Attachment 26 - Exterior Building Lead Condition-Presence-Absence.pdf
PDF 2 MB Posted
- Attached to
- 687-23-101 CON Repair Exterior Features
- Solicitation number
- 36C26026R0033
About this file
This is a Lead-Based Paint (LBP) Survey Report for exterior components at the Jonathan M. Wainwright Memorial VA Medical Center in Walla Walla, Washington. The survey was conducted by MCS Environmental, Inc. on behalf of Zeck Butler Architects P.S. and covers 23 buildings (numbered 31, 40, 41, 47, 63, 65, 66, 76, 81, 82, 97, 99, 101, 105, 107, 109, 110, 111, 112, 113, 120, 129, and T-7). The field survey was performed July 12-13, 2006, with a follow-up visit on July 26, 2006, by certified EPA/Washington State Lead Risk Assessor Samuel W. Bailey Jr. (WA 0168).
The survey employed nondestructive X-ray fluorescence (XRF) testing using a Scitec MAP 4 analyzer, yielding 472 XRF assays with a 1.0 mg/cm² threshold for regulated lead-based paint classification. MCS collected 25 confirmatory paint scrape samples analyzed by EMSL Analytical using EPA method SW846-1311/7420. Results identified lead-containing coatings on wood walls, moldings, doors, frames, windows, soffits, fascia, and various metal components across multiple buildings, predominantly in poor condition and presenting lead hazards. Five bulk samples exceeded the Federal 0.5% weight standard: Building 31 yellow corner board molding (30.00% wt), Building 41 gray wood deck (1.20% wt), Building 63 brown metal handrail (8.80% wt), Building 65 brown wood door (17.00% wt), and Building 76 red metal post (1.10% wt). The report recommends TCLP sampling if LBP-coated components require removal and disposal, prohibits uncontained abrasive blasting and power sanding, and notes that Paint Film Stabilization constitutes interim control rather than permanent remediation.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEAD-BASED PAINT SURVEY
Exterior Components; Buildings 31, 40, 41, 47, 63, 65, 66, 76, 81, 82, 97, 99,101,105, 107,109,110,111,112,113,120,129 and T-7; Jonathan M. Wainwright Memorial VA
Medical Center; Walla Walla, Washington
SUMMARY
Mr. Bob Woods, representing Zeck Butler Architects P.S., contracted MCS Environmental, Inc.
(MCS), to perform a limited lead-based paint (LBP) survey of the exterior coated building components associated with buildings numbered 31, 40, 41, 47, 63, 65, 66, 76, 81, 82, 97, 99, 101, 105,107,109,110,111,112, 113,120, 129 andT-7 located on the property oftheJonathanM.
Wainwright Memorial VA Medical Center in Walla Walla, Washington.
Mr. Samuel W. Bailey Jr., certified EP NWashington State Lead Risk Assessor, certificate number:
WA 0168, expiration date: April 8, 2008 perfo1med a field survey of the strnctures on July 12 and
13, 2006 with a follow-up visit on July 26, 2006
The limited LBP survey consisted of the following:
• MCS used the Scitec [now EDAX®] MAP 4 X-ray fluorescence (XRF) spectrum analyzer, serial number M41256, for nondestructive sampling for suspect lead-based paints. MCS collected 472 XRF assays for this project and all paint films with lead concentrations of 1.0 mg/cm2 or greater were classified as regulated lead-based paints.
• MCS collected 25 representative paint scrape samples from select exterior paint films that either produced XRF results ofless than 1.0 mg/cm2 (0.5 % wt.) or were collected to confinn positive XRF results. Each bulk sample consisted of paint scraped from an area of at least 2 square inches. The samples were submitted using proper chain-of-custody procedures to
EMSL Analytical, Inc. of Westmont, New Jersey, for analysis by EPA method SW846-
1311/7420. The American Industrial Hygiene Association accredits the EMSL laboratory.
