This document package includes construction drawings and specifications for upgrades to a Sterile Processing Services department located in Building 100 at the VA Puget Sound Health Care System campus in Seattle, Washington. The project involves renovating and expanding existing sterile processing facilities including demolition work, construction of temporary barriers and negative pressure isolation zones, installation of a temporary mobile sterilization trailer, and upgrades to mechanical, electrical and plumbing systems. The construction drawings provide details on the proposed site plan for the temporary trailer, floor plans delineating demolition and new work areas, sections and elevations, as well as schedules, notes and specifications covering fire protection, structural, architectural and MEP scopes of work. Concurrent with interior renovations, the project will also replace an existing covered walkway and construct a new canopy structure.

The related federal contract opportunity is a solicitation posted to the beta.SAM.gov platform seeking bids from qualified construction firms to complete the Sterile Processing Services upgrade project. The solicitation includes the project name and number, issuing agency details, and identifies the Department of Veterans Affairs Veterans Health Administration and Veterans Integrated Service Network 20 as the contracting entities. No further information is provided on response dates, award timing, or other procurement specifics.

View the file

Other files

File Type Posted
Attachment 23 Partial Architectural Set.pdf PDF
36C26023R0021 0002.docx DOCX document
Attachment 19 RFI Responses Rev 1.pdf PDF
Attachment 24 RFI Supplement.pptx PPTX presentation
Attachment 15 Wage Determination REV 1 20230825.pdf PDF
Attachment 22 Mobile Steris Trailer.pdf PDF
Attachment 21 Site Visit Agenda and Sign-In.pdf PDF
Attachment 20 36C26022Q0073 RFI List FOR INFORMATIONAL PURPOSES ONLY.pdf PDF
36C26023R0021 0001.docx DOCX document
Attachment 19 RFI Responses.pdf PDF
Attachment 20 36C26022Q0073 RFI List.pdf PDF
Attachment 18 Calculation of Self Performed Work REV 1.pdf PDF
Attachment 14 Drawings 11 of 11 Haz Mat.pdf PDF
Attachment 16 Price Breakout.xlsx XLSX spreadsheet
Attachment 9 Drawings 6 of 11 Mechanical.pdf PDF
36C26023R0021.docx DOCX document
Attachment 8 Drawings 5 of 11 Fire Protection.pdf PDF
Attachment 7 Drawings 4 of 11 Structural.pdf PDF
Attachment 3 Specs 2 of 2.pdf PDF
Attachment 2 Specs 1 of 2.pdf PDF
Attachment 1 Construction SOW Rev5.docx DOCX document
Attachment 13 Drawings 10 of 11 Electrical 3 of 3.pdf PDF
Attachment 10 Drawings 7 of 11 Plumbing.pdf PDF
Attachment 17 Contractor Rules Of Behavior.pdf PDF
Attachment 18 Calculation of Self Performed Work.pdf PDF
Attachment 12 Drawings 9 of 11 Electrical 2 of 3.pdf PDF
Attachment 5 Drawings 2 of 11 Civil.pdf PDF
Attachment 15 Wage Determination.pdf PDF
Attachment 11 Drawings 8 of 11 Electrical 1 of 3.pdf PDF
Attachment 6 Drawings 3 of 11 Architectural.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SO. SNOQUALMIE ST.

SO. ALASKA ST.

C O

LU

M B

IA

N

W A Y S O

B E A C O N

A V E

S O

N O R

TH

D R

IV

E

SOUTH DRIVE

S O U

TH

D R

IV

E

M

ED

IA

R D

EAST LOOP RD.

LOT "F"

LOT "E"

LOT"D"

LO

T "C

BL

DG

.1

ENERGY

PLANT

EN

GR

'G

SH

OP

S

F

IS

H E R

H O U S E

E.D.

BL

DG

.1

P A R K

IN

G

S T R U C T U R E

ELEC.

S H

ED

MHR BUILDING

ARCHITECTURAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECTION

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

STRUCTURAL

REID MIDDLETON

728 134TH STREET SW, SUITE 200

EVERETT, WA 98204

PHONE: (425) 741-3800

ELECTRICAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PLUMBING

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

MECHANICAL

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

PHONE: (206) 590-2118

PHONE: (206) 590-2118

PHONE: (206) 590-2118

MEDICAL PLANNING

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

PHONE: (206) 590-2118

CALLISON RTKL

1717 PACIFIC AVE

DALLAS, TX 75201

PHONE: (214) 468-7600

CIVIL

REID MIDDLETON

728 134TH STREET SW, SUITE 200

EVERETT, WA 98204

PHONE: (425) 741-3800

PROJECT INFORMATION

STATE:

COUNTY:

JURISTICTION:

OWNER:

SITE ZONING:

CONST TYPE:

OCCUPANCY:

CODE ANALYSIS

PROJECT DESCRIPTION

THESE TENENT IMPROVEMENT

CONSTRUCTION DRAWINGS ARE FOR THE

RENOVATION AND EXPANSION OF THE

EXISTING STERILE PROCESSING SERVICES

SUITE LOCATED IN THE BASEMENT OF THE

DIAGNOSTIC AND TREATMENT WING OF

BUILDING 100

APPLICABLE BUILDING

BUILDING 100

APPLICABLE FLOOR

D&T BASEMENT

APPLICABLE CLINIC

STERILE PROCESSING SERVICE

ICRA CLASS REQUIREMENTS

CONST TYPE:

CLINIC RISK:

CLASS REQS:

APPROXIMATE SQUARE FOOTAGE

14,200 SF FOR SPS, 900 SF FOR SWING SPACE

TOTAL = 15,100 SF

TYPE C

HIGHEST

CLASS IV

WASHINGTON

KING

SEATTLE

GOV, VETERANS AFFAIRS

1A, FIRE RESISTANT, FULLY

SPRINKLERED

B

REFERENCE DOCUMENTS

HAZMAT (GOOD FAITH) SURVEY REPORTS - FOR SPS AND SWING SPACE PROVIDED BY EHSI

SITE SPECIFIC MANUFACTURER DRAWINGS TO BE PROVIDED BY EQUIPMENT MANUFACTURER

FOR LATER SUBMITTALS.

