Attachment 13 Drawings 10 of 11 Electrical 3 of 3.pdf

PDF 13 MB Posted

Attached to
Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
Solicitation number
36C26023R0021
Issued by

About this file

This document provides details for a federal solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20. The solicitation, numbered 36C26023R0021, seeks proposals for upgrades to the SPS OM system under the contract name Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation. Responses are due by the date specified in the solicitation. The opportunity type is listed as a solicitation. The attached file is a technical drawing numbered 10 of 11 for the electrical specifications. No other salient details regarding the required products, services, pricing, or response timeline are provided in this document.

View the file

Other files

File Type Posted
Attachment 23 Partial Architectural Set.pdf PDF
36C26023R0021 0002.docx DOCX document
Attachment 19 RFI Responses Rev 1.pdf PDF
Attachment 24 RFI Supplement.pptx PPTX presentation
Attachment 15 Wage Determination REV 1 20230825.pdf PDF
Attachment 22 Mobile Steris Trailer.pdf PDF
Attachment 21 Site Visit Agenda and Sign-In.pdf PDF
Attachment 20 36C26022Q0073 RFI List FOR INFORMATIONAL PURPOSES ONLY.pdf PDF
36C26023R0021 0001.docx DOCX document
Attachment 19 RFI Responses.pdf PDF
Attachment 20 36C26022Q0073 RFI List.pdf PDF
Attachment 18 Calculation of Self Performed Work REV 1.pdf PDF
Attachment 14 Drawings 11 of 11 Haz Mat.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 9 Drawings 6 of 11 Mechanical.pdf PDF
36C26023R0021.docx DOCX document
Attachment 8 Drawings 5 of 11 Fire Protection.pdf PDF
Attachment 7 Drawings 4 of 11 Structural.pdf PDF
Attachment 3 Specs 2 of 2.pdf PDF
Attachment 2 Specs 1 of 2.pdf PDF
Attachment 1 Construction SOW Rev5.docx DOCX document
Attachment 10 Drawings 7 of 11 Plumbing.pdf PDF
Attachment 17 Contractor Rules Of Behavior.pdf PDF
Attachment 18 Calculation of Self Performed Work.pdf PDF
Attachment 12 Drawings 9 of 11 Electrical 2 of 3.pdf PDF
Attachment 5 Drawings 2 of 11 Civil.pdf PDF
Attachment 15 Wage Determination.pdf PDF
Attachment 11 Drawings 8 of 11 Electrical 1 of 3.pdf PDF
Attachment 6 Drawings 3 of 11 Architectural.pdf PDF
Attachment 4 Drawings 1 of 11 General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

SE

38-0

NW

SE

0-0

NE

421'-9"

S143-3

201-0

SE

76-0

SE

114-0

SE

152-0

SE

190-0

SE

179-4

NW

14-9

NE

380-0

NE

342-0

NE

304-0

NW

3-6

SE

152-10

201-1

1 1

AREA OF WORK

1 1 1

1 1

1 1 1

1 1

5 5

3 3 3 3

3 3 3 3

3 3 3 3

3 3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

3 3

3 3

3 3 3 3

3 3 3

3 3

3 3

3 3 3

3 3

3 3 3

3 3

3 3

3 3 3

3 3

D & T NORTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORE

NORTH

CENTRAL CORE

SOUTH

CENTRAL CORECENTRAL CORE

116 SF

CONTAINMENT ROOM

BD-100C

641 SF

OFFICE

BD-104D

179 SF

OFFICE

BD-100

169 SF

COMMON SPACE

594 SF

SOILED RECEIVING /

DECONTAMINATION

BD-100F

74 SF

HAC

BD-100A

149 SF

CART WASH

BA-100D

2536 SF

STERILE STORAGE

BD-104B

96 SF

HAC

BD-104C

159 SF

M TOILET

BD-101

3089 SF

NON-STERILE

STORAGE

BD-104

225 SF

M TOILET

BD-103

94 SF

HAC

BD-103A303 SF

BREAK ROOM

BD-112D

206 SF

OFFICE

BD-112C

204 SF

OFFICE

BD-112B

120 SF

OFFICE

BD-112A

226 SF

OFFICE

BD-112

999 SF

CORRIDOR

CB-14

1606 SF

MECHANICAL #3

BD-111

370 SF

CORRIDOR

CB-12

338 SF

CONFERENCE

BD-113

157 SF

SPD CORRIDOR

CB-18B 1273 SF

EDUCATION LAB

BD-152

90 SF

MACHINE

BD-104E

147 SF

BD-149J

141 SF

OFFICE

BD-149H

176 SF

OFFICE

BD-149G

224 SF

SUPERVISOR OFFICE

BD-143F

221 SF

STAFF

BD-143E

173 SF

STAIR #1

BA-S01

172 SF

OFFICE

BD-149F

299 SF

OFFICE

BA-102I 99 SF

OFFICE

BA-102J

135 SF

OFFICE

BA-103

145 SF

OFFICE

BA-103A

283 SF

MALE

LOCKERS/TOILET

BA-106

538 SF

CORRIDOR

CB-10

124 SF

ELECTRICAL

BD-110

18 SF

SIGNAL

BD-110B

20 SF

TELE

BD-110A

44 SF

VESTIBULE

BD-110C

C O

M M

O N

S

PA

C E

576 SF

OUTPATIENT LOBBY

CB-15A

2895 SF

DISTRIBUTION

BD-143D

977 SF

579 SF

CORRIDOR

CB-15

456 SF

CORRIDOR

CB-16

ELEV #10

ELEV #9

ELEV #6

ELEV #5

363 SF

STAFF ELEV LOBBY

CB-16A

554 SF

BULK STORAGE

BD-105A 389 SF

MAILROOM

BD-105

1117 SF

DRY STORAGE

BA-104

313 SF

STAFF LOUNGE

BA-102L

300 SF

FOOD SERVICE

BD-100I

6671 SF

SUPPLY WAREHOUSE

BD-106

307 SF

FEMALE LOCKERS /

TOILET

BA-105

3991 SF

KITCHEN

BA-102

1731 SF

LOADING DOCK

BD-107

143 SF

F TOILET

BD-103D

214 SF

F TOILET

BD-103C

467 SF

CORRIDOR

CB-8

647 SF

CORRIDOR

CB-9

169 SF

STAIR

BD-103K

EXISTING LUMINAIRE TO BE DEMOLISHED.1

SCALE : 1/8" = 1'-0"

OVERALL LIGHTING DEMOLITION PLAN1

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR

CLARITY. CONTRACTOR SHALL FIELD VERIFY LIGHTING

AND LIGHTING CONTROL EQUIPMENT AND CIRCUITRY AS

REQUIRED. ALL CIRCUITS TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO ITS SOURCE. ALL RACEWAYS

FEEDING THE SPS AREA SHALL BE DEMOLISHED IN

THEIR ENTIRETY.