The paint associated with the following exterior components should be considered lead containing.
These painted components are potential lead hazards if disturbed. Contractors working on or around these materials should bl) informed of the lead content of the coating (paint).
Building Component Location
All Wood Walls and Corner Moldings All Sides of Building
All Wood Doors, Frames and Moldings All Sides of Building
August 8, 2006 S-1
Paint Condition
Poor
Poor
Lead Hazard
Yes
Yes
MCS Environmental, Inc.
All Wood Window Sashes, Sills & Moldings AU Sides of Building All Wood Soffits and Fascia Moldings All Sides of Building All Metal Electrical Conduit South Side of Building
BUILOING40{STORAGE)
Summarj ofLBF'2C!)ated ExteriiirCompon�nts
Bui/ding Component Location
All Wood Window Sashes and Moldings All Sides of Building All Wood Storm Windows All Sides of Building All Wood Door, Frame and Moldings West Side of Building All Wood Soffits and Fascia Moldings All Sides of Building
Poor Yes Poor Yes
Satisfactory No
Paint Lead Condition Hazard
Poor Yes Poor Yes Poor Yes Poor Yes
.•. '} 13lJIL..C>l('IC34-1(IVIAT$RIAI..STORAC3E)i•.
. •··•.·•.•··•·•····· i \ . ... {·.·· SiJ111rniry ht•1..�fl•C:()atf �····Ext�iior •. Co 111 pp11eni�i····<.·• .. ·.
Bui/ding Component Location Paint Lead Condition Hazard
All Wood Walls and Corner & Belt Moldings All Sides of Building Poor Yes All Wood Storm Windows, Sills & Moldings All Sides of Building Poor Yes All Wood Doors, Frames and Moldings All Sides of Building Poor Yes All Wood Soffits and Fascia Moldings All Sides of Building Poor Yes Wood Hand Railings South Side of Building Poor Yes
·•·•··•···•.•rrr•.·i· / ... i•.•·•·· .... •·••it Building Component Location Paint Lead
Condition Hazard
All Wood Doors, Frames and Moldings N & S Sides of Building Poor Yes All Wood Window Sashes, Sills & Moldings All Sides of Building Poor Yes All Wood Soffits and Fascia Moldings All Sides of Building Poor Yes
Bui/ding Component Location Paint Lead Condition Hazard
All Wood Walls and Corner Moldings All Sides of Building Overall Poor Yes All Wood Doors, Frames and Moldings All Sides of Building Poor Yes All Wood Window Sashes, Sills and Moldings All Sides of Building Poor Yes All Wood Storm Windows All Sides of Building Poor Yes All Wood Soffits and Fascia Moldings All Sides of Building Poor Yes All Metal Electrical Conduit South Side of Building Satisfactory No
August 8, 2006 S-2 MCS Environmental, Inc.
I
BUILDING 65 (CARPENIJ!:R & PAINT SHOP)
Summary ofLBP'.c:oated Exterior Compone�is.
Building Component Location
All Wood Walls and Corner Moldings All Sides of Building
Paint Condition
Poor All Wood Doors, Frames and Moldings All Sides of Building Overall Poor All Wood Soffits and Fascia Moldings All Sides of Building All Wood Window Sashes, Sills and Moldings All Sides of Building· Lattus Paneling East Side of Building
Poor Poor Poor.
Lead Hazard
Yes Yes Yes Yes Yes
·······.·I•.····•··•···••·•···?•(iI·.· )'.t•····•··•·.•·•·····
\ BQILDlr,lG 66 (LAUNDRY) . i.i.·•·. ·•.•·•.··.•.i.· .. ·· i < < \ · .. slimniiiry ofLsi>-cbated E�terior component� \... ·• < ... · •··. .• • .
