Attachment 10 Drawings 7 of 11 Plumbing.pdf

PDF 3 MB Posted

Attached to
Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
Solicitation number
36C26023R0021
Issued by

About this file

This document package includes construction drawings and specifications for an upgrade project to expand sterile processing services at a Department of Veterans Affairs medical center. Key details include:

  • The project involves renovating and expanding existing sterile processing facilities in Building 100 at the VA Puget Sound Health Care System medical center in Seattle. Scope includes demolition, new construction, and upgrades to mechanical, electrical and plumbing systems.

  • Construction drawings show demolition plans, new floor plans, plumbing plans, and diagrams for reverse osmosis water and compressed air systems. Specifications address requirements for plumbing fixtures and equipment, backflow prevention, and special connections for various washer/sterilizer units and medical gas systems.

  • The solicitation is identified as number 36C26023R0021 and relates to contract 663-20-102 for the upgrade project. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

  • Key requirements center around sterile processing upgrades including new washer/sterilizers, sinks, piping and utilities to support the expanded facilities. Professional engineering and construction services will be required to complete the renovations and system installations per the drawings and specifications.

View the file

Other files

File Type Posted
Attachment 23 Partial Architectural Set.pdf PDF
36C26023R0021 0002.docx DOCX document
Attachment 19 RFI Responses Rev 1.pdf PDF
Attachment 24 RFI Supplement.pptx PPTX presentation
Attachment 15 Wage Determination REV 1 20230825.pdf PDF
Attachment 22 Mobile Steris Trailer.pdf PDF
Attachment 21 Site Visit Agenda and Sign-In.pdf PDF
Attachment 20 36C26022Q0073 RFI List FOR INFORMATIONAL PURPOSES ONLY.pdf PDF
36C26023R0021 0001.docx DOCX document
Attachment 19 RFI Responses.pdf PDF
Attachment 20 36C26022Q0073 RFI List.pdf PDF
Attachment 18 Calculation of Self Performed Work REV 1.pdf PDF
Attachment 14 Drawings 11 of 11 Haz Mat.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 9 Drawings 6 of 11 Mechanical.pdf PDF
36C26023R0021.docx DOCX document
Attachment 8 Drawings 5 of 11 Fire Protection.pdf PDF
Attachment 7 Drawings 4 of 11 Structural.pdf PDF
Attachment 3 Specs 2 of 2.pdf PDF
Attachment 2 Specs 1 of 2.pdf PDF
Attachment 1 Construction SOW Rev5.docx DOCX document
Attachment 13 Drawings 10 of 11 Electrical 3 of 3.pdf PDF
Attachment 17 Contractor Rules Of Behavior.pdf PDF
Attachment 18 Calculation of Self Performed Work.pdf PDF
Attachment 12 Drawings 9 of 11 Electrical 2 of 3.pdf PDF
Attachment 5 Drawings 2 of 11 Civil.pdf PDF
Attachment 15 Wage Determination.pdf PDF
Attachment 11 Drawings 8 of 11 Electrical 1 of 3.pdf PDF
Attachment 6 Drawings 3 of 11 Architectural.pdf PDF
Attachment 4 Drawings 1 of 11 General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONCENTRIC REDUCER/INCREASER

ECCENTRIC REDUCER/INCREASER

UNION

TOP CONNECTION, 45° OR 90°

GENERAL PLUMBING SYMBOLS

EXTENSION & CONTINUATION

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

(HOSE) CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FS FLOW SWITCH

FU FIXTURE UNITS

EL ELEVATION

EMCS ENERGY MONOSERRAT

AND CENTRAL SYSTEM

EPA ENVIROMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EWS/SH EYE WASH/DRENCH SHOWER

EX EXISTING

DCW DOMESTIC COLD WATER

DFU DRAINAGE FIXTURE UNITS

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

C CELSIUS

CA COMPRESSED AIR

CGA COMPRESSED GAS ASSOCIATION

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

CV CONTROL VALVE

BFP REDUCED PRESSURE BACKFLOW

PREVENTER

BHP BREAK HORSEPOWER

BSP BLACK STEEL PIPE

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

A/E ARCHITECT / ENGINEER

AD AREA DRAIN/ACCESS DOOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASD ADJUSTABLE SPEED DRIVES

ASD AUTOMATIC SPRINKLER DRAIN

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH 1000 BTUH

MED MEDICAL

MER MECHANICAL EQUIPMENT

ROOM

MGDU MEDICAL GAS DISTRIBUTION UNIT

MH MANHOLE

MOU MEMORANDUM OF

UNDERSTADING

MSB MOP SERVICE BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N20 NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM. NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW LEADER

KW KILOWATT

KWH KILOWATT-HOUR

ID INSIDE DIAMETER

IE INVERT ELEVATION

ICW INDUSTRIAL COLD WATER

IHW INDUSTRIAL HOT WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

H&CW HOT AND COLD WATER

HB HOSE BIBB

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

PA PASCAL

PBPU PREFABRICATED BEDSIDE PATIENT

UNIT

PD PRESSURE DROP OR

DIFFERENCE

PDI PLUMBING AND DRAINAGE

INSTITUTE

PG PRESSURE GAGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

SAN SANITARY SEWER

SMACNA SHEET METAL AND AIR

CONDITIONING CONTRACTORS

NATIONAL ASSOCIATION

SCFM STANDARD CUBIC FOOT/MINUTE

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SMH SANITARY MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT/SF SQUARE FEET

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL

VALVE

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

V VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAGE

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

WSFU WATER SUPPLY FIXTURE UNITS

YCO YARD CLEANOUT

YH YARD HYDRANT

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RP RECIRCULATION PUMP

RO REVERSE OSMOSIS WATER

PLUMBING ABBREVIATIONSPLUMBING PIPING SYMBOLS

DEFINITIONSYMBOL

DOMESTIC COLD WATER, COLD WATER

DOMESTIC HOT WATER, HOT WATER

DOMESTIC HOW WATER RETURN, HOT WATER RETURN

MEDICAL AIR

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

LIMIT OF DEMOLITION

ANCHOR

DIRECTION OF FLOW

DIRECTION OF PIPE PITCH (DOWN)

VENT (SANITARY)

SOIL, WASTE, OR SANITARY SEWER

SANITARY SEWER, BELOW GRADE

SS

SAN

MA

MEDICAL VACUUMMV

LAB AIR

LAB VACUUMLV

LA

ORAL EXTRACTIONOA

INDUSTRIAL AIRIA

DRAIND

STORM WATERSD

STORM WATER, BELOW GRADESD

SOFTEN COLD WATERSCW

FILTERED COLD WATERFCW

DRINKING WATER SUPPLYDWS

DRINKING WATER RETURNDWR

TEMPERED WATER SUPPLYTWS

TEMPERED WATER RETURNTWR

NITROUS OXIDEN2O

OXYGENO

NITROGENN

NATURAL GASNG

NATURAL GAS, BELOW GRADENG

BOTTOM CONNECTION, 45° OR 90°

PIPE UP

SIDE CONNECTION

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES

FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES

STRAINER

PRESSURE GAGE

THERMOMETER

CLEAN-OUTCO

PTRAP

HOSE BIB

FLOW ELEMENTFE

WATER BALANCING VALVE

PROJECT NOTES

1. SINCE WORK WILL TAKE PLACE IN A HOSPITAL, THERE IS THE POSSIBILITY OF THE

CONTRACTOR COMING IN CONTRACT WITH BLOOD AND BODY FLUIDS WHENEVER

WORKING ON THE SANITARY SEWER SYSTEM. CONTRACTOR IS REQUIRED TO PROVIDE

AND USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT WHENEVER WORKING ON

THE SANITARY SEWER SYSTEM TO PREVENT EXPOSURE TO THEIR EMPLOYEES

PLUMBING SHEET INDEX

P-001 NOTES & LEGENDS - PLUMBING

PD401 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - PLUMBING

PD402 BASEMENT FOUNDATION DEMOLITION PLAN - SOUTH - PLUMBING

PD403 BASEMENT FOUNDATION DEMOLITION PLAN - NORTH - PLUMBING

PD404 BASEMENT INTERSTITIAL DEMOLITION PLAN - SOUTH - PLUMBING

PD405 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - PLUMBING

PW406 BASEMENT FOUNDATION PLAN - SOUTH - PLUMBING

PW407 BASEMENT FOUNDATION PLAN - NORTH - PLUMBING

PL408 BASEMENT MECHANICAL ROOM - PLUMBING

PL409 BASEMENT FLOOR PLAN - SOUTH - PLUMBING

PL410 BASEMENT FLOOR PLAN - NORTH - PLUMBING

PL411 BASEMENT INTERSTITIAL SPACE - SOUTH - PLUMBING

PL412 BASEMENT INTERSTITIAL SPACE - NORTH - PLUMBING

P-501 DETAILS - PLUMBING

P-502 DETAILS - PLUMBING

P-503 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING

P-504 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING

P-505 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING

P-601 SCHEDULES - PLUMBING

PW701 SWING SPACE FOUNDATION PLAN - PLUMBING

PL702 SWING SPACE FLOOR PLAN - PLUMBING

PL703 SWING SPACE INSTERSTITIAL PLAN - PLUMBING

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

P-001

NOTES & LEGENDS - PLUMBING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

BACKFLOW PREVENTER PIPING DETAIL

SCALE: NOT TO SCALE

TYPE "C" FLOOR DRAIN DETAIL

SCALE: NOT TO SCALE

NICKLE BRONZE

ADJUSTABLE

STRAINER

(FLUSH WITH

FINISHED

FLOOR)

CEMENT BED

TILE FLOOR

CONCRETE FILL

STRUCTURAL SLAB

FLASHING

CLAMP WITH

WEEP HOLES

THREADED, CAULKED OR

NO-HUB CONNECTION

LOOSE GRAVEL

AT WEEP HOLES

3mm to 6mm SIZE

WATERPROOF

MEMBRANE

PROVIDE A METAL

SUPPORT PLATE WHEN

DRAIN IS INSTALLED IN

AN EXISTING FLOOR -

CAULK AROUND DRAIN

PRIOR TO RE-GROUTING

CLAMP WATERPROOF

MEMBRANE INSIDE OF DRAIN

BODY TO DRAIN TO WEEP HOLES

NOTE:

SLOPE MEMBRANE LINER 2% TO DRAIN.

6"

FLOOR CLEANOUT (FCO)

CLEANOUT NOT TO BE

LOCATED IN

CARPETED AREA

1/8" BEND IF CLEANOUT

OCCURS AT END OF LINE.

WASTE LINE

LENGTH TO SUIT.

16" SQUARE CONC. PAD.

TROWEL SMOOTH AND

EDGE.

FINISH GRADE.

BRASS CLEANOUT PLUG

W/ COUNTER SUNK HEAD.

CLEANOUT AND ACCESS

COVER. TOP OF COVER

TO BE FLUSH W/ TOP OF

FLOOR.

FLOOR LINE

BALANCE OF PIPING

SAME AS CLEANOUT

TO GRADE.

FLOOR CLEAN-OUT DETAIL

SCALE: NOT TO SCALE

PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING CONSTRUCTION, HAVING PDI #WH- 201, ASSE #1010 AND ANSI #A112.26.1M CERTIFICATION. INSTALL IN HORIZONTAL OR VERTICAL POSITION, BUT NEVER UPSIDE DOWN. INSTALL IN LINE WITH WATER FLOW DIRECTION IF POSSIBLE. SIZE THE

UNITS AS SHOWN ON THE DRAWINGS AND/OR PER THE TABLES SHOWN ABOVE. PROVIDE ACCESS

PANEL FOR SERVICING OR REPLACEMENT, WHERE REQUIRED.

F

E

154-330

114-1541-1/2"

2" SHOWER/BATHTUB

JANITOR'S SINK

PROVIDE ANOTHER HA IN MIDDLE, EACH

IF BRANCH IS GREATER THAN 20' LONG,

LONG, PROVIDE ONE HA AT END OF LINE

IF HORIZONTAL BRANCH IS LESS THAN 20'

SIZED FOR HALF THE FIXTURE UNITSINSTRUCTIONS

SINGLE FIXTURE

C D

A

B

PDI

SIZE

33-60

12-32

61-1131-1/4" 1"

3/4"

1/2" 1-11

FIXTURE

UNIT LOAD

PIPE

SIZE

INSTALL PER PDI

MANUFACTURER'S

STANDARDS AND

MULTIPLE FIXTURES

FIXTURE UNIT TABULATION

VALVE WATER CLOSET

LAVATORY/SINK

TANK WATER CLOSET

URINAL

FIXTURE

1.5

1.5

10 --

HOTCOLD

HA-

HA-

HA-

HA-

HA-

HA-

PDI SIZE "A"

FLOOR LINE

DRAIN LINE

d d

FLOOR GRATE

MOUNT FLUSH

WITH FLOOR AIR GAP = 2 x " "

(MINIMUM 1")

TRAP PRIMER LINE

3" SANITARY

SEWER PIPING

2" VENT UP IN

WALL TO

ABOVE CEILING

P-TRAP

IN

C H

ES

MAY EXTEND AS A

WASTE OR VENT LINE.

WALL

PLUGGED TEE

PVC DWV PIPE

FLOOR LINE

CHROME WALLCOVER

AND SCREW

TE

TR AR

SEWER GASES

FD-1

A W

P

6"

COLD WATER MAIN

SHUT OFF VALVE

TRAP PRIMER VALVE

VACUUM BREATHER PORTS

1/2"

FIN FLOOR1/2"

PUSH PLATE

42"

14.75"

FACE/EYEWASH

WALL

1/2" TEMPERED WATER LINE TO

MIXING VALVE. SEE FLOOR PLAN

FOR ROUTING AND LOCATION

2"V SEE FLOOR PLAN

FOR ROUTING

2"W SEE FLOOR PLAN

FOR ROUTING

PTRAP

PROVIDE WALL

SUPPORT FOR

EYE WASH

83-1/2"

2"

52-1/2"

1-1/4" TEMPERED

WATER LINE TO MIXING

VALVE

ROUTE DRAIN LINE DOWN AND

TERMINATE 2"AFF IN THE DIRECTION

OF THE ROOM SUMP.

11-1/2"

160LEONARD

112kg/cm psi

20 MIXING VALVE

3/4" HW

3/4" CW

EMERGENCY PULL HANDLE

SHOWER HEAD

BRACE

WALL

BRACE

FOOT PEDAL

SIGN

WASTE 1-1/4" NATIONAL

PIPE THREAD

32"

WALL CLEAN-OUT DETAIL

SCALE: NOT TO SCALE

INDIRECT DRAIN FLOOR SINK DETAIL

SCALE: NOT TO SCALE

6EMERGENCY SHOWER WASH IN WALL DETAIL

SCALE: NOT TO SCALE

EMERGENCY EYEWASH (WALL MOUNT) DETAIL

SCALE: NOT TO SCALE

FLOOR DRAIN & TRAP PRIMER DETAIL

SCALE: NOT TO SCALE

WATER HAMMER ARRESTOR DETAIL

SCALE: NOT TO SCALE

[3 m m

WALL LINE

PLAN

AIR GAP

FITTINGWATER LINE

FROM BUILDING

PIPE TO DRAIN

(TYPICAL)

FINISHED FLOOR

COLD WATER

TO EQUIPMENT

PIPE SUPPORT

ELEVATION

[3 m m

TO

BO

TT

O M

O F

R

EL

IE

F

O

PE

N

IN

G S

NO

TEMP/PRESSURE GAUGES

FOR HOT AND COLD SUPPLY.

MIXING VALVE.

NO

TEMP/PRESSURE GAUGES

FOR HOT AND COLD SUPPLY.

TEMP/PRESSURE GAUGE

FOR TEMPERED WATER.

MEDIVATOR

1/2"

IW

SHUT OFF VALVE.

1/2"

IW

1/2" RO

1/2"HW

10 MEDIVATOR PIPING DETAIL

SCALE: NOT TO SCALE

40 60

40 60

.1 Micron .4 Micron 1.0 Micron

FILTER ASSEMBLY .

3 BAY SINK

IW

BFP

REDUCE PRESSURE BFP

CW SUPPLY

40 60

40 60

.1 Micron .4 Micron 1.0 Micron

FILTER ASSEMBLY .

MEDIVATOR

ADVANTAGE

PLUS

IW

NO

TEMP/PRESSURE GAUGES

FOR HOT AND COLD SUPPLY.

MIXING VALVE.

NO

TEMP/PRESSURE GAUGES

FOR HOT AND COLD SUPPLY.

TEMP/PRESSURE GAUGE

FOR TEMPERED WATER.

1/2"

IW

SHUT OFF VALVE.

1/2"

CW

HW

12 SWING SPACE MEDIVATOR PIPING DETAIL

SCALE: NOT TO SCALE

1/2"

1/2"

11 SWING SPACE 3 BAY SINK PIPING DETAIL

SCALE: NOT TO SCALE

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

P-501

DETAILS - PLUMBING

AutoCAD SHX Text d"

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

(RO) REVERSE OSMOSIS WATER RISER DIAGRAM

BASEMENT

1ST FLOOR

INTERSTITIAL

TYPICAL SERVICES POINT OF

CONNECTION. SEE EQUIPMENT

SCHEDULE FOR CONNECTION

SIZES AND FLOW REQUIREMENTS

1/2"

13 1613

RO RO

15 15 15 15 2B 2A 2A 2A 1

3/4"

RO

R O

R O

R O

R O

R O

R O

R O

R O

2A 2B

AIR COMPRESSOR SYSTEM - ACP-1

SCALE: NOT TO SCALE

COMPRESSED AIR RISER DIAGRAM

SCALE: NOT TO SCALE

STORAGE TANK

AIR FILTER

FLEX

CONNECTION

UNION

(TYPICAL)

LINE PRESSURE

RELIEF VALVE

AIR DRYER

1-1/2"CA TO SPS

PRESSURE GAUGE

0-150 PSI (TYPICAL)

PRESSURE REGULATOR

BALL VALVE

(TYPICAL)

SAFETY RELIEF

VALVE

VIBRATION ISOLATION

HOUSEKEEPING PAD

AUTO DRAIN PIPE TO

OVER FLOOR DRAIN

(TYP-3)

AIR INTAKE FILTER

AND SILENCER

COMPRESSED

AIR EQUIPMENT

BASEMENT

1ST FLOOR

INTERSTITIAL

COMPRESSED AIR PRESSURE REDUCING STATION

SCALE: NOT TO SCALE

BALL

VALVE

DRAIN

BALL

VALVE

BALL

VALVE

PRV FILTER

MP502

(TYPICAL)

1111 11 11

1/2" CA

(100 PSI)

1-1/2" CA (120 PSI)

15 2A 12A 2A2B 2B15 15 15 2A13 13

3/4" CA

(100 PSI)

1-1/4" CA

3/4" CA

(100 PSI)

1" CA

1/2" CA

(100 PSI)

1/2" CA

(100 PSI)

1/2" CA

(100 PSI)

1/2" CA

(30 PSI)

1/2" CA

(30 PSI)

1/2" CA

(100 PSI)

3/4" CA

(100 PSI)

3/4" CA

(100 PSI)

3/4" CA 1/2" CA

1/2" CA

(30 PSI)

1/2" CA

(30 PSI)

A

1/2" RACK ON WALL

DIRT LEG WITH

REMOVABLE CAP

12" LONG

PLUGGED 1/2" BALL

VALVE +42"

A

PROVIDE TAKE OFF

FROM TOP OF MAIN

LINE

SCALE: NOT TO SCALE

COMPRESSED AIR DROP DETAIL

RO

(PACKAGE)

3/4" REDUCE PRESSURE BFP

3/4"3/4"3/4"3/4" 3/4"1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2"CW FROM BUILDING

UNION UNION UNION

PRESSURE

GAUGE

PRESSURE

GAUGE

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

P-502

DETAILS - PLUMBING

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

PRETREATMENT DIAGRAM

RO SYSTEM DIAGRAM

SCALE: NOT TO SCALE

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

P-503

RO PROCESS AND

EQUIPMENT DIAGRAMS

- PLUMBING

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

STORAGE AND UV TREATMENT SYSTEM DIAGRAM

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

P-504

RO PROCESS AND

EQUIPMENT DIAGRAMS

- PLUMBING

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

DISTRIBUTION LOOP DIAGRAM

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

P-505

RO PROCESS AND

EQUIPMENT DIAGRAMS

- PLUMBING

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

SPECIAL EQUIPMENT CONNECTION SCHEDULE

SYMBOL DESCRIPTION MANUFACTURER

AND CATALOG # QUANTITY

CONNECTIONS

UTILITY REQUIREMENTS

ESTIMATED RO

WATER USAGE PER

EQUIPMENT UNIT

GALLONS / HOUR

COMBINED

ESTIMATED RO

WATER USAGE

GALLONS / HOUR

COMBINED

ESTIMATED RO

WATER USAGE

(GPM)

NOTES

HW CW V W IW STEAM CD

RETURN RO AIR

VISION 1327 (QT.2) SIDE BY SIDE CART AND UTENSIL

WASHER/DISINFECTOR - SHARED SERVICE / DOUBLE DOOR /

PIT MOUNTED / COMMON SERVICE AREA JUNCTION PANELS

STERIS VISION

1327 1 1" 1" - - F.D. 1-1/2" 1-1/2" 3/4" 1/2"

HARDNESS: 50-80 PPM. PURE WATER

USAGE: 50 GAL INITIAL CYCLE, 14 GAL /

SEQUENTIAL CYCLES. MAX 28 GPM. 8.8

CFM AT 100 PSI.

112 112 1.9 1, 2, 7

AMSCO 50 REPROCESSING SINK - 3 BAY/120" LONG/HEIGHT

ADJUSTABLE/RIGHT TO LEFT WORK FLOW STERIS AMSCO 50 4 1/2" 1/2" - - F.S. - - 1/2" 1/4" HARDNESS: 100-200 PPM. PURE WATER

USAGE: 2 GMP. 2 SCFM AT 30 PSI MAX 15 60 1.0 1, 2, 8, 9

AMSCO 50 REPROCESSING SINK - 3 BAY/120" LONG/HEIGHT

ADJUSTABLE/LEFT TO RIGHT WORK FLOW STERIS AMSCO 50 2 1/2" 1/2" - - F.S. - - 1/2" 1/4" HARDNESS: 100-200 PPM. PURE WATER

USAGE: 2 GMP. 2 SCFM AT 30 PSI MAX 15 30 0.5 1, 2, 8, 9

AMSCO 7052HP SINGLE-CHAMBER WASHER/ DISINFECTOR -

DOUBLE DOOR/ STEAM HEAT/ ACU-RINSE/ VENTED/ OFFSET

MOUNTED

AMSCO 705HP 3 1/2" 1/2" - - F.D. 1/2" 1/2" 1/2" 1/4"

