE INTERNAL SPS COMMUNICATION VIA THE
INTERCOM SYSTEM; PHONE SHALL HAVE THE ABILITY
TO CALL INTO THE OVERHEAD INTERCOM SYSTEM AS
NEEDED. COORDINATE WITH VA FOR FINAL
LOCATIONS AS REQUIRED.
0 2' 4' 8'
PROJECT
NORTH
2 CARD READER SHALL COMMUNICATE WITH PACS
ACCESS CONTROL PANEL LOCATED IN RM BD-110.
PROVIDE RACEWAYS AND CABLING AS REQUIRED.
W
WAP
WAP
WAP
WAP
WAP
WAP
WAP
W
W
W
W
WAP
AREA OF WORK
W
WAP
WAP
W
FS
FS
UC
UC
UC UC
UC
UC
UCUC
UC
UC
UC
UC
UC
UC
FS
MECHANICAL
ROOM #3
BD-111
+48 AFF
G
FI
LOW TEMP
B130
STERILIZATION COOL
DOWN
B108
OFFICE
B106
MACHINE
B109
CORR
CB-18B
CB-14
CORRIDOR
CB15C
CB13CB-12
MECHANICAL ROOM
#3
BD-111
CORRIDOR
CB-10
ELECTRICAL
CB15K SIGNAL
BD-110B
VESTIBULE
BD-110A
TELE
BD-110A
MALE LOCKERS /
BREAK
B127
FEMALE STAFF
TOILET / LOCKER /
SHOWER
B129
C
LE
A N
A N
TE
B1
OFFICE
B104
OFFICE
B107
PROJECTOR
SYSTEM WITH
SPEAKERS
CLEAN SCOPE
STORAGE
MALE STAFF TOILET /
LOCKER / SHOWER
B128
Room B405
PREP AND PACK
B126
OFFICE
B105
5 TYP
CENTRAL CORE
NORTH
D & T NORTH
CENTRAL CORE
SOUTH
NURSING
TOWER
AREA SHOWN
CENTRAL CORECENTRAL CORE ELECTRICAL RM
BD-110
TELECOM RM
BD-110
(E) 48X30
NE
380-0
PROVIDE WALL MOUNTED PHONE. PHONE SHALL PROVIDE
INTERNAL SPS COMMUNICATION VIA THE INTERCOM
SYSTEM; PHONE SHALL HAVE THE ABILITY TO CALL INTO THE
OVERHEAD INTERCOM SYSTEM AS NEEDED. COORDINATE
WITH VA FOR FINAL LOCATIONS AS REQUIRED.
CEILING SUSPENDED COMPUTER WORK STATION. PROVIDE
CEILING MOUNTED POWER AND DATA OUTLETS AS SHOWN
ON POWER AND TELECOMMUNICATIONS PLANS.
3/4" CO RACEWAY FOR EVOLUTION STEAM STERILIZER
NETWORK CONNECTION.
SMOKE DUCT DETECTOR SHALL BE ACCOMPANIED WITH A
REMOTE TEST SWITCH WITH INDICATOR LOCATED IN
MECHANICAL ROOM BD-111. COORDINATE EXACT LOCATION
OF DEVICES WITH MECHANICAL CONTRACTOR AND VA AS
REQUIRED.
CARD READER SHALL COMMUNICATE WITH PACS ACCESS
CONTROL PANEL LOCATED IN RM BD-110. PROVIDE
RACEWAYS AND CABLING AS REQUIRED.
1. ALL DATA CONNECTIONS SHALL BE ROUTED TO EXISTING IT
CLOSET BD-110. REFERENCE SHEET E-402 FOR ADDITIONAL
INFORMATION.
2. COORDINATE ALL DATA CONNECTIONS WITH EQUIPMENT
MANUFACTURER.
3. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED
WITH THE CONTRACTORS PHASING OF THE PROJECT.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER
TRADES.
4. MAKE ALL CONNECTIONS TO EQUIPMENT PER
MANUFACTURER'S REQUIREMENTS.
5. ROUTE ALL CONDUIT HOME RUNS TO PANELS OVERHEAD
AND ABOVE ACCESSIBLE CEILINGS WHERE AVAILABLE.
6. PROVIDE POWER RELAYS, LOW VOLTAGE TRANSFORMERS,
CONDUIT AND JUNCTION BOXES FOR FIRE ALARM AND
TELECOMMUNICATION SYSTEMS AS REQUIRED.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. COORDINATE WITH OWNERS AGENT FOR FINAL LOCATIONS
OF ALL DATA PORTS AND SPECIAL CONNECTIONS FOR
EQUIPMENT PRIOR TO ROUGH-IN. COORDINATE RECEPTACLE
INSTALLATION WITH MILLWORK AND BACKSPLASH
INSTALLERS TO AVOID INTERFERENCES.
9. ELECTRICAL POWER AND TELECOMMUNICATIONS
CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW EACH
OTHER'S DRAWING AND SUBMITTALS AND COORDINATE FOR
FULLY OPERATIONAL SYSTEM.
10. COORDINATE MOUNTING HEIGHTS AND ORIENTATION OF
DEVICES IN MILLWORK WITH ARCHITECTURAL ELEVATIONS.
11. PROVIDE MODIFICATIONS TO THE EXISTING FIRE ALARM
SYSTEM TO SUPPORT THE ADDED FIRE ALARM FIELD
DEVICES AS REQUIRED. PROVIDE ADDITIONAL I/O
CARDS/MODULES, EQUIPMENT, CONNECTIONS, AND
APPERTENANCES AS REQUIRED TO PROVIDE A COMPLETE
AND FULLY FUNCTIONAL SYSTEM. CONTRACTOR SHALL
COORDINATE ALL FIRE ALARM WORK WITH VA PRIOR TO
INITIATING WORK.
SCALE : 1/4" = 1'-0"
SPECIAL SYSTEMS PLAN - SOUTH1
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
M A
TC
H
LI
N E
TO
S
H
EE
T
ET
M A
TC
H
LI
N E
TO
S
H
EE
T
ET
3 3 3 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ET102
SPECIAL SYSTEMS PLAN - SOUTH
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 LRL/WNM JPS/FEB
100% CD
Revisions: Date:
2 2 2
S s I s I s I s I s I
0 2' 4' 8'
PROJECT
NORTH
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text J
| 663-102.100.ED101.20210625 |
| 663-102.100.ED102.20210625 |
| 663-102.100.EL101.20210625 |
| 663-102.100.EL102.20210625 |
| 663-102.100.EP101.20210625 |
| 663-102.100.EP102.20210625 |
| 663-102.100.EP103.20210625 |
| 663-102.100.ES100.20210625 |
| 663-102.100.ES101.20210625 |
| 663-102.100.ET101.20230221 |
| Sheets and Views |
| ET101 |
| 663-102.100.ET102.20230221 |
| Sheets and Views |
| ET102 |
File details come from the government source that posted it. Updated .