Attachment 6 - DWG - 01 - G.pdf
PDF 8 MB Posted
- Attached to
- Y1DA--626-310 Construct Sleep Disorder Clinic and Specialty Clinics Minor Construction - Murfreesboro
- Solicitation number
- 36C77625B0035
About this file
This document is a comprehensive set of architectural and construction planning drawings for the Alvin C. York VA Medical Center Sleep Disorder Clinic and Specialty Clinic project located in Murfreesboro, Tennessee. The 100% Construction Documents set includes detailed plans for a basement-level renovation and addition, with project number 626-310 and contract number 36C77622R0075. The drawings cover multiple aspects of the project, including site plans, architectural layouts, life safety plans, accessibility details, phasing plans, and infection control risk assessment (ICRA) documentation.
Key technical details include a fully sprinklered Type II-B construction classification, business occupancy designation, and a project scope involving 17,759 square feet of renovation and 2,200 square feet of new entry space. The project is phased into three distinct construction stages (Phase 1A, 1B, and Phase 2), with careful consideration for maintaining facility operations, patient access, and strict infection control protocols. The design team includes Wold AE as architects/structural engineers, Atriax Group for civil/interiors, and TLC Engineering for mechanical, electrical, plumbing, and technology systems. The 100% Construction Documents are dated 07/10/2024, indicating the project is in its final design stages.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2023
TLC No.:
www.tlc-engineers.com
923116
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldae.com
703 MAIN AVENUE SW
HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
A u to d e s k D o c s /2
V A
M C
S le e p D is o rd e r
C lin ic /2
A R
C H
P ro je c t
C e n tr a l.
rv t
/8 /2
:2
:0
P M
GI 00.01
COVER SHEET CONSTRUCT SLEEP DISORDER CLINIC
AND SPECIALTY CLINIC
AT07/10/2024
626-310
RA
100% CONSTRUCTION
DOCUMENTS
WEB: www.atriaxgroup.com
PHONE: 828.315.9962
CITY/STATE/ZIP: HICKORY, NC 28602
ADDRESS: 703 MAIN AVE. SW.
EMAIL: JODY.BLAKE@ATRIAXGROUP.COM
DESIGNER: JODY BLAKE
INTERIOR
DESIGNER:
ATRIAX GROUP
PROJECT NUMBER: 217122
WEB: www.woldae.com
FAX: 615.370.8530
PHONE: 615.370.8500
CITY/STATE/ZIP: BRENTWOOD, TN 37027
ADDRESS: 214 CENTERVIEW DRIVE, STE 300
EMAIL: ATRAYLOR@WOLDAE.COM
PROJ. MANAGER: ANTHONY TRAYLOR
EMAIL: RFRANKS@WOLDAE.COM
PRINCIPAL: RON FRANKS
ARCHITECT: WOLD ARCHITECTS AND ENGINEERS
PHONE: (828) 315-9962
ADDRESS: 703 MAIN AVE. SW, HICKORY, NC 28602
EMAIL: ED.HENSON@ATRIAXGROUP.COM
CONTACT: ED HENSON
ARCHITECT: ATRIAX GROUP
PROJECT NUMBER: 626-310
PHONE: 615.867.6000
CITY/STATE/ZIP: MURFREESBORO, TN 37129
ADDRESS: 3400 LEBANON ROAD
EMAIL: JOHN.FOSTER3@VA.GOV
CONTACT PERSON: JOHN FOSTER
COR: VA
PROJECT CONTACT LIST
PHONE: (828) 315-9962
ADDRESS: 703 MAIN AVE. SW, HICKORY, NC 28602
EMAIL: justin.keener.atriaxgroup.com
CONTACT: JUSTIN KEENER
CIVIL: ATRIAX GROUP
WEB: www.tlc-engineers.com
FAX: 615.297.4554
PHONE: 615.297.4554
CITY/STATE/ZIP: BRENTWOOD, TN 37027
ADDRESS: 12 CADILLIAC DRIVE, SUITE 150
EMAIL: Michael.Steward@tlc-eng.com
ELECTRICAL: MICHAEL STEWARD@TLC-ENG.COM
EMAIL: steve.kemp@tlc-eng.com
PLUMBING: STEVE KEMP
EMAIL: steve.kemp@tlc-eng.com
MECHANICAL: STEVE KEMP
MECHANICAL,
PLUMBING, &
ELECTRICAL
ENGINEERS:
TLC ENGINEERING SOLUTIONS
PROJECT CONTACTS (CONT)
ARCHITECTS / STRUCTURAL
WOLD AE ATRIAX GROUP
ARCHITECTS / CIVIL / INTERIORS
TLC ENGINEERING
MECHANICAL/ELECTRICAL/PLUMBING/TECHNOLOGY
DEPARTMENT OF VETERANS AFFAIRS
CONSTRUCT SLEEP DISORDER CLINIC AND SPECIALTY CLINIC
3400 LEBANON PIKE
MURFREESBORO, TN 37130
PROJECT NO. 626-310
CONTRACT NUMBER: 36C77622R0075
ALVIN C. YORK VA MEDICAL CENTER
07/10/2024
100% CONSTRUCTION DOCUMENTS
W O
L D
A R
C H
IT
E
C T
S A
N D
E N
G
IN
E E
R S
/1
/2
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
Revisions: Date:
WINDOW TAG
ELEVATION TAG
GYPSUM BOARD
CONCRETE
CONC. MASONRY UNITS
FINISH WOOD
BATT INSULATION
HANDICAP ACCESSIBLE
SECTION INDICATOR
SHEET NUMBER
ENLARGED PLAN NUMBER
NOTE: THE DIRECTION OF THE SECTION INDICATOR'S
FLAG MAY REFLECT AN "OPPOSITE HAND" OR
"MIRRORED VIEW" OF BUILDING AND WALL SECTIONS
EQUIPMENT TAG
A
CALLOUT TAG
# / A ##.##
# / A ##.##
# / A ##.##
0000-000
EXIST DEMO NEW
CONTINUOUS LINE
MEDIUM DASH LINE
0 4' 8' 12'
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT
(SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DIMENSION LINE
DOOR OPENING/
BORROWED LIGHT IDENTIFIER
NORTH
DETAIL INDICATOR
FURNITURE, FIXTURE, &
EQUIPMENTS INDICATOR
GRAPHIC SCALE, 1/8" = 1'-0"
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
FIRE EXTINGUISHER CABINET
NORTH ARROW
WALL OR PARTITION TYPE
CORNER GUARD
EXISTING CONSTRUCTION
TO REMAIN
EXISTING CONSTRUCTION
TO BE REMOVED
NEW CONSTRUCTION
VV ITEM - VA SUPPLIED & INSTALLED
VC ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
CC ITEM - CONTRACTOR SUPPLIED &
INSTALLED
DETAIL NUMBER
SHEET WHERE REF.
SHEET WHERE DRAWN
FEC
AA
A
CG
CORRIDOR
C2
A3.1 A4.3
D2
A-512
101A
DOOR TAG
DRAWING BLOCK TITLE, TYPICALFLOOR PLAN1
RIGID INSULATION
EARTH
BASE COURSE
PROJECT LOCATION
PROJECT LOCATION
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2023
TLC No.:
www.tlc-engineers.com
923116
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldae.com
703 MAIN AVENUE SW
HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
A u to d e s k D o c s /2
V A
M C
S le e p D is o rd e r
C lin ic /2
A R
C H
P ro je c t
C e n tr a l.
rv t
/1
/2
:4
:0
P
M
GI 01.01
GENERAL DATA CONSTRUCT SLEEP DISORDER CLINIC
AND SPECIALTY CLINIC
AT07/10/2024
626-310
RA
100% CONSTRUCTION
DOCUMENTS
SYMBOL LEGEND
A.F.F. ABOVE FINISHED FLOOR
A.F.S. AT FINISHED SLAB
ACT ACOUSTICAL CEILING TILE
ADD'L ADDITIONAL
ADJ. ADJUSTABLE
ADMIN. ADMINISTRATION
ALUM. ALUMINUM
APPROX. APPROXIMATE
ASST. ASSISTANT
B.W. BOTTOM OF THE WALL
B/B BALLED & BURLAPPED
BR. BARE ROOT
BRKT. BRACKET
BRKTS. BRACKETS
C CALK
C'SNK. COUNTERSUNK
C.B. CATCH BASIN
C.F.C.I. CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
C.J. CONTROL JOINT
C.M.U. CONCRETE MASONRY UNIT
CAB. CABINET
CLG. CEILING
CLO. CLOSET
CNTR. COUNTER
COL. COLUMN
COMP. COMPUTER
CONC. CONCRETE
CONF. CONFERENCE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CORR. CORRIDOR
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DIR. DIRECTOR
DISP. DISPENSER
DS DOWNSPOUT
DTL. DETAIL
DWGS. DRAWINGS
EA. EACH
ELEC. ELECTRICAL
ELEV. ELEVATION
ENCL. ENCLOSURE
EQ EQUAL
EQUIP. EQUIPMENT
EXIST. EXISTING
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
F.D. FLOOR DRAIN
F.E.C. FIRE EXTINGUISHER CABINET
F.F.E. FINISH FLOOR ELEVATION
FDS FOLD DOWN SEAT
FH FIRE HYDRANT
FIN. FINISH
FL. FLOOR
FOB FACE OF BRICK
FTG. FOOTING
FZR. FREEZER
G.B. GRAB BAR
GA. GAUGE
GAL. GALLON
GALV. GALVANIZED
GEN. GENERAL
GYP. GYPSUM
GYP. BD. GYPSUM BOARD
H.B. HOSE BIBB
H.M. HOLLOW METAL
HD. HEAD
HRDBD HARDBOARD
I.D. INSIDE DIAMETER
INFO. INFORMATION
INSUL. INSULATION
INT. INTERIOR
INV. INVERT
JT. JOINT
KIT. KITCHEN
LAB. LABORATORY
LAV. LAVATORY
LKR. LOCKER
M.O. MASONRY OPENING
MACH. MACHINE
MAINT. MAINTENANCE
MAT'L MATERIAL
MAX. MAXIMUM
GENERAL ABBREVIATIONS
● ALL OTHER NON-STRUCTURAL COMPONENTS WITHIN THE HVAC, MECHANICAL, PLUMBING, AND
ELECTRICAL SYSTEMS ARE ASSIGNED AN IMPORTANCE FACTOR OF 1.0 AND ARE ELIGIBLE FOR THE LATERAL BRACING EXEMPTIONS LISTED IN ASCE 7 SECTION 9.6. THE EXEMPTIONS APPLY TO SPECIFIC SMALLER SIZES OF PIPING AND DUCTWORK AND LESS HEAVY EQUIPMENT. NON-EXEMPT PORTIONS OF THESE SYSTEMS SHALL STILL BE LATERALLY BRACED. SYSTEMS WITH AN IMPORTANCE FACTOR OF 1.0
ARE CONSIDERED BY THE CODE TO BE NOT CRITICAL FOR THE CONTINUED OPERATION OF THE
FACILITY.
COMPONENTS WITH AN IMPORTANCE FACTOR OF 1.0:
● STORM SEWER SERVING CRITICAL CARE AREAS.
● SANITARY SEWER SERVING CRITICAL CARE AREAS.
● STEAM SYSTEM.
● HEATING HOT WATER SYSTEM.
● DOMESTIC HOT WATER SYSTEM.
● FIRE ALARM SYSTEM.
● EMERGENCY POWER DISTRIBUTION SYSTEMS INCLUDING ASSOCIATED GENERATOR, TRANSFER
SWITCHES, BUS DUCTS, SWITCHBOARDS, CONDUIT, AND TRANSFORMERS.
● GENERATOR ENGINE EXHAUST.
● DUCTWORK CARRYING RADIOACTIVE AGENTS AND INFECTIOUS ISOLATION AIR.
● MEDICAL GAS PIPING AND EQUIPMENT.
● FIRE SPRINKLERS AND EQUIPMENT.
● NATURAL GAS PIPING.
● FUEL OIL PIPING AND EQUIPMENT.
COMPONENTS WITH AN IMPORTANCE FACTOR OF 1.5:
3. ASSIGNED SEISMIC USE GROUP OR BUILDING DESIGN CATEGORY AS DEFINED IN THE IBC:
2. THE TERM "WITHSTAND" MEANS "THE SYSTEM WILL REMAIN IN PLACE WITHOUT SEPARATION OF ANY PARTS WHEN SUBJECTED TO THE SEISMIC FORCES SPECIFIED AND THE SYSTEM WILL BE FULLY OPERATIONAL
AFTER THE SEISMIC EVENT."
1. COMPONENTS SHALL WITHSTAND THE EFFECTS OF EARTHQUAKE MOTIONS DETERMINED ACCORDING TO
ASCE/SEI 7.
NON-STRUCTURAL SEISMIC NOTES
14. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE CONSTRUCTION PERMITS.
13. CONTRACTOR SHALL NOT DISRUPT OR LIMIT THE FACILITY'S LIFE SAFETY PLAN AND SYSTEM.
12. SEISMIC: NON-STRUCTURAL COMPONENTS SHALL WITHSTAND THE EFFECTS OF EARTHQUAKE MOTIONS
DETERMINED ACCORDING TO ASCE/SEI 7. PROVIDE ENGINEERED SUPPORTS PER SEISMIC
CLASSIFICATION AND ASCE/SEI 7 REQUIRMENTS.
11. CODES: COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES.
10. SUPPORT / BLOCKING: PROVIDE SUPPORT FOR NEW WORK. IF HANGERS, BACKERS, OR OTHER SUPPORTS ARE NOT DETAILED, NOTED, OR SPECIFIED, CONTRACTOR SHALL SUBMIT A VIABLE SUPPORT
DETAIL TO THE ARCHITECT FOR APPROVAL.
9. MAINTAIN RATINGS: MAINTAIN FIRE / SMOKE RATINGS OF EXISTING PARTITIONS AND BARRIERS.
8. SHUTDOWNS / DOWNTIME: CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE DOWNTIME
ASSOCIATED WITH SCHEDULED SHUTDOWNS. COORDINATE WITH COR.
7. COORDINATE TRADES: GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION BETWEEN
TRADES. MECHANICAL DUCTWORK & EQUIPMENT SHALL HAVE PRIORITY OVER OTHER DISCIPLINES (FOR INSTALLATION & ROUTING). COORDINATE UTILITIES, SO THEY ARE INSTALLED IN AN ORDERLY AND
UNIFORM MANNER.
6. PROTECT / RESTORE: PROTECT EXISTING ITEMS, EQUIPMENT, FINISHES, ETC., TO REMAIN. REPAIR / REPLACE / RESTORE CONDITIONS THAT ARE DAMAGED OR DISTURBED AS A RESULT OF DEMOLITION OR
NEW WORK.
5. UTILITIES: UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).
4. COORDINATE NEW ITEMS: EXACT LOCATIONS OF ALL EQUIPMENT, DEVICES / OUTLETS, FIXTURES, CASEWORK, MOUNTS, AND ROUTING OF UTILITIES SHALL BE COORDINATED WITH AND APPROVED BY THE
COR.
3. DO NOT SCALE DRAWINGS.
2. VERIFY CONDITIONS: INVESTIGATE THE SITE AND VERIFY EXISTING CONDITIONS (BOTH EXPOSED AND
CONCEALED) PRIOR TO PRICING THE JOB.
1. DIAGRAMMATIC DRAWINGS: THE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE DRAWINGS
REPRESENT THE INTENT OF THE PROJECT WORK.
GENERAL PROJECT NOTES
BUSINESS OCCUPANCY (B) - 50'0"
DEAD END CORRIDOR DISTANCE
I DEAD END CORRIDOR DISTANCE
ROOF CONSTRUCTION: 0 HR
FLOOR CONSTRUCTION: 0 HR
NON-BEARING WALLS & PARTITIONS (INTERIOR): 0 HR
NON-BEARING WALLS & PARTITIONS (EXTERIOR) 0 HR
BEARING WALLS (INTERIOR): 0 HR
BEARING WALLS (EXTERIOR): 0 HR
STRUCTURAL FRAME: 0 HR
H. FIRE PROTECTION REQUIREMENTS (IBC TABLE 601 & NFPA A.8.2.1.2):
DEAD ENDS: 50 FEET MAX
CORR. FIRE RATING OCCUPANCY: 0 HRS (SPRINKLERED)
CORRIDORS: WIDTH 44 IN
MAX EGRESS: DISTANCE: 300 FT (SPRINKLERED)
EGRESS WIDTH: 0.2 PER OCCUPANT DOORS (OTHER)
G. EXIT REQUIREMENTS:
NOTE: REFER TO PLAN FOR INDIVIDUAL SPACE OCCUPANCY LOADS
BUSINESS AND OP
TREATMENT AREAS
150 GSF / OCCUPANT 18,949 127
AREA DESCRIPTION LOAD FACTOR TOTAL AREA OCCUPANTS
F. OCCUPANT LOAD:
PROPOSED HEIGHT: NO CHANGE
EXISTING HEIGHT: 3 STORIES WITH A BASEMENT
NEW ENTRY: 2,200 SF
RENOVATION: 17,759 SF
ALLOWED AREA: 69,000 SF IBC TABLE 506.2
ALLOWED HEIGHT: 75 FEET IBC TABLE 504.3
E. BUILDING HEIGHT & AREA:
SITE SEISMIC ZONE: B
D. SEISMIC ZONE:
NFPA 2021: TYPE II (0,0,0) - FULLY SPRINKLED NFPA 101
IBC 2021: TYPE II-B - FULLY SPRINKLED IBC TABLE 601
C. CONSTRUCTION TYPE:
NFPA 2021 : BUSINESS OCCUPANCY NFPA 101. 6.1.11.1
IBC 2021: BUSINESS OCCUPANCY - B IBC CH. 3, SEC. 304
B. OCCUPANACY:
PH: 800-698-2411
WASHINGTON DC 20420
810 VERMONT AVE. NW
VETERANS ADMINISTRATION
A. AUTHORITIES HAVING JURISDICTION (AHJ):
DESCRIPTION: THIS PROJECT PROPOSES A RENOVATION OF THE BASEMENT LEVEL OF BUILDING
6 TO INCLUDE A SLEEP DISORDER CLINIC AND EYE CLINIC AS WELL AS AN
ADDITION TO THE EXISTING CORRIDOR CONNECTING BUILDINGS 5 & 6.
LOCATION: TVHS - MURFREESBORO CAMPUS
PROJECT: CONSTRUCT SLEEP DISORDER CLINIC
AND SPECIALTY CLINIC
PLAN REVIEW DATA DRAWING INDEX
SHEET # SHEET NAME
SUBMISSIONS
CD
00 - GENERAL
GI 00.01 COVER SHEET ●
GI 01.01 GENERAL DATA ●
GI 01.10 WALL TYPE DETAILS ●
GI 01.20 ACCESSIBILITY DETAILS ●
GI 01.30 BASEMENT SCOPE OF WORK ●
GI 01.31 BASEMENT PHASING PLAN ●
GI 01.40 ICRA ASSESSMENT ●
GI 01.41 BASEMENT ICRA PLAN PHASE 1A & 1B ●
GI 01.42 BASEMENT ICRA PLAN PHASE 2 ●
GI 01.43 BASEMENT ICRA PLAN PHASE 3 ●
GI 02.01 BASEMENT EXISTING PLAN ●
GI 02.10 ASBESTOS SURVEY REPORT ●
GI 02.11 ASBESTOS SURVEY REPORT ●
GI 03.01 BASEMENT LIFE SAFETY PLAN ●
01_CIVIL
G 101 CIVIL COVER SHEET ●
B 101 GEOTECHNICAL BORINGS REPORT ●
V 101 SITE TOPOGRAPHIC SURVEY EXISTING CONDITIONS ●
CD 101 CIVIL SITE DEMOLITION PLAN ●
C 101 CIVIL SITE PLAN ●
C 102 GRADING AND ALIGNMENT PLAN ●
C 103 UTILITIES AND DRAINAGE PLAN ●
C 104 EROSION AND SEDIMENT CONTROL STABILIZATION PLAN ●
C 105 PAVEMENT MARKING AND SIGNAGE PLAN ●
C 201 CIVIL SITE PLAN ●
C 202 CIVIL SITE PLAN ●
C 501 CIVIL DETAILS ●
C 502 CIVIL DETAILS 2 ●
C 503 CIVIL DETAILS 3 ●
C 504 CIVIL DETAILS 4 ●
C 505 CIVIL DETAILS 5 ●
C 506 CIVIL DETAILS 6 ●
C 507 CIVIL DETAILS 7 ●
C 508 CIVIL DETAILS 8 ●
C 509 CIVIL DETAILS 9 ●
C 510 CIVIL DETAILS 10 ●
C 511 CIVIL DETAILS 11 ●
C 512 CIVIL DETAILS 11 ●
03 - DEMOLITION
AD 01.01 BASEMENT DEMOLITION PLAN ●
AD 01.02 BASEMENT DEMOLITION PHOTOS ●
04 - ARCHITECTURAL
AE 00.00 ARCHITECTURAL SITE PLAN ●
AE 01.01 OVERALL BASEMENT FLOOR PLAN ●
AE 01.01A BASEMENT FLOOR PLAN AREA A & B ●
AE 01.01B BASEMENT FLOOR PLAN AREA C ●
AE 01.01C BASEMENT FLOOR PLAN AREA D & E ●
AE 01.01D BASEMENT FLOOR PLAN AREA F ●
AE 01.01E BASEMENT FLOOR PLAN MECHANICAL BASEMENT ●
AE 01.02 EXISTING FIRST FLOOR PLAN - BUILDING 6 ●
AE 01.02A EXISTING SECOND FLOOR PLAN - BUILDING 6 ●
AE 01.03 OVERALL BASEMENT ACCESS CONTROL PLAN ●
AE 01.04 ROOF PLAN ●
AE 02.01 TYPICAL ROOMS - EYE EXAM, PHOTOCOAG LASER ●
AE 02.02 TYPICAL ROOMS - PROCEDURE, SPEC TESTING ●
AE 02.03 TYPICAL ROOMS - TOMOGRAPHY/CAMERA, ULTRASOUND ●
AE 02.04 TYPICAL ROOMS - VISUAL FIELDS, YAG LASER ●
AE 02.05 TYPICAL ROOMS - SLEEP STUDY, SLEEP EXAM ●
AE 03.01 DOOR ELEVATIONS, SCHEDULE, & NOTES ●
AE 03.02 DOOR DETAILS ●
AE 03.04 EXTERIOR WINDOW/DOOR DETAILS ●
AE 04.01 BUILDING ELEVATIONS ●
AE 04.02 3D VIEWS ●
AE 05.01 CONNECTOR SECTION/DETAILS ●
AE 06.01 DROP OFF CANOPY PLAN/SECTIONS ●
AE 08.01 EXTERIOR DETAILS ●
AE 08.02 EXTERIOR DETAILS ●
AE 08.03 DROP OFF CANOPY DETAILS ●
AE 08.06 MISC. DETAILS ●
AE 08.07 MISC. DETAILS ●
AE 08.08 TOILET DETAILS/MISC. DETAILS ●
AE 08.09 PLAN DETAILS ●
AE 08.10 PLAN DETAILS ●
AE 09.01 INTERIOR ELEVATIONS ●
AE 09.02 INTERIOR ELEVATIONS ●
AE 09.03 INTERIOR ELEVATIONS - CORRIDORS ●
AC 11.01 OVERALL BASEMENT CEILING PLAN ●
AC 11.01A BASEMENT CEILING PLAN AREA A & B ●
AC 11.01B BASEMENT CEILING PLAN AREA C ●
AC 11.01C BASEMENT CEILING PLAN AREA D & E ●
AC 11.01D BASEMENT CEILING PLAN AREA F ●
AE 01.10A BASEMENT PLAN AREA A & B - DIMENSIONED ●
AE 01.10B BASEMENT PLAN AREA C - DIMENSIONED ●
AE 01.10C BASEMENT PLAN AREA D & E - DIMENSIONED ●
AE 01.10D BASEMENT PLAN AREA F - DIMENSIONED ●
AE 10.01 CASEWORK SECTIONS AND MISC DETAILS ●
U. VA FIRE PROTECTION DESIGN MANUAL, 9TH EDITION, NOVEMBER 2023
T. SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE STANDARD 15-2007.
S. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1-2004.
R. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
Q. EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
P. FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
O. DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL
AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433, 434, AND 435.
N ENERGY POLICY ACT OF 2005 (EPACT)
M. MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
L. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE
AND COMMENTARY (ACI 318)
K. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
J. ASME CODE FOR PRESSURE PIPING
I. ASME BOILER AND PRESSURE VESSEL CODE
H. SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL
ENGINEERS (ASME) A 17.1.
G. INTERNATIONAL PLUMBING CODE (IPC)
F. NATIONAL ELECTRICAL CODE (NEC)
E. VA SEISMIC DESIGN REQUIREMENTS, H-18-8
D. OCCUPATION, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
C. NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
B. 2021 NFPA 101 LIFE SAFETY CODE
A. 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN
DOCUMENTS,)
THE LATEST EDITIONS OF THE FOLLOW CODES SHALL BE FOLLOWED. THE LIST OF CODES
REPRESENT WHAT WAS DESIGNED AROUND.
VA CODE LIST
VICINITY MAP
MECH. MECHANICAL
MED. MEDICAL
MED. CAB. MEDICAL CABINET
MFR. MANUFACTURER
MGMT. MANAGEMENT
MH MANHOLE
MIN. MINIMUM
MIR. MIRROR
MISC. MISCELLANEOUS
MR/S MIRROR WITH SHELF
MTD. MOUNTED
MTL. METAL
N.I.C. NOT IN CONTRACT
NOM. NOMINAL
O.C. ON CENTER
O.D. OVERFLOW DRAIN
O.F.O.I. OWNER FURNISHED / OWNER
INSTALLED
OPER. OPERATIONS
OPNG. OPENING
OPP. OPPOSITE
P.P.G. POLISHED PLATE GLASS
P.R.V. POWER ROOF VENTILATOR
P.T. PRESSURE TREATED
PART'N(S) PARTITION(S)
PLAS. PLASTER
PLAS. LAM. PLASTIC LAMINATE
PLYWD. PLYWOOD
PREP. PREPARATION
PREV. PREVENTIVE
PROF. PROFESSIONAL
PTD PAPER TOWEL DISPENSER
Q.T. QUARRY TILE
R. RADIUS
R.D. ROOF DRAIN
R.O. ROUGH OPENING
RECEPT. RECEPTION
RECOV. RECOVERY
REF. REFRIGERATOR
REF. REFER, REFERENCE
REINF. REINFORCING, REINFORCED
REQ'D REQUIRED
RM. ROOM
S SEALANT
S.&R. SHELF AND ROD
SAN. SANITARY
SB SPLASHBLOCK
SCHED. SCHEDULE
SD SOAP DISPENSER
SEC. SECTION, SECRETARY
SGNL. SIGNAL
SHLVG. SHELVING
SIM. SIMILAR
SPECS. SPECIFICATIONS
SS STAINLESS STEEL
STD. STANDARD
STL. STEEL
STO. STORAGE
STRUCT. STRUCTURAL
SYS. SYSTEM
T./TOIL./TL
T.
TOILET
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TB TOWEL BAR
TBL. TABLE
TECH. TECHNICIAN
TEL. TELEPHONE
THK. THICK
THKNS. THICKNESS
TPD TOILET PAPER DISPENSER
TRAIN. TRAINING
TRANS. TRANSFORMER
TREAT. TREATMENT
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
UNEXP. UNEXPOSED
VEST. VESTIBULE
W.H.F.E. WALL HUNG FIRE
EXTINGUISHER
W/ WITH
WC/W.C. WATER CLOSET
WD. WOOD
WP WATERPROOF(ING)
WP WALL PROTECTION
DRAWING INDEX
SHEET # SHEET NAME
SUBMISSIONS
CD
QH 12.01A BASEMENT EQUIPMENT PLAN AREA A & B ●
QH 12.01B BASEMENT EQUIPMENT PLAN AREA C ●
QH 12.01C BASEMENT EQUIPMENT PLAN AREA D & E ●
QH 12.01D BASEMENT EQUIPMENT PLAN AREA F ●
05 - INTERIOR DESIGN
IN 00.01 INTERIOR FIISH LEGEND AND ABBREVIATIONS ●
IN 01.01 OVERALL BASEMENT FLOOR FINISH PLAN ●
IN 01.01A BASEMENT FLOOR FINISH PLAN AREA A & B ●
IN 01.01B BASEMENT FLOOR FINISH PLAN AREA C ●
IN 01.01C BASEMENT FLOOR FINISH PLAN AREA D & E ●
IN 01.01D BASEMENT FLOOR FINISH PLAN AREA F ●
IN 01.02 ENLARGED TOILET FLOOR FINISH PLANS ●
IN 02.01A BASEMENT WALL FINISH PLAN AREA A & B ●
IN 02.01B BASEMENT WALL FINISH PLAN AREA C ●
IN 02.01C BASEMENT WALL FINISH PLAN AREA D & E ●
IN 02.01D BASEMENT WALL FINISH PLAN AREA F ●
IN 03.01A BASEMENT WALL PROTECTION AREA A & B ●
IN 03.01B BASEMENT WALL PROTECTION AREA C ●
IN 03.01C BASEMENT WALL PROTECTION AREA D & E ●
IN 03.01D BASEMENT WALL PROTECTION AREA F ●
IN 04.01 SCHEDULES ●
IN 05.01 WALL MURAL ELEAVTION & DETAILS ●
IN 05.02 INTERIOR PLAN & SECTION DETAILS ●
IN 05.03 RECEPTION DESK PLAN, ELEVATION AND DETAILS ●
IN 06.01 FLOOR & WALL TRANSITION DETAILS ●
IN 07.01 INTERIOR SIGNAGE PLAN ●
IN 07.02A INTERIOR SIGNAGE TYPES ●
IN 07.02B INTERIOR SIGNAGE TYPES ●
IN 07.03 INTERIOR SIGNAGE FINISHES AND NOTES ●
07 - STRUCTURAL
S 1.00 STRUCTURAL NOTES ●
S 1.01 CONNECTOR FOUNDATION AND ROOF FRAMING PLAN ●
S 1.02 CANOPY FOUNDATION AND ROOF FRAMING PLAN ●
S 4.01 SECTIONS AND DETAILS ●
S 4.51 SECTIONS AND DETAILS ●
08 - MECHANICAL
M-MK-01 MECHANICAL SYMBOLS, LEGEND, NOTES AND INDEX ●
M-MK-02 MECHANICAL SCHEDULES ●
M-MK-03 MECHANICAL SCHEDULES ●
M-MK-04 MECHANICAL SCHEDULES ●
M-MK-05 MECHANICAL SCHEDULES ●
M-MD-01 OVERALL CRAWLSPACE LEVEL DEMO - MECHANICAL ●
M-MD-02 OVERALL BASEMENT FLOOR DEMO - MECHANICAL ●
M-MD-05 OVERALL FIRST FLOOR DEMO - MECHANICAL ●
M-MH-02.01 OVERALL BASEMENT FLOOR NEW WORK - DUCTWORK ●
M-MH-03.01A BASEMENT FLOOR AREA A & B - DUCTWORK ●
M-MH-04.01B BASEMENT FLOOR AREA C - DUCTWORK ●
M-MH-05.01C BASEMENT FLOOR AREA D & E - DUCTWORK ●
M-MH-06.01D BASEMENT FLOOR AREA F - DUCTWORK ●
M-MH-07 DUCT RISERS ●
M-MH-08.01 OVERALL FIRST FLOOR NEW WORK - DUCTWORK ●
M-MP-01.01 OVERALL CRAWLSPACE LEVEL NEW WORK - PIPING ●
M-MP-02.01 OVERALL BASEMENT FLOOR NEW WORK - PIPING ●
M-MP-03.01A BASEMENT FLOOR AREA A & B - PIPING ●
M-MP-04.01B BASEMENT FLOOR AREA C - PIPING ●
M-MP-05.01C BASEMENT FLOOR AREA D & E - PIPING ●
M-MP-06.01D BASEMENT FLOOR AREA F - PIPING ●
M-MJ-01 MECHANICAL DETAILS ●
M-MJ-02 MECHANICAL DETAILS ●
M-MJ-03 MECHANICAL DETAILS ●
M-MJ-04 MECHANICAL DETAILS ●
M-MI-01 MECHANICAL CONTROLS ●
M-MI-02 MECHANICAL CONTROLS ●
M-MI-03 MECHANICAL CONTROLS ●
M-MI-04 MECHANICAL CONTROLS ●
09 - PLUMBING
P-PI-01 PLUMBING SYMBOLS, LEGEND, NOTES AND INDEX ●
P-PI-02 PLUMBING SCHEDULES ●
P-PI-03 PLUMBING DETAILS ●
P-PD-01 OVERALL CRAWLSPACE LEVEL DEMO - GRAVITY ●
P-PD-02 OVERALL BASEMENT FLOOR DEMO - GRAVITY ●
P-PD-03 OVERALL CRAWLSPACE LEVEL DEMO - PRESSURE ●
P-PD-04 OVERALL BASEMENT FLOOR DEMO - PRESSURE ●
P-PD-05 OVERALL CRAWLSPACE LEVEL DEMO - MEDICAL GAS ●
P-PD-06 OVERALL BASEMENT FLOOR DEMO - MEDICAL GAS ●
P-PP-00.01 OVERALL CRAWLSPACE LEVEL NEW WORK - GRAVITY ●
P-PP-01.01 OVERALL BASEMENT FLOOR NEW WORK - GRAVITY ●
P-PP-01.01A BASEMENT FLOOR PLAN AREA A & B NEW WORK - GRAVITY ●
P-PP-01.01B BASEMENT FLOOR PLAN AREA C NEW WORK - GRAVITY ●
P-PP-01.01C BASEMENT FLOOR PLAN AREA D & E NEW WORK - GRAVITY ●
P-PP-01.01D BASEMENT FLOOR PLAN AREA F NEW WORK - GRAVITY ●
P-PP-01.02 OVERALL FIRST FLOOR PLAN - GRAVITY ●
P-PP-01.03 OVERALL SECOND FLOOR PLAN - GRAVITY ●
P-PP-01.04 OVERALL ATTIC FLOOR PLAN - GRAVITY ●
P-PP-01.05 GRAVITY ISOMETRIC DIAGRAM AREA A & B ●
DRAWING INDEX
SHEET # SHEET NAME
SUBMISSIONS
CD
P-PP-01.06 GRAVITY ISOMETRIC DIAGRAM AREA C ●
P-PP-01.07 GRAVITY ISOMETRIC DIAGRAM AREA D & E ●
P-PP-01.08 GRAVITY ISOMETRIC DIAGRAM AREA F ●
P-PP-02.00 OVERALL CRAWLSPACE LEVEL NEW WORK - PRESSURE ●
P-PP-02.01 OVERALL BASEMENT FLOOR NEW WORK - PRESSURE ●
P-PP-02.01A BASEMENT FLOOR PLAN AREA A & B NEW WORK -
PRESSURE
P-PP-02.01B BASEMENT FLOOR PLAN AREA C NEW WORK - PRESSURE ●
P-PP-02.01C BASEMENT FLOOR PLAN AREA D & E NEW WORK -
PRESSURE
P-PP-02.01D BASEMENT FLOOR PLAN AREA F NEW WORK - PRESSURE ●
P-PP-02.02 PRESSURE ISOMETRIC DIAGRAM AREA A & B ●
P-PP-02.03 PRESSURE ISOMETRIC DIAGRAM AREA C ●
P-PP-02.04 PRESSURE ISOMETRIC DIAGRAM AREA D & E ●
P-PP-02.05 PRESSURE ISOMETRIC DIAGRAM AREA F ●
10 - ELECTRICAL
E-EI-01 ELECTRICAL SYMBOLS, LEGEND, NOTES AND INDEX ●
E-EI-02 ELECTRICAL ONE-LINE DIAGRAM ●
E-EI-03 ELECTRICAL PANEL SCHEDULES ●
E-EI-04 ELECTRICAL PANEL SCHEDULES ●
E-EI-05 ELECTRICAL DETAILS ●
E-EI-06 ELECTRICAL DETAILS ●
E-EI-07 ELECTRICAL DETAILS ●
E-EI-08 ELECTRICAL DETAILS ●
E-EI-09 ELECTRICAL SCHEDULES ●
E-ES-01 ELECTRICAL SITE PLAN ●
E-ED-01.01 OVERALL CRAWLSPACE LEVEL DEMO - ELECTRICAL ●
E-ED-02.01 OVERALL BASEMENT FLOOR DEMO - ELECTRICAL ●
E-EL-02.01 OVERALL BASEMENT RCP PLAN NEW WORK - LIGHTING ●
E-EL-02.01A BASEMENT RCP PLAN AREA A & B NEW WORK - LIGHTING ●
E-EL-02.01B BASEMENT RCP PLAN AREA C NEW WORK - LIGHTING ●
E-EL-02.01C BASEMENT RCP PLAN AREA D & E NEW WORK - LIGHTING ●
E-EL-02.01D BASEMENT RCP PLAN AREA F NEW WORK - LIGHTING ●
E-EP-02.01 OVERALL BASEMENT FLOOR NEW WORK - POWER ●
E-EP-02.01A BASEMENT FLOOR PLAN AREA A & B NEW WORK - POWER ●
E-EP-02.01B BASEMENT FLOOR PLAN AREA C NEW WORK - POWER ●
E-EP-02.01C BASEMENT FLOOR PLAN AREA D & E NEW WORK - POWER ●
E-EP-02.01D BASEMENT FLOOR PLAN AREA F NEW WORK - POWER ●
E-EF-02.01 OVERALL BASEMENT FLOOR NEW WORK - FIRE ALARM ●
E-EF-02.01A BASEMENT FLOOR PLAN AREA A & B NEW WORK - FIRE
ALARM
E-EF-02.01B BASEMENT FLOOR PLAN AREA C NEW WORK - FIRE ALARM ●
E-EF-02.01C BASEMENT FLOOR PLAN AREA D & E NEW WORK - FIRE
ALARM
E-EF-02.01D BASEMENT FLOOR PLAN AREA F NEW WORK - FIRE ALARM ●
E-EN-02.01 OVERALL BASEMENT FLOOR NEW WORK - NURSE CALL ●
E-EN-02.01A BASEMENT FLOOR PLAN AREA A & B NEW WORK - NURSE
CALL
E-EN-02.01B BASEMENT FLOOR PLAN AREA C NEW WORK - NURSE CALL ●
E-EN-02.01C BASEMENT FLOOR PLAN AREA D & E NEW WORK - NURSE
CALL
11 - FIRE PROTECTION
F-FI-01 FIRE PROTECTION SYMBOLS, LEGEND, NOTES AND INDEX ●
F-FD-01 OVERALL CRAWLSPACE LEVEL DEMO - FIRE PROTECTION ●
F-FD-02 OVERALL BASEMENT FLOOR DEMO - FIRE PROTECTION ●
F-FX-01.00 OVERALL CRAWLSPACE LEVEL - FIRE PROTECTION ●
F-FX-01.01 OVERALL BASEMENT RCP PLAN NEW WORK - FIRE
PROTECTION
F-FX-01.01A BASEMENT RCP PLAN AREA A & B NEW WORK - FIRE
PROTECTION
F-FX-01.01B BASEMENT RCP PLAN AREA C NEW WORK - FIRE
PROTECTION
F-FX-01.01C BASEMENT RCP PLAN AREA D & E NEW WORK - FIRE
PROTECTION
F-FX-01.01D BASEMENT RCP PLAN AREA F NEW WORK - FIRE
PROTECTION
12 - TECHNOLOGY
T-TJ-00 TECHNOLOGY SYMBOLS, LEGEND, NOTES AND INDEX ●
T-TD-01 OVERALL BASEMENT FLOOR DEMO - TECHNOLOGY ●
T-TJ-01 OVERALL BASEMENT FLOOR NEW WORK - TECHNOLOGY ●
T-TJ-02.01A BASEMENT FLOOR PLAN AREA A & B NEW WORK -
TECHNOLOGY
T-TJ-02.01B BASEMENT FLOOR PLAN AREA C NEW WORK - TECHNOLOGY ●
T-TJ-02.01C BASEMENT FLOOR PLAN AREA D & E NEW WORK -
TECHNOLOGY
T-TJ-02.01D BASEMENT FLOOR PLAN AREA F NEW WORK - TECHNOLOGY ●
T-TJ-04 ENLARGED PLANS - TECHNOLOGY ●
T-TJ-07 TECHNOLOGY - RISER ●
T-TJ-08 TECHNOLOGY - DETAILS ●
T-TJ-09 TECHNOLOGY - DETAILS ●
T-TJ-10 TECHNOLOGY - DETAILS ●
NON-RATED PARTITION
16" O.C.
SECTION
PLAN
1 3-5/8" STUD
DESCRIPTION:
2 43
UL DESIGN #:
STC RATING:
FIRE RATING:
SCALE:
45 - 49
N.T.S.
ABOVE CEILING ID (STENCIL):
PLAN DESIGNATION:
GENERAL NOTES:
1. ALL REQUIREMENTS OF LISTED UL
DESIGN # MUST BE MET.
WALL PRIORITY:
OPENINGS: --
V A
R
IE
S
1. STEEL FLOOR AND CEILING CHANNELS - TOP AND BOTTOM CHANNELS OF WALL
ASSEMBLY SHALL BE MIN. 20 GA. GALV. STEEL SIZED TO FIT STUDS. TOP CHANNEL TO
HAVE 2" FLANGES (MIN). BOTTOM CHANNEL TO HAVE 1-1/4" FLANGES (MIN). SECURE
BOTTOM CHANNELS WITH STEEL FASTENERS AT 24" O.C. (MAX). SECURE TOP
CHANNELS TO VALLEYS OF STEEL FLOOR UNITS (OR STRUCTURE ABOVE) WITH STEEL
FASTENERS AT 12" O.C. (MAX).
2. STEEL STUDS - MIN. 3-5/8" WIDE (UNLESS NOTED OTHERWISE), 1-1/4" LEGS, 3/8" FOLDED
BACK RETURN. FORMED OF 20 GA.(MIN) GALV. STEEL. MAX. SPACING 16" O.C. CUT
STUDS 1" LESS IN LENGTH THAN ASSEMBLY HEIGHT WITH BOTTOM NESTING IN AND
SECURED TO FLOOR CHANNEL, AND WITH TOP NESTING IN CEILING CHANNEL WITHOUT
ATTACHMENT.
3. SOUND ATTENUATION BATT INSUL. - 3-1/2" (DEPENDING ON STUD SIZE) GLASS FIBER
BATTS IN STUD CAVITY. FILL ENTIRE CAVITY FULL HEIGHT.
4. GYPSUM WALLBOARD- 5/8" THICK TYPE "X", 4' WIDE, ATTACHED TO STEEL STUDS AND
FLOOR CHANNELS WITH 1" LONG TYPE S SELF-TAPPING STEEL SCREWS AT 8" O.C.
ALONG THE VERTICAL AND BOTTOM EDGES AND 12" O.C. IN THE FIELD OF THE BOARD.
INSTALL WALLBOARD WITH A MIN. 1/2" AND MAX. 3/4" GAP BETWEEN THE TOP OF THE
WALLBOARD AND THE BOTTOM OF THE FLOOR UNIT VALLEYS (OR STRUCTURE ABOVE).
NO SCREWS ARE TO BE INSTALLED WITHIN 4" OF THE STEEL FLOOR UNIT VALLEYS AT
THE TOP OF THE WALL. ORIENT JOINTS VERTICALLY AND STAGGER JOINTS ON
OPPOSITE SIDES OF THE ASSEMBLY.
5. JOINT TAPE AND COMPOUND - VINYL, DRY OR PRE-MIXED JOINT COMPOUND, APPLIED
IN TWO COATS TO JOINTS AND SCREW HEADS; PAPER TAPE 2" WIDE EMBEDDED IN
FIRST LAYER OF COMPOUND OVER ALL JOINTS. JOINTS REINFORCED.
6. ACOUSTICAL SEALANT.
1/ 4"
M
IN
6" STUD
1HR FIRE BARRIER
UL DESIGN #:
STC RATING:
FIRE RATING:
SCALE:
16" O.C.
SECTION
PLAN
3-5/8" STUD1B
U465
45 - 49
1HR
N.T.S.
DESCRIPTION:
2 43
ABOVE CEILING ID (STENCIL):
"1HR FIRE BARRIER"
PLAN DESIGNATION:
GENERAL NOTES:
1. ALL REQUIREMENTS OF LISTED UL
DESIGN # MUST BE MET.
WALL PRIORITY:
1/ 4"
M
IN
OPENINGS: 45 MIN
1. STEEL FLOOR AND CEILING CHANNELS - TOP AND BOTTOM CHANNELS OF WALL
ASSEMBLY SHALL BE MIN. 20 GA. GALV. STEEL SIZED TO FIT STUDS. TOP CHANNEL TO
HAVE 2" FLANGES (MIN). BOTTOM CHANNEL TO HAVE 1-1/4" FLANGES (MIN). SECURE
BOTTOM CHANNELS WITH STEEL FASTENERS AT 24" O.C. (MAX). SECURE TOP
CHANNELS TO VALLEYS OF STEEL FLOOR UNITS (OR STRUCTURE ABOVE) WITH STEEL
FASTENERS AT 12" O.C. (MAX).
2. STEEL STUDS - MIN. 3-5/8" WIDE, 1-1/4" LEGS, 3/8" FOLDED BACK RETURN. FORMED OF
20 GA.(MIN) GALV. STEEL. MAX. SPACING 16" O.C. CUT STUDS 1" LESS IN LENGTH THAN
ASSEMBLY HEIGHT WITH BOTTOM NESTING IN AND SECURED TO FLOOR CHANNEL, AND
WITH TOP NESTING IN CEILING CHANNEL WITHOUT ATTACHMENT.
3. SOUND ATTENUATION BATT INSUL. - 3-1/2" (DEPENDING ON STUD SIZE) GLASS FIBER
BATTS IN STUD CAVITY. FILL ENTIRE CAVITY FULL HEIGHT.
4. GYPSUM WALLBOARD- 5/8" THICK TYPE "X", 4' WIDE, ATTACHED TO STEEL STUDS AND
FLOOR CHANNELS WITH 1" LONG TYPE S SELF-TAPPING STEEL SCREWS AT 8" O.C.
ALONG THE VERTICAL AND BOTTOM EDGES AND 12" O.C. IN THE FIELD OF THE BOARD.
INSTALL WALLBOARD WITH A MIN. 1/2" AND MAX. 3/4" GAP BETWEEN THE TOP OF THE
WALLBOARD AND THE BOTTOM OF THE FLOOR UNIT VALLEYS (OR STRUCTURE ABOVE).
NO SCREWS ARE TO BE INSTALLED WITHIN 4" OF THE STEEL FLOOR UNIT VALLEYS AT
THE TOP OF THE WALL. ORIENT JOINTS VERTICALLY AND STAGGER JOINTS ON
OPPOSITE SIDES OF THE ASSEMBLY. WHEN ATTACHED TO FURRING CHANNELS,
WALLBOARD IS ATTACHED WITH 1" LONG TYPE S SCREWS AT 12" O.C.
5. JOINT TAPE AND COMPOUND - VINYL, DRY OR PRE-MIXED JOINT COMPOUND, APPLIED
IN TWO COATS TO JOINTS AND SCREW HEADS; PAPER TAPE 2" WIDE EMBEDDED IN
FIRST LAYER OF COMPOUND OVER ALL JOINTS. JOINTS REINFORCED.
6. FURRING CHANNELS (OPTIONAL NOT SHOWN) - RESILIENT 20 MSG GALV. STEEL
FURRING CHANNELS SPACED VERT. MAX. 24" O.C. ATTACH FLANGE TO EACH
INTERSECTING STUD WITH 1/2" LONG TYPE S-12 PANHEAD SCREWS.
7. ACOUSTICAL SEALANT.
8. PACKING MATERIAL - MIN. 4" TKNS. OF MIN. 4.0 PCF MINERAL WOOL BATT INSULATION
FIRMLY PACKED INTO FLUTES OF STEEL FLOOR UNITS AS A PERMANENT FORM.
PACKING MATERIAL TO BE RECESSED FROM BOTH SURFACES OF THE WALL AS
REQUIRED TO RECEIVE JOINT SEALANT.
9. JOINT TREATMENT MATERIAL - NON-SAG FIRE CAULK EACH SIDE MIN THICKNESS 1/2",
APPLIED WITHIN THE OPENING BETWEEN THE TOP OF THE WALLBOARD AND ALL
SURFACES OF THE STEEL FLOOR OR STRUCTURE, FLUSH WITH BOTH SURFACES OF
THE WALL ASSEMBLY.
7/
8" M
IN
NO RATING - 3 5/8" MTL. STUD W/ 1 LAYER GYPSUM BOARD ON BOTH SIDES
NO RATING - 6" MTL. STUD W/ 1 LAYER GYPSUM BOARD ON BOTH SIDES
1 HR FIRE RATED - 3 5/8" MTL. STUD W/ 1 LAYER GYPSUM BOARD ON BOTH SIDES
WALL LEGEND
1B
NO RATING - 3 5/8" MTL. STUD W/ 1 LAYER GYPSUM BOARD ON ONE SIDE
NO RATING - 7/8" HAT CHANNELS W/ 1 LAYER GYPSUM BOARD ON ONE SIDE
NO RATING - 2 1/2" MTL STUD W/ 1 LAYER GYPSUM BOARD ON ONE SIDE6
NON-RATED SMOKE PARTITION - 3 5/8" MTL. STUD W/ 1 LAYER GYPSUM BOARD ON BOTH SIDES1A
NO RATING - 3 5/8" MTL. STUD W/ 1 LAYER GYPSUM BOARD ON ONE SIDE AND 2" INSULATION19
SECTION
NON-RATED
FURRING WITH
INSULATION
ABOVE CEILING ID (STENCIL):
PLAN DESIGNATION:
GENERAL NOTES:
1. ALL REQUIREMENTS OF LISTED UL DESIGN
# MUST BE MET.
WALL PRIORITY:
ACOUSTICAL SEALANT
MTL. STUDS
AT 16" O.C. MAX.
GYPSUM WALLBOARD - 5/8"
THICK TYPE "X"
JOINT TAPE AND COMPOUND
ACOUSTICAL SEALANT
UL DESIGN #:
FIRE RATING:
GA FILE #:
STC RATING: --
OPENINGS: --
DAMPERS: --
CEILING ASSEMBLY
GYPSUM BOARD CUT TO FIT
1/ 4"
M
IN
1/ 4"
M
IN
SCALE:
N.T.S.
2" RIGID INSULATION
3 5/8" STUD19
EXISTING WALL
SECTION
NON-RATED FURRING
ABOVE CEILING ID (STENCIL):
PLAN DESIGNATION:
GENERAL NOTES:
1. ALL REQUIREMENTS OF LISTED UL DESIGN
# MUST BE MET.
WALL PRIORITY:
ACOUSTICAL SEALANT
HAT CHANNEL- 7/8" MIN
MTL STUD - 2 1/2"
AT 16" O.C. MAX.
GYPSUM WALLBOARD - 5/8"
THICK TYPE "X"
JOINT TAPE AND COMPOUND
ACOUSTICAL SEALANT
UL DESIGN #:
FIRE RATING:
GA FILE #:
STC RATING: --
OPENINGS: --
DAMPERS: --
CEILING ASSEMBLY
GYPSUM BOARD CUT TO FIT DECK
CONFIGURATION
1/ 4"
M
IN
1/ 4"
M
IN
7/8" HAT CHANNEL5
SCALE:
N.T.S.
2 1/2" STUD6
3 5/8" STUD4
EXISTING WALL
HIGHER PRIORITY
PRIORITY 1 (HIGHEST)
PRIORITY 2
PRIORITY 3
PRIORITY 4
PRIORITY 5 (LOWEST)NON-RATED WALL
ONE HOUR FIRE WALL
ONE HOUR FIRE AND SMOKE WALL
TWO HOUR SHAFTWALL
TWO HOUR FIRE WALL
TWO HOUR FIRE AND SMOKE WALL
WALL PRIORITY LEGEND
LOWER PRIORITY
PLAN
PRIORITY 2
0 6" 1' 2'3"
TEST REF
WP 1711
WP 1200
GAGOLD BOND
OSU T-1770
FM W1A-1HR.
UL U411
OSU T-1771
PARTITIONRATED WALL
HOLLOW METAL FRAME
JAMB STUDS
TAPE & JT. COMP.-TYP.
ONE HOUR
CONSTRUCTION
2 HR.
CONSTRUCTION
METAL
STUDS
HIGHER PRIORITY WALL
1 LAYER AT 1 HOUR
FIRE &/OR SMOKE
PARTITIONS
(NON-RATED)
3 5/8"
GYPSUM WALLBOARD
5/8" TYPE "X"
SMOKETIGHT PARTITION
UL DESIGN #:
STC RATING:
FIRE RATING:
SCALE:
16" O.C.
SECTION
PLAN
3-5/8" STUD1A
45 - 49
N.T.S.
DESCRIPTION:
2 43
ABOVE CEILING ID (STENCIL):
"NON-RATED SMOKETIGHT"
PLAN DESIGNATION:
GENERAL NOTES:
1. ALL REQUIREMENTS OF LISTED UL
DESIGN # MUST BE MET.
WALL PRIORITY:
1/ 4"
M
IN
OPENINGS: SM
1. STEEL FLOOR AND CEILING CHANNELS - TOP AND BOTTOM CHANNELS OF WALL
ASSEMBLY SHALL BE MIN. 20 GA. GALV. STEEL SIZED TO FIT STUDS. TOP CHANNEL TO
HAVE 2" FLANGES (MIN). BOTTOM CHANNEL TO HAVE 1-1/4" FLANGES (MIN). SECURE
BOTTOM CHANNELS WITH STEEL FASTENERS AT 24" O.C. (MAX). SECURE TOP
CHANNELS TO VALLEYS OF STEEL FLOOR UNITS (OR STRUCTURE ABOVE) WITH STEEL
FASTENERS AT 12" O.C. (MAX).
2. STEEL STUDS - MIN. 3-5/8" WIDE (UNLESS NOTED OTHERWISE), 1-1/4" LEGS, 3/8" FOLDED
BACK RETURN. FORMED OF 20 GA.(MIN) GALV. STEEL. MAX. SPACING 16" O.C. CUT
STUDS 1" LESS IN LENGTH THAN ASSEMBLY HEIGHT WITH BOTTOM NESTING IN AND
SECURED TO FLOOR CHANNEL, AND WITH TOP NESTING IN CEILING CHANNEL WITHOUT
ATTACHMENT.
3. SOUND ATTENUATION BATT INSUL. - 3-1/2" (DEPENDING ON STUD SIZE) GLASS FIBER
BATTS IN STUD CAVITY. FILL ENTIRE CAVITY FULL HEIGHT.
4. GYPSUM WALLBOARD- 5/8" THICK TYPE "X", 4' WIDE, ATTACHED TO STEEL STUDS AND
FLOOR CHANNELS WITH 1" LONG TYPE S SELF-TAPPING STEEL SCREWS AT 8" O.C.
ALONG THE VERTICAL AND BOTTOM EDGES AND 12" O.C. IN THE FIELD OF THE BOARD.
INSTALL WALLBOARD WITH A MIN. 1/2" AND MAX. 3/4" GAP BETWEEN THE TOP OF THE
WALLBOARD AND THE BOTTOM OF THE FLOOR UNIT VALLEYS (OR STRUCTURE ABOVE).
NO SCREWS ARE TO BE INSTALLED WITHIN 4" OF THE STEEL FLOOR UNIT VALLEYS AT
THE TOP OF THE WALL. ORIENT JOINTS VERTICALLY AND STAGGER JOINTS ON
OPPOSITE SIDES OF THE ASSEMBLY.
5. JOINT TAPE AND COMPOUND - VINYL, DRY OR PRE-MIXED JOINT COMPOUND, APPLIED
IN TWO COATS TO JOINTS AND SCREW HEADS; PAPER TAPE 2" WIDE EMBEDDED IN
FIRST LAYER OF COMPOUND OVER ALL JOINTS. JOINTS REINFORCED.
6. ACOUSTICAL SEALANT.
7. JOINT TREATMENT MATERIAL - NON-SAG FIRE CAULK EACH SIDE MIN THICKNESS 1/2",
APPLIED WITHIN THE OPENING BETWEEN THE TOP OF THE WALLBOARD AND ALL
SURFACES OF THE STEEL FLOOR OR STRUCTURE, FLUSH WITH BOTH SURFACES OF
THE WALL ASSEMBLY.
V A
R
IE
S
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2023
TLC No.:
www.tlc-engineers.com
923116
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldae.com
703 MAIN AVENUE SW
HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
A u to d e s k D o c s /2
V A
M C
S le e p D is o rd e r
C lin ic /2
A R
C H
P ro je c t
C e n tr a l.
rv t
/8 /2
:2
:1
P M
GI 01.10
WALL TYPE DETAILS CONSTRUCT SLEEP DISORDER CLINIC
AND SPECIALTY CLINIC
AT07/10/2024
626-310
RA
100% CONSTRUCTION
DOCUMENTS
●USE SEMI-GLOSS PAINT.
●LOCATE NOT MORE THAN 12'-0" O.C. ON CORRIDOR SIDES OF PARTITIONS, AND WITH A LEAST ONE MESSAGE PER
ROOM ON ROOM SIDE OF PARTITION, AND WITHIN 15'-0" OF THE END OF EACH WALL.
●STENCIL MESSAGE SIMILAR TO: "SMOKE PARTITION" OR "1-HR FIRE BARRIER."
●IDENTIFY PARTITIONS ABOVE CEILINGS ON BOTH SIDES OF PARTITIONS EXCEPT WITHIN SHAFTS IN RED LETTERS
NOT LESS THAN 4" HIGH WITH AT LEAST A 3/8" STROKE.
12. FIRE AND SMOKE PARTITION / BARRIER IDENTIFICATION:
11. PENETRATIONS IN WALLS SHALL BE SEALED AS REQUIRED BY THE WALL RATING PER AN APPROVED UL DESIGN.
10. GYPSUM BOARD PANELS SHALL BE PLACED A MINIMUM OF 1/4" ABOVE FLOOR AND SHALL BE CUT WITHIN 1/4" MAX TOLERANCE TO SHAPE OF DECK OR STRUCTURE ABOVE. GAPS BETWEEN PANELS SHALL BE <1/4".
●PROVIDE DEFLECTION AND BRIDGING CLIPS.
●MAINTAIN CLEARANCE UNDER STRUCTURAL BUILDING MEMBERS TO AVOID DEFLECTION TRANSFER TO STUDS.
PROVIDE EXTENDED LEG CEILING RUNNERS.
9. DO NOT TRANSFER DEFLECTION FROM STRUCTURAL BUILDING MEMBERS TO STUDS. CONTRACTOR'S OPTION, PROVIDE EITHER OF THE FOLLOWING:
8. EXTEND ALL WALL CONSTRUCTION TO THE DECK ABOVE AND SEAL U.N.O.
7. INSTALL ACOUSTICAL GASKETS AT FLOOR AND CEILING TRACK LOCATIONS.
6. PROVIDE ACOUSTICAL INSULATION FULL HEIGHT IN ALL WALLS U.N.O.
5. STAGGER JOINTS ON OPPOSITE SIDES OF PARTITIONS.
4. ALL FRAMING SHALL BE 20 GA U.N.O.
●PROVIDE FIRE RATED MOLD AND MOISTURE RESISTANT GYPSUM PANELS ON INTERIOR SURFACE OF EXTERIOR WALLS, TOILET ROOMS, JANITOR'S CLOSETS, MECHANICAL SPACES, AND WITHIN 4'-0" OF WATER SOURCES.
●ALL GYPSUM BOARD SHALL BE 5/8" TYPE 'X' U.N.O.
3. GYPSUM BOARD REQUIREMENTS:
2. --
1. ALL WALLS SHALL BE 3-5/8" METAL STUD AT 16"0.C. MAX U.N.O.
REFERENCE WALL TYPE DETAILS, PLANS, AND SPECIFICATIONS.
GENERAL WALL NOTES
INTERSECTION OF RATED WALLS
GENERAL NOTES
1. THIS IS DIAGRAMMATIC IN NATURE AND SHOWS GENERIC
CONDITIONS. SEE FLOOR PLANS FOR ACTUAL CONDITIONS.
2. MAINTAIN NOTED CLEARANCES AT ALL DOORS.
MIN
18"
60" MIN
(A)
FRONT APPROACH, PULL SIDE
48" MIN
(B)
FRONT APPROACH, PUSH SIDE
48" MIN
(C)
FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
MIN
12" MIN
36"
60" MIN
(D)
HINGE APPROACH, PULL SIDE
42" MIN
(F)
HINGE APPROACH, PUSH SIDE
MIN
42" 54" MIN
(E)
HINGE APPROACH, PULL SIDE
MIN
22"
48" MIN
(G)
HINGE APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
MIN
22"
MIN
24"48" MIN
(H)
LATCH APPROACH, PULL SIDE
MIN
24"54" MIN
(I)
LATCH APPROACH, PULL SIDE,
DOOR PROVIDED WITH
CLOSER
42" MIN
(J)
LATCH APPROACH, PUSH SIDE
MIN
24"
48" MIN
(K)
LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
MIN
24"
MIN
18"
60" MIN
(A)
PULL SIDE
X > 8"
MANEUVERING CLEARANCES AT RECESSED
DOORS AND GATES
MANEUVERING CLEARANCES AT MANUAL
SWINGING DOORS AND GATES
(B)
PUSH SIDE
48" MIN
X > 8"
(C)
PUSH SIDE, DOOR PROVIDED
WITH BOTH CLOSER AND
LATCH
48" MIN
X > 8"
MIN
12"
DOORS IN SERIES AND GATES IN SERIES
(A)
48" MIN
(B)
48" MIN
(C)
48" MIN
T .O
. S E
A T
SOME ITEMS MAY NOT BE APPLICABLE
GB-42
MIRROR
TPD
TB-18
FPDL
BCS
PTD-WR
C L P
U
LL
H A
N D
LE
C L F
LU
S
H C
O N
T R
O L
GB-18 INSULATED
SUPPLY AND
DRAIN LINES
TPD
48" MAX
48" MAX
48" MAX
48" MAX
48" MAX15" MIN
S U
R F
A C
E
M A
X T
O R
E F
LE
C
T
IV
E
25"MAX
17"MIN
TO OUTLET
15" MIN
48" MAX
G R
IP
S
U R
F A
C E
T .O
5/
1"
42" MIN
MAX
12"
40" ±1"
SURFACE
40" MAX TO
REFLECTIVE
18" OR 24"
36"
(FRONT) (SIDE)
34" MAX27" MIN
18" (±1") 29
M
IN
M A
X
FLUSH
VALVE
44" MAX.
6" MAX
36" MIN
60" MIN±1"
17"
GB-36
CLEAR
15" MIN
CLEAR
15" MIN
8" (±1")
44" MAX
C O
N T
R O
LS
H C
A C
C E
S S
IB
LE
48" 54"
MIN
15"
PTD
48" MAX 48" MAX
C O
N T
R O
LS
48" MAX
SD
48" MAX
5" MAX
42" MAX
C O
N T
R O
LS
EHD EHD-HF
C O
N T
R O
LS
C O
N T
R O
LS
C O
N T
R O
LS
UNOBSTRUCTED ITEMS
MAX
24".
44" MAX
C O
N T
R O
LS
PAPER TOWEL
DISPENSER & WASTE
RECEPTACLE (PTD-WR)
C O
N T
R O
LSFPDR
PAPER
TOWEL
DISPENSER
(PTD)
ELECTRIC
HAND DRYER
(EHD)
ELECTRIC
HAND DRYER -
HANDS FREE
(EHD-HF)
SOAP
DISPENSER
(SD)
FEMININE
PRODUCT
DISPENSER
(FNDR)
48" MAX
FEMININE
PRODUCT
DISPOSAL UNIT
(FNDL)
SD (ONLY) SD, PTD, EHD
OR EHD-HF
BACK WALL
MOUNTED
OBSTRUCTED ITEMS
SIDE WALL
MOUNTED
TOILET PAPER
DISPENSER
(TPD)
TOWEL BAR
18" MIN
(TB-18)
BABY CHANGING STATION
(BCS)
MIN
12".
MIN
24".
G R
IP
S
U R
F A
C E
T .O
HC WATER CLOSET
(HCWC)
GRAB BAR
42" (GB-42)
(SIDE) (FRONT)
GRAB BAR
18" (GB-18)
GRAB BAR
36" (GB-36)
MIN18"
54" MIN
HC LAVATORY
(SIDE) (FRONT)
COAT HOOK
(CH)
(FRONT)
MIRROR WITH OR
WITHOUT SHELF
(MIR/S-18X36)
(MIR-18X36)
(MIR/S-24X36)
(MIR-24X36)
EXAM
ROOM
DOCTOR'S
OFFICE
NURSE
STATION
JANITOR'S
CLOSET
RECEPTION /
FILES
MECHANICAL
SPACE
BREAK
ROOM
PUBLIC USE SPACES (SEC 201)
FULL ACCESS TO PUBLIC USE
AREAS, INCLUDING WAITING
AREAS AND CORRIDORS
MECHANICAL SPACE (SEC 203.5)
EXEMPT SPACE
EMPLOYEE WORK AREAS (SEC 203.9)
PARTIAL ACCESS TO AREAS USED
ONLY BY EMPLOYEES FOR WORK
(RECEPTION / FILE AREAS, NURSE
STATIONS, AND JANITOR'S CLOSETS
EXAM ROOMS AND OFFICES
(SEC 201 AND 203.9)
ALL EXAM ROOMS AND OFFICES
USED BY THE PUBLIC MUST BE
ACCESSIBLE, BUT ELEMENTS
WITHIN THESE ROOMS THAT
ARE USED ONLY BY EMPLOYEES
FOR WORK ARE NOT REQUIRED
TO COMPLY.
DRESSING ROOMS (SEC 222)
ACCESS IS REQUIRED TO AT
LEAST 5% (BUT NO LESS THAN 1)
OF EACH TYPE OF USE IN EACH
CLUSTER
TOILET ROOMS (SEC 213)
ACCESS IS REQUIRED TO ALL PUBLIC
AND EMPLOYEE TOILET ROOMS (OR
NO MORE THAN 50% OF SINGLE
USER TOILET ROOMS FOR EACH USE
AT EACH CLUSTER)
COMMON USE (NON-WORK)
AREAS (SEC 201)
FULL ACCESS TO BREAK ROOMS
AND TO OTHER EMPLOYEE AREAS
NOT USED FOR WORK PURPOSES.
GENERAL EXCEPTIONS (§203):
THESE STRUCTURES AND SPACES ARE FULLY EXEMPT FROM THE STANDARDS AND ARE NOT REQUIRED TO BE ACCESSIBLE OR ON AN ACCESSIBLE ROUTE:
• CONSTRUCTION SITES (§203.2): STRUCTURES DIRECTLY ASSOCIATED WITH THE ACTUAL PROCESSES OF CONSTRUCTION AND PORTABLE TOILETS USED ONLY BY CONSTRUCTION WORKERS. (EXAMPLES: SCAFFOLDING, BRIDGING, MATERIALS HOISTS, CONSTRUCTION TRAILERS)
• AREAS RAISED FOR SECURITY/ SAFETY (§203.3): AREAS RAISED PRIMARILY FOR PURPOSES OF SECURITY OR LIFE/ FIRE SAFETY. (EXAMPLES: LIFE GUARD STANDS, FIRE
TOWERS, AND PRISON GUARD TOWERS)
• RAISED WORK AREAS (§203.9): EMPLOYEE WORK AREAS UNDER 300 S.F. THAT ARE ELEVATED AT LEAST 7” AS AN ESSENTIAL FUNCTIONAL CONDITION OF THE SPACE (EXCLUDING RAISED COURTROOM STATIONS. (EXAMPLE: WORK AREAS WITH EQUIPMENT/ MACHINERY THAT MUST BE OPERATED FROM A PLATFORM)
• LIMITED ACCESS SPACES (§203.4): SPACES ACCESSED ONLY BY LADDERS, CATWALKS, CRAWL SPACES, OR VERY NARROW PASSAGEWAYS. (EXAMPLES: LIGHTING/ EQUIPMENT
CATWALKS AT STAGES AND PERFORMING AREAS, PLATFORMS SERVED ONLY BY LADDER.)
• MACHINERY SPACES (§203.5): SPACES USED ONLY BY SERVICE PERSONNEL FOR MAINTENANCE, REPAIR, OR OCCASIONAL MONITORING OF EQUIPMENT. (EXAMPLES: ELEVATOR PITS/ PENTHOUSES, MECHANICAL/ ELECTRICAL/ COMMUNICATIONS EQUIPMENT ROOMS, WATER OR SEWAGE TREATMENT PUMP ROOMS, ELECTRIC SUBSTATIONS, AND
TRANSFORMER VAULTS.)
• SINGLE OCCUPANT STRUCTURES (§203.6): SINGLE OCCUPANT STRUCTURES ACCESSED ONLY BY BELOW-GRADE PASSAGEWAYS OR ELEVATED ABOVE STANDARD CURB HEIGHT.
(EXAMPLES: TOLL BOOTHS THAT ARE ACCESSED BY UNDERGROUND TUNNELS OR ELEVATED ABOVE CURB HEIGHT, SUCH AS THOSE SERVING DEDICATED TRUCK LANES.)
ACCESSIBILITY EXAMPLE OF CLINICAL SUITE
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2023
TLC No.:
www.tlc-engineers.com
923116
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldae.com
703 MAIN AVENUE SW
HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
A u to d e s k D o c s /2
V A
M C
S le e p D is o rd e r
C lin ic /2
A R
C H
P ro je c t
C e n tr a l.
rv t
/8 /2
:2
:1
P M
GI 01.20
ACCESSIBILITY DETAILS CONSTRUCT SLEEP DISORDER CLINIC
AND SPECIALTY CLINIC
AT07/10/2024
626-310
RA
100% CONSTRUCTION
DOCUMENTS
NOT TO SCALE
ACCESSIBLE DOOR CLEARANCES
NOT TO SCALE
TYPICAL TOILET FIXTURE AND ACCESSORY MOUNTING REQUIREMENTS
NOT TO SCALE
00 ADA CLINICAL SUITE EXAMPLE
AUTODOOR
A U
T O
D O
O R
AUTODOOR
UP
H O
L D
O P
E N
UP
AUTODOOR
A U
T O
D O
O R
A U
T O
D O
O R
GENERAL NOTE:
ALL ADDITIONAL WORK SCHEDULED TO BE COMPLETED PER MP&E REQUIREMENTS OR ANY
OTHER WORK OUTSIDE THE SCOPE OF WORK SHOWN BELOW SHOULD BE COORDINATED
WITH THE FACILITY.
ANY WORK THAT RESULTS IN THE NEED TO REMOVE OR ALTER EXISTING CONDITIONS
OUTSIDE THE SCOPE OF WORK SHOWN BELOW SHOULD BE REPLACED OR REPAIRED TO
MATCH THE FINISH AND CONSTRUCTION OF THE EXISTING CONDITION BEING REMOVED AT
NO COST TO THE FACILITY.
THIS INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING:
* GYPSUM BOARD AND FINISHES
* DOORS INCLUDING FRAMES/HARDWARE OR OTHER ACCESSORIES
* WINDOWS AND FRAMES
* CEILING TILES AND GRIDS
* FLOORING; INCLUDING FINISHES.
NOT IN SCOPE OF WORK
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2023
TLC No.:
www.tlc-engineers.com
923116
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldae.com
703 MAIN AVENUE SW
HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
A
B
C
D
E
F
A u to d e s k D o c s /2
V A
M C
S le e p D is o rd e r
C lin ic /2
A R
C H
P ro je c t
C e n tr a l.
rv t
/8 /2
:2
:4
P M
GI 01.30
BASEMENT SCOPE OF WORK CONSTRUCT SLEEP DISORDER CLINIC
AND SPECIALTY CLINIC
AT07/10/2024
626-310
RA
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
1 BASEMENT SCOPE OF WORK PLAN
0 4' 8' 12'
A U
T O
D O
O R
AUTODOOR
UP
H O
L D
O P
E N
UP
AUTODOOR
A U
T O
D O
O R
A U
T O
D O
O R
PHASE 1A
PHASE 2
PHASE 3
PHASE 1B
ELEVATOR SUPPORT
ELEVATOR
ELEVATOR
ELECT
ELECT
COMM
MECH
MECH
STAIR STAIR
GENERAL NOTE:
CHANGES TO THE PHASING PLAN MUST BE COORDINATED WITH AND APPROVED BY THE COR.
PHASING LEGEND:
PHASE 1A
IT AND COMM ROOM TO BE COMPLETED PRIOR TO DEMO WORK IN THE
FOLLOWING PHASES BEGINS. SEE TECHNOLOGY DRAWINGS FOR ADDITIONAL
INFORMATION.
PHASE 2
EYE CLINIC AND SLEEP CLINIC WORK WILL BEGIN. ACCESS TO THE ELEVATORS
FROM THE EXTERIOR PLAN EAST ENTRANCE MUST BE MAINTAINED FOR
PATIENT AND STAFF TRAFFIC. ONCE PHASE 2 IS COMPLETE, ACCESS TO THE
ELEVATORS FROM THE EXTERIOR PLAN WEST ENTRANCE MUST BE MAINTAINED
FOR PATIENT AND STAFF TRAFFIC. INFECTION CONTROL PROTOCOLS MUST BE
IN EFFECT DURING ALL WORK.
PHASE 3
INCLUDES THE CONNECTOR ADDITION, ALL FINISHES AND UPDATES TO THE
CONNECTOR, AND THE CORRIDOR LEADING TO THE ELEVATORS THAT WAS
PREVIOUSLY HELD OUT OF PHASE 2 TO MAINTAIN ELEVATOR ACCESS. PHASE 3
MUST START ONLY AFTER PHASE 2 HAS BEEN COMPLETED. ACCESS TO
ELEVATORS MUST BE MAINTAINED AT ALL TIMES. INFECTION CONTROL
PROTOCOLS MUST BE IN EFFECT DURING ALL WORK.
PHASE 1B
THE WORK ON THE BASEMENT LEVEL NEAR THE ELEVATORS CAN BEGIN AT THE
SAME TIME AS PHASE 1A. THE ELEVATORS WILL REMAIN ACTIVE DURING THE
ENTIRETY OF CONSTRUCTION AND A CLEAR PATH OF ACCESS AND EGRESS
SHALL BE MAINTAINED DURING NORMAL DUTY HOURS. ALL WORK
RESTRICTING/LIMITING ELEVATOR ACCESS ON ANY FLOOR SHALL TAKE PLACE
OUTSIDE NORMAL DUTY HOURS AND BE COORDINATED WITH THE COR AT LEAST
TWO WEEKS PRIOR TO WORK. INFECTION CONTROL PROTOCOLS MUST BE IN
EFFECT DURING ALL WORK.
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2023
TLC No.:
www.tlc-engineers.com
923116
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldae.com
703 MAIN AVENUE SW
HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
A
B
C
D
E
F
A u to d e s k D o c s /2
V A
M C
S le e p D is o rd e r
C lin ic /2
A R
C H
P ro je c t
C e n tr a l.
rv t
/8 /2
:2
:5
P M
GI 01.31
BASEMENT PHASING PLAN CONSTRUCT SLEEP DISORDER CLINIC
AND SPECIALTY CLINIC
AT07/10/2024
626-310
RA
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
1 BASEMENT PHASING PLAN
0 4' 8' 12'
NOTE: THIS DRAWING MUST BE PRINTED IN COLOR.
LEVEL
CONSTRUCTION ACTIVITY TYPES
CONSTRUCTION ACTIVITY TYPE
TYPE DTYPE CTYPE B
IC RISK
GROUP 4
ICRA MATRIX
GROUP 1
GROUP 2
GROUP 3
TYPE A
INFECTION CONTROL RISK LEVELS
GROUP 1 GROUP 3 GROUP 4
HIGHESTMEDIUM HIGHLOWEST MEDIUM
ICRA CLASSIFICATION SCHEDULEINFECTION CONTROL RISK ASSESSMENT (ICRA)
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE
WORK SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM, AND NEW CONSTRUCTION.
ANY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED
BUILDING COMPONENTS OR ASSEMBLIES.INCLUDES, BUT IS NOT LIMITED TO, SANDING OF WALL FOR PAINTING OR WALL COVERING, REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL
WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE
WORKSHIFT.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF
TELEPHONE AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED.
TYPE D
TYPE C
TYPE B
TYPE A
CLASS IVCLASS III/IVCLASS III/IVCLASS III
CLASS IVCLASS IIICLASS IICLASS I
CLASS I CLASS II CLASS II CLASS III/IV
CLASS IVCLASS III/IVCLASS IIICLASS I
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL
INSPECTION.
GROUP 2
PUBLIC BATHROOMS ROCP RECOVERY ROOMS
CONFERENCE ROOMS
TRANSPLANT CLINICEMERGENCY ROOMALL PATIENT CARE UNITSOFFICE AREAS
WAITING ROOMS RADIOLOGY AREAS SURGERY SUITES
WAITING ROOMS LABOR AND DELIVERY LABOR & DELIVERY ORs*
* DEPENDENT ON LOCATION
NURSERIES
DIALYSIS AND TRANSPLANTALL INTENSIVE CARE AREAS
CVICUPEDIATRICS
CARDIAC CATH / ANGIO
OUTPATIENT UNITSRIO SURGERY
PHYSICAL THERAPY TANK AREA HYPERBARIC MEDICINE
ONCOLOGY / BONE MARROW
ADMISSION / DISCHARGE AREA CARDIOLOGY
CAFETERIA ENDOSCOPY
NUCLEAR MEDICINE
PHARMACY
LABORATORIES
PHARMACY ADMIXTUREECHOCARDIOGRAPHY
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION.
3. MINOR DEMOLITION FOR REMODELING.
CLASS I
CLASS II
CLASS III
CLASS IV
1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. WIPE SURFACES WITH DISINFECTANT.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR
WITH
MAGNEHELIC GAUGES.
5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY
ENVIRONMENTAL
SERVICES DEPARTMENT.
6. VACUUM WORK WITH HEPA FILTERED VACUUMS.
7. WET MOP WITH DISINFECTANT.
8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .