This is an Asbestos Survey Report for Building 82 at the Walla Walla VA Medical Center in Walla Walla, Washington, prepared by Mabbett & Associates, Inc. in June 2019 under AES Contract Number VA201-1901.1. The survey involved comprehensive testing of the two-story, approximately 8,732 square foot engineering office and garage building constructed in 1932. Mabbett's team collected 48 bulk samples of suspect asbestos-containing materials (ACM) across two survey periods (February 11-15, 2019 and March 20-21, 2019) and submitted them to ProScience Analytical Services for polarized light microscopy (PLM) analysis. Results identified three samples containing asbestos greater than 1% (the regulatory threshold for ACM): 2% chrysotile in joint compound in Room 104, 2% chrysotile in 12"x12" white floor tile with brown and white specks in Corridor C1-2/C2-1, and 5% chrysotile in the mastic for that same floor tile. An additional two materials were previously identified as ACM or Presumed ACM: 125 linear feet of pipe and fitting insulation containing 2%-30% chrysotile in the stairwell and first-floor areas.
The survey methodology followed EPA AHERA regulations (40 CFR 763), OSHA Asbestos Standards (29 CFR 1910.1001 and 1926.1101), and VHA Directive 7714. The report included review of historical asbestos surveys from 1989 and 2003. Notable limitations include inaccessible areas within walls, fire doors, pipe/duct chases, mechanical equipment, and above fixed drywall ceilings without access panels. Roofing materials were not sampled to maintain warranty compliance. The report recommends comprehensive pre-demolition ACM surveys prior to any renovations involving inaccessible areas and emphasizes that all personnel should be informed of ACM locations before work begins. If ACM will be disturbed, removal must be conducted by a licensed asbestos abatement contractor in accordance with applicable regulations.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIMA’S TEMPLATE
p
WALLA WALLA VA MEDICAL CENTER
ASBESTOS SURVEY REPORT
BUILDING 82
Mabbett Project No. R2019002.000.001 June 2019
Prepared for:
11031 S. Pikes Peak Drive, Suite 202 Parker, CO 80138 and
Walla Walla VA Medical Center 77 Wainwright Drive Walla Walla, WA 99362
Mabbett & Associates, Inc.
5 Alfred Circle Bedford, MA 01730-2318 T. 781-275-6050 Massachusetts | Virginia | Rhode Island | New Jersey www.mabbett.com
© 2019, Mabbett & Associates, Inc.
BUILDING 82 – ASBESTOS SURVEY REPORT
Walla Walla VA Medical Center | Walla Walla, WA
© 2019, Mabbett & Associates, Inc. i June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 82\Building 82 Walla Walla VAMC - Final Rev 1.doc
ACKNOWLEDGEMENT
This Asbestos Containing Material (ACM) Survey Report was prepared in accordance with an established scope of work as defined in the Mabbett Proposal No. P2018292 for AES Contract Number VA201-1901.1. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc.
(Mabbett®) during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.
This report was prepared by:
Mabbett & Associates, Inc.
Kevin M. Donovan Environmental, Health and Safety Specialist
This report has been reviewed and approved by:
Mabbett & Associates, Inc.
Michael F. Delaney Director, Building Sciences Group
© 2019, Mabbett & Associates, Inc. ii June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 82\Building 82 Walla Walla VAMC - Final Rev 1.doc
TABLE OF CONTENTS
SECTION PAGE
1.0 INTRODUCTION
2.0 BUILDING DESCRIPTION
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
3.2 Analytical Methodology
3.3 Summary of Asbestos Containing Materials (ACM) Findings
3.3.1 Drawings
4.0 LIMITATIONS
5.0 CLOSING REMARKS
TABLES
Table 1 – Summary of ACM (in text) Table 2 – Summary of ACM Sampling Results
FIGURES
Figure 1 – Asbestos Survey, Building 82 – First Floor and Second Floor
APPENDICES
Appendix A – Table 2, Summary of ACM Sampling Results Appendix B – Laboratory Analytical Results and Chain of Custody Appendix C – Historical Asbestos Survey Data
© 2019, Mabbett & Associates, Inc. 1 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 82\Building 82 Walla Walla VAMC - Final Rev 1.doc
1.0 INTRODUCTION
Mabbett and Associates, Inc. (Mabbett®) performed surveys for suspect asbestos containing materials (ACM) of selected buildings at the Walla Walla VA Medical Center (Walla Walla VAMC) located at 77 Wainwright Drive in Walla Walla, Washington, under AES Contract Number VA201-1901.1. This report presents results of the ACM survey conducted at Building 82. Site survey work was performed over two periods ranging from February 11, 2019 through February 15, 2019 and March 20, 2019 through March 21, 2019, by appropriately credentialed regulated building materials inspectors. Bulk samples of suspected ACM were collected and submitted to a certified analytical laboratory for asbestos analysis by polarized light microscopy (PLM) using stop positive methodology. Confirmatory analysis of some samples by transmission electron microscopy (TEM) was conducted as required. The survey effort involved the collection of the following samples, resulting in the following conclusions:
Forty-eight (48) bulk samples for suspect ACM were collected in this building.
Based on laboratory analysis of suspect ACM, three (3) of the collected samples contained asbestos greater than 1%.
Two (2) additional materials were previously sampled and identified as ACM or Presumed ACM (PACM).
The Asbestos Survey was comprised of three primary project tasks including:
Evaluation of previous survey data (if available) and existing site conditions and formulation of the sampling plan.
Site survey to collect building material samples for laboratory analysis and reporting.
Interpretation of laboratory data and development of this Asbestos Survey Report.
This project deliverable is supported by a series of tables and appendices that are embedded within this report, or provided as attachments.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC and observations made by the Mabbett team at the time of the survey, Building 82 is the Engineering Office and Garage Building which is a two-story structure on a concrete foundation with an attic space and an asphalt shingle roof. The building was reportedly built in 1932 and occupies approximately 8,732 square feet.
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
The Mabbett team performed a physical U.S. Environmental Protection Agency (EPA) Asbestos Hazard and Emergency Response Act (AHERA) type inspection and sampling of suspect materials as required by EPA Asbestos Hazard Emergency Response Act (AHERA) regulations (i.e. 40 CFR 763), OSHA Asbestos Standards (i.e. 29 CFR
1910.1001 & 29 CFR 1926.1101) and the VHA Asbestos Management Directive (VHA Directive 7714).
The Walla Walla VAMC provided Mabbett with two historical asbestos inspection reports for asbestos surveys that were previously conducted at the facility. The first survey was conducted by Environmental Health Sciences, Inc. in October 1989. The second survey, which was limited in scope, was conducted by Blue Mountain Environmental & Consulting, Inc. in December 2003. These reports were reviewed by the Mabbett team prior to performing inspection activities. In some instances, ACM identified by the previous surveys was confirmed by Mabbett, reassessed and included in this Asbestos Survey Report.
© 2019, Mabbett & Associates, Inc. 2 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 82\Building 82 Walla Walla VAMC - Final Rev 1.doc
A visual screening inspection was conducted to identify locations of suspect ACM throughout identified areas of the building by Asbestos Hazard and Emergency Response Act (AHERA) trained and accredited asbestos inspectors. Only areas that were accessible during the field work phase were inspected. Every effort was made during the initial field survey work to access areas as necessary to complete the survey.
General areas that were inaccessible or where the survey was limited to visual observation only are identified below:
• Within walls • Within fire doors
• Enclosed pipe/duct chases •Inside mechanical equipment/ductwork
• Above fixed drywall or plaster ceilings without access panels
Due to these access restrictions, comprehensive pre-demolition ACM surveys should be performed prior to any proposed renovations or maintenance involving inaccessible areas. Roofing materials were not sampled in order to maintain applicable warranties.
Bulk samples were collected of suspect ACM in accordance with AHERA and conducted according to the following sampling plan:
a) Surfacing material:
a. At least three bulk samples were collected from each homogeneous area that is 1,000 ft2 or less.
b. At least five bulk samples were collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.
c. At least seven bulk samples were collected from each homogeneous area that is greater than 5,000 ft2.
b) Thermal system insulation:
a. At least three bulk samples were collected from each homogeneous area of thermal system insulation.
b. At least one bulk sample was collected from each homogeneous area of patched area of thermal system insulation.
c. Sufficient samples were collected from elbows and fittings to determine if they contain ACM.
d. Bulk samples were not collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.
c) Miscellaneous material:
a. At least one bulk sample was collected from each homogeneous area that is less than 100 ft2.
b. At least two bulk samples were collected from each homogeneous area that is greater than 100 ft2.
3.2 Analytical Methodology
The collected bulk samples were submitted under chain of custody procedures to ProScience of Woburn, MA.
ProScience is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200090-0). Bulk samples were analyzed with polarized light microscopy (PLM) using EPA Method 600/R-93/116.
Bulk sample results are summarized in Table 2 – Summary of ACM Sampling Results and included as Appendix A. The
© 2019, Mabbett & Associates, Inc. 3 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 82\Building 82 Walla Walla VAMC - Final Rev 1.doc
EPA and the Occupational Safety and Health Administration (OSHA) defines any material that contains greater than one percent (>1%) asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive for asbestos that met the regulatory criteria of greater than or equal to one percent (≥1%) asbestos. Laboratory reports and the chain of custodies are provided in Appendix B. Historical asbestos survey data is provided in Appendix C of this report.
3.3 Summary of Asbestos Containing Materials (ACM) Findings
Mabbett sampled eighteen (18) types of homogenous materials and collected forty-eight (48) representative bulk ACM samples. Forty-three (43) samples were analyzed by PLM and five (5) samples were positive stops and not analyzed. The current and historical laboratory analytical data indicated that six (5) homogenous materials had greater than 1% asbestos and were ACM or PACM. Estimated quantities of materials identified as ACM or PACM are presented in Table 1 below:
Table 1 Summary of ACM
Building 82 Walla Walla VAMC
Sample / Homogeneous
Area No.
Location Description of
Material
Percent and Type of Asbestos
Estimated Quantity Material
Type Condition Amount Units
1.1 Room 104 Joint Compound 2%
Chrysotile Undetermined1 SF Misc. Good
Corridor C1-2, C2-1, Rooms 201, 202, 207, 209
12" x 12" White with Brown and White Speck Floor Tile
2% Chrysotile 1,300 SF Misc. Good
15.1 Corridor C1-2, C2-1, Rooms 201, 202, 207, 209
12" x 12" White with Brown and White Speck Floor Tile
Mastic
5% Chrysotile Above QTY SF Misc. Good
NA
Rooms 101, 102, 103, 104, 105, 106 Stairwell
Pipe and Fitting Insulation
2% - 30% Chrysotile* 125 LF TSI Good
Notes:
SF = Square Feet Misc. = Miscellaneous Material LF = Linear Feet TSI = Thermal System Insulation
* = Materials Identified as ACM or PACM by Previous Testing 1 = An estimate for the quantity of ACM joint compound not determined due to unknown renovation history of the building and the difficulty in accurately determining homogeneous areas when surfaces are painted.
3.3.1 Drawings
The location of each collected bulk sample and its sample ID is shown on the drawings in the Figures Section of this report. Each positive ACM sample location is marked with an asterisk (*), while positive stops are marked with two asterisks (**). Collected bulk samples that were not positive are identified solely by the sample ID.
