Attachment 10 - RFI Questions P0008.docx

DOCX document 64 KB Posted

Attached to
687-23-101 CON Repair Exterior Features Federal contract opportunity
Solicitation number
36C26026R0033
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This is a Technical Questions and Responses Tracking Sheet for Solicitation 36C26026R0033, which addresses contractor inquiries regarding the Repair Exterior Features project at a VA facility in Walla Walla. The document contains three key clarifications issued by the VA in response to contractor questions about scope and specifications.

The VA's responses clarify critical scope modifications and design intent: Buildings T1 and T2 have been removed entirely from the scope of work, and all references to those buildings should be disregarded. Regarding window repairs on buildings such as B031, the VA confirmed that if paint is not explicitly called out in the notes, contractors should not bid paint costs; however, repairs to wood and putty work are expected to be painted to match existing conditions without requiring full repainting. For missing detail sheets 112-A-500 and 113-A-500, the VA consolidated all relevant details into sheets G-500 through G-504, which should be referenced instead. These clarifications were issued under Amendment 0007 and 0008, with the proposal due date extended to March 9, 2026, at 8:00 AM.

View the file

Other files for this federal contract opportunity

Other files attached to 687-23-101 CON Repair Exterior Features, newest first.
File Type Posted
36C26026R0033 0009.pdf PDF
36C26026R0033 0008.docx DOCX document
Attachment 4 - 687-23-101_100__COMPLETE_DRAWING_SET_VA REDLI.pdf PDF
Attachment 2 - SPECS VOL 1 Rev 1 Less T1 and T2.pdf PDF
Attachment 12 - Asbestos Survey - Building 48 - Final Rev 1.pdf PDF
Attachment 15 - Asbestos Survey - Building 65 - Final Rev 1.pdf PDF
Attachment 22 - Asbestos Survey - Building 120 - Final Rev 1.pdf PDF
Attachment 23 - Asbestos Survey - Building T1 - Final Rev 1.pdf PDF
Attachment 26 - Exterior Building Lead Condition-Presence-Absence.pdf PDF
Attachment 14 - Asbestos Survey - Building 63 - Final Rev 1.pdf PDF
Attachment 18 - Asbestos Survey - Building 81 - Final Rev 1.pdf PDF
Attachment 24 - Asbestos Survey - Building T2 - Final Rev 1.pdf PDF
Attachment 28 - RFI and Responses 687-23-101.xlsx XLSX spreadsheet
36C26026R0033 0007.pdf PDF
Attachment 10 - Asbestos Survey - Building 31 - Final Rev 1.pdf PDF
Attachment 11 - Asbestos Survey - Building 41 - Final Rev 1.pdf PDF
Attachment 13 - Asbestos Survey - Building 49 - Final Rev 1.pdf PDF
Attachment 16 - Asbestos Survey - Building 66 - Final Rev 1.pdf PDF
Attachment 19 - Asbestos Survey - Building 82 - Final Rev 1.pdf PDF
Attachment 20 - Asbestos Survey - Building 105 - Final Rev 1.pdf PDF
Attachment 21 - Asbestos Survey - Building 107 - Final Rev 1.pdf PDF
Attachment 25 - Asbestos Survey - Building T7 - Final Rev 1.pdf PDF
Attachment 27 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 17 - Asbestos Survey - Building 76 - Final Rev 1.pdf PDF
Attachment 29 - Mobilization-Project-Areas.pdf PDF
36C26026R0033 0006.docx DOCX document
Site Visit 2nd Sheet.pdf PDF
36C26026R0033 0005.docx DOCX document
Site Visit Sign-In Sheet - February 9 2026.jpg JPG image
36C26026R0033 0004.docx DOCX document
687-23-101_Repair_Exterior_Features_Geotech Memorandum.pdf PDF
687-23-101- 36C26026R0033 - Contractor Questions and Answers.pdf PDF
36C26026R0033 0003.docx DOCX document
36C26026R0033 0002.docx DOCX document
36C26026R0033 0002 pdf version Rev. 01.pdf PDF
36C26026R0033 0002 pdf version Rev. 01.pdf PDF
36C26026R0033 pdf version.pdf PDF
36C26026R0033 0001.docx DOCX document
Attachment 4 - COMPLETE_DRAWING_SET_VA REDLINES.pdf PDF
Attachment 3 - SPECS VOL 2 687-23-101 Exterior Repairs 01.26.2026.pdf PDF
Attachment 2 - SPECS VOL 1 687-23-101 Exterior Repairs 01.26.2026.pdf PDF
36C26026R0033.docx DOCX document
Attachment 8 - Contractor Rules of Behavior 687-23-101 Repair Exterior Features.pdf PDF
Attachment 7 - PPQ NCO 20 687-23-101.docx DOCX document
Attachment 5 - Divisional Price Breakout.xlsx XLSX spreadsheet
Attachment 9 - Wage Determination 1.23.2026.pdf PDF
Attachment 6 - Limitations on Subcontracting 687-23-101 Repair Exteriors.docx DOCX document
Attachment 1 - SOW CON Repair Exterior Features Rev 01.docx DOCX document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS AND

SOLICITATION #:

RESPONSES TRACKING SHEET #2
PROJECT TITLE:
Repair Exterior Features – Walla Walla
#
CONTRACTOR QUESTION
VA RESPONSE
1
Building T1-T2 demolition keynote 43D on sheet T1-T2-A-200 states, “Patch and Restucco Entire Building. Paint New Stucco Patches to Match Existing.”

0. Is the new stucco to be integrally colored, which does not require painting?

0. Would there be any need to paint new stucco patches if the entire building is to receive new stucco?

BUILDINGS T1 AND T2 HAVE BEEN REMOVED FROM THE SCOPE OF WORK. DISREGARD SHEETS T1-T2-

2
Some of the plans reference work to be performed on the existing windows but does not call out for paint. Are we to figure that these windows such as on B031 are to only be cleaned and repaired and not receive paint?
ASSUME NOTES ARE CORRECT. IF PAINT IS NOT CALLED FOR DO NOT BID PAINT. “REPAIRS” OF WOOD, PUTTY ETC. ARE EXPECTED TO BE PAINTED TO MATCH EXISTING. BUT DO NOT REQUIRE FULL RE-PAINT.
3
1. The drawings seem to be missing the following sheets:

· 112-A-500 Details

· 113-A-500 Details Please provide these missing sheets.

ALL RELEVANT DETAILS HAVE BEEN CONSOLIDATED TO SHEETS G-500, G-501, G-502, G-503, G-504. DIREGARD MISSING SHEET IN DRAWING INDEX.