BUILDING 100

NURSING TOWER

BUILDING 100

D&T

CORE

SPS RENOVATION AREA

TEMP SPS TRAILER

LOCATION

SWING SPACE RENOVATION AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GI001

COVER

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 MK SR

100% CD

RENOVATE AND EXPAND SEATTLE STERILE

PROCESSING SERVICES IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - SEATTLE, WASHINGTON

PROJECT # 663-20-102

TRUE

NORTH

1" = 100'-0"1

VICINITY PLAN

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GI002

DRAWING INDEX

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 MK JG

100% CD

DRAWING INDEX

PAGE # SHEET # SHEET NAME

83 OF 156 MP422 BASEMENT INTERSTITIAL PLAN - SOUTH - MECHANICAL PIPING

84 OF 156 MP423 BASEMENT INTERSTITIAL SPACE - NORTH - MECHANCIAL PIPING

85 OF 156 MP424 BASEMENT WAREHOUSE INTERSTITIAL PLAN – MECHANICAL PIPING

86 OF 156 MH425 PRESSURIZATION MAP - SOUTH - MECHANICAL

87 OF 156 MH426 PRESSURIZATIOIN MAP - NORTH - MECHANICAL

88 OF 156 MH427 PENTHOUSE AND ROOF PLAN - MECHANICAL

89 OF 156 M-501 DETAILS - MECHANICAL

90 OF 156 M-502 DETAILS - MECHANICAL

91 OF 156 MI503 CONTROL DIAGRAMS - MECHANICAL

92 OF 156 M-601 SCHEDULES - MECHANICAL

93 OF 156 M-602 SCHEDULES - MECHANICAL

94 OF 156 MD701 SWING SPACE DEMOLITION PLAN - MECHANICAL

95 OF 156 MD702 SWING SPACE INTERSTITIAL DEMOLITION PLAN - MECHANICAL

96 OF 156 MH703 SWING SPACE PLAN - MECHANICAL

97 OF 156 MH704 SWING SPACE INTERSTITIAL PLAN - MECHANICAL

98 OF 156 MH705 SWING SPACE PRESSURIZATION MAP - MECHANICAL

99 OF 156 MP706 SWING SPACE INTERSTITIAL PLAN - MECHANICAL PIPING

PLUMBING

100 OF 156 P-001 NOTES & LEDGENDS - PLUMBING

101 OF 156 PD401 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - PLUMBING

102 OF 156 PD402 BASEMENT FOUNDATION DEMOLITION PLAN - SOUTH - PLUMBING

103 OF 156 PD403 BASEMENT FOUNDATION DEMOLITION PLAN - NORTH - PLUMBING

104 OF 156 PD404 BASEMENT INTERSTITIAL DEMOLITION PLAN - SOUTH - PLUMBING

105 OF 156 PD405 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - PLUMBING

106 OF 156 PW406 BASEMENT FOUNDATION PLAN - SOUTH - PLUMBING

107 OF 156 PW407 BASEMENT FOUNDATION PLAN - NORTH - PLUMBING

108 OF 156 PL408 BASEMENT MECHANICAL ROOM PLAN - PLUMBING

109 OF 156 PL409 BASEMENT FLOOR PLAN - SOUTH - PLUMBING

110 OF 156 PL410 BASEMENT FLOOR PLAN - NORTH - PLUMBING

111 OF 156 PL411 BASEMENT INTERSTITIAL SPACE - SOUTH - PLUMBING

112 OF 156 PL412 BASEMENT INTERSTITIAL SPACE - NORTH - PLUMBING

113 OF 156 P-501 DETAILS - PLUMBING

114 OF 156 P-502 DETAILS - PLUMBING

115 OF 156 P-503 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING

116 OF 156 P-504 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING

117 OF 156 P-505 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING

118 OF 156 P-601 SCHEDULES - PLUMBING

119 OF 156 PW701 SWING SPACE FOUNDATION PLAN - PLUMBING

120 OF 156 PL702 SWING SPACE FLOOR PLAN - PLUMBING

121 OF 156 PL703 SWING SPACE INTERSTITIAL PLAN - PLUMBING

ELECTRICAL

122 OF 156 E-001 GENERAL NOTES, ABBREVIATIONS AND LEGENDS

123 OF 156 ED101 OVERALL LIGHTING DEMOLITION PLAN

124 OF 156 ED102 OVERALL POWER AND SPECIAL SYSTEMS DEMOLITION PLAN

125 OF 156 ES100 SITE ELECTRICAL PLAN

126 OF 156 ES101 OVERALL ELECTRICAL PLAN

127 OF 156 EL101 LIGHTING PLAN - NORTH

128 OF 156 EL102 LIGHTING PLAN - SOUTH

129 OF 156 EP101 POWER PLAN - NORTH

130 OF 156 EP102 POWER PLAN - SOUTH

131 OF 156 EP103 POWER PLAN - BASEMENT WAREHOUSE

132 OF 156 ET101 SPECIAL SYSTEM PLAN - NORTH

133 OF 156 ET102 SPECIAL SYSTEM PLAN - SOUTH

134 OF 156 E-401 ENLARGED DEMOLITION PLANS

135 OF 156 E-402 ENLARGED PLANS

136 OF 156 E-403 ENLARGED ENERGY PLANT - ELECTRICAL PLAN

137 OF 156 E-404 ENLARGED FLOOR PLANS AND SECTION - CART LIFT

138 OF 156 E-405 ENLARGED PARTIAL ROOF PLAN

139 OF 156 E-406 ENLARGED SUBSTATION 'B' ELECTRICAL PLAN

140 OF 156 E-407 ENLARGED SPS TRAILER COVERED WALKWAY PLAN

141 OF 156 E-501 ELECTRICAL DETAILS

142 OF 156 E-502 ELECTRICAL DETAILS

143 OF 156 E-601 SCOPE PROCESSING AREA ONE-LINE DIAGRAM - EXISTING

144 OF 156 E-602 SCOPE PROCESSING AREA ONE-LINE DIAGRAM - REVISED

