This document package includes construction drawings and specifications for an upgrade project to expand sterile processing services at a Department of Veterans Affairs medical center. Key details include:
-
The project involves renovating and expanding existing sterile processing facilities in Building 100 at the VA Puget Sound Health Care System medical center in Seattle. Scope includes demolition, new construction, and upgrades to mechanical, electrical and plumbing systems.
-
Construction drawings show demolition plans, new floor plans, plumbing plans, and diagrams for reverse osmosis water and compressed air systems. Specifications address requirements for plumbing fixtures and equipment, backflow prevention, and special connections for various washer/sterilizer units and medical gas systems.
-
The solicitation is identified as number 36C26023R0021 and relates to contract 663-20-102 for the upgrade project. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.
-
Key requirements center around sterile processing upgrades including new washer/sterilizers, sinks, piping and utilities to support the expanded facilities. Professional engineering and construction services will be required to complete the renovations and system installations per the drawings and specifications.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONCENTRIC REDUCER/INCREASER
ECCENTRIC REDUCER/INCREASER
UNION
TOP CONNECTION, 45° OR 90°
GENERAL PLUMBING SYMBOLS
EXTENSION & CONTINUATION
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
(HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT
ROOM
MGDU MEDICAL GAS DISTRIBUTION UNIT
MH MANHOLE
MOU MEMORANDUM OF
UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW LEADER
KW KILOWATT
KWH KILOWATT-HOUR
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
PA PASCAL
PBPU PREFABRICATED BEDSIDE PATIENT
UNIT
PD PRESSURE DROP OR
DIFFERENCE
PDI PLUMBING AND DRAINAGE
INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL
VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
PLUMBING ABBREVIATIONSPLUMBING PIPING SYMBOLS
DEFINITIONSYMBOL
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER, HOT WATER
DOMESTIC HOW WATER RETURN, HOT WATER RETURN
MEDICAL AIR
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
LIMIT OF DEMOLITION
ANCHOR
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH (DOWN)
VENT (SANITARY)
SOIL, WASTE, OR SANITARY SEWER
SANITARY SEWER, BELOW GRADE
SS
SAN
MA
MEDICAL VACUUMMV
LAB AIR
LAB VACUUMLV
LA
ORAL EXTRACTIONOA
INDUSTRIAL AIRIA
DRAIND
STORM WATERSD
STORM WATER, BELOW GRADESD
SOFTEN COLD WATERSCW
FILTERED COLD WATERFCW
DRINKING WATER SUPPLYDWS
DRINKING WATER RETURNDWR
TEMPERED WATER SUPPLYTWS
TEMPERED WATER RETURNTWR
NITROUS OXIDEN2O
OXYGENO
NITROGENN
NATURAL GASNG
NATURAL GAS, BELOW GRADENG
BOTTOM CONNECTION, 45° OR 90°
PIPE UP
SIDE CONNECTION
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES
STRAINER
PRESSURE GAGE
THERMOMETER
CLEAN-OUTCO
PTRAP
HOSE BIB
FLOW ELEMENTFE
WATER BALANCING VALVE
PROJECT NOTES
1. SINCE WORK WILL TAKE PLACE IN A HOSPITAL, THERE IS THE POSSIBILITY OF THE
CONTRACTOR COMING IN CONTRACT WITH BLOOD AND BODY FLUIDS WHENEVER
WORKING ON THE SANITARY SEWER SYSTEM. CONTRACTOR IS REQUIRED TO PROVIDE
AND USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT WHENEVER WORKING ON
THE SANITARY SEWER SYSTEM TO PREVENT EXPOSURE TO THEIR EMPLOYEES
PLUMBING SHEET INDEX
P-001 NOTES & LEGENDS - PLUMBING
PD401 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - PLUMBING
PD402 BASEMENT FOUNDATION DEMOLITION PLAN - SOUTH - PLUMBING
PD403 BASEMENT FOUNDATION DEMOLITION PLAN - NORTH - PLUMBING
PD404 BASEMENT INTERSTITIAL DEMOLITION PLAN - SOUTH - PLUMBING
PD405 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - PLUMBING
PW406 BASEMENT FOUNDATION PLAN - SOUTH - PLUMBING
PW407 BASEMENT FOUNDATION PLAN - NORTH - PLUMBING
PL408 BASEMENT MECHANICAL ROOM - PLUMBING
PL409 BASEMENT FLOOR PLAN - SOUTH - PLUMBING
PL410 BASEMENT FLOOR PLAN - NORTH - PLUMBING
PL411 BASEMENT INTERSTITIAL SPACE - SOUTH - PLUMBING
PL412 BASEMENT INTERSTITIAL SPACE - NORTH - PLUMBING
P-501 DETAILS - PLUMBING
P-502 DETAILS - PLUMBING
P-503 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING
P-504 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING
P-505 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING
P-601 SCHEDULES - PLUMBING
PW701 SWING SPACE FOUNDATION PLAN - PLUMBING
PL702 SWING SPACE FLOOR PLAN - PLUMBING
PL703 SWING SPACE INSTERSTITIAL PLAN - PLUMBING
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
P-001
NOTES & LEGENDS - PLUMBING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
BACKFLOW PREVENTER PIPING DETAIL
SCALE: NOT TO SCALE
TYPE "C" FLOOR DRAIN DETAIL
SCALE: NOT TO SCALE
NICKLE BRONZE
ADJUSTABLE
STRAINER
(FLUSH WITH
FINISHED
FLOOR)
CEMENT BED
TILE FLOOR
CONCRETE FILL
STRUCTURAL SLAB
FLASHING
CLAMP WITH
WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
LOOSE GRAVEL
AT WEEP HOLES
3mm to 6mm SIZE
WATERPROOF
MEMBRANE
PROVIDE A METAL
SUPPORT PLATE WHEN
DRAIN IS INSTALLED IN
AN EXISTING FLOOR -
CAULK AROUND DRAIN
PRIOR TO RE-GROUTING
CLAMP WATERPROOF
MEMBRANE INSIDE OF DRAIN
BODY TO DRAIN TO WEEP HOLES
NOTE:
SLOPE MEMBRANE LINER 2% TO DRAIN.
