Attachment 16 Price Breakout.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
Solicitation number
36C26023R0021
Issued by

About this file

This document contains a price schedule breakdown template for federal contract number 663-20-102 to upgrade an SPS facility. The price schedule includes line items for general requirements, various construction divisions including concrete, metals, and finishes. It also includes facility services such as fire suppression, plumbing, HVAC, and communications. Site and infrastructure work such as earthwork, exterior improvements and utilities are accounted for. The template requires the contractor to provide pricing for insurance, bonds, taxes, O&M manuals, overhead, subcontractor mark-up and profit. The related federal contract opportunity is solicitation number 36C26023R0021 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 for an upgrade to an SPS OM facility. Pricing is fixed for all items.

View the file

Other files

File Type Posted
Attachment 23 Partial Architectural Set.pdf PDF
36C26023R0021 0002.docx DOCX document
Attachment 19 RFI Responses Rev 1.pdf PDF
Attachment 24 RFI Supplement.pptx PPTX presentation
Attachment 15 Wage Determination REV 1 20230825.pdf PDF
Attachment 22 Mobile Steris Trailer.pdf PDF
Attachment 21 Site Visit Agenda and Sign-In.pdf PDF
Attachment 20 36C26022Q0073 RFI List FOR INFORMATIONAL PURPOSES ONLY.pdf PDF
36C26023R0021 0001.docx DOCX document
Attachment 19 RFI Responses.pdf PDF
Attachment 20 36C26022Q0073 RFI List.pdf PDF
Attachment 18 Calculation of Self Performed Work REV 1.pdf PDF
Attachment 14 Drawings 11 of 11 Haz Mat.pdf PDF
Attachment 9 Drawings 6 of 11 Mechanical.pdf PDF
36C26023R0021.docx DOCX document
Attachment 8 Drawings 5 of 11 Fire Protection.pdf PDF
Attachment 7 Drawings 4 of 11 Structural.pdf PDF
Attachment 3 Specs 2 of 2.pdf PDF
Attachment 2 Specs 1 of 2.pdf PDF
Attachment 1 Construction SOW Rev5.docx DOCX document
Attachment 13 Drawings 10 of 11 Electrical 3 of 3.pdf PDF
Attachment 10 Drawings 7 of 11 Plumbing.pdf PDF
Attachment 17 Contractor Rules Of Behavior.pdf PDF
Attachment 18 Calculation of Self Performed Work.pdf PDF
Attachment 12 Drawings 9 of 11 Electrical 2 of 3.pdf PDF
Attachment 5 Drawings 2 of 11 Civil.pdf PDF
Attachment 15 Wage Determination.pdf PDF
Attachment 11 Drawings 8 of 11 Electrical 1 of 3.pdf PDF
Attachment 6 Drawings 3 of 11 Architectural.pdf PDF
Attachment 4 Drawings 1 of 11 General.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
663-20-102

UPGRADE SPS

RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General Requirements (furnish and install)N/A$0.00
Division Item 2 Existing Conditions (furnish and install)N/A$0.00
Division Item 3 Concrete (furnish and install)N/A$0.00
Division Item 5 Metals (furnish and install)N/A$0.00
Division Item 6 Woods, Plastic and Composites (furnish and install)N/A$0.00
Division Item 7 Thermal and Moisture Protection (furnish and install)N/A$0.00
Division Item 8 Openings (furnish and install)N/A$0.00
Division Item 9 Finishes (furnish and install or state included in Division 5)N/A$0.00
Division Item 10 Specialties (furnish and install)N/A$0.00
Division Item 12 Furnishes (furnish and install)N/A$0.00
Division Item 13 Special Construction (furnish and install)N/A$0.00
Division Item 14 Conveying Equipment (furnish and install)N/A$0.00
Facility Services Subgroup
Division Item 21 Fire Suppression (furnish and install)N/A$0.00
Division Item 22 Plumbing (furnish and install)N/A$0.00
Division Item 23 Heating, Ventilating and A/C (furnish and install)N/A$0.00
Division Item 26 ElectricN/A$0.00
Division Item 27 CommunicationsN/A$0.00
Division Item 28 Electronic Safety & SecurityN/A$0.00
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/A$0.00
Division Item 32 Exterior ImprovmentsN/A$0.00
Division Item 33 UtilitiesN/A$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOAL$0.00

File details come from the government source that posted it. Updated .