145 OF 156 E-603 SUBSTATION "B" ONE-LINE DIAGRAM - REVISED

146 OF 156 E-604 SPS TRAILER ONE-LINE DIAGRAMS

147 OF 156 E-605 PARTIAL ONE-LINE DIAGRAM AND LOAD SCHEDULES - CART LIFT

148 OF 156 E-606 ELECTRICAL LOAD SCHEDULES - REVISED

149 OF 156 E-607 ELECTRICAL LOAD SCHEDULES - REVISED

150 OF 156 E-608 ELECTRICAL SCHEDULES

151 OF 156 E-701 SWING SPACE - OVERALL ELECTRICAL PLAN

152 OF 156 E-702 SWING SPACE - BASEMENT SUBSTATION "C" ROOM BC-102 ELECTRICAL PLAN

153 OF 156 E-703 SWING SPACE - LIGHTING AND ELECTRICAL DEMOLITION PLAN

154 OF 156 E-704 SWING SPACE - REVISED LIGHTING AND ELECTRICAL PLAN

155 OF 156 E-705 SWING SPACE - PARTIAL ONE-LINE DIAGRAMS

156 OF 156 E-706 SWING SPACE - ELECTRICAL LOAD SCHEDULES

HAZMAT

HA001 HAZMAT - GENERAL INFORMATION

HA101 HAZMAT - PARTIAL DEMO PLAN - SOUTH

HA102 HAZMAT - SWING SPACE DEMO PLAN

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

01 OF 156 GI001 COVER

02 OF 156 GI002 DRAWING INDEX

03 OF 156 GS101 TEMPORARY TRAILER SITE PLAN

04 OF 156 GS102 ENLARGED TEMPORARY TRAILER SITE PLAN

05 OF 156 GS103 TEMPORARY TRAILER SITE SECTIONS

06 OF 156 GS104 TEMPORARY TRAILER SITE SECTIONS

07 OF 156 GS201 BUILDING 100, BASEMENT LEVEL - ICRA PLAN

08 OF 156 GS301 BASEMENT FIRE & LIFE SAFETY PLAN

CIVIL

09 OF 156 CD101 DEMOLITION AND TESC PLAN

10 OF 156 CU101 UTILITY PLAN

11 OF 156 C-501 DETAILS

ARCHITECTURAL

12 OF 156 A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

13 OF 156 AD101 OVERALL DEMO FLOOR PLAN

14 OF 156 AD102 OVERALL DEMO REFLECTED CEILING PLAN

15 OF 156 AD111 PARTIAL DEMO PLAN - NORTH

16 OF 156 AD112 PARTIAL DEMO PLAN - SOUTH

17 OF 156 AE101 OVERALL FLOOR PLAN

18 OF 156 AE111 PARTIAL FLOOR PLAN - NORTH

19 OF 156 AE112 PARTIAL FLOOR PLAN - SOUTH

20 OF 156 AC101 OVERALL REFLECTED CEILING PLAN

21 OF 156 AC111 PARTIAL REFELCTED CEILING PLAN - NORTH

22 OF 156 AC112 PARTIAL REFLECTED CEILING PLAN - SOUTH

23 OF 156 AE301 BUILDING SECTIONS

24 OF 156 AE401 ENLARGED FLOOR PLANS, REF CEILING PLANS & DETAILS

25 OF 156 AE402 ENLARGED FLOOR PLAN - STERILIZERS & DISINFECTORS

26 OF 156 AE403 ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT

27 OF 156 AE404 ENLARGED PARTIAL ROOF PLAN

28 OF 156 AE411 INTERIOR ELEVATIONS

29 OF 156 AE412 INTERIOR ELEVATIONS

30 OF 156 A-601 ROOM FINISH SCHEDULE

31 OF 156 A-602 DOOR & WINDOW SCHEDULE & TYPES, INTERIOR DOOR DETAILS

32 OF 156 A-603 EQUIPMENT SCHEDULES

33 OF 156 A-611 WALL TYPES

34 OF 156 A-612 WALL TYPES

35 OF 156 AE701 SWING SPACE - DEMO PLAN, ENLARGED FLOOR PLAN & RCP

36 OF 156 AW001 SIGNAGE LOCATION PLAN & MESSAGE SCHEDULE

37 OF 156 AW002 SIGNAGE MATERIALS, FINISHES, & INDEX

38 OF 156 AW015 IN-01.15 HAZARDOUS MATERIAL SAFETY INFORMATION SIGN

39 OF 156 AW018 IN-01.22 BIOHAZARD WARNING SIGN

40 OF 156 AW024 IN-04.01 ROOM NUMBER SIGN

41 OF 156 AW025 IN-04.02 PERMANENT ROOM SIGN

42 OF 156 AW027 IN-04.03 CHANGEABLE MESSAGE ROOM SIGN

43 OF 156 AW043 IN-08.02 PROHIBIT INSTRUCTIONAL AND CONTROL

44 OF 156 AW044 IN-09.01A, IN-09.01C RESTROOM SIGN MEN

45 OF 156 AW045 IN-09.02A, IN-09.02C RESTROOM SIGN WOMEN

46 OF 156 AW075 IN-19.02 DIMENSIONAL LETTERS

STRUCTURAL

47 OF 156 S-001 GENERAL STRUCTURAL NOTES AND SHEET INDEX

48 OF 156 S-002 ABBREVIATIONS AND SPECIAL INSPECTION SCHEDULES

49 OF 156 SF101 LEVEL BASEMENT PLAN

50 OF 156 SF102 COVERED WALKWAY FOUNDATION PARTIAL PLAN

51 OF 156 SF103 COVERED WALKWAY ROOF FRAMING PLAN

52 OF 156 SF104 COVERED WALKWAY SECTIONS

53 OF 156 SF501 TYPICAL SECTIONS AND DETAILS

54 OF 156 SF502 TYPICAL SECTIONS AND DETAILS

FIRE PROTECTION

55 OF 156 FD101 BASEMENT DEMOLITION PLAN - FIRE PROTECTION

56 OF 156 FX102 BASEMENT FLOOR PLAN - FIRE PROTECTION

57 OF 156 FX401 CART LIFT EQUIPMENT ROOM - FIRE PROTECTION

58 OF 156 FX402 COVERED WALKWAY - FIRE PROTECTION

MECHANICAL

59 OF 156 M-001 LEGENDS, SYMBOLS, ABBREVIATIONS, & NOTES - MECHANICAL

60 OF 156 MD101 BASEMENT DEMOLITION PLAN - OVERALL - MECHANICAL

61 OF 156 MD401 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - MECHANICAL

62 OF 156 MD402 BASEMENT DEMOLITION PLAN - SOUTH - MECHANCIAL

63 OF 156 MD403 BASEMENT DEMOLITION PLAN - NORTH - MECHANCIAL

64 OF 156 MD404 BASEMENT WAREHOUSE DEMOLITION PLAN - MECHANICAL

65 OF 156 MD405 BASEMENT INTERSTITIAL DEMOLITION PLAN - SOUTH - MECHANICAL

66 OF 156 MD406 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - MECHANICAL

67 OF 156 MD407 BASEMENT WAREHOUSE INTERSTITIAL DEMOLITION PLAN - MECHANICAL

68 OF 156 MD408 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - MECHANICAL PIPING

69 OF 156 MD409 BASEMENT INTERSTITAL DEMOLITION PLAN - SOUTH - MECHANICAL PIPING

70 OF 156 MD410 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - MECHANICAL PIPING

71 OF 156 MD411 BASEMENT WAREHOUSE INTERSTITIAL DEMOLITION PLAN - MECHANICAL PIPING

72 OF 156 MH301 SECTION VIEWS - MECHANICAL

73 OF 156 MH412 BASEMENT MECHANICAL ROOM - MECHANICAL

74 OF 156 MH413 BASEMENT FLOOR PLAN - SOUTH - MECHANICAL

75 OF 156 MH414 BASEMENT FLOOR PLAN - NORTH - MECHANICAL

76 OF 156 MH415 BASEMENT WAREHOUSE FLOOR PLAN - MECHANICAL

77 OF 156 MH416 BASEMENT INTERSTITIAL SPACE - SOUTH - MECHANICAL

78 OF 156 MH417 BASEMENT INTERSTITIAL SPACE - NORTH - MECHANICAL

79 OF 156 MH418 BASEMENT WAREHOUSE INTERSTITIAL SPACE - MECHANICAL

80 OF 156 MH419 BASEMENT MECHANICAL ROOM - MECHANICAL PIPING

81 OF 156 MP420 BASEMENT FLOOR PLAN - SOUTH - MECHANICAL PIPING

82 OF 156 MP421 BASEMENT FLOOR PLAN - NORTH - MECHANICAL PIPING

BD

-1

EN

TR

Y

CD

-2 9B

VE

ST

INDUSTRIALSTAIR

#25

INDUSTRIAL STAIR

#27

TUNNEL

CB-6

865 S.F.

INDUSTRIAL STAIR

#28

COMMON

73 S.F.

SPACE

G F I

G

FI

1. REFERENCE CIVIL AND ELECTRICAL DRAWINGS FOR SITE

DEMOLITION AND RELATED WORK INFORMATION

2. CONTRACTOR SHALL BE RESPONSIBLE FOR LEASING THE

TEMPORARY SPS TRAILER. THE CONTRACTOR SHALL

ALSO BE RESPONSIBLE FOR COORDINATING WITH THE

PROVIDER AND COORDINATING ALL UTILITY

CONNECTIONS.

RENOVATION

AREA

MOBILE STERILIZATION

TRAILER LOCATION

EXISTING 10'-0" H

COVERED

WALKWAY

' - 1

SPS MOBILE UNIT

SUPPORT POD

PET / CT

HVAC

ENCLOSURE

NEW CANOPY

8' -

V E R

IF

Y

' - 0

' - 0

B E

A C

O N

A V

E S

O

70' -

NURSING WING

ENERGY PLANT

BUILDING

BUILDING 100

D & T WING

BUILDING 100

BUILDING 33

ED

BUILDING 102

ENG SHOP

BUILDING 1

BUILDING 18

6' -

R

R

R

' - 0

' - 0

' - 6

' - 0

BOLLARD,

TYP

PROJECTION ROOM

BB-108A

ELEC

BB-103A

DECONTAMINATION

B368C

MECHANICAL ROOM #5

BB-120

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS101

TEMPORARY TRAILER SITE PLAN

SPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 MA SR

100% CD

TRUE

NORTH

GENERAL NOTES

1" = 30'-0"1

TEMPORARY TRAILER SITE PLAN

DNDN

TEMP SPS

EXISTING 10'-0" H

COVERED WALKWAY

(NO WORK)

GS103

PET / CTHVAC

ENCLOSURE

NEW PET / CT

CANOPY

NO WORK

80' - 0"

GS103

GS103

RADIATION THERAPY

BUILDING 33

/2

GS104

[No Slope]

17' - 0 1/8"

SPS SUPPORT

POD

1/2" / 1'-0"

1/2" / 1'-0"

10' - 10" 6' - 0"

GS103

GS103

GS103

SPS SUPPORT

POD

TEMP SPS

EXISTING 10'-0" H

COVERED

WALKWAY

PET / CTHVAC

ENCLOSURE

NEW PET / CT

COVERED WALKWAY

V E

R

IF

Y

/8

/4

V E

R

IF

Y

RADIATION THERAPY

BUILDING 33

6' - 11 5/8" 8' - 6" 6' - 11 5/8"

/4

45"x80 DOOR WITH 42"

CLEAR OPENING

40 3/4"x80" DOOR WITH

36" CLEAR OPENING

COORDINATE

LOCATION AND

HEIGHT OF WALKWAY

WITH STERIS MOBILE

MANUFACTURER

REQUIREMENT

70'x30' MOBILE SPD

REQUIREMENT FOOT

PRINT FOR

EMPLOYMENT AND

SERVICE ACCESS

EXISTING GRAVEL

EXISTING ROCKERY

EXISTING CONC

PAVEMENT

EXISTING WALL

COORDINATE

LOCATION AND

HEIGHT OF WALKWAY

WITH PET / CT

GS104

/4

22' - 5 1/4"

INSTALL NEW WALKWAY

ENCLOSED WALL

STORAGE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS102

ENLARGED TEMPORARY TRAILER

SITE PLANSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/04/2021 Checker Author

100% CD

1/8" = 1'-0"2

COVERED WALKWAY - ROOF PLAN

1/8" = 1'-0"1

COVERED WALKWAY - PLAN

LEVEL BASEMENT

-18' - 0"

EXISTING WOOD FRAMING

WALKWAY BEYOND

EXISTING 4" DIA

PIPE COLUMN

EXISTING C-CHANNEL

ROOF FRAMING

EXISTING METAL

ROOF PANEL

EXISTING GUTTER

EXISTING

WALKWAY

(CONCRETE

OVER METAL

DECK?)

DEMO EXISTING

PIPE HANDRAIL

EXISTING CONCRETE

PAVING

F

IE

L D

V E

R

IF

Y

LEVEL BASEMENT

- INTERSTITIAL

-7' - 11"

PAVING

-21' - 6"

• CORRUGATED METAL PANEL

• WRB OVER 1/2" PLYWOOD

SHEATHING

• 4" METAL STUDS @ 24" OC

• 5/8" GWB, PAIMT

LEVEL BASEMENT

-18' - 0"

EXISTING CONCRETE PAVING

CONCRETE COLUMN BASE

PT WOOD ROOF

FRAMING PER

STRUCT

CORRUGATED ROOFING

PANEL OVER VAPOR

RETARDER , 1/2"

PLYWOOD SHEATHING

EXISTING CONC

WALKWAY

NEW WALKWAY

FLOOR

LEVEL BASEMENT

- INTERSTITIAL

-7' - 11"

PT WOOD BEAM PER STRUCT

PAVING

-21' - 6"

STORAGECOVERED WALKWAY

• CORRUGATED METAL PANEL

• WRB OVER 1/2" PLYWOOD SHEATHING

• 4" METAL STUDS @ 24" OC

• 5/8" GWB, PAIMT

• CORRUGATED METAL PANEL

• WRB OVER 1/2" PLYWOOD SHEATHING

• 4" METAL STUDS @ 24" OC

• 5/8" GWB, PAIMT

LEVEL BASEMENT

-18' - 0"

EXISTING

CONCRETE

STAIR

DEMO EXISTING

GUARD RAIL

METAL EAVE FLASHING

EXISTING CONC WALL

BEYOND

PAVING

-21' - 6"

• CORRUGATED METAL

PANEL

• WRB OVER 1/2"

PLYWOOD

SHEATHING

• 4" METAL STUDS @

24" OC

• 5/8" GWB, PAIMT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS103

TEMPORARY TRAILER SITE

SECTIONSSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/04/2021 Checker Author

100% CD

1/2" = 1'-0"1

SECTION - EXISTING WALKWAY

1/2" = 1'-0"3

CROSS SECTION - NEW ROOF OVER EXISTING WALKWAY

1/2" = 1'-0"2

CROSS SECTION - NEW COVERED WALKWAY

LEVEL BASEMENT

-18' - 0"

GS103

GS103

LEVEL BASEMENT

- INTERSTITIAL

-7' - 11"

PAVING

-21' - 6"

/4

/8

D O

O R

O P

E N

IN

G

CORRUGATED METAL PANEL

WRB OVER 1/2" PLYWOOD

SHEATHING

4" METAL STUDS @ 24" OC

5/8" GWB, PAIMT

METAL ROOF PANEL

OVER PT WOOD

FRAMING

/2

/2

/2

STERIS MOBILE SPD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS104

TEMPORARY TRAILER SITE

SECTIONSSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/04/2021 Checker Author

100% CD

1/2" = 1'-0"1

CROSS SECTION - STERIS MOBILE SPD ENTRY

D & T

TRUE

NORTH

NURSING

TOWER

AREA SHOWN

BUILDING 100

BASEMENT LEVEL

ANTE ROOM

CONSTRUCTION ZONE MAIN ENTRANCE

EXIST DOOR TO REMAIN UNTIL FINAL CONSTRUCTION

SCOPE IS EXECUTED. SECURE DOOR, ACCESS ONLY

ALLOWED TO CONSTRUCTION AND FMS STAFF.

ANTE ROOM

EXIST DOOR USED AS CONSTRUCTION ZONE EMERGENCY

EGRESS, ENSURE DOOR IS FIT WITH PROPER EGRESS HW

ANTE ROOM, FOR EMERGENCY EGRESS ONLY

EXISTING CONDITIONS

ISOLATED CONSTRUCTION ZONE, ( - - ) PRESSURE

TEMPORARY BARRIERS

ANTE ROOM, ( - ) PRESSURE

PATH OF TRAVEL

CORRIDOR

CB-14

MECHANICAL #3

BD-111

CORRIDOR

CB-12

CONFERENCE

BD-113

SPD CORRIDOR

CB-18B

EDUCATION LAB

BD-152

MORGUE

BD-117A

PASSAGE

BD-151F

PASSAGE

BD-151A

M LOCKER

BD-151C

F TOILET

BD-151D

RESIDENT CUBICLES

BD-151

CORRIDOR

CB-22

OFFICE

BD-149J

OFFICE

BD-149H

OFFICE

BD-149G

SUPERVISOR OFFICE

BD-143F

STAFF

BD-143E

STAIR #1

ELEV #6

OFFICE

BD-149F

PASSAGE

BD-149J

OFFICE

BD-149E

OFFICE

BD-149D

OFFICE

BA-102I

OFFICE

BA-102J

OFFICE

BA-103

OFFICE

BA-103A

FEMALE LOCKERS / TOILET

BA-105

MALE LOCKERS/TOILET

BA-106

MAILROOM

BD-105

SUPPLY WAREHOUSE

BD-106

CORRIDOR

CB-10

ELECTRICAL

BD-110

SIGNAL

BD-110B

TELE

BD-110A

VESTIBULE

BD-110C

Room

3D-134

COMMON SPACE

OUTPATIENT LOBBY

CB-15A

TRAINING

BA-102H DRY STORAGE

BA-104

NON-FOOD STORAGE

BA-104G

STOR

BA-104F

REFRIG

BA-104C

REFRIG

BA-104D

REFRIG

BA-104E

CORRIDOR

CB-13

PASSAGE

BD-117B

HISTOLOGY

BD-150

CYTOLOGY

BD-150A

OFFICE

BD-150B

DARK ROOM

BD-126A

SCOPE

BD-126

RECEPTION/CLERICAL

BD-149

F LOCKER

BD-151E

M TOILET

BD-151B

DISTRIBUTION

BD-143D

OFFICE

BD-149L

OFFICE

BD-149B

CORRIDOR

CB-17

CORRIDOR

CB-15

CORRIDOR

CB-16

ELEV #10ELEV #9

ELEV #5

STAFF ELEV LOBBY

CB-16A

ELEV #7 ELEV #8

VENDING ROOM

BA-101

DIETARY STORAGE

BA-101A

CORRIDOR

CB-1A

ELEV #4 ELEV #3

PASSENGER LOBBY

CB-1

ELEV #1

CB-15L

ELEV #2

CB-15M

STAFF LOUNGE

BA-102L

FOOD SERVICE

BD-100I

MAN WASH

BB-102M

KITCHEN

BB-102A

POT WASH

BA-102D

DISHWASHING

BA-102C

IT CLOSET

BB-109B

HAC

BB-109A

BULK STORAGE

BD-105A

HAC

BD-147

CL'N SPD

BD-148

OFFICE

BD-149A

CORRIDOR

CB-20

STORAGE

BD-144

TOILET

BD-142G

TOILET

BD-142F

OFFICE

BD-129B

ED ROOM

BD-129A

PHLEB WAITING

BD-142

TRAINING

BD-143C

STORAGE

BD-143B

CUST COUNT

BD-143A

CORRIDOR

CB-18

CORRIDOR

CB-21

Room

BD-150D

LOUNGE

BD-128

SERVICE

BD-131A

CUTTING

BD-124B

FINISH

BD-124

MOL BIO

BD-131C

CORRIDOR

CB-13

AUTOPSY

BD-117

M TOILET

BD-136

F TOILET

BD-137

STAIR #7

BD-S07

SUBSTATION ROOM

BD-115

COMMON SPACE

BD-S09

MECHANICAL

BD-123

ELECTRICAL

BD-122

GAS STORAGE

BD-121

COMMON SPACE

BD-S13

COMMON SPACE

BD-S14

ELECTRICAL

BD-120

STAIR #6

BD-S06

VEST

BD-122C

TELE

BD-122A

SIGNAL

BD-122B

STAIR #34

BD-S20

SIGNAL

BD-120B

TELE

BD-120A

VEST

BD-120C

CORRIDOR

CB-23

VESTIBULE

CB-19

STAT CHEM LAB

BD-129

HEMATHOLOGY

BD-140A

CHEMISTRY

BD-140

STORAGE

BD-140F

MICROSCOPE

BD-141E

STORAGE

BD-141G

OFFICE

BD-140D

M TOILET

BD-140C

F TOILET

BD-140B

MICROBIOLOGY

BD-139LAB SCI

BD-139F

ALCOVE

BD-139G

ALCOVE

BD-139H

ALCOVE

BD-139I

SET-UP

BD-139J

OFFICE

BD-139K

CHEM LAB

BD-131

SHARED OFFICE

BD-131E

ANTE ROOM

BD-131B

OFFICE

BD-131D

STORAGE

BD-131F

PASSAGE

CB-27

MEDIA-PREP

BD-139B

ALCOVE

BD-139E

ALCOVE

BD-139D

STERILIZER

BD-135

OFFICE

BD-139A

GLASS WASH

BD-133

OFFICE

BD-134

OFFICE

BD-131G

MECHANICAL ROOM

MER

#2

MECHANICAL #6

BC-103

ELECTRICAL

BC-102

PLUMB SHOP

BC-101

TUNNEL

CB-6A

PLUMBING STORAGE

BC-100

MECHANICAL #5

BB-120

KITCHEN

BA-102

TUNNEL

CB-6

OFFICE

BB-107

CONFERENCE ROOM

BB-103

OFFICE

BB-106

ELEC

BB-103A

OFFICE

BB-104

OFFICE

BB-105

RECEPTION

CB-4A

ASEPTIC COMPOUNDING

BB-102A

ANTE ROOM

BB-102B

OFFICE

BB-103B

CHEMO COMPOUND

BB-102C

IN-PATIENT PHARMACY

BB-102

VESTIBULE

CB-3

CORRIDOR

CB-2

Room

BA-128

SOAP STORAGE

BB-102K

TELEPHONE SWITCHGEAR

BB-120ARoom

BA-127

Room

BA-126

CONFERENCE

BB-113

COMMUNICATIONS CENTER

BB-112

STORAGE

BB-108F

STORAGE

BB-108D

VESTIBULE

BB-108G

PROJECTION

BB-108A

VESTIBULE

BB-108B

CLOSET

BB-108C

HAC

BB-119

AUDITORIUM / CHAPEL

BB-108

CORRIDOR

CB-5

OFFICE

CB-124A

OFFICE

BD-105B

REFRIG

BA-104A

FREEZER

BA-104B

COMPRESSOR ROOM

BD-106A

FLUOR MICRO

BD-139Q

BLOOD CULTURE

BD-139P

TRANSFER ROOM

BD-139M

INNER CHAMBER

BD-139N

STERILIZER

BD-139C

STORAGE

CB-18A

DOCK

BD-114

OFFICE

BD-106A

BREAK ROOM

BD-106B

STAIR #5A

BD-S05A

STAIR #10

BD-S10

STERILE STORAGE

BD-104B

NON-STERILE STORAGE

BD-104

F TOILET

BD-103C

M TOILET

BD-103

HAC

BD-103A

BREAK ROOM

BD-112D

OFFICE

BD-112

OFFICE

BD-112A

OFFICE

BD-112B

OFFICE

BD-112C

MACHINE

BD-104E

PREP STERILE WORKROOM

BD-100C

DECONTAMINATION

BA-113

CONTAINMENT ROOM

BD-100C

OFFICE

BD-104D

HAC

BD-104C

OFFICE

BD-100

SOILED RECEIVING /

DECONTAMINATION

BD-100F

M TOILET

BD-101

CART WASH

BA-100D

HAC

BD-100A

F TOILET

BD-103D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS201

BUILDING 100, BASEMENT LEVEL -

ICRA PLANSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 MK AK

100% CD

ICRA PLAN LEGEND

KEY PLAN

3/64" = 1'-0"1

BUILDING 100, BASEMENT LEVEL - ICRA PLAN

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

DOOR(S) TO REMAIN LOCKED AND SEALED AT EDGES TO

PROVIDE AIR TIGHT CONDITION DURING CONTRUCTION.

TEMP WALLS FRAMED TO CEILING ABV WITH OPENINGS

PROVIDED FOR ACCESS. THESE TEMP WALLS WILL BE

REMOVED AFTER SEGMENT OF WALL AT THE

CONSTRUCTION ZONE MAIN ENTRANCE HAS BEEN

REMOVED AND A SECURED DOUBLE DOOR CONSTRUCTION

OPENING IS PROVIDED. WORK FOR THESE TWO WALLS TO

BE COMPLETED AFTER HOURS OR ON THE WEEKENDS.

HOSPITAL STAFF ACCESS MUST BE MAINTAINED AT ALL

TIMES.

TEMP WALLS FRAMED TO STRUCTURE ABV. TO REMAIN IN

PLACE THROUGHOUT THE DURATION OF CONSTRUCTION.

TEMP HOLLOW METAL DOOR TO REMAIN LOCKED EXCEPT

WHEN BEING USED BY THE CONTRACTOR. WHEN IN USE,

ACCESS WILL BE CONTROLLED AND MONITORED BY THE

CONTRACTOR.

ICRA CLASS IV NOTES:

A. OBTAIN INFECTION CONTROL APPROVAL BEFORE

CONSTRUCTION BEGINS.

B. ALL ITEMS IN PREVIOUS CLASS(ES) MUST ALSO BE

PERFORMED.

C. CONSTRUCT ANTEROOM AND REQUIRE PERSONNEL TO

PASS THRU THIS ROOM. PERSONNEL TO BE VACUUMED

USING A HEPA-FILTERED VACUUM BEFORE LEAVING WORK

SITE OR WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE THE WORK SITE.

D. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING

PERFORMED TO PREVENT CONTAMINATION OF DUCT

SYSTEM.

E. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES

APPROPRIATELY.

F. MAINTAIN NEGATIVE AIR PRESSURE @ MINIMUM .03 INCHES

WATER GAUGE WITHIN WORK SITE USING HEPA-FILTERED

AIR FILTRATION UNITS.

G. PLACE ADHESIVE WALK OFF MATS AT ENTRANCE TO WORK

AREA WITHIN ANTEROOM.

H. ALL PERSONNEL ENTERING / EXITING THE WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST

BE CHANGED EACH TIME THE WORKER EXITS THE WORK

AREA.

I. IF WORK IS IN OR ADJACENT TO A CRITICAL AREA WHERE

AIRFLOW, TEMPERATURE, AND HUMIDITY LEVELS MUST

REMAIN STABLE THEY WILL BE MONITORED TO MAINTAIN

MINIMUM REQUIRED LEVELS AND NECESSARY ACTIONS

TAKEN DOCUMENTED.

1. CLASS IV ISOLATED CONSTRUCTION ZONES ARE REQUIRED

TO MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES.

COORDINATE LOCATION(S) OF NEGATIVE AIR MACHINES

AND EXHAUST LOCATION WITH VA COR & VA FACILITY ICRA

STAFF AT POST-BID, PRE-CONSTRUCTION MEETING.

2. COMPLY WITH ALL APPLICABLE VA ICRA CLASS

REQUIREMENTS. PROJECT COR MAY HALT WORK AT

ANY TIME IF REQUIREMENTS ARE NOT MET.

3. MAINTAIN A CLEAN, SAFE CONSTRUCTION ZONE AT ALL

TIMES.

4. EXISTING CORRIDOR SPRINKLER HEADS AND SYSTEM

SHALL BE MAINTAINED AND KEPT FUNCTIONING AT ALL

TIMES.

5. TEMPORARY BARRIERS MAY ONLY BE TAKEN DOWN AFTER

THE VA COR HAS GIVEN FINAL APPROVAL.

6. DEMO EXISTING ACT CEILING AS REQUIRED TO

CONSTRUCT TEMPORARY BARRIERS. INSTALL NEW ACT

AFTER ALL WORK IS COMPLETED AND TEMPORARY

BARRIERS ARE TAKEN DOWN.

7. CONTRACTOR RESPONSIBLE FOR WIPING DOWN WHEELS

OF CARTS PRIOR TO IT LEAVING THE CONSTRUCTION

ZONE.

8. ALL DEBRIS REMOVED FROM THE WORK AREA THROUGH

INTERIOR HOSPITAL SPACE WILL BE REMOVED IN SEALED,

COVERED CART.

9. ALL CONSTRUCTION MATERIAL DELIVERED TO THE WORK

AREA THROUGH INTERIOR HOSPITAL SPACE WILL BE

DELIVERED IN SEALED, COVERED CART.

10. WALK-OFF MATS SHALL BE PROVIDED AT ALL

CONSTRUCTION ZONE ENTRANCE AND EXITS.

11. ONCE ALL WORK INSIDE THE SPS SPACE HAS BEEN

COMPLETED, PATCH & DEMO WORK FOR EXISTING AND

NEW DOORS ON THE PERIMETER WALLS MAY BEGIN. ALL

WORK IMPACTING THE PERIMETER WALLS IS REQUIRED

TO BE COMPLETED ON WEEKENDS AND AFTER FACILITY

HOURS. COORDINATION WITH VA STAFF AND COR WILL BE

REQUIRED. EACH 'PHASE' OF PERIMETER WORK WILL BE

ISOLATED APPROPRIATELY.

12. COORDINATE ANY WORK OUTSIDE OF THE HIGHLIGHTED

ICRA ZONES WITH THE COR TO MEET APPLICABLE ICRA

REQS. ASSUME CLASS IV REQUIREMENTS SHALL BE MET

UNLESS OTHERWISE APPROVED BY THE COR.

TRUE

NORTH

UPDN

LOW TEMP

B130

STERILIZATION COOL DOWN

B108

OFFICE

B104

OFFICE

B106

FEMALE STAFF TOILET /

LOCKER / SHOWER

B129

DIRTY PROCESSING

B122

DETERGENT

B117

STERILE/ NON-STERILE

EQUIP STORAGE

B110

CLEAN HAC

B110A

MACHINE

B109

RECEIVING / BREAKDOWN

B114

FEMALE STAFF TOILET /

SHOWER

B119

MALE STAFF TOILET /

LOCKER / SHOWER

B120

SOILED ANTE

B121

OFFICE

B105

MECHANICAL ROOM #3

BD-111

RME COOR / SPD

SECRETARY

B101

CONFERENCE

B102

PREP AND PACK

B126

BREAK

B127

CLEAN SCOPE STORAGE

B124

MALE STAFF TOILET /

LOCKER / SHOWER

B128

CLEAN ANTE

B125

DECONTAM

B116

ENDO PROCESSING / HIGH

LEVEL DISINFECTION

B123

CORRIDOR

CB-12

CORR

CB-18B

E X

IS

T

IN

G

E X

IS

T

IN

G

DECONTAMINATION

B368C

VESTIBULE

B367

ANTE

B112

IMPLANT

B111

OFFICE

B107

CORRIDOR

CB13

ELECTRICAL

CB15K

VESTIBULE

BD-110A

SCOPE STORAGE

B368D

NURSING TOWER

DIAGNOSTICS & TREATMENT (D&T)

78' TO POINT OF TWO EXITS

258' FROM POINT OF TWO

EXITS TO EGRESS

74' FROM POINT OF TWO

EXITS TO EGRESS

91' TO POINT OF TWO EXITS

190' FROM POINT OF TWO

EXITS TO EGRESS

128' FROM POINT OF TWO

EXITS TO EGRESS

EGRESS

EGRESS

EGRESS STAIR

D & T

TRUE

NORTH

NURSING

TOWER

AREA SHOWN

BUILDING 100

BASEMENT LEVEL

SMOKE ZONE BOUNDARY

2-HR FIRE BARRIER

3-HR FIRE BARRIER

ROUTE OF EMERGENCY EGRESS

LOCATION OF INSET FIRE

EXTINGUISHER / CABINET

EXIT WITH OCCUPANT LOAD &

EGRESS CAPACITY

1-HR FIRE BARRIER

EXIT SIGN

PULL BOX

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

GS301

BASEMENT FIRE & LIFE SAFETY

PLANSPEES DESIGN BUILD

625 1ST AVE, UNIT #301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

RENOVATE & EXPAND SEATTLE

STERILE PROCESSING SERVICES

IN BUILDING 100

VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA

663-20-102

06/25/2021 Checker Author

100% CD

3/64" = 1'-0"1

BASEMENT FIRE AND LIFE SAFETY PLAN

KEY PLAN

TRUE

NORTH

LEGEND

FIRE AND LIFE SAFETY DETAILS

CODE REVIEW NFPA 101, 2018 EDITION. DEMOLITION AND

CONSTRUCTION OPERATIONS SHALL COMPLY WITH NFPA 101 4.6.10

OCCUPANCY:

- BUSINESS

PROTECTION:

- AUTOMATIC SPRINKLER SYSTEM THROUGHOUT

- FIRE ALARM AND SMOKE DETECTION SYSTEMS

GENERAL NOTES

1. COORDINATE FIRE SPRINKLER SUBMITTALS AND WORK

WITH GOVERNING JURISDICTION PRIOR TO

COMMENCEMENT OF ANY WORK.

2. CORRIDORS AND EGRESS PASSAGEWAYS TO REMAIN

CLEAR AND FREE OF DEBRIS.

3. PROVIDE SIGNAGE FOR ROUTES OF EGRESS EFFECTED BY

CONSTRUCTION ZONES.

4. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL

SYMBOLS AND ABBREVIATIONS.

663-102.100.GI001.20230221
Sheets
GI001 - COVER
GI002 - DRAWING INDEX
HA001 - HAZMAT - GENERAL INFORMATION
HA101 - HAZMAT - PARTIAL DEMO PLAN - SOUTH
HA102 - HAZMAT - SWING SPACE DEMO PLAN
663-102.100.GI002.20230221
Sheets
GI001 - COVER
GI002 - DRAWING INDEX
HA001 - HAZMAT - GENERAL INFORMATION
HA101 - HAZMAT - PARTIAL DEMO PLAN - SOUTH
HA102 - HAZMAT - SWING SPACE DEMO PLAN
663-102.100.GS101.20210810
Sheets
A-601 - ROOM FINISH SCHEDULE
A-603 - EQUIPMENT SCHEDULES
AE403 - ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT
GI001 - COVER
GS101 - TEMPORARY TRAILER SITE PLAN
GS201 - BUILDING 100, BASEMENT LEVEL - ICRA PLAN
GS301 - BASEMENT FIRE & LIFE SAFETY PLAN
663-102.100.GS102.20210625
663-102.100.GS103.20210625
663-102.100.GS104.20210625
663-102.100.GS201.20210810
Sheets
A-601 - ROOM FINISH SCHEDULE
A-603 - EQUIPMENT SCHEDULES
AE403 - ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT
GI001 - COVER
GS101 - TEMPORARY TRAILER SITE PLAN
GS201 - BUILDING 100, BASEMENT LEVEL - ICRA PLAN
GS301 - BASEMENT FIRE & LIFE SAFETY PLAN
663-102.100.GS301.20210810
Sheets
A-601 - ROOM FINISH SCHEDULE
A-603 - EQUIPMENT SCHEDULES
AE403 - ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT
GI001 - COVER
GS101 - TEMPORARY TRAILER SITE PLAN
GS201 - BUILDING 100, BASEMENT LEVEL - ICRA PLAN
GS301 - BASEMENT FIRE & LIFE SAFETY PLAN

File details come from the government source that posted it. Updated .