6"
FLOOR CLEANOUT (FCO)
CLEANOUT NOT TO BE
LOCATED IN
CARPETED AREA
1/8" BEND IF CLEANOUT
OCCURS AT END OF LINE.
WASTE LINE
LENGTH TO SUIT.
16" SQUARE CONC. PAD.
TROWEL SMOOTH AND
EDGE.
FINISH GRADE.
BRASS CLEANOUT PLUG
W/ COUNTER SUNK HEAD.
CLEANOUT AND ACCESS
COVER. TOP OF COVER
TO BE FLUSH W/ TOP OF
FLOOR.
FLOOR LINE
BALANCE OF PIPING
SAME AS CLEANOUT
TO GRADE.
FLOOR CLEAN-OUT DETAIL
SCALE: NOT TO SCALE
PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING CONSTRUCTION, HAVING PDI #WH- 201, ASSE #1010 AND ANSI #A112.26.1M CERTIFICATION. INSTALL IN HORIZONTAL OR VERTICAL POSITION, BUT NEVER UPSIDE DOWN. INSTALL IN LINE WITH WATER FLOW DIRECTION IF POSSIBLE. SIZE THE
UNITS AS SHOWN ON THE DRAWINGS AND/OR PER THE TABLES SHOWN ABOVE. PROVIDE ACCESS
PANEL FOR SERVICING OR REPLACEMENT, WHERE REQUIRED.
F
E
154-330
114-1541-1/2"
2" SHOWER/BATHTUB
JANITOR'S SINK
PROVIDE ANOTHER HA IN MIDDLE, EACH
IF BRANCH IS GREATER THAN 20' LONG,
LONG, PROVIDE ONE HA AT END OF LINE
IF HORIZONTAL BRANCH IS LESS THAN 20'
SIZED FOR HALF THE FIXTURE UNITSINSTRUCTIONS
SINGLE FIXTURE
C D
A
B
PDI
SIZE
33-60
12-32
61-1131-1/4" 1"
3/4"
1/2" 1-11
FIXTURE
UNIT LOAD
PIPE
SIZE
INSTALL PER PDI
MANUFACTURER'S
STANDARDS AND
MULTIPLE FIXTURES
FIXTURE UNIT TABULATION
VALVE WATER CLOSET
LAVATORY/SINK
TANK WATER CLOSET
URINAL
FIXTURE
1.5
1.5
10 --
HOTCOLD
HA-
HA-
HA-
HA-
HA-
HA-
PDI SIZE "A"
FLOOR LINE
DRAIN LINE
d d
FLOOR GRATE
MOUNT FLUSH
WITH FLOOR AIR GAP = 2 x " "
(MINIMUM 1")
TRAP PRIMER LINE
3" SANITARY
SEWER PIPING
2" VENT UP IN
WALL TO
ABOVE CEILING
P-TRAP
IN
C H
ES
MAY EXTEND AS A
WASTE OR VENT LINE.
WALL
PLUGGED TEE
PVC DWV PIPE
FLOOR LINE
CHROME WALLCOVER
AND SCREW
TE
TR AR
SEWER GASES
FD-1
A W
P
6"
COLD WATER MAIN
SHUT OFF VALVE
TRAP PRIMER VALVE
VACUUM BREATHER PORTS
1/2"
FIN FLOOR1/2"
PUSH PLATE
42"
14.75"
FACE/EYEWASH
WALL
1/2" TEMPERED WATER LINE TO
MIXING VALVE. SEE FLOOR PLAN
FOR ROUTING AND LOCATION
2"V SEE FLOOR PLAN
FOR ROUTING
2"W SEE FLOOR PLAN
FOR ROUTING
PTRAP
PROVIDE WALL
SUPPORT FOR
EYE WASH
83-1/2"
2"
52-1/2"
1-1/4" TEMPERED
WATER LINE TO MIXING
VALVE
ROUTE DRAIN LINE DOWN AND
TERMINATE 2"AFF IN THE DIRECTION
OF THE ROOM SUMP.
11-1/2"
160LEONARD
112kg/cm psi
20 MIXING VALVE
3/4" HW
3/4" CW
EMERGENCY PULL HANDLE
SHOWER HEAD
BRACE
WALL
BRACE
FOOT PEDAL
SIGN
WASTE 1-1/4" NATIONAL
PIPE THREAD
32"
WALL CLEAN-OUT DETAIL
SCALE: NOT TO SCALE
INDIRECT DRAIN FLOOR SINK DETAIL
SCALE: NOT TO SCALE
6EMERGENCY SHOWER WASH IN WALL DETAIL
SCALE: NOT TO SCALE
EMERGENCY EYEWASH (WALL MOUNT) DETAIL
SCALE: NOT TO SCALE
FLOOR DRAIN & TRAP PRIMER DETAIL
SCALE: NOT TO SCALE
WATER HAMMER ARRESTOR DETAIL
SCALE: NOT TO SCALE
[3 m m
WALL LINE
PLAN
AIR GAP
FITTINGWATER LINE
FROM BUILDING
PIPE TO DRAIN
(TYPICAL)
FINISHED FLOOR
COLD WATER
TO EQUIPMENT
PIPE SUPPORT
ELEVATION
[3 m m
TO
BO
TT
O M
O F
R
EL
IE
F
O
PE
N
IN
G S
NO
TEMP/PRESSURE GAUGES
FOR HOT AND COLD SUPPLY.
MIXING VALVE.
NO
TEMP/PRESSURE GAUGES
FOR HOT AND COLD SUPPLY.
TEMP/PRESSURE GAUGE
FOR TEMPERED WATER.
MEDIVATOR
1/2"
IW
SHUT OFF VALVE.
1/2"
IW
1/2" RO
1/2"HW
10 MEDIVATOR PIPING DETAIL
SCALE: NOT TO SCALE
40 60
40 60
.1 Micron .4 Micron 1.0 Micron
FILTER ASSEMBLY .
3 BAY SINK
IW
BFP
REDUCE PRESSURE BFP
CW SUPPLY
40 60
40 60
.1 Micron .4 Micron 1.0 Micron
FILTER ASSEMBLY .
MEDIVATOR
ADVANTAGE
PLUS
IW
NO
TEMP/PRESSURE GAUGES
FOR HOT AND COLD SUPPLY.
MIXING VALVE.
NO
TEMP/PRESSURE GAUGES
FOR HOT AND COLD SUPPLY.
TEMP/PRESSURE GAUGE
FOR TEMPERED WATER.
1/2"
IW
SHUT OFF VALVE.
1/2"
CW
HW
12 SWING SPACE MEDIVATOR PIPING DETAIL
SCALE: NOT TO SCALE
1/2"
1/2"
11 SWING SPACE 3 BAY SINK PIPING DETAIL
SCALE: NOT TO SCALE
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
P-501
DETAILS - PLUMBING
AutoCAD SHX Text d"
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
(RO) REVERSE OSMOSIS WATER RISER DIAGRAM
BASEMENT
1ST FLOOR
INTERSTITIAL
TYPICAL SERVICES POINT OF
CONNECTION. SEE EQUIPMENT
SCHEDULE FOR CONNECTION
SIZES AND FLOW REQUIREMENTS
1/2"
13 1613
RO RO
15 15 15 15 2B 2A 2A 2A 1
3/4"
RO
R O
R O
R O
R O
R O
R O
R O
R O
2A 2B
AIR COMPRESSOR SYSTEM - ACP-1
SCALE: NOT TO SCALE
COMPRESSED AIR RISER DIAGRAM
SCALE: NOT TO SCALE
STORAGE TANK
AIR FILTER
FLEX
CONNECTION
UNION
(TYPICAL)
LINE PRESSURE
RELIEF VALVE
AIR DRYER
1-1/2"CA TO SPS
PRESSURE GAUGE
0-150 PSI (TYPICAL)
PRESSURE REGULATOR
BALL VALVE
(TYPICAL)
SAFETY RELIEF
VALVE
VIBRATION ISOLATION
HOUSEKEEPING PAD
AUTO DRAIN PIPE TO
OVER FLOOR DRAIN
(TYP-3)
AIR INTAKE FILTER
AND SILENCER
COMPRESSED
AIR EQUIPMENT
BASEMENT
1ST FLOOR
INTERSTITIAL
COMPRESSED AIR PRESSURE REDUCING STATION
SCALE: NOT TO SCALE
BALL
VALVE
DRAIN
BALL
VALVE
BALL
VALVE
PRV FILTER
MP502
(TYPICAL)
1111 11 11
1/2" CA
(100 PSI)
1-1/2" CA (120 PSI)
15 2A 12A 2A2B 2B15 15 15 2A13 13
3/4" CA
(100 PSI)
1-1/4" CA
3/4" CA
(100 PSI)
1" CA
1/2" CA
(100 PSI)
1/2" CA
(100 PSI)
1/2" CA
(100 PSI)
1/2" CA
(30 PSI)
1/2" CA
(30 PSI)
1/2" CA
(100 PSI)
3/4" CA
(100 PSI)
3/4" CA
(100 PSI)
3/4" CA 1/2" CA
1/2" CA
(30 PSI)
1/2" CA
(30 PSI)
A
1/2" RACK ON WALL
DIRT LEG WITH
REMOVABLE CAP
12" LONG
PLUGGED 1/2" BALL
VALVE +42"
A
PROVIDE TAKE OFF
FROM TOP OF MAIN
LINE
SCALE: NOT TO SCALE
COMPRESSED AIR DROP DETAIL
RO
(PACKAGE)
3/4" REDUCE PRESSURE BFP
3/4"3/4"3/4"3/4" 3/4"1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2"CW FROM BUILDING
UNION UNION UNION
PRESSURE
GAUGE
PRESSURE
GAUGE
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
P-502
DETAILS - PLUMBING
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
PRETREATMENT DIAGRAM
RO SYSTEM DIAGRAM
SCALE: NOT TO SCALE
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
P-503
RO PROCESS AND
EQUIPMENT DIAGRAMS
- PLUMBING
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
STORAGE AND UV TREATMENT SYSTEM DIAGRAM
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
P-504
RO PROCESS AND
EQUIPMENT DIAGRAMS
- PLUMBING
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
DISTRIBUTION LOOP DIAGRAM
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
P-505
RO PROCESS AND
EQUIPMENT DIAGRAMS
- PLUMBING
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
SPECIAL EQUIPMENT CONNECTION SCHEDULE
SYMBOL DESCRIPTION MANUFACTURER
AND CATALOG # QUANTITY
CONNECTIONS
UTILITY REQUIREMENTS
ESTIMATED RO
WATER USAGE PER
EQUIPMENT UNIT
GALLONS / HOUR
COMBINED
ESTIMATED RO
WATER USAGE
GALLONS / HOUR
COMBINED
ESTIMATED RO
WATER USAGE
(GPM)
NOTES
HW CW V W IW STEAM CD
RETURN RO AIR
VISION 1327 (QT.2) SIDE BY SIDE CART AND UTENSIL
WASHER/DISINFECTOR - SHARED SERVICE / DOUBLE DOOR /
PIT MOUNTED / COMMON SERVICE AREA JUNCTION PANELS
STERIS VISION
1327 1 1" 1" - - F.D. 1-1/2" 1-1/2" 3/4" 1/2"
HARDNESS: 50-80 PPM. PURE WATER
USAGE: 50 GAL INITIAL CYCLE, 14 GAL /
SEQUENTIAL CYCLES. MAX 28 GPM. 8.8
CFM AT 100 PSI.
112 112 1.9 1, 2, 7
AMSCO 50 REPROCESSING SINK - 3 BAY/120" LONG/HEIGHT
ADJUSTABLE/RIGHT TO LEFT WORK FLOW STERIS AMSCO 50 4 1/2" 1/2" - - F.S. - - 1/2" 1/4" HARDNESS: 100-200 PPM. PURE WATER
USAGE: 2 GMP. 2 SCFM AT 30 PSI MAX 15 60 1.0 1, 2, 8, 9
AMSCO 50 REPROCESSING SINK - 3 BAY/120" LONG/HEIGHT
ADJUSTABLE/LEFT TO RIGHT WORK FLOW STERIS AMSCO 50 2 1/2" 1/2" - - F.S. - - 1/2" 1/4" HARDNESS: 100-200 PPM. PURE WATER
USAGE: 2 GMP. 2 SCFM AT 30 PSI MAX 15 30 0.5 1, 2, 8, 9
AMSCO 7052HP SINGLE-CHAMBER WASHER/ DISINFECTOR -
DOUBLE DOOR/ STEAM HEAT/ ACU-RINSE/ VENTED/ OFFSET
MOUNTED
AMSCO 705HP 3 1/2" 1/2" - - F.D. 1/2" 1/2" 1/2" 1/4"
HARDNESS: 100-200 PPM. PURE WATER
USAGE: 12 GAL / CYCLE. 14 GPM. 1.75 CFM
BETWEEN 80 - 125 PSI
12 36 0.6 1, 2, 5, 6, 7
AMSCO 7052HP SINGLE-CHAMBER WASHER/DISINFECTOR -
DOUBLE DOOR/ STEAM HEAT/ ACU-RINSE/ VENTED/ OFFSET
MOUNTED
AMSCO 705HP 2 1/2" 1/2" - - F.D. 1/2" 1/2" 1/2" 1/4"
HARDNESS: 100-200 PPM. PURE WATER
USAGE: 12 GAL / CYCLE. 14 GPM. 1.75 CFM
BETWEEN 80 - 125 PSI
12 24 0.4 1, 2, 5, 6, 7
AMSCO EVOLUTION-NA MEDIUM STEAM STERILIZER -
26X37.5X66"(660X953X1676MM)(958L) DOUBLE
HINGED LR DOORS/ RECESSED 2 WALLS/ STEAM HEAT
AMSCO
EVOLUTION
STEAM
STERILIZER
4 - 3/4" - - F.D. 3/4" 3/4" - 1/4" 3 CFM BETWEEN 80 - 120 PSI. AIR QUALITY:
OIL FREE AND DRY - - - -
ADVANTAGE PLUS ENDOSCOPE WASHER / DISINFECTOR MEDIVATORS
ADVANTAGE PLUS 2 1/2" - - - F.D. - - 1/2" 1/4"
HARDNESS: 50-200 PPM. PURE WATER
USAGE: 11.5 GAL / CYCLE. 2.6 GPM. 1.1 CFM
AT 58 TO 145 PSI.
3 6 0.1 1, 2, 3, 4, 7
INNOWAVE PRO SONIC IRRIGATOR - 60 LUMEN CAPACITY/
208-220 VOLT/3 PHASE, 18kW. CENTER OVER DRAIN.
INNOWAVE PRO
SONIC IRRIGATOR 4 3/4" 3/4" - 2-1/8" F.D. - - 3/4" 1/2"
HARDNESS: 125 PPM. PURE WATER USAGE:
38 GAL / CYCLE. 8 GPM. 80-100 PSI 19 SCFM
FOR 1 MINUTE TOTAL
25 100 1.7 10
INNOWAVE UNITY ULTRASONIC IRRIGATOR INNOWAVE
IRRIGATOR 1 3/4" 3/4" - 2-1/8" F.D. - - - - - - - - 1, 2
ESTIMATED TOTAL RO WATER
DEMAND (GPM) 6.1
COMPRESSED AIR SYSTEM SCHEDULE
# MFR/MODEL # SERVICE TYPE
SYSTEM
CAPACITY HP
SYSTEM FLA RECEIVER
SIZE
(GALLONS)
LOCATION
WEIGHT
(LB) NOTES
120 PSIG 208V (A) 230V (B) 460V (C)
PATTONS
68L-25-203
SPS
COMPRESSED AIR
DUPLEX SCROLL
COMPRESSOR 120 20 - - 39 120 MECHANICAL
ROOM #3 BD-111 2688 1, 2, 3ACP
1. COMPRESSED AIR LOADS INDICATE A MAX USAGE (NO DIVERSITY) OF 120 SCFM. EACH COMPRESSED IS SIZED FOR 50% OF THE LOAD.
2. TWO COMPRESSORS AND THE FOLLOWING ACCESSORIES TO BE PROVIDED AS A SINGLE PACKAGE: AIR DRYER, AND AIR FILTER.
3. NOTE THAT THE AIR DRYER REQUIRES AN ELECTRICAL CONNECTION FOR 1kW AT 120VOLT/SINGLE PHASE.
PLUMBING FIXTURE SCHEDULE
SYMBOL DESCRIPTION MANUFACTURER AND CATALOG # FAUCET/FLUSH VALVE
CONNECTIONS
NOTES
HW CW W V
WATER CLOSET, WALL
HUNG, FLUSH VALVE
(ACCESSIBLE)
SEE SPECIFICATIONS SEE SPECIFICATIONS - 1" 3" 2" PROVIDE FLUSH HANDLE TO COMPLY WITH ADA REQUIREMENTS. SEE ARCHITECTURAL PLANS FOR
LOCATION OF ADA FIXTURES
URINAL WALL MOUNT
WASHDOWN
(ACCESSIBLE)
SEE SPECIFICATIONS SEE SPECIFICATIONS - 3/4" 2" 2" PROVIDE FLUSH HANDLE TO COMPLY WITH ADA REQUIREMENTS. SEE ARCHITECTURAL PLANS FOR
LOCATION OF ADA FIXTURES AND MOUNTING HEIGHTS
LAVATORY WALL MOUNT SEE SPECIFICATIONS SENSOR OPERATED. SEE
SPECIFICATIONS 1/2" 1/2" 1-1/2" 1-1/2"
GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL
MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. 120V-24V TRANSFORMER
WALL MOUNTED
LAVATORY HAND SINK SEE SPECIFICATIONS WRIST BLADE HANDLES. SEE
SPECIFICATIONS 3/4" 3/4" 2" 1-1/2" SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.
LAVATORY COUNTER
MOUNT SEE SPECIFICATIONS SENSOR OPERATED. SEE
SPECIFICATIONS 1/2" 1/2" 1-1/2" 1-1/2"
GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF
ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL
MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. 120V-24V TRANSFORMER
WALL MOUNTED
LAVATORY HAND SINK SEE SPECIFICATIONS SENSOR OPERATED. SEE
SPECIFICATIONS 1/2" 1/2" 1-1/2" 1-1/2"
GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF
ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL
MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F. 120V-24V TRANSFORMER
SERVICE MOP SINK SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 3" 2" PROVIDE 4' HOSE, HOSE BRACKET, AND MOP HANGER.
FLOORSTANDING SS
UTILITY SINK SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 3" 2" SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.
KITCHEN DOUBLE
COMPARTMENT SINK SEE SPECIFICATIONS SEE SPECIFICATIONS 3/4" 3/4" 2" 1-1/2" GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, PROVIDE MANUAL MIXING VALVE TO LIMIT HOT
WATER SUPPLY TO 105°F.
SHOWER
(ACCESSIBLE) SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 2" 2"
PROVIDE SHOWER GRID DRAIN AND PTRAP, FOLD UP SEAT, L-SHAPED AND VERTICAL SS GRAB BARS, SHOWER ROD, CURTAIN, AND RINGS. PROVIDE PRESSURE BALANCE SHOWER VALVE TO LIMIT HOT WATER
SUPPLY TO 105°F
CEILING HUNG
EMERGENCY SHOWER SEE SPECIFICATIONS SEE SPECIFICATIONS 3/4" 3/4" F.D. - SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF ADA FIXTURES, PROVIDE MANUAL
MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F
CEILING HUNG
EMERGENCY SHOWER
AND EYE & FACE WASH
SEE SPECIFICATIONS SEE SPECIFICATIONS 3/4" 3/4" F.D. - SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF ADA FIXTURES, PROVIDE MANUAL
MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F
WALL MOUNT EYE WASH SEE SPECIFICATIONS SEE SPECIFICATIONS 1/2" 1/2" 2" 2"
GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, SEE ARCHITECTURAL PLANS FOR LOCATION OF
ADA FIXTURES, PROVIDE INSULATION ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL
MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F
MIXING VALVE SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR SIZES
ELECTRIC TRAP PRIMER
MANIFOLD SEE SPECIFICATIONS SEE SPECIFICATIONS - 1/2" - - 120V/1PH/60HZ, 12.1 AMPS IN RUSH, 8.8 AMPS HOLDING
REDUCED PRESSURE
BACK FLOW PREVENTER SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - BACKFLOW DEVICE FOR EQUIPMENT. SEE DRAWINGS FOR SIZES
6"Ø FLOOR DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.
