Attachment 22 Mobile Steris Trailer.pdf
PDF 9 MB Posted
- Attached to
- Y1DA--CON 663-20-102 Upgrade SPS OM Solicitation
- Solicitation number
- 36C26023R0021
About this file
This document provides planning guidelines for a mobile sterilization processing department (Mobile SPD) unit. Key details include requirements for the Mobile SPD such as a minimum footprint of 70 feet by 30 feet for deployment, with utility connections including 480V 3-phase power supply within 50 feet of the unit, domestic water and waste water connections, and data network connections. The document outlines equipment layout and operational flow within the Mobile SPD. It provides recommendations for site preparations such as support pads below the unit, maximum pitch for delivery and deployment, tie-down anchoring points, and connecting corridors for transporting instruments in and out of the unit. Requirements are specified for fire protection systems, HVAC systems, and cold weather packages if needed. The planning guidelines help ensure Mobile SPD units can be properly deployed and integrated into healthcare facility operations.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STERIS Mobile SPD Site Planning and Utility Connections Guide
800-548-4873 www.STERIS.com
VA Sea ttle
STERIS MOBILE SPD
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Introduction and Disclaimer
The purpose of this document is to provide the basic information needed for site planning. Please note that some STERIS Mobile SPD units have slight variations in dimensions, equipment layout, product portfolio, ancillary cooling packages and means of egress.
For specific unit information not contained in this document, please contact STERIS Corporation.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Special Notes: 1. Prior to deployment, STERIS will perform a site visit and/or teleconference to review mechanical, electrical and plumbing (MEP) requirements with all parties involved to ensure a successful project.
2. Customer is responsible for all licenses, permits and any government approvals. Time spent to meet these requirements should be built into your master project schedule.
3. Customer is responsible to make all utility connections.
4. Power must be with 50’ of the front/nose of the unit, readily available upon unit arrival and all utilities must be stubbed out to the deployment location.
5. In the event power cannot be provided due to an emergency, STERIS will discuss alternative power options with generator support on a case by case basis.
6. STERIS can provide steps for entrance and exit, however, it is strongly recommended that the facility provides a deck or connecting corridor to transport instruments into and out of the unit. IMPORTANT – any connecting structure must be constructed AFTER the Mobile SPD arrives on site.
7. It is recommended that anchor tie downs are not placed until the Mobile SPD arrives. Although STERIS does not penetrate the ground, STERIS Installation Specialists will be on site and can provide guidance regarding tie down locations.
Pre-Deployment Activities
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Pre-Deployment Checklist
Coordinate a site walk with STERIS and responsible parties
Execute the STERIS rental agreement and provide a purchase order to reserve the unit
Submit deployment plans/drawings to STERIS for final review
Communicate with applicable state and local agencies regarding approvals and inspections
Review mechanical, electrical and plumbing requirements with state and local agencies
It is important to ensure the following has occurred prior to the delivery of the Mobile SPD:
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Sample Mobile SPD Commission Schedule Provided by STERIS
Equipment Layout, Operational Flow and Facility Requirements
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Equipment Layout
NOTE: Customer is responsible for providing a deck or connecting corridor to transport instruments into and out of the unit. IMPORTANT
– any connecting structure must be constructed AFTER the Mobile SPD arrives on site.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Facility Requirements and Optional Packages
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Mobile SPD Operational Flow
Decontamination
Prep and Pack
Sterile Unload
Sterile loadVA Sea
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Mobile SPD Operational Flow Continued
Surgery case is completed
Place Instruments back in container and spray with transport gel such as PRE-
KLENZ™
Place dirty sets on dirty staging cart
Quick Turn?
Call SPD Manager and place dirty set on priority cart
Yes
No Pull instruments for cases
Transport dirty sets on dedicated dirty cart to SPD following LEAN delivery
Transport dirty sets to dirty holding
Enter vestibule and close outer door. Open inner door and unload dirty sets. Close inner door and wipe down cart per policy and standards.
Return cart to dirty side of surgery
Process instrument sets per Manufacturer IFU’s and policy
Wipe out containers per policy and work instructions and pass through the pass-through window.
Assemble the containers with appropriate sets. Inspect, assemble and wrap according to work instructions and procedures.
Sterilize instruments in either high or low temp sterilizer per manufacturers instructions.
Su rg er y
Tr an sp or t
SP
D Soiled Sterile
Transport sterile sets to Sterile Storage
Enter vestibule and close outer door. Open inner door and load cool sterile instrument sets in clean case cart. Close inner door and cover cart per policy and standards.
Site Preparation
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Operational Envelope
NOTE: The Mobile SPD requires a 70’L x30’W foot print for deployment and service access70’
30’
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Operational Envelope Driver Side View
NOTE: The Mobile SPD requires a 70’L x15’H footprint for deployment and service access
70’
15’
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Operational Envelope Passenger Side View
NOTE: The Mobile SPD requires a 70’L x15’H footprint for deployment and service access
70’
15’
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Operational Envelope Rear View
Measurements are based on expandable at 45" standard height
Shelton, Nicholas <Nicholas_Shelton@steris.com>; Munroe, Mark <Mark_Munroe@steris.com>; Fleming, John <John_Fleming@steris.com>
STERIS MOBILE SPD
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
NOTE: 4’ x 8’ by 1” steel road plates are needed to support and distribute weight accordingly. STERIS can advise if these plates are NOT needed once a formal site visit is performed
Mobile SPD Weight Distribution
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Touch Points and Weight Distribution PhotosNOTE: Total unit weight is approximately 70,000 lbs.
NOTE: If necessary, and based on individual site conditions, two 4’ x 8’ by 1” steel road plates may be needed. Plates provided by others.
Front Unit Stabilizers Rear Unit StabilizersRear Axle Stabilizers
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Unit Tie-Down Images and Requirements
Unit Anchoring / Tie Downs 2 per corner (8 total) at 9,200 lb. capacity (6,500 lb horizontal/vertical capacity)
- Locations are field specific
- Anchor points to be located approximately 45 degrees from the ground
- STERIS will provide straps needed to secure the unit.
NOTE:
1. Ground penetrations are the responsibility of others -
STERIS does not penetrate the ground.
2. The requirement for tie downs is at the discretion of the
Authority Having Jurisdiction (AHJ).
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Mobile SPD Anchor Point Locations
Side Tie Down
Location
Rear Tie Down
Location
Rear Tie Down
Location
Side Tie Down
Location
Side Tie Down
Location
Side Tie Down
Location
Front Tie Down
Location
Front Tie Down
Location
NOTE: It is recommended that anchor tie downs are placed after the Mobile SPD arrives. Although STERIS does not penetrate the ground, Installation Specialists will be on site and can provide guidance regarding tie down locations.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Support Pad Recommendations
1) Minimum Support Pad Requirements:
A minimum support pad measuring 11’W x 47’L is recommended. The cross hatching shown on the following pages depicts the recommended support pad.
2) Support Pad Depth:
Recommendations for the width and length of the pad are given on the following pages. Based upon the weight distribution of the Mobile SPD and existing site conditions, the depth should be determined by a contractor.
3) Support Pad Levelness:
In order to ensure proper operation of the system, the support pad(s) must be level and the deviation shall not exceed ¼” in 10’.
4) Recommended Service Pad:
A full service pad measuring 25’W x 62’L is recommended. This will allow full service access to the Mobile SPD. The recommended service pad is illustrated on the following pages.
5) Vehicle Access:
A firm, level surface is recommended around the Mobile SPD in order to provide access to the site, access to the Mobile SPD and access to service the unit.
NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Support Pad Recommendations Continued
NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
NOTE: When applicable, the Customer is responsible for providing a pad. If a pad is needed, the Customer is also responsible for performing calculations based on unit weight to determine the depth of the pad.
Support Pad Recommendations Continued
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Maximum Pitch and Slope for Delivery
NOTE: The Customer is responsible for providing an appropriate delivery path and ramp to accommodate the Mobile SPD.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Maximum Pitch and Slope for Deployment
NOTE: The Customer is responsible for providing an appropriate delivery path and ramp to accommodate the Mobile SPD.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Dunnage Blocks
I
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Connecting Corridor and Unit Delivery Protocol
Step 1:
STERIS Site Walk
Step 2:
Document Sharing (Customer to provide elevation drawings)
Step 3:
Unit Arrival
Step 4:
Connecting Corridor Construction Begins
Step 5:
Connecting Corridor
Construction Completes
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Sample Deck, Ramp and Connecting Corridor Photos
NOTE: The facility is responsible for engineering and constructing ramps, decks and connecting corridors that will connect to the unit.
Construction of these structures can begin prior to unit arrival, however, these structures are not to be completed until after the unit is on site.
During the design phase, please pay special attention to the door locations to ensure there is enough clearance for the SPD doors to align with the connecting structure.
NOTE: When designing a connecting corridor, the facility is responsible for constructing an extension over the unit and sealing the structure to ensure that water/snow does not penetrate this connecting area.
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Proper Site Preparation Procedure
NOTE: Deck elevations are required to be sent to STERIS for approval prior to unit arrival. Customer should not build the deck until after the unit arrives on site.
The Mobile SPD has the capability to raise and lower to meet various height challenges, however, the connecting structure must be built after unit arrival as there are limitations to the maximum height of the unit.
The connecting corridor should be constructed AFTER the Mobile SPD arrives on site as there must be enough room to expand the unit and ensure an exact alignment to the connecting structure. The structure must be built to the unit (STERIS will not manipulate the unit to align with a pre-existing structure).
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Connecting Corridor Bumper Protection
NOTE: Customer is responsible for ensuring the protection of the exterior of the SPD unit. When installing a deck/connecting structure, please incorporate a bumper or protective rail/barrier to prevent the unit from being damaged by transfer carts.
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Connecting Corridor and Weather Sealing
NOTE: It is the responsibility of the Customer/contractor to ensure that all connecting corridors are installed with a sealer/expansion foam. Installing this material will prevent leaks from enter the transition space between the corridor and the Mobile SPD.
Example of Proper Weather Seal
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Connecting Corridor Roof Extension
NOTE: When designing a connecting corridor, the facility is responsible for constructing an extension over the unit and sealing the structure to ensure that water/snow does not penetrate this connecting area.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Mobile SPD Door Dimensions
NOTE: STERIS will provide information regarding which specific unit will be deployed for scheduled projects.
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
STERIS Storage Container
NOTE: A STERIS storage container travels with every Mobile SPD. This container is used to help transport the roll-around equipment while the unit is in transit.
This unit also holds various supplies that are used to support the unit throughout the deployment. It is important that this unit resides within close proximity to the Mobile SPD. STERIS will assess location areas for this container during the site visit.
92” Wide
99” Tall
240” Deep
Utility Connection Drawings and Connection Points
NOTE: Customer/contractor is responsible for all utility connections. STERIS Mobile Installation Specialists will be on site to provide guidance as needed.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Plan View - Utility Connection Points
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Driver Side Utility Connection Points
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Passenger Side Utility Connection Points
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Front and Rear Utility Connection Points
Front Rear
Power Connections & HVAC Outdoor Air Inlets 6”x 24”
Sprinkler ConnectionVA Sea
Utility Connections Detail and Images
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Utility Connection Locations
6 7
Data Connections HVAC Condensate Locations Tie-Down Locations Ground Point Connection
Power Cold Water Connection Hot Water Connection Waste Water Connection Fire Sprinkler Connection Fire Alarm Connection
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
NOTE:
Facility/Contractor is responsible for making the final power connection from the Mobile
SPD to the disconnect.
Shoreline Cable: (2) 75’ lengths (provided)
Power Connection Images and Requirements Power 1
480VAC, 3-Phase, (2) 250 AMP
Configuration 4 wire (L1,L2,L3,G) Frequency: 60hz
Facility end hard wired (Customer Connection Point)
Strain ReliefMale Connection (unit) Female Connection (shoreline)
NOTE: A Neutral is NOT needed in this configuration.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Power Connection Images and Requirements Power 1
NOTE: Disconnect must be within 50’ of the front/nose of the unit.
Main 480V 3PH (2) 250 Amp Connection
- 2 75’ cables provided by STERIS
- Facility to provide disconnect 4 wire configuration (L1, L2, L3, G) No Neutral Required
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Power Load Calculations Power 1
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Power Load Calculations Continued Power 1
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Power Load Calculations Continued Power 1
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Power Connection Images and Requirements Power 1
Product Construction:
• Conductor:
• 8 AWG through 500 kcmil fully annealed stranded bare copper
• Insulation:
• Premium-grade, color-coded 90 C
EPDM
• Color code: see chart
• Jacket:
• Super Vu-Tron 90 C, black
• Temperature range: -40 C to + 90 C
• Jacket Marketing:
• Sizes smaller than 2-1/4” Carol
Super VU-Tron (size) Type W portable power cable (UL) 2000V dry 90 C wet 75 C sun res CSA (-40 C) FT-
5 P-7K-123049 MSHA
• Sizes 2-14” and larger – (size) type W Carol Super Vu-Tron 90 C dry and water resistant 75 C 2000V sun res (UL) P-7k-123049 MSHA LR27161
(Super Vu-Tron Multi-Conductor Type W Round)
90 C (UL) Type W 2000 Volt Portable Power Cable)
NOTE: Specifications may vary by unit. (Units 104-107 are 2/0 and units 108+ are 3/0
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Hot and Cold Water Supply Images and Requirements
Hot Water Supply Requirements
- 1 ¼ inch connection
- Minimum 40psi dynamic at SPD
- Temperature: 140°F nominal
- External lines must be facility protected.
Hot and Cold Water Supply Images and Requirements Cold Water Supply Hot Water Supply
Cold Water Supply Requirements
- 1 ¼ inch connection
- Minimum 40psi dynamic at SPD
-External lines must be facility protected
MCSSD Belly Boxes (Hot/Cold Water Access Point)
Water Manifolds (Customer Connection Point) 1 ¼ MPT Fresh - Water Fill Port - Hot and Cold
NOTE:
1. Connection sizes indicate the equipment termination sizes only.
2. Size of supply piping is dependent on length of pipe run to ensure adequate supply service pressure and demand flow at equipment terminals.
3. Effect of coincident draw of multiple unit installations must also be considered.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Belly Box Waste Water Access Point
Waste Water Supply4
4” Waste Water Connection (Customer Connection Point)
Waste Water Images and Requirements
NOTE: Waste connection can be connected through the side of the belly box door or the bottom of the floor.
Drain can’t be connected to a grease trap or grease interceptor line.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Belly Box (Waste Water Exit Point) Waste Water Line to Drain (under unit)
Waste Water Line to Drain Location (External lines must be facility protected)
The maximum waste peak flow (with all equipment running at the same time) is equal to 700 gallons per hour (excluding water from the sinks which vary by rate of use.
Waste Water Supply4
Waste Water Images and Requirements
NOTE: Waste flow will vary depending on the frequency of equipment operation in the unit.
NOTE: It is highly recommended that a P-Trap be installed on the waste line to minimize the potential for foul odors.VA Sea
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Driver Side View - Waste Drain Heights
Waste Water Supply4
(10”) FLOOR TO
CENTER OF DRAIN
(17 ¾”) FLOOR TO
CENTER OF DRAIN
NOTE: Two waste water connections are offered to accommodate for site specific slope and elevation.
NOTE: It is important to review the slope at specific site locations to ensure gravity can drive waste water removal.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Fire Sprinkler Images and Requirements Fire Sprinkler5
Fire Sprinkler Requirements
- External lines must be facility protected
- Supply required:
Residual Pressure 46PSI minimum at SPD Flow Rate: 143 GPM at SPD
2 inch Victaulic coupling
NOTE: Consider a close source such as a fire hydrant where allowed by local municipalities and follow local laws and codes prior to making any connections.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Fire Alarm6
Fire Alarm System Drawing
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Fire Evacuation Plan
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Fire Extinguisher Locations
Fire extinguisher location
NOTE: There are two fire extinguisher brackets installed in the SPD, one at each door. The Mobile SPD arrives with three fire extinguishers; it is the Customer’s responsibility for any incoming and routine inspections required by local code or policies if the STERIS fire extinguishers are used by the Customer.
ABC Type Dry Chemical
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Fire Alarm System Drawing Fire Alarm6
Fire Alarm Panel
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Fire Alarm Matrix
Facility Remote
Activation
Manual Pull Stations
Area Smoke/Heat
Detectors
Sprinkler Waterflow
Switch
Sprinkler Shut Off Tamper
Switch
Unit Power
Alarm Battery Back-Up
General Alarm System Errors
Alarm X X X X
Supervisory X
Trouble X X X
Activate Audio/Visual Alarm Signals Throughout Unit
X X X X
Unit Alarm Panel Tone and Signal X X X X
Export To Alarm Contact X X X X
Export To Supervisory Contact X
Export to Trouble Contact X X X
Fire Alarm6
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Fire Alarm Images and Requirements Fire Alarm
Fire Alarm Connection Customer Connection Point
Fire Alarm Remote Dry Contacts
- Conventional analog fire alarm system with local audible-visual, horn-strobe alarm devices for occupant warning.
- Unit alarm system configured with:
- 2 zones with detection and pull stations
- 1 zone with supervisory tamper switch on sprinkler water control valve
- 1 zone for water flow switch on sprinkler system
- System exports trouble, supervisory and alarm conditions to three dry contacts available at the rear of the unit.
NOTE: The fire alarm system has no capability to repeat or react to external alarms or external PA systems.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Data Images and Requirements Data Connections7
Data Connection Box Customer Connection Point
(Rear of Unit) Data Connection Box (Interior) Two RJ45 Connection Points
RJ45 Connections Provided Throughout the Unit
NOTE: Customer must extend their IT network to the Mobile SPD for their IT provided equipment.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Data Connections Drawing Data Connections7
NOTE: RJ45 data connections are available at several locations throughout the unit to support network, voice and POTS (phone).
RJ45 Connection Locations
IT Patch Panel Interior Connection
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
HVAC Condensate Images and Connections HVAC Condensate (4)8
Front of Unit
Heating and Cooling Connections/ HVAC Condensate Drain Terminations
- Nominal ¾” drain at front and rear of unit
Rear of Unit
NOTE: If condensate from the HVAC units is not captured, the condensate will drain to ground.
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Ground Point Images and Requirements Ground Point10
- Earth ground provided; installation per NEC Article 250
- (1) single point ground stud
- (1) 20’ ground cable with (2) clamps provided
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Cold Weather Package
Power Requirements
- Electrical Service:
- 208VAC, 2 pole, total of 70 amps, 60 HZ, Single Phase or
- 240VAC, 2 pole, total of 80 amps, 60 HZ, Single Phase
- STERIS will supply (4) 4,000 watt 240V heaters with NEMA 6-30 plugs
- Customer is responsible to provide one 208V or 240V single phase 60 Hz 70/80 amp feed (hard wired to lugs in panel) to STERIS provided panel.
NOTE: When deploying the Mobile SPD in climates where the ambient temperature routinely drops and stays below 40 degrees Fahrenheit, the cold weather insulation package is a requirement.
NEMA 6-30 plug
STERIS Provided Heaters Customer Provided Power
Utility Connection Inside the Mobile SPD
SITE PLANNING
UTILITY GUIDE
THE MATERIAL AND INFORMATION CONTAINED HERIEN IS CONFIDENTIAL AND IS THE
PROPERTY OF STERIS CORPORATION AND IS NOT TO BE USED, DISCLOSED, COPIED,
TRANSFFERED OR REPRODUCED WITHOUT THE PRIOR WRITTEN PERMISSION OF STERIS
CORPORATION.
Revision 18 10/25/2021
Ancillary Cooling Package
NOTE: The ancillary cooling package is required in locations where the heat index consistently exceeds 100 degrees. Air inlets are 6”x24”.
Power Requirements
- Electrical Service: 480 VAC, 3-phase, 60hz
- (1) 30 AMP breakers
Unit Information STERIS will supply HVAC pre-cooling capability
- HVAC Pre-cool unit dimensions and weight:
- Width = 32”
- Length = 48”
- Height = 52”
- Weight = 685 lbs
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
| Slide Number 40 |
| Slide Number 41 |
| Slide Number 42 |
| Slide Number 43 |
| Slide Number 44 |
| Slide Number 45 |
| Slide Number 46 |
| Slide Number 47 |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| Slide Number 54 |
| Slide Number 55 |
| Slide Number 56 |
| Slide Number 57 |
| Slide Number 58 |
| Slide Number 59 |
| Slide Number 60 |
| Slide Number 61 |
| Slide Number 62 |
| Slide Number 63 |
| Slide Number 64 |
File details come from the government source that posted it. Updated .