Attachment 5 - Divisional Price Breakout.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
687-23-101 CON Repair Exterior Features Federal contract opportunity
Solicitation number
36C26026R0033
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This is a Divisional Price Breakout template for a fixed-price construction contract. The spreadsheet provides the pricing structure for RFQ 36C26026R0033 related to Project 687-23-101, Repair Exterior Features at Jonathan M. Wainwright VA Medical Center in Walla Walla, Washington. The price schedule requires bidders to break down costs across Construction Specification Institute (CSI) divisions including General Requirements, Existing Conditions, Concrete, Masonry, Woods/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, HVAC, Electrical, Earthwork, and Exterior Improvements. Contractors must also account for mobilization/demobilization, insurance/bonds, taxes, operations and maintenance manuals, red line drawings, overhead costs (with specified daily rate), subcontract mark-up, and profit rates.

The instructions emphasize that all pricing is fixed-price and that field office overhead and general conditions are considered the same cost category, to be applied only once to the contract and any changes. Bidders are responsible for ensuring formula accuracy and properly transposing totals to the Price Summary. The contract line item price breakdown is provided for information purposes only and does not constitute separate billable deliverables. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 is the contracting agency overseeing this 25-building exterior repair project spanning mechanical, electrical, architectural, and structural modifications.

View the file

Other files for this federal contract opportunity

Other files attached to 687-23-101 CON Repair Exterior Features, newest first.
File Type Posted
36C26026R0033 0009.pdf PDF
36C26026R0033 0008.docx DOCX document
Attachment 10 - RFI Questions P0008.docx DOCX document
Attachment 4 - 687-23-101_100__COMPLETE_DRAWING_SET_VA REDLI.pdf PDF
Attachment 2 - SPECS VOL 1 Rev 1 Less T1 and T2.pdf PDF
Attachment 12 - Asbestos Survey - Building 48 - Final Rev 1.pdf PDF
Attachment 15 - Asbestos Survey - Building 65 - Final Rev 1.pdf PDF
Attachment 22 - Asbestos Survey - Building 120 - Final Rev 1.pdf PDF
Attachment 23 - Asbestos Survey - Building T1 - Final Rev 1.pdf PDF
Attachment 26 - Exterior Building Lead Condition-Presence-Absence.pdf PDF
Attachment 14 - Asbestos Survey - Building 63 - Final Rev 1.pdf PDF
Attachment 18 - Asbestos Survey - Building 81 - Final Rev 1.pdf PDF
Attachment 24 - Asbestos Survey - Building T2 - Final Rev 1.pdf PDF
Attachment 28 - RFI and Responses 687-23-101.xlsx XLSX spreadsheet
36C26026R0033 0007.pdf PDF
Attachment 10 - Asbestos Survey - Building 31 - Final Rev 1.pdf PDF
Attachment 11 - Asbestos Survey - Building 41 - Final Rev 1.pdf PDF
Attachment 13 - Asbestos Survey - Building 49 - Final Rev 1.pdf PDF
Attachment 16 - Asbestos Survey - Building 66 - Final Rev 1.pdf PDF
Attachment 19 - Asbestos Survey - Building 82 - Final Rev 1.pdf PDF
Attachment 20 - Asbestos Survey - Building 105 - Final Rev 1.pdf PDF
Attachment 21 - Asbestos Survey - Building 107 - Final Rev 1.pdf PDF
Attachment 25 - Asbestos Survey - Building T7 - Final Rev 1.pdf PDF
Attachment 27 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 17 - Asbestos Survey - Building 76 - Final Rev 1.pdf PDF
Attachment 29 - Mobilization-Project-Areas.pdf PDF
36C26026R0033 0006.docx DOCX document
Site Visit 2nd Sheet.pdf PDF
36C26026R0033 0005.docx DOCX document
Site Visit Sign-In Sheet - February 9 2026.jpg JPG image
36C26026R0033 0004.docx DOCX document
687-23-101_Repair_Exterior_Features_Geotech Memorandum.pdf PDF
687-23-101- 36C26026R0033 - Contractor Questions and Answers.pdf PDF
36C26026R0033 0003.docx DOCX document
36C26026R0033 0002.docx DOCX document
36C26026R0033 0002 pdf version Rev. 01.pdf PDF
36C26026R0033 0002 pdf version Rev. 01.pdf PDF
36C26026R0033 pdf version.pdf PDF
36C26026R0033 0001.docx DOCX document
Attachment 4 - COMPLETE_DRAWING_SET_VA REDLINES.pdf PDF
Attachment 3 - SPECS VOL 2 687-23-101 Exterior Repairs 01.26.2026.pdf PDF
Attachment 2 - SPECS VOL 1 687-23-101 Exterior Repairs 01.26.2026.pdf PDF
36C26026R0033.docx DOCX document
Attachment 8 - Contractor Rules of Behavior 687-23-101 Repair Exterior Features.pdf PDF
Attachment 7 - PPQ NCO 20 687-23-101.docx DOCX document
Attachment 9 - Wage Determination 1.23.2026.pdf PDF
Attachment 6 - Limitations on Subcontracting 687-23-101 Repair Exteriors.docx DOCX document
Attachment 1 - SOW CON Repair Exterior Features Rev 01.docx DOCX document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
RFQ: 36C26026R0033

Project Number / Title: 687-23-101, Repair Exterior Features Project Location: Jonathan M. Wainwright VA Medical Center, Walla Walla, WA

RatesBase Item
Price
Division 1 General Requirements
Division 2 Existing Conditions
Division 3 Concrete
Division 4 Masonry
Division 6 Woods, Plastic and Composites
Division 7 Thermal and Moisture Protection
Division 8 Openings
Division 9 Finishes
Division 23 HVAC
DivisIon 26 Electrical
Division 31 Earthwork
Division 32 Exterior Improvements

SubTotals N/A $0.00

Period of Performance (FAR 52.211-10) ________ days

Mobilization / Demobilization
Insurance / Bonds
Taxes / Other Fees (provide itemized list)
O&M Manuals and Red Line Drawings
OverheadRate _______%
Overhead (daily rate)Per Day $0.00
SubContract Mark-UpRate _______%
ProfitRate _______%
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS $0.00