This document package includes construction drawings and specifications for upgrades to a Sterile Processing Services department located in Building 100 at the VA Puget Sound Health Care System campus in Seattle, Washington. The project involves renovating and expanding existing sterile processing facilities including demolition work, construction of temporary barriers and negative pressure isolation zones, installation of a temporary mobile sterilization trailer, and upgrades to mechanical, electrical and plumbing systems. The construction drawings provide details on the proposed site plan for the temporary trailer, floor plans delineating demolition and new work areas, sections and elevations, as well as schedules, notes and specifications covering fire protection, structural, architectural and MEP scopes of work. Concurrent with interior renovations, the project will also replace an existing covered walkway and construct a new canopy structure.
The related federal contract opportunity is a solicitation posted to the beta.SAM.gov platform seeking bids from qualified construction firms to complete the Sterile Processing Services upgrade project. The solicitation includes the project name and number, issuing agency details, and identifies the Department of Veterans Affairs Veterans Health Administration and Veterans Integrated Service Network 20 as the contracting entities. No further information is provided on response dates, award timing, or other procurement specifics.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SO. SNOQUALMIE ST.
SO. ALASKA ST.
C O
LU
M B
IA
N
W A Y S O
B E A C O N
A V E
S O
N O R
TH
D R
IV
E
SOUTH DRIVE
S O U
TH
D R
IV
E
M
ED
IA
R D
EAST LOOP RD.
LOT "F"
LOT "E"
LOT"D"
LO
T "C
BL
DG
.1
ENERGY
PLANT
EN
GR
'G
SH
OP
S
F
IS
H E R
H O U S E
E.D.
BL
DG
.1
P A R K
IN
G
S T R U C T U R E
ELEC.
S H
ED
MHR BUILDING
ARCHITECTURAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
STRUCTURAL
REID MIDDLETON
728 134TH STREET SW, SUITE 200
EVERETT, WA 98204
PHONE: (425) 741-3800
ELECTRICAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PLUMBING
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
MECHANICAL
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
PHONE: (206) 590-2118
PHONE: (206) 590-2118
PHONE: (206) 590-2118
MEDICAL PLANNING
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
PHONE: (206) 590-2118
CALLISON RTKL
1717 PACIFIC AVE
DALLAS, TX 75201
PHONE: (214) 468-7600
CIVIL
REID MIDDLETON
728 134TH STREET SW, SUITE 200
EVERETT, WA 98204
PHONE: (425) 741-3800
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
SITE ZONING:
CONST TYPE:
OCCUPANCY:
CODE ANALYSIS
PROJECT DESCRIPTION
THESE TENENT IMPROVEMENT
CONSTRUCTION DRAWINGS ARE FOR THE
RENOVATION AND EXPANSION OF THE
EXISTING STERILE PROCESSING SERVICES
SUITE LOCATED IN THE BASEMENT OF THE
DIAGNOSTIC AND TREATMENT WING OF
BUILDING 100
APPLICABLE BUILDING
BUILDING 100
APPLICABLE FLOOR
D&T BASEMENT
APPLICABLE CLINIC
STERILE PROCESSING SERVICE
ICRA CLASS REQUIREMENTS
CONST TYPE:
CLINIC RISK:
CLASS REQS:
APPROXIMATE SQUARE FOOTAGE
14,200 SF FOR SPS, 900 SF FOR SWING SPACE
TOTAL = 15,100 SF
TYPE C
HIGHEST
CLASS IV
WASHINGTON
KING
SEATTLE
GOV, VETERANS AFFAIRS
1A, FIRE RESISTANT, FULLY
SPRINKLERED
B
REFERENCE DOCUMENTS
HAZMAT (GOOD FAITH) SURVEY REPORTS - FOR SPS AND SWING SPACE PROVIDED BY EHSI
SITE SPECIFIC MANUFACTURER DRAWINGS TO BE PROVIDED BY EQUIPMENT MANUFACTURER
FOR LATER SUBMITTALS.
BUILDING 100
NURSING TOWER
BUILDING 100
D&T
CORE
SPS RENOVATION AREA
TEMP SPS TRAILER
LOCATION
SWING SPACE RENOVATION AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GI001
COVER
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 MK SR
100% CD
RENOVATE AND EXPAND SEATTLE STERILE
PROCESSING SERVICES IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - SEATTLE, WASHINGTON
PROJECT # 663-20-102
TRUE
NORTH
1" = 100'-0"1
VICINITY PLAN
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GI002
DRAWING INDEX
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 MK JG
100% CD
DRAWING INDEX
PAGE # SHEET # SHEET NAME
83 OF 156 MP422 BASEMENT INTERSTITIAL PLAN - SOUTH - MECHANICAL PIPING
84 OF 156 MP423 BASEMENT INTERSTITIAL SPACE - NORTH - MECHANCIAL PIPING
85 OF 156 MP424 BASEMENT WAREHOUSE INTERSTITIAL PLAN – MECHANICAL PIPING
86 OF 156 MH425 PRESSURIZATION MAP - SOUTH - MECHANICAL
87 OF 156 MH426 PRESSURIZATIOIN MAP - NORTH - MECHANICAL
88 OF 156 MH427 PENTHOUSE AND ROOF PLAN - MECHANICAL
89 OF 156 M-501 DETAILS - MECHANICAL
90 OF 156 M-502 DETAILS - MECHANICAL
91 OF 156 MI503 CONTROL DIAGRAMS - MECHANICAL
92 OF 156 M-601 SCHEDULES - MECHANICAL
93 OF 156 M-602 SCHEDULES - MECHANICAL
94 OF 156 MD701 SWING SPACE DEMOLITION PLAN - MECHANICAL
95 OF 156 MD702 SWING SPACE INTERSTITIAL DEMOLITION PLAN - MECHANICAL
96 OF 156 MH703 SWING SPACE PLAN - MECHANICAL
97 OF 156 MH704 SWING SPACE INTERSTITIAL PLAN - MECHANICAL
98 OF 156 MH705 SWING SPACE PRESSURIZATION MAP - MECHANICAL
99 OF 156 MP706 SWING SPACE INTERSTITIAL PLAN - MECHANICAL PIPING
PLUMBING
100 OF 156 P-001 NOTES & LEDGENDS - PLUMBING
101 OF 156 PD401 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - PLUMBING
102 OF 156 PD402 BASEMENT FOUNDATION DEMOLITION PLAN - SOUTH - PLUMBING
103 OF 156 PD403 BASEMENT FOUNDATION DEMOLITION PLAN - NORTH - PLUMBING
104 OF 156 PD404 BASEMENT INTERSTITIAL DEMOLITION PLAN - SOUTH - PLUMBING
105 OF 156 PD405 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - PLUMBING
106 OF 156 PW406 BASEMENT FOUNDATION PLAN - SOUTH - PLUMBING
107 OF 156 PW407 BASEMENT FOUNDATION PLAN - NORTH - PLUMBING
108 OF 156 PL408 BASEMENT MECHANICAL ROOM PLAN - PLUMBING
109 OF 156 PL409 BASEMENT FLOOR PLAN - SOUTH - PLUMBING
110 OF 156 PL410 BASEMENT FLOOR PLAN - NORTH - PLUMBING
111 OF 156 PL411 BASEMENT INTERSTITIAL SPACE - SOUTH - PLUMBING
112 OF 156 PL412 BASEMENT INTERSTITIAL SPACE - NORTH - PLUMBING
113 OF 156 P-501 DETAILS - PLUMBING
114 OF 156 P-502 DETAILS - PLUMBING
115 OF 156 P-503 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING
116 OF 156 P-504 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING
117 OF 156 P-505 RO PROCESS AND EQUIPMENT DIAGRAMS - PLUMBING
118 OF 156 P-601 SCHEDULES - PLUMBING
119 OF 156 PW701 SWING SPACE FOUNDATION PLAN - PLUMBING
120 OF 156 PL702 SWING SPACE FLOOR PLAN - PLUMBING
121 OF 156 PL703 SWING SPACE INTERSTITIAL PLAN - PLUMBING
ELECTRICAL
122 OF 156 E-001 GENERAL NOTES, ABBREVIATIONS AND LEGENDS
123 OF 156 ED101 OVERALL LIGHTING DEMOLITION PLAN
124 OF 156 ED102 OVERALL POWER AND SPECIAL SYSTEMS DEMOLITION PLAN
125 OF 156 ES100 SITE ELECTRICAL PLAN
126 OF 156 ES101 OVERALL ELECTRICAL PLAN
127 OF 156 EL101 LIGHTING PLAN - NORTH
128 OF 156 EL102 LIGHTING PLAN - SOUTH
129 OF 156 EP101 POWER PLAN - NORTH
130 OF 156 EP102 POWER PLAN - SOUTH
131 OF 156 EP103 POWER PLAN - BASEMENT WAREHOUSE
132 OF 156 ET101 SPECIAL SYSTEM PLAN - NORTH
133 OF 156 ET102 SPECIAL SYSTEM PLAN - SOUTH
134 OF 156 E-401 ENLARGED DEMOLITION PLANS
135 OF 156 E-402 ENLARGED PLANS
136 OF 156 E-403 ENLARGED ENERGY PLANT - ELECTRICAL PLAN
137 OF 156 E-404 ENLARGED FLOOR PLANS AND SECTION - CART LIFT
138 OF 156 E-405 ENLARGED PARTIAL ROOF PLAN
139 OF 156 E-406 ENLARGED SUBSTATION 'B' ELECTRICAL PLAN
140 OF 156 E-407 ENLARGED SPS TRAILER COVERED WALKWAY PLAN
141 OF 156 E-501 ELECTRICAL DETAILS
142 OF 156 E-502 ELECTRICAL DETAILS
143 OF 156 E-601 SCOPE PROCESSING AREA ONE-LINE DIAGRAM - EXISTING
144 OF 156 E-602 SCOPE PROCESSING AREA ONE-LINE DIAGRAM - REVISED
145 OF 156 E-603 SUBSTATION "B" ONE-LINE DIAGRAM - REVISED
146 OF 156 E-604 SPS TRAILER ONE-LINE DIAGRAMS
147 OF 156 E-605 PARTIAL ONE-LINE DIAGRAM AND LOAD SCHEDULES - CART LIFT
148 OF 156 E-606 ELECTRICAL LOAD SCHEDULES - REVISED
149 OF 156 E-607 ELECTRICAL LOAD SCHEDULES - REVISED
150 OF 156 E-608 ELECTRICAL SCHEDULES
151 OF 156 E-701 SWING SPACE - OVERALL ELECTRICAL PLAN
152 OF 156 E-702 SWING SPACE - BASEMENT SUBSTATION "C" ROOM BC-102 ELECTRICAL PLAN
153 OF 156 E-703 SWING SPACE - LIGHTING AND ELECTRICAL DEMOLITION PLAN
154 OF 156 E-704 SWING SPACE - REVISED LIGHTING AND ELECTRICAL PLAN
155 OF 156 E-705 SWING SPACE - PARTIAL ONE-LINE DIAGRAMS
156 OF 156 E-706 SWING SPACE - ELECTRICAL LOAD SCHEDULES
HAZMAT
HA001 HAZMAT - GENERAL INFORMATION
HA101 HAZMAT - PARTIAL DEMO PLAN - SOUTH
HA102 HAZMAT - SWING SPACE DEMO PLAN
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
01 OF 156 GI001 COVER
02 OF 156 GI002 DRAWING INDEX
03 OF 156 GS101 TEMPORARY TRAILER SITE PLAN
04 OF 156 GS102 ENLARGED TEMPORARY TRAILER SITE PLAN
05 OF 156 GS103 TEMPORARY TRAILER SITE SECTIONS
06 OF 156 GS104 TEMPORARY TRAILER SITE SECTIONS
07 OF 156 GS201 BUILDING 100, BASEMENT LEVEL - ICRA PLAN
08 OF 156 GS301 BASEMENT FIRE & LIFE SAFETY PLAN
CIVIL
09 OF 156 CD101 DEMOLITION AND TESC PLAN
10 OF 156 CU101 UTILITY PLAN
11 OF 156 C-501 DETAILS
ARCHITECTURAL
12 OF 156 A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
13 OF 156 AD101 OVERALL DEMO FLOOR PLAN
14 OF 156 AD102 OVERALL DEMO REFLECTED CEILING PLAN
15 OF 156 AD111 PARTIAL DEMO PLAN - NORTH
16 OF 156 AD112 PARTIAL DEMO PLAN - SOUTH
17 OF 156 AE101 OVERALL FLOOR PLAN
18 OF 156 AE111 PARTIAL FLOOR PLAN - NORTH
19 OF 156 AE112 PARTIAL FLOOR PLAN - SOUTH
20 OF 156 AC101 OVERALL REFLECTED CEILING PLAN
21 OF 156 AC111 PARTIAL REFELCTED CEILING PLAN - NORTH
22 OF 156 AC112 PARTIAL REFLECTED CEILING PLAN - SOUTH
23 OF 156 AE301 BUILDING SECTIONS
24 OF 156 AE401 ENLARGED FLOOR PLANS, REF CEILING PLANS & DETAILS
25 OF 156 AE402 ENLARGED FLOOR PLAN - STERILIZERS & DISINFECTORS
26 OF 156 AE403 ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT
27 OF 156 AE404 ENLARGED PARTIAL ROOF PLAN
28 OF 156 AE411 INTERIOR ELEVATIONS
29 OF 156 AE412 INTERIOR ELEVATIONS
30 OF 156 A-601 ROOM FINISH SCHEDULE
31 OF 156 A-602 DOOR & WINDOW SCHEDULE & TYPES, INTERIOR DOOR DETAILS
32 OF 156 A-603 EQUIPMENT SCHEDULES
33 OF 156 A-611 WALL TYPES
34 OF 156 A-612 WALL TYPES
35 OF 156 AE701 SWING SPACE - DEMO PLAN, ENLARGED FLOOR PLAN & RCP
36 OF 156 AW001 SIGNAGE LOCATION PLAN & MESSAGE SCHEDULE
37 OF 156 AW002 SIGNAGE MATERIALS, FINISHES, & INDEX
38 OF 156 AW015 IN-01.15 HAZARDOUS MATERIAL SAFETY INFORMATION SIGN
39 OF 156 AW018 IN-01.22 BIOHAZARD WARNING SIGN
40 OF 156 AW024 IN-04.01 ROOM NUMBER SIGN
41 OF 156 AW025 IN-04.02 PERMANENT ROOM SIGN
42 OF 156 AW027 IN-04.03 CHANGEABLE MESSAGE ROOM SIGN
43 OF 156 AW043 IN-08.02 PROHIBIT INSTRUCTIONAL AND CONTROL
44 OF 156 AW044 IN-09.01A, IN-09.01C RESTROOM SIGN MEN
45 OF 156 AW045 IN-09.02A, IN-09.02C RESTROOM SIGN WOMEN
46 OF 156 AW075 IN-19.02 DIMENSIONAL LETTERS
STRUCTURAL
47 OF 156 S-001 GENERAL STRUCTURAL NOTES AND SHEET INDEX
48 OF 156 S-002 ABBREVIATIONS AND SPECIAL INSPECTION SCHEDULES
49 OF 156 SF101 LEVEL BASEMENT PLAN
50 OF 156 SF102 COVERED WALKWAY FOUNDATION PARTIAL PLAN
51 OF 156 SF103 COVERED WALKWAY ROOF FRAMING PLAN
52 OF 156 SF104 COVERED WALKWAY SECTIONS
53 OF 156 SF501 TYPICAL SECTIONS AND DETAILS
54 OF 156 SF502 TYPICAL SECTIONS AND DETAILS
FIRE PROTECTION
55 OF 156 FD101 BASEMENT DEMOLITION PLAN - FIRE PROTECTION
56 OF 156 FX102 BASEMENT FLOOR PLAN - FIRE PROTECTION
57 OF 156 FX401 CART LIFT EQUIPMENT ROOM - FIRE PROTECTION
58 OF 156 FX402 COVERED WALKWAY - FIRE PROTECTION
MECHANICAL
59 OF 156 M-001 LEGENDS, SYMBOLS, ABBREVIATIONS, & NOTES - MECHANICAL
60 OF 156 MD101 BASEMENT DEMOLITION PLAN - OVERALL - MECHANICAL
61 OF 156 MD401 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - MECHANICAL
62 OF 156 MD402 BASEMENT DEMOLITION PLAN - SOUTH - MECHANCIAL
63 OF 156 MD403 BASEMENT DEMOLITION PLAN - NORTH - MECHANCIAL
64 OF 156 MD404 BASEMENT WAREHOUSE DEMOLITION PLAN - MECHANICAL
65 OF 156 MD405 BASEMENT INTERSTITIAL DEMOLITION PLAN - SOUTH - MECHANICAL
66 OF 156 MD406 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - MECHANICAL
67 OF 156 MD407 BASEMENT WAREHOUSE INTERSTITIAL DEMOLITION PLAN - MECHANICAL
68 OF 156 MD408 BASEMENT MECHANICAL ROOM DEMOLITION PLAN - MECHANICAL PIPING
69 OF 156 MD409 BASEMENT INTERSTITAL DEMOLITION PLAN - SOUTH - MECHANICAL PIPING
70 OF 156 MD410 BASEMENT INTERSTITIAL DEMOLITION PLAN - NORTH - MECHANICAL PIPING
71 OF 156 MD411 BASEMENT WAREHOUSE INTERSTITIAL DEMOLITION PLAN - MECHANICAL PIPING
72 OF 156 MH301 SECTION VIEWS - MECHANICAL
73 OF 156 MH412 BASEMENT MECHANICAL ROOM - MECHANICAL
74 OF 156 MH413 BASEMENT FLOOR PLAN - SOUTH - MECHANICAL
75 OF 156 MH414 BASEMENT FLOOR PLAN - NORTH - MECHANICAL
76 OF 156 MH415 BASEMENT WAREHOUSE FLOOR PLAN - MECHANICAL
77 OF 156 MH416 BASEMENT INTERSTITIAL SPACE - SOUTH - MECHANICAL
78 OF 156 MH417 BASEMENT INTERSTITIAL SPACE - NORTH - MECHANICAL
79 OF 156 MH418 BASEMENT WAREHOUSE INTERSTITIAL SPACE - MECHANICAL
80 OF 156 MH419 BASEMENT MECHANICAL ROOM - MECHANICAL PIPING
81 OF 156 MP420 BASEMENT FLOOR PLAN - SOUTH - MECHANICAL PIPING
82 OF 156 MP421 BASEMENT FLOOR PLAN - NORTH - MECHANICAL PIPING
BD
-1
EN
TR
Y
CD
-2 9B
VE
ST
INDUSTRIALSTAIR
#25
INDUSTRIAL STAIR
#27
TUNNEL
CB-6
865 S.F.
INDUSTRIAL STAIR
#28
COMMON
73 S.F.
SPACE
G F I
G
FI
1. REFERENCE CIVIL AND ELECTRICAL DRAWINGS FOR SITE
DEMOLITION AND RELATED WORK INFORMATION
2. CONTRACTOR SHALL BE RESPONSIBLE FOR LEASING THE
TEMPORARY SPS TRAILER. THE CONTRACTOR SHALL
ALSO BE RESPONSIBLE FOR COORDINATING WITH THE
PROVIDER AND COORDINATING ALL UTILITY
CONNECTIONS.
RENOVATION
AREA
MOBILE STERILIZATION
TRAILER LOCATION
EXISTING 10'-0" H
COVERED
WALKWAY
' - 1
SPS MOBILE UNIT
SUPPORT POD
PET / CT
HVAC
ENCLOSURE
NEW CANOPY
8' -
V E R
IF
Y
' - 0
' - 0
B E
A C
O N
A V
E S
O
70' -
NURSING WING
ENERGY PLANT
BUILDING
BUILDING 100
D & T WING
BUILDING 100
BUILDING 33
ED
BUILDING 102
ENG SHOP
BUILDING 1
BUILDING 18
6' -
R
R
R
' - 0
' - 0
' - 6
' - 0
BOLLARD,
TYP
PROJECTION ROOM
BB-108A
ELEC
BB-103A
DECONTAMINATION
B368C
MECHANICAL ROOM #5
BB-120
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS101
TEMPORARY TRAILER SITE PLAN
SPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 MA SR
100% CD
TRUE
NORTH
GENERAL NOTES
1" = 30'-0"1
TEMPORARY TRAILER SITE PLAN
DNDN
TEMP SPS
EXISTING 10'-0" H
COVERED WALKWAY
(NO WORK)
GS103
PET / CTHVAC
ENCLOSURE
NEW PET / CT
CANOPY
NO WORK
80' - 0"
GS103
GS103
RADIATION THERAPY
BUILDING 33
/2
GS104
[No Slope]
17' - 0 1/8"
SPS SUPPORT
POD
1/2" / 1'-0"
1/2" / 1'-0"
10' - 10" 6' - 0"
GS103
GS103
GS103
SPS SUPPORT
POD
TEMP SPS
EXISTING 10'-0" H
COVERED
WALKWAY
PET / CTHVAC
ENCLOSURE
NEW PET / CT
COVERED WALKWAY
V E
R
IF
Y
/8
/4
V E
R
IF
Y
RADIATION THERAPY
BUILDING 33
6' - 11 5/8" 8' - 6" 6' - 11 5/8"
/4
45"x80 DOOR WITH 42"
CLEAR OPENING
40 3/4"x80" DOOR WITH
36" CLEAR OPENING
COORDINATE
LOCATION AND
HEIGHT OF WALKWAY
WITH STERIS MOBILE
MANUFACTURER
REQUIREMENT
70'x30' MOBILE SPD
REQUIREMENT FOOT
PRINT FOR
EMPLOYMENT AND
SERVICE ACCESS
EXISTING GRAVEL
EXISTING ROCKERY
EXISTING CONC
PAVEMENT
EXISTING WALL
COORDINATE
LOCATION AND
HEIGHT OF WALKWAY
WITH PET / CT
GS104
/4
22' - 5 1/4"
INSTALL NEW WALKWAY
ENCLOSED WALL
STORAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS102
ENLARGED TEMPORARY TRAILER
SITE PLANSPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/04/2021 Checker Author
100% CD
1/8" = 1'-0"2
COVERED WALKWAY - ROOF PLAN
1/8" = 1'-0"1
COVERED WALKWAY - PLAN
LEVEL BASEMENT
-18' - 0"
EXISTING WOOD FRAMING
WALKWAY BEYOND
EXISTING 4" DIA
PIPE COLUMN
EXISTING C-CHANNEL
ROOF FRAMING
EXISTING METAL
ROOF PANEL
EXISTING GUTTER
EXISTING
WALKWAY
(CONCRETE
OVER METAL
DECK?)