Building Component Location
All Concrete Foundation Walls All Sides of Building Metal Electrical Conduit North Sides of Building All Metal Window Sashes and Moldings All Sides of Building All Metal Storm Windows All Sides of Building All Metal Hand-Railings N & E Sides of Building All Metal Posts S & W Sides of Building All Wood Soffits and Fascia Moldings All Sides of Building Wood & Metal Floors West Side of Building
Bui/ding Component Location
All Concrete Walls All Sides of Building Wood Door Frame North Side of Building All Metal Gutter Down-Pipe E & W Sides of Building All Concrete Windowsills E & W Sides of Building Metal Electrical Conduit East Side of Building
Building Component Location
All CMU Block Walls All Sides of Building Metal Door Frames North Side of Building All Metal Window Sashes All Sides of Building All Concrete Window Sills All Sides of Building
August 8, 2006 S-3
Paint Condition
Poor Poor
Overall Poor Poor Poor Poor Poor Poor.
Paint Condition
Poor Poor Poor Poor Poor
Paint Condition
Poor Poor Poor Poor
Lead Hazard
Yes Yes Yes Yes Yes Yes Yes Yes
Lead Hazard
Yes
Yes Yes Yes
Lead Hazard
Yes Yes Yes
MCS Environmental, Inc.
All Concrete Foundation Walls All Sides of Building Poor Metal Floor North Side of Building Poor Metal Electrical Conduit East Side of Building Poor
BUILDIN .. ·.�.·.·. 82 (ENGINEERING OFFICE & G.4.RAG. E .•. s.)
Building Component Location Paint
Condition
All Original CMU Block Walls All Sides of Building Poor All Original Concrete Foundation Walls All Sides of Building Poor All Window Sashes All Sides of Building Poor All Concrete Window Sills All Sides of Building Poor All Wood Soffiting and Fascia Molding All Sides of Building Poor Metal Piping East Side of Building Poor
.. · . ii•.·su1p::,j�<3 �!/(£:IGHT CARGARAGE)t·.>•··· ..•.•. · .. sumfniir{/'�fj.IE:i.R:Coatlicl•·E�eriorComprinii�ts'.'.•···•··>/
Bui/ding Component
All CMU Block Walls All Wood Doors, Frames and Moldings Metal Electrical Conduit All Wood Soffiting and Fascia Molding All Wood Window Sashes, Sills and Moldings
Bui/ding Component
Metal Door Frames Metal Door Wood Window Sash, Sill and Molding All Wood Soffiting and Fascia Molding Metal Floor
Bui/ding Component
Metal Window Sash All Wood Soffiting and Fascia Molding
Location
All Sides of Building North Side of Building North Side of Building.
All Sides of Building South Side of Building
Location
E & S Sides of Building South Side of Building South Side of Building All Sides of Building West Side of Building
Location
North Side of Building All Sides of Building
Paint Condition
Poor Poor Poor
· Poor Poor
Paint Condition
Satisfactory Satisfactory
Poor Poor Poor
Paint Condition
Satisfactory Poor
Yes Yes Yes
Lead Hazard
Yes Yes Yes Yes Yes Yes
Lead Hazard
Yes Yes Yes Yes Yes
Lead Hazard
No No
Yes Yes Yes
Lead Hazard
No
August 8, 2006 S-4 MCS Environmental, Inc.
I Wood Wall Vent I West Side of Building
. BUILD!NGfOSJWASTE STORAGE) ..
�Ul11t11aiy of Lsfcpatecl Exter.ior Components
Building Component Location
Ali Piaster Walls All Sides of Building Wood Window Sash, Sill and Molding E & W Side of Building All Wood Soffiting and Fascia Molding All Sides of Building All Plaster Window Sills E & W Side of Building
Poor
Paint Condition
Poor Poor Poor Poor
I I?\;;·•••/·· .. •··.•• •· .. •·•·•.• . iii( •·••su1Lo1Nd Woii�roRAc;1f13u1Lo1NGJ••·•··· · .. >
··.shmi\,itcybtCsp;cbiti:ecl•.Elcte·r10r·co111pohehts·••·•·•.••, _ :_._-__ ·-:-·-- .: .. _,-_-- ·=--= :·:- ..... - •·:-:-:-·_. _.- .·•:, · ·.·-: ,-,- _, ..... _ .. ',,•:·, .. -
Building Component Location Paint
Condition
Metal Piping North Side of Building Satisfactory All Metal Window Sashes N, E & S Sides of Bldg. Overall Poor All Metal Hand-Railing N, E &S Sides of Bldg. Poor All Metal Doors and Frames N & W Side of Building Poor Wood Door East Side of Building Poor Metal Electrical Conduit South Side of Building Poor Metal Corner Moldings West Side of Building Poor Wood Floor Bang Board West Side of Building Poor
'\.· t 13UILDINGj 11 JTRA,NSFQRMER,]• EMERGENCY G�NERATOR)··•··· T. ;s��'.n\irycittijRl§§.iteil 1=;JeVi&(coinp§11e�tf •.· ·· .•
Building Component
Metal Door Frame
Building Component
All Wood Walls and Corner Moldings All Wood Window Sash, Sill and Molding All Wood Soffiting and Fascia Molding All Wood Doors, Frames and Moldings
Location
South Side of Building
Location
All Sides of Building N, E & W Sides of Bldg.
All S.ides of Building E, S & W Sides of Bldg.
Paint Condition
Satisfactory
Paint Condition
Poor Poor Poor Poor
Yes
Lead Hazard
Yes Yes Yes Yes
Lead Hazard
No Yes Yes Yes Yes Yes Yes Yes
Lead Hazard
No
Lead Hazard
Yes Yes Yes Yes
August 8, 2006 S-5 MCS Environmental, Inc.
s __ · ... • u1i.p1NG 129 <�M�ijhENC'f .RC>Wek GENEl'¼tC>�J 6 ·· ..
Building Component
All Wood Soffiting and Fascia Molding
Metal Wall Vents
Building Component
All Wood Window Sashes, Sills & Moldings
All Wood Storm Windows
All Wood Soffiting and Fascia Molding
All Wood Door Frames and Moldings
Wood Door
Wood Hand-Railing and Beams
All Concrete Foundation Walls
Wood Posts
Metal Piping
Location
All Sides of Building
West Side of Building
Location
All Sides of Building
All Sides of Building
All Sides of Building
E & W Sides of Building
West Side of Building
E & W Sides of Building
All Sides of Building
West Side of Building
South Side of Building
Paint Condition
Poor
Poor
Paint Condition
Poor
Poor
Poor
Poor
Poor
Poor
Poor
Poor
Poor
Lead Hazard
Yes
Yes
Lead Hazard
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Building included in this limited lead based paint survey, that are not listed in the aforementioned tables did not produce lead in coatings by XRF testing.
Components in satisfactory condition do not constitute lead hazards at the time of this survey.
However, lead hazards could emerge if paint deteriorates or is disturbed by demolition activities.
The HUD action limit for the presence oflead by bulk paint chip analysis is 0.5 percent by weight
(%wt.). Confirmatory paint chip samples were collected from components that had negative or positive XRF assay results. The results of the confitmation bulk paint chip samples are listed as.
follows:
1. Bldg. 31- Yellow Corner Board Molding 30.00 ¾wt
2. Bldg. 31-Brown Wood Door Molding 0.05 %wt
3. Bldg. 41 - Yellow Wood Door Threshold <0.01 %wt
4. Bldg. 41 -Brown Metal Garage Door <0.01 %wt
5. Bldg. 41- Gray Wood Deck 1.20 ¾wt
6. Bldg. 63 - Brown Metal Handrail 8.80 ¾wt
7. Bldg. 63 - Brown Wood Door Molding 0.05 %wt
8. Bldg. 65- Brown Wood Door 17.00 ¾wt
9. Bldg. 65 - Gray CMU Block Foundation 0.02 %wt
10. Bldg. 65 - Brown Metal Garage Door 0.23 %wt
August 8, 2006 S-6 MCS Environmental, Inc.
I 1
11. Bldg. 107 - Gray Concrete Foundation
12. Bldg. 66 - Black Metal Handrail
13. Bldg. 66- Gray Concrete Floor
14. Bldg. 76 - Gray Concrete Floor
15. Bldg. 76- Brown Metal Handrail
16. Bldg. 76 - Red Metal Post
17. Bldg. 81 - Black Metal Handrail
1.8. Bldg. 82- Yellow CMU Block Wall (NEW)
19. Bldg. 82 - Brown Metal Door/Handrail
20. Bldg. T7 - Gray Wood Floor
21. Bldg. T7 - Gray Concrete Foundation
22. Bldg. 47 - Gray Concrete Foundation
23. Bldg. 101- Yellow wood Soffit/Fascia
24. Bldg. 111 - Yellow Coated Wood Handrail
25. Bldg. 111 - Yellow Metal Door
Note: I ¾wt = 10,000 paits per million.
<0.03 ¾wt
0.01 ¾wt
<0.01 ¾wt
0.09 ¾wt
0.03 ¾wt
1.10 %wt
0.02 ¾wt
0.31 ¾wt 0.04%wt
<0.01 ¾wt
0.26 ¾wt
0.28 ¾wt
0.22 ¾wt
<0.01 ¾wt
0.01 ¾wt
The results of the bulk paint chip samples numbered 1, 5, 6, 8 and 16 all exceed the Federal definition for lead based paint and are considered regulated LBPs. The results for samples 1 and 8 were for verification of positive XRF results however, the results for 5, 6 and 16 were collected to verify negative XRF results and resulted in positive analysis.
It is possible that the sample location sites for the XRF assays and bulk paint scrape samples differ, but the testing was conducted on the same components with the same appearance and most likely, were in-fact not the same coatings.
MCS understands that the structures included in this limited LBP survey will be repainted and that loose and flaking paint will be impacted and unrepairable deteriorated sub-straight components might be replaced. Paint Film Stabilization is considered an interim control activity to manage existing lead based paint hazards and not a permanent removal technique.
At the request of the owner MCS did not collect any TCLP (toxic characterization leaching procedure) waste stream characterization samples. The owner stated that they would prefer that the established general contractor would determine any wastes and perform their own characterization sampling.
If however the remediation painting contractor needs to remove and dispose of any LBP coated building components identified in this survey, TCLP sampling and analysis is required to determine if the demolition waste stream can be disposed of as standard construction debris or hazardous .
waste.
August 8, 2006 S-7 MCS Environmental, Inc.
If the analytical results of the TCLP samples collected for this project are below the Hazardous Waste Classification threshold limit of 5 ppm (parts per million) or 5 mg/I (milligrams per liter), the waste stream can be classified as Category I Low Lead Waste and can be disposed ofin a landfill that accepts standard construction debris as per the requirements of 40 CFR Part 261 and WAC 173- 303-110( 5) for the determination of waste characterization. If the TCLP waste stream sample results fail the threshold limit the waste stream must be disposed of as hazardous lead waste.
The following methods are prohibited when implementing interim lead hazard control measures:
uncontained abrasive, sand, or water blasting; power sanding; or open flame burning of lead-based paint coated surfaces.
It should be noted that if building components that contain lead or are coated with lead based paint and are to be recycled or reclaimed for reuse, the waste disposal criteria is not required for those specific components or materials, however MCS strongly recommends that if recycling is a course of action full disclosure and documentation with the recycling firm should be conducted and documented.
For information concerning lead-based paint and the health effects of lead, contact the
National Lead Information Clearing House at 1-800-424 Lead.
AugustS,2006 S-8 MCS Environmental, Inc.