4.0 LIMITATIONS
This survey report is the result of both a qualitative (visual inspection) and quantitative assessment of potential ACM in Building 82 at the Walla Walla VAMC. Although a comprehensive inspection was performed with the majority of
© 2019, Mabbett & Associates, Inc. 4 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 82\Building 82 Walla Walla VAMC - Final Rev 1.doc the building accessed for evaluation and sampling purposes, Mabbett does not claim to have identified all of the materials that may be present at/in the facility due to limitations. Only accessible and authorized areas/materials were included in this survey. Mabbett has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. Mabbett makes no assurances that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.
5.0 CLOSING REMARKS
Prior to initiating plans for maintenance activities, the Walla Walla VAMC should review the asbestos survey results to determine whether any of the materials identified as ACM will be disturbed by proposed work activities. This report may not be used as a renovation/demolition Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) type inspection report. Prior to any renovation/demolition activities, a full destructive asbestos inspection of the work area, including any previously inaccessible or unsampled materials that might be impacted, must be conducted.
The purpose of this ACM survey was to identify ACM in Building 82 within the limitations of the survey for worker protection purposes and for future renovation planning. In regard to asbestos, any suspect material encountered during maintenance activities that is not identified in this report as being non-ACM should be assumed to be ACM unless laboratory analytical data for bulk samples prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, and that accordingly was not inspected, should be assumed to contain asbestos if discovered until otherwise verified, as previously described. If ACM will be disturbed, the ACM must be removed by a licensed asbestos abatement contractor and be performed in accordance with applicable regulations. If proposed work activities will not disturb intact ACM, continuous monitoring of ACM should be conducted throughout work activities to ensure the ACM remains in an intact condition. Additionally, prior to commencing work activities, all personnel involved should be made aware of the location of known ACM within the building in which they will be working.
© 2019, Mabbett & Associates, Inc. FIGURES June 2019 Project No. R2019002.000.001 Building 82 Walla Walla VAMC - Final Rev 1.doc
FIGURES
82-10A
82-07A 82-07B
82-05A 82-08A
82-03A 82-14B
82-10B 82-12A 82-12B 82-12C
82-13A 82-13B
82-10C 82-05B 82-15A* 82-15A.1*
82-11A
82-06A 82-06B
82-14A
82-11B
82-15B** 82-15B.1**
82-11C
82-03B 82-08B
82-04A 82-04B
82-03C 82-05C 82-08C
82-15C** 82-15C.1**
82-09A 82-09B 82-09C
82-14C
82-02A 82-02B
82-01A 82-01A.1*
82-02C
82-01B 82-01B.1**
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
COMPREHENSIVE BASELINE
ASBESTOS SURVEY
WALLA WALLA, WA
687-19-105 AE
APPROVED: PROJECT DIRECTOR
JUNE, 2019
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
RECORD DRAWINGS
DWG. OF
GENERAL NOTES:
1. DRAWINGS DO NOT CLAIM TO IDENTIFY ASBESTOS CONTAINING MATERIAL
PRESENT IN THE BUILDING AND SHOULD NOT BE THE BASIS FOR IDENTIFYING
ACM FOR FUTURE RENOVATION OR DEMOLITION PROJECTS, ABATEMENT
SPECIFICATIONS, ETC. THIS SURVEY DOES NOT MEET THE REQUIREMENTS OF A
PRE-RENOVATION NESHAP SURVEY. MABBETT'S SURVEY WAS PERFORMED
WITH LIMITATIONS INHERENT TO NON-DESTRUCTIVE VISUAL INSPECTIONS IN
OCCUPIED SPACES. ANY SUSPECT MATERIAL ENCOUNTERED DURING
RENOVATION/DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD
BE ASSUMED TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.
LEGEND:
1,2
25*
25(TEM)
25**
APPROXIMATE SAMPLE LOCATION
SAMPLE GREATER THAN 1% ASBESTOS
SAMPLE GREATER THAN 1% ASBESTOS (TEM)
STOP POSITIVE SAMPLE FOR ASBESTOS
NO ASBESTOS DETECTED (NAD)
BUILDING 82
1ST AND 2ND FLOOR
82-101
WBRMFD
0'
SCALE: 1/4" = 1'-0"
8'4'2'
AutoCAD SHX Text
%%UBUILDING 82 FIRST FLOOR PLAN
AutoCAD SHX Text
%%UBUILDING 82 SECOND FLOOR PLAN
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
MEN RESTROOM
AutoCAD SHX Text
WOMEN RESTROOM
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
WORK ORDERS
AutoCAD SHX Text
CHEIF ENGINEER
AutoCAD SHX Text C2-2
AutoCAD SHX Text C2-1
AutoCAD SHX Text
AutoCAD SHX Text 212B
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text H.A.C.
AutoCAD SHX Text
AutoCAD SHX Text 211B
AutoCAD SHX Text 212A
AutoCAD SHX Text
AutoCAD SHX Text 211A
AutoCAD SHX Text
AutoCAD SHX Text 205A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text H.A.C.
AutoCAD SHX Text H.A.C.
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
KEY ROOM
AutoCAD SHX Text
ENG. TECH
AutoCAD SHX Text
SECRETARY
AutoCAD SHX Text
ASS'T CHEIF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
ELEV. EQUIP.
AutoCAD SHX Text
WORKSHOP
AutoCAD SHX Text
TOOL STORAGE
AutoCAD SHX Text
WELDING ROOM
AutoCAD SHX Text
AutoCAD SHX Text C1-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C1-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
ROOM#
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
FUNCTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C1-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C1-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C2-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 205A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 212B
AutoCAD SHX Text
AutoCAD SHX Text 211A
AutoCAD SHX Text 212A
AutoCAD SHX Text 211B
AutoCAD SHX Text
AutoCAD SHX Text C2-1
AutoCAD SHX Text N
© 2019, Mabbett & Associates, Inc. APPENDIX A June 2019
’S TEMPLATE
APPENDIX A
Table 2 Summary of ACM Sampling Results
© 2019, Mabbett & Associates, Inc. Appendix A Page 1 of 2 June 2019
Table 2
Summary of ACM Sampling Results Building 82
Walla Walla VAMC
Sample No. Sample Location Description of Material Percent and
Type of Asbestos
82-01A Room 104 Gypsum Wallboard NAD 82-01B Room 104 Gypsum Wallboard NAD
82-01A.1 Room 104 Joint Compound associated with 82-01A 2% Chrysotile 82-01B.1 Room 104 Joint Compound associated with 82-01B NA/PS 82-02A Room 101 Interior Window Glazing NAD 82-02B Room 101 Interior Window Glazing NAD 82-02C Room 104 Interior Window Glazing NAD 82-03A Room 202 Brown Glue Daubs Above 2' x 4' Ceiling Tile NAD 82-03B Room 207 Brown Glue Daubs Above 2' x 4' Ceiling Tile NAD 82-03C Room 209 Brown Glue Daubs Above 2' x 4' Ceiling Tile NAD 82-04A Room 207 Gypsum Wallboard NAD 82-04B Room 207 Gypsum Wallboard NAD 82-04B Hallway C2-1 2' x 4' Small Fissure with Pinhole Ceiling Tile NAD 82-05A Room 205 2' x 4' Small Fissure with Pinhole Ceiling Tile NAD 82-05C Room 209 2' x 4' Small Fissure with Pinhole Ceiling Tile NAD
82-06A Hallway C2-2 White Coating over 2' x 4' Fiberglass Medium Fissure with Pinhole Ceiling Tile NAD
82-06B Hallway C2-2 White Coating over 2' x 4' Fiberglass Medium Fissure with Pinhole Ceiling Tile NAD
82-07A Room 201 2' x 4' Medium Fissure with Pinhole Ceiling Tile NAD
82-07B Room 201 2' x 4' Medium Fissure with Pinhole Ceiling Tile NAD
82-08A Hallway C2-1 White Coating over 2' x 4' Fiberglass Large Fissure with Pinhole Ceiling Tile NAD
82-08B Room 207 White Coating over 2' x 4' Fiberglass Large Fissure with Pinhole Ceiling Tile NAD
82-08C Room 209 White Coating over 2' x 4' Fiberglass Large Fissure with Pinhole Ceiling Tile NAD
82-09A Attic Attic Insulation NAD 82-09B Attic Attic Insulation NAD 82-09C Attic Attic Insulation NAD 82-10A Room 201 4" Blue Cove Base Adhesive NAD 82-10B Room 202 4" Blue Cove Base Adhesive NAD 82-10C Room 205 4" Blue Cove Base Adhesive NAD 82-11A Hallway C2-1 4" Brown Cove Base Adhesive NAD 82-11B Hallway C2-2 4" Brown Cove Base Adhesive NAD
© 2019, Mabbett & Associates, Inc. Appendix A Page 2 of 2 June 2019 Project No. R2019002.000.001 Building 82 Walla Walla VAMC - Final Rev 1.doc
Table 2 Summary of ACM Sampling Results
Building 82 Walla Walla VAMC
Sample No. Sample Location Description of Material Percent and
Type of Asbestos
82-11C Room 207 4" Brown Cove Base Adhesive NAD 82-12A Room 203 4" Grey Cove Base Adhesive NAD 82-12B Room 203 4" Grey Cove Base Adhesive NAD 82-12C Room 203 4" Grey Cove Base Adhesive NAD 82-13A Room 204 Carpet Mastic NAD 82-13B Room 204 Carpet Mastic NAD
82-14A Hallway C2-2 12" x 12" Tan with Brown and Tan Specks Floor Tile NAD
82-14B Room 202 12" x 12" Tan with Brown and Tan Specks Floor Tile NAD
82-14C Room 211A 12" x 12" Tan with Brown and Tan Specks Floor Tile NAD
82-14A.1 Hallway C2-2 12" x 12" Tan with Brown and Tan Specks Floor Tile Mastic NAD
82-14B.1 Room 202 12" x 12" Tan with Brown and Tan Specks Floor Tile Mastic NAD
82-14C.1 Room 211A 12" x 12" Tan with Brown and Tan Specks Floor Tile Mastic NAD
82-15A Hallway C2-1 12" x 12" White with Brown and White Speck Floor Tile 2% Chrysotile
82-15B Room 207 12" x 12" White with Brown and White Speck Floor Tile NA/PS
82-15C Room 209 12" x 12" White with Brown and White Speck Floor Tile NA/PS
82-15A.1 Hallway C2-1 12" x 12" White with Brown and White Speck Floor Tile Mastic 5% Chrysotile
82-15B.1 Room 207 12" x 12" White with Brown and White Speck Floor Tile Mastic NA/PS
82-15C.1 Room 209 12" x 12" White with Brown and White Speck Floor Tile Mastic NA/PS
Notes:
NAD = No Asbestos Detected NA/PS = Not Analyzed / Positive Stop
© 2019, Mabbett & Associates, Inc. APPENDIX B June 2019
APPENDIX B
Laboratory Analytical Results and Chain of Custody
© 2019, Mabbett & Associates, Inc. APPENDIX C June 2019
APPENDIX C
Historical Asbestos Survey Data
| 1.0 INTRODUCTION |
| 2.0 BUILDING DESCRIPTION |
| 3.0 ASBESTOS SURVEY |
| 3.1 Sampling Methodology |
| 3.2 Analytical Methodology |
| 3.3 Summary of Asbestos Containing Materials (ACM) Findings |
| 3.3.1 Drawings |
| 4.0 LIMITATIONS |
| 5.0 CLOSING REMARKS |
| Figure 1 - B82 June.pdf |
| Sheets and Views |