HARDNESS: 100-200 PPM. PURE WATER

USAGE: 12 GAL / CYCLE. 14 GPM. 1.75 CFM

BETWEEN 80 - 125 PSI

12 36 0.6 1, 2, 5, 6, 7

AMSCO 7052HP SINGLE-CHAMBER WASHER/DISINFECTOR -

DOUBLE DOOR/ STEAM HEAT/ ACU-RINSE/ VENTED/ OFFSET

MOUNTED

AMSCO 705HP 2 1/2" 1/2" - - F.D. 1/2" 1/2" 1/2" 1/4"

HARDNESS: 100-200 PPM. PURE WATER

USAGE: 12 GAL / CYCLE. 14 GPM. 1.75 CFM

BETWEEN 80 - 125 PSI

12 24 0.4 1, 2, 5, 6, 7

AMSCO EVOLUTION-NA MEDIUM STEAM STERILIZER -

26X37.5X66"(660X953X1676MM)(958L) DOUBLE

HINGED LR DOORS/ RECESSED 2 WALLS/ STEAM HEAT

AMSCO

EVOLUTION

STEAM

STERILIZER

4 - 3/4" - - F.D. 3/4" 3/4" - 1/4" 3 CFM BETWEEN 80 - 120 PSI. AIR QUALITY:

OIL FREE AND DRY - - - -

ADVANTAGE PLUS ENDOSCOPE WASHER / DISINFECTOR MEDIVATORS

ADVANTAGE PLUS 2 1/2" - - - F.D. - - 1/2" 1/4"

HARDNESS: 50-200 PPM. PURE WATER

USAGE: 11.5 GAL / CYCLE. 2.6 GPM. 1.1 CFM

AT 58 TO 145 PSI.

3 6 0.1 1, 2, 3, 4, 7

INNOWAVE PRO SONIC IRRIGATOR - 60 LUMEN CAPACITY/

208-220 VOLT/3 PHASE, 18kW. CENTER OVER DRAIN.

INNOWAVE PRO

SONIC IRRIGATOR 4 3/4" 3/4" - 2-1/8" F.D. - - 3/4" 1/2"

HARDNESS: 125 PPM. PURE WATER USAGE:

38 GAL / CYCLE. 8 GPM. 80-100 PSI 19 SCFM

FOR 1 MINUTE TOTAL

25 100 1.7 10

INNOWAVE UNITY ULTRASONIC IRRIGATOR INNOWAVE

IRRIGATOR 1 3/4" 3/4" - 2-1/8" F.D. - - - - - - - - 1, 2

ESTIMATED TOTAL RO WATER

DEMAND (GPM) 6.1

COMPRESSED AIR SYSTEM SCHEDULE

# MFR/MODEL # SERVICE TYPE

SYSTEM

CAPACITY HP

SYSTEM FLA RECEIVER

SIZE

(GALLONS)

LOCATION

WEIGHT

(LB) NOTES

120 PSIG 208V (A) 230V (B) 460V (C)

PATTONS

68L-25-203

SPS

COMPRESSED AIR

DUPLEX SCROLL

COMPRESSOR 120 20 - - 39 120 MECHANICAL

ROOM #3 BD-111 2688 1, 2, 3ACP

1. COMPRESSED AIR LOADS INDICATE A MAX USAGE (NO DIVERSITY) OF 120 SCFM. EACH COMPRESSED IS SIZED FOR 50% OF THE LOAD.

2. TWO COMPRESSORS AND THE FOLLOWING ACCESSORIES TO BE PROVIDED AS A SINGLE PACKAGE: AIR DRYER, AND AIR FILTER.

3. NOTE THAT THE AIR DRYER REQUIRES AN ELECTRICAL CONNECTION FOR 1kW AT 120VOLT/SINGLE PHASE.

PLUMBING FIXTURE SCHEDULE

SYMBOL DESCRIPTION MANUFACTURER AND CATALOG # FAUCET/FLUSH VALVE

CONNECTIONS

NOTES

HW CW W V

WATER CLOSET, WALL

HUNG, FLUSH VALVE

(ACCESSIBLE)

SEE SPECIFICATIONS SEE SPECIFICATIONS - 1" 3" 2" PROVIDE FLUSH HANDLE TO COMPLY WITH ADA REQUIREMENTS. SEE ARCHITECTURAL PLANS FOR

LOCATION OF ADA FIXTURES

URINAL WALL MOUNT

WASHDOWN

(ACCESSIBLE)

SEE SPECIFICATIONS SEE SPECIFICATIONS - 3/4" 2" 2" PROVIDE FLUSH HANDLE TO COMPLY WITH ADA REQUIREMENTS. SEE ARCHITECTURAL PLANS FOR

LOCATION OF ADA FIXTURES AND MOUNTING HEIGHTS

LAVATORY WALL MOUNT SEE SPECIFICATIONS SENSOR OPERATED. SEE

SPECIFICATIONS 1/2" 1/2" 1-1/2" 1-1/2"

GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL

MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. 120V-24V TRANSFORMER

WALL MOUNTED

LAVATORY HAND SINK SEE SPECIFICATIONS WRIST BLADE HANDLES. SEE

SPECIFICATIONS 3/4" 3/4" 2" 1-1/2" SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.

LAVATORY COUNTER

MOUNT SEE SPECIFICATIONS SENSOR OPERATED. SEE

SPECIFICATIONS 1/2" 1/2" 1-1/2" 1-1/2"

GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF

ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL

MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. 120V-24V TRANSFORMER

WALL MOUNTED

LAVATORY HAND SINK SEE SPECIFICATIONS SENSOR OPERATED. SEE

SPECIFICATIONS 1/2" 1/2" 1-1/2" 1-1/2"

GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF

ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL

MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. 120V-24V TRANSFORMER

SERVICE MOP SINK SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 3" 2" PROVIDE 4' HOSE, HOSE BRACKET, AND MOP HANGER.

FLOORSTANDING SS

UTILITY SINK SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 3" 2" SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.

KITCHEN DOUBLE

COMPARTMENT SINK SEE SPECIFICATIONS SEE SPECIFICATIONS 3/4" 3/4" 2" 1-1/2" GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, PROVIDE MANUAL MIXING VALVE TO LIMIT HOT

WATER SUPPLY TO 105°F.

SHOWER

(ACCESSIBLE) SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 2" 2"

PROVIDE SHOWER GRID DRAIN AND PTRAP, FOLD UP SEAT, L-SHAPED AND VERTICAL SS GRAB BARS, SHOWER ROD, CURTAIN, AND RINGS. PROVIDE PRESSURE BALANCE SHOWER VALVE TO LIMIT HOT WATER

SUPPLY TO 105°F

CEILING HUNG

EMERGENCY SHOWER SEE SPECIFICATIONS SEE SPECIFICATIONS 3/4" 3/4" F.D. - SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF ADA FIXTURES, PROVIDE MANUAL

MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F

CEILING HUNG

EMERGENCY SHOWER

AND EYE & FACE WASH

SEE SPECIFICATIONS SEE SPECIFICATIONS 3/4" 3/4" F.D. - SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF ADA FIXTURES, PROVIDE MANUAL

MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F

WALL MOUNT EYE WASH SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 2" 2"

GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF

ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL

MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F

MIXING VALVE SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR SIZES

ELECTRIC TRAP PRIMER

MANIFOLD SEE SPECIFICATIONS SEE SPECIFICATIONS - 1/2" - - 120V/1PH/60HZ, 12.1 AMPS IN RUSH, 8.8 AMPS HOLDING

REDUCED PRESSURE

BACK FLOW PREVENTER SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - BACKFLOW DEVICE FOR EQUIPMENT. SEE DRAWINGS FOR SIZES

6"Ø FLOOR DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.

12" SQUARE FLOOR

DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.

S.S. 12" SQUARE FLOOR

DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.

6"Ø FLOOR DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.

DISH WASHER PROVIDED BY VA. INSTALLED BY

CONTRACTOR. - 1/2" - - - PROVIDE HOT WATER WITH SHUTOFF FROM NEAREST SINK, PROVIDE 3/4" INDIRECT DRAIN TO NEAREST

SINK TAIL PIECE THROUGH AIR GAP FITTING.

P-103

P-401

P-711

FD-C

FD-I

TP-1

P-501

P-418

P-524

P-402

P-519

P-201

P-708

P-810

P-706

P-413

BFP-1

DW-1

2A

2B

FD-S

FD-G

RO WATER FILTER SYSTEM

TAG MANUFACTURER

MODEL LOCATION SERVING PRESSURE

DI REQUIREMENTS

NOTES

QUALITY

(PPM)

TEMPERATURE

(F°)

EVOQUA MECH RM

M.E.R. #13

SPS RO

WATER 90 PSI 50 - 80 70 - 140 1, 2, 3

NOTES:

1. 10 GPM AND 310 GALLON STORAGE PURE WATER MAKEUP SYSTEM, 50-75 GPM DISTRIBUTION SYSTEM

2. PROVIDE PACKAGED RO SYSTEM WITH INTEGRAL PUMP AND CONTROLS.

3. MULTI COMPONENT ELECTRICAL REQUIREMENTS:

- 20 FLA, 120 V SINGLE PHASE: CONTROLS, UV, PTC CARBON, LEAK DETECTOR, AND QUALITY LIGHTS

- (2) 8.4A, 480 V THREE PHASE: RO DISTRIBUTION PUMPS

4. PROVIDE AND INSTALL DIFFERENTIAL PRESSURE GAUGE TO MEASURE PRESSURE LOSS ACROSS THE FILTER. SEE GAUGE

LOCATIONS (LABELED P&ID) ON RO DISTRIBUTION DIAGRAM SHEET P-505.

5. RO SYSTEM SHALL BE DESIGNED AND INSTALLED TO MEET THE WATER QUALITY AND TESTING REQUIREMENTS OF AAMI TIR 34.

RO

P-707

NOTES:

1. PROVIDE UTILITY CONNECTIONS WITH SHUTOFF DISCONNECTS WITHIN 2'

OF UNIT PER MANUFACTURE RECOMMENDATIONS.

2. PROVIDE VACUUM BEAKERS ON SERVICE LINES PER MANUFACTURE

RECOMMENDATIONS.

3. PROVIDE 1 MICRON FILTER FOR TEMPERED WATER CONNECTION

4. PROVIDE THERMAL MIXING VALVE FOR WATER CONNECTION

5. PROVIDE 1/4"CA CONNECTION FROM WASHER SUPPLY AIR CONNECTION.

6. PROVIDE 3/4" DRAIN KIT FOR CONVEYERS (UP TO 4 CONVEYERS).

7. ROUTE EACH WET VENT CONDENSATE DRAIN TO NEAREST FLOOR DRAIN

8. PROVIDE PRESSURE REGULATOR FOR AIR GUN.

9. PROVIDE PRESSURE REDUCING VALVE FOR WATER GUN.

10. PROVIDE ELIMINIZER COMBO DRYER/FILTER

SWING SPACE SPECIAL EQUIPMENT CONNECTION SCHEDULE

SYMBOL DESCRIPTION MANUFACTURER AND

CATALOG # QUANTITY

CONNECTIONS

UTILITY REQUIREMENTS

ESTIMATED PURE

WATER USAGE PER

EQUIPMENT UNIT

GALLONS / HOUR

COMBINED

ESTIMATED PURE

WATER USAGE

GALLONS / HOUR

COMBINED

ESTIMATED PURE

WATER USAGE

(GPM)

NOTES

HW CW V W IW STEAM CD

RETURN

FILTERED

WATER AIR

INNOWAVE PRO SONIC IRRIGATOR - 60 LUMEN CAPACITY/

208-220 VOLT/3 PHASE, 18kW. CENTER OVER DRAIN.

INNOWAVE PRO SONIC

IRRIGATOR 2 3/4" 3/4" - 2-1/8" 4" F.D. - - - 1/2"

HARDNESS: 125 PPM. PURE WATER

USAGE: 38 GAL / CYCLE. 8 GPM. 80-100

PSI 19 SCFM FOR 1 MINUTE TOTAL

- - - 1, 2, 6, 8

AMSCO 50 REPROCESSING SINK - 3 BAY/120" LONG/HEIGHT

ADJUSTABLE/LEFT TO RIGHT WORK FLOW STERIS AMSCO 50 1 1/2" 1/2" - 1-1/2" 3" F.S. - - 1/2" 1/4"

HARDNESS: 100-200 PPM. PURE

WATER USAGE: 2 GPM. 2 SCFM AT 30

PSI MAX

- - - 1, 2, 5, 6, 9, 10

AUTOMATED ENDOSCOPE REPROCESSOR STERIS MEDIVATOR

ADVANTAGE PLUS 2 - - - 1" 3" F.D. - - (2) 1/2" 1/4" HARDNESS: LESS THAN 200 PPM. MIN

TEPID FLOW OF 3.2 GPM MIN AT 95° F. - - - 1, 2, 3, 4, 6, 7

SONIC CLEANER CAVIWAVE DUAL BAY 1 1/2" - - 1-1/4" 3" F.D. - - - - HARDNESS: LESS THAN 120 mg/L.

USAGE: 6 GPM - - - 1, 2

ESTIMATED TOTAL PURE WATER

DEMAND (GPM) -

NOTES:

1. PROVIDE UTILITY CONNECTIONS WITH SHUTOFF DISCONNECTS

WITHIN 2' OF UNIT PER MANUFACTURE RECOMMENDATIONS.

2. PROVIDE VACUUM BEAKERS ON SERVICE LINES PER MANUFACTURE

RECOMMENDATIONS.

3. PROVIDE 1 MICRON FILTER FOR TEMPERED WATER CONNECTION

4. PROVIDE THERMAL MIXING VALVE FOR WATER CONNECTION WITHIN

4' OF PREPROCESSOR UNIT

5. PROVIDE A 1 MICRON WATER FILTER FOR COLD WATER

6. PROVIDE BACKFLOW PREVENTER ON COLD WATER INLET

7. PROVIDE OPTIONAL AIR COMPRESSOR FOR PREPROCESSOR.

REQUIRES 120V 20 AMP CONNECTION.

8. PROVIDE ELIMINIZER COMBO DRYER/FILTER

9. PROVIDE PRESSURE REGULATOR FOR AIR GUN.

10. PROVIDE PRESSURE REDUCING VALVE FOR WATER GUN.

S2

S4

S5

S7

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

P-601

SCHEDULES - PLUMBING

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

SE

152-0

SE

179-4

SE

152-10

NE

383'-9"

UP

P-801 30" ABOVE FINISHED FLOOR

HWR

P-805

3" CRP

" MAKE-UP WATER

W/ BACKFLOW PREVENTER

4 " 2"

4 "

4 " DN VALVE

2" V-UP

4"

2" V-UP

2"

4" W

4"

4 "

2"

MA

MV

2" V DN

8"W DN

4" CW & HWR

4"CW

2" HW

4"

2"

4"

4" W

(E) 4"W

(E) HWR

(E) HW

(E) VENT

4" FD 'B'

W/ FUNNEL

EXISTING TO

REMAIN

DRAIN FROM PRV

DRIP-L & HW/HTG.

UNIT INTO S/B

BELOW.

EXISTING TO

REMAIN.

SEE PD404 FOR PIPING

CONTINUATION (TYP)

(E) WASTE LINE TO REMAIN

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

KEY PLAN

LEGEND

PD401

BASEMENT MECHANICAL ROOM DEMOLITION

PLAN - PLUMBING

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

KEY PLAN:NTS

GENERAL NOTES

KEY NOTES

TRUE

NORTH

PROJECT

NORTH

1/4" = 1'-0"1 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - PLUMBING

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN

DEMOLITION AND NEW WORK. COORDINATE DEMOLITION

WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT

WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED

TO BE RETURNED TO THE OWNER, SHALL BECOME THE

PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF

ITEMS ON THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT

AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST

AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN

AND AROUND BUILDING DURING DEMOLITION. PREVENT

INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE

ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE

CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE

MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING

REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND

PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES

SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT

FIRST OBTAINING PERMISSION FROM THE UTILITY COMPANY

AND/OR OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL

EQUIPMENT AS SHOWN, UNLESS NOTED OTHERWISE.

COORDINATE WITH ARCHITECT, AREAS OF DEMOLITION

AROUND, ADJACENT, OR CONNECTED TO EXISTING

MECHANICAL EQUIPMENT THAT IS TO REMAIN.

EXISTING WORK (LIGHT)

DEMOLITION (DARK)

POINT OF DEMOLITION

DEMOLITION KEY

SPS

SWING

SPACE

WAREHOUSE

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

76-0

SE

114-0

SE

152-0

SE

190-0

SE

179-4

SE

152-10

SE

76-0

SE

114-0

NE

383'-9"

NE

342-0

NE

304-0

UP

NE

380-0

SEE PD403 FOR

CONTINUATION

(E) CLEANOUT

TO REMAIN

(TYP)

SPEES DESIGN BUILD

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN

DEMOLITION AND NEW WORK. COORDINATE DEMOLITION

WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT

WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO

BE RETURNED TO THE OWNER, SHALL BECOME THE

PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF

ITEMS ON THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT

AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST

AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN

AND AROUND BUILDING DURING DEMOLITION. PREVENT

INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE

ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE

CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE

MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING

REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND

PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES

SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM THE UTILITY COMPANY AND/OR

OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT

AS SHOWN, UNLESS NOTED OTHERWISE. COORDINATE WITH

ARCHITECT, AREAS OF DEMOLITION AROUND, ADJACENT, OR

CONNECTED TO EXISTING MECHANICAL EQUIPMENT THAT IS

TO REMAIN.

KEY NOTES

KEY PLAN

REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE

ABOVE. REMOVE ASSOCIATED WASTE, VENT, HOT WATER, AND

COLD WATER. COORDINATE EXTENT OF DEMOLITION WITH NEW

WORK.

LEGEND

PD402

BASEMENT FOUNDATION DEMOLITION PLAN -

SOUTH - PLUMBING

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

KEY PLAN:NTSTRUE

NORTH

PROJECT

NORTH

1/4" = 1'-0"1 BASEMENT FOUNDATION DEMOLITION PLAN - SOUTH - PLUMBING

EXISTING WORK (LIGHT)

DEMOLITION (DARK)

POINT OF DEMOLITION

DEMOLITION KEY

SPS

SWING

SPACE

WAREHOUSE

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

38'-0"

NW

SE

0'-0"

S 176'-7"

S 143'-3"

E 146'-6"

E 197'-4"

E

SE

76-0

NW

14-9

NW

3-6

NE

380-0

NE

304-0

NE

342-0

SE

38'-0"

NW

SE

0'-0"

SE

76-0

NW

14-9

NW

3-6

NE

383'-9"

CAP 4" GREASE

WASTE LINE AND

VENT

SEE PD402 FOR

CONTINUATION

(E) 3"

(E) 4"

(E) 4"

(E) 4"

(E) 4"

(E) 4"

(E) 4"

(E) 2"

(E) 2"

(E) 3"

(E) 3"

(E) 3"

GW

GW

GW

GW

GW

W UP TO (E) SINK

TO REMAIN

(E) CLEANOUT

TO REMAIN

(E) 2"

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN

DEMOLITION AND NEW WORK. COORDINATE DEMOLITION

WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT

WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED

TO BE RETURNED TO THE OWNER, SHALL BECOME THE

PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF

ITEMS ON THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT

AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST

AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN

AND AROUND BUILDING DURING DEMOLITION. PREVENT

INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE

ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE

CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE

MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING

REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND

PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES

SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT

FIRST OBTAINING PERMISSION FROM THE UTILITY COMPANY

AND/OR OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL

EQUIPMENT AS SHOWN, UNLESS NOTED OTHERWISE.

COORDINATE WITH ARCHITECT, AREAS OF DEMOLITION

AROUND, ADJACENT, OR CONNECTED TO EXISTING

MECHANICAL EQUIPMENT THAT IS TO REMAIN.

KEY NOTES

REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE

ABOVE. REMOVE ASSOCIATED WASTE, VENT, HOT WATER,

AND COLD WATER. COORDINATE EXTENT OF DEMOLITION

WITH NEW WORK.

LEGEND

PD403

BASEMENT FOUNDATION DEMOLITION PLAN -

NORTH - PLUMBING

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

KEY PLAN:NTSTRUE

NORTH

PROJECT

NORTH

1/4" = 1'-0"1 BASEMENT FOUNDATION DEMOLITION PLAN - NORTH - PLUMBING

EXISTING WORK (LIGHT)

DEMOLITION (DARK)

POINT OF DEMOLITION

DEMOLITION KEY

SPS

SWING

SPACE

WAREHOUSE

AutoCAD SHX Text

EXPIRES 2/20/22

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text 44961

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

VA

C

1688 SF

PREP / PACK

B117

SE

76-0

SE

114-0

SE

152-0

SE

190-0

SE

179-4

SE

152-10

SE

76-0

SE

114-0

NE

383'-9"

NE

342-0

NE

304-0

UP

NE

380-0

OFFICE

BD-112MECHANICAL

ROOM #3

BD-111

CORRIDOR

CB-9

OFFICE

BD-112C

BD-110A

SIGNAL

BD-110B

BREAK

ROOM

BD-112D BD-103A

HAC

MALE

TOILET

FEMALE

TOILET

BD-103C

OFFICE

BD-112B

OFFICE

BD-112A

NON-STERILE

STORAGE

BD-104

BD-103

VESTIBULE

BD-110C

(E) 1-1/2"W UP TO

FLOOR ABOVE.

(E) 1-1/2"W UP TO

FLOOR ABOVE.

HWR HWR

HWHW

VV

SEE PD401 FOR DEMO WORK

IN MECHANICAL ROOM

SEE PD405 FOR

CONTINUATION

(TYP)

(E) 1"CW

(E) 3/4"CW

(E) VALVE

(E) 3/4"CW

HW, CW, AND VENT TO

(E) SINK TO REMAIN

625 1ST AVE, UNIT 301

SEATTLE, WA 98101

(360) 223-8994

RAY SPEES, PRINCIPAL

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

06/25/2021 Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MKK AGG

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

663-20-102

KARTCHNER ENGINEERING

101 S STEVENS, SUITE 201

SPOKANE, WA 99201

(509) 922-0383

100% CD

GENERAL NOTES

KEY NOTES

LEGEND

PD404

D & T

TRUE

NORTH

PROJECT

NORTH

NURSING

TOWER

AREA OF

RENOVATION

WORK

KEY PLAN:NTS

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN

DEMOLITION AND NEW WORK. COORDINATE DEMOLITION

WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT

WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED

TO BE RETURNED TO THE OWNER, SHALL BECOME THE

PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF

ITEMS ON THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT

AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST

AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN

AND AROUND BUILDING DURING DEMOLITION. PREVENT

INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE

ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE

CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE

MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING

REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND

PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES

SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT

FIRST OBTAINING PERMISSION FROM THE UTILITY COMPANY

AND/OR OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL

EQUIPMENT AS SHOWN, UNLESS NOTED OTHERWISE.

COORDINATE WITH…