This DD Form 1391c outlines a construction project to build access roads at Camp Sparta in Ali Al Salem Air Base, Kuwait. The project involves removing the existing unpaved vehicle path, preparing the subgrade, and placing and compacting aggregate base and asphalt surface courses across approximately 1400 linear meters to connect Camp Sparta to the main road and airfield. The estimated cost is $750,000. The project aims to improve safety and reduce vehicle damage by upgrading the current unpaved and deteriorated road, which poses a risk due to holes, bumps, washboards and mud pits. Completing this access road project per the Camp Sparta Project Implementation Plan is necessary to sustain operations between Camp Sparta and the airfield for U.S. Air Force and coalition forces stationed at Ali Al Salem Air Base.

View the file

Other versions and copies of DD Form 1354

File Revision Posted Attached to
P-1555U WCSR DD1354 27FEB2026.pdf Feb 27, 2026 P1555U Wallace Creek Service Road
DD Form 1354 - AUG 2022.pdf Aug 2022 Demo Mini mute sites
Attachment 16-DD Form 1354 - AUG 2022.pdf Aug 2022 Well 4 PFAS/PFOA Upgrade
DD Form 1354 - AUG 2022.pdf Aug 2022 B1130 ROOF REPLACEMENT
DD Form 1354 - AUG 2022.pdf Aug 2022 New Poinsett Tower Installation
DD Form 1354 - AUG 2022.pdf Aug 2022 B1921 Repair Power
017800_Attch2_DD1354 Checklist.docx Revision not stated WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
017800_Attch1_DD1354.pdf Revision not stated WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Attachment 04 - DD Form 1354.pdf Revision not stated Bldg 1947 Repair Drop Arms
Attachment E - DD1354 Form.pdf Revision not stated New Fort Bliss Paving IDIQ Contract
Attachment E - DD1354 Form.pdf Revision not stated New Fort Bliss Paving IDIQ Contract
017800_Attch1_DD1354.pdf Revision not stated Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
017800_Attch2_DD1354 Checklist.docx Revision not stated Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Attachment H - BLANK SAMPLE DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf Revision not stated Robins AFB Paving Multi-Award IDIQ
DD Form 1354.pdf Revision not stated Repair Oil Water Separators - Stratton ANGB
CDRL A014 DD Form 1354 (Draft and Final).pdf Revision not stated AMARG Large Component Bead Blast Booth
SOW App 005 DD Form 1354.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
Attachment 0001_SOW Attachment 1.1 - DD1354.pdf Revision not stated SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
6 - Attachment 0001 - DRAFT SOW Attachment 1.1 - DD1354.pdf Revision not stated DRAFT SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
DD1354 Equipment Warranty.xlsx Revision not stated B1921 Repair Power
Show all 20

Who attaches DD Form 1354

State Files
Michigan 3

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1391c, JAN 06 PREVIOUS EDITION IS OBSOLETE. Page 1 of 3

1. COMPONENT

SOCCENT FY 2023 CONSTRUCTION PROJECT DATA

2. DATE

18 MAY 23

3. INSTALLATION AND LOCATION

ALI AL SALEM AIR BASE, KUWAIT

4. PROJECT TITLE

CONSTRUCT CAMP SPARTA ACCESS ROADS

5. PROGRAM ELEMENT

22179F

6. CATEGORY CODE

851-147

7. PROJECT NUMBER

AEWV 22-3007

8. PROJECT COST ($000)

EEIC: 529 $750,000

9. COST ESTIMATES

ITEM U/M QUANTITY UNIT COST COST ($000)

PRIMARY FACILITIES - - - -

Aggregate Base Course - 150 MM MT 4780 29.00 $138,620.0 Base Course - 100 MM MT 2930 125.00 $366,250.0 Ashpalt Surface Course - 50 MM MT 1140 125.00 $142,500.0 Pavement Markings M 6270 5.00 $31,350.0 Drainage M 120 570 $68,400

TOTAL REQUEST $747,120.0

TOTAL REQUEST ROUNDED $750,000

10. DESCRIPTION OF PROPOSED WORK: Work involves removal of existing vehicle path, preparation of subgrade, placement and compaction of base and subbase layers, and paving of hot mix asphalt (HMA) surface course for approximately 1400 LM. This will connect the unpaved perimeter of Camp Sparta between the entry control point ECHO 9 and the paved Camp Canada road, including the access roads into Camp Sparta and Camp Moreell.

11. REQUIREMENT: 1400 LM ADEQUATE: 1000 LM SUBSTANDARD: 400 LM

REQUIREMENT: This project is a necessary requirement to ensure sustainability of operations between Camp Sparta and the ASAB Airfield. Work involves removal of existing vehicle path, preparation of subgrade, placement and compaction of base and subbase layers, and paving of hot mix asphalt (HMA) for approximately 1400 LM. This will connect the unpaved perimeter of Camp Sparta between the entry control point ECHO 9 and the paved Camp Canada road, including the access roads into Camp Sparta and Camp Moreell.

CURRENT SITUATION: The main thoroughfare for access to Ali Al Salem from the installation access point ECHO 9 is unpaved and in critical condition. The road is filled with holes, bumps, washboards, and mud pits (in the rainy season). All Coalition Forces vehicles that enter ASAB through ECHO 9 are subject to damage from these unsatisfactory road conditions. Also, all SOCCENT logistical operations that require traversing from the Camp Sparta warehouses to the airfield are damaged by these roads.

IMPACT IF NOT PROVIDED: Installation and Coalition vehicles will break at an expedited rate and risk further catastrophic damage from failed road conditions.

ADDITIONAL INFORMATION: This project is in line with the Camp Sparta Project Implementation Plan approved by the SOCCENT J4/CC.

SOCCENT APPROVAL:

JOSEPH C. BREWEN, LCDR, USN Date SOCCENT J4 Command Engineer

DD FORM 1391c, JAN 06 PREVIOUS EDITION IS OBSOLETE. Page 2 of 3

2. DATE

18 MAY 23

3. INSTALLATION AND LOCATION

ALI AL SALEM AIR BASE, KUWAIT

4. PROJECT TITLE

CONSTRUCT CAMP SPARTA ACCESS ROADS

5. PROGRAM ELEMENT

22179F

6. CATEGORY CODE

851-147

7. PROJECT NUMBER

Project Location Map:

Ali Al Salem Air Base

Camp Sparta

DD FORM 1391c, JAN 06 PREVIOUS EDITION IS OBSOLETE. Page 3 of 3

2. DATE

18 MAY 23

3. INSTALLATION AND LOCATION

ALI AL SALEM AIR BASE, KUWAIT

4. PROJECT TITLE

CONSTRUCT CAMP SPARTA ACCESS ROADS

5. PROGRAM ELEMENT

22179F

6. CATEGORY CODE

851-147

7. PROJECT NUMBER

Affected Vehicle Path:

2023-06-05T07:17:39-0400
BREWEN.JOSEPH.CLARK.1365109911