1 TYP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ED101

OVERALL LIGHTING DEMOLITION

PLANSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

100% CD

Revisions: Date:

PROJECT

NORTH

0 4' 8' 16'

641 SF

OFFICE

BD-104D

178 SF

OFFICE

BD-100

170 SF

COMMON SPACE

592 SF

SOILED RECEIVING

/DECONTAMINATION

BD-100F

74 SF

HAC

BD-100A

149 SF

CART WASH

BA-100D

2538 SF

STERILE STORAGE

BD-104B

96 SF

HAC

BD-104C

159 SF

M TOILET

BD-101

116 SF

CONTAINMENT ROOM

BD-100C

3089 SF

NON-STERILE

STORAGE

BD-104

226 SF

MALE TOILET

BD-103

94 SF

HAC

BD-103A

304 SF

BREAK ROOM

BD-112D

206 SF

OFFICE

BD-112C

204 SF

OFFICE

BD-112B

120 SF

OFFICE

BD-112A

226 SF

OFFICE

BD-112

999 SF

CORRIDOR

CB-14

1606 SF

MECHANICAL ROOM

#3

BD-111

370 SF

CORRIDOR

CB-12

338 SF

CONFERENCE

BD-113

157 SF

SPD CORRIDOR

CB-18B 871 SF

EDUCATION LAB

BD-152

138 SF

MACHINE ROOM

BD-104E

72 SF

PASSAGE

BD-151F

92 SF

M LOCKER

BD-151C

34 SF

F TOILET

BD-151D

401 SF

RESIDENT CUBICLES

BD-151

468 SF

CORRIDOR

CB-22

147 SF

OFFICE

BD-149J

141 SF

OFFICE

BD-149H

176 SF

OFFICE

BD-149G

224 SF

SUPERVISOR OFFICE

BD-143F

221 SF

STAFF

BD-143E

173 SF

STAIR #1

BA-S01

172 SF

OFFICE

BD-149F

573 SF

PASSAGE

BD-149J

170 SF

OFFICE

BD-149E

299 SF

OFFICE

BA-102I

99 SF

OFFICE

BA-102J

135 SF

OFFICE

BA-103

152 SF

OFFICE

BA-103A

283 SF

MALE

LOCKERS/TOILET

BA-106

538 SF

CORRIDOR

CB-10

124 SF

ELECTRICAL

BD-110

18 SF

SIGNAL

BD-110B

20 SF

TELE

BD-110A

44 SF

VESTIBULE

BD-110C

141 SF

COMMON SPACE

576 SF

OUTPATIENT LOBBY

CB-15A

761 SF

CORRIDOR

CB-13

320 SF

BD-149

89 SF

F LOCKER

BD-151E

46 SF

M TOILET

BD-151B

2895 SF

DISTRIBUTION

BD-143D 983 SF

CORRIDOR

CB-17

579 SF

CORRIDOR

CB-15

456 SF

CORRIDOR

CB-16

106 SF

ELEV #10

87 SF

ELEV #9

116 SF

ELEV #6

96 SF

ELEV #5

359 SF

STAFF ELEV LOBBY

CB-16A

554 SF

BULK STORAGE

BD-105A 389 SF

MAILROOM

BD-105

1117 SF

DRY STORAGE

BA-104

313 SF

STAFF LOUNGE

BA-102L

300 SF

FOOD SERVICE

BD-100I

6671 SF

SUPPLY WAREHOUSE

BD-106

307 SF

FEMALE LOCKERS /

TOILET

BA-105

3991 SF

KITCHEN

BA-102

1731 SF

LOADING DOCK

BD-107

143 SF

Room

BD-103D

214 SF

FEMALE TOILET

BD-103C

1434 SF

CORRIDOR

CB-7

466 SF

CORRIDOR

CB-8

647 SF

CORRIDOR

CB-9

169 SF

Room

BD-103K

M A

TC

H

L

IN

E

MATCH LINE

UP

SE

38'-0"

NW

SE

0'-0"

NE

421'-9"

S 176'-7"

S143'-3"

S 128'-9"

E 146'-6"

E 197'-4"

E 201'-0"

S 120'-0"

SE

76-0

SE

114-0

SE

152-0

SE

190-0

SE

179-4

NW

14-9

NE

380-0

NE

342-0

NE

304-0

NE

266-0

NW

3-6

SE

152-10

NE

383'-9"

E 201-1

AREA OF WORK

WT

WT

W T

WT WT

WT

WTWT

WT

WT

WT

WT WT WT

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

4 4 2 2

T

T

TW

P

T

P

P

VACUUM TUBE EQUIPMENT

DUMBWAITER

W R

W R P

P

P

CART WASHER

DECONTAMINATION100A

CENSITAK WASHERS

P

P

P

W R

S

S S

S

S

P

P

CC

C

C

C

T

W

AP2

WT

T C

WAP

WAP

T

T

P

P T

P W R

S

T

WT

WAP

S

S

S

S

AC-11

EF-11X

QMCC-B2

NMCC-B3

AREA OF WORK

BDN3

PBN4

LTCP 3/11

MER 3CP

CCP 3/0

MER 3 DGP

EF-44

EF-11

CONDENSATE

PUMPS CP-6

FAN COIL

HEAT TRANSFER

MODULE

D & T NORTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORE

NORTH

CENTRAL CORE

SOUTH

CENTRAL CORECENTRAL CORE

ETHYLENE OXIDE DEVICE.1

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN.

CONTRACTOR SHALL FIELD VERIFY ALL POWER, DATA,

SIGNAL EQUIPMENT AND CIRCUITRY AS REQUIRED. ALL

CIRCUITS AND RACEWAYS TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO ITS SOURCE.

