Attachment 17 - Asbestos Survey - Building 76 - Final Rev 1.pdf
PDF 2 MB Posted
- Attached to
- 687-23-101 CON Repair Exterior Features Federal contract opportunity
- Solicitation number
- 36C26026R0033
About this file
This is an Asbestos Containing Material (ACM) Survey Report for Building 76 at Walla Walla VA Medical Center in Walla Walla, Washington, prepared by Mabbett & Associates, Inc. in June 2019 under AES Contract Number VA201-1901.1. The survey was conducted over two periods in February and March 2019 by credentialed regulated building materials inspectors in accordance with EPA AHERA regulations, OSHA Asbestos Standards, and VHA Asbestos Management Directive requirements.
The survey collected 40 bulk samples from 14 types of homogeneous materials throughout Building 76, a 4,582 square-foot Boiler Plant structure built in 1922. All samples were analyzed by polarized light microscopy (PLM) using EPA Method 600/R-93/116 by ProScience Analytical Services, an AIHA-accredited laboratory. The critical finding is that none of the 40 collected samples contained asbestos greater than 1%, meaning no ACM was identified in the building. The report documents material types sampled including textured concrete surfaces, seam caulk, cove base adhesives, joint compound, gypsum wallboard, floor tiles, mastic, brick, gaskets, tank insulation, and window caulk. The report includes laboratory analytical results with detailed chain of custody documentation, a building floor plan showing sample locations, and guidance that suspect materials encountered during future maintenance activities should be assumed to contain asbestos unless proven otherwise by laboratory analysis.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIMA’S TEMPLATE
p
WALLA WALLA VA MEDICAL CENTER
ASBESTOS SURVEY REPORT
BUILDING 76
Mabbett Project No. R2019002.000.001 June 2019
Prepared for:
11031 S. Pikes Peak Drive, Suite 202 Parker, CO 80138 and
Walla Walla VA Medical Center 77 Wainwright Drive Walla Walla, WA 99362
Mabbett & Associates, Inc.
5 Alfred Circle Bedford, MA 01730-2318 T. 781-275-6050 Massachusetts | Virginia | Rhode Island | New Jersey www.mabbett.com
© 2019, Mabbett & Associates, Inc.
BUILDING 76 – ASBESTOS SURVEY REPORT
Walla Walla VA Medical Center | Walla Walla, WA
© 2019, Mabbett & Associates, Inc. i June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 76\Building 76 Walla Walla VAMC - Final Rev 1.doc
ACKNOWLEDGEMENT
This Asbestos Containing Material (ACM) Survey Report was prepared in accordance with an established scope of work as defined in the Mabbett Proposal No. P2018292 for AES Contract Number VA201-1901.1. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc.
(Mabbett®) during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.
This report was prepared by:
Kevin M. Donovan Environmental, Health and Safety Specialist
This report has been reviewed and approved by:
Michael F. Delaney Director, Building Sciences Group
© 2019, Mabbett & Associates, Inc. ii June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 76\Building 76 Walla Walla VAMC - Final Rev 1.doc
TABLE OF CONTENTS
SECTION PAGE
1.0 INTRODUCTION
2.0 BUILDING DESCRIPTION
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
3.2 Analytical Methodology
3.3 Summary of Asbestos Containing Materials (ACM) Findings
3.3.1 Drawings
4.0 LIMITATIONS
5.0 CLOSING REMARKS
TABLES
Table 1 – Summary of ACM (in text) Table 2 – Summary of ACM Sampling Results
FIGURES
Figure 1 – Asbestos Survey, Building 76 – First Floor
APPENDICES
Appendix A – Table 2, Summary of ACM Sampling Results Appendix B – Laboratory Analytical Results and Chain of Custody
© 2019, Mabbett & Associates, Inc. 1 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 76\Building 76 Walla Walla VAMC - Final Rev 1.doc
1.0 INTRODUCTION
Mabbett and Associates, Inc. (Mabbett®) performed surveys for suspect asbestos containing materials (ACM) of selected buildings at the Walla Walla VA Medical Center (Walla Walla VAMC) located at 77 Wainwright Drive in Walla Walla, Washington, under AES Contract Number VA201-1901.1. This report presents results of the ACM survey conducted at Building 76. Site survey work was performed over two periods ranging from February 11, 2019 through February 15, 2019 and March 20, 2019 through March 21, 2019, by appropriately credentialed regulated building materials inspectors. Bulk samples of suspected ACM were collected and submitted to a certified analytical laboratory for asbestos analysis by polarized light microscopy (PLM) using stop positive methodology. Confirmatory analysis of some samples by transmission electron microscopy (TEM) was conducted as required. The survey effort involved the collection of the following samples, resulting in the following conclusions:
Forty (40) bulk samples for suspect ACM were collected in this building.
Based on laboratory analysis of suspect ACM, none of the collected samples contained asbestos greater than
1%.
The Asbestos Survey was comprised of three primary project tasks including:
Evaluation of previous survey data (if available) and existing site conditions and formulation of the sampling plan.
Site survey to collect building material samples for laboratory analysis and reporting.
Interpretation of laboratory data and development of this Asbestos Survey Report.
This project deliverable is supported by a series of tables and appendices that are embedded within this report, or provided as attachments.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC and observations made by the Mabbett team at the time of the survey, Building 76 is the Boiler Plant which is a two-level structure on a concrete foundation with a built up roof. The building was reportedly built in 1922 and occupies approximately 4,582 square feet.
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
The Mabbett team performed a physical U.S. Environmental Protection Agency (EPA) Asbestos Hazard and Emergency Response Act (AHERA) type inspection and sampling of suspect materials as required by EPA Asbestos Hazard Emergency Response Act (AHERA) regulations (i.e. 40 CFR 763), OSHA Asbestos Standards (i.e. 29 CFR
1910.1001 & 29 CFR 1926.1101) and the VHA Asbestos Management Directive (VHA Directive 7714).
The Walla Walla VAMC provided Mabbett with two historical asbestos inspection reports for asbestos surveys that were previously conducted at the facility. The first survey was conducted by Environmental Health Sciences, Inc. in October 1989. The second survey, which was limited in scope, was conducted by Blue Mountain Environmental & Consulting, Inc. in December 2003. These reports were reviewed by the Mabbett team prior to performing inspection activities. In some instances, ACM identified by the previous surveys was confirmed by Mabbett, reassessed and included in this Asbestos Survey Report.
A visual screening inspection was conducted to identify locations of suspect ACM throughout identified areas of the building by Asbestos Hazard and Emergency Response Act (AHERA) trained and accredited asbestos inspectors. Only
© 2019, Mabbett & Associates, Inc. 2 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 76\Building 76 Walla Walla VAMC - Final Rev 1.doc areas that were accessible during the field work phase were inspected. Every effort was made during the initial field survey work to access areas as necessary to complete the survey.
General areas that were inaccessible or where the survey was limited to visual observation only are identified below:
• Within walls • Within fire doors
• Enclosed pipe/duct chases •Inside mechanical equipment/ductwork
• Above fixed drywall or plaster ceilings without access panels
Due to these access restrictions, comprehensive pre-demolition ACM surveys should be performed prior to any proposed renovations or maintenance involving inaccessible areas. Roofing materials were not sampled in order to maintain applicable warranties.
Bulk samples were collected of suspect ACM in accordance with AHERA and conducted according to the following sampling plan:
a) Surfacing material:
a. At least three bulk samples were collected from each homogeneous area that is 1,000 ft2 or less.
b. At least five bulk samples were collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.
c. At least seven bulk samples were collected from each homogeneous area that is greater than 5,000 ft2.
b) Thermal system insulation:
a. At least three bulk samples were collected from each homogeneous area of thermal system insulation.
b. At least one bulk sample was collected from each homogeneous area of patched area of thermal system insulation.
c. Sufficient samples were collected from elbows and fittings to determine if they contain ACM.
d. Bulk samples were not collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.
c) Miscellaneous material:
a. At least one bulk sample was collected from each homogeneous area that is less than 100 ft2.
b. At least two bulk samples were collected from each homogeneous area that is greater than 100 ft2.
3.2 Analytical Methodology
The collected bulk samples were submitted under chain of custody procedures to ProScience of Woburn, MA.
ProScience is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200090-0). Bulk samples were analyzed with polarized light microscopy (PLM) using EPA Method 600/R-93/116.
Bulk sample results are summarized in Table 2 – Summary of ACM Sampling Results and included as Appendix A. The EPA and the Occupational Safety and Health Administration (OSHA) defines any material that contains greater than one percent (>1%) asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive
© 2019, Mabbett & Associates, Inc. 3 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 76\Building 76 Walla Walla VAMC - Final Rev 1.doc for asbestos that met the regulatory criteria of greater than or equal to one percent (≥1%) asbestos. Laboratory reports and the chain of custodies are provided in Appendix B of this report.
3.3 Summary of Asbestos Containing Materials (ACM) Findings
Mabbett sampled fourteen (14) types of homogenous materials and collected forty (40) representative bulk ACM samples. All forty (40) samples were analyzed by PLM. The current and historical laboratory analytical data indicated that none of the homogenous materials had greater than 1% asbestos and were ACM or PACM. Estimated quantities of materials identified as ACM or PACM are presented in Table 1 below:
3.3.1 Drawings
The location of each collected bulk sample and its sample ID is shown on the drawings in the Figures Section of this report. Each positive ACM sample location is marked with an asterisk (*), while positive stops are marked with two asterisks (**). Collected bulk samples that were not positive are identified solely by the sample ID.
4.0 LIMITATIONS
This survey report is the result of both a qualitative (visual inspection) and quantitative assessment of potential ACM in Building 76 at the Walla Walla VAMC. Although a comprehensive inspection was performed with the majority of the building accessed for evaluation and sampling purposes, Mabbett does not claim to have identified all of the materials that may be present at/in the facility due to limitations. Only accessible and authorized areas/materials were included in this survey. Mabbett has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. Mabbett makes no assurances that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.
5.0 CLOSING REMARKS
Prior to initiating plans for maintenance activities, the Walla Walla VAMC should review the asbestos survey results to determine whether any of the materials identified as ACM will be disturbed by proposed work activities. This report may not be used as a renovation/demolition Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) type inspection report. Prior to any renovation/demolition activities, a full destructive asbestos inspection of the work area, including any previously inaccessible or unsampled materials that might be impacted, must be conducted.
The purpose of this ACM survey was to identify ACM in Building 76 within the limitations of the survey for worker protection purposes and for future renovation planning. In regard to asbestos, any suspect material encountered during maintenance activities that is not identified in this report as being non-ACM should be assumed to be ACM unless laboratory analytical data for bulk samples prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, and that accordingly was not inspected, Table 1 Summary of ACM
Building 76 Walla Walla VAMC
Sample / Homogeneous
Area No.
Location Description of Material
Percent and Type of
Asbestos
Estimated Quantity Material Type Condition
Amount Units
No ACM Identified.
© 2019, Mabbett & Associates, Inc. 4 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 76\Building 76 Walla Walla VAMC - Final Rev 1.doc should be assumed to contain asbestos if discovered until otherwise verified, as previously described. If ACM will be disturbed, the ACM must be removed by a licensed asbestos abatement contractor and be performed in accordance with applicable regulations. If proposed work activities will not disturb intact ACM, continuous monitoring of ACM should be conducted throughout work activities to ensure the ACM remains in an intact condition. Additionally, prior to commencing work activities, all personnel involved should be made aware of the location of known ACM within the building in which they will be working.
© 2019, Mabbett & Associates, Inc. FIGURES June 2019 Project No. R2019002.000.001 Building 76 Walla Walla VAMC - Final Rev 1.doc
FIGURES
76-01C
76-02A 76-02B 76-02C
76-01A
76-01B
76-09A 76-09B
76-03A 76-03B 76-04A 76-04B
76-06A 76-06B 76-06C
76-07A 76-07B
76-05A 76-05B 76-05C
76-08A 76-08B
76-12C
76-14A 76-14B 76-14C
76-08C 76-10A 76-10B 76-10C 76-11A 76-11B 76-11C 76-12A 76-12B
76-13A 76-13B 76-13C
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
COMPREHENSIVE BASELINE
ASBESTOS SURVEY
WALLA WALLA, WA
687-19-105 AE
APPROVED: PROJECT DIRECTOR
JUNE, 2019
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
RECORD DRAWINGS
DWG. OF
GENERAL NOTES:
1. DRAWINGS DO NOT CLAIM TO IDENTIFY ASBESTOS CONTAINING MATERIAL
PRESENT IN THE BUILDING AND SHOULD NOT BE THE BASIS FOR IDENTIFYING
ACM FOR FUTURE RENOVATION OR DEMOLITION PROJECTS, ABATEMENT
SPECIFICATIONS, ETC. THIS SURVEY DOES NOT MEET THE REQUIREMENTS OF A
PRE-RENOVATION NESHAP SURVEY. MABBETT'S SURVEY WAS PERFORMED
WITH LIMITATIONS INHERENT TO NON-DESTRUCTIVE VISUAL INSPECTIONS IN
OCCUPIED SPACES. ANY SUSPECT MATERIAL ENCOUNTERED DURING
RENOVATION/DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD
BE ASSUMED TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.
LEGEND:
1,2
25*
25(TEM)
25**
APPROXIMATE SAMPLE LOCATION
SAMPLE GREATER THAN 1% ASBESTOS
SAMPLE GREATER THAN 1% ASBESTOS (TEM)
STOP POSITIVE SAMPLE FOR ASBESTOS
NO ASBESTOS DETECTED (NAD)
BUILDING 76
1ST FLOOR
76-101
WBRMFD
0'
SCALE: 1/4" = 1'-0"
8'4'2'
AutoCAD SHX Text 101C
AutoCAD SHX Text
AutoCAD SHX Text 101A
AutoCAD SHX Text 101B
AutoCAD SHX Text 101D
AutoCAD SHX Text 101E
AutoCAD SHX Text
DN
AutoCAD SHX Text 101F
AutoCAD SHX Text
DN
AutoCAD SHX Text 101G
AutoCAD SHX Text
UP
AutoCAD SHX Text N
© 2019, Mabbett & Associates, Inc. APPENDIX A June 2019
’S TEMPLATE
APPENDIX A
Table 2 Summary of ACM Sampling Results
© 2019, Mabbett & Associates, Inc. Appendix A Page 1 of 1 June 2019
Table 2
Summary of ACM Sampling Results Building 76
Walla Walla VAMC Sample
No. Sample Location Description of Material Percent and Type of Asbestos
76-01A Room 101 Textured over Concrete NAD 76-01B Room 101A Textured over Concrete NAD 76-01C Room 101A Textured over Concrete NAD 76-02A Room 101A Seam Caulk NAD 76-02B Room 101A Seam Caulk NAD 76-02C Room 101A Seam Caulk NAD 76-03A Room 101C 4" Grey Cove Base Adhesive Type 1 (Front Layer) NAD 76-03B Room 101C 4" Grey Cove Base Adhesive Type 1 (Front Layer) NAD 76-04A Room 101C 4" Tan Cove Base Adhesive Type 2 (Back Layer) NAD 76-04B Room 101C 4" Tan Cove Base Adhesive Type 2 (Back Layer) NAD 76-05A Room 101C Joint Compound NAD 76-05B Room 101C Joint Compound NAD 76-05C Room 101C Joint Compound NAD 76-06A Room 101C Gypsum Wallboard NAD 76-06B Room 101C Gypsum Wallboard NAD 76-06C Room 101C Gypsum Wallboard NAD 76-07A Room 101C Texture over Concrete NAD 76-07B Room 101C Texture over Concrete NAD 76-08A Room 101E Texture over Concrete Interior of Window NAD 76-08B Room 101E Texture over Concrete Interior of Window NAD 76-08C Room 101E Texture over Concrete Interior of Window NAD 76-09A Room 101C 12"x12" Green Floor Tile NAD 76-09B Room 101C 12"x12" Green Floor Tile NAD
76-09A.1 Room 101C Gold Mastic assoc. w/12"x12" Green Floor Tile NAD 76-09B.1 Room 101C Gold Mastic assoc. w/12"x12" Green Floor Tile NAD 76-10A Room 101E Mastic at Rear Opening of Boiler #3 NAD 76-10B Room 101E Mastic at Rear Opening of Boiler #3 NAD 76-10C Room 101E Mastic at Rear Opening of Boiler #3 NAD 76-11A Room 101E Brick at Rear Opening of Boiler #3 NAD 76-11B Room 101E Brick at Rear Opening of Boiler #3 NAD 76-11C Room 101E Brick at Rear Opening of Boiler #3 NAD 76-12A Room 101E Ribbed Gasket at Rear Opening of Boiler #3 NAD 76-12B Room 101E Ribbed Gasket at Rear Opening of Boiler #3 NAD 76-12C Room 101E Ribbed Gasket at Front Opening of Boiler #3 NAD 76-13A Room 101G Tank Insulation NAD 76-13B Room 101G Tank Insulation NAD 76-13C Room 101G Tank Insulation NAD 76-14A Exterior Window Caulk NAD 76-14B Exterior Window Caulk NAD 76-14C Exterior Window Caulk NAD
Notes:
NAD = No Asbestos Detected
© 2019, Mabbett & Associates, Inc. APPENDIX B June 2019
APPENDIX B
Laboratory Analytical Results and Chain of Custody
| 1.0 INTRODUCTION |
| 2.0 BUILDING DESCRIPTION |
| 3.0 ASBESTOS SURVEY |
| 3.1 Sampling Methodology |
| 3.2 Analytical Methodology |
| 3.3 Summary of Asbestos Containing Materials (ACM) Findings |
| 3.3.1 Drawings |
| 4.0 LIMITATIONS |
| 5.0 CLOSING REMARKS |
| Figure 1 - B76 June.pdf |
| Sheets and Views |
| VAWA BUILDING 76 - 1ST FLOOR-Layout1 |
File details come from the government source that posted it. Updated .