DEMO EXISTING
PIPE HANDRAIL
EXISTING CONCRETE
PAVING
F
IE
L D
V E
R
IF
Y
LEVEL BASEMENT
- INTERSTITIAL
-7' - 11"
PAVING
-21' - 6"
• CORRUGATED METAL PANEL
• WRB OVER 1/2" PLYWOOD
SHEATHING
• 4" METAL STUDS @ 24" OC
• 5/8" GWB, PAIMT
LEVEL BASEMENT
-18' - 0"
EXISTING CONCRETE PAVING
CONCRETE COLUMN BASE
PT WOOD ROOF
FRAMING PER
STRUCT
CORRUGATED ROOFING
PANEL OVER VAPOR
RETARDER , 1/2"
PLYWOOD SHEATHING
EXISTING CONC
WALKWAY
NEW WALKWAY
FLOOR
LEVEL BASEMENT
- INTERSTITIAL
-7' - 11"
PT WOOD BEAM PER STRUCT
PAVING
-21' - 6"
STORAGECOVERED WALKWAY
• CORRUGATED METAL PANEL
• WRB OVER 1/2" PLYWOOD SHEATHING
• 4" METAL STUDS @ 24" OC
• 5/8" GWB, PAIMT
• CORRUGATED METAL PANEL
• WRB OVER 1/2" PLYWOOD SHEATHING
• 4" METAL STUDS @ 24" OC
• 5/8" GWB, PAIMT
LEVEL BASEMENT
-18' - 0"
EXISTING
CONCRETE
STAIR
DEMO EXISTING
GUARD RAIL
METAL EAVE FLASHING
EXISTING CONC WALL
BEYOND
PAVING
-21' - 6"
• CORRUGATED METAL
PANEL
• WRB OVER 1/2"
PLYWOOD
SHEATHING
• 4" METAL STUDS @
24" OC
• 5/8" GWB, PAIMT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS103
TEMPORARY TRAILER SITE
SECTIONSSPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/04/2021 Checker Author
100% CD
1/2" = 1'-0"1
SECTION - EXISTING WALKWAY
1/2" = 1'-0"3
CROSS SECTION - NEW ROOF OVER EXISTING WALKWAY
1/2" = 1'-0"2
CROSS SECTION - NEW COVERED WALKWAY
LEVEL BASEMENT
-18' - 0"
GS103
GS103
LEVEL BASEMENT
- INTERSTITIAL
-7' - 11"
PAVING
-21' - 6"
/4
/8
D O
O R
O P
E N
IN
G
CORRUGATED METAL PANEL
WRB OVER 1/2" PLYWOOD
SHEATHING
4" METAL STUDS @ 24" OC
5/8" GWB, PAIMT
METAL ROOF PANEL
OVER PT WOOD
FRAMING
/2
/2
/2
STERIS MOBILE SPD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS104
TEMPORARY TRAILER SITE
SECTIONSSPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/04/2021 Checker Author
100% CD
1/2" = 1'-0"1
CROSS SECTION - STERIS MOBILE SPD ENTRY
D & T
TRUE
NORTH
NURSING
TOWER
AREA SHOWN
BUILDING 100
BASEMENT LEVEL
ANTE ROOM
CONSTRUCTION ZONE MAIN ENTRANCE
EXIST DOOR TO REMAIN UNTIL FINAL CONSTRUCTION
SCOPE IS EXECUTED. SECURE DOOR, ACCESS ONLY
ALLOWED TO CONSTRUCTION AND FMS STAFF.
ANTE ROOM
EXIST DOOR USED AS CONSTRUCTION ZONE EMERGENCY
EGRESS, ENSURE DOOR IS FIT WITH PROPER EGRESS HW
ANTE ROOM, FOR EMERGENCY EGRESS ONLY
EXISTING CONDITIONS
ISOLATED CONSTRUCTION ZONE, ( - - ) PRESSURE
TEMPORARY BARRIERS
ANTE ROOM, ( - ) PRESSURE
PATH OF TRAVEL
CORRIDOR
CB-14
MECHANICAL #3
BD-111
CORRIDOR
CB-12
CONFERENCE
BD-113
SPD CORRIDOR
CB-18B
EDUCATION LAB
BD-152
MORGUE
BD-117A
PASSAGE
BD-151F
PASSAGE
BD-151A
M LOCKER
BD-151C
F TOILET
BD-151D
RESIDENT CUBICLES
BD-151
CORRIDOR
CB-22
OFFICE
BD-149J
OFFICE
BD-149H
OFFICE
BD-149G
SUPERVISOR OFFICE
BD-143F
STAFF
BD-143E
STAIR #1
ELEV #6
OFFICE
BD-149F
PASSAGE
BD-149J
OFFICE
BD-149E
OFFICE
BD-149D
OFFICE
BA-102I
OFFICE
BA-102J
OFFICE
BA-103
OFFICE
BA-103A
FEMALE LOCKERS / TOILET
BA-105
MALE LOCKERS/TOILET
BA-106
MAILROOM
BD-105
SUPPLY WAREHOUSE
BD-106
CORRIDOR
CB-10
ELECTRICAL
BD-110
SIGNAL
BD-110B
TELE
BD-110A
VESTIBULE
BD-110C
Room
3D-134
COMMON SPACE
OUTPATIENT LOBBY
CB-15A
TRAINING
BA-102H DRY STORAGE
BA-104
NON-FOOD STORAGE
BA-104G
STOR
BA-104F
REFRIG
BA-104C
REFRIG
BA-104D
REFRIG
BA-104E
CORRIDOR
CB-13
PASSAGE
BD-117B
HISTOLOGY
BD-150
CYTOLOGY
BD-150A
OFFICE
BD-150B
DARK ROOM
BD-126A
SCOPE
BD-126
RECEPTION/CLERICAL
BD-149
F LOCKER
BD-151E
M TOILET
BD-151B
DISTRIBUTION
BD-143D
OFFICE
BD-149L
OFFICE
BD-149B
CORRIDOR
CB-17
CORRIDOR
CB-15
CORRIDOR
CB-16
ELEV #10ELEV #9
ELEV #5
STAFF ELEV LOBBY
CB-16A
ELEV #7 ELEV #8
VENDING ROOM
BA-101
DIETARY STORAGE
BA-101A
CORRIDOR
CB-1A
ELEV #4 ELEV #3
PASSENGER LOBBY
CB-1
ELEV #1
CB-15L
ELEV #2
CB-15M
STAFF LOUNGE
BA-102L
FOOD SERVICE
BD-100I
MAN WASH
BB-102M
KITCHEN
BB-102A
POT WASH
BA-102D
DISHWASHING
BA-102C
IT CLOSET
BB-109B
HAC
BB-109A
BULK STORAGE
BD-105A
HAC
BD-147
CL'N SPD
BD-148
OFFICE
BD-149A
CORRIDOR
CB-20
STORAGE
BD-144
TOILET
BD-142G
TOILET
BD-142F
OFFICE
BD-129B
ED ROOM
BD-129A
PHLEB WAITING
BD-142
TRAINING
BD-143C
STORAGE
BD-143B
CUST COUNT
BD-143A
CORRIDOR
CB-18
CORRIDOR
CB-21
Room
BD-150D
LOUNGE
BD-128
SERVICE
BD-131A
CUTTING
BD-124B
FINISH
BD-124
MOL BIO
BD-131C
CORRIDOR
CB-13
AUTOPSY
BD-117
M TOILET
BD-136
F TOILET
BD-137
STAIR #7
BD-S07
SUBSTATION ROOM
BD-115
COMMON SPACE
BD-S09
MECHANICAL
BD-123
ELECTRICAL
BD-122
GAS STORAGE
BD-121
COMMON SPACE
BD-S13
COMMON SPACE
BD-S14
ELECTRICAL
BD-120
STAIR #6
BD-S06
VEST
BD-122C
TELE
BD-122A
SIGNAL
BD-122B
STAIR #34
BD-S20
SIGNAL
BD-120B
TELE
BD-120A
VEST
BD-120C
CORRIDOR
CB-23
VESTIBULE
CB-19
STAT CHEM LAB
BD-129
HEMATHOLOGY
BD-140A
CHEMISTRY
BD-140
STORAGE
BD-140F
MICROSCOPE
BD-141E
STORAGE
BD-141G
OFFICE
BD-140D
M TOILET
BD-140C
F TOILET
BD-140B
MICROBIOLOGY
BD-139LAB SCI
BD-139F
ALCOVE
BD-139G
ALCOVE
BD-139H
ALCOVE
BD-139I
SET-UP
BD-139J
OFFICE
BD-139K
CHEM LAB
BD-131
SHARED OFFICE
BD-131E
ANTE ROOM
BD-131B
OFFICE
BD-131D
STORAGE
BD-131F
PASSAGE
CB-27
MEDIA-PREP
BD-139B
ALCOVE
BD-139E
ALCOVE
BD-139D
STERILIZER
BD-135
OFFICE
BD-139A
GLASS WASH
BD-133
OFFICE
BD-134
OFFICE
BD-131G
MECHANICAL ROOM
MER
#2
MECHANICAL #6
BC-103
ELECTRICAL
BC-102
PLUMB SHOP
BC-101
TUNNEL
CB-6A
PLUMBING STORAGE
BC-100
MECHANICAL #5
BB-120
KITCHEN
BA-102
TUNNEL
CB-6
OFFICE
BB-107
CONFERENCE ROOM
BB-103
OFFICE
BB-106
ELEC
BB-103A
OFFICE
BB-104
OFFICE
BB-105
RECEPTION
CB-4A
ASEPTIC COMPOUNDING
BB-102A
ANTE ROOM
BB-102B
OFFICE
BB-103B
CHEMO COMPOUND
BB-102C
IN-PATIENT PHARMACY
BB-102
VESTIBULE
CB-3
CORRIDOR
CB-2
Room
BA-128
SOAP STORAGE
BB-102K
TELEPHONE SWITCHGEAR
BB-120ARoom
BA-127
Room
BA-126
CONFERENCE
BB-113
COMMUNICATIONS CENTER
BB-112
STORAGE
BB-108F
STORAGE
BB-108D
VESTIBULE
BB-108G
PROJECTION
BB-108A
VESTIBULE
BB-108B
CLOSET
BB-108C
HAC
BB-119
AUDITORIUM / CHAPEL
BB-108
CORRIDOR
CB-5
OFFICE
CB-124A
OFFICE
BD-105B
REFRIG
BA-104A
FREEZER
BA-104B
COMPRESSOR ROOM
BD-106A
FLUOR MICRO
BD-139Q
BLOOD CULTURE
BD-139P
TRANSFER ROOM
BD-139M
INNER CHAMBER
BD-139N
STERILIZER
BD-139C
STORAGE
CB-18A
DOCK
BD-114
OFFICE
BD-106A
BREAK ROOM
BD-106B
STAIR #5A
BD-S05A
STAIR #10
BD-S10
STERILE STORAGE
BD-104B
NON-STERILE STORAGE
BD-104
F TOILET
BD-103C
M TOILET
BD-103
HAC
BD-103A
BREAK ROOM
BD-112D
OFFICE
BD-112
OFFICE
BD-112A
OFFICE
BD-112B
OFFICE
BD-112C
MACHINE
BD-104E
PREP STERILE WORKROOM
BD-100C
DECONTAMINATION
BA-113
CONTAINMENT ROOM
BD-100C
OFFICE
BD-104D
HAC
BD-104C
OFFICE
BD-100
SOILED RECEIVING /
DECONTAMINATION
BD-100F
M TOILET
BD-101
CART WASH
BA-100D
HAC
BD-100A
F TOILET
BD-103D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS201
BUILDING 100, BASEMENT LEVEL -
ICRA PLANSPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 MK AK
100% CD
ICRA PLAN LEGEND
KEY PLAN
3/64" = 1'-0"1
BUILDING 100, BASEMENT LEVEL - ICRA PLAN
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
DOOR(S) TO REMAIN LOCKED AND SEALED AT EDGES TO
PROVIDE AIR TIGHT CONDITION DURING CONTRUCTION.
TEMP WALLS FRAMED TO CEILING ABV WITH OPENINGS
PROVIDED FOR ACCESS. THESE TEMP WALLS WILL BE
REMOVED AFTER SEGMENT OF WALL AT THE
CONSTRUCTION ZONE MAIN ENTRANCE HAS BEEN
REMOVED AND A SECURED DOUBLE DOOR CONSTRUCTION
OPENING IS PROVIDED. WORK FOR THESE TWO WALLS TO
BE COMPLETED AFTER HOURS OR ON THE WEEKENDS.
HOSPITAL STAFF ACCESS MUST BE MAINTAINED AT ALL
TIMES.
TEMP WALLS FRAMED TO STRUCTURE ABV. TO REMAIN IN
PLACE THROUGHOUT THE DURATION OF CONSTRUCTION.
TEMP HOLLOW METAL DOOR TO REMAIN LOCKED EXCEPT
WHEN BEING USED BY THE CONTRACTOR. WHEN IN USE,
ACCESS WILL BE CONTROLLED AND MONITORED BY THE
CONTRACTOR.
ICRA CLASS IV NOTES:
A. OBTAIN INFECTION CONTROL APPROVAL BEFORE
CONSTRUCTION BEGINS.
B. ALL ITEMS IN PREVIOUS CLASS(ES) MUST ALSO BE
PERFORMED.
C. CONSTRUCT ANTEROOM AND REQUIRE PERSONNEL TO
PASS THRU THIS ROOM. PERSONNEL TO BE VACUUMED
USING A HEPA-FILTERED VACUUM BEFORE LEAVING WORK
SITE OR WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE THE WORK SITE.
D. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING
PERFORMED TO PREVENT CONTAMINATION OF DUCT
SYSTEM.
E. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
F. MAINTAIN NEGATIVE AIR PRESSURE @ MINIMUM .03 INCHES
WATER GAUGE WITHIN WORK SITE USING HEPA-FILTERED
AIR FILTRATION UNITS.
G. PLACE ADHESIVE WALK OFF MATS AT ENTRANCE TO WORK
AREA WITHIN ANTEROOM.
H. ALL PERSONNEL ENTERING / EXITING THE WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST
BE CHANGED EACH TIME THE WORKER EXITS THE WORK
AREA.
I. IF WORK IS IN OR ADJACENT TO A CRITICAL AREA WHERE
AIRFLOW, TEMPERATURE, AND HUMIDITY LEVELS MUST
REMAIN STABLE THEY WILL BE MONITORED TO MAINTAIN
MINIMUM REQUIRED LEVELS AND NECESSARY ACTIONS
TAKEN DOCUMENTED.
1. CLASS IV ISOLATED CONSTRUCTION ZONES ARE REQUIRED
TO MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES.
COORDINATE LOCATION(S) OF NEGATIVE AIR MACHINES
AND EXHAUST LOCATION WITH VA COR & VA FACILITY ICRA
STAFF AT POST-BID, PRE-CONSTRUCTION MEETING.
2. COMPLY WITH ALL APPLICABLE VA ICRA CLASS
REQUIREMENTS. PROJECT COR MAY HALT WORK AT
ANY TIME IF REQUIREMENTS ARE NOT MET.
3. MAINTAIN A CLEAN, SAFE CONSTRUCTION ZONE AT ALL
TIMES.
4. EXISTING CORRIDOR SPRINKLER HEADS AND SYSTEM
SHALL BE MAINTAINED AND KEPT FUNCTIONING AT ALL
TIMES.
5. TEMPORARY BARRIERS MAY ONLY BE TAKEN DOWN AFTER
THE VA COR HAS GIVEN FINAL APPROVAL.
6. DEMO EXISTING ACT CEILING AS REQUIRED TO
CONSTRUCT TEMPORARY BARRIERS. INSTALL NEW ACT
AFTER ALL WORK IS COMPLETED AND TEMPORARY
BARRIERS ARE TAKEN DOWN.
7. CONTRACTOR RESPONSIBLE FOR WIPING DOWN WHEELS
OF CARTS PRIOR TO IT LEAVING THE CONSTRUCTION
ZONE.
8. ALL DEBRIS REMOVED FROM THE WORK AREA THROUGH
INTERIOR HOSPITAL SPACE WILL BE REMOVED IN SEALED,
COVERED CART.
9. ALL CONSTRUCTION MATERIAL DELIVERED TO THE WORK
AREA THROUGH INTERIOR HOSPITAL SPACE WILL BE
DELIVERED IN SEALED, COVERED CART.
10. WALK-OFF MATS SHALL BE PROVIDED AT ALL
CONSTRUCTION ZONE ENTRANCE AND EXITS.
11. ONCE ALL WORK INSIDE THE SPS SPACE HAS BEEN
COMPLETED, PATCH & DEMO WORK FOR EXISTING AND
NEW DOORS ON THE PERIMETER WALLS MAY BEGIN. ALL
WORK IMPACTING THE PERIMETER WALLS IS REQUIRED
TO BE COMPLETED ON WEEKENDS AND AFTER FACILITY
HOURS. COORDINATION WITH VA STAFF AND COR WILL BE
REQUIRED. EACH 'PHASE' OF PERIMETER WORK WILL BE
ISOLATED APPROPRIATELY.
12. COORDINATE ANY WORK OUTSIDE OF THE HIGHLIGHTED
ICRA ZONES WITH THE COR TO MEET APPLICABLE ICRA
REQS. ASSUME CLASS IV REQUIREMENTS SHALL BE MET
UNLESS OTHERWISE APPROVED BY THE COR.
TRUE
NORTH
UPDN
LOW TEMP
B130
STERILIZATION COOL DOWN
B108
OFFICE
B104
OFFICE
B106
FEMALE STAFF TOILET /
LOCKER / SHOWER
B129
DIRTY PROCESSING
B122
DETERGENT
B117
STERILE/ NON-STERILE
EQUIP STORAGE
B110
CLEAN HAC
B110A
MACHINE
B109
RECEIVING / BREAKDOWN
B114
FEMALE STAFF TOILET /
SHOWER
B119
MALE STAFF TOILET /
LOCKER / SHOWER
B120
SOILED ANTE
B121
OFFICE
B105
MECHANICAL ROOM #3
BD-111
RME COOR / SPD
SECRETARY
B101
CONFERENCE
B102
PREP AND PACK
B126
BREAK
B127
CLEAN SCOPE STORAGE
B124
MALE STAFF TOILET /
LOCKER / SHOWER
B128
CLEAN ANTE
B125
DECONTAM
B116
ENDO PROCESSING / HIGH
LEVEL DISINFECTION
B123
CORRIDOR
CB-12
CORR
CB-18B
E X
IS
T
IN
G
E X
IS
T
IN
G
DECONTAMINATION
B368C
VESTIBULE
B367
ANTE
B112
IMPLANT
B111
OFFICE
B107
CORRIDOR
CB13
ELECTRICAL
CB15K
VESTIBULE
BD-110A
SCOPE STORAGE
B368D
NURSING TOWER
DIAGNOSTICS & TREATMENT (D&T)
78' TO POINT OF TWO EXITS
258' FROM POINT OF TWO
EXITS TO EGRESS
74' FROM POINT OF TWO
EXITS TO EGRESS
91' TO POINT OF TWO EXITS
190' FROM POINT OF TWO
EXITS TO EGRESS
128' FROM POINT OF TWO
EXITS TO EGRESS
EGRESS
EGRESS
EGRESS STAIR
D & T
TRUE
NORTH
NURSING
TOWER
AREA SHOWN
BUILDING 100
BASEMENT LEVEL
SMOKE ZONE BOUNDARY
2-HR FIRE BARRIER
3-HR FIRE BARRIER
ROUTE OF EMERGENCY EGRESS
LOCATION OF INSET FIRE
EXTINGUISHER / CABINET
EXIT WITH OCCUPANT LOAD &
EGRESS CAPACITY
1-HR FIRE BARRIER
EXIT SIGN
PULL BOX
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
GS301
BASEMENT FIRE & LIFE SAFETY
PLANSPEES DESIGN BUILD
625 1ST AVE, UNIT #301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
RENOVATE & EXPAND SEATTLE
STERILE PROCESSING SERVICES
IN BUILDING 100
VA PUGET SOUND HEALTH CARE SYSTEM - Seattle, WA
663-20-102
06/25/2021 Checker Author
100% CD
3/64" = 1'-0"1
BASEMENT FIRE AND LIFE SAFETY PLAN
KEY PLAN
TRUE
NORTH
LEGEND
FIRE AND LIFE SAFETY DETAILS
CODE REVIEW NFPA 101, 2018 EDITION. DEMOLITION AND
CONSTRUCTION OPERATIONS SHALL COMPLY WITH NFPA 101 4.6.10
OCCUPANCY:
- BUSINESS
PROTECTION:
- AUTOMATIC SPRINKLER SYSTEM THROUGHOUT
- FIRE ALARM AND SMOKE DETECTION SYSTEMS
GENERAL NOTES
1. COORDINATE FIRE SPRINKLER SUBMITTALS AND WORK
WITH GOVERNING JURISDICTION PRIOR TO
COMMENCEMENT OF ANY WORK.
2. CORRIDORS AND EGRESS PASSAGEWAYS TO REMAIN
CLEAR AND FREE OF DEBRIS.
3. PROVIDE SIGNAGE FOR ROUTES OF EGRESS EFFECTED BY
CONSTRUCTION ZONES.
4. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
| 663-102.100.GI001.20230221 |
| Sheets |
| GI001 - COVER |
| GI002 - DRAWING INDEX |
| HA001 - HAZMAT - GENERAL INFORMATION |
| HA101 - HAZMAT - PARTIAL DEMO PLAN - SOUTH |
| HA102 - HAZMAT - SWING SPACE DEMO PLAN |
| 663-102.100.GI002.20230221 |
| Sheets |
| GI001 - COVER |
| GI002 - DRAWING INDEX |
| HA001 - HAZMAT - GENERAL INFORMATION |
| HA101 - HAZMAT - PARTIAL DEMO PLAN - SOUTH |
| HA102 - HAZMAT - SWING SPACE DEMO PLAN |
| 663-102.100.GS101.20210810 |
| Sheets |
| A-601 - ROOM FINISH SCHEDULE |
| A-603 - EQUIPMENT SCHEDULES |
| AE403 - ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT |
| GI001 - COVER |
| GS101 - TEMPORARY TRAILER SITE PLAN |
| GS201 - BUILDING 100, BASEMENT LEVEL - ICRA PLAN |
| GS301 - BASEMENT FIRE & LIFE SAFETY PLAN |
| 663-102.100.GS102.20210625 |
| 663-102.100.GS103.20210625 |
| 663-102.100.GS104.20210625 |
| 663-102.100.GS201.20210810 |
| Sheets |
| A-601 - ROOM FINISH SCHEDULE |
| A-603 - EQUIPMENT SCHEDULES |
| AE403 - ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT |
| GI001 - COVER |
| GS101 - TEMPORARY TRAILER SITE PLAN |
| GS201 - BUILDING 100, BASEMENT LEVEL - ICRA PLAN |
| GS301 - BASEMENT FIRE & LIFE SAFETY PLAN |
| 663-102.100.GS301.20210810 |
| Sheets |
| A-601 - ROOM FINISH SCHEDULE |
| A-603 - EQUIPMENT SCHEDULES |
| AE403 - ENLARGED FLOOR PLAN AND SECTIONS - CART LIFT |
| GI001 - COVER |
| GS101 - TEMPORARY TRAILER SITE PLAN |
| GS201 - BUILDING 100, BASEMENT LEVEL - ICRA PLAN |
| GS301 - BASEMENT FIRE & LIFE SAFETY PLAN |
File details come from the government source that posted it. Updated .