Attachment 10 - RFI Questions P0008.docx
DOCX document 64 KB Posted
- Attached to
- 687-23-101 CON Repair Exterior Features Federal contract opportunity
- Solicitation number
- 36C26026R0033
About this file
This is a Technical Questions and Responses Tracking Sheet for Solicitation 36C26026R0033, which addresses contractor inquiries regarding the Repair Exterior Features project at a VA facility in Walla Walla. The document contains three key clarifications issued by the VA in response to contractor questions about scope and specifications.
The VA's responses clarify critical scope modifications and design intent: Buildings T1 and T2 have been removed entirely from the scope of work, and all references to those buildings should be disregarded. Regarding window repairs on buildings such as B031, the VA confirmed that if paint is not explicitly called out in the notes, contractors should not bid paint costs; however, repairs to wood and putty work are expected to be painted to match existing conditions without requiring full repainting. For missing detail sheets 112-A-500 and 113-A-500, the VA consolidated all relevant details into sheets G-500 through G-504, which should be referenced instead. These clarifications were issued under Amendment 0007 and 0008, with the proposal due date extended to March 9, 2026, at 8:00 AM.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS AND
SOLICITATION #:
| RESPONSES TRACKING SHEET #2 |
| PROJECT TITLE: |
| Repair Exterior Features – Walla Walla |
| # |
| CONTRACTOR QUESTION |
| VA RESPONSE |
| 1 |
| Building T1-T2 demolition keynote 43D on sheet T1-T2-A-200 states, “Patch and Restucco Entire Building. Paint New Stucco Patches to Match Existing.” |
0. Is the new stucco to be integrally colored, which does not require painting?
0. Would there be any need to paint new stucco patches if the entire building is to receive new stucco?
BUILDINGS T1 AND T2 HAVE BEEN REMOVED FROM THE SCOPE OF WORK. DISREGARD SHEETS T1-T2-
| 2 |
| Some of the plans reference work to be performed on the existing windows but does not call out for paint. Are we to figure that these windows such as on B031 are to only be cleaned and repaired and not receive paint? |
| ASSUME NOTES ARE CORRECT. IF PAINT IS NOT CALLED FOR DO NOT BID PAINT. “REPAIRS” OF WOOD, PUTTY ETC. ARE EXPECTED TO BE PAINTED TO MATCH EXISTING. BUT DO NOT REQUIRE FULL RE-PAINT. |
| 3 |
| 1. The drawings seem to be missing the following sheets: |
· 112-A-500 Details
· 113-A-500 Details Please provide these missing sheets.
ALL RELEVANT DETAILS HAVE BEEN CONSOLIDATED TO SHEETS G-500, G-501, G-502, G-503, G-504. DIREGARD MISSING SHEET IN DRAWING INDEX.
image1.jpeg
File details come from the government source that posted it. Updated .