SCALE : 1/8" = 1'-0"

OVERALL POWER AND SPECIAL SYSTEMS DEMOLITION PLAN1

0 4' 8' 16'

TR

UE

NO

RT

H

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

E-401

E-401

E-401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ED102

OVERALL POWER AND SPECIAL

SYSTEMS DEMOLITION PLANSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

100% CD

Revisions: Date:

38-0

NW

SE

0-0

S 176-7

S143-3

E 197-4

SE

76-0

NW

14-9

NE

380-0

NE

380-0

NE

342-0

NE

304-0

NW

3-6

NE

383'-9"

E 201-1

90 SF

MACHINE

B109

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

64 SF

CLEAN HAC

B110A

194 SF

CLEAN SCOPE

STORAGE

B124

281 SF

ENDO PROCESSING /

HIGH LEVEL

DISINFECTION

B123

173 SF

DIRTY PROCESSING

B122

151 SF

SOILED ANTE

B121

191 SF

FEMALE STAFF

TOILET / SHOWER

B119

75 SF

HAC

B118

182 SF

COORD OFFICE

B115

202 SF

RECEIVING /

BREAKDOWN

B114

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

156 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B120

197 SF

DETERGENT

B117

12 SF

PRZ CLOSET

B116A

2303 SF

DECONTAM

B116

1952 SF

PREP AND PACK

B126

SUPPLY CLOSET

116 SF

ANTE

B112

264 SF

IMPLANT

B111

SE

76-0

NE

380-0

NE

342-0

AC

AC

G25

G25

G25E

G25

G25

G25E

G3E

G3

G5 G5E

G26E

G3

G5

G5E

G5

G5G5

G5G5

G5

G5

G5E

G5

G5G5E

G5

G5

G5

G5E

G5

G5E

G5E

G3E

G3G3E

G3

G24G3E

G3

G3E

G26E

G26E

G26E

G26E

G26

G26E

G26EG26G26E

G26G26EG26

G26E

G26G5E

G5

G5E

G5E

G5

G5E G5

G5

G5

G3E G3E

G3

G3E

G3

G3

G3

G3

G3E

G3 G3E

G3

D2E

D2

WS1

D2

D2

D2

D2

WS1

D2E

D2

D2

D2

3 3

OS

OS

OS

OS

1 43

L1e

L1a L1a

L1b L1b

L1c L1c

L1d L1d

G5E

G25

G25

L1f L1f L1e

G5E

X

X

X

X

X

X

X

X

X

X f e

BDE4-1

BDE4-1

BDE4-1

BDE4-2

BDE4-2

BDE4-2

BDE4-1

BDE4-1

BDE4-1

BDE4-3

BDE4-1

BDE4-3

BDE4-3

BDE4-3

BDE4-3 BDE4-3

BDE4-3

BDE4-3

BDE4-4

BDE4-4

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-4

BDE4-2

BDE4-2

BDE4-4

BDE4-4

BDE4-4

BDE4-4

BDE4-4BDE4-4

BDE4-4

BDE4-4

BDE4-4

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-3BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-3

BDE4-3BDE4-3

BDE4-3

BDE4-3BDE4-3

BDE4-3

BDE4-2

BDE4-4 BDE4-4

BDE4-4 BDE4-4

BDE4-4 BDE4-4

BDE4-4 BDE4-4

BDE4-2 BDE4-2 BDE4-2

BDE4-4

BDE4-4

BDE4-4

BDE4-4

BDE4-4

BDE4-4

BDE4-4 BDE4-4 BDE4-4

BDE4-4 BDE4-4

BDE4-4

BDE4-4

BDE4-2

BDE4-2 BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-4

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-4

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-2

BDE4-3

BDE4-3

BDE4-4

BDE4-2BDE4-2

BDE4-2

a b c d

4 4

OS

OS

G5

BDE4-3

AREA OF WORK

BDE4-1

E-501 TYP.

E-501 TYP.

BDE4-2

OS

G24E

BDE4-2

OS

OS

X

BDE4-2

OS

G3E

BDE4-2

G26

G26G26G26G26G26G26

G26 G26 G26 G26

G26

G26

G26

G26

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

CENTRAL CORE

NORTH

D & T NORTH

CENTRAL CORE

SOUTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORECENTRAL CORE

-1

1. -

SCALE : 1/4" = 1'-0"

LIGHTING PLAN - NORTH1

0 4' 8' 16'

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

M A

TC

H

LI

N E

TO

S

H

EE

L

EL

M A

TC

H

LI

N E

TO

S

H

EE

L

EL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EL101

LIGHTING PLAN - NORTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

100% CD

Revisions: Date:

PROJECT

3 3

DW

513 SF

LOW TEMP

B130

1381 SF

STERILIZATION

COOL DOWN

B108

151 SF

OFFICE

B106 138 SF

MACHINE

ROOM

B109

404 SF

BREAK ROOM

B127

179 SF

FEMALE

STAFF

TOILET/LOCKER

/SHOWER

B129

55 SF

CLEAN ANTE

ROOM

B125

241 SF

OFFICE

B104

128 SF

OFFICE

B107

189 SF

MALE STAFF

TOILET/

LOCKER/SHOWER

B128

1953 SF

PREP AND

PACK

B126

131 SF

OFFICE

B105

INE ROOM

B109

PREP AND PACK

B126

622 SF

CORR

CB-18B

124 SF

ELECTRICAL

CB15K

141 SF

COMMON

SPACE

18 SF

SIGNAL

BD-110B

VESTIBULE

BD-110A

20 SF

TELE

BD-110A

169 SF

STAIR

AREA OF WORK

G5

G5E

G5E

G5G5E

G3E

G5E

G3

G5

G3E

G5

G5

G5E

G5E

G22

G22E

G22

G22

G22E

G22

G22E

G22 G22 G22

G22

G5EG5G5E

G5G5EG5

G5EG5G5E

G5G5EG5

G5E

G5

G5E

G5

G5E

G5

G5E

G5

G5E

G5

G5E

G5

D2

D2

D2D2

D2

D2EWS1

G25G25

D2 D2

D2

D2E

WS1

D2

G3E

D2

1 1

OS

OS

OS

OS

1 1 1

1 1

1 1

1 1

5 5

X

X

X

BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-3BDE4-3

BDE4-3

BDE4-3 BDE4-3 BDE4-3

BDE4-1

BDE4-1BDE4-1

BDE4-1

BDE4-1BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1BDE4-1

BDE4-1

BDE4-1BDE4-1

BDE4-1BDE4-1

BDE4-1 BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-3 BDE4-3

BDE4-3

BDE4-3 BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-3

BDE4-1 BDE4-1

BDE4-1

BDE4-1 BDE4-1

BDE4-1 BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-1

BDE4-3

BDE4-3

BDE4-1

BDE4-3

BDE4-3

BDE4-3BDE4-3

BDE4-3

X

X

BDE4-1

BDE4-1

G22

G22

G22E

G22

G22

BDE4-3

BDE4-3 BDE4-3

BDE4-3

G22

G22

BDE4-3

BDE4-3

1606 SF

MECHANICAL

ROOM #3

BD-111

D2

BDE4-1

X

BDE4-3

G5

BDE4-3

3 1

OS

OS

BDE4-3

G25E

BDE4-1

G25

BDE4-1

OS OS

G25

BDE4-1

G25

BDE4-1

G25

BDE4-1

X

BDE4-1

X

BDE4-3

TYP.

TYP. 2

TYP.

E-501

E-502

E-501

OS

OS

OS

OS

OS

OS

OS

OSOSOS

OS

TYP.

CENTRAL CORE

NORTH

D & T NORTH

CENTRAL CORE

SOUTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORECENTRAL CORE

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

SPS

SWING

SPACE

WAREHOUSE

NE

380-0

NE

342-0

NE

304-0

COORDINATE EXISTING LIGHTING DURING THE DEMOLITION OF EQUIPMENT IN

THE MECHANICAL ROOM. RELOCATE EXISTING LIGHTING AS REQUIRED TO NOT

INTERFERE WITH NEW EQUIPMENT.

1. -

SCALE : 1/4" = 1'-0"

LIGHTING PLAN - SOUTH1

0 4' 8' 16'

TR

UE

SO

UT

H

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

M A

TC

H

LI

N E

TO

S

H

EE

L

EL

M A

TC

H

LI

N E

TO

S

H

EE

L

EL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EL102

LIGHTING PLAN - SOUTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

38-0

NW

SE

0-0

S 176-7

S143-3

E 197-4

SE

76-0

NW

14-9

NE

380-0

NW

3-6

NE

383'-9"

E 201-1

90 SF

MACHINE

B109

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

64 SF

CLEAN HAC

B110A

194 SF

CLEAN SCOPE

STORAGE

B124

281 SF

ENDO PROCESSING /

HIGH LEVEL

DISINFECTION

B123 173 SF

DIRTY PROCESSING

B122

151 SF

SOILED ANTE

B121

191 SF

FEMALE STAFF

TOILET / SHOWER

B119

75 SF

HAC

B118

182 SF

COORD OFFICE

B115

202 SF

RECEIVING /

BREAKDOWN

B114

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

156 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B120

197 SF

DETERGENT

B117

12 SF

PRZ CLOSET

B116A

2303 SF

DECONTAM

B116

1952 SF

PREP AND PACK

B126

SUPPLY CLOSET

116 SF

ANTE

B112

264 SF

IMPLANT

B111

48"AFF

48"AFF

48"AFF

A

EQ13

EQ15

EQ01

EQ4

EQ4

EQ4

EQ5

EQ5

EQ07 6

7 7

EQ16

EQ18

EQ19

12EQ20A

EQ20B

EQ20B

EQ20B

48"AFF

48"AFFEQ02

BDN2.1-3

E

EQ15 8

E

EQ15 8

EQ15

E

E

E E

BDQ4-1,3,5

BDQ4-8,10,12

PBN4-13,15,17

PBN4-31,33,35

PBN4-19,21,23

PBD4-1,3,5

BDQ2-17,19,21

BDQ2-12BDN2.1-1

BDQ2-9,11,13

BDQ2-30,32,34

BDN2.1-21,23,25

BDN2.1-15,17,19

BDQ2-12

BDQ2-12

BDN2.1-4

BDQ2-28

BDN2.1-40

BDN2.1-40

BDN2.1-30

BDN2.1-40

BDN2.1-32

BDN2.1-32

BDN2.1-32

BDN2.1-28

BDN2.1-28

BDN2.1-26

BDN2.1-34

BDN2.1-36

BDN2.1-36

BDN2.1-36BDN2.1-36BDN2.1-36

BDN2.1-26 BDN2.1-26

BDN2.1-38

BDN2.1-38

BDN2.1-38BDN2.1-24

BDN2.1-36

BDN2.2-59

BDN2.2-57

BDN2.2-55

BDN2.2-53

BDN2.2-49

BDN2.2-49

BDN2.2-51

BDN2.2-45

BDN2.2-45

BDN2.2-43

BDN2.2-43

BDN2.2-43

BDN2.2-43

BDN2.1-28

BDN2.2-43

BDN2.1-28

BDN2.2-45BDN2.2-49

BDN2.2-45

BDN2.1-28 BDN2.1-28

BDN2.2-20

BDN2.2-45

BDN2.2-45BDN2.2-49

BDN2.2-49

EQ13

BDN2.2-43

BDN2.1-24

BDN2.1-24

BDN2.1-22

BDN2.1-22

BDN2.2-47

BDN2.2-47

BDN2.2-47

BDN2.2-47

BDN2.2-47

EQ02

BDN2.1-1

EQ02

BDQ2-7

EQ02

BDQ2-5

EQ02

BDN2.1-7 EQ02

BDN2.1-5

BDQ2-8,10 BDN2.1-39,41

AREA OF WORK

BDN2.1-26

EQ8

BDN2.1-26

EQ8

BDN2.1-32

EQ8

BDN2.1-32

EQ8

EQ8 EQ8

EQ8

BDN2.1-42

BDN2.1-42

BDN2.1-42

BDN2.1-42

W

R W

R W

R W

R W

R W

R W

R

R W

TP-1

BDN3-15

W R W R

TP-1

BDN3-17

TP-1

BDN3-19

TP-1

BDN3-13

TP-1

BDN3-9

TP-1

BDN3-7

TP-1

BDN3-11

TP-1

BDN3-5

TP-1

BDN3-3

TP-1

BDN3-1

BDN2.1-2

EQ17A

BDN2.1-2

EQ17A

EQ17A

BDN2.1-2

EQ17A

BDN2.1-2

WRWR

WR WR

WR

WR

BDQ2-33 BDQ2-33

EQ8

BDQ2-31 BDQ2-31

BDQ2-12

EQ01

BDQ4-1,3,5

BDN2.1-2

EQ17A

A

CENTRAL CORE

NORTH

D & T NORTH

CENTRAL CORE

SOUTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORECENTRAL CORE

PREP AND PACK WORK STATION.

AUTOMATIC DOOR OPENER WITH PUSH BUTTONS. COORDINATE INSTALLATION

DOOR AND AUTOMATIC DOOR OPERATOR MANUFACTURER AS REQUIRED.

CIRCUIT ALL DOOR OPERATORS TO PANELBOARD BDN3; REFERENCE PANEL

SCHEDULE ON SHEET E-605 FOR ADDITIONAL INFORMATION.

CART AND UTENSIL DISINFECTOR.

WASHER/DISINFECTOR .

SCOPE CABINET, QTY = 5. ALL SCOPE CABINET RECEPTACLES TO BE MOUNTED

96"AFF.

MOTORIZED RETURN CONVEYOR SYSTEM.

WASHER/DISINFECTOR, ENDOSCOPE.

SONIC IRRIGATOR.

ULTRASONIC IRRIGATOR.

TEE PROBE DISINFECTOR.

DRYING CABINET PASS-THROUGH.

AUTOMATED PASS-THROUGH WINDOW TYPE 1.

AUTOMATED PASS-THROUGH WINDOW TYPE 2.

WIREMOLD, SIMPLEX RECEPTACLE EVERY 12".

ALL AUTOMATIC LAVATORIES SHALL BE HARDWIRED TO A REMOTE MOUNTED

120V - 24V TRANSFORMER. TRANSFORMER SHALL BE LOCATED IN ACCESSIBLE

CEILING SPACE. COORDINATE WITH PLUMBING AS REQUIRED. ALL LAVATORIES

SHALL BE CIRCUITED TO PANEL "BDN3"; REFERENCE PANEL SCHEDULE ON

SHEET E-605 FOR ADDITIONAL INFORMATION.

DENTAL CLEANING UNIT. UTILIZE ADJACENT RECEPTACLE FOR POWER.

PANELBOARD "BDN3".

1. REFERENCE EQUIPMENT SCHEDULE FOR ADDITIONAL EQUIPMENT

INFORMATION.

2. NOTE ALL EQUIPMENT MAY BE SHOWN FOR CLARITY. REFERENCE

ARCHITECTURAL AND MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.

SCALE : 1/4" = 1'-0"

POWER PLAN - NORTH1

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

M A

TC

H

LI

N E

TO

S

H

EE

P

EP

M A

TC

H

LI

N E

TO

S

H

EE

P

EP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EP101

POWER PLAN - NORTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

100% CD

Revisions: Date:

PROJECT

0 4' 8' 16'

DW

76-0

SE

114-0

SE

152-0

SE

179-4

SE

152-10

151 SF

OFFICE

B106

128 SF

OFFICE

B107

1391 SF

STERILIZATION COOL

DOWN

B108

241 SF

OFFICE

B104

513 SF

LOW TEMP

B130

174 SF

FEMALE STAFF

TOILET / LOCKER /

SHOWER

B129

403 SF

BREAK

B127

177 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B128

CLEAN ANTE

1952 SF

PREP AND PACK

B126

131 SF

OFFICE

B105

138 SF

MACHINE ROOM

PREP AND PACK

B126

CLEAN ANTE

AREA OF WORK

E-402

A

A A A

QMCC-B2

NMCC-B3

E-402

E-402

EQ9

EQ9

EQ9

EQ8 EQ8 EQ8 EQ8

3EQ11 EQ11 EQ11 EQ11

USB

USB

48"AFF

EQ8 EQ8 EQ8 EQ8

3 3 3

TP-1

BDQ4-8,10,12 BDQ4-14,16,18 PBN4-2,4,6 PBN4-8,10,12

BDN3-27

BDN2.1-38

BDN2.1-18

BDN2.1-18

BDN2.1-18 BDN2.1-18

BDN2.1-18

BDN2.1-18

BDN2.1-16

BDN2.1-16

BDN2.1-16

BDN2.1-16

BDN2.1-16

BDN2.1-16

BDN2.1-14

BDN2.1-14

BDN2.1-14

BDN2.1-14

BDN2.1-12

BDN2.1-10 BDN2.1-10

BDN2.1-12

BDN2.1-10

BDN2.1-33,35,37

BDN2.1-27,29,31

BDQ2-22,24,26

BDN2.1-11 BDN2.1-11 BDN2.1-9 BDN2.1-9 BDQ2-37BDQ2-37 BDQ2-35BDQ2-35

BDN2.2-20BDN2.2-20BDN2.2-20

BDN2.1-22

BDN2.1-22

BDN2.2-20

BDN2.2-20

BDN2.2-20

BDN3-8

BDN3-8

BDN3-8

K4665

BDN3-41

BDN3-8K1552

BDN3-39

BDN3-6

BDN2.2-23

BDN2.1-22

BDN2.1-13

EQ8

BDN2.1-13

EQ8

5 5 5

DW-1

BDN3-37

BDN3-2

BDN3-2

BDN3-4 BDN3-4 BDN3-4

R7250

TP-1

BND3-21

TP-1

BND3-25

MECHANICAL

ROOM #3

BD-111

S

EF-11

QMCCB2

EF-11A

QMCCB2

AC-11

QMCCB2

FC-1

BDQ2-1

ACP-1

QMCCB2

P-1

BDQ2-6

P-2

BDQ2-6

TP - 1

BND3-23

C

C C C

C

ACP-1 DRYER

BDQ2-16

RO-1

QMCCB2

RO-1

BDQ2-18

RO-1

BDQ2-20

CENTRAL CORE

NORTH

D & T NORTH

CENTRAL CORE

SOUTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORECENTRAL CORE ELECTRICAL RM

CB15K

TELECOM RM

BD-110

NE

380-0

PREP AND PACK WORK STATION.

SMALL STEAM STERILIZER.

STEAM STERILIZER.

AUTOMATIC DOOR OPENER WITH PUSH BUTTONS. COORDINATE INSTALLATION

DOOR AND AUTOMATIC DOOR OPERATOR MANUFACTURER AS REQUIRED.

CIRCUIT ALL DOOR OPERATORS TO PANELBOARD BDN3; REFERENCE PANEL

SCHEDULE ON SHEET E-605 FOR ADDITIONAL INFORMATION.

CEILING SUSPENDED COMPUTER WORK STATION. PROVIDE POWER AND DATA

CORD DROPS AS SHOWN ON POWER AND TELECOMMUNICATIONS PLANS.

ALL AUTOMATIC LAVATORIES SHALL BE HARDWIRED TO A REMOTE MOUNTED

120V - 24V TRANSFORMER. TRANSFORMER SHALL BE LOCATED IN ACCESSIBLE

CEILING SPACE. COORDINATE WITH PLUMBING AS REQUIRED. ALL LAVATORIES

SHALL BE CIRCUITED TO PANEL "BDN3"; REFERENCE PANEL SCHEDULE ON

SHEET E-605 FOR ADDITIONAL INFORMATION.

PANELBOARD "PBN4".

1. REFERENCE EQUIPMENT SCHEDULE FOR ADDITIONAL EQUIPMENT

INFORMATION.

2. NOT ALL EQUIPMENT MAY BE SHOWN FOR CLARITY, REFERENCE

ARCHITECTURAL AND MECHANICAL SHEETS FOR ADDITIONAL INFORMATION.

SCALE : 1/4" = 1'-0"

POWER PLAN - SOUTH1

0 4' 8' 16'

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

M A

TC

H

LI

N E

TO

S

H

EE

P

EP

M A

TC

H

LI

N E

TO

S

H

EE

P

EP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EP102

POWER PLAN - SOUTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

100% CD

Revisions: Date:

D & T NORTH

NURSING

TOWER

AREA SHOWN

WAREHOUSE

CORRIDOR

CB-13

STOREKEEPER

OFFICE

BD-106A

VALILT

BD-106B

SLIPPLY

WAREHOUSE

BD-106

CORRIDOR

CB-14

MECHANICAL

BD-109

CORRIDOR

CB-15

6"Ø

PAC-1

PAC-2

BDQ2-39

BDQ2-41

WIU

WIU

POWER PLAN - BASEMENT WAREHOUSE

1. COORDINATE WITH MECHANICAL DRAWINGS FOR EXACT EQUIPMENT PLACEMENT AS

REQUIRED.

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

SCALE : 1/4" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

100% CD

Revisions: Date:

EP103

POWER PLAN - BASEMENT

WAREHOUSE

PROJECT

NORTH

0 4' 8' 16'

PROVIDE CORD AND PLUG SET TO POWER PAC UNIT VIA ADJACENT

RECEPTACLE. PROVIDE SURFACE MOUNTED RACEWAY AS REQUIRED TO

PROVIDE PROTECTION TO POWER CORD FROM PAC UNIT TO RECEPTACLE.

GFI

DN

RENOVATION

AREA

EXISTING 10'-0" H

COVERED

WALKWAY

BEAC

O

N

AVE SO

ENERGY PLANT

D & T WING

BUILDING 100

BUILDING 33

BUILDING 1

BD

-1

EN

TR

Y

CD

-2 9B

VE

ST

BD

-1

EN

TR

Y

CD

-2 9B

VE

ST

E

U

ES101

(E)MH-B

(E)MH-A

(E)MH-B

(E)MH-A

SUBSTATION 1B (BLDG

1 9TH FLOOR) REFER

TO SHT E3.2

UP TO 9TH FLOOR

(E) PULLBOX IN

500kVA PAD MTD

XFMR (T-17)

(E)REACTOR

(FOR FAULT

LIMITING)

(E)5kV SVC

SWITCHBOARD

HI VOLT

(E)ELECTRICAL

METERS (2)

(E)VA EAST SERVICE SUBSTATION (2)

MVA 26kV: 4160kV SCL XFMRS

(E)SUBSTATION 'A'

E-403

E-502

E-502

E-502

MOBILE

STERILIZATION

TRAILER

RELOCATED

"PET/CT"

CONTINUE POWER AND SPECIAL SYSTEMS CONNECTIONS TO MOBILE

STERILIZATION TRAILER. WHERE RACEWAYS EXTEND FROM BUILDING 33

EXTERIOR WALL TO TRAILER, PROVIDE PVC SCH. 80 CONDUIT FOR

PROTECTION AND ROUTE AS REQUIRED TO AVOID TRIPPING HAZARDS.

MOBILE STERILIZATION TRAILER EQUIPMENT DISCONNECTS.

EXISTING IT CLOSET. PROVIDE TELECOMMUNICATION AND FIRE ALARM

SYSTEM CONNECTION AS REQUIRED. PROVIDE (1) 2"C. WITH (2) CAT 6

ETHERNET CABLES (FOR TELECOMMUNICATION), (6) 14AWG (FOR FIRE ALARM

SYSTEM) AND (1) 14 AWG GND. COORDINATE WITH TRAILER MANUFACTURER

AS REQUIRED.

EXISTING DISCONNECT FOR PET/CT TRAILER.

CONTRACTOR SHALL PROVIDE A TEMPORARY 3RD PARTY FIRE ALARM DIALER

TO INTERCEPT TRAILER FIRE ALARM SIGNALS (NOTE: THE SPS MOBILE

TRAILER OFFERS (3) DRY CONTACTS FOR THE FOLLOWING STATUTES-

"TROUBLE", "SUPERVISORY", AND "ALARM"). THE FIRE ALARM DIALER SHALL BE

HOUSED IN BUILDING 33 EXISTING IT ROOM AS INDICATED; UTILIZE EXISTING

RECEPTACLES TO POWER TEMPORARY DIALER. DIALER SHALL BE UTILIZED

FOR THE DURATION OF THE PROJECT AND SHALL BE REMOVED WHEN THE

PROJECT IS COMPLETED. THE TRAILER FIRE ALARM STATUS "ALARM" SHALL

DIAL/NOTIFY THE SEATTLE FIRE DEPARTMENT. THE TRAILER FIRE ALARM

STATUSES "TROUBLE" AND "SUPERVISORY" SHALL DIAL/NOTIFY BOTH THE 3RD

PARTY VENDOR AND ENERGY PLANT. CONTRACTOR SHALL USE CURRENT

FACILITY WIDE 3RD PARTY VENDOR "GUARDIAN SECURITY" (800-282-6998).

1. COORDINATE ALL SITE WORK WITH ALL UTILITIES AND CIVIL DOCUMENTS

PRIOR TO COMMENCING WORK.

2. EXISTING PET/CT TRAILER SHALL BE RELOCATED VIA VA. CONTRACTOR

SHALL COORDINATE AS REQUIRED.

SCALE : 1" = 30'-0"

SITE ELECTRICAL PLAN1

0 30' 60'

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ES100

SITE ELECTRICAL PLAN

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

100% CD

Revisions: Date:

DW

G

FI

SE

38-0

NW

SE

0-0

S 176-7

S143-3

S 128-9

E 146-6

E 197-4

E 201-0

SE

76-0

SE

114-0

SE

152-0

SE

190-0

SE

179-4

NW

14-9

NE

380-0

NE

342-0

NE

304-0

NW

3-6

SE

152-10

LOW TEMP

B130

STERILIZATION COOL

DOWN

B108

OFFICE

B106

DIRTY PROCESSING

B122

STERILE/

NON-STERILE EQUIP

STORAGE

B110

CLEAN HAC

B110A

MACHINE

B109

CORR

CB-18B

RECEIVING /

BREAKDOWN

B114

CORRIDOR

CB-14

OUTPATIENT LOBBY

CB15A

CORRIDOR

CB-16

CORRIDOR

CB15C

CONFERENCE

B102

CORRIDOR

CB13

CORRIDOR

CB-12

MECHANICAL ROOM

#3

BD-111

AUTOPSY PREP

ROOM

BD-117

CORRIDOR

CB-10

ELECTRICAL

CB15K SIGNAL

BD-110B

VESTIBULE

BD-110A

TELE

BD-110A

EDUCATION LAB

BD-152

OFFICE

BD-149H

OFFICE

BD-149I OFFICE

BD-149F

OFFICE

BD-149G

SUPERVISOR OFFICE

BD143F

STAFF

BD-143E

CORRIDOR

CB-15

SPD CORRIDOR

CB-18B

ELEV #10

CB-18C

ELEV #9

CB-18D

STAIR #1

CB-18E

ELEV #6

CB-18F

ELEV #5

CB-18G

STAFF ELEV LOBBY

CB-16A

OFFICE

BA-102I

OFFICE

BA-102J

FEMALE LOCKERS /

TOILET

BA-105

MALE LOCKERS /

TOILET

BA-106

BULK STORAGE

BD-105A

MAIL ROOM

BD-105

OFFICE

BA-103

RME COOR / SPD

SECRETARY

B101

ENDO PROCESSING /

HIGH LEVEL

DISINFECTION

B123

DETERGENT

B117

COORD OFFICE

B115

BREAK

B127

FEMALE STAFF

TOILET / LOCKER /

SHOWER

B129

C

LE

A N

A N

TE

B1

OFFICE

B104

OFFICE

B107

UPGRADE

CART

ELEVATOR

PROVIDE

PROJECTOR

SYSTEM WITH

SPEAKERS

CLEAN SCOPE

STORAGE

B124

MALE STAFF TOILET /

LOCKER / SHOWER

B128

FEMALE STAFF

TOILET / SHOWER

B119

MALE STAFF TOILET /

LOCKER / SHOWER

B120

HAC

B118

Room B405

AE111

AE112

PREP AND PACK

B126

OFFICE

B105

DECONTAM

B116

PRZ CLOSET

B116A

SO

IL

ED

A

N

TE

B1

ANTE

B112

IMPLANT

B111

SUPPLY CLOSET

S 176'-7"

E-402

E-402

EL102

EP102

ET102

EL101

EP101

ET101

D & T NORTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORE

NORTH

CENTRAL CORE

SOUTH

CENTRAL CORECENTRAL CORE

1. DRAWING SHOWN FOR CLARITY ONLY. SEE REFERENCED DRAWINGS FOR

ADDITIONAL INFORMATION AS REQUIRED.

SCALE : 1/8" = 1'-0"

OVERALL ELECTRICAL PLAN1

0 4' 8' 16'

TR

UE

NO

RT

H

GENERAL NOTES

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ES101

OVERALL ELECTRICAL PLAN

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL JPS/FEB

38'-0"

NW

SE

0'-0"

S 176'-7"

SE

76'-0"

NW

14'-9"

NW

3'-6"

UPGRADE

CART

ELEVATOR

90 SF

MACHINE

B109

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

64 SF

CLEAN HAC

B110A

194 SF

CLEAN SCOPE

STORAGE

B124

281 SF

ENDO PROCESSING /

HIGH LEVEL

DISINFECTION

B123

173 SF

DIRTY PROCESSING

B122

151 SF

SOILED ANTE

B121

191 SF

FEMALE STAFF

TOILET / SHOWER

B119

75 SF

HAC

B118

182 SF

COORD OFFICE

B115

202 SF

RECEIVING /

BREAKDOWN

B114

2151 SF

STERILE/

NON-STERILE EQUIP

STORAGE

B110

156 SF

MALE STAFF TOILET /

LOCKER / SHOWER

B120

197 SF

DETERGENT

B117

12 SF

PRZ CLOSET

B116A

2303 SF

DECONTAM

B116

1952 SF

PREP AND PACK

B126

SUPPLY CLOSET

116 SF

ANTE

B112

264 SF

IMPLANT

B111

FSFS

W

WAP

W

W

W

W

W

WAP WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

W

WAP

FS

UC

UC

UC

UC

UC

UC

1S

S

S

S

S s I s I s I s

I s I s I s I

+48 AFF

+48 AFF

s I

W

2 TYP

CENTRAL CORE

NORTH

D & T NORTH

CENTRAL CORE

SOUTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORECENTRAL CORE

1. ALL DATA CONNECTIONS SHALL BE ROUTED TO EXISTING IT'S

CLOSET BD-110. REFERENCE SHEET E-402 FOR ADDITIONAL

INFORMATION.

2. COORDINATE ALL DATA CONNECTIONS WITH EQUIPMENT

MANUFACTURER.

3. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED

WITH THE CONTRACTORS PHASING OF THE PROJECT.

COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER

TRADES.

4. MAKE ALL CONNECTIONS TO EQUIPMENT PER

MANUFACTURER'S REQUIREMENTS.

5. ROUTE ALL CONDUIT HOME RUNS TO PANELS OVERHEAD

AND ABOVE ACCESSIBLE CEILINGS WHERE AVAILABLE.

6. PROVIDE POWER RELAYS, LOW VOLTAGE TRANSFORMERS,

CONDUIT AND JUNCTION BOXES FOR FIRE ALARM AND

TELECOMMUNICATION SYSTEMS AS REQUIRED.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS

IMPACTED BY THIS PROJECT.

8. COORDINATE WITH OWNERS AGENT FOR FINAL LOCATIONS

OF ALL DATA PORTS AND SPECIAL CONNECTIONS FOR

EQUIPMENT PRIOR TO ROUGH-IN. COORDINATE RECEPTACLE

INSTALLATION WITH MILLWORK AND BACKSPLASH

INSTALLERS TO AVOID INTERFERENCES.

9. ELECTRICAL POWER AND TELECOMMUNICATIONS

CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW EACH

OTHER'S DRAWING AND SUBMITTALS AND COORDINATE FOR

FULLY OPERATIONAL SYSTEM.

10. COORDINATE MOUNTING HEIGHTS AND ORIENTATION OF

DEVICES IN MILLWORK WITH ARCHITECTURAL ELEVATIONS.

11. PROVIDE MODIFICATIONS TO THE EXISTING FIRE ALARM

SYSTEM TO SUPPORT THE ADDED FIRE ALARM FIELD

DEVICES AS REQUIRED. PROVIDE ADDITIONAL I/O

CARDS/MODULES, EQUIPMENT, CONNECTIONS, AND

APPERTENANCES AS REQUIRED TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. CONTRACTOR SHALL

COORDINATE ALL FIRE ALARM WORK WITH VA PRIOR TO

INITIATING WORK.

SCALE : 1/4" = 1'-0"

SPECIAL SYSTEMS PLAN - NORTH1

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

M A

TC

H

LI

N E

TO

S

H

EE

T

ET

M A

TC

H

LI

N E

TO

S

H

EE

T

ET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ET101

SPECIAL SYSTEMS PLAN - NORTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL/WNM JPS/FEB

100% CD

Revisions: Date:

1 PROVIDE WALL MOUNTED PHONE. PHONE SHALL

PROVIDE INTERNAL SPS COMMUNICATION VIA THE

INTERCOM SYSTEM; PHONE SHALL HAVE THE ABILITY

TO CALL INTO THE OVERHEAD INTERCOM SYSTEM AS

NEEDED. COORDINATE WITH VA FOR FINAL

LOCATIONS AS REQUIRED.

0 2' 4' 8'

PROJECT

NORTH

2 CARD READER SHALL COMMUNICATE WITH PACS

ACCESS CONTROL PANEL LOCATED IN RM BD-110.

PROVIDE RACEWAYS AND CABLING AS REQUIRED.

W

WAP

WAP

WAP

WAP

WAP

WAP

WAP

W

W

W

W

WAP

AREA OF WORK

W

WAP

WAP

W

FS

FS

UC

UC

UC UC

UC

UC

UCUC

UC

UC

UC

UC

UC

UC

FS

MECHANICAL

ROOM #3

BD-111

+48 AFF

G

FI

LOW TEMP

B130

STERILIZATION COOL

DOWN

B108

OFFICE

B106

MACHINE

B109

CORR

CB-18B

CB-14

CORRIDOR

CB15C

CB13CB-12

MECHANICAL ROOM

#3

BD-111

CORRIDOR

CB-10

ELECTRICAL

CB15K SIGNAL

BD-110B

VESTIBULE

BD-110A

TELE

BD-110A

MALE LOCKERS /

BREAK

B127

FEMALE STAFF

TOILET / LOCKER /

SHOWER

B129

C

LE

A N

A N

TE

B1

OFFICE

B104

OFFICE

B107

PROJECTOR

SYSTEM WITH

SPEAKERS

CLEAN SCOPE

STORAGE

MALE STAFF TOILET /

LOCKER / SHOWER

B128

Room B405

PREP AND PACK

B126

OFFICE

B105

5 TYP

CENTRAL CORE

NORTH

D & T NORTH

CENTRAL CORE

SOUTH

NURSING

TOWER

AREA SHOWN

CENTRAL CORECENTRAL CORE ELECTRICAL RM

BD-110

TELECOM RM

BD-110

(E) 48X30

NE

380-0

PROVIDE WALL MOUNTED PHONE. PHONE SHALL PROVIDE

INTERNAL SPS COMMUNICATION VIA THE INTERCOM

SYSTEM; PHONE SHALL HAVE THE ABILITY TO CALL INTO THE

OVERHEAD INTERCOM SYSTEM AS NEEDED. COORDINATE

WITH VA FOR FINAL LOCATIONS AS REQUIRED.

CEILING SUSPENDED COMPUTER WORK STATION. PROVIDE

CEILING MOUNTED POWER AND DATA OUTLETS AS SHOWN

ON POWER AND TELECOMMUNICATIONS PLANS.

3/4" CO RACEWAY FOR EVOLUTION STEAM STERILIZER

NETWORK CONNECTION.

SMOKE DUCT DETECTOR SHALL BE ACCOMPANIED WITH A

REMOTE TEST SWITCH WITH INDICATOR LOCATED IN

MECHANICAL ROOM BD-111. COORDINATE EXACT LOCATION

OF DEVICES WITH MECHANICAL CONTRACTOR AND VA AS

REQUIRED.

CARD READER SHALL COMMUNICATE WITH PACS ACCESS

CONTROL PANEL LOCATED IN RM BD-110. PROVIDE

RACEWAYS AND CABLING AS REQUIRED.

1. ALL DATA CONNECTIONS SHALL BE ROUTED TO EXISTING IT

CLOSET BD-110. REFERENCE SHEET E-402 FOR ADDITIONAL

INFORMATION.

2. COORDINATE ALL DATA CONNECTIONS WITH EQUIPMENT

MANUFACTURER.

3. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED

WITH THE CONTRACTORS PHASING OF THE PROJECT.

COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER

TRADES.

4. MAKE ALL CONNECTIONS TO EQUIPMENT PER

MANUFACTURER'S REQUIREMENTS.

5. ROUTE ALL CONDUIT HOME RUNS TO PANELS OVERHEAD

AND ABOVE ACCESSIBLE CEILINGS WHERE AVAILABLE.

6. PROVIDE POWER RELAYS, LOW VOLTAGE TRANSFORMERS,

CONDUIT AND JUNCTION BOXES FOR FIRE ALARM AND

TELECOMMUNICATION SYSTEMS AS REQUIRED.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS

IMPACTED BY THIS PROJECT.

8. COORDINATE WITH OWNERS AGENT FOR FINAL LOCATIONS

OF ALL DATA PORTS AND SPECIAL CONNECTIONS FOR

EQUIPMENT PRIOR TO ROUGH-IN. COORDINATE RECEPTACLE

INSTALLATION WITH MILLWORK AND BACKSPLASH

INSTALLERS TO AVOID INTERFERENCES.

9. ELECTRICAL POWER AND TELECOMMUNICATIONS

CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW EACH

OTHER'S DRAWING AND SUBMITTALS AND COORDINATE FOR

FULLY OPERATIONAL SYSTEM.

10. COORDINATE MOUNTING HEIGHTS AND ORIENTATION OF

DEVICES IN MILLWORK WITH ARCHITECTURAL ELEVATIONS.

11. PROVIDE MODIFICATIONS TO THE EXISTING FIRE ALARM

SYSTEM TO SUPPORT THE ADDED FIRE ALARM FIELD

DEVICES AS REQUIRED. PROVIDE ADDITIONAL I/O

CARDS/MODULES, EQUIPMENT, CONNECTIONS, AND

APPERTENANCES AS REQUIRED TO PROVIDE A COMPLETE

AND FULLY FUNCTIONAL SYSTEM. CONTRACTOR SHALL

COORDINATE ALL FIRE ALARM WORK WITH VA PRIOR TO

INITIATING WORK.

SCALE : 1/4" = 1'-0"

SPECIAL SYSTEMS PLAN - SOUTH1

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

KEY PLAN

M A

TC

H

LI

N E

TO

S

H

EE

T

ET

M A

TC

H

LI

N E

TO

S

H

EE

T

ET

3 3 3 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

ET102

SPECIAL SYSTEMS PLAN - SOUTH

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 LRL/WNM JPS/FEB

100% CD

Revisions: Date:

2 2 2

S s I s I s I s I s I

0 2' 4' 8'

PROJECT

NORTH

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

663-102.100.ED101.20210625
663-102.100.ED102.20210625
663-102.100.EL101.20210625
663-102.100.EL102.20210625
663-102.100.EP101.20210625
663-102.100.EP102.20210625
663-102.100.EP103.20210625
663-102.100.ES100.20210625
663-102.100.ES101.20210625
663-102.100.ET101.20230221
Sheets and Views
ET101
663-102.100.ET102.20230221
Sheets and Views
ET102

File details come from the government source that posted it. Updated .