12" SQUARE FLOOR
DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.
S.S. 12" SQUARE FLOOR
DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.
6"Ø FLOOR DRAIN SEE SPECIFICATIONS SEE SPECIFICATIONS - - - - SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP WITH TRAP PRIMER CONNECTION.
DISH WASHER PROVIDED BY VA. INSTALLED BY
CONTRACTOR. - 1/2" - - - PROVIDE HOT WATER WITH SHUTOFF FROM NEAREST SINK, PROVIDE 3/4" INDIRECT DRAIN TO NEAREST
SINK TAIL PIECE THROUGH AIR GAP FITTING.
P-103
P-401
P-711
FD-C
FD-I
TP-1
P-501
P-418
P-524
P-402
P-519
P-201
P-708
P-810
P-706
P-413
BFP-1
DW-1
2A
2B
FD-S
FD-G
RO WATER FILTER SYSTEM
TAG MANUFACTURER
MODEL LOCATION SERVING PRESSURE
DI REQUIREMENTS
NOTES
QUALITY
(PPM)
TEMPERATURE
(F°)
EVOQUA MECH RM
M.E.R. #13
SPS RO
WATER 90 PSI 50 - 80 70 - 140 1, 2, 3
NOTES:
1. 10 GPM AND 310 GALLON STORAGE PURE WATER MAKEUP SYSTEM, 50-75 GPM DISTRIBUTION SYSTEM
2. PROVIDE PACKAGED RO SYSTEM WITH INTEGRAL PUMP AND CONTROLS.
3. MULTI COMPONENT ELECTRICAL REQUIREMENTS:
- 20 FLA, 120 V SINGLE PHASE: CONTROLS, UV, PTC CARBON, LEAK DETECTOR, AND QUALITY LIGHTS
- (2) 8.4A, 480 V THREE PHASE: RO DISTRIBUTION PUMPS
4. PROVIDE AND INSTALL DIFFERENTIAL PRESSURE GAUGE TO MEASURE PRESSURE LOSS ACROSS THE FILTER. SEE GAUGE
LOCATIONS (LABELED P&ID) ON RO DISTRIBUTION DIAGRAM SHEET P-505.
5. RO SYSTEM SHALL BE DESIGNED AND INSTALLED TO MEET THE WATER QUALITY AND TESTING REQUIREMENTS OF AAMI TIR 34.
RO
P-707
NOTES:
1. PROVIDE UTILITY CONNECTIONS WITH SHUTOFF DISCONNECTS WITHIN 2'
OF UNIT PER MANUFACTURE RECOMMENDATIONS.
2. PROVIDE VACUUM BEAKERS ON SERVICE LINES PER MANUFACTURE
RECOMMENDATIONS.
3. PROVIDE 1 MICRON FILTER FOR TEMPERED WATER CONNECTION
4. PROVIDE THERMAL MIXING VALVE FOR WATER CONNECTION
5. PROVIDE 1/4"CA CONNECTION FROM WASHER SUPPLY AIR CONNECTION.
6. PROVIDE 3/4" DRAIN KIT FOR CONVEYERS (UP TO 4 CONVEYERS).
7. ROUTE EACH WET VENT CONDENSATE DRAIN TO NEAREST FLOOR DRAIN
8. PROVIDE PRESSURE REGULATOR FOR AIR GUN.
9. PROVIDE PRESSURE REDUCING VALVE FOR WATER GUN.
10. PROVIDE ELIMINIZER COMBO DRYER/FILTER
SWING SPACE SPECIAL EQUIPMENT CONNECTION SCHEDULE
SYMBOL DESCRIPTION MANUFACTURER AND
CATALOG # QUANTITY
CONNECTIONS
UTILITY REQUIREMENTS
ESTIMATED PURE
WATER USAGE PER
EQUIPMENT UNIT
GALLONS / HOUR
COMBINED
ESTIMATED PURE
WATER USAGE
GALLONS / HOUR
COMBINED
ESTIMATED PURE
WATER USAGE
(GPM)
NOTES
HW CW V W IW STEAM CD
RETURN
FILTERED
WATER AIR
INNOWAVE PRO SONIC IRRIGATOR - 60 LUMEN CAPACITY/
208-220 VOLT/3 PHASE, 18kW. CENTER OVER DRAIN.
INNOWAVE PRO SONIC
IRRIGATOR 2 3/4" 3/4" - 2-1/8" 4" F.D. - - - 1/2"
HARDNESS: 125 PPM. PURE WATER
USAGE: 38 GAL / CYCLE. 8 GPM. 80-100
PSI 19 SCFM FOR 1 MINUTE TOTAL
- - - 1, 2, 6, 8
AMSCO 50 REPROCESSING SINK - 3 BAY/120" LONG/HEIGHT
ADJUSTABLE/LEFT TO RIGHT WORK FLOW STERIS AMSCO 50 1 1/2" 1/2" - 1-1/2" 3" F.S. - - 1/2" 1/4"
HARDNESS: 100-200 PPM. PURE
WATER USAGE: 2 GPM. 2 SCFM AT 30
PSI MAX
- - - 1, 2, 5, 6, 9, 10
AUTOMATED ENDOSCOPE REPROCESSOR STERIS MEDIVATOR
ADVANTAGE PLUS 2 - - - 1" 3" F.D. - - (2) 1/2" 1/4" HARDNESS: LESS THAN 200 PPM. MIN
TEPID FLOW OF 3.2 GPM MIN AT 95° F. - - - 1, 2, 3, 4, 6, 7
SONIC CLEANER CAVIWAVE DUAL BAY 1 1/2" - - 1-1/4" 3" F.D. - - - - HARDNESS: LESS THAN 120 mg/L.
USAGE: 6 GPM - - - 1, 2
ESTIMATED TOTAL PURE WATER
DEMAND (GPM) -
NOTES:
1. PROVIDE UTILITY CONNECTIONS WITH SHUTOFF DISCONNECTS
WITHIN 2' OF UNIT PER MANUFACTURE RECOMMENDATIONS.
2. PROVIDE VACUUM BEAKERS ON SERVICE LINES PER MANUFACTURE
RECOMMENDATIONS.
3. PROVIDE 1 MICRON FILTER FOR TEMPERED WATER CONNECTION
4. PROVIDE THERMAL MIXING VALVE FOR WATER CONNECTION WITHIN
4' OF PREPROCESSOR UNIT
5. PROVIDE A 1 MICRON WATER FILTER FOR COLD WATER
6. PROVIDE BACKFLOW PREVENTER ON COLD WATER INLET
7. PROVIDE OPTIONAL AIR COMPRESSOR FOR PREPROCESSOR.
REQUIRES 120V 20 AMP CONNECTION.
8. PROVIDE ELIMINIZER COMBO DRYER/FILTER
9. PROVIDE PRESSURE REGULATOR FOR AIR GUN.
10. PROVIDE PRESSURE REDUCING VALVE FOR WATER GUN.
S2
S4
S5
S7
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
P-601
SCHEDULES - PLUMBING
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
SE
152-0
SE
179-4
SE
152-10
NE
383'-9"
UP
P-801 30" ABOVE FINISHED FLOOR
HWR
P-805
3" CRP
" MAKE-UP WATER
W/ BACKFLOW PREVENTER
4 " 2"
4 "
4 " DN VALVE
2" V-UP
4"
2" V-UP
2"
4" W
4"
4 "
2"
MA
MV
2" V DN
8"W DN
4" CW & HWR
4"CW
2" HW
4"
2"
4"
4" W
(E) 4"W
(E) HWR
(E) HW
(E) VENT
4" FD 'B'
W/ FUNNEL
EXISTING TO
REMAIN
DRAIN FROM PRV
DRIP-L & HW/HTG.
UNIT INTO S/B
BELOW.
EXISTING TO
REMAIN.
SEE PD404 FOR PIPING
CONTINUATION (TYP)
(E) WASTE LINE TO REMAIN
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
KEY PLAN
LEGEND
PD401
BASEMENT MECHANICAL ROOM DEMOLITION
PLAN - PLUMBING
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
KEY PLAN:NTS
GENERAL NOTES
KEY NOTES
TRUE
NORTH
PROJECT
NORTH
1/4" = 1'-0"1 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - PLUMBING
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN
DEMOLITION AND NEW WORK. COORDINATE DEMOLITION
WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT
WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED
TO BE RETURNED TO THE OWNER, SHALL BECOME THE
PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF
ITEMS ON THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT
AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST
AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN
AND AROUND BUILDING DURING DEMOLITION. PREVENT
INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE
ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE
CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE
MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING
REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND
PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES
SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT
FIRST OBTAINING PERMISSION FROM THE UTILITY COMPANY
AND/OR OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL
EQUIPMENT AS SHOWN, UNLESS NOTED OTHERWISE.
COORDINATE WITH ARCHITECT, AREAS OF DEMOLITION
AROUND, ADJACENT, OR CONNECTED TO EXISTING
MECHANICAL EQUIPMENT THAT IS TO REMAIN.
EXISTING WORK (LIGHT)
DEMOLITION (DARK)
POINT OF DEMOLITION
DEMOLITION KEY
SPS
SWING
SPACE
WAREHOUSE
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
76-0
SE
114-0
SE
152-0
SE
190-0
SE
179-4
SE
152-10
SE
76-0
SE
114-0
NE
383'-9"
NE
342-0
NE
304-0
UP
NE
380-0
SEE PD403 FOR
CONTINUATION
(E) CLEANOUT
TO REMAIN
(TYP)
SPEES DESIGN BUILD
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN
DEMOLITION AND NEW WORK. COORDINATE DEMOLITION
WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT
WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO
BE RETURNED TO THE OWNER, SHALL BECOME THE
PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF
ITEMS ON THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT
AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST
AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN
AND AROUND BUILDING DURING DEMOLITION. PREVENT
INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE
ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE
CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE
MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING
REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND
PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES
SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM THE UTILITY COMPANY AND/OR
OWNER. PROVIDE TEMPORARY SERVICES AS REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT
AS SHOWN, UNLESS NOTED OTHERWISE. COORDINATE WITH
ARCHITECT, AREAS OF DEMOLITION AROUND, ADJACENT, OR
CONNECTED TO EXISTING MECHANICAL EQUIPMENT THAT IS
TO REMAIN.
KEY NOTES
KEY PLAN
REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE
ABOVE. REMOVE ASSOCIATED WASTE, VENT, HOT WATER, AND
COLD WATER. COORDINATE EXTENT OF DEMOLITION WITH NEW
WORK.
LEGEND
PD402
BASEMENT FOUNDATION DEMOLITION PLAN -
SOUTH - PLUMBING
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
KEY PLAN:NTSTRUE
NORTH
PROJECT
NORTH
1/4" = 1'-0"1 BASEMENT FOUNDATION DEMOLITION PLAN - SOUTH - PLUMBING
EXISTING WORK (LIGHT)
DEMOLITION (DARK)
POINT OF DEMOLITION
DEMOLITION KEY
SPS
SWING
SPACE
WAREHOUSE
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
38'-0"
NW
SE
0'-0"
S 176'-7"
S 143'-3"
E 146'-6"
E 197'-4"
E
SE
76-0
NW
14-9
NW
3-6
NE
380-0
NE
304-0
NE
342-0
SE
38'-0"
NW
SE
0'-0"
SE
76-0
NW
14-9
NW
3-6
NE
383'-9"
CAP 4" GREASE
WASTE LINE AND
VENT
SEE PD402 FOR
CONTINUATION
(E) 3"
(E) 4"
(E) 4"
(E) 4"
(E) 4"
(E) 4"
(E) 4"
(E) 2"
(E) 2"
(E) 3"
(E) 3"
(E) 3"
GW
GW
GW
GW
GW
W UP TO (E) SINK
TO REMAIN
(E) CLEANOUT
TO REMAIN
(E) 2"
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN
DEMOLITION AND NEW WORK. COORDINATE DEMOLITION
WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT
WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED
TO BE RETURNED TO THE OWNER, SHALL BECOME THE
PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF
ITEMS ON THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT
AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST
AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN
AND AROUND BUILDING DURING DEMOLITION. PREVENT
INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE
ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE
CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE
MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING
REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND
PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES
SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT
FIRST OBTAINING PERMISSION FROM THE UTILITY COMPANY
AND/OR OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL
EQUIPMENT AS SHOWN, UNLESS NOTED OTHERWISE.
COORDINATE WITH ARCHITECT, AREAS OF DEMOLITION
AROUND, ADJACENT, OR CONNECTED TO EXISTING
MECHANICAL EQUIPMENT THAT IS TO REMAIN.
KEY NOTES
REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURE
ABOVE. REMOVE ASSOCIATED WASTE, VENT, HOT WATER,
AND COLD WATER. COORDINATE EXTENT OF DEMOLITION
WITH NEW WORK.
LEGEND
PD403
BASEMENT FOUNDATION DEMOLITION PLAN -
NORTH - PLUMBING
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
KEY PLAN:NTSTRUE
NORTH
PROJECT
NORTH
1/4" = 1'-0"1 BASEMENT FOUNDATION DEMOLITION PLAN - NORTH - PLUMBING
EXISTING WORK (LIGHT)
DEMOLITION (DARK)
POINT OF DEMOLITION
DEMOLITION KEY
SPS
SWING
SPACE
WAREHOUSE
AutoCAD SHX Text
EXPIRES 2/20/22
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text 44961
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
VA
C
1688 SF
PREP / PACK
B117
SE
76-0
SE
114-0
SE
152-0
SE
190-0
SE
179-4
SE
152-10
SE
76-0
SE
114-0
NE
383'-9"
NE
342-0
NE
304-0
UP
NE
380-0
OFFICE
BD-112MECHANICAL
ROOM #3
BD-111
CORRIDOR
CB-9
OFFICE
BD-112C
BD-110A
SIGNAL
BD-110B
BREAK
ROOM
BD-112D BD-103A
HAC
MALE
TOILET
FEMALE
TOILET
BD-103C
OFFICE
BD-112B
OFFICE
BD-112A
NON-STERILE
STORAGE
BD-104
BD-103
VESTIBULE
BD-110C
(E) 1-1/2"W UP TO
FLOOR ABOVE.
(E) 1-1/2"W UP TO
FLOOR ABOVE.
HWR HWR
HWHW
VV
SEE PD401 FOR DEMO WORK
IN MECHANICAL ROOM
SEE PD405 FOR
CONTINUATION
(TYP)
(E) 1"CW
(E) 3/4"CW
(E) VALVE
(E) 3/4"CW
HW, CW, AND VENT TO
(E) SINK TO REMAIN
625 1ST AVE, UNIT 301
SEATTLE, WA 98101
(360) 223-8994
RAY SPEES, PRINCIPAL
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
06/25/2021 Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MKK AGG
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
663-20-102
KARTCHNER ENGINEERING
101 S STEVENS, SUITE 201
SPOKANE, WA 99201
(509) 922-0383
100% CD
GENERAL NOTES
KEY NOTES
LEGEND
PD404
D & T
TRUE
NORTH
PROJECT
NORTH
NURSING
TOWER
AREA OF
RENOVATION
WORK
KEY PLAN:NTS
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN
DEMOLITION AND NEW WORK. COORDINATE DEMOLITION
WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT
WITH OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED
TO BE RETURNED TO THE OWNER, SHALL BECOME THE
PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF
ITEMS ON THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT
AND SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST
AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN
AND AROUND BUILDING DURING DEMOLITION. PREVENT
INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE
ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE
CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE
MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING
REMOVAL OR RELOCATION. KEEP UTILITIES IN SERVICE AND
PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES
SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT
FIRST OBTAINING PERMISSION FROM THE UTILITY COMPANY
AND/OR OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL
EQUIPMENT AS SHOWN, UNLESS NOTED OTHERWISE.
COORDINATE WITH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .