Attachment 4 - Specs Vol 1.pdf
PDF 12 MB Posted
- Attached to
- Y1DA--626-310 Construct Sleep Disorder Clinic and Specialty Clinics Minor Construction - Murfreesboro
- Solicitation number
- 36C77625B0035
About this file
This is a comprehensive Geotechnical Engineering Report for proposed improvements at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The project involves two single-story building additions totaling approximately 1,200+ square feet to an existing covered corridor, creating a new entry/lobby space with restrooms, and realigning the existing roadway to create a drop-off loop with a covered canopy.
The report provides detailed geotechnical analysis of the site, including subsurface soil conditions, groundwater assessment, and seismic site classification. Key findings include the presence of existing fill material (3-4 feet deep) and high plasticity clay, which will require subgrade remediation. The recommended foundation design includes shallow spread footings with an allowable bearing pressure of 2,000 psf after proper site preparation. The report suggests removing existing fill, carefully compacting engineered fill, and taking precautions due to the site's karst limestone geology, which presents potential risks for ground subsidence. Pavement design recommendations are also provided, with a 20-year design period anticipated for the site improvements.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
102 3rd Avenue, NE (28601)
PO Box 1629, Hickory, NC 28603
Telephone: (828)-315-9962
Website: www.atriaxgroup.com
PROJECT MANUAL
Volume 1
100% Construction Documents
July 10, 2024 for the
Construct sleep disorder clinic and specialty clinic Murfreesboro, TN
Atriax Group Project No. #626-310
Owner
York, VAMC Murfreesboro, TN
Anthony Traylor Snapshot
Anthony Traylor Snapshot
Anthony Traylor Snapshot
09-01-21
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
00 11 21 Request for Proposal to Design Build 09-21
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-21
01 32 16.13 Network Analysis Schedules – Major Construction Project
Design-Bid-Build
03-20
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20
01 33 23 Shop Drawings, Product Data, and Samples 06-21
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
GeoTech Report
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 01-21
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 01-21
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
02 83 33.13 Lead-Based Paint Removal and Disposal 01-31
Asbestos Survey Report
DIVISION 03 – CONCRETE
03 30 53 (Short Form) Cast-in-place concrete 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21
04 05 13 Masonry Mortaring 10-17
04 05 16 Masonry Grouting 01-21
04 20 00 Unit Masonry 08-17
04 73 00 Manufactured Masonry Veneer
DIVISION 05 – METALS
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
05 12 00 Structural Steel Framing 11-18
05 31 00 Steel Decking 01-21
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 20 00 Finish Carpentry 01-21
06 82 13 Sheet Resin Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 Bituminous Dampproofing 01-21
07 21 13 Thermal Insulation 01-21
07 22 00 Roof and Deck Insulation 01-21
07 24 00 Exterior Insulation and Finish Systems 01-21
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21
07 60 00 Flashing and Sheet Metal 01-21
07 71 00 Roof Specialties 01-21
07 72 00 Roof Accessories 01-21
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 10-17
07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 17 10 Integrated Door Assemblies 01-21
08 31 13 Access Doors and Frames 01-21
08 41 13 Aluminum-Framed Entrances and Storefronts 01-21
08 51 13 Aluminum Windows 01-21
08 71 00 Door Hardware 01-21
08 71 13 Automatic Door Operators 01-21
08 71 13.11 Low Energy Power Assist Door Operators 01-21
08 80 00 Glazing 01-21
08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 65 36.16 ESD Vinyl Tile
09 68 00 Carpeting 01-21
09 72 16 Vinyl Coated Fabric Wall Covering 01-21
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21
10 21 13 Toilet Compartments 01-21
10 21 23 Cubicle Curtain Tracks 01-21
10 26 00 Wall and Door Protection 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
10 73 16 Canopies
DIVISION 12 – FURNISHINGS
12 32 00 Wood Casework 09-15
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 21 - FIRE SUPPRESSION
21 08 00 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS 3
21 13 13 WET-PIPE SPRINKLER SYSTEMS 11
DIVISION 22 - PLUMBING
22 05 11 COMMON WORK RESULTS FOR PLUMBING 36
22 05 12 GENERAL MOTOR REQUIREMENTS FOR PLUMBING
EQUIPMENT
22 05 19 METERS AND GAUGES FOR PLUMBING PIPING 7
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING 16
22 05 33 HEAT TRACING FOR PLUMBING PIPING 8
22 07 11 PLUMBING INSULATION 23
22 08 00 COMMISSIONING OF PLUMBING SYSTEMS 4
22 11 00 FACILITY WATER DISTRIBUTION 14
22 11 23 DOMESTIC WATER PUMPS 15
22 13 00 FACILITY SANITARY AND VENT PIPING 22
22 14 00 FACILITY STORM DRAINAGE 16
22 14 29 SUMP PUMPS 7
22 33 00 ELECTRIC DOMESTIC WATER HEATERS 8
22 35 00 DOMESTIC WATER HEAT EXCHANGERS 11
22 40 00 PLUMBING FIXTURES 37
22 67 21 WATER DEALKALIZING SYSTEM 8
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
00 01 10-4
23 05 11 COMMON WORK RESULTS FOR HVAC 39
23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM
GENERATION EQUIPMENT
23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 14
23 07 11 HVAC AND BOILER PLANT INSULATION 35
23 08 00 COMMISSIONING OF HVAC SYSTEMS 5
23 21 13 HYDRONIC PIPING 26
23 22 13 STEAM AND CONDENSATE HEATING PIPING 37
23 23 00 REFRIGERANT PIPING 13
23 31 00 HVAC DUCTS AND CASINGS 19
23 34 00 HVAC FANS 12
23 36 00 AIR TERMINAL UNITS 9
23 37 00 AIR OUTLETS AND INLETS 10
23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT 6
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT 12
23 81 23 COMPUTER-ROOM AIR-CONDITIONERS 13
23 82 16 AIR COILS 4
DIVISION 26 - ELECTRICAL
26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 12
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND
CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 10
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 14
26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION 11
26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION
STUDY
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS 4
26 09 23 LIGHTING CONTROLS 14
26 24 16 PANELBOARDS 7
26 27 26 WIRING DEVICES 8
26 29 11 MOTOR CONTROLLERS 15
26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 5
26 41 00 FACILITY LIGHTNING PROTECTION 6
26 43 13 SURGE PROTECTIVE DEVICES 4
26 51 00 INTERIOR LIGHTING 19
26 56 00 EXTERIOR LIGHTING 12
DIVISION 27 - COMMUNICATIONS
27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS 48
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS
SYSTEMS
27 05 33 RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS 17
27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS 3
27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS 2
00 01 10-5
27 10 00 STRUCTURED CABLING 6
27 11 00 TELECOMMUNICATIONS ROOM FITTINGS 17
27 11 16 COMMUNICATIONS CABINETS, RACKS, FRAMES, AND
ENCLOSURES
27 11 19 COMMUNICATIONS TERMINATION BLOCKS AND PATCH
PANELS
27 11 26 COMMUNICATIONS RACK MOUNTED POWER PROTECTION
AND POWER STRIPS
27 13 13 COMMUNICATIONS COPPER BACKBONE CABLING 3
27 13 23 COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING 3
27 15 13 COMMUNICATIONS COPPER HORIZONTAL CABLING 2
27 16 19 COMMUNICATIONS PATCH CORDS, STATION CORDS, AND
CROSS CONNECT WIRE
27 41 31 MASTER ANTENNA TELEVISION EQUIPMENT AND SYSTEMS 33
27 51 16 PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS 62
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND
SECURITY
28 05 13 CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND
SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND
SECURITY
28 13 00 PHYSICAL ACCESS CONTROL SYSTEM 127
28 13 16 PHYSICAL ACCESS CONTROL SYSTEM AND DATABASE
MANAGEMENT
28 23 00 VIDEO SURVEILLANCE 90
28 26 00 ELECTRONIC PERSONAL PROTECTION SYSTEM 27
28 31 00 FIRE DETECTION AND ALARM 63
DIVISION 31 - EARTHWORK
31 20 11 Earthwork (shorth form)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVMENTS
32 12 16 ASPHALT PAVING
32 17 23 PAVEMENT MARKINGS
32 90 00 COMMISSIONING OF SITE UTILITY SYSTEMS
DIVISION 33 – UTILITIES
33 08 00 COMMISSIONING OF SITE UTILITY SYSTEMS
33 10 00 WATER UTILITIES
33 30 00 STANITARY SEWER UTILITIES
33 40 00 STORM SEWER UTILITIES
00 01 10-6
33 46 13 FOUNDATION DRAINAGE
DIVISION 34 – TRANSPORTATION
34 71 13 PASSIVE VEHICLE BARRIERS
CONSTRUCT SLEEP DISORDER CLINIC AND SPECIALTY CLINIC
TVHS MURFREESBORO CAMPUS
MURFREESBORO, TN
VA PROJECT NUMBER 626-310
i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 USE OF ROADWAYS
1.16 RESIDENT ENGINEER'S FIELD OFFICE
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.18 TEMPORARY USE OF EXISTING ELEVATORS
1.19 TEMPORARY USE OF NEW ELEVATORS
1.20 TEMPORARY TOILETS
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
1.22 NEW TELEPHONE EQUIPMENT
1.23 TESTS
1.24 INSTRUCTIONS
MURFREESBORO, TN
VA PROJECT NUMBER 626-310
ii
1.25 GOVERNMENT-FURNISHED PROPERTY
1.26 RELOCATED // EQUIPMENT // ITEMS //
1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.28 CONSTRUCTION SIGN
1.29 SAFETY SIGN
1.30 PHOTOGRAPHIC DOCUMENTATION
1.31 FINAL ELEVATION Digital Images
1.32 HISTORIC PRESERVATION
1.33 VA TRIRIGA CPMS
Construct Sleep Disorder Clinic and Specialty Clinic
TVHS Murfreesboro Campus
Project Number: 626-310
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for “Construct Sleep Disorder and
Specialty Clinic” as required by drawings and specifications at the historic York Campus of the VA Tennessee Valley Healthcare System, 3400
Lebanon Pike, Murfreesboro, TN 37129.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting
Officer.
c. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
D. Contractor work hours:
1.Normal working hours for this contract will be from 7:00AM to
4:30PM (local time) Monday through Thursday, except for established Federal Holidays.
2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR.
Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government.
Approvals are subject to the availability of on-site staff.
Project Number: 626-310
01 00 00 -2
1.3 STATEMENT OF BID ITEM(S)
A. Base Bid includes all work described in SOW, Drawings and
Specifications.
B. Bid Alternate NO.1: Same as Base Bid except eliminate exterior window replacement. Windows will remain but all gaps including the sash must be sealed from the inside and outside.
C. Bid Alternate NO. 2: Same as Bid Alternate NO. 1 except exclude Drop off canopy
D. Bid Alternate NO. 2: Same as Bid Alternate NO. 2 except exclude all exterior work that is not related to the new construction. The existing sidewalk shall still be connected to the new construction for functionality.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give two weeks’ notice to the Contracting Officer so that security arrangements can
Project Number: 626-310
01 00 00 -3 be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards:
Not required.
D. Key Control:
Up to 2 contractor keys will be issued to the Prime Contractor. If lost, the Prime Contractor shall pay $50 per key that is not returned to the issuing VA. Final Payment on the project will be held until keys are returned or reimbursement (in full) is made the issuing department. Lost or theft of these issued keys must be reported to the COR immediately.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access
Project Number: 626-310
01 00 00 -4 to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General
Contractor and its employees for parking in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Project Number: 626-310
01 00 00 -5
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing materials(Laydown Area) shall be as determined by the COR see (I) below for requirements.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly
Project Number: 626-310
01 00 00 -6 by patients or medical personnel, and Contractor's personnel, except as permitted by COR and where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
G. Phasing: The Medical Center must maintain its operation 24 hours a day
7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
I. Construction Fence/Laydown Area: Before construction operations begin, Contractor shall provide and maintain a chain link construction fence, 2.1m (seven feet) minimum height, around the construction/Laydown area indicated on the drawings or as provided by COR. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum
375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR. Area within fence is the entire responsibility including upkeep and maintenance of the contractor. Grass shall be mowed and edges/fence line trimmed, trash policed.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs
Project Number: 626-310
01 00 00 -7 or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the Resident Engineer COR.
Project Number: 626-310
01 00 00 -8
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads; walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
Project Number: 626-310
01 00 00 -9
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR in areas where alterations will occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.
Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4 and VAAR 852.236-88).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls
Project Number: 626-310
01 00 00 -10 and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
Project Number: 626-310
01 00 00 -11
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors if required in project. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the Environmental Protection Agency (EPA) and the
Department of Transportation (DOT) as outlined in Code of Federal
Regulation (CFR), Titled 40 and 49 respectively. The EPA's Toxic
Substance Control Act (TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform
Hazardous Waste Manifest (EPA Form 8700-22), along with the Uniform
Hazardous Waste Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the Manifest to the Medical Center Chief.
a. Copies of the following listed CFR titles may be obtained from the Government Printing Office:
40 CFR 261 .......Identification and Listing of Hazardous Waste
40 CFR 262 .......Standards Applicable to Generators of Hazardous
Waste
40 CFR 263 .......Standards Applicable to Transporters of
Hazardous Waste
40 CFR 761 .......PCB Manufacturing, Processing, Distribution in
Commerce, and use Prohibitions
Project Number: 626-310
01 00 00 -12
49 CFR 172 .......Hazardous Material tables and Hazardous
Material Communications Regulations
49 CFR 173 .......Shippers - General Requirements for Shipments and Packaging
49 CRR 173 .......Subpart A General
49 CFR 173 .......Subpart B Preparation of Hazardous Material for
Transportation
49 CFR 173 .......Subpart J Other Regulated Material; Definitions and Preparation
TSCA .............Compliance Program Policy Nos. 6-PCB-6 and 6-
PCB-7
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Project Number: 626-310
01 00 00 -13
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge
Elimination System (NPDES) permit is required for this project. The
Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.
Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the
Contractor's method of operations and operations planning and the
Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
- Designating areas for equipment maintenance and repair;
- Providing waste receptacles at convenient locations and provide regular collection of wastes;
- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
- Providing adequately maintained sanitary facilities.
Project Number: 626-310
01 00 00 -14
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR
52.236-2).
1.11 PHYSICAL DATA
A. Data and information furnished or referred to below is for the
Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
Project Number: 626-310
01 00 00 -15
1. The indications of physical conditions on the drawings and in the specifications are the result existing site and condition drawings and should be verified by contractor.
(FAR 52.236-4)
B. Subsurface conditions – not performed or required.
C. A soils report is not available or required. Confirm
D. Government does not guarantee that unsuitable materials will or will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations.
Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of
Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.
The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract. All survey documentation shall be turned over to the government for review and retention.
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.
Project Number: 626-310
01 00 00 -16
The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the
Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through
Contractor's negligence before their removal is authorized, the
Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the
Contractor.
(FAR 52.236-17)
Establish and plainly mark all required lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for all contract required construction, signage, and underground work. The contractor is responsible to ensure all work is in accordance with lines and elevations shown on contract drawings.
Following completion of general mass excavation and before any other permanent work is performed, establish, and plainly mark
(through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities, and elevations of floor slabs:
Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities, and other major controlling features) is placed.
Project Number: 626-310
01 00 00 -17
During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.
Lines of each building and/or addition.
Elevations of bottoms of footings and tops of floors of each building and/or addition.
Lines and elevations of sewers and of all outside distribution systems.
Lines and elevations of roads, streets and parking lots.
Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including fifty-foot stationing along new road centerlines if applicable. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.
Project Number: 626-310
01 00 00 -18
The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings and in the electronic version (scanned PDF) to the COR within
15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.
C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads
Project Number: 626-310
01 00 00 -19 leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.
1.16 RESIDENT ENGINEER'S FIELD OFFICE
Not Required
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
Not Required
1.18 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevator for handling building materials and
Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the COR for use of elevators.
Personnel for operating elevators will not be provided by the
Department of Veterans Affairs.
2. Contractor covers and provides maximum protection of following elevator components:
a. Entrance jambs, heads soffits and threshold plates.
b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
c. Finish flooring.
3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractor’s expense.
4. If brake lining of elevators is excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining at the contractor’s expense.
5. All parts of main controller, starter, relay panel, selector, etc., worn or damaged during temporary use shall be removed and replaced
Project Number: 626-310
01 00 00 -20 with new parts at the contractor’s expense, if recommended by elevator inspector after elevator is released by Contractor.
6. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer.
1.19 TEMPORARY USE OF NEW ELEVATORS
Not Applicable
1.20 TEMPORARY TOILETS
A. Contractor will provide ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies. All connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies. The
Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the
Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
C. Contractor-installed meters are not required.
D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
Project Number: 626-310
01 00 00 -21
1. Obtain heat by connecting to Medical Center heating distribution system.
E. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system.
F. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the
Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation COR’s discretion of use of water from
Medical Center's system.
1.22 NEW TELEPHONE EQUIPMENT
Not Required
1.23 TESTS
A. All testing is the responsibility of the general contractor. As per specification section 23 05 93 the general contractor shall provide a written testing plan complete with component level, equipment level, sub-system level and system level breakdowns.
The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work.
The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before
Project Number: 626-310
01 00 00 -22 requesting final tests. Final test will not be conducted unless pre-tested.
Conduct final tests required in various sections of specifications in presence of an authorized representative of the
Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
Mechanical and electrical systems shall be balanced, controlled, and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls, and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate, and other related components.
All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.24 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by
Project Number: 626-310
01 00 00 -23 the various sections of the specifications and as hereinafter specified.
Manuals: Maintenance and operating manuals and one compact disc
(four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory, and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment like but of a different model, style, and size than that furnished will not be accepted.
Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment.
All such training will be at the job site. These requirements are more specifically detailed in the various technical sections.
Instructions for different items of equipment that are component parts of a complete system, shall be given…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .