Attachment 20 - Asbestos Survey - Building 105 - Final Rev 1.pdf

PDF 440 KB Posted

Attached to
687-23-101 CON Repair Exterior Features Federal contract opportunity
Solicitation number
36C26026R0033
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This is an Asbestos Survey Report for Building 105 at the Walla Walla VA Medical Center, prepared by Mabbett & Associates, Inc. under AES Contract Number VA201-1901.1 (Mabbett Proposal No. P2018292). The survey was conducted over two periods: February 11-15, 2019 and March 20-21, 2019 by AHERA-trained and accredited asbestos inspectors. Building 105 is identified as a Waste Storage Building, a one-story structure on a concrete slab foundation with a flat roof, reportedly constructed in 1944 and occupying approximately 150 square feet. The survey followed EPA AHERA regulations (40 CFR 763), OSHA Asbestos Standards (29 CFR 1910.1001 & 29 CFR 1926.1101), and the VHA Asbestos Management Directive (VHA Directive 7714).

The survey's primary finding is that no suspect asbestos-containing materials (ACM) were identified in Building 105, and therefore no bulk samples were collected for laboratory analysis. The report notes that historical surveys were previously conducted in October 1989 by Environmental Health Sciences, Inc. and in December 2003 by Blue Mountain Environmental & Consulting, Inc., which were reviewed during the assessment. The report identifies areas that were inaccessible during the inspection (within walls, enclosed pipe/duct chases, above fixed drywall or plaster ceilings, within fire doors, and inside mechanical equipment/ductwork) and recommends that comprehensive pre-demolition ACM surveys be performed prior to any proposed renovations or maintenance involving inaccessible areas. The report emphasizes that roofing materials were not sampled to maintain applicable warranties and advises that any suspect materials encountered during future maintenance activities not identified as non-ACM should be assumed to contain asbestos unless laboratory analysis proves otherwise.

View the file

Other files for this federal contract opportunity

Other files attached to 687-23-101 CON Repair Exterior Features, newest first.
File Type Posted
36C26026R0033 0009.pdf PDF
36C26026R0033 0008.docx DOCX document
Attachment 10 - RFI Questions P0008.docx DOCX document
Attachment 4 - 687-23-101_100__COMPLETE_DRAWING_SET_VA REDLI.pdf PDF
Attachment 2 - SPECS VOL 1 Rev 1 Less T1 and T2.pdf PDF
Attachment 10 - Asbestos Survey - Building 31 - Final Rev 1.pdf PDF
Attachment 11 - Asbestos Survey - Building 41 - Final Rev 1.pdf PDF
Attachment 13 - Asbestos Survey - Building 49 - Final Rev 1.pdf PDF
Attachment 16 - Asbestos Survey - Building 66 - Final Rev 1.pdf PDF
Attachment 19 - Asbestos Survey - Building 82 - Final Rev 1.pdf PDF
Attachment 21 - Asbestos Survey - Building 107 - Final Rev 1.pdf PDF
Attachment 25 - Asbestos Survey - Building T7 - Final Rev 1.pdf PDF
Attachment 27 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 12 - Asbestos Survey - Building 48 - Final Rev 1.pdf PDF
Attachment 15 - Asbestos Survey - Building 65 - Final Rev 1.pdf PDF
Attachment 22 - Asbestos Survey - Building 120 - Final Rev 1.pdf PDF
Attachment 23 - Asbestos Survey - Building T1 - Final Rev 1.pdf PDF
Attachment 26 - Exterior Building Lead Condition-Presence-Absence.pdf PDF
Attachment 14 - Asbestos Survey - Building 63 - Final Rev 1.pdf PDF
Attachment 18 - Asbestos Survey - Building 81 - Final Rev 1.pdf PDF
Attachment 24 - Asbestos Survey - Building T2 - Final Rev 1.pdf PDF
Attachment 28 - RFI and Responses 687-23-101.xlsx XLSX spreadsheet
36C26026R0033 0007.pdf PDF
Attachment 17 - Asbestos Survey - Building 76 - Final Rev 1.pdf PDF
Attachment 29 - Mobilization-Project-Areas.pdf PDF
36C26026R0033 0006.docx DOCX document
Site Visit 2nd Sheet.pdf PDF
Site Visit Sign-In Sheet - February 9 2026.jpg JPG image
36C26026R0033 0005.docx DOCX document
36C26026R0033 0004.docx DOCX document
687-23-101- 36C26026R0033 - Contractor Questions and Answers.pdf PDF
36C26026R0033 0003.docx DOCX document
687-23-101_Repair_Exterior_Features_Geotech Memorandum.pdf PDF
36C26026R0033 0002.docx DOCX document
36C26026R0033 0002 pdf version Rev. 01.pdf PDF
36C26026R0033 0002 pdf version Rev. 01.pdf PDF
36C26026R0033 pdf version.pdf PDF
36C26026R0033 0001.docx DOCX document
Attachment 5 - Divisional Price Breakout.xlsx XLSX spreadsheet
Attachment 4 - COMPLETE_DRAWING_SET_VA REDLINES.pdf PDF
Attachment 3 - SPECS VOL 2 687-23-101 Exterior Repairs 01.26.2026.pdf PDF
Attachment 2 - SPECS VOL 1 687-23-101 Exterior Repairs 01.26.2026.pdf PDF
36C26026R0033.docx DOCX document
Attachment 8 - Contractor Rules of Behavior 687-23-101 Repair Exterior Features.pdf PDF
Attachment 7 - PPQ NCO 20 687-23-101.docx DOCX document
Attachment 9 - Wage Determination 1.23.2026.pdf PDF
Attachment 6 - Limitations on Subcontracting 687-23-101 Repair Exteriors.docx DOCX document
Attachment 1 - SOW CON Repair Exterior Features Rev 01.docx DOCX document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIMA’S TEMPLATE

p

WALLA WALLA VA MEDICAL CENTER

ASBESTOS SURVEY REPORT

BUILDING 105

Mabbett Project No. R2019002.000.001 June 2019

Prepared for:

11031 S. Pikes Peak Drive, Suite 202 Parker, CO 80138 and

Walla Walla VA Medical Center 77 Wainwright Drive Walla Walla, WA 99362

Mabbett & Associates, Inc.

5 Alfred Circle Bedford, MA 01730-2318 T. 781-275-6050 Massachusetts | Virginia | Rhode Island | New Jersey www.mabbett.com

© 2019, Mabbett & Associates, Inc.

BUILDING 105 – ASBESTOS SURVEY REPORT

Walla Walla VA Medical Center | Walla Walla, WA

© 2019, Mabbett & Associates, Inc. i June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 105\Building 105 Walla Walla VAMC - Final Rev 1.doc

ACKNOWLEDGEMENT

This Asbestos Containing Material (ACM) Survey Report was prepared in accordance with an established scope of work as defined in the Mabbett Proposal No. P2018292 for AES Contract Number VA201-1901.1. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc.

(Mabbett®) during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.

This report was prepared by:

Kevin M. Donovan Environmental, Health and Safety Specialist

This report has been reviewed and approved by:

Michael F. Delaney Director, Building Sciences Group

© 2019, Mabbett & Associates, Inc. ii June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 105\Building 105 Walla Walla VAMC - Final Rev 1.doc

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION

2.0 BUILDING DESCRIPTION

3.0 ASBESTOS SURVEY

3.1 Sampling Methodology

3.2 Analytical Methodology

3.3 Summary of Asbestos Containing Materials (ACM) Findings

3.3.1 Drawings

4.0 LIMITATIONS

5.0 CLOSING REMARKS

TABLES

Table 1 – Summary of ACM (in text)

© 2019, Mabbett & Associates, Inc. 1 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 105\Building 105 Walla Walla VAMC - Final Rev 1.doc

1.0 INTRODUCTION

Mabbett and Associates, Inc. (Mabbett®) performed surveys for suspect asbestos containing materials (ACM) of selected buildings at the Walla Walla VA Medical Center (Walla Walla VAMC) located at 77 Wainwright Drive in Walla Walla, Washington, under AES Contract Number VA201-1901.1. This report presents results of the ACM survey conducted at Building 105. Site survey work was performed over two periods ranging from February 11, 2019 through February 15, 2019 and March 20, 2019 through March 21, 2019, by appropriately credentialed regulated building materials inspectors. Bulk samples of suspected ACM were collected and submitted to a certified analytical laboratory for asbestos analysis by polarized light microscopy (PLM) using stop positive methodology. Confirmatory analysis of some samples by transmission electron microscopy (TEM) was conducted as required. The survey effort involved the collection of the following samples, resulting in the following conclusions:

Suspect ACM was not identified and not sampled in the building.

The Asbestos Survey was comprised of three primary project tasks including:

Evaluation of previous survey data (if available) and existing site conditions and formulation of the sampling plan.

Site survey to collect building material samples for laboratory analysis and reporting.

Interpretation of laboratory data and development of this Asbestos Survey Report.

This project deliverable is supported by a series of tables and appendices that are embedded within this report, or provided as attachments.

2.0 BUILDING DESCRIPTION

According to information provided by the VAMC and observations made by the Mabbett team at the time of the survey, Building 105 is the Waste Storage Building which is a one-story structure on a concrete slab foundation with a flat roof. The building was reportedly built in 1944 and occupies approximately 150 square feet.

3.0 ASBESTOS SURVEY

3.1 Sampling Methodology

The Mabbett team performed a physical U.S. Environmental Protection Agency (EPA) Asbestos Hazard and Emergency Response Act (AHERA) type inspection and sampling of suspect materials as required by EPA Asbestos Hazard Emergency Response Act (AHERA) regulations (i.e. 40 CFR 763), OSHA Asbestos Standards (i.e. 29 CFR

1910.1001 & 29 CFR 1926.1101) and the VHA Asbestos Management Directive (VHA Directive 7714).

The Walla Walla VAMC provided Mabbett with two historical asbestos inspection reports for asbestos surveys that were previously conducted at the facility. The first survey was conducted by Environmental Health Sciences, Inc. in October 1989. The second survey, which was limited in scope, was conducted by Blue Mountain Environmental & Consulting, Inc. in December 2003. These reports were reviewed by the Mabbett team prior to performing inspection activities. In some instances, ACM identified by the previous surveys was confirmed by Mabbett, reassessed and included in this Asbestos Survey Report.

A visual screening inspection was conducted to identify locations of suspect ACM throughout identified areas of the building by Asbestos Hazard and Emergency Response Act (AHERA) trained and accredited asbestos inspectors. Only areas that were accessible during the field work phase were inspected. Every effort was made during the initial field survey work to access areas as necessary to complete the survey.

General areas that were inaccessible or where the survey was limited to visual observation only are identified below:

© 2019, Mabbett & Associates, Inc. 2 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 105\Building 105 Walla Walla VAMC - Final Rev 1.doc

• Within walls • Within fire doors

• Enclosed pipe/duct chases •Inside mechanical equipment/ductwork

• Above fixed drywall or plaster ceilings without access panels

Due to these access restrictions, comprehensive pre-demolition ACM surveys should be performed prior to any proposed renovations or maintenance involving inaccessible areas. Roofing materials were not sampled in order to maintain applicable warranties.

Bulk samples were collected of suspect ACM in accordance with AHERA and conducted according to the following sampling plan:

a) Surfacing material:

a. At least three bulk samples were collected from each homogeneous area that is 1,000 ft2 or less.

b. At least five bulk samples were collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.

c. At least seven bulk samples were collected from each homogeneous area that is greater than 5,000 ft2.

b) Thermal system insulation:

a. At least three bulk samples were collected from each homogeneous area of thermal system insulation.

b. At least one bulk sample was collected from each homogeneous area of patched area of thermal system insulation.

c. Sufficient samples were collected from elbows and fittings to determine if they contain ACM.

d. Bulk samples were not collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.

c) Miscellaneous material:

a. At least one bulk sample was collected from each homogeneous area that is less than 100 ft2.

b. At least two bulk samples were collected from each homogeneous area that is greater than 100 ft2.

3.2 Analytical Methodology

Mabbett did not identify any suspect materials requiring sampling.

3.3 Summary of Asbestos Containing Materials (ACM) Findings

Mabbett did not identify any suspect materials in Building 105 and therefore did not collect any representative bulk ACM samples.

© 2019, Mabbett & Associates, Inc. 3 June 2019 Project No. R2019002.000.001 S:\ADMINA\2019002 Walla Walla VAMC\000\001\Bldg 105\Building 105 Walla Walla VAMC - Final Rev 1.doc

Table 1 Summary of ACM

Building 105 Walla Walla VAMC

Sample / Homogeneous

Area No.

Location Description of Material

Percent and Type of Asbestos

Estimated Quantity Material Type Condition

Amount Units

No ACM Identified.

3.3.1 Drawings

Suspect materials requiring sampling were not identified.

4.0 LIMITATIONS

This survey report is the result of both a qualitative (visual inspection) and quantitative assessment of potential ACM in Building 105 at the Walla Walla VAMC. Although a comprehensive inspection was performed with the majority of the building accessed for evaluation and sampling purposes, Mabbett does not claim to have identified all of the materials that may be present at/in the facility due to limitations. Only accessible and authorized areas/materials were included in this survey. Mabbett has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. Mabbett makes no assurances that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.

5.0 CLOSING REMARKS

Prior to initiating plans for maintenance activities, the Walla Walla VAMC should review the asbestos survey results to determine whether any of the materials identified as ACM will be disturbed by proposed work activities. This report may not be used as a renovation/demolition Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) type inspection report. Prior to any renovation/demolition activities, a full destructive asbestos inspection of the work area, including any previously inaccessible or unsampled materials that might be impacted, must be conducted.

The purpose of this ACM survey was to identify ACM in Building 105 within the limitations of the survey for worker protection purposes and for future renovation planning. In regard to asbestos, any suspect material encountered during maintenance activities that is not identified in this report as being non-ACM should be assumed to be ACM unless laboratory analytical data for bulk samples prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, and that accordingly was not inspected, should be assumed to contain asbestos if discovered until otherwise verified, as previously described. If ACM will be disturbed, the ACM must be removed by a licensed asbestos abatement contractor and be performed in accordance with applicable regulations. If proposed work activities will not disturb intact ACM, continuous monitoring of ACM should be conducted throughout work activities to ensure the ACM remains in an intact condition. Additionally, prior to commencing work activities, all personnel involved should be made aware of the location of known ACM within the building in which they will be working.

1.0 INTRODUCTION
2.0 BUILDING DESCRIPTION
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
3.2 Analytical Methodology
3.3 Summary of Asbestos Containing Materials (ACM) Findings
3.3.1 Drawings
4.0 LIMITATIONS
5.0 CLOSING REMARKS

File details come from the government source